CN103741696A - 一种加竖向围檩的内支撑体系 - Google Patents

一种加竖向围檩的内支撑体系 Download PDF

Info

Publication number
CN103741696A
CN103741696A CN201310715883.XA CN201310715883A CN103741696A CN 103741696 A CN103741696 A CN 103741696A CN 201310715883 A CN201310715883 A CN 201310715883A CN 103741696 A CN103741696 A CN 103741696A
Authority
CN
China
Prior art keywords
diaphragm wall
construction
purlin
excavation
support system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310715883.XA
Other languages
English (en)
Inventor
吴其琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi University of Science and Technology
Original Assignee
Guangxi University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi University of Science and Technology filed Critical Guangxi University of Science and Technology
Priority to CN201310715883.XA priority Critical patent/CN103741696A/zh
Publication of CN103741696A publication Critical patent/CN103741696A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

一种加竖向围檩的内支撑体系,其施工步骤如下:⑴根据基坑的平面布置图,设计支撑布置图,在靠基坑的内侧施工竖向围檩,竖向围檩采用方形或矩形截面,尺寸根据计算确定,入土深度不少于基坑深度;⑵在靠近基坑内侧支撑的位置预埋一钢板,便于与支撑的连接;⑶保证竖向围檩的垂直度,不妨碍地下连续墙的施工;⑷施工连续墙的厚度、入土深度和配筋参数由计算确定;⑸按土方开挖,分层开挖,每开挖到需设置支撑的位置,立即设置支撑,同时施加预应力;⑹分步开挖一直到坑底。其优点是:加快施工进度,改善劳动条件,保证施工质量;合理地调整地下连续墙内力分布,能减少地连墙弯矩峰值;能有效的控制地连墙水平位移,保证围护结构的稳定。

Description

一种加竖向围檩的内支撑体系
技术领域
本发明涉及一种加竖向围檩的内支撑体系,属于建筑领域。
背景技术
地下连续墙围护结构加内支撑支护体系是基坑工程,特别是软土地区一种常用的支护体系。地下连续墙不仅可以起到挡土和防渗的作用,同时也可作为主体结构的侧墙使用。而对于较深的基坑,往往需要增加内部支撑(如图1所示),作用在围护结构上的水土压力可以由内支撑有效的传递和平衡,整个体系构造简单,受力明确。在整个围护体系中,围檩是协调支撑和围护墙结构间受力与变形的重要受力构件,其可加强围护墙的整体性,并将其所受的水平力传递给支撑构件;水平支撑是平衡围护墙外侧水平作用力的主要构件,要求传力直接、平面刚度好而且分布均匀。
   上述常规的支撑体系也有很明显的缺点:
1.横向围檩的施工较麻烦,影响施工进度。
2.每道横向围檩施加一道支撑,所以整个连续墙剖面上支点数量少,对控制连续梁截面内力(弯矩和剪力)以及连续墙的水平位移不利。因此,需要一种采用竖向围檩的内支撑体系。
发明内容
本发明的目的是要提出一种加竖向围檩的内支撑体系,这种围檩的内支撑体系,具有加快施工进度,改善劳动条件,而且能较好的保证施工质量的特点。能合理地调整地下连续墙内力分布;特别是能较大程度地减少地连墙弯矩峰值;能有效的控制地连墙水平位移,保证围护结构的稳定。
本发明的技术方案是, 一种加竖向围檩的内支撑体系,其施工步骤如下:
⑴根据基坑的平面布置图,设计支撑布置图,在连续墙靠基坑的内侧施工竖向围檩,竖向围檩采用方形或矩形截面,具体尺寸根据计算确定,入土深度不少于基坑深度;
⑵在靠近基坑内侧支撑的位置预埋一钢板,便于以后与支撑的连接;
⑶此工序要保证竖向围檩的垂直度,不妨碍地下连续墙的施工;
⑷施工地下连续墙,连续墙的厚度、入土深度和配筋等参数由计算确定;
⑸按土方开挖方案分层开挖,每开挖到需设置支撑的位置,立即设置支撑,同时施加预应力;
⑹分步开挖一直到坑底。
加竖向围檩的内支撑体系的优点:
①   加快施工进度,改善劳动条件,而且能较好的保证施工质量。
②能合理地调整地下连续墙内力分布,特别能较大程度减少地连墙弯矩峰值。
③能有效的控制地连墙水平位移,保证围护结构的稳定。
附图说明
附图用来对发明作进一步解释和说明,但并不限制本发明。
图1是现有地下连续墙围护结构加内支撑体系的布置平面图。
图2是现有地下连续墙围护结构加内支撑体系布置剖面图。
图3是本发明的一种加竖向围檩的内支撑体系布置平面图。
图4是本发明的一种加竖向围檩的内支撑体系布置剖面图。
图中:1-横向围檩, 2-立柱,   3-支撑, 4-冠梁,5-地下连续墙,6-竖向围檩。
具体实施方式
以下结合附图对本发明作进一步说明,图3是本发明的一种加竖向围檩的内支撑体系布置平面图。图4是剖面图。从附图可看出,一种加竖向围檩的内支撑体系的结构是:一个四周封闭的地下连续墙5结构的基坑,在连续墙5体内侧指定支撑3的位置,埋设有一块与支撑3连接用的钢板;在连续墙体5内侧施工有竖向围檩6,保证竖向围檩6的垂直度,竖向围檩6形状,可采用方形或矩形截面;在连续墙5体内竖向围檩6的指定位置,横向架设支撑3。如图3、图4所示。
要实现上述本发明的一种加竖向围檩的内支撑体系,其施工步骤如下:
⑴根据基坑的平面布置图,支撑布置设计图,在连续墙靠基坑的内侧施工竖向围檩6,竖向围檩6采用方形或矩形截面,具体尺寸根据计算确定,入土深度不少于基坑深度;
⑵在靠近基坑内侧支撑的位置预埋一钢板,便于以后与支撑3的连接;
⑶此工序要保证竖向围檩6的垂直度,不妨碍地下连续墙5的施工;
⑷施工地下连续墙5,连续墙5的厚度、入土深度和配筋等参数由计算确定;
⑸按土方开挖方案分层开挖,每开挖到需设置支撑3的位置,立即设置支撑3,同时施加预应力;
⑹分步开挖一直到坑底。
施工成型后的内支撑3体系参见图3、图4.
加竖向围檩的内支撑体系的方法的优点:
1.加快施工进度,改善劳动条件,而且能较好的保证施工质量。
2.能合理地调整地下连续墙内力分布,特别是能较大程度地减少地连墙弯矩峰值。
3.能有效的控制地连墙水平位移,保证围护结构的稳定。
本发明的一种加竖向围檩的内支撑体系的构思,对于本领域技术人员来说,可以在本构思的启发下,推导出多种实施方案,但是,凡在本构思下的各种技术方案,都在本发明权利要求的保护范围之中。

Claims (1)

1.一种加竖向围檩的内支撑体系其特征在于,其施工步骤如下:
⑴根据基坑的平面布置图,设计支撑布置图,在连续墙靠基坑的内侧施工竖向围檩,竖向围檩采用方形或矩形截面,具体尺寸根据计算确定,入土深度不少于基坑深度;
⑵在靠近基坑内侧支撑的位置预埋一钢板,便于以后与支撑的连接;
⑶此工序要保证竖向围檩的垂直度,不妨碍地下连续墙的施工;
⑷施工地下连续墙,连续墙的厚度、入土深度和配筋等参数由计算确定;
⑸按土方开挖方案分层开挖,每开挖到需设置支撑的位置,立即设置支撑,同时施加预应力;
⑹分步开挖一直到坑底。
CN201310715883.XA 2013-12-23 2013-12-23 一种加竖向围檩的内支撑体系 Pending CN103741696A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310715883.XA CN103741696A (zh) 2013-12-23 2013-12-23 一种加竖向围檩的内支撑体系

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310715883.XA CN103741696A (zh) 2013-12-23 2013-12-23 一种加竖向围檩的内支撑体系

Publications (1)

Publication Number Publication Date
CN103741696A true CN103741696A (zh) 2014-04-23

Family

ID=50498755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310715883.XA Pending CN103741696A (zh) 2013-12-23 2013-12-23 一种加竖向围檩的内支撑体系

Country Status (1)

Country Link
CN (1) CN103741696A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421488A (zh) * 2015-09-14 2016-03-23 上海建工七建集团有限公司 地下复合围护体系中基础底板换撑的施工方法
CN107503355A (zh) * 2017-07-20 2017-12-22 广东省建筑工程集团有限公司 外排后插型钢式双排桩基坑支护体系及其施工方法
CN110185044A (zh) * 2019-06-17 2019-08-30 中铁上海设计院集团有限公司 一种用于深厚不稳定地层的基坑侧壁应力调整系统
CN111549785A (zh) * 2020-03-23 2020-08-18 宁波工程学院 支护系统及其施工方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1204714A (zh) * 1997-07-04 1999-01-13 李宪奎 挡土墙的成形方法
WO2000042263A2 (en) * 1999-01-13 2000-07-20 Won Kee Hong Composite retaining wall and construction method for underground structure
CN1515757A (zh) * 2003-01-09 2004-07-28 李宪奎 一种挡土墙的支护结构
CN101139839A (zh) * 2007-10-15 2008-03-12 上海市隧道工程轨道交通设计研究院 高承压水地区超深基坑的设置结构
CN101696573A (zh) * 2009-10-23 2010-04-21 广东省基础工程公司 一种桩墙式挡土墙的成形施工方法
CN202273233U (zh) * 2011-10-09 2012-06-13 浙江荣邦房地产开发有限公司 一种立体车库深基坑
CN102635120A (zh) * 2012-05-04 2012-08-15 张全胜 圆形深基坑无支撑施工结构和施工方法
CN102767186A (zh) * 2012-07-16 2012-11-07 中铁隧道集团有限公司 竖向挡土结构上配有预应力筋的基坑围护结构及施工方法

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1204714A (zh) * 1997-07-04 1999-01-13 李宪奎 挡土墙的成形方法
WO2000042263A2 (en) * 1999-01-13 2000-07-20 Won Kee Hong Composite retaining wall and construction method for underground structure
WO2000042263A3 (en) * 1999-01-13 2001-10-04 Won Kee Hong Composite retaining wall and construction method for underground structure
CN1515757A (zh) * 2003-01-09 2004-07-28 李宪奎 一种挡土墙的支护结构
CN101139839A (zh) * 2007-10-15 2008-03-12 上海市隧道工程轨道交通设计研究院 高承压水地区超深基坑的设置结构
CN101696573A (zh) * 2009-10-23 2010-04-21 广东省基础工程公司 一种桩墙式挡土墙的成形施工方法
CN202273233U (zh) * 2011-10-09 2012-06-13 浙江荣邦房地产开发有限公司 一种立体车库深基坑
CN102635120A (zh) * 2012-05-04 2012-08-15 张全胜 圆形深基坑无支撑施工结构和施工方法
CN102767186A (zh) * 2012-07-16 2012-11-07 中铁隧道集团有限公司 竖向挡土结构上配有预应力筋的基坑围护结构及施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄胜仁: ""高层建筑基坑支护中排桩与地下连续墙施工技术的探讨"", 《现代装饰理论》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421488A (zh) * 2015-09-14 2016-03-23 上海建工七建集团有限公司 地下复合围护体系中基础底板换撑的施工方法
CN107503355A (zh) * 2017-07-20 2017-12-22 广东省建筑工程集团有限公司 外排后插型钢式双排桩基坑支护体系及其施工方法
CN107503355B (zh) * 2017-07-20 2023-10-13 广东省建筑工程集团有限公司 外排后插型钢式双排桩基坑支护体系及其施工方法
CN110185044A (zh) * 2019-06-17 2019-08-30 中铁上海设计院集团有限公司 一种用于深厚不稳定地层的基坑侧壁应力调整系统
CN110185044B (zh) * 2019-06-17 2023-12-12 中铁上海设计院集团有限公司 一种用于深厚不稳定地层的基坑侧壁应力调整系统
CN111549785A (zh) * 2020-03-23 2020-08-18 宁波工程学院 支护系统及其施工方法

Similar Documents

Publication Publication Date Title
CN104878835B (zh) 条形基础房屋后增地下室结构
CN102653945B (zh) 基础托换结构及其施工方法
CN103741696A (zh) 一种加竖向围檩的内支撑体系
CN108222015B (zh) 一种采用主动式隔离桩控制基坑开挖影响的装置及方法
CN109811769B (zh) 一种基坑开挖施工方法
CN202626999U (zh) 采用主动调控变形设计方法的基坑支撑系统
CN104674863A (zh) 一种对深基坑开挖范围内既有市政管廊的加固方法
CN110761296A (zh) 一种水泥土围护墙-灌注桩悬臂式组合支护及其施工方法
CN109505298A (zh) 一种自平衡基坑围护方法
CN102587410A (zh) 钢筋混凝土挡土墙设计施工方法
CN209509554U (zh) 既有建筑物下新增地下室用托换结构
CN103742163A (zh) 一种确定地面出入式盾构施工盾构机土仓控制压力的方法
CN104196032A (zh) 一种地铁车站撑板结合逆作的施工方法
CN212582693U (zh) 一种伺服式中隔墙结构
CN205188976U (zh) 一种拉索式双排桩支护结构
CN208309592U (zh) 一种基坑支护结构
CN105239579A (zh) 软土深基坑变形的封堵墙式控制方法
CN112523275B (zh) 地铁车站叠合墙结构中地下连续墙与主体结构侧墙间相互作用的测试方法
CN105003088A (zh) 一种钢结构施工中漏埋埋件的施工方法
CN104631467A (zh) 基坑开挖工程的l型换撑板的支设方法
CN204940303U (zh) 一种大刚度基坑支护桩
CN101979779B (zh) 对临近偏斜建筑控倾防沉的基坑施工方法
CN205475323U (zh) 一种市政管线群跨越隧道的地下结构
CN112878381B (zh) 地下室构造防水板下软垫层的确定方法及装置
CN207672592U (zh) 高层建筑室内下沉空间基础结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140423