CN102587410A - 钢筋混凝土挡土墙设计施工方法 - Google Patents

钢筋混凝土挡土墙设计施工方法 Download PDF

Info

Publication number
CN102587410A
CN102587410A CN2011100048191A CN201110004819A CN102587410A CN 102587410 A CN102587410 A CN 102587410A CN 2011100048191 A CN2011100048191 A CN 2011100048191A CN 201110004819 A CN201110004819 A CN 201110004819A CN 102587410 A CN102587410 A CN 102587410A
Authority
CN
China
Prior art keywords
reinforced concrete
retaining wall
wall panel
balance plate
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100048191A
Other languages
English (en)
Other versions
CN102587410B (zh
Inventor
曾令明
陈振健
方家强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
PowerChina Fujian Electric Power Engineering Co Ltd
Original Assignee
Fujian Electric Power Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Electric Power Survey and Design Institute filed Critical Fujian Electric Power Survey and Design Institute
Priority to CN201110004819.1A priority Critical patent/CN102587410B/zh
Publication of CN102587410A publication Critical patent/CN102587410A/zh
Application granted granted Critical
Publication of CN102587410B publication Critical patent/CN102587410B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明涉及一种挡土墙施工方法,特别是一种钢筋混凝土挡土墙设计施工方法,在施工的时候,分段施工,并在施工过程中在挡土墙的填土方边坡一侧安装平衡板,依序提供第N台平衡板与第N+1段钢筋混凝土墙板的施工直至达到挡土墙的整体设计高度,这样,当填土方边坡对挡土墙产生推力时,平衡板则根据其上方填土的重力作用下,使挡土墙产生一个与推力对抗的弯矩,由此平衡了钢筋混凝土挡土墙板内力,增加了挡土墙的安全性和可靠性,无需增加墙板厚度,施工方法简单易行,大大降低了工程造价,减少了施工用地。

Description

钢筋混凝土挡土墙设计施工方法
技术领域
本发明涉及一种挡土墙施工方法,特别是一种钢筋混凝土挡土墙设计施工方法。
背景技术
当变电站或电厂厂址区域位于山区时,经常会因为地形原因形成高填方边坡,时常因用地限制 要设置 钢筋混凝土挡土墙 。由于填方边坡高差大,为了保证挡土墙有足够的 能力来平衡填方边坡的推力,现有技术通常采用增大钢筋混凝土挡土墙厚度来提高挡土墙内力,但这样一来需要大大增加工程造价 ;另一种办法是加密扶壁柱间距,但是现有的填方边坡高差都很大,随着深度增大,土压增大,加密扶壁柱间距的施工方法难以有效减低工程造价 。
发明内容
本发明的目的在于根据现有技术的不足之处而提供一种有效降低工程造价,安全、可靠的钢筋混凝土挡土墙设计施工方法。
本发明是通过以下途径来实现的:
钢筋混凝土挡土墙设计施工方法,其要点在于,包括如下步骤:
1、对钢筋混凝土墙板进行基础施工;
2、浇筑设定高度的第一段钢筋混凝土墙板、肋柱,进行墙后填土工作,并整平墙背后填土;
3、 利用墙背后已经整平的填土做底模设置第一台平衡板 ,平衡板设置 在第二段钢筋混凝土墙板填土一侧,平台板的一端部垂直 在该土墙板肋柱上,肋板侧靠在肋柱上,一端支撑在第一段钢筋混凝土墙板的顶部,另一端与平台板连接;
4、利用墙背后已经整平的填土做底模,将第一台平衡板与第二段设定高度的钢筋混凝土墙板整体浇筑;
5、进行第二段钢筋混凝土墙板背后填土工作,并整平填土;
6、如果没有达到该处钢筋混凝土挡土墙的规定高度,则提供第二台平衡板,其结构与第一台平衡板相同,利用第二段钢筋混凝土墙板背后已经整平的填土做底模,将第二台平衡板与第三段设定高度的钢筋混凝土墙板整体浇筑;
7、依据步骤6的方法,依序提供第N台平衡板与第N+1段钢筋混凝土墙板的施工直至达到挡土墙的整体设计高度,其中N大于1。
平衡板与填土方边坡均位于挡土墙的一侧边,当填土方边坡对挡土墙产生推力时,平衡板则根据其上方填土的重力作用下,使挡土墙产生一个与推力 相反的弯矩,由此平衡了部分钢筋混凝土挡土墙板内力,增加了挡土墙的安全性和可靠性,无需明显增加墙板厚度,施工方法简单易行,较大降低了工程造价,减少了施工用地。
本发明可以进一步具体为:
所述的填土工作包括填土、密 实、做反滤、做泄水孔。
第一段钢筋混凝土墙板的设定高度一般为3米左右。
该设定高度是根据现场具体情况和填料的性能,所需的整体钢筋混凝土挡土墙的高度来计算的,从而可以合理规划好平衡板的数量、标高、内挑长度以及厚度。
平衡板安装在对应段的钢筋混凝土墙板的下半段,安装高度为对应段土墙板设计高度的30%-50%。
这样,平衡板可以达到对其所对应段钢筋混凝土墙板产生 的弯矩平衡 ; 平台板长度 、宽度、高度、截面积以及肋板的厚度都需要根据具体情况进行计算分析。
综上所述,本发明提供了一种钢筋混凝土挡土墙设计施工方法,在施工过程中 分段施工,并在施工过程中在挡土墙的填土方边坡一侧设置 平衡板,依序提供第N台平衡板与第N+1段钢筋混凝土墙板的施工直至达到挡土墙的整体设计高度 。
附图说明
图1所示为本发明所述施工方法中的示意图。
下面结合实施例对本发明做进一步描述。
具体实施例
最佳实施例:
参照附图1,钢筋混凝土挡土墙设计施工方法,包括如下步骤:
1、          根据现场具体情况和填料的性能,所需的整体钢筋混凝土挡土墙的高度来计算分段土墙板的设计高度,从而合理规划好平衡板的数量、标高、内挑长度以及厚度;
2、          对钢筋混凝土墙板进行基础施工;
3、          浇筑设定高度的第一段钢筋混凝土墙板和肋柱,进行墙后填土工作:包括米实、做好反滤和泄水孔,并整平墙背后填土;
4、          提供第一台平衡板,该平衡板包括有平台板和肋板,平衡板安装在第二段钢筋混凝土墙板填土一侧,平台板的一端部垂直安装在该土墙板肋柱上,肋板侧靠在肋柱上,一端支撑在第一段钢筋混凝土墙板的顶部,另一端与平台板连接;
5、          利用墙背后已经整平的填土做底模,将第一台平衡板与第二段设定高度的钢筋混凝土墙板整体浇筑;
6、          进行第二段钢筋混凝土墙板背后填土工作,并整平填土;
7、          如果没有达到该处钢筋混凝土挡土墙的规定高度,则提供第二台平衡板,其结构与第一台平衡板相同,利用第二段钢筋混凝土墙板背后已经整平的填土做底模,将第二台平衡板与第三段设定高度的钢筋混凝土墙板整体浇筑;
8、          依据步骤7的方法,依序提供第N台平衡板与第N+1段钢筋混凝土墙板的施工直至达到挡土墙的整体设计高度,其中N大于1。
本发明未述部分与现有技术相同。 

Claims (3)

1.钢筋混凝土挡土墙设计施工方法,其特征在于,包括如下步骤:  ①对钢筋混凝土墙板进行基础施工;
 ②浇筑设定高度的第一段钢筋混凝土墙板和肋柱,进行墙后填土工作,并整平墙背后填土;
 ③提供第一台平衡板,该平衡板包括有平台板和肋板,平衡板安装在第二段钢筋混凝土墙板填土一侧,平台板的一端部垂直安装在该土墙板肋柱上,肋板侧靠在肋柱上,一端支撑在第一段钢筋混凝土墙板的顶部,另一端与平台板连接;
 ④利用墙背后已经整平的填土做底模,将第一台平衡板与第二段设定高度的钢筋混凝土墙板整体浇筑;
 ⑤进行第二段钢筋混凝土墙板背后填土工作,并整平填土;
 ⑥如果没有达到该处钢筋混凝土挡土墙的规定高度,则提供第二台平衡板,其结构与第一台平衡板相同,利用第二段钢筋混凝土墙板背后已经整平的填土做底模,将第二台平衡板与第三段设定高度的钢筋混凝土墙板整体浇筑;
 ⑦依据步骤⑥的方法,依序提供第N台平衡板与第N+1段钢筋混凝土墙板的施工直至达到挡土墙的整体设计高度,其中N大于1。
2.根据权利要求1所述的钢筋混凝土挡土墙设计施工方法,其特征在于,第一段钢筋混凝土墙板的设定高度为3米。
3.根据权利要求1所述的钢筋混凝土挡土墙设计施工方法,其特征在于,平衡板安装在对应段的钢筋混凝土墙板的下半段,安装高度为对应段土墙板设计高度的30%-50%。
CN201110004819.1A 2011-01-12 2011-01-12 钢筋混凝土挡土墙设计施工方法 Active CN102587410B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110004819.1A CN102587410B (zh) 2011-01-12 2011-01-12 钢筋混凝土挡土墙设计施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110004819.1A CN102587410B (zh) 2011-01-12 2011-01-12 钢筋混凝土挡土墙设计施工方法

Publications (2)

Publication Number Publication Date
CN102587410A true CN102587410A (zh) 2012-07-18
CN102587410B CN102587410B (zh) 2014-10-15

Family

ID=46476601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110004819.1A Active CN102587410B (zh) 2011-01-12 2011-01-12 钢筋混凝土挡土墙设计施工方法

Country Status (1)

Country Link
CN (1) CN102587410B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061354A (zh) * 2012-12-21 2013-04-24 广州市设计院 一种抗填土水平推力的外墙拖板结构
CN103603369A (zh) * 2013-12-09 2014-02-26 中国石油集团工程设计有限责任公司 一种锚拉桩扶壁式挡土墙施工方法
CN106592626A (zh) * 2016-11-18 2017-04-26 广东省基础工程集团有限公司 一种用于超高填方的挡土墙结构及其施工方法
CN108277777A (zh) * 2017-12-08 2018-07-13 中交烟台环保疏浚有限公司 挡浪墙分步浇筑施工工艺
US10676890B2 (en) 2016-03-30 2020-06-09 Robert Gordon McIntosh Retaining wall system, method of supporting same, and kit for use in constructing same
USD895153S1 (en) 2018-10-05 2020-09-01 Pacific Prebenched Ltd. Block for a retaining wall
CN112227308A (zh) * 2020-09-07 2021-01-15 中国二十冶集团有限公司 水域码头堵坝方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86207001U (zh) * 1986-09-13 1987-11-07 湖北省水利厅 T形加翼预制挡土墙构件
JP2010159578A (ja) * 2009-01-08 2010-07-22 Koken Sangyo Kk プレキャストコンクリートブロックによる大型擁壁

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86207001U (zh) * 1986-09-13 1987-11-07 湖北省水利厅 T形加翼预制挡土墙构件
JP2010159578A (ja) * 2009-01-08 2010-07-22 Koken Sangyo Kk プレキャストコンクリートブロックによる大型擁壁

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
朱向东: "超高挡土墙结构设计", 《建筑结构》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061354A (zh) * 2012-12-21 2013-04-24 广州市设计院 一种抗填土水平推力的外墙拖板结构
CN103603369A (zh) * 2013-12-09 2014-02-26 中国石油集团工程设计有限责任公司 一种锚拉桩扶壁式挡土墙施工方法
CN103603369B (zh) * 2013-12-09 2015-07-15 中国石油集团工程设计有限责任公司 一种锚拉桩扶壁式挡土墙施工方法
US10676890B2 (en) 2016-03-30 2020-06-09 Robert Gordon McIntosh Retaining wall system, method of supporting same, and kit for use in constructing same
CN106592626A (zh) * 2016-11-18 2017-04-26 广东省基础工程集团有限公司 一种用于超高填方的挡土墙结构及其施工方法
CN106592626B (zh) * 2016-11-18 2019-06-18 广东省基础工程集团有限公司 一种用于超高填方的挡土墙结构的施工方法
CN108277777A (zh) * 2017-12-08 2018-07-13 中交烟台环保疏浚有限公司 挡浪墙分步浇筑施工工艺
USD895153S1 (en) 2018-10-05 2020-09-01 Pacific Prebenched Ltd. Block for a retaining wall
CN112227308A (zh) * 2020-09-07 2021-01-15 中国二十冶集团有限公司 水域码头堵坝方法

Also Published As

Publication number Publication date
CN102587410B (zh) 2014-10-15

Similar Documents

Publication Publication Date Title
CN102587410B (zh) 钢筋混凝土挡土墙设计施工方法
CN101666081B (zh) 深水库区陡坡裸岩钻孔平台及工艺
CN103321260B (zh) 间隔钻孔截桩纠倾方法
CN104652443B (zh) 深基坑临时水平支撑兼作永久结构梁的施工方法
Baryakh et al. Sinkhole formation mechanism
CN103422510B (zh) 钢管框架式围堰结构及施工方法
CN110206038A (zh) 一种凹型基坑阳角处的支护结构及施工方法
CN103469732B (zh) 一种桥梁支座地脚螺栓预留孔的施工方法
CN104711931B (zh) 一种适用于桥梁架设的水中临时墩制造安装及拆除方法
CN106096162A (zh) 一种确定盾构土仓压力的方法及其数学模型和构建方法
CN111814234A (zh) 一种破碎岩体泄洪隧洞施工处理的方法
CN201502056U (zh) 深水库区陡坡裸岩钻孔平台
CN102720218A (zh) 基于深孔倒t型桩的高层抗震建筑结构
CN109577322A (zh) 一种用于土体内部既有桩基接桩的施工装置
CN203977432U (zh) 多级h型挡土桩
CN105696701B (zh) 一种顺坡剪力墙建筑开发平台及其施工方法
CN105544597A (zh) 适用于潟湖相岛礁环境下的组合基础结构及其施工方法
CN202560234U (zh) 一种无柱大跨度地下空间结构
CN104181044B (zh) 一种横向受荷体土压力测量试验方法
CN101824821B (zh) 一种基岩中建造混凝土地下连续墙的方法
TWI683941B (zh) 石籠固定工法
CN207919567U (zh) 高填方隧道减载防护结构
CN202359564U (zh) 一种拱形钢板桩支护结构
CN106013238B (zh) 一种软弱地层大覆土明挖隧道沉降控制方法
Jin-Wei et al. Deformation monitoring and numerical simulation of retaining structure in subway station deep foundation pit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: FUJIAN ELECTRIC POWER CO., LTD. FUJIAN POWER SURVE

Effective date: 20130105

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: FUJIAN POWER SURVEY DESIGN ACADEMY

Effective date: 20130105

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 350003 FUZHOU, FUJIAN PROVINCE TO: 100031 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20130105

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: Fujian Electric Power Co., Ltd.

Applicant after: Fujian Electric Power Survey and Design Institute

Address before: 350003 Fuzhou Road, Fujian, No. 54, No. 268

Applicant before: Fujian Electric Power Survey and Design Institute

C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Co-patentee after: Fujian Electric Power Co., Ltd.

Patentee after: State Grid Corporation of China

Co-patentee after: China Electric Power Construction Group Fujian electric survey and Design Institute Co., Ltd.

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Co-patentee before: Fujian Electric Power Co., Ltd.

Patentee before: State Grid Corporation of China

Co-patentee before: Fujian Electric Power Survey and Design Institute