CN1204714A - 挡土墙的成形方法 - Google Patents

挡土墙的成形方法 Download PDF

Info

Publication number
CN1204714A
CN1204714A CN 97111925 CN97111925A CN1204714A CN 1204714 A CN1204714 A CN 1204714A CN 97111925 CN97111925 CN 97111925 CN 97111925 A CN97111925 A CN 97111925A CN 1204714 A CN1204714 A CN 1204714A
Authority
CN
China
Prior art keywords
retaining
surface layer
mentioned
layer
geotechnique
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 97111925
Other languages
English (en)
Other versions
CN1088487C (zh
Inventor
李宪奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=5171953&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN1204714(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Individual filed Critical Individual
Priority to CN 97111925 priority Critical patent/CN1088487C/zh
Publication of CN1204714A publication Critical patent/CN1204714A/zh
Application granted granted Critical
Publication of CN1088487C publication Critical patent/CN1088487C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

一种挡土墙的成形方法,其目的在于减少材料浪费,施工方便。其步骤包括:按照一定间距形成多个桩孔;向桩孔内注浆,插入钢桩;在所有钢桩就位后,在钢桩顶部安装横梁;开挖第1层土体,形成具有规定尺寸的工作面;在相邻钢桩之间安装第1层挡土板,形成第1挡土工作面层;沿水平方向在相邻钢桩之间设置中间横梁;分阶段形成第2~n层挡土工作面,每层的步骤与第1层的相同,至规定位置,在相邻挡土工作面层之间形成中间横梁。

Description

挡土墙的成形方法
本发明涉及土体的支护领域。
随着城市高层建筑的兴起以及建筑物密度的提高,采用深基础护坡支护桩来挡土、止水的场合越来越多。传统的办法是采用大量的钢筋混凝土作成重力式、悬臂式等挡土结构,其缺点是材料用量不合理,工期较慢,造价较高,因基坑支护一般属于临时性质的,花费大量的资金会造成不必要的浪费。
本发明的目的在于提供一种挡土墙的成形方法,该方法即能确保质量,又能节约资金,而且工期短。
本发明的目的是通过下述的挡土墙的成形方法来实现的,该方法包括下述步骤:
a)首先在地表面按照一定间距钻孔形成多个桩孔;
b)在钻到设计深度后,向桩孔内进行注浆,并插入钢桩;
c)在所有钢桩就位后,马上在上述多个钢桩顶部沿水平方向安装锁口横梁;
d)向下开挖第1层土体,形成具有规定深度和宽度的工作面;
e)在相邻的钢桩之间安装第1层挡土板,形成第1挡土工作面层;
f)沿水平方向在相邻钢桩之间设置中间横梁;
g)按顺序分阶段形成第2~n挡土工作面层,每个挡土工作面层的步骤与第1挡土工作面层的相同,直至到达规定位置,在形成第2~n挡土工作面层时,在相邻挡土工作面层之间形成中间横梁。
在上述的方法中,最好在形成上述锁口横梁后,在挡上墙后面的土体中形成多个地锚,该多个地锚的顶端固定于上述锁口横梁上,上述方式适合于开挖土体深度较大的场合
在上述的方法中,最好在设置好位于每个挡土工作面层之间的中间横梁后,在挡土墙后面的土体中形成多个地锚,该多个地锚的顶端固定于上述中间横梁上,该方式适合开挖土体深度较大的场合。
在上述的方法中,最好上述钢桩为竖直桩,每个挡土工作面层的深度为2~3m,宽度为4m。
在上述的方法中,最好上述钢桩为朝向挡土墙所挡土体倾斜的桩。
在上述的方法中,最好在上述多个挡土工作面层后面沿该面形成水泥土止水墙,其由水泥土搅拌桩构成,上述方式适合于松散饱和,以及软弱土体等含水量较大的土体。
在上述的方法中,最好在上述多个挡土工作面层上喷射水泥混凝土,或通过人工敷设混凝土面层,在该面层上设置多个排水孔,上述方式适合于松散饱和,以及软弱土体等含水量较大的土体。
在上述的方法中,最好上述挡土板采用木板,钢板,或槽钢。
在上述的方法中,最好在插入钢桩之前,向桩孔内注浆至桩长的1/3处。
本发明的优点在于:采用上述方法,即能保证质量,又能降低造价,另外施工快速,所形成的挡土墙整体性好,刚度高,可防止渗漏。当钢桩倾斜时,可形成后倾的挡土工作面,从而能够显著减少主动土压力,或横向破坏作用,而且后倾的钢桩自重的水平分力还能抵抗主动土压力的破坏作用力,进而为基坑围护带来有利条件。因为所有的材料可在建筑物的地下室外墙作到地表后及时回收,重复使用,可大大降低施工费用。当在挡土墙后面的土体中设置地锚时,该地锚与墙体本身一起作用,可共同承受土侧压力。
下面结合附图对本发明进行进一步描述。
图1为采用本发明方法形成的挡土墙的透视图;
图2为图1所示的挡土墙的局部顶视图;
图3为图1所示的挡土墙的局部透视示意图;
图4为表示钢桩与地锚关系的挡土墙的简化侧面图;
图5为图1所示的挡土墙的整体侧面图;
图6为图1所示的挡土墙的局部立面图。
如图1~4所示,基坑挡土墙是这样形成的,即首先在规定位置形成多个桩孔,其成倾斜状态,并向后倾斜,向其内灌注砂浆5,至1/3桩长处,插入工字钢3,接着在上述钢桩3的顶部形成锁口横梁7,在后侧土体中形成多个地锚6,其顶端与上述锁口横梁7相连接,然后制作第1挡土工作面层,即向下开挖土体,深度为2-3m,在相邻钢桩3之间设置挡土板4以便形成挡土工作面,之后沿水平方向设置横梁2,在后侧土体中形成多个地锚9,接着制作第2挡土工作面层,其步骤第1层的相同,反复上述步骤,可形成多个挡土工作面层以及多个位于相邻层之间的横梁2,从而形成网格状的挡土墙,如图6所示。
当建筑物的地下室为一层(深度为5~6m)时,可不采用地锚,如伞型地锚拉住挡土墙。当基坑与边坡深度较大,建筑物采用2~3层地下室(9~14m)时,可设置伞型地锚7,即在桩顶部增设一排锚杆,其与桩之间的夹角根据地质条件,周围环境而确定,比如图4所示的80°从而形成人字形结构。
在特定区域,如含水量较大的上体中,可在挡土板4上喷射混凝土面层,其厚度10cm,在该面层上可设置多个排水孔,或在挡土板后面形成止水墙8,其可由水泥土搅拌桩形成,如图5所示。

Claims (9)

1.一种挡土墙的成形方法,其步骤包括:
a)首先在地表面按照一定间距钻孔形成多个桩孔;
b)在钻到设计深度后,向桩孔内进行注浆,并插入钢桩;
c)在所有钢桩就位后,马上在上述多个钢桩顶部沿水平方向安装锁口横梁;
d)向下开挖第1层土体,形成具有规定深度和宽度的工作面;
e)在相邻的钢桩之间安装第1层挡土板,形成第1挡土工作面层;
f)沿水平方向在相邻钢桩之间设置中间横梁;
g)按顺序分阶段形成第2~n挡土工作面层,每个挡土工作面层的步骤与第1层挡土工作面的相同,直至到达规定位置,在形成第2~n挡土工作面层时,在相邻挡上工作面层之间形成中间横梁。
2.根据权利要求1所述的方法,其特征在于在形成上述锁口横梁后,在挡土墙后面的土体中形成多个地锚,该多个地锚的顶端固定于上述锁口横梁上。
3.根据权利要求1所述的方法,其特征在于在设置好位于每个挡土工作面层之间的中间横梁后,在挡土墙后面的土体中形成多个地锚,该多个地锚的顶端固定于上述中间横梁上。
4根据权利要求1所述的方法,其特征在于上述钢桩为竖直桩,每个挡土工作面层的深度为2~3m,宽度为4m。
5.根据权利要求1所述的方法,其特征在于上述钢桩为朝向挡土墙所挡土体倾斜的桩。
6.根据权利要求1所述的方法,其特征在于在上述多个挡土工作面层后面沿该面形成水泥土止水墙,其由水泥土搅拌桩构成。
7.根据权利要求1所述的方法,其特征在于在上述多个挡土工作面层上喷射水泥混凝土,或通过人工敷设混凝土面层,在该面层上设置多个排水孔。
8.根据权利要求1所述的方法,其特征在于上述挡土板采用木板,钢板,或槽钢。
9.根据权利要求1所述的方法,其特征在于在插入钢桩之前,向桩孔内注浆至桩长的1/3处。
CN 97111925 1997-07-04 1997-07-04 挡土墙的成形方法 Expired - Fee Related CN1088487C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 97111925 CN1088487C (zh) 1997-07-04 1997-07-04 挡土墙的成形方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 97111925 CN1088487C (zh) 1997-07-04 1997-07-04 挡土墙的成形方法

Publications (2)

Publication Number Publication Date
CN1204714A true CN1204714A (zh) 1999-01-13
CN1088487C CN1088487C (zh) 2002-07-31

Family

ID=5171953

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 97111925 Expired - Fee Related CN1088487C (zh) 1997-07-04 1997-07-04 挡土墙的成形方法

Country Status (1)

Country Link
CN (1) CN1088487C (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243723A (zh) * 2013-05-03 2013-08-14 河北省建筑科学研究院 一种深基坑支护方法
CN103485351A (zh) * 2013-09-30 2014-01-01 中国建筑股份有限公司 用于基坑支护的斜桩竖向锚杆支护结构及其施工方法
CN103741696A (zh) * 2013-12-23 2014-04-23 广西科技大学 一种加竖向围檩的内支撑体系
CN105544465A (zh) * 2016-01-29 2016-05-04 俞向阳 一种岸堤防护墙
CN106638675A (zh) * 2017-01-11 2017-05-10 重庆建工住宅建设有限公司 一种逆作型钢及竹夹板挡土施工方法
CN106759402A (zh) * 2017-02-10 2017-05-31 陈启品 一种多维生态挡墙系统及制作挡墙系统的预制块
CN111535243A (zh) * 2020-04-27 2020-08-14 李凤玲 一种水利工程挡土墙
CN112523253A (zh) * 2020-11-23 2021-03-19 中建桥梁有限公司 一种可重复利用的挡土墙施工方法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243723A (zh) * 2013-05-03 2013-08-14 河北省建筑科学研究院 一种深基坑支护方法
CN103485351A (zh) * 2013-09-30 2014-01-01 中国建筑股份有限公司 用于基坑支护的斜桩竖向锚杆支护结构及其施工方法
CN103741696A (zh) * 2013-12-23 2014-04-23 广西科技大学 一种加竖向围檩的内支撑体系
CN105544465A (zh) * 2016-01-29 2016-05-04 俞向阳 一种岸堤防护墙
CN105544465B (zh) * 2016-01-29 2018-04-10 俞向阳 一种岸堤防护墙
CN106638675A (zh) * 2017-01-11 2017-05-10 重庆建工住宅建设有限公司 一种逆作型钢及竹夹板挡土施工方法
CN106759402A (zh) * 2017-02-10 2017-05-31 陈启品 一种多维生态挡墙系统及制作挡墙系统的预制块
CN111535243A (zh) * 2020-04-27 2020-08-14 李凤玲 一种水利工程挡土墙
CN112523253A (zh) * 2020-11-23 2021-03-19 中建桥梁有限公司 一种可重复利用的挡土墙施工方法

Also Published As

Publication number Publication date
CN1088487C (zh) 2002-07-31

Similar Documents

Publication Publication Date Title
CN111236241B (zh) 基于半盖挖法的软弱富水地层地铁基坑加固开挖方法
CN110777806B (zh) 多连杆平面框架永久支护结构及其施工工艺
CN1043263C (zh) 建筑物基坑边坡支护的施工方法
CN1088487C (zh) 挡土墙的成形方法
CN112942377A (zh) 一种新型支撑抗剪结构及其施工方法
CN110700270B (zh) 一种超深基坑不排水土方开挖的施工方法
CN215441921U (zh) 一种新型支撑抗剪结构
CN115506382A (zh) 一种用于筑岛平台桩板墙的施工方法
CN114922195A (zh) 一种紧邻保护对象的软土深大基坑施工方法
CN111794102B (zh) 一种板桩式锚碇结构及其施工方法
CN209958372U (zh) 铁路新增二线台后路基桩管帷幕支护结构
CN210887256U (zh) 挡水围堰平直组合板桩地连墙式框架
CN206233244U (zh) 基坑的支护结构
CN217480236U (zh) 一种适用于高边坡的桩板式挡墙
CN217870600U (zh) 一种圆桩接方桩桩板墙支挡结构
CN214061633U (zh) 一种软土地区土方开挖便道保护结构
CN218373908U (zh) 倾斜桩构造的“桩墙合一”结构体系
CN221167656U (zh) 深挖河道的无阻水支护结构
CN218540761U (zh) 一种道路软土地基排水管道装配式基础辅助支撑装置
NL2036718B1 (en) Construction method for foundation pit of cast-in-place box culvert
CN114351746B (zh) 一种山区临河陡倾岸坡桩基平台及施工方法
KR100367516B1 (ko) 부력에 의하여 부상된 구조물의 안정화 방법
CN218148385U (zh) 一种预制混凝土基坑护坡
CN216839459U (zh) 一种基坑内毗邻深浅基坑垂直式变截面构造
CN213448531U (zh) 用于地墙防护的河道围堰结构

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Li Xiankui

Document name: Deemed not to advise

C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Li Xiankui

Document name: Notification of Termination of Patent Right

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee