CN102653945B - 基础托换结构及其施工方法 - Google Patents

基础托换结构及其施工方法 Download PDF

Info

Publication number
CN102653945B
CN102653945B CN201110052732.1A CN201110052732A CN102653945B CN 102653945 B CN102653945 B CN 102653945B CN 201110052732 A CN201110052732 A CN 201110052732A CN 102653945 B CN102653945 B CN 102653945B
Authority
CN
China
Prior art keywords
supporting pile
joist
shaped steel
soil
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110052732.1A
Other languages
English (en)
Other versions
CN102653945A (zh
Inventor
张继红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Solid Earth Rock Engineering Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201110052732.1A priority Critical patent/CN102653945B/zh
Publication of CN102653945A publication Critical patent/CN102653945A/zh
Application granted granted Critical
Publication of CN102653945B publication Critical patent/CN102653945B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

本发明涉及基础托换工程领域中的基础托换结构及其施工方法,该基础托换结构包括型钢(1)、水泥土搅拌体(2)、托梁(3)和支撑桩(4)四部分组成,其中型钢(1)插入水泥土搅拌体内(2),型钢(1)、托梁(3)与支撑桩(4)牢固连接,针对不同的目的,还可以在支撑桩(4)上安装支撑桩隔离器(6),本发明可广泛用于保护已有建筑,可用于消除工程建设活动(如打桩、基坑开挖、盾构施工、地铁运营等)对邻近房屋的影响。

Description

基础托换结构及其施工方法
技术领域
本发明涉及土木工程领域,特别是涉及基础托换工程领域。
背景技术
随着社会经济的发展与人民生活水平的日益改善,人们对自身居住条件的要求日益提高,对建筑物的要求越来越高,已建的建筑物往往因为沉降过大、自身倾斜、开裂及邻近工程建设的影响而影响到建筑物的正常使用与安全,目前此类事件时常引发社会纠纷。对于已建的建(构)筑物进行基础托换,改善建筑原有基础的功能,控制建筑沉降、倾斜与开裂,减小邻近工程建设对已建建(构)筑物的影响是基础工程领域中的一个新的发展方向。现有的基础托换技术主要采用逐步掏空原基础下的土体,然后置入新基础结构的形式予以实现,该方法在掏土过程中经常出现较大的沉降,对建筑物损伤严重,且在软土区域难以实现,因而在软土区域该方法一直难以使用。
发明内容
本发明的第一个目的在于提供第一种基础托换结构,该基础托换结构在基础托换施工过程中对已有建筑的损伤很小,施工方便,速度快,且可在软土地区广泛使用。
该基础托换结构包括型钢、水泥土搅拌体、托梁和支撑桩四部分组成,其中的型钢与水泥土搅拌体近似水平布置,且型钢插入水泥土搅拌体内,托梁近似水平放置,托梁与型钢相交,支撑桩接近垂直放置,托梁与支撑桩、型钢牢固连接。
在上述的基础托换结构中,上述的型钢可以是工字钢或H型钢。
本发明的第二个目的在于提供第二种基础托换结构,该第二种基础托换结构可有效减小邻近工程活动(如打桩振动、打桩挤土、地铁运营振动、地面填土所引起的拖带沉降等因素)对已建建(构)筑物的影响,对于保护已建建(构)筑物具有重大工程意义。
该第二种基础托换结构包括横梁、托梁、支撑桩和支撑桩隔离器四部分组成,其中的横梁近似水平布置,托梁近似水平放置,托梁与横梁相交,支撑桩近似垂直放置,托梁与支撑桩、横梁牢固连接,支撑桩中至少有一段与其邻近的土体通过支撑桩隔离器隔离。
本发明的第三个目的在于提供第一种基础托换结构的施工方法,该方法可顺利完成本发明的第一种基础托换结构的施工,且在施工过程对已建建(构)筑物的影响很小,工艺简单,造价低。
该第一种基础托换结构施工方法包括以下步骤:
a)根据设计图纸,对基础托换结构进行现场定位;
b)施工支撑桩;
c)以近似水平的角度在已建建(构)筑物基础下方施工水泥土搅拌体;
d)在水泥土搅拌体内插入型钢;
e)施工托梁,并使托梁与支撑桩牢固连接,将型钢与托梁牢固连接,完成基础托换施工。
附图说明
图1为本发明的第一个实施例所用的基础托换结构平面布置示意图。
图2为本发明的第一个实施例所用的基础托换结构A-A剖面结构示意图。
图3为本发明的第二个实施例所用的基础托换结构平面布置示意图。。
图4为本发明的第二个实施例所用的基础托换结构B-B剖面结构示意图。
具体实施方式
作为本发明的第一个实施例,结合图1与图2介绍第一种基础托换结构的结构构造、工作原理及其施工方法。首先介绍第一种基础托换结构的结构构造与工作原理,如图1与图2所示,该基础托换结构包括型钢(1)、水泥土搅拌体(2)、托梁(3)和支撑桩(4)四部分组成,在本实施例中,其中的型钢(1)与水泥土搅拌体(2)水平布置在已建建(构)筑物(5)的基础下方,且型钢(1)插入水泥土搅拌体(2)内,托梁(3)水平放置,托梁(3)与型钢(1)垂直相交,亦可根据设计需要做成以斜交方式相交,支撑桩(4)垂直放置,托梁(3)与支撑桩(4)牢固连接,型钢(1)与托梁(3)牢固连接,这样,由型钢(1)、水泥土搅拌体(2)、托梁(3)和支撑桩(4)组成结构体系,待该结构体系施工完成后,已建建(构)筑物(5)的重量可通过该结构体系顺利地传递至深层土体,可有效控制已建建(构)筑物(5)的后期沉降。本实施例以下部分主要介绍第一种基础托换结构的施工方法。在第一种基础托换结构的施工方法的第一步,根据设计图纸,对各构件进行现场定位,完成第一步,进入第二步。在第二步中,根据设计图纸要求的工艺施工支撑桩(4),支撑桩(4)可以是钻孔灌注桩,也可以是施工过程对已建建(构)筑物(5)影响较小的其他桩型。从而完成本实施例的基础托换结构的施工方法的第二步,进入第三步。在本步骤中以近似水平的角度在已建建(构)筑物基础下方施工水泥土搅拌体(2),为了减小水泥土搅拌体(2)的施工对已建建(构)筑物(5)的影响,可间隔施工,并在施工过程中采取措施防止未凝固的水泥土搅拌体(2)外流。从而完成第三步,进入第四步。在本步骤中,在施工操作面位置开槽,便于水平放置型钢(1),在水泥土搅拌体(2)凝固前采用推或拉的方式将型钢(1)插入水泥土搅拌体(2)中,从而完成第四步,进入第五步。本步骤的具体的施工方法可以是这样的,在托梁(3)位置开槽,将支撑桩(4)的桩顶混凝土凿除,露出支撑桩(4)的主筋,并将型钢(1)挖出,然后在支撑桩(4)顶部浇筑钢筋混凝土托梁(3),并将型钢(1)包入其中,待钢筋混凝土凝固后,托梁(3)、支撑桩(4)型钢(1)之间便形成牢固连接从而完成本实施例的基础托换结构的施工方法的第五步,完成本发明的第一种基础托换结构的施工。
作为本发明的第二个实施例,结合图3与图4介绍第二种基础托换结构的结构构造、工作原理及其施工方法。本实施例介绍的第二种基础托换结构与第一个实施例总体相似,不同点在于以下两方面。第一个不同点是,去除第一个实施例中的水泥土搅拌体(2)与型钢(1),直接采用横梁(7)予以代替,横梁(7)可以是钢结构梁,也可以是钢筋混凝土梁,横梁(7)的施工方法可以是采用近似水平方向压入土体,也可以是在已建建(构)筑物(5)的基础下方开槽施工完成。第二个不同点是,在支撑桩(4)中,至少有一段设置有支撑桩隔离器(6),使其与其邻近的土体通过支撑桩隔离器(6)隔离,针对不同目的,可设置不同材料与构造的支撑桩隔离器(6),可减小邻近工程建设(如打桩施工、基坑施工、地铁隧道等施工与运营等)对已建建(构)筑物(5)的影响。例如,为了减小打桩挤土对已建建(构)筑物(5)的影响,可在支撑桩(4)上设置支撑桩隔离器(6),支撑桩隔离器(6)可采用可消除挤压的材料制作(如易压缩多孔材料)。再如,为了减小地铁运营振动对已建建(构)筑物(5)的影响,可在支撑桩(4)的部分段(振动影响范围内)设置支撑桩隔离器(6),支撑桩隔离器(6)可采用减振材料(如泡沫塑料等)制作,使支撑桩(4)不受振动影响,并使已建建(构)筑物(5)支撑在支撑桩(4)上,使已建建(构)筑物(5)与周边可能振动固体隔离,达到减振目的。支撑桩隔离器(6)的施工方法可以是这样的,在施工支撑桩(4)时同时放置支撑桩隔离器(6)。如支撑桩(4)为钻孔灌注桩,可在钻孔灌注桩施工过程中下钢筋笼的同时,将支撑桩隔离器(6)绑扎在钢筋笼的外围,然后再浇筑混凝土,即可完成支撑桩隔离器(6)的施工。再如支撑桩(4)为预制桩,可在支撑桩(4)打桩施工过程桩,将支撑桩隔离器(6)包在支撑桩(4)的外围,并在支撑桩隔离器(6)的外侧套钢管予以保护,打桩后将钢管拔出,即可完成支撑桩隔离器(6)的施工。其他方面同第一个实施例。
本专利包括但不限于本领域内专业人士可替代使用的其他施工方法。

Claims (4)

1.一种基础托换结构,其特征是包括型钢(1)、水泥土搅拌体(2)、托梁(3)和支撑桩(4)四部分组成,其中的型钢(1)与水泥土搅拌体(2)近似水平布置,且型钢(1)插入水泥土搅拌体(2)内,托梁(3)近似水平放置,托梁(3)与型钢(1)相交,支撑桩(4)接近垂直放置,托梁(3)与支撑桩(4)、型钢(1)牢固连接。
2.根据权利要求1所述的基础托换结构,其特征是上述的型钢(1)可以是工字钢或H型钢。
3.一种基础托换结构,其特征是包括横梁(7)、托梁(3)、支撑桩(4)和支撑桩隔离器(6)四部分组成,其中的横梁(7)近似水平布置,托梁(3)近似水平放置,托梁(3)与横梁(7)相交,支撑桩(4)近似垂直放置,托梁(3)与支撑桩(4)、横梁(7)牢固连接,支撑桩(4)中至少有一段与其邻近的土体通过支撑桩隔离器(6)隔离。
4.一种基础托换结构施工方法,其特征是包括以下步骤:
a)根据设计图纸,对基础托换结构进行现场定位;
b)施工支撑桩(4);
c)以近似水平的角度在已建建(构)筑物(5)基础下方施工水泥土搅拌体(2);
d)在水泥土搅拌体(2)内插入型钢(1);
e)施工托梁(3),并使托梁(3)与支撑桩(4)牢固连接,将型钢(1)与托梁(3)牢固连接,完成基础托换施工。
CN201110052732.1A 2011-03-04 2011-03-04 基础托换结构及其施工方法 Active CN102653945B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110052732.1A CN102653945B (zh) 2011-03-04 2011-03-04 基础托换结构及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110052732.1A CN102653945B (zh) 2011-03-04 2011-03-04 基础托换结构及其施工方法

Publications (2)

Publication Number Publication Date
CN102653945A CN102653945A (zh) 2012-09-05
CN102653945B true CN102653945B (zh) 2014-10-22

Family

ID=46729664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110052732.1A Active CN102653945B (zh) 2011-03-04 2011-03-04 基础托换结构及其施工方法

Country Status (1)

Country Link
CN (1) CN102653945B (zh)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104420486B (zh) * 2013-08-21 2017-03-01 贵阳铝镁设计研究院有限公司 一种在已有扩展浅基础底部增设钢管桩的方法及结构
CN103912134B (zh) * 2014-03-21 2016-09-14 上海建工四建集团有限公司 既有建筑原位地下空间结构及施工方法
CN104179204B (zh) * 2014-08-28 2016-01-20 山西钢铁建设(集团)有限公司 建筑物邻近深基坑基础桩基托换方法
CN106285039B (zh) * 2015-06-02 2018-09-14 五冶集团上海有限公司 脱硫塔用胎架承重进行底部更换方法
CN105672348A (zh) * 2016-01-27 2016-06-15 重庆大学 一种深水区砂卵石地层截除桥梁桩基的施工方法
CN106337432A (zh) * 2016-08-30 2017-01-18 中国建筑西南勘察设计研究院有限公司 后植钢管混凝土劲型桩补强止沉基础加固方法
CN106988337B (zh) * 2017-04-20 2019-02-01 南京工大桥隧与轨道交通研究院有限公司 一种用于减小条形浅基础房屋不均匀沉降的加固方法
CN109838112A (zh) * 2017-11-29 2019-06-04 中冶宝钢技术服务有限公司 一种塔类设备下段局部更换施工工艺
CN108798065B (zh) * 2018-06-20 2020-08-07 桐乡市乌镇内利仿古园林建设有限公司 一种古建筑物整体顶升方法
CN111335670A (zh) * 2020-03-18 2020-06-26 同济大学建筑设计研究院(集团)有限公司 在既有保留建筑下方原位施工基坑及新增地下结构的方法
CN112267557B (zh) * 2020-10-20 2022-08-09 中国十九冶集团有限公司 地下挡板支撑结构的施工方法
CN113863714A (zh) * 2021-11-08 2021-12-31 中铁上海工程局集团有限公司 一种对牌坊原位保护基础托换结构和施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1058312C (zh) * 1996-08-02 2000-11-08 丛蔼森 一种大型建筑物的基础托换方法
CN101387114A (zh) * 2008-09-19 2009-03-18 天津市市政工程设计研究院 超静定墩柱或桩基主动托换结构及其施工方法
CN201991015U (zh) * 2011-03-04 2011-09-28 张继红 基础托换结构

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5120163A (en) * 1990-12-07 1992-06-09 A.B. Chance Company Foundation underpinning bracket and jacking tool assembly

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1058312C (zh) * 1996-08-02 2000-11-08 丛蔼森 一种大型建筑物的基础托换方法
CN101387114A (zh) * 2008-09-19 2009-03-18 天津市市政工程设计研究院 超静定墩柱或桩基主动托换结构及其施工方法
CN201991015U (zh) * 2011-03-04 2011-09-28 张继红 基础托换结构

Also Published As

Publication number Publication date
CN102653945A (zh) 2012-09-05

Similar Documents

Publication Publication Date Title
CN102653945B (zh) 基础托换结构及其施工方法
CN105672356B (zh) 一种跨越地铁隧道的市政管线群地下结构施工方法
CN104652443B (zh) 深基坑临时水平支撑兼作永久结构梁的施工方法
CN103696784B (zh) 一种浅埋大跨隧道下穿建构筑物的大直径长管幕施工方法
CN101270579B (zh) 深基坑向浅基坑的扩展施工的基坑围护方法
CN104264688A (zh) 人工挖孔变截面桩支护施工工艺
CN102444142A (zh) 一种群桩改柱扩建地下室及其施工工法
CN105064397A (zh) 一种在地铁区间盾构隧道基础上扩挖车站的明挖施工方法
CN104912098A (zh) 一种深基坑支撑梁板与结构板结合施工方法
KR20140075767A (ko) 부지의 압축 및 굴착을 이용한 옹벽 구축
CN203782684U (zh) 一种桩身设有横梁的抗滑桩
CN105089670B (zh) 一种在并行区间盾构隧道基础上扩挖地铁车站施工方法
CN205242436U (zh) 地下复合围护体系中辅助基础底板换撑的临时支撑结构
CN109505298A (zh) 一种自平衡基坑围护方法
CN106223354A (zh) 浅基础结构模板的施工方法
CN101824825B (zh) 一种深基坑明挖施工方法
CN204282399U (zh) 一种地铁围护结构
CN106436721B (zh) 地下连续墙预埋式钢围檩堵头体系的施工方法
CN105696701B (zh) 一种顺坡剪力墙建筑开发平台及其施工方法
JP2012112162A (ja) 山留壁及び山留壁の構築方法
CN110984216A (zh) 水平t字形钢筋混凝土挡土墙及其施工方法
CN201991015U (zh) 基础托换结构
CN107299635A (zh) 一种软土地基边坡塌方支护加固方法
CN103334451A (zh) 高铁桥墩间利用咬合桩形成下穿通道及其方法
CN105421488A (zh) 地下复合围护体系中基础底板换撑的施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI GEO-ANCHOR CO., LTD.

Free format text: FORMER OWNER: ZHANG JIHONG

Effective date: 20150826

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150826

Address after: 200086 Shanghai city Hongkou District Helen Road 306 Lane 4, Room 502

Patentee after: Shanghai Solid Earth Rock Engineering Co., Ltd.

Address before: 200086 Shanghai Helen Road, Lane 306 No. 4 Room 502

Patentee before: Zhang Jihong

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Foundation underpinning structure and its construction method

Effective date of registration: 20220207

Granted publication date: 20141022

Pledgee: Zhejiang Tailong Commercial Bank Co.,Ltd. Shanghai Zhabei sub branch

Pledgor: SHANGHAI GEO-ANCHOR CO.,LTD.

Registration number: Y2022310000018

PE01 Entry into force of the registration of the contract for pledge of patent right