CN104652443B - 深基坑临时水平支撑兼作永久结构梁的施工方法 - Google Patents

深基坑临时水平支撑兼作永久结构梁的施工方法 Download PDF

Info

Publication number
CN104652443B
CN104652443B CN201310587815.XA CN201310587815A CN104652443B CN 104652443 B CN104652443 B CN 104652443B CN 201310587815 A CN201310587815 A CN 201310587815A CN 104652443 B CN104652443 B CN 104652443B
Authority
CN
China
Prior art keywords
horizontal support
interim
construction
armored concrete
permanent structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310587815.XA
Other languages
English (en)
Other versions
CN104652443A (zh
Inventor
岳齐贤
赵建立
梁勇
温克彬
于青川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd, CMTCC Shanghai Shisanye Construction Co Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201310587815.XA priority Critical patent/CN104652443B/zh
Publication of CN104652443A publication Critical patent/CN104652443A/zh
Application granted granted Critical
Publication of CN104652443B publication Critical patent/CN104652443B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2220/00Temporary installations or constructions

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本发明涉具体为一种深基坑临时水平支撑兼作永久结构梁的施工方法;其特征是:它包括下述步骤:确定钢筋混凝土临时水平支撑兼作永久结构梁的位置、参数;开挖首层土方,施工第一道钢筋混凝土临时水平支撑;开挖土方至第二道钢筋混凝土临时水平支撑底标高位置,施工该道水平支撑,并在该道水平支撑上按设计要求预留出钢筋,逐层施工第三道及以下水平支撑,直至基坑开挖结束,底板浇筑完成;将临时水平支撑梁上预留的钢筋与对应的地下室楼板钢筋连接形成一个整体并制作成地下室楼板等永久结构;拆除第一道水平支撑;基坑回填,施工完成。本发明采用上述步骤,相对于传统正作法省去了后期拆除临时水平支撑而产生的大量建筑垃圾及昂贵的施工经费。

Description

深基坑临时水平支撑兼作永久结构梁的施工方法
技术领域
本发明涉及深基坑施工领域,具体为一种深基坑临时水平支撑兼作永久结构梁的施工方法。
背景技术
正(顺)作法基坑土方开挖一般按照分层、分块、对称的原则进行,并在每块或每层土方开挖完成后及时施工水平支撑系统。土方开挖完成后再由下至上逐层施工地下结构并拆除对应的临时支撑。水平临时支撑一般采取型钢支撑或钢筋混凝土支撑形式。
钢支撑尤其适用于开挖面积小、施工周期短、长条形的基坑,(如地铁车站等);其具有拆装方便、自重小、可多次利用的优点,但自身稳定性差、不易控制基坑变形。
钢筋混凝土支撑适用于基坑面积大、深度深、施工周期长、地质条件复杂的基坑;其具有稳定性好、适应性高、基坑变形小的优点,但自重比较大,且地下主体结构施工完成后需采取机械或爆破进行拆除,产生大量的建筑垃圾,造成资源的浪费。
发明内容
本发明的目的在于,充分利用钢筋混凝土临时水平支撑,减少临时结构工程量,降低基坑工程施工过程中的材料浪费,将水平支撑系统与地下永久结构体系相结合,形成一种深基坑临时水平支撑兼作永久结构梁的施工方法。
为了达到上述目的,本发明是这样实现的:
一种深基坑临时水平支撑兼作永久结构梁的施工方法,它包括下述步骤:
步骤1、确定钢筋混凝土临时水平支撑兼作永久结构梁的位置、横截面尺寸、配筋及混凝土强度等参数,使其同时满足作为支撑围护结构所需承受的水平载荷及作为地下室主体结构受力和变形尤其是楼板抗弯载荷的要求;
步骤2、开挖首层土方,施工第一道钢筋混凝土临时水平支撑;
步骤3、开挖土方至第二道钢筋混凝土临时水平支撑底标高位置,施工该道水平支撑,并在该道水平支撑上按设计要求预留出钢筋,所留钢筋的长度应满足结构梁的设计规范及要求;
步骤4、重复步骤3,逐层施工第三道及以下水平支撑,直至基坑开挖结束,底板浇筑完成;
步骤5、由下至上,逐层施工地下室楼板等永久结构,将临时水平支撑梁上预留的钢筋与对应的地下室楼板钢筋连接形成一个整体并制作成地下室楼板等永久结构;
步骤6、地下结构顶板施工完成后,拆除第一道水平支撑;
步骤7、进行基坑回填,地下结构施工完成。
本发明采用上述步骤,其相对于传统正(顺)作法基坑施工而言,其省去了后期拆除临时水平支撑而产生的大量建筑垃圾以及昂贵的施工经费;相对逆作法基坑施工而言,其布置的水平支撑结构不同、密度小,可以有的放矢地设置于关键部位,从而具有更大的操作空间,方便施工作业。
附图说明
图1为第一道钢筋混凝土水平临时支撑的剖面图。
图2为第一道钢筋混凝土水平临时支撑的平面图。
图3为第二道钢筋混凝土水平支撑兼作永久结构梁的剖面图
图4为第二道钢筋混凝土水平支撑兼作永久结构梁的平面图。
图5为第三道钢筋混凝土水平支撑兼作永久结构梁的剖面图。
具体实施方式
以下通过具体实施例进一步说明本发明。
某基坑工程,基坑面积7万多平方米,开挖深度平均17.9米,地下三层,采用地下连续墙作为围护与止水结构。基坑的水平支撑共三道,采取“深基坑临时水平支撑兼作永久结构梁的施工方法”施工,具体步骤如下:
第一步,经设计验算,确定钢筋混凝土临时水平支撑兼作永久结构梁的位置(竖向、平面)、横截面尺寸、配筋及混凝土强度等参数,使其同时满足支撑围护结构和地下室主体结构受力和变形的要求。(尤其应当满足作为支撑围护结构所需承受的水平载荷及作为地下室主体结构受力、变形、楼板抗弯载荷的要求)
如图1、图2所示,
第二步,开挖首层土方,施工第一道钢筋混凝土临时水平支撑1。
如图3、图4所示,
第三步,开挖土方至第二道钢筋混凝土临时水平支撑2底标高位置,施工该道水平支撑,并在兼作永久结构梁的支撑上按设计要求预留出钢筋3,所留钢筋3的长度应满足结构梁的设计规范及要求。
如图5所示,
第四步,逐层施工第三道水平支撑4及以下水平支撑,直至基坑开挖结束,底板浇筑完成。
第五步,由下至上,逐层施工地下室楼板等永久结构,将临时水平支撑梁上预留的钢筋3与对应的地下室楼板钢筋连接形成一个整体并制作成地下室楼板等永久结构;
第六步,地下结构顶板施工完成后,拆除第一道水平支撑1。
第七步,进行基坑回填,地下结构施工完成。
本施工作业方法将第二道及以下各道钢筋混凝土临时水平支撑与地下室永久结构梁设计在同一竖向标高,前期作为基坑开挖期间水平支撑体系,后期转换为结构梁,作为永久结构的一部分。在设计阶段,通过对临时水平支撑梁的尺寸和配筋进行调整,使其同时满足围护结构水平支撑与地下主体结构受力与变形的要求。基坑开挖期间,施工临时水平支撑梁时,在梁上预留钢筋。在施工地下室结构楼板结构时,将临时水平支撑梁上预留的钢筋与对应的地下室楼板钢筋连接形成一个整体。由于第一道水平支撑受力较复杂,结构截面大,容易受到破坏,按照通常的办法施工,在地下室顶板施工完成后拆除即可。

Claims (1)

1.一种深基坑临时水平支撑兼作永久结构梁的施工方法,其特征是:它包括下述步骤:
步骤1、确定钢筋混凝土临时水平支撑兼作永久结构梁的位置、横截面尺寸、配筋及混凝土强度参数,使其同时满足作为支撑围护结构所需承受的水平载荷及作为地下室主体结构受力和变形、楼板抗弯载荷的要求;
步骤2、开挖首层土方,施工第一道钢筋混凝土临时水平支撑;
步骤3、开挖土方至第二道钢筋混凝土临时水平支撑底标高位置,施工该道水平支撑,并在该道水平支撑上按设计要求预留出钢筋,所留钢筋的长度应满足结构梁的设计规范及要求;
步骤4、重复步骤3,逐层施工第三道及以下水平支撑,直至基坑开挖结束,底板浇筑完成;
步骤5、由下至上,逐层施工地下室楼板永久结构,将临时水平支撑梁上预留的钢筋与对应的地下室楼板钢筋连接形成一个整体并制作成地下室楼板永久结构;
步骤6、地下结构顶板施工完成后,拆除第一道水平支撑;
步骤7、进行基坑回填,地下结构施工完成。
CN201310587815.XA 2013-11-21 2013-11-21 深基坑临时水平支撑兼作永久结构梁的施工方法 Active CN104652443B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310587815.XA CN104652443B (zh) 2013-11-21 2013-11-21 深基坑临时水平支撑兼作永久结构梁的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310587815.XA CN104652443B (zh) 2013-11-21 2013-11-21 深基坑临时水平支撑兼作永久结构梁的施工方法

Publications (2)

Publication Number Publication Date
CN104652443A CN104652443A (zh) 2015-05-27
CN104652443B true CN104652443B (zh) 2017-03-29

Family

ID=53244037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310587815.XA Active CN104652443B (zh) 2013-11-21 2013-11-21 深基坑临时水平支撑兼作永久结构梁的施工方法

Country Status (1)

Country Link
CN (1) CN104652443B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700496A (zh) * 2017-09-30 2018-02-16 中国建筑第八工程局有限公司 深基坑的逆顺结合施工方法

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908748B (zh) * 2016-05-31 2019-01-22 中国建筑第八工程局有限公司 对撑支护体系下用于控制基坑变形的深基坑支撑方法
CN106638936A (zh) * 2016-11-21 2017-05-10 上海建工二建集团有限公司 一种地下室连通方法
CN106836241A (zh) * 2017-03-30 2017-06-13 天津天建设集团有限公司 一种基坑支护水平支撑结构的换撑施工工法
CN107975064A (zh) * 2017-11-27 2018-05-01 上海市基础工程集团有限公司 用于地下工程的整体预制装配式施工工艺
CN108149707A (zh) * 2017-12-07 2018-06-12 成都新艺置业有限公司 一种地下室建筑结构及其施工方法
CN109183848B (zh) * 2018-08-10 2019-06-21 广东省建工设计院有限公司 一种隧道设计和建设方法
CN110158604B (zh) * 2019-06-19 2021-07-02 北京城建北方集团有限公司 基坑马道处支护结构施工方法
CN110439002A (zh) * 2019-07-18 2019-11-12 中国建筑第四工程局有限公司 一种内支撑临时水平结构用作永久结构梁板的方法
CN110578337B (zh) * 2019-09-10 2021-03-23 深圳市建工集团股份有限公司 一种深基坑内支撑梁、楼板木模加固混凝土同步施工方法
CN112177042A (zh) * 2020-08-26 2021-01-05 济南轨道交通集团有限公司 一种不影响地面交通的轨道交通车站施工方法
CN114635430B (zh) * 2022-03-28 2023-12-26 广州一建建设集团有限公司 用于大深度半逆作开挖的施工工艺

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002227204A (ja) * 2001-01-29 2002-08-14 Maeda Corp 掘削部の山留め工法
CN101126240A (zh) * 2006-08-16 2008-02-20 上海电力设计院有限公司 深基坑开挖过程中利用时差效应控制基坑变形的方法
CN101294390A (zh) * 2007-04-27 2008-10-29 上海市第五建筑有限公司 一平一抛局部中心岛基坑支撑系统及施工方法
CN102505696A (zh) * 2011-10-28 2012-06-20 上海建瓴工程咨询有限公司 后拆撑式型钢-混凝土双围檩基坑支撑体系及施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002227204A (ja) * 2001-01-29 2002-08-14 Maeda Corp 掘削部の山留め工法
CN101126240A (zh) * 2006-08-16 2008-02-20 上海电力设计院有限公司 深基坑开挖过程中利用时差效应控制基坑变形的方法
CN101294390A (zh) * 2007-04-27 2008-10-29 上海市第五建筑有限公司 一平一抛局部中心岛基坑支撑系统及施工方法
CN102505696A (zh) * 2011-10-28 2012-06-20 上海建瓴工程咨询有限公司 后拆撑式型钢-混凝土双围檩基坑支撑体系及施工方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
天津某地铁广场深基坑设计及施工简介;罗尉荣等;《建筑结构》;20110430;第41卷;第1340-1343 *
深基坑支护结构与主体结构相结合的设计与施工;王卫东等;《岩土工程学报》;20100731;第32卷;第191-199页 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700496A (zh) * 2017-09-30 2018-02-16 中国建筑第八工程局有限公司 深基坑的逆顺结合施工方法
CN107700496B (zh) * 2017-09-30 2019-10-01 中国建筑第八工程局有限公司 深基坑的逆顺结合施工方法

Also Published As

Publication number Publication date
CN104652443A (zh) 2015-05-27

Similar Documents

Publication Publication Date Title
CN104652443B (zh) 深基坑临时水平支撑兼作永久结构梁的施工方法
CN107313431B (zh) 临近不等高基坑同步施工方法
CN107542108B (zh) 一种建筑物地下室结构的逆向施工方法
CN103924602B (zh) 深厚软土基坑施工方法
CN104131565B (zh) 一种逆作土方正作开挖的施工方法
CN103410152B (zh) 一种用于狭长深基坑土方开挖的施工方法
CN103938634B (zh) 一种深基坑支护结构及施工方法
CN102505704A (zh) 软弱地质竖井中大型沉井施工方法
CN103362513A (zh) 暗挖区间既有洞体改造施工工法
CN102817372A (zh) 地下深基础混凝土反模施工方法
CN105735354A (zh) 一种城市地下工程盖挖全逆作施工方法
CN104652444A (zh) 超大型深基坑中心岛式交替土方开挖的整体逆作施工方法
CN104264684B (zh) 一种用于深基坑支护结构的预制异形空腹桩及其施工方法
CN105040707B (zh) 组合密排桩深基坑支护围护结构的施工方法
CN204356780U (zh) 一种用于深基坑支护结构的预制异形空腹桩
CN109898556A (zh) 一种地下综合管廊结构及下沉式施工方法
CN106988337B (zh) 一种用于减小条形浅基础房屋不均匀沉降的加固方法
CN203476354U (zh) 一种地下暗挖工程主体结构
CN113027464A (zh) 一种基于矿山法托换桩基的隧道结构施工方法
CN110939139B (zh) 基于桩后异型挡墙刚性接触的桩板墙结构及其构建方法
CN203080536U (zh) 基坑围护结构
CN203373753U (zh) 基坑桩锚护壁混凝土锚索冠梁结构
CN105696701A (zh) 一种顺坡剪力墙建筑开发平台及其施工方法
CN105002912A (zh) 一种基于预制空腹桩拼接式的沉箱结构的施工方法
Hui Effect on existing building by foundation pit excavation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: CMTCC Shanghai 13th Construction Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200430

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.