CN101294390A - 一平一抛局部中心岛基坑支撑系统及施工方法 - Google Patents

一平一抛局部中心岛基坑支撑系统及施工方法 Download PDF

Info

Publication number
CN101294390A
CN101294390A CNA2007100400625A CN200710040062A CN101294390A CN 101294390 A CN101294390 A CN 101294390A CN A2007100400625 A CNA2007100400625 A CN A2007100400625A CN 200710040062 A CN200710040062 A CN 200710040062A CN 101294390 A CN101294390 A CN 101294390A
Authority
CN
China
Prior art keywords
foundation pit
support
steel
base plate
purlin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2007100400625A
Other languages
English (en)
Other versions
CN101294390B (zh
Inventor
毛子成
张翼德
丁利峰
熊玎玮
朱煜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 5 Group Co Ltd
Original Assignee
Shanghai No5 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No5 Construction Co Ltd filed Critical Shanghai No5 Construction Co Ltd
Priority to CN2007100400625A priority Critical patent/CN101294390B/zh
Publication of CN101294390A publication Critical patent/CN101294390A/zh
Application granted granted Critical
Publication of CN101294390B publication Critical patent/CN101294390B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种用于超大面积深基坑的一平一抛局部中心岛基坑的支撑系统及施工方法。包括一道水平钢支撑,其以设置在基坑周边的第一道钢筋混凝土围檩作为支撑围檩,还包括位于水平钢支撑下方沿基坑局部周边设置的抛撑,所述抛撑下端抵靠在已挖土并浇筑完成的基坑底板上,上端抵靠在第一道钢筋混凝土围檩下方的第二道钢筋混凝土围檩上,所述已挖土并浇筑完成的基坑底板与未挖土的基坑底板之间设有施工缝。本发明基坑支撑系统及施工方法,为大面积深基坑的支撑提供了新的设计思路,发挥了支撑与中心岛支护各自优势,降低了二道支撑支护第二道支撑下方土方施工的难度,也减少了纯中心岛施工土坡过多过长的缺陷。

Description

一平一抛局部中心岛基坑支撑系统及施工方法
技术领域
本发明属于建筑施工技术领域,涉及一种基坑支撑系统及施工方法, 特别是用于超大面积深基坑的一平一抛局部中心岛基坑的支撑系统及施 工方法。 背景技术
目前,在建筑领域施工过程中经常根据地块以及建筑特点对施工区域 进行分区基坑施工,对于大基坑的基坑支撑主要采用二道水平支撑,但是 对于面积超大的深基坑,采用二道水平支撑的围护方式,增加了第二道支 撑下土方开挖的难度,而且必须增置钢栈桥,由于基坑中间区范围大,钢 栈桥的用钢量非常大,按工期考虑,不仅增加施工的成本,而且施工进度 也会受到大的影响。
因此如果充分利用周边已完成分区基坑的地室外墙作为支撑,设计出 一种既不需要钢栈桥,又能满足超大基坑支撑需要,完成土方挖土需要的 基坑支护系统和施工方法成为本领域技术人员迫切需要解决的技术难题。 发明内容
本发明的目的在于提供一种既能满足基坑的有效支撑,又能保证土方 开挖顺利并降低成本的一平一抛局部中心岛基坑支撑系统及施工方法,以 满足超大面积深基坑的土方开挖需要。
本发明解决技术问题的技术方案如下:
一种一平一抛局部中心岛基坑支撑系统,包括一道水平钢支撑,其以 设置在基坑周边的第一道钢筋混凝土围檩作为支撑围檩,其特征在于,还 包括位于水平钢支撑下方沿基坑局部周边设置的抛撑,所述抛撑下端抵靠 在已挖土并浇筑完成的基坑底板上,上端抵靠在第一道钢筋混凝土围檩下方的第二道钢筋混凝土围檩上,所述已挖土并浇筑完成的基坑底板与未挖 土的基坑底板之间设有施工缝。
本发明同时公开了一种如上所述的基坑支撑系统的施工方法,其特征 在于,包括如下步骤:
(1) 、根据施工现场基坑周围道路情况确定挖土流向;
(2) 、第一次土方开挖:在围护墙内侧第一道水平钢管支撑部位开挖 沟槽,安装第一道水平钢支撑;
(3) 、第二次土方开挖:开挖分两层、双机接力进行,上层布置一台 大挖机,先挖至一定深度,挖出阶梯平台后,土方放坡,小挖机下坑挖下 一层土,层间土方放坡,至基坑板底标高;
(4) 、浇筑基坑底板,沿后浇带设置抛撑钢筋混凝土支墩,在已挖土 并浇筑完成的底板与抛撑下为完成基坑底板之间设置施工缝,待已挖土并 浇筑完成的底板和钢筋混凝土支墩达到设计强度70%后进行抛撑施工;
(5) 、第二次土方开挖:抛撑施工完毕并施加预应力后进行第三次挖 土,开挖至抛撑下土方至基坑底标高。
由以上公开的技术方案可知,本发明通过利用已完成的外围基坑的外 墙,以其作为基坑区域支撑,非外围基坑包围的局部设置抛撑,采用一平 即一道完全的水平支撑, 一抛即一道斜撑,局部中心岛有两层含义, 一是 它的平面范围为非外围基坑包围的基坑一侧,二是有一道满堂水平支撑, 不是完全的中心岛施工法。本发明采用抛撑首先减少了第二道水平支撑的 安装以及拆除时间,大大加快了第二道支撑底挖土速度,从而总工期相应 减少;其次,采用第二道水平钢支撑需整体成型方可施加预应力,发挥作 用,这需要相对较长的时间,而抛撑体系可分开施工,预应力可随做随加, 迅速发挥作用,因此抛撑体系可使预计SMW工法位移以及挖土期间对周 边环境的影响均得到不同程度减少;最后采用抛撑体系代替第二道钢支 撑,整个基坑内主要区域土方可以一次开挖到底,而不需要分两次开挖,故可取消原挖土用钢栈桥,同时栈桥下H型钢取消后对底板防水、各楼层 施工亦带来不同程度的方便,不仅节省了施工时间,而且节省了钢栈桥产 生的费用。
本发明一平一抛局部中心岛的基坑支撑系统及施工方法,为大面积深 基坑的支撑提供了新的设计思路,发挥了支撑与中心岛支护各自优势,降 低了 二道支撑支护第二道支撑下方土方施工的难度,也减少了纯中心岛施 工土坡过多过长的缺陷。 附图说明
图1是本发明支撑系统局部里面结构示意图; 图2是本发明支撑系统中抛撑的分布结构示意图。 具体实施方式
下面结合附图进一步说明本发明。
图2为本发明的一个具体实施例,图中B区即本发明所述的超大面积 深基坑,A区、C区为位于B区周边的已完成基坑,图中A1、 Cl分别为 已完成的周边基坑A区和C区的外墙。如图1〜2所示,本发明一平一抛 局部中心岛基坑支撑系统,包括一道水平钢支撑1,其以设置在基坑周边 的第一道钢筋混凝土围檩2作为支撑围檩,还包括位于水平钢支撑1下方 沿基坑局部周边设置的抛撑3,所述抛撑3下端抵靠在已挖土并浇筑完成 的基坑底板4上,上端抵靠在第一道钢筋混凝土围檩2下方的第二道钢筋 混凝土围檩5上,所述已挖土并浇筑完成的基坑底板4与未挖土的基坑底 板6之间设有施工缝7。
所述已挖土并浇筑完成的基坑底板(4)上设有钢筋混凝土支墩(8), 所述抛撑(3)下端顶在钢筋混凝土支墩(8)上。
所述第二道钢筋混凝土围檩(5)上预埋有钢板(9),所述抛撑(3) 的上端与钢板(9)焊接固定。
所述抛撑(3)的倾角为8〜15度。如上所述的基坑支撑系统的施工方法,包括如下步骤:
(1) 、根据施工现场基坑周围道路情况确定挖土流向;
(2) 、第一次土方开挖:主要配合第一道圈梁、钢筋混凝土角撑和钢
管对撑施工。首先沿SMW围护墙内侧开挖一条深为1.5m的沟槽,以便将 围护墙顶的泛浆凿出填入,凿至圈梁底标高、将混凝土角撑区域土方挖出, 再施工砼圈梁和砼角撑。在围护墙内侧第一道水平钢管支撑1部位开挖沟 槽,安装第一道水平钢支撑1;在混凝土强度达到设计要求、第一道水平 钢管支撑1施工完毕并施加预应力后再进行第二次土方开挖。
(3) 、第二次土方开挖:开挖分两层、双机接力进行,上层布置一台 大挖机,先挖至一定深度,挖出阶梯平台后,小挖机下坑挖下一层土,至 基坑板底标高,层间土方放坡;层间土方按1: 1放坡,已完成的坑内围
护加固以外按l: 1向上放坡。
(4) 、浇筑基坑底板,沿后浇带设置抛撑钢筋混凝土支墩,在已挖土
并浇筑完成的底板4与未完成基坑底板6之间设置施工缝7,待已挖土并
浇筑完成的底板和钢筋混凝土支墩达到设计强度70%后进行抛撑施工;抛
撑施工时先进行钢围檩安装,在钢围檩处预先开槽挖土,逐段安装钢围檩。
(5) 、第二次土方开挖:抛撑施工完毕并施加预应力后进行第三次挖
土,开挖至抛撑下土方至基坑底标高。

Claims (8)

1.一种一平一抛局部中心岛基坑支撑系统,包括一道水平钢支撑(1),其以设置在基坑周边的第一道钢筋混凝土围檩(2)作为支撑围檩,其特征在于,还包括位于水平钢支撑(1)下方沿基坑局部周边设置的抛撑(3),所述抛撑(3)下端抵靠在已挖土并浇筑完成的基坑底板(4)上,上端抵靠在第一道钢筋混凝土围檩(2)下方的第二道钢筋混凝土围檩(5)上,所述已挖土并浇筑完成的基坑底板(4)与未挖土的基坑底板(6)之间设有施工缝(7)。
2. 如权利要求1所述的一平一抛局部中心岛基坑支撑系统,其特征 在于,所述已挖土并浇筑完成的基坑底板(4)上设有钢筋混凝土支墩(8), 所述抛撑(3)下端顶在钢筋混凝土支墩(8)上。
3. 如权利要求1所述的一平一抛局部中心岛基坑支撑系统,其特征 在于,所述第二道钢筋混凝土围檩(5)上预埋有钢板(9),所述抛撑(3) 的上端与钢板(9)焊接固定。
4. 如权利要求1所述的一平一抛局部中心岛基坑支撑系统,其特征 在于,所述抛撑(3)的倾角为8〜15度。
5. 如权利要求1〜4所述的基坑支撑系统的施工方法,其特征在于, 包括如下步骤:(1) 、根据施工现场基坑周围道路情况确定挖土流向;(2) 、第一次土方开挖:在围护墙内侧第一道水平钢管支撑部位开挖 沟槽,安装第一道水平钢支撑;(3) 、第二次土方开挖:开挖分两层、双机接力进行,上层布置一台 大挖机,先挖至一定深度,挖出阶梯平台后,土方放坡,小挖机下坑挖下 一层土,层间土方放坡,至基坑板底标高;(4) 、浇筑基坑底板,沿后浇带设置抛撑钢筋混凝土支墩,在已挖土 并浇筑完成的底板与抛撑下为完成基坑底板之间设置施工缝,待已挖土并浇筑完成的底板和钢筋混凝土支墩达到设计强度70%后进行抛撑施工;(5) 、第二次土方开挖:抛撑施工完毕并施加预应力后进行第三次挖 土,开挖至抛撑下土方至基坑底标高。
6. 如权利要求5所述的基坑支撑系统的施工方法,其特征在于,所 说的步骤(2)中第一次土方开挖要配合第一道圈梁、钢筋混凝土角撑和钢管对撑施工。
7. 如权利要求1所述的基坑支撑系统的施工方法,其特征在于,所 说抛撑施工时先进行钢围檩安装,在钢围檩处预先开槽挖土,逐段安装钢 围檩。
8. 如权利要求1所述的基坑支撑系统的施工方法,其特征在于,所说的步骤(3)中层间土方按l: l放坡。
CN2007100400625A 2007-04-27 2007-04-27 一平一抛局部中心岛基坑支撑系统及施工方法 Active CN101294390B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007100400625A CN101294390B (zh) 2007-04-27 2007-04-27 一平一抛局部中心岛基坑支撑系统及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007100400625A CN101294390B (zh) 2007-04-27 2007-04-27 一平一抛局部中心岛基坑支撑系统及施工方法

Publications (2)

Publication Number Publication Date
CN101294390A true CN101294390A (zh) 2008-10-29
CN101294390B CN101294390B (zh) 2010-09-08

Family

ID=40064901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007100400625A Active CN101294390B (zh) 2007-04-27 2007-04-27 一平一抛局部中心岛基坑支撑系统及施工方法

Country Status (1)

Country Link
CN (1) CN101294390B (zh)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102002953A (zh) * 2010-12-02 2011-04-06 上海市第四建筑有限公司 一种基坑围护肋板换撑的方法
CN101408025B (zh) * 2008-11-11 2011-06-01 广州市设计院 利用主体结构作为支撑点的基坑施工方法
CN102322063A (zh) * 2011-06-28 2012-01-18 天津住宅集团建设工程总承包有限公司 一种深基坑二次开挖及支护施工方法
CN102561362A (zh) * 2011-12-31 2012-07-11 青建集团股份公司 一种强夯置换淤泥质土的基坑支护施工方法
CN103103988A (zh) * 2013-01-21 2013-05-15 安徽省城建设计研究院 利用中心岛楼板水平支撑结构的基坑施工方法
CN103161168A (zh) * 2013-02-22 2013-06-19 东通岩土科技(杭州)有限公司 一种可拆卸预应力支撑架系统
CN103233477A (zh) * 2013-04-25 2013-08-07 温州天然工程勘察有限公司 深基坑围护工程中敞开型钢筋混凝土支撑与地下室底板的浇注方法
CN103276739A (zh) * 2013-06-28 2013-09-04 上海强劲地基工程股份有限公司 一种带有斜向支撑和预应力围檩的基坑支护结构
CN104652443A (zh) * 2013-11-21 2015-05-27 中冶天工上海十三冶建设有限公司 深基坑临时水平支撑兼作永久结构梁的施工方法
CN104746522A (zh) * 2015-04-22 2015-07-01 国家海洋局南海海洋工程勘察与环境研究院 一种用于疏浚淤泥质土地区基坑的可智能变形调节的斜抛撑支护系统
CN104963347A (zh) * 2015-07-20 2015-10-07 龙元建设集团股份有限公司 基坑腰梁钢管带换撑施工方法
CN105113512A (zh) * 2015-08-05 2015-12-02 中国建筑第八工程局有限公司 基坑围护结构中梁板缺失处的换撑及其施工方法
CN106522241A (zh) * 2016-12-14 2017-03-22 上海建工建集团有限公司 超大层高地下室结构的深基坑支护方法
CN106894424A (zh) * 2017-03-03 2017-06-27 周同和 一种盆式开挖短支撑支护体系及其施工工艺
CN106988318A (zh) * 2017-03-28 2017-07-28 广东省基础工程集团有限公司 一种先施工抛撑后施工围护的基坑支护方法
CN111254807A (zh) * 2020-03-25 2020-06-09 中冶建工集团有限公司 用于深大基坑土石方转运的转运桥及土石方挖运方法
CN112609706A (zh) * 2020-12-09 2021-04-06 中铁二十局集团第六工程有限公司 填海区基坑对撑角撑混凝土水平支护结构施工方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1206422C (zh) * 2002-07-25 2005-06-15 上海隧道工程股份有限公司 逆筑法空间斜撑的施工方法

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101408025B (zh) * 2008-11-11 2011-06-01 广州市设计院 利用主体结构作为支撑点的基坑施工方法
CN102002953A (zh) * 2010-12-02 2011-04-06 上海市第四建筑有限公司 一种基坑围护肋板换撑的方法
CN102322063A (zh) * 2011-06-28 2012-01-18 天津住宅集团建设工程总承包有限公司 一种深基坑二次开挖及支护施工方法
CN102322063B (zh) * 2011-06-28 2013-04-17 天津住宅集团建设工程总承包有限公司 一种深基坑二次开挖及支护施工方法
CN102561362A (zh) * 2011-12-31 2012-07-11 青建集团股份公司 一种强夯置换淤泥质土的基坑支护施工方法
CN103103988A (zh) * 2013-01-21 2013-05-15 安徽省城建设计研究院 利用中心岛楼板水平支撑结构的基坑施工方法
CN103161168A (zh) * 2013-02-22 2013-06-19 东通岩土科技(杭州)有限公司 一种可拆卸预应力支撑架系统
CN103233477A (zh) * 2013-04-25 2013-08-07 温州天然工程勘察有限公司 深基坑围护工程中敞开型钢筋混凝土支撑与地下室底板的浇注方法
CN103276739A (zh) * 2013-06-28 2013-09-04 上海强劲地基工程股份有限公司 一种带有斜向支撑和预应力围檩的基坑支护结构
CN104652443B (zh) * 2013-11-21 2017-03-29 中冶天工上海十三冶建设有限公司 深基坑临时水平支撑兼作永久结构梁的施工方法
CN104652443A (zh) * 2013-11-21 2015-05-27 中冶天工上海十三冶建设有限公司 深基坑临时水平支撑兼作永久结构梁的施工方法
CN104746522A (zh) * 2015-04-22 2015-07-01 国家海洋局南海海洋工程勘察与环境研究院 一种用于疏浚淤泥质土地区基坑的可智能变形调节的斜抛撑支护系统
CN104963347A (zh) * 2015-07-20 2015-10-07 龙元建设集团股份有限公司 基坑腰梁钢管带换撑施工方法
CN105113512A (zh) * 2015-08-05 2015-12-02 中国建筑第八工程局有限公司 基坑围护结构中梁板缺失处的换撑及其施工方法
CN106522241A (zh) * 2016-12-14 2017-03-22 上海建工建集团有限公司 超大层高地下室结构的深基坑支护方法
CN106522241B (zh) * 2016-12-14 2019-04-12 上海建工一建集团有限公司 超大层高地下室结构的深基坑支护方法
CN106894424A (zh) * 2017-03-03 2017-06-27 周同和 一种盆式开挖短支撑支护体系及其施工工艺
CN106988318A (zh) * 2017-03-28 2017-07-28 广东省基础工程集团有限公司 一种先施工抛撑后施工围护的基坑支护方法
CN106988318B (zh) * 2017-03-28 2019-12-17 广东省基础工程集团有限公司 一种先施工抛撑后施工围护的基坑支护方法
CN111254807A (zh) * 2020-03-25 2020-06-09 中冶建工集团有限公司 用于深大基坑土石方转运的转运桥及土石方挖运方法
CN111254807B (zh) * 2020-03-25 2021-05-11 中冶建工集团有限公司 用于深大基坑土石方转运的转运桥及土石方挖运方法
CN112609706A (zh) * 2020-12-09 2021-04-06 中铁二十局集团第六工程有限公司 填海区基坑对撑角撑混凝土水平支护结构施工方法
CN112609706B (zh) * 2020-12-09 2022-05-17 中铁二十局集团第六工程有限公司 填海区基坑对撑角撑混凝土水平支护结构施工方法

Also Published As

Publication number Publication date
CN101294390B (zh) 2010-09-08

Similar Documents

Publication Publication Date Title
CN101294390B (zh) 一平一抛局部中心岛基坑支撑系统及施工方法
CN101936167B (zh) 桥梁托换结合盾构施工穿越桥梁桩基的施工方法
CN101736749B (zh) 软土基连续沉箱施工方法
CN102505695B (zh) 一种立体车库深基坑施工方法
CN100543241C (zh) 一种地下工程中一桩多用半逆作的方法
CN101440708B (zh) Pba浅埋暗挖近距离大断面三洞分离岛式结构施工方法
CN102182325B (zh) 一种框架结构独立基础既有建筑物地下室增层方法
CN110630283B (zh) 一种适用于双连拱隧道的三层支护结构及施工方法
CN101509263A (zh) 钢盖板盖挖法基坑结构及其施工方法
CN101761068A (zh) 隧道穿越河流上方桥梁桩基的箱-筏承压式基础托换及施工加固方法
CN103590404B (zh) 一种紧邻已建地下结构的基坑支撑方法
CN102828520A (zh) 一种应用于深厚泥炭土深基坑中的环形内支撑结构
CN102691300A (zh) 基坑土方的施工方法
CN102966108A (zh) 紧临既有建筑物以地下结构为内支撑的深基坑施工方法
CN101614019A (zh) 紧临既有建筑物多层地下结构自支护施工方法
CN104563146A (zh) 定直埋式雨污水泵站沉井工程施工方法
CN105178327A (zh) 一种基坑工程的复合围护结构及其施工方法
CN103711056B (zh) 钢质工具式临时施工道路及其施工方法
CN108035379B (zh) 一种综合管廊及其施工方法
CN103290847A (zh) 超大面积深基坑内斜梁支撑结构及施工方法
CN102031785A (zh) 永久结构板带代替临时围檩的基坑支护技术
CN112576056A (zh) 一种用于既有建筑地下室增层改造的托换支撑体系及其施工方法
CN109403981B (zh) 地铁盾构井主体结构的施工工艺
CN106592598A (zh) 同层双榀大直径钢管支撑及其组成的深基坑组合内支撑
CN112012763B (zh) 一种双层初期支护的多连拱隧道结构的施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI CONSTRUCTION NO.5 GROUP CO., LTD.

Free format text: FORMER NAME: SHANGHAI NO.5 BUILDING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 200062 1000 Cao Yang Road, Shanghai

Patentee after: Shanghai Construction NO.5 (Group) Co., Ltd.

Address before: 200062 1000 Cao Yang Road, Shanghai

Patentee before: Shanghai No.5 Construction Co., Ltd.