CN103669432B - A kind of jacking device for deviation rectification of steel pylon in mining area of coal mine - Google Patents

A kind of jacking device for deviation rectification of steel pylon in mining area of coal mine Download PDF

Info

Publication number
CN103669432B
CN103669432B CN201310575656.1A CN201310575656A CN103669432B CN 103669432 B CN103669432 B CN 103669432B CN 201310575656 A CN201310575656 A CN 201310575656A CN 103669432 B CN103669432 B CN 103669432B
Authority
CN
China
Prior art keywords
jacking
main material
plate
iron tower
coal mine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310575656.1A
Other languages
Chinese (zh)
Other versions
CN103669432A (en
Inventor
舒前进
袁广林
王丽彬
任秀生
李庆涛
王玮
宋巍
王文龙
李青
徐支松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Shanxi Electric Power Co Ltd
Original Assignee
China University of Mining and Technology CUMT
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Shanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT, State Grid Corp of China SGCC, Economic and Technological Research Institute of State Grid Shanxi Electric Power Co Ltd filed Critical China University of Mining and Technology CUMT
Priority to CN201310575656.1A priority Critical patent/CN103669432B/en
Publication of CN103669432A publication Critical patent/CN103669432A/en
Application granted granted Critical
Publication of CN103669432B publication Critical patent/CN103669432B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention discloses a kind of electric power pylon deviation correcting device, particularly relate to a kind of jacking device for deviation rectification of steel pylon in mining area of coal mine, including concrete long column independent footing (1), foundation bolt (3) and can jacking column foot plate (4), jacking column foot plate (4) can include base plate (6) and the iron tower main material connecting plate (8) being welded on base plate (6), iron tower main material connecting plate (8) welds along edge with iron tower main material (5);Can the base plate (6) of jacking column foot plate (4) be connected with concrete long column independent footing (1) by foundation bolt (3);Concrete long column independent footing (1) is provided with the loading hole (7) for laying jack (2);Foundation bolt (3) exposes screw thread length and is not shorter than 150mm.This structural system simple structure, when electric power pylon run-off the straight, releasably foot bolt (3), use the direct jacking of jack can be carried out correction by jacking column foot plate.

Description

A kind of jacking device for deviation rectification of steel pylon in mining area of coal mine
Technical field
The present invention relates to a kind of electric power pylon deviation correcting device, particularly relate to a kind of jacking device for deviation rectification of steel pylon in mining area of coal mine.
Background technology
Due to the change of colliery minery geologic structure, build the electric power pylon at minery and be susceptible to sinking in various degree and inclination, cause serious threat to the safe operation of transmission line of electricity.The way solving this problem at present is after electric power pylon tilts, and uses the mode transforming iron tower structure or basis to rectify a deviation.Adopt in this way, Work tool consumption is big, site layout project is more complicated, workload and labor strength the biggest.
Summary of the invention
The problem existed for above-mentioned prior art, the present invention provides a kind of jacking device for deviation rectification of steel pylon in mining area of coal mine, in the case of easy construction, using Work tool few, rectifies a deviation the electric power pylon tilted, it is ensured that the safety of transmission line of electricity.
To achieve these goals, the technical solution used in the present invention is: a kind of jacking device for deviation rectification of steel pylon in mining area of coal mine, including concrete long column independent footing, and foundation bolt and can jacking column foot plate;Can include base plate and the iron tower main material connecting plate being welded on base plate by jacking column foot plate, iron tower main material connecting plate welds along edge with iron tower main material, the base plate of jacking column foot plate can pass through foundation bolt and be connected with concrete long column independent footing;Concrete long column independent footing is provided with the loading hole that can lay jack;Described foundation bolt exposes screw thread length and is not shorter than 150mm.
Preferably, base plate is welded with stiffener, stiffener and iron tower main material connecting plate vertical welding.
Preferably, loading hole is rectangular structure.
Preferably, the size width x length × height of described loading hole is not less than 150mm × 200mm × 300mm.
Preferably, described foundation bolt exposes screw thread a length of 150mm 300mm.
The present invention, when carrying out foundation construction, reserves the loading hole that can lay jack, and installation can jacking column foot plate while installing steel tower.During steel tower run-off the straight, releasably foot bolt, jack is placed in loading hole, use jack jacking column foot plate, just can safe and accurate, reliably the electric power pylon of run-off the straight is rectified a deviation;The present invention when electric power pylon run-off the straight, releasably foot bolt, use jack direct jacking column foot plate can be carried out correction, easily the steel tower tilted can be adjusted continuously, effectively reduce the angle of inclination of steel tower, easy construction, the Work tool used is few, and reliability is high;The additional stress that earth's surface deformation produces on electric power pylon can be substantially reduced, enable electric power pylon to stand the impact that Coal Exploitation is dynamic, and then ensure the safety of transmission line of electricity.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the A-A generalized section of Fig. 1;
Fig. 3 is the top view of concrete long column independent footing;
Fig. 4 is the left view of concrete long column independent footing.
In figure: 1, concrete long column independent footing, 2, jack, 3, foundation bolt, 4, can jacking column foot plate, 5, iron tower main material, 6, base plate, 7, loading hole, 8, iron tower main material connecting plate, 9, stiffener.
Detailed description of the invention
The invention will be further described below in conjunction with the accompanying drawings.
As shown in Figures 1 to 4: the present invention includes concrete long column independent footing 1, foundation bolt 3 and can jacking column foot plate 4;Can include base plate 6 and the iron tower main material connecting plate 8 being welded on base plate 6 by jacking column foot plate 4, iron tower main material connecting plate 8 welds along edge with iron tower main material 5, the base plate 6 of jacking column foot plate 4 can pass through foundation bolt 3 and be connected with concrete long column independent footing 1;Concrete long column independent footing 1 is provided with the reserved loading hole 7 that can lay jack 2;Described foundation bolt 3 exposes screw thread length and is not shorter than 150mm.
It is welded with stiffener 9, stiffener 9 and iron tower main material connecting plate 8 vertical welding on base plate 6, due to the setting of stiffener 9, the bearing capacity of this device can be effectively improved.
For the ease of accommodating jack 2, loading hole 7 is rectangular structure.
In order to accommodate jack 2, the size width x length × height of described loading hole 7 is not less than 150mm × 200mm × 300mm.
Described foundation bolt 3 exposes screw thread a length of 150mm 300mm, in this length range, convenient can the installation and removal of jacking column foot plate 4.
In the present invention, by the loading hole 7 that can lay jack 2 reserved on concrete long column independent footing 1, and construct and can jacking column foot plate 4, i.e. iron tower main material connecting plate 8 weld with iron tower main material 5 while steel tower is installed, and be welded on base plate 6 with stiffener 9 simultaneously.When steel tower run-off the straight, it is only necessary to releasably foot bolt 3, jack 2 is placed in the reserved loading hole 7 of concrete long column independent footing 1, use jack 2 jacking can jacking column foot plate 4, just the electric power pylon tilted can be rectified a deviation, after rectification work completes, fastening foundation bolt 3.The present invention can reduce the angle of inclination of steel tower in the case of easy construction, Work tool lack effectively, and can adjust continuously, reduce the additional stress that earth's surface deformation produces on electric power pylon, enable steel tower to stand the impact that Coal Exploitation is dynamic, and then ensure the safety of transmission line of electricity.

Claims (5)

1. a jacking device for deviation rectification of steel pylon in mining area of coal mine, including concrete long column independent footing (1) and foundation bolt (3);Characterized by further comprising can jacking column foot plate (4), jacking column foot plate (4) base plate (6) and the iron tower main material connecting plate (8) being welded on base plate (6) can be included, iron tower main material connecting plate (8) welds along edge with iron tower main material (5);Can the base plate (6) of jacking column foot plate (4) be connected with concrete long column independent footing (1) by foundation bolt (3);Concrete long column independent footing (1) is provided with the loading hole (7) for laying jack (2);Described foundation bolt (3) exposes screw thread length and is not shorter than 150mm.
A kind of jacking device for deviation rectification of steel pylon in mining area of coal mine the most according to claim 1, it is characterised in that be welded with stiffener (9), stiffener (9) and iron tower main material connecting plate (8) vertical welding on base plate (6).
A kind of jacking device for deviation rectification of steel pylon in mining area of coal mine the most according to claim 1, it is characterised in that described loading hole (7) is rectangular structure.
A kind of jacking device for deviation rectification of steel pylon in mining area of coal mine the most according to claim 3, it is characterised in that the size width x length × height of described loading hole (7) is not less than 150mm × 200mm × 300mm.
A kind of jacking device for deviation rectification of steel pylon in mining area of coal mine the most according to claim 1, it is characterised in that described foundation bolt (3) exposes screw thread a length of 150mm 300mm.
CN201310575656.1A 2013-11-18 2013-11-18 A kind of jacking device for deviation rectification of steel pylon in mining area of coal mine Expired - Fee Related CN103669432B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310575656.1A CN103669432B (en) 2013-11-18 2013-11-18 A kind of jacking device for deviation rectification of steel pylon in mining area of coal mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310575656.1A CN103669432B (en) 2013-11-18 2013-11-18 A kind of jacking device for deviation rectification of steel pylon in mining area of coal mine

Publications (2)

Publication Number Publication Date
CN103669432A CN103669432A (en) 2014-03-26
CN103669432B true CN103669432B (en) 2016-11-02

Family

ID=50308146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310575656.1A Expired - Fee Related CN103669432B (en) 2013-11-18 2013-11-18 A kind of jacking device for deviation rectification of steel pylon in mining area of coal mine

Country Status (1)

Country Link
CN (1) CN103669432B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563172B (en) * 2015-01-13 2016-10-05 浙江湖州市建工集团有限公司 A kind of steel construction room sinking resetting structure and repositioning method thereof
CN104763005A (en) * 2015-03-18 2015-07-08 山东省水利科学研究院 Large steel spherical tank inclination rectification method
CN106759556A (en) * 2016-12-26 2017-05-31 中国化学工程第三建设有限公司 One kind correction inclined method of tower body
CN113482034B (en) * 2021-06-23 2023-07-14 国网山西省电力公司阳泉供电公司 Deviation correcting method for differential settlement of power transmission tower
CN114278139B (en) * 2021-11-26 2023-03-24 内蒙古电力(集团)有限责任公司鄂尔多斯电业局 Mining-correcting cooperative power transmission tower maintenance method
CN114278141B (en) * 2021-11-26 2023-03-24 内蒙古电力(集团)有限责任公司鄂尔多斯电业局 Deviation-correctable power transmission tower and using method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102080382A (en) * 2010-11-30 2011-06-01 济南大学 Building foundation adaptable to goaf foundation deformation
CN102864795A (en) * 2012-10-19 2013-01-09 重庆大学 Light steel factory post foundation suitable for sedimentation of filled-in ground and construction method
CN203284791U (en) * 2013-06-06 2013-11-13 中鼎国际工程有限责任公司 Independent column basis below column and capable of conducting jacking rectification
CN203960919U (en) * 2013-11-18 2014-11-26 国家电网公司 Colliery minery electric power pylon correction lift-up device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3100350B2 (en) * 1997-03-31 2000-10-16 富士男 板垣 Correction device and correction method for correcting settlement of building

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102080382A (en) * 2010-11-30 2011-06-01 济南大学 Building foundation adaptable to goaf foundation deformation
CN102864795A (en) * 2012-10-19 2013-01-09 重庆大学 Light steel factory post foundation suitable for sedimentation of filled-in ground and construction method
CN203284791U (en) * 2013-06-06 2013-11-13 中鼎国际工程有限责任公司 Independent column basis below column and capable of conducting jacking rectification
CN203960919U (en) * 2013-11-18 2014-11-26 国家电网公司 Colliery minery electric power pylon correction lift-up device

Also Published As

Publication number Publication date
CN103669432A (en) 2014-03-26

Similar Documents

Publication Publication Date Title
CN103669432B (en) A kind of jacking device for deviation rectification of steel pylon in mining area of coal mine
CN203960919U (en) Colliery minery electric power pylon correction lift-up device
CN103669431B (en) A kind of colliery minery electric power pylon inclination adjusting device
CN103938663A (en) Correction device of inclined power transmission tower made of signal-splicing steel angle principal material
CN203546728U (en) Improved installation fixing device of top-down steel pipe column
CN101148888B (en) Compressed-air caisson anchor pile automatic error correcting device
CN203960920U (en) Colliery minery electric power pylon inclination adjusting device
CN202073100U (en) Temporary vertical steel support structure for compensating displacement or missed piling of steel lattice columns
CN206140039U (en) Novel steel bow member and connector plates welding position ware
CN102817617B (en) Novel inhaul cable type shield originating backrest substrate system
CN201495556U (en) Structure for quickly hoisting and centering base of large steel frame
CN215858944U (en) Platform structure for steel structure construction operation
CN203022409U (en) Iron tower support assembly
CN203594264U (en) Clamp special for angle steel iron tower rectification and tool for angle steel iron tower rectification
CN205012299U (en) Pressure steel pipe installation shaped steel rail set
CN206090604U (en) Device on collecting space area self -adaptation adjustment basis
CN206591903U (en) Electric power pylon differential settlement adjusting means
CN203361116U (en) Drilling construction platform
CN202730784U (en) Underwater thrusting device used for deviation correction of steel cofferdam
CN207245741U (en) Tunnel low-angle lift canopy
CN106759557B (en) Mining area power transmission tower horizontal deformation recovery device
CN205709663U (en) A kind of for assisting the jack of pipe laying support
CN203322510U (en) Bidirectional petroleum platform pipeline fixing device
CN203479305U (en) Auxiliary measurement supporting system of CMS (Cavity Monitoring System) detecting instrument
CN201714414U (en) Quick supporting device for preventing roofs from falling in stope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161102

Termination date: 20211118

CF01 Termination of patent right due to non-payment of annual fee