CN103669432B - A deflection correcting and jacking device for transmission towers in coal mine mining areas - Google Patents

A deflection correcting and jacking device for transmission towers in coal mine mining areas Download PDF

Info

Publication number
CN103669432B
CN103669432B CN201310575656.1A CN201310575656A CN103669432B CN 103669432 B CN103669432 B CN 103669432B CN 201310575656 A CN201310575656 A CN 201310575656A CN 103669432 B CN103669432 B CN 103669432B
Authority
CN
China
Prior art keywords
tower
plate
coal mine
jacking
jacking device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310575656.1A
Other languages
Chinese (zh)
Other versions
CN103669432A (en
Inventor
舒前进
袁广林
王丽彬
任秀生
李庆涛
王玮
宋巍
王文龙
李青
徐支松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Economic and Technological Research Institute of State Grid Shanxi Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
China University of Mining and Technology Beijing CUMTB
Economic and Technological Research Institute of State Grid Shanxi Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB, Economic and Technological Research Institute of State Grid Shanxi Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201310575656.1A priority Critical patent/CN103669432B/en
Publication of CN103669432A publication Critical patent/CN103669432A/en
Application granted granted Critical
Publication of CN103669432B publication Critical patent/CN103669432B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)
  • Electric Cable Installation (AREA)

Abstract

本发明公开了一种输电铁塔纠偏装置,尤其涉及一种煤矿采动区输电铁塔纠偏顶升装置,包括混凝土长柱独立基础(1)、地脚螺栓(3)和可顶升塔脚板(4),可顶升塔脚板(4)包括底板(6)和焊接在底板(6)上的铁塔主材连接板(8),铁塔主材连接板(8)与铁塔主材(5)沿边沿焊接;可顶升塔脚板(4)的底板(6)通过地脚螺栓(3)与混凝土长柱独立基础(1)相连;混凝土长柱独立基础(1)上设有用于安放千斤顶(2)的加载孔(7);地脚螺栓(3)外露丝扣长度不短于150mm。本结构体系构造简单,当输电铁塔发生倾斜时,松开地脚螺栓(3),使用千斤顶直接顶升可顶升塔脚板就可以进行纠偏。

The invention discloses a deflection correcting device for a power transmission tower, in particular to a deflection correcting and lifting device for a power transmission tower in a coal mine mining area, which includes a concrete long column independent foundation (1), anchor bolts (3) and a liftable tower foot plate (4) ), the jacking tower foot plate (4) includes the bottom plate (6) and the main tower material connecting plate (8) welded on the bottom plate (6), the main tower material connecting plate (8) and the main tower material (5) along the edge Welding; the bottom plate (6) of the jacking tower foot plate (4) is connected to the independent foundation of the long concrete column (1) through the anchor bolts (3); the independent foundation of the long concrete column (1) is provided with a jack (2) The loading hole (7); the exposed thread length of the anchor bolt (3) shall not be less than 150mm. The structure of the structure is simple. When the transmission tower is tilted, loosen the anchor bolts (3), and use a jack to directly lift the tower foot plate to correct the deviation.

Description

一种煤矿采动区输电铁塔纠偏顶升装置A deflection correcting and jacking device for transmission towers in coal mine mining areas

技术领域 technical field

本发明涉及一种输电铁塔纠偏装置,尤其涉及一种煤矿采动区输电铁塔纠偏顶升装置。 The invention relates to a deflection correcting device for a power transmission tower, in particular to a deflection correcting and jacking device for a power transmission tower in a coal mine mining area.

背景技术 Background technique

由于煤矿采动区地质结构的变化,建设在采动区的输电铁塔容易发生不同程度的下沉和倾斜,给输电线路的安全运行造成严重威胁。目前解决该问题的做法是当输电铁塔倾斜后,采用对铁塔结构或基础进行改造的方式进行纠偏。采用这种方法,工器具用量大、现场布置较复杂、工作量和工人劳动强度都比较大。 Due to the changes in the geological structure of the coal mine mining area, the transmission towers built in the mining area are prone to sinking and tilting to varying degrees, which poses a serious threat to the safe operation of the transmission line. The current way to solve this problem is to correct the deflection by modifying the tower structure or foundation after the transmission tower is tilted. This method requires a large amount of tools, complex site layout, and relatively large workload and labor intensity.

发明内容 Contents of the invention

针对上述现有技术存在的问题,本发明提供一种煤矿采动区输电铁塔纠偏顶升装置,在施工方便、使用工器具少的情况下,对倾斜的输电铁塔进行纠偏,保证输电线路的安全。 Aiming at the problems existing in the above-mentioned prior art, the present invention provides a deflection correcting and jacking device for power transmission towers in coal mine mining areas, which can rectify the deflection of inclined power transmission towers and ensure the safety of power transmission lines under the condition of convenient construction and less use of tools and appliances .

为了实现上述目的,本发明采用的技术方案是:一种煤矿采动区输电铁塔纠偏顶升装置,包括混凝土长柱独立基础,地脚螺栓和可顶升塔脚板;可顶升塔脚板包括底板和焊接在底板上的铁塔主材连接板,铁塔主材连接板与铁塔主材沿边沿焊接,可顶升塔脚板的底板通过地脚螺栓与混凝土长柱独立基础相连;混凝土长柱独立基础上设有可安放千斤顶的加载孔;所述的地脚螺栓外露丝扣长度不短于150mm。 In order to achieve the above object, the technical solution adopted by the present invention is: a deflection correcting and lifting device for the transmission iron tower in the mining area of the coal mine, including the independent foundation of the concrete long column, the anchor bolts and the jacking tower foot plate; the jacking tower foot plate includes the bottom plate and the connecting plate of the main tower material welded on the bottom plate, the connecting plate of the main material of the iron tower is welded along the edge of the main material of the iron tower, the bottom plate of the lifting tower foot plate is connected with the independent foundation of the concrete long column through anchor bolts; the independent foundation of the concrete long column There is a loading hole where a jack can be placed; the length of the exposed thread of the anchor bolts is not less than 150mm.

优选地,底板上焊接有加劲板,加劲板与铁塔主材连接板垂直焊接。 Preferably, a stiffening plate is welded on the bottom plate, and the stiffening plate is vertically welded to the connecting plate of the main material of the iron tower.

优选地,加载孔为长方体结构。 Preferably, the loading hole is a cuboid structure.

优选地,所述加载孔的尺寸宽×长×高不小于150mm×200mm×300mm。 Preferably, the size of the loading hole is not less than 150mm×200mm×300mm in width×length×height.

优选地,所述地脚螺栓外露丝扣长度为150mm—300mm。 Preferably, the length of the exposed threads of the anchor bolts is 150mm-300mm.

本发明在进行基础施工时,预留可安放千斤顶的加载孔,并且在安装铁塔的同时安装可顶升塔脚板。铁塔发生倾斜时,松开地脚螺栓,将千斤顶放在加载孔内,采用千斤顶顶升塔脚板,便能够安全、准确、可靠地对发生倾斜的输电铁塔进行纠偏;本发明在输电铁塔发生倾斜时,松开地脚螺栓,使用千斤顶直接顶升塔脚板就可以进行纠偏,能方便地对倾斜的铁塔进行连续调整,有效地减小铁塔的倾斜角度,施工方便,使用的工器具少,可靠性高;能够显著减少地表变形在输电铁塔上产生的附加应力,使输电铁塔能够经受煤矿采动的影响,进而保证输电线路的安全。 In the present invention, during foundation construction, a loading hole for placing a jack is reserved, and a tower foot plate that can be lifted is installed at the same time as the iron tower is installed. When the iron tower is inclined, loosen the anchor bolts, put the jack in the loading hole, and use the jack to lift the tower foot plate, so that the deviation of the inclined transmission tower can be corrected safely, accurately and reliably; At the same time, loosen the anchor bolts, and use the jack to directly lift the tower foot plate to correct the deviation. It is convenient to continuously adjust the inclined iron tower, effectively reducing the inclination angle of the iron tower. The construction is convenient, and the tools used are few and reliable. High performance; can significantly reduce the additional stress generated by surface deformation on the transmission tower, so that the transmission tower can withstand the impact of coal mining, thereby ensuring the safety of the transmission line.

附图说明 Description of drawings

图1为本发明的结构示意图; Fig. 1 is a structural representation of the present invention;

图2为图1的A-A剖面示意图; Fig. 2 is the A-A sectional schematic diagram of Fig. 1;

图3为混凝土长柱独立基础的俯视图; Fig. 3 is the top view of concrete long column independent foundation;

图4为混凝土长柱独立基础的左视图。 Fig. 4 is the left view of the concrete long column independent foundation.

图中:1、混凝土长柱独立基础,2、千斤顶,3、地脚螺栓,4、可顶升塔脚板,5、铁塔主材,6、底板,7、加载孔,8、铁塔主材连接板,9、加劲板。 In the figure: 1. Concrete long column independent foundation, 2. Jack, 3. Anchor bolts, 4. Liftable tower foot plate, 5. Main tower material, 6. Bottom plate, 7. Loading hole, 8. Main tower material connection Plate, 9, stiffening plate.

具体实施方式 detailed description

下面结合附图对本发明作进一步说明。 The present invention will be further described below in conjunction with accompanying drawing.

如图1至图4所示:本发明包括混凝土长柱独立基础1,地脚螺栓3和可顶升塔脚板4;可顶升塔脚板4包括底板6和焊接在底板6上的铁塔主材连接板8,铁塔主材连接板8与铁塔主材5沿边沿焊接,可顶升塔脚板4的底板6通过地脚螺栓3与混凝土长柱独立基础1相连;混凝土长柱独立基础1上设有可安放千斤顶2的预留加载孔7;所述的地脚螺栓3外露丝扣长度不短于150mm。 As shown in Figures 1 to 4: the present invention includes a concrete long column independent foundation 1, anchor bolts 3 and a jacking tower foot plate 4; the jacking tower foot plate 4 includes a bottom plate 6 and the iron tower main material welded on the bottom plate 6 Connecting plate 8, the connecting plate 8 of the main material of the iron tower is welded with the main material of the iron tower 5 along the edge, and the bottom plate 6 of the lifting tower foot plate 4 is connected with the independent foundation 1 of the long concrete column through the anchor bolt 3; There is a reserved loading hole 7 where the jack 2 can be placed; the length of the exposed thread of the anchor bolt 3 is not less than 150mm.

底板6上焊接有加劲板9,加劲板9与铁塔主材连接板8垂直焊接,由于加劲板9的设置,可以有效提高本装置的承载力。 A stiffening plate 9 is welded on the bottom plate 6, and the stiffening plate 9 is vertically welded to the connecting plate 8 of the main material of the iron tower. Due to the setting of the stiffening plate 9, the bearing capacity of the device can be effectively improved.

为了便于容纳千斤顶2,加载孔7为长方体结构。 In order to accommodate the jack 2 conveniently, the loading hole 7 is a cuboid structure.

为了能够容纳千斤顶2,所述加载孔7的尺寸宽×长×高不小于150mm×200mm×300mm。 In order to accommodate the jack 2, the size of the loading hole 7 is not less than 150mm×200mm×300mm in width×length×height.

所述地脚螺栓3外露丝扣长度为150mm—300mm,在此长度范围内,方便可顶升塔脚板4的安装和拆卸。 The length of the exposed threads of the anchor bolts 3 is 150mm-300mm, within this length range, it is convenient to install and disassemble the jacking tower foot plate 4.

本发明中,通过在混凝土长柱独立基础1上预留可安放千斤顶2的加载孔7,并且在安装铁塔的同时施工可顶升塔脚板4,即铁塔主材连接板8与铁塔主材5焊接,并与加劲板9同时焊接于底板6上。当铁塔发生倾斜时,只需要松开地脚螺栓3,将千斤顶2放在混凝土长柱独立基础1预留的加载孔7内,使用千斤顶2顶升可顶升塔脚板4,就可以对倾斜的输电铁塔进行纠偏,纠偏工作完成后,紧固地脚螺栓3即可。本发明在施工方便、工器具少的情况下可以有效地减小铁塔的倾斜角度,并且可以进行连续调整,减少地表变形在输电铁塔上产生的附加应力,使铁塔能够经受煤矿采动的影响,进而保证输电线路的安全。 In the present invention, by reserving the loading hole 7 on which the jack 2 can be placed on the independent foundation 1 of the concrete long column, and constructing the tower foot plate 4 that can be lifted while installing the iron tower, that is, the main material connecting plate 8 of the iron tower and the main material 5 of the iron tower Welded, and welded on the base plate 6 simultaneously with the stiffener 9. When the iron tower tilts, you only need to loosen the anchor bolt 3, put the jack 2 in the loading hole 7 reserved for the independent foundation 1 of the concrete long column, and use the jack 2 to lift the foot plate 4 of the tower to correct the tilt. Correct the deflection of the transmission tower. After the deflection correction is completed, tighten the anchor bolts 3. The present invention can effectively reduce the inclination angle of the iron tower under the condition of convenient construction and few tools, and can carry out continuous adjustment to reduce the additional stress generated on the power transmission tower by surface deformation, so that the iron tower can withstand the influence of coal mine mining, Thus ensuring the safety of the transmission line.

Claims (5)

1. a jacking device for deviation rectification of steel pylon in mining area of coal mine, including concrete long column independent footing (1) and foundation bolt (3);Characterized by further comprising can jacking column foot plate (4), jacking column foot plate (4) base plate (6) and the iron tower main material connecting plate (8) being welded on base plate (6) can be included, iron tower main material connecting plate (8) welds along edge with iron tower main material (5);Can the base plate (6) of jacking column foot plate (4) be connected with concrete long column independent footing (1) by foundation bolt (3);Concrete long column independent footing (1) is provided with the loading hole (7) for laying jack (2);Described foundation bolt (3) exposes screw thread length and is not shorter than 150mm.
A kind of jacking device for deviation rectification of steel pylon in mining area of coal mine the most according to claim 1, it is characterised in that be welded with stiffener (9), stiffener (9) and iron tower main material connecting plate (8) vertical welding on base plate (6).
A kind of jacking device for deviation rectification of steel pylon in mining area of coal mine the most according to claim 1, it is characterised in that described loading hole (7) is rectangular structure.
A kind of jacking device for deviation rectification of steel pylon in mining area of coal mine the most according to claim 3, it is characterised in that the size width x length × height of described loading hole (7) is not less than 150mm × 200mm × 300mm.
A kind of jacking device for deviation rectification of steel pylon in mining area of coal mine the most according to claim 1, it is characterised in that described foundation bolt (3) exposes screw thread a length of 150mm 300mm.
CN201310575656.1A 2013-11-18 2013-11-18 A deflection correcting and jacking device for transmission towers in coal mine mining areas Expired - Fee Related CN103669432B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310575656.1A CN103669432B (en) 2013-11-18 2013-11-18 A deflection correcting and jacking device for transmission towers in coal mine mining areas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310575656.1A CN103669432B (en) 2013-11-18 2013-11-18 A deflection correcting and jacking device for transmission towers in coal mine mining areas

Publications (2)

Publication Number Publication Date
CN103669432A CN103669432A (en) 2014-03-26
CN103669432B true CN103669432B (en) 2016-11-02

Family

ID=50308146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310575656.1A Expired - Fee Related CN103669432B (en) 2013-11-18 2013-11-18 A deflection correcting and jacking device for transmission towers in coal mine mining areas

Country Status (1)

Country Link
CN (1) CN103669432B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563172B (en) * 2015-01-13 2016-10-05 浙江湖州市建工集团有限公司 A kind of steel construction room sinking resetting structure and repositioning method thereof
CN104763005A (en) * 2015-03-18 2015-07-08 山东省水利科学研究院 Large steel spherical tank inclination rectification method
CN106759556A (en) * 2016-12-26 2017-05-31 中国化学工程第三建设有限公司 One kind correction inclined method of tower body
CN113482034B (en) * 2021-06-23 2023-07-14 国网山西省电力公司阳泉供电公司 A correction method for uneven settlement of transmission towers
CN114278141B (en) * 2021-11-26 2023-03-24 内蒙古电力(集团)有限责任公司鄂尔多斯电业局 Deviation-correctable power transmission tower and using method thereof
CN114278139B (en) * 2021-11-26 2023-03-24 内蒙古电力(集团)有限责任公司鄂尔多斯电业局 Mining-correcting cooperative power transmission tower maintenance method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102080382A (en) * 2010-11-30 2011-06-01 济南大学 Building foundation adaptable to goaf foundation deformation
CN102864795A (en) * 2012-10-19 2013-01-09 重庆大学 Light steel factory post foundation suitable for sedimentation of filled-in ground and construction method
CN203284791U (en) * 2013-06-06 2013-11-13 中鼎国际工程有限责任公司 Independent column basis below column and capable of conducting jacking rectification
CN203960919U (en) * 2013-11-18 2014-11-26 国家电网公司 Colliery minery electric power pylon correction lift-up device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3100350B2 (en) * 1997-03-31 2000-10-16 富士男 板垣 Correction device and correction method for correcting settlement of building

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102080382A (en) * 2010-11-30 2011-06-01 济南大学 Building foundation adaptable to goaf foundation deformation
CN102864795A (en) * 2012-10-19 2013-01-09 重庆大学 Light steel factory post foundation suitable for sedimentation of filled-in ground and construction method
CN203284791U (en) * 2013-06-06 2013-11-13 中鼎国际工程有限责任公司 Independent column basis below column and capable of conducting jacking rectification
CN203960919U (en) * 2013-11-18 2014-11-26 国家电网公司 Colliery minery electric power pylon correction lift-up device

Also Published As

Publication number Publication date
CN103669432A (en) 2014-03-26

Similar Documents

Publication Publication Date Title
CN103669431B (en) A kind of colliery minery electric power pylon inclination adjusting device
CN103669432B (en) A deflection correcting and jacking device for transmission towers in coal mine mining areas
CN203960919U (en) Colliery minery electric power pylon correction lift-up device
CN106276577B (en) A kind of suspension bracket and operating method of framework isolated footing
CN108999226B (en) Tilt rectification method for rotating and shifting frame structure buildings
CN104912569A (en) Draw shaft treatment method
CN207227968U (en) T beam beams bottom steel plate supertronic device
CN202416967U (en) Principal material length adjusting device for tower leg of inclined power transmission tower in coal mine subsidence area
CN209243794U (en) A kind of underpinning limit structure for rectifying and intercepting piles of pile foundation buildings
CN108999225B (en) Inclination correcting method for rotary shifting brick-concrete structure building
CN203960920U (en) Colliery minery electric power pylon inclination adjusting device
CN104929380A (en) Heightening steel tower boot foot used for tilt centralizing adjustment of transmission line steel towers and method for tilt centralizing adjustment of transmission line steel towers
CN104110353B (en) Antidumping blower foundation ring structure and construction method thereof
CN202767612U (en) Coal mine subsidence area inclined power transmission tower centering device
CN102425188A (en) Height-adjustable tower foundation and adjusting method thereof
CN202073100U (en) Temporary vertical steel support structure for compensating displacement or missed piling of steel lattice columns
CN106759270A (en) A kind of prefabricated reinforced concrete resistance to plucking pile construction method with ribbing
CN212359211U (en) Subsidence area steel pylons slope deviation correcting device
CN118745751A (en) A transmission tower foundation leveling device and method
CN206956735U (en) A kind of combined type shaped steel PHC pile tube bearing diagonal foundation pit enclosure structures
CN208650798U (en) A derrick support column and derrick
CN206607952U (en) A kind of concrete column jacking apparatus for rectifying a deviation integral inclined
CN104763005A (en) Large steel spherical tank inclination rectification method
CN102021913A (en) Height-adjustable steel structure foundation and manufacturing method thereof
CN108193723A (en) A kind of subsidence control method based on building stress relief method rectification

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161102

Termination date: 20211118