CN203960920U - Colliery minery electric power pylon inclination adjusting device - Google Patents

Colliery minery electric power pylon inclination adjusting device Download PDF

Info

Publication number
CN203960920U
CN203960920U CN201320726592.6U CN201320726592U CN203960920U CN 203960920 U CN203960920 U CN 203960920U CN 201320726592 U CN201320726592 U CN 201320726592U CN 203960920 U CN203960920 U CN 203960920U
Authority
CN
China
Prior art keywords
tower
iron tower
base
plate
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320726592.6U
Other languages
Chinese (zh)
Inventor
袁广林
舒前进
陈志梅
王永安
王慧刚
王强
李庆涛
鲁彩凤
苗生龙
徐支松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing
State Grid Shanxi Electric Power Co Ltd
State Grid Corp of China
Original Assignee
China University of Mining and Technology Beijing
State Grid Shanxi Electric Power Co Ltd
State Grid Corp of China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing, State Grid Shanxi Electric Power Co Ltd, State Grid Corp of China filed Critical China University of Mining and Technology Beijing
Priority to CN201320726592.6U priority Critical patent/CN203960920U/en
Application granted granted Critical
Publication of CN203960920U publication Critical patent/CN203960920U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本实用新型公开了一种煤矿采动区输电铁塔倾斜调整装置,包括地脚螺栓、可顶升塔脚板、铁塔基础和底座;可顶升塔脚板通过地脚螺栓与铁塔基础连接;底座设置于铁塔基础底部外侧,可顶升塔脚板包括底板、焊接在底板上的铁塔主材连接板以及平行焊接于底板上的两个承载槽钢,铁塔主材连接板沿铁塔主材边沿焊接,承载槽钢两端垂直焊接有连接槽钢,连接槽钢位于底座上方;地脚螺栓外露丝扣长度不短于150mm。有益效果是在安装铁塔的同时,预置了可顶升塔脚板,通过该塔脚板上的连接槽钢与用于放置千斤顶的底座相对应设置,能安全、准确、可靠地对倾斜输电铁塔进行纠偏,有效减少铁塔的倾斜。

The utility model discloses an inclination adjustment device for a power transmission iron tower in a coal mine mining area, which comprises an anchor bolt, a jacking tower foot plate, an iron tower foundation and a base; the jacking tower foot plate is connected with the iron tower foundation through the anchor bolt; the base is arranged on Outside the bottom of the tower foundation, the jacking tower foot plate includes the bottom plate, the main tower material connecting plate welded on the bottom plate, and two load-bearing channel steels welded in parallel on the bottom plate. Both ends of the steel are welded vertically with connecting channel steel, and the connecting channel steel is located above the base; the length of the exposed thread of the anchor bolts is not less than 150mm. The beneficial effect is that when the iron tower is installed, the tower foot plate that can be lifted is preset, and the connecting channel steel on the tower foot plate is set correspondingly to the base for placing the jack, so that the inclined transmission tower can be safely, accurately and reliably Correction, effectively reducing the inclination of the tower.

Description

煤矿采动区输电铁塔倾斜调整装置Tilt adjustment device for power transmission tower in coal mine mining area

技术领域 technical field

本实用新型涉及一种纠偏装置,具体是一种煤矿采动区输电铁塔倾斜调整装置。 The utility model relates to a deviation correcting device, in particular to a device for adjusting the inclination of a power transmission tower in a mining area of a coal mine.

背景技术 Background technique

由于煤矿采动区地质结构的变化,建设在采动区的输电铁塔容易发生不同程度的下沉和倾斜,给输电线路的安全运行造成严重威胁。目前解决该问题的做法是当输电铁塔倾斜后,采用对铁塔结构或基础进行改造的方式进行纠偏。采用这种方法,工器具用量大、现场布置较复杂、工作量和工人劳动强度都比较大。 Due to the changes in the geological structure of the coal mine mining area, the transmission towers built in the mining area are prone to sinking and tilting to varying degrees, which poses a serious threat to the safe operation of the transmission line. The current way to solve this problem is to correct the deflection by modifying the tower structure or foundation after the transmission tower is tilted. This method requires a large amount of tools, complex site layout, and relatively large workload and labor intensity.

发明内容 Contents of the invention

针对上述现有技术存在的问题,本实用新型提供一种煤矿采动区输电铁塔倾斜调整装置,在施工方便、使用工器具少的情况下,对倾斜的输电铁塔进行纠偏,保证输电线路的安全。 Aiming at the problems existing in the above-mentioned prior art, the utility model provides an inclination adjustment device for the transmission iron tower in the coal mine mining area, which can correct the deviation of the inclined transmission iron tower and ensure the safety of the transmission line under the condition of convenient construction and less use of tools and tools .

为了实现上述目的,本实用新型采用的技术方案是:一种煤矿采动区输电铁塔倾斜调整装置,包括地脚螺栓和铁塔基础;还包括可顶升塔脚板和底座,底座设置于铁塔基础底部外侧,可顶升塔脚板通过地脚螺栓与铁塔基础连接;所述可顶升塔脚板包括底板、焊接在底板上的铁塔主材连接板以及平行焊接于底板上的两个承载槽钢,铁塔主材连接板沿铁塔主材边沿焊接,承载槽钢两端垂直焊接有连接槽钢,连接槽钢位于底座上方;地脚螺栓外露丝扣长度不短于150mm。 In order to achieve the above purpose, the technical solution adopted by the utility model is: a tilt adjustment device for the transmission iron tower in the mining area of the coal mine, including the anchor bolt and the iron tower foundation; On the outside, the jacking tower foot plate is connected to the iron tower foundation through anchor bolts; the jacking tower foot plate includes a base plate, a main material connecting plate of the iron tower welded on the base plate, and two load-bearing channel steels welded on the base plate in parallel, the iron tower The connecting plate of the main material is welded along the edge of the main material of the iron tower, and the two ends of the bearing channel steel are vertically welded with connecting channel steel, and the connecting channel steel is located above the base; the length of the exposed thread of the anchor bolt is not less than 150mm.

优选地,底板上焊接有加劲板,加劲板与铁塔主材垂直焊接。 Preferably, a stiffening plate is welded on the bottom plate, and the stiffening plate is vertically welded to the main material of the iron tower.

优选地,所述地脚螺栓外露丝扣长度为150mm—300mm。 Preferably, the length of the exposed threads of the anchor bolts is 150mm-300mm.

优选地,所述底座采用方木。 Preferably, the base is made of square wood.

本实用新型的有益效果是:可顶升塔脚板在安装铁塔时,与铁塔同时施工,通过该塔脚板上的连接槽钢与用于放置千斤顶的底座相对应设置,当铁塔发生倾斜时,松开地脚螺栓,将千斤顶放在底座上,采用千斤顶通过顶升可顶升塔脚板中的连接槽钢,就能安全、准确、可靠地对倾斜输电铁塔进行纠偏,有效减少铁塔的倾斜,减少地表变形在输电铁塔上产生的附加应力,使其能够经受煤矿采动的影响,保证输电线路的安全。本实用新型采用的结构简单,使用的工器具少,施工方便,可靠性高。 The beneficial effect of the utility model is: when the iron tower can be lifted, the tower foot plate is constructed simultaneously with the iron tower, and the connecting channel steel on the tower foot plate is set correspondingly to the base for placing the jack. When the iron tower tilts, loose Open the anchor bolts, put the jack on the base, and use the jack to lift the connecting channel steel in the tower foot plate, so that the deviation of the inclined transmission tower can be corrected safely, accurately and reliably, and the inclination of the tower can be effectively reduced. The additional stress generated by the surface deformation on the transmission tower enables it to withstand the impact of coal mining and ensure the safety of the transmission line. The utility model has the advantages of simple structure, few tools, convenient construction and high reliability.

附图说明 Description of drawings

图1为本实用新型的结构示意图; Fig. 1 is the structural representation of the utility model;

图2为本实用新型的A-A向剖视图。 Fig. 2 is an A-A sectional view of the utility model.

图中:1、底座,2、地脚螺栓,3、千斤顶,4、可顶升塔脚板,5、铁塔基础,6、铁塔主材,7、底板,8、铁塔主材连接板,9、加劲板,10、承载槽钢,11、连接槽钢。 In the figure: 1. Base, 2. Anchor bolts, 3. Jack, 4. Liftable tower foot plate, 5. Iron tower foundation, 6. Main material of iron tower, 7. Base plate, 8. Connection plate of main material of iron tower, 9. Stiffening plate, 10, bearing channel steel, 11, connecting channel steel.

具体实施方式 Detailed ways

下面结合附图对本实用新型作进一步说明。 Below in conjunction with accompanying drawing, the utility model is further described.

如图1和图2所示:本实用新型包括地脚螺栓2和铁塔基础5;还包括底座1和可顶升塔脚板4,底座1设置于铁塔基础5底部外侧,可顶升塔脚板4通过地脚螺栓2与铁塔基础5连接;可顶升塔脚板4包括底板7、焊接在底板7上的铁塔主材连接板8以及平行焊接于底板7上的两个承载槽钢10,铁塔主材连接板8沿铁塔主材6边沿焊接;承载槽钢10两端垂直焊接有连接槽钢11,连接槽钢11位于底座1上方;地脚螺栓2外露丝扣长度不短于150mm。 As shown in Figure 1 and Figure 2: the utility model includes anchor bolts 2 and iron tower foundation 5; it also includes a base 1 and a jacking tower foot plate 4, the base 1 is arranged outside the bottom of the iron tower foundation 5, and the tower foot plate 4 can be lifted It is connected with the iron tower foundation 5 through the anchor bolts 2; the jacking tower foot plate 4 includes a bottom plate 7, an iron tower main material connection plate 8 welded on the bottom plate 7, and two load-bearing channel steels 10 welded on the bottom plate 7 in parallel. The material connecting plate 8 is welded along the edge of the main material 6 of the iron tower; the two ends of the bearing channel steel 10 are vertically welded with connecting channel steel 11, and the connecting channel steel 11 is located above the base 1; the length of the exposed thread of the anchor bolt 2 is not less than 150mm.

底板7上焊接有加劲板9,加劲板9与铁塔主材6垂直焊接,由于加劲板9的设置,可以有效提高本装置的承载力。 A stiffening plate 9 is welded on the bottom plate 7, and the stiffening plate 9 is vertically welded to the main material 6 of the iron tower. Due to the setting of the stiffening plate 9, the bearing capacity of the device can be effectively improved.

所述地脚螺栓2外露丝扣长度为150mm—300mm,在此长度范围内,方便可顶升塔脚板4的安装和拆卸。 The length of the exposed threads of the anchor bolts 2 is 150mm-300mm, within this length range, it is convenient to install and disassemble the jacking tower foot plate 4.

为了节约成本,所述底座1采用方木。 In order to save cost, the base 1 adopts square wood.

本实用新型的倾斜调整装置,在安装铁塔时,同时施工预置可顶升塔脚板4,即将铁塔主材连接板8与铁塔主材6焊接,并与加劲板9、承载槽钢10同时焊接于底板7上;然后将连接槽钢11与承载槽钢10焊接。当铁塔发生倾斜时,松开地脚螺栓2,将千斤顶3放在底座1上,通过千斤顶3顶升塔脚板4中的连接槽钢11,对倾斜输电铁塔进行纠偏,从而有效地减少铁塔的倾斜,减少地表变形在输电铁塔上产生的附加应力,使其能够经受煤矿采动的影响,保证输电线路的安全。 The inclination adjustment device of the utility model, when installing the iron tower, simultaneously constructs and presets the jacking tower foot plate 4, that is, the main material connecting plate 8 of the iron tower is welded with the main material 6 of the iron tower, and is welded simultaneously with the stiffening plate 9 and the load-bearing channel steel 10 on the bottom plate 7; then the connecting channel 11 and the bearing channel 10 are welded. When the iron tower is tilted, loosen the anchor bolt 2, put the jack 3 on the base 1, lift the connecting channel steel 11 in the tower foot plate 4 through the jack 3, and correct the deviation of the inclined transmission iron tower, thereby effectively reducing the deflection of the iron tower Inclined to reduce the additional stress generated by ground deformation on the transmission tower, so that it can withstand the impact of coal mining and ensure the safety of the transmission line.

Claims (5)

1. a colliery minery electric power pylon inclination adjusting device, comprises stone bolt (2) and iron tower foundation (5), it is characterized in that: also comprise base (1) and can jacking column foot plate (4), base (1) is arranged at iron tower foundation (5) bottom outside, can be connected with iron tower foundation (5) by stone bolt (2) by jacking column foot plate (4), describedly can comprise base plate (7) by jacking column foot plate (4), be welded on iron tower main material junction plate (8) and parallel two the carrying channel-section steels (10) that are welded on base plate (7) on base plate (7), iron tower main material junction plate (8) welds along iron tower main material (6) edge, carrying channel-section steel (10) two ends are vertically welded with and connect channel-section steel (11), connect channel-section steel (11) and be positioned at base (1) top, stone bolt (2) exposes screw thread length and is not shorter than 150mm.
2. a kind of colliery according to claim 1 minery electric power pylon inclination adjusting device, is characterized in that, is welded with stiffener (9) on base plate (7).
3. a kind of colliery according to claim 2 minery electric power pylon inclination adjusting device, is characterized in that, stiffener (9) and iron tower main material (6) vertical welding.
4. a kind of colliery according to claim 1 minery electric power pylon inclination adjusting device, is characterized in that, it is 150mm-300mm that described stone bolt (2) exposes screw thread length.
5. a kind of colliery according to claim 1 minery electric power pylon inclination adjusting device, is characterized in that, described base (1) adopts the lumps of wood.
CN201320726592.6U 2013-11-18 2013-11-18 Colliery minery electric power pylon inclination adjusting device Expired - Lifetime CN203960920U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320726592.6U CN203960920U (en) 2013-11-18 2013-11-18 Colliery minery electric power pylon inclination adjusting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320726592.6U CN203960920U (en) 2013-11-18 2013-11-18 Colliery minery electric power pylon inclination adjusting device

Publications (1)

Publication Number Publication Date
CN203960920U true CN203960920U (en) 2014-11-26

Family

ID=51921522

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320726592.6U Expired - Lifetime CN203960920U (en) 2013-11-18 2013-11-18 Colliery minery electric power pylon inclination adjusting device

Country Status (1)

Country Link
CN (1) CN203960920U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669431A (en) * 2013-11-18 2014-03-26 国家电网公司 Device for adjusting inclined steel pylon in mining area of coal mine
CN106639610A (en) * 2016-12-09 2017-05-10 国家电网公司 Iron tower tail edge continuous leveling method
CN106759556A (en) * 2016-12-26 2017-05-31 中国化学工程第三建设有限公司 One kind correction inclined method of tower body

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669431A (en) * 2013-11-18 2014-03-26 国家电网公司 Device for adjusting inclined steel pylon in mining area of coal mine
CN103669431B (en) * 2013-11-18 2016-06-01 国家电网公司 A kind of colliery minery electric power pylon inclination adjusting device
CN106639610A (en) * 2016-12-09 2017-05-10 国家电网公司 Iron tower tail edge continuous leveling method
CN106759556A (en) * 2016-12-26 2017-05-31 中国化学工程第三建设有限公司 One kind correction inclined method of tower body

Similar Documents

Publication Publication Date Title
CN103669431B (en) A kind of colliery minery electric power pylon inclination adjusting device
CN103669432B (en) A kind of jacking device for deviation rectification of steel pylon in mining area of coal mine
CN203960919U (en) Colliery minery electric power pylon correction lift-up device
CN201339336Y (en) Adjustable tower baseboard for electric transmission line pole tower
CN203097393U (en) Power transmission tower with adjustable tower foot plate
CN202416967U (en) Principal material length adjusting device for tower leg of inclined power transmission tower in coal mine subsidence area
CN104929380A (en) Heightening steel tower boot foot used for tilt centralizing adjustment of transmission line steel towers and method for tilt centralizing adjustment of transmission line steel towers
CN202266277U (en) Contractible strut for U-shaped shed support
CN204266671U (en) A kind of electric power pylon adjusting device
CN101492967A (en) Steel column error-correcting method
CN202718680U (en) U-shaped steel support and surrounding rock stress coupler united shoring system
CN106759557B (en) A horizontal deformation recovery device for transmission towers in mining areas
CN212359211U (en) Subsidence area steel pylons slope deviation correcting device
CN203594264U (en) Clamp special for angle steel iron tower rectification and tool for angle steel iron tower rectification
CN206607952U (en) A kind of concrete column jacking apparatus for rectifying a deviation integral inclined
CN117627035A (en) A foundation for correcting uneven settlement of transmission towers
CN202273243U (en) Adjustable height type pole and tower foundation
CN202266280U (en) A retractable breast beam used for supporting a U-shaped shed
CN108716368A (en) A kind of derrick support column, derrick and derrick method for correcting error
CN106869198A (en) The method that a kind of sagging dead zone of non cohesire soil reinforces pole and tower foundation using cross beam
CN203145967U (en) Round steel column base
CN208010018U (en) A kind of extra-high compressed steel pylon connecting flange
CN207999113U (en) A kind of jack leveler device
CN207048351U (en) A kind of steel structural upright column correction auxiliary tools
CN201933834U (en) Inclination correcting device for power transmission line iron tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20141126

Effective date of abandoning: 20160601

AV01 Patent right actively abandoned

Granted publication date: 20141126

Effective date of abandoning: 20160601

C25 Abandonment of patent right or utility model to avoid double patenting