JP3100350B2 - Correction device and correction method for correcting settlement of building - Google Patents

Correction device and correction method for correcting settlement of building

Info

Publication number
JP3100350B2
JP3100350B2 JP09096604A JP9660497A JP3100350B2 JP 3100350 B2 JP3100350 B2 JP 3100350B2 JP 09096604 A JP09096604 A JP 09096604A JP 9660497 A JP9660497 A JP 9660497A JP 3100350 B2 JP3100350 B2 JP 3100350B2
Authority
JP
Japan
Prior art keywords
base
anchor bolt
correction
jack
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP09096604A
Other languages
Japanese (ja)
Other versions
JPH10280427A (en
Inventor
富士男 板垣
Original Assignee
富士男 板垣
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 富士男 板垣 filed Critical 富士男 板垣
Priority to JP09096604A priority Critical patent/JP3100350B2/en
Publication of JPH10280427A publication Critical patent/JPH10280427A/en
Application granted granted Critical
Publication of JP3100350B2 publication Critical patent/JP3100350B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、通常は木造建築物
などの基礎に据え付けられる土台を固定し、基礎に沈下
が生じたときは、この沈下を修正することができる修正
装置の構造及び修正工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure and a correction device for fixing a base which is usually installed on a foundation of a wooden building or the like, and when the settlement of the foundation occurs, the settlement can be corrected. Concerning the construction method.

【0002】[0002]

【従来の技術】一度建てられた建築物の基礎が沈下する
と建築物に歪みが生じ、扉や窓の開閉が難しくなった
り、柱と壁の間に隙間ができたりする。
2. Description of the Related Art When the foundation of a building once settles down, the building is distorted, making it difficult to open and close doors and windows, and creating a gap between a pillar and a wall.

【0003】従来、このような既設の建築物の沈下修正
を行う工法として、各種の工法が存在するが、50mm
あるいは60mm程度までの修正量については、基礎の
上に据え付けられる土台をジャッキアップする工法があ
った。この工法を図8乃至図12において説明する。
Conventionally, there have been various construction methods for correcting settlement of an existing building.
Alternatively, for a correction amount up to about 60 mm, there was a method of jacking up a base installed on a foundation. This method will be described with reference to FIGS.

【0004】すなわち図8に示すように、基礎コンクリ
ート1の上表面3にはアンカーボルト5が、雄ネジ部7
を上に向けて植設されており、土台9であるオビキに開
けられたボルト孔11に通される。このアンカーボルト
5の上端には、さらに座金13を介してナット15が螺
合され、ナット15が締め付けられることで、基礎コン
クリート1の上に土台9が固定されている。
[0004] That is, as shown in FIG. 8, an anchor bolt 5 is provided on an upper surface 3 of a foundation concrete 1, and a male screw portion 7 is provided.
Is planted upward, and is passed through a bolt hole 11 formed in the base 9 as a base. A nut 15 is further screwed to the upper end of the anchor bolt 5 via a washer 13 and the nut 15 is tightened, so that the base 9 is fixed on the foundation concrete 1.

【0005】この状態で沈下が生じた場合には、まず図
9に示すようにナット15と座金13を外して土台9を
上下に移動できるようにする。そして、アンカーボルト
5の上端に、必要な長さのアンカーボルトの一部17を
溶接19により継ぎ足す。
If subsidence occurs in this state, first, as shown in FIG. 9, the nut 15 and the washer 13 are removed so that the base 9 can be moved up and down. Then, a part 17 of the anchor bolt having a required length is added to the upper end of the anchor bolt 5 by welding 19.

【0006】次に、アンカーボルト5付近で土台9に接
する部分の基礎コンクリート1をはつり、隙間21を作
る。そして、図10に示すように、基礎コンクリート1
の肩23の部分に爪付きジャッキ25を固定し、爪27
を前記隙間21に挿入する。そしてジャッキアップを行
う。
Next, a gap 21 is formed by removing the foundation concrete 1 at a portion in contact with the base 9 near the anchor bolt 5. Then, as shown in FIG.
A nail 25 with a nail is fixed to the shoulder 23 of the
Into the gap 21. Then jack up.

【0007】このジャッキアップは、建築物の土台9の
うち修正しようとする部分全体で多数箇所に及ぶのが一
般的である。したがって、爪付きジャッキ25も多数台
が用いられる。その後、基礎コンクリート1と土台9と
の間にスペーサ27を取り付け、モルタル29などを充
填し固定する(図11、図12)。
[0007] Generally, the jack-up extends to a large number of places on the entire portion of the foundation 9 of the building to be corrected. Therefore, many jacks 25 with claws are used. Thereafter, a spacer 27 is attached between the foundation concrete 1 and the base 9, and is filled and fixed with a mortar 29 or the like (FIGS. 11 and 12).

【0008】[0008]

【発明が解決しようとする課題】しかしながら、以上の
従来技術によれば、アンカーボルトの一部17を継ぎ足
すための溶接、土台9を傷つけないように行わなければ
ならない基礎コンクリート1のはつり、多数台の爪付き
ジャッキ25の据え付けなどが必要であり、工事に手数
がかかり、従って工期が長くなり、施工費も高くなりが
ちであった。
However, according to the prior art described above, welding for adding a part 17 of the anchor bolt, and a large number of base concrete 1 to be removed without damaging the base 9 must be performed. Installation of the jack 25 with the claw of the stand was required, and the construction was troublesome, so that the construction period was prolonged and the construction cost was likely to increase.

【0009】本発明は、以上の問題点を解決するために
なされたもので、工期が短縮でき、施工費が安く沈下修
正が行える沈下修正用アンカーボルト装置を提供するこ
とをを目的とする。
The present invention has been made in order to solve the above problems, and an object of the present invention is to provide an anchor bolt device for subsidence correction capable of shortening the construction period, reducing construction costs, and performing subsidence correction.

【0010】[0010]

【課題を解決するための手段】以上の目的を達成するた
めに、請求項1の発明は、建築物の基礎の上面の一部に
形成された凹部と、この凹部の底面に予め埋め込まれ雄
ネジ部が上方に突出しているアンカーボルトと、このア
ンカーボルトに螺合する下部ナットと、この下部ナット
の上側に位置しアンカーボルトが貫通するボルト孔が形
成され土台の下面を受ける修正具と、この修正具に受け
られアンカーボルトが貫通するボルト孔が形成され基礎
の上面に据え付けられる土台と、前記修正具に一体的に
設けられ側方に突出してジャッキの力を受け土台に伝え
るジャッキ受け部と、前記土台の上側に位置し上記アン
カーボルトに螺合する上部ナットとを有することを特徴
とする建築物の沈下を修正する修正装置である。
In order to achieve the above object, an invention according to claim 1 comprises a concave portion formed on a part of a top surface of a foundation of a building, and a male member previously embedded in a bottom surface of the concave portion. An anchor bolt having a threaded portion projecting upward, a lower nut screwed into the anchor bolt, and a correction tool for receiving a lower surface of the base, having a bolt hole formed above the lower nut and through which the anchor bolt penetrates, A base which is received by the correction tool and has a bolt hole formed therein through which an anchor bolt is formed and which is installed on the upper surface of a foundation; And an upper nut located above the base and screwed to the anchor bolt.

【0011】請求項2の発明は、請求項1に記載の修正
装置を使用し、(a) 上部ナットをアンカーボルトの軸回
りに回転させて上昇せしめ、(b) ジャッキによって、修
正具のジャッキ受け部の下側を上方に押し上げて、土台
を押し上げ、(c) 凹部からレンチなどの道具を差し込ん
で下部ナットを回転させ上昇させて、修正具を支え、
(d) 土台と基礎との間にモルタルなどを充填し固定する
上記(a) 〜(d) の工程を有してなる沈下を修正する修正
工法である。
According to a second aspect of the present invention, there is provided the correcting device according to the first aspect, wherein (a) the upper nut is rotated around the axis of the anchor bolt to be raised, and (b) the jack of the correcting tool is jacked by the jack. Push the lower part of the receiving part upward, push up the base, (c) Insert a tool such as a wrench from the recess, rotate the lower nut and raise it to support the correction tool,
(d) This is a correction method for correcting settlement, which comprises the steps (a) to (d) of filling and fixing mortar or the like between the base and the foundation.

【0012】[0012]

【発明の実施の形態】以下、この発明の一実施形態を、
図1乃至図6において説明する。図2に示すように、こ
の実施形態に係る建築物の沈下修正を行う修正装置31
は、アンカーボルト33と、このアンカーボルト33に
螺合する下部ナット35と、この下部ナット35の上側
に位置し、アンカーボルト33が貫通する修正具37
と、修正具37の上側に位置しアンカーボルト33に貫
通する座金39と、座金39の上側でアンカーボルト3
3に螺合する上部ナット41とからなる。
BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, one embodiment of the present invention will be described.
This will be described with reference to FIGS. As shown in FIG. 2, a correction device 31 that corrects settlement of a building according to this embodiment.
Are an anchor bolt 33, a lower nut 35 screwed to the anchor bolt 33, and a correction tool 37 located above the lower nut 35 and through which the anchor bolt 33 passes.
And a washer 39 located above the corrector 37 and penetrating the anchor bolt 33, and an anchor bolt 3 above the washer 39.
3 and an upper nut 41 screwed into the upper nut 41.

【0013】図1に示すように、修正具37は全体が長
い矩形の板状をなし、上面の端部と中央部で幅方向へ横
切るようにして垂直板43、45が立設されている。両
垂直板43、45に挟まれた部分が、土台9を受ける土
台受け部47である。垂直板43、45は土台9の側面
を支える支えになる。この土台受け部47の中央に、ア
ンカーボルト33が貫通するボルト孔49が形成されて
いる。
As shown in FIG. 1, the correction tool 37 has a long rectangular plate shape as a whole, and vertical plates 43 and 45 are erected so as to cross in the width direction at the end and the center of the upper surface. . A portion sandwiched between the vertical plates 43 and 45 is a base receiving portion 47 that receives the base 9. The vertical plates 43 and 45 serve as supports for supporting the side surface of the base 9. A bolt hole 49 through which the anchor bolt 33 passes is formed in the center of the base receiving portion 47.

【0014】修正具の土台受け部47以外の部分は、ジ
ャッキを受けるジャッキ受け部51である。このジャッ
キ受け部51は、土台受け部47に一体的に設けられ、
土台の側方に突出してジャッキの力を受け土台に伝える
働きをする。ジャッキ受け部51には、前記垂直板45
が設けられたのと同じ面に、前記垂直板45に直交して
補強板53が立設されジャッキ力によっても変形しない
ようになっている。
The portion other than the base receiving portion 47 of the correction tool is a jack receiving portion 51 for receiving a jack. The jack receiving portion 51 is provided integrally with the base receiving portion 47,
It protrudes to the side of the base and acts to receive the power of the jack and transmit it to the base. The jack receiving portion 51 includes the vertical plate 45.
The reinforcing plate 53 is erected perpendicularly to the vertical plate 45 on the same surface as that on which the is provided, so that it is not deformed by the jack force.

【0015】(装置の取り付け手順)次に、建築物を建
築する際に、この一実施形態に係る装置31を予め取り
付けておくための作業手順を、図2及び図3をもとに説
明する。
(Apparatus installation procedure) Next, a work procedure for mounting the apparatus 31 according to this embodiment in advance when building a building will be described with reference to FIG. 2 and FIG. .

【0016】まず、予め基礎コンクリート1の上面3に
凹部55を形成し、この凹部55にアンカーボルト33
を埋め込んでおく。アンカーボルト33の雄ネジ部は、
十分に長いものとし、凹部55の底面から上方に突出し
た状態にしておく。このアンカーボルト33に下部ナッ
ト35を螺合し、修正具37を貫通しておく。下部ナッ
ト35は十分に下降させ凹部55内に位置させる。
First, a concave portion 55 is formed in the upper surface 3 of the foundation concrete 1 in advance.
Is embedded. The male screw part of the anchor bolt 33 is
It should be long enough to protrude upward from the bottom of the recess 55. The lower nut 35 is screwed into the anchor bolt 33 and the correction tool 37 is penetrated. The lower nut 35 is sufficiently lowered to be positioned in the recess 55.

【0017】そして、基礎コンクリート1の上に土台9
を据え付ける際に、土台9に予め上下方向に形成された
ボルト孔11に対しアンカーボルト33を貫通させる。
そして、土台9の側面を修正具37の垂直板43、45
に支えさせる。
Then, the foundation 9 is placed on the foundation concrete 1.
When installing the anchor bolts 33, the anchor bolts 33 are passed through the bolt holes 11 formed in advance in the base 9 in the vertical direction.
Then, the side surfaces of the base 9 are fixed to the vertical plates 43 and 45 of the corrector 37.
To support.

【0018】さらに、アンカーボルト33に座金39を
貫通させ、上部ナット41を螺合させる。上部ナット4
1と下部ナット35によって、土台9を修正具37によ
って基礎コンクリート1にしっかりと固定させる。
Further, the washer 39 is passed through the anchor bolt 33, and the upper nut 41 is screwed. Upper nut 4
The base 9 is firmly fixed to the foundation concrete 1 by the correction tool 37 by the nut 1 and the lower nut 35.

【0019】(沈下修正手順)さて、地盤沈下などによ
り基礎コンクリート1及び土台9が沈下し、建築物に歪
みが生じた場合には、次の作業手順により沈下を修正す
る。
(Sinking Correction Procedure) If the foundation concrete 1 and the base 9 sink due to land subsidence or the like and the building is distorted, the settlement is corrected by the following operation procedure.

【0020】まず図4に示すように、上部ナット41を
アンカーボルト33の軸回りに回転させ所定の修正高さ
Hだけ上昇させる。この高さHは、測量によって予め必
要に寸法になるようにセットする。この上部ナット41
の高さ位置は、沈下修正の目標となる。
First, as shown in FIG. 4, the upper nut 41 is rotated about the axis of the anchor bolt 33 and raised by a predetermined correction height H. This height H is set in advance to a necessary dimension by surveying. This upper nut 41
Is the target for settlement correction.

【0021】つぎに、地面を掘削して作業用の穴56を
掘り、基礎コンクリート1の肩部23を露出させる。こ
の肩部23にジャッキ57を載せ、ジャッキヘッド59
により修正具37のジャッキ受け部51の下側を上方に
押し上げて、土台9を押し上げる。
Next, the ground is excavated and a working hole 56 is dug to expose the shoulder 23 of the foundation concrete 1. A jack 57 is placed on the shoulder 23 and a jack head 59
As a result, the lower side of the jack receiving portion 51 of the correction tool 37 is pushed upward, and the base 9 is pushed up.

【0022】そのようにして、土台9が目標となる上部
ナット41まで押し上げられたら、凹部55からレンチ
などの道具を差し込んで下部ナット35を回転させ上昇
させて、修正具37を支える。その後、土台9と基礎コ
ンクリート1との間に、スペーサーやモルタル61など
を充填し固定する以上説明したように、この実施形態に
よれば以下の効果を得る。 (1) 修正具37が突出するジャッキ受け部51を有し、
また基礎コンクリート1の上面3に予め凹部55が形成
され、この凹部55からレンチなどを差し込んで下部ナ
ット35を回転する作業が行えるので、従来のように基
礎コンクリート1をはつって隙間21を形成する作業の
必要がない。これにより、木材(オビキ)などからなる
土台9を傷つけるおそれがない。 (2) 下部ナット35を回転させることで、下部ナットと
アンカーボルト33により、ある程度のジャッキの機能
を果たすことができるため、従来のように、多数のジャ
ッキ25を用意する必要が無い。すなわち、ジャッキ5
7の数を少なくできる。 (3) 従来はジャッキ25で土台9を押し上げて必要な修
正量を得たか否かを、たびたび測量して確認する必要が
あったが、この実施形態においては上部ナット41の位
置を、予め測量した必要な修正量に合わせて位置させて
おけばよい。よって、測量ははじめの1回のみで済む。
すなわち上部ナット41の位置を、修正の目標とするこ
とがきる。 (4) この実施形態は、いわば従来のジャッキ25に類似
する装置31を予め基礎コンクリート1の部分に埋め込
んで設けておくものといえる。そして、このジヤッキ2
5に相当するアンカーボルト33は、基礎コンクリート
1の中に予め埋め込んでおくことにより、外観は通常の
基礎コンクリート1と変わらないものにすることが可能
である。 (5) また、予め基礎コンクリート1の部分で土台9の真
下に大きな窪みを形成して従来のジャッキ25を設けて
おく場合に比べ、ジャッキ25に類似する部分としての
アンカーボルト33は、基礎コンクリート1に予め埋め
込まれているので、基礎コンクリート1の構造上の強度
を損なわないものにできる。 (6) 従来の沈下修正は、多数台の爪付きジャッキ25を
用い面倒な作業を必要とするため専門の業者が行うもの
であったが、この実施形態によれば通常のジャッキによ
って手軽に修正工事が行えるので、一般の工務店でも沈
下修正が可能となる。
When the base 9 is pushed up to the target upper nut 41 in this way, a tool such as a wrench is inserted from the concave portion 55, and the lower nut 35 is rotated and raised to support the correction tool 37. After that, the space and the mortar 61 are filled and fixed between the base 9 and the foundation concrete 1. As described above, according to this embodiment, the following effects are obtained. (1) The correction tool 37 has a jack receiving portion 51 protruding,
A concave portion 55 is formed in the upper surface 3 of the base concrete 1 in advance, and a wrench or the like can be inserted into the concave portion 55 to rotate the lower nut 35. Therefore, the gap 21 is formed by removing the base concrete 1 as in the related art. There is no need to work. Thereby, there is no possibility of damaging the base 9 made of wood (Obiki) or the like. (2) By rotating the lower nut 35, the lower nut and the anchor bolt 33 can perform a certain amount of jacking function, so that it is not necessary to prepare a large number of jacks 25 as in the related art. That is, jack 5
7 can be reduced. (3) Conventionally, it was necessary to frequently measure and check whether or not the necessary correction amount was obtained by pushing up the base 9 with the jack 25. In this embodiment, the position of the upper nut 41 is previously measured. What is necessary is just to position it according to the required correction amount. Therefore, only one survey is required.
That is, the position of the upper nut 41 can be set as a correction target. (4) In this embodiment, it can be said that a device 31 similar to the conventional jack 25 is embedded in the foundation concrete 1 in advance. And this jack 2
By embedding the anchor bolts 33 corresponding to No. 5 in the foundation concrete 1 in advance, the appearance can be made the same as that of the ordinary foundation concrete 1. (5) In comparison with the case where the conventional jack 25 is provided by forming a large depression immediately below the base 9 in the portion of the foundation concrete 1 in advance, the anchor bolt 33 as a portion similar to the jack 25 is different from the foundation concrete. 1, the structural strength of the foundation concrete 1 can be maintained. (6) Conventional subsidence correction is performed by a specialized trader because it requires cumbersome work using a large number of jacks 25, but according to this embodiment, it is easily corrected by a normal jack. Since construction work can be performed, settlement can be corrected at ordinary construction shops.

【0023】(他の実施形態)以上の実施形態において
は、修正具37の端部と中央部に二つの垂直板43、4
5が立設されるものであったが、他の実施形態において
は、図7に示すように端部の垂直板43を省略しても良
い。また、十分に大きな肉厚の板材を用いれば、このよ
うな垂直板43、45や補強板53を全て省略すること
もできる。なお、図7において前記実施形態(図1)と
同一の部分については同一の符号を付す。
(Other Embodiments) In the above embodiment, two vertical plates 43, 4 are provided at the end and the center of the corrector 37.
5, the vertical plate 43 at the end may be omitted in another embodiment as shown in FIG. In addition, if a sufficiently thick plate material is used, all of the vertical plates 43 and 45 and the reinforcing plate 53 can be omitted. In FIG. 7, the same parts as those in the embodiment (FIG. 1) are denoted by the same reference numerals.

【0024】以上の実施形態においては、ナット35、
41の回転はレンチなどの道具を用いて行うものであっ
たが、他の実施形態においてはナット35、41に予め
ハンドルを取り付けておき、道具を用いずに容易にナッ
ト35、41を回転することも可能である。
In the above embodiment, the nut 35,
The rotation of 41 is performed using a tool such as a wrench, but in other embodiments, a handle is attached to the nuts 35 and 41 in advance, and the nuts 35 and 41 are easily rotated without using a tool. It is also possible.

【0025】以上の実施形態においては凹部55は、基
礎コンクリート1の外側からアンカーボルト33やナッ
ト35が見えるように形成される(図2参照)ものであ
ったが、他の実施形態においては凹部55の一部、即ち
基礎コンクリート1の側面の延長部分に相当する部分を
薄いモルタルで覆い、外部から見えないように目隠し状
態とすることが可能である。そして、実際に沈下の修正
を行う際には、このモルタルを削り落とし凹部53を露
出させてから作業を行うものとすることができる。
In the above embodiment, the concave portion 55 is formed so that the anchor bolt 33 and the nut 35 can be seen from the outside of the foundation concrete 1 (see FIG. 2). However, in other embodiments, the concave portion 55 is formed. It is possible to cover a part of the base concrete 55, that is, a part corresponding to an extension of the side surface of the foundation concrete 1, with a thin mortar so as to make it invisible so as not to be seen from the outside. Then, when actually correcting the settlement, the work can be performed after the mortar is shaved off to expose the concave portion 53.

【0026】特に、建築物の外周部位に位置する基礎コ
ンクリート1に設けられた沈下修正用アンカーボルト装
置31においては、凹部55に目隠し状態のモルタルを
施すことは、美的外観を保つという観点から有効であ
る。
In particular, in the anchor bolt device 31 for subsidence correction provided on the foundation concrete 1 located on the outer peripheral portion of the building, it is effective to apply the mortar in a blind state to the concave portion 55 from the viewpoint of maintaining an aesthetic appearance. It is.

【0027】[0027]

【発明の効果】以上説明したように、この発明によれ
ば、基礎の上面の一部に予め凹部を形成し、この凹部に
本発明に係る修正装置を設けることにより、側方に突出
するジャッキ受けを用いることで従来のように爪付きジ
ャッキの爪を土台と基礎の間に挿入する必要がなく、ま
た、この凹部において下部ナットを回転することがで
き、従って従来のように基礎をはつる必要がない。よっ
て土台に傷を付ける恐れもなくなる。
As described above, according to the present invention, a jack which projects laterally is formed by forming a concave portion in advance on a part of the upper surface of the foundation and providing the correcting device according to the present invention in the concave portion. By using the catch, it is not necessary to insert the claw of the jack with a claw between the base and the foundation as in the conventional case, and the lower nut can be rotated in this concave portion, so that the foundation can be removed as in the conventional case. No need. Therefore, there is no danger of damaging the base.

【0028】また、アンカーボルトとナットとがいわば
ジャッキの働きをも兼ね備えるので、使用するジャッキ
の数を減らすことができる。これらのことから、工期を
短くでき、施工費を安くすることが可能となる。
Further, since the anchor bolt and the nut also function as a jack, so to speak, the number of jacks used can be reduced. From these, the construction period can be shortened, and the construction cost can be reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施形態に係る建物の沈下を修正す
る修正装置の要部を示す斜視図である。
FIG. 1 is a perspective view showing a main part of a correction device for correcting settlement of a building according to an embodiment of the present invention.

【図2】図1の修正装置が取り付けられた建築物の基礎
の部分を示す側面図である。
FIG. 2 is a side view showing a foundation portion of a building to which the correction device of FIG. 1 is attached.

【図3】図2の断面図である。FIG. 3 is a sectional view of FIG. 2;

【図4】図2において沈下を修正するためにジャッキを
セットした状態を示す側面図である。
FIG. 4 is a side view showing a state in which a jack is set to correct settlement in FIG. 2;

【図5】図4においてジャッキアップし土台を押し上げ
た状態を示す側面図である。
FIG. 5 is a side view showing a state where a jack is raised and a base is pushed up in FIG. 4;

【図6】図5において修正が完了した状態を示す側面図
である。
FIG. 6 is a side view showing a state where the correction is completed in FIG. 5;

【図7】他の実施形態における図1に対応する図であ
る。
FIG. 7 is a diagram corresponding to FIG. 1 in another embodiment.

【図8】従来例を示す基礎の断面図である。FIG. 8 is a sectional view of a foundation showing a conventional example.

【図9】図8の側面図である。FIG. 9 is a side view of FIG.

【図10】図8の土台をジャッキにより押し上げた状態
を示す図である。
FIG. 10 is a view showing a state where the base of FIG. 8 is pushed up by a jack.

【図11】図10の土台と基礎の間をモルタルなどで充
填した状態を示す側面図である。
11 is a side view showing a state where the space between the base and the foundation in FIG. 10 is filled with mortar or the like.

【図12】図11の断面図である。FIG. 12 is a sectional view of FIG. 11;

【符号の説明】[Explanation of symbols]

1 基礎コンクリート 9 土台(オビキ) 33 アンカーボルト 35 下部ナット 37 修正具 39 座金 41 上部ナット 43、45 垂直板 47 土台受け部 49 ボルト孔 51 ジャッキ受け部 53 補強板 55 凹部 57ジャッキ 61 モルタル DESCRIPTION OF SYMBOLS 1 Foundation concrete 9 Base (Obiki) 33 Anchor bolt 35 Lower nut 37 Correction tool 39 Washer 41 Upper nut 43, 45 Vertical plate 47 Base receiving part 49 Bolt hole 51 Jack receiving part 53 Reinforcement plate 55 Depression 57 Jack 61 Mortar

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】建築物の基礎の上面の一部に形成された凹
部と、この凹部の底面に予め埋め込まれ雄ネジ部が上方
に突出しているアンカーボルトと、このアンカーボルト
に螺合する下部ナットと、この下部ナットの上側に位置
しアンカーボルトが貫通するボルト孔が形成され土台の
下面を受ける修正具と、この修正具に受けられアンカー
ボルトが貫通するボルト孔が形成され基礎の上面に据え
付けられる土台と、前記修正具に一体的に設けられ側方
に突出してジャッキの力を受け土台に伝えるジャッキ受
け部と、前記土台の上側に位置し上記アンカーボルトに
螺合する上部ナットとを有することを特徴とする建築物
の沈下を修正する修正装置。
1. A recess formed in a part of an upper surface of a foundation of a building, an anchor bolt previously embedded in a bottom surface of the recess and having a male screw portion projecting upward, and a lower portion screwed to the anchor bolt. A nut and a fixing tool positioned above the lower nut and formed with a bolt hole through which the anchor bolt passes and receiving the lower surface of the base, and a bolt hole received by the fixing tool and through which the anchor bolt passes are formed on the upper surface of the foundation. A base to be installed, a jack receiving part integrally provided with the correction tool and projecting sideways and transmitting the force of the jack to the base, and an upper nut located above the base and screwed to the anchor bolt. A correction device for correcting settlement of a building, the correction device comprising:
【請求項2】請求項1に記載の修正装置を使用し、(a)
上部ナットをアンカーボルトの軸回りに回転させて上昇
せしめ、(b) ジャッキによって、修正具のジャッキ受け
部の下側を上方に押し上げて、土台を押し上げ、(c) 凹
部からレンチなどの道具を差し込んで下部ナットを回転
させ上昇させて、修正具を支え、(d) 土台と基礎との間
にモルタルなどを充填し固定する上記(a) 〜(d) の工程
を有してなる建築物の基礎の沈下を修正する修正工法。
2. The method according to claim 1, wherein (a)
Rotate the upper nut around the axis of the anchor bolt to raise it. (B) Push up the lower side of the jack receiving part of the correction tool with a jack, push up the base, and (c) Remove a tool such as a wrench from the recess. (D) A building having the above-mentioned steps (a) to (d) in which the lower nut is rotated by rotating the lower nut to raise and support the correction tool, and (d) the mortar is filled and fixed between the base and the foundation. Correction method to correct settlement of foundation of building.
JP09096604A 1997-03-31 1997-03-31 Correction device and correction method for correcting settlement of building Expired - Fee Related JP3100350B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP09096604A JP3100350B2 (en) 1997-03-31 1997-03-31 Correction device and correction method for correcting settlement of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP09096604A JP3100350B2 (en) 1997-03-31 1997-03-31 Correction device and correction method for correcting settlement of building

Publications (2)

Publication Number Publication Date
JPH10280427A JPH10280427A (en) 1998-10-20
JP3100350B2 true JP3100350B2 (en) 2000-10-16

Family

ID=14169480

Family Applications (1)

Application Number Title Priority Date Filing Date
JP09096604A Expired - Fee Related JP3100350B2 (en) 1997-03-31 1997-03-31 Correction device and correction method for correcting settlement of building

Country Status (1)

Country Link
JP (1) JP3100350B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102696396A (en) * 2012-06-27 2012-10-03 盐城市爱菲尔钢结构有限公司 Ceiling anti-settling framework of fruiting room for edible fungi

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6503024B2 (en) * 2000-03-06 2003-01-07 Stan Rupiper Concrete foundation pierhead and method of lifting a foundation using a jack assembly
JP5937883B2 (en) * 2012-05-09 2016-06-22 トヨタホーム株式会社 Mounting member for building jack-up
CN103669432B (en) * 2013-11-18 2016-11-02 国家电网公司 A kind of jacking device for deviation rectification of steel pylon in mining area of coal mine
CN103669431B (en) * 2013-11-18 2016-06-01 国家电网公司 A kind of colliery minery electric power pylon inclination adjusting device
CN104563172B (en) * 2015-01-13 2016-10-05 浙江湖州市建工集团有限公司 A kind of steel construction room sinking resetting structure and repositioning method thereof
CN104805876B (en) * 2015-05-18 2017-03-29 中国化学工程第三建设有限公司 A kind of method for inclining the vertical pushing tow correction of independent bent columns
CN106836281A (en) * 2017-02-21 2017-06-13 安徽省高迪环保股份有限公司 A kind of precast concrete segment height adjustment mechanism and regulation construction method
CN110080551B (en) * 2019-04-29 2021-02-05 杭州科技职业技术学院 Reinforcing method for protecting wooden structure ancient building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102696396A (en) * 2012-06-27 2012-10-03 盐城市爱菲尔钢结构有限公司 Ceiling anti-settling framework of fruiting room for edible fungi

Also Published As

Publication number Publication date
JPH10280427A (en) 1998-10-20

Similar Documents

Publication Publication Date Title
JP3100350B2 (en) Correction device and correction method for correcting settlement of building
CN111868332A (en) Column mounting bracket
JP3260096B2 (en) Anchor bolt device for correcting settlement of buildings
JP3523849B2 (en) How to correct settlement of buildings
JP3671344B2 (en) Joint structure between foundation pile and column base and its construction method
JP5985283B2 (en) Building subsidence correction device and correction method
JP3032104B2 (en) Fixing method of pillar lower end
AU2010257353B2 (en) Building foundation structure, foundation construction method, and anchor bolt installation jig
JP3656452B2 (en) Seismic isolation method for existing buildings
JP3615018B2 (en) How to correct a house with a steel base
JP2945629B2 (en) Reform foam on existing wall surfaces and relocation wall material attachment position
JPH0978580A (en) Foundation pile pressing-in method and pressing-in device
JP2981663B1 (en) House standing posture compensation structure
JPS6127528B2 (en)
JP4312907B2 (en) Direct foundation structure with non-settlement correction function
JP2004332496A (en) Method for correcting partial settlement of wooden building, and jack holder for correcting settlement of wooden building
JP4993487B2 (en) Clay concrete construction method of building using outer wall panel and steel foundation
KR200362839Y1 (en) Fixing structure for big-size concrete form
JPH0714556Y2 (en) Scaffold connection strengthening hardware and scaffold connection device
JP6771980B2 (en) How to install the support
GB2026646A (en) Structural Joint for a Building Framework
JPS63223217A (en) Piling work in neighborhood of boundary line
JPH10238074A (en) Connecting fitting between joist material and flooring material in wooden floor structure, and wooden flooring material laying method
JPH09158640A (en) Gatepost and installing method of gatepost
JP3000041U (en) Positioning plate for anchor bolts for building foundations

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees