JP2945629B2 - Reform foam on existing wall surfaces and relocation wall material attachment position - Google Patents

Reform foam on existing wall surfaces and relocation wall material attachment position

Info

Publication number
JP2945629B2
JP2945629B2 JP15044196A JP15044196A JP2945629B2 JP 2945629 B2 JP2945629 B2 JP 2945629B2 JP 15044196 A JP15044196 A JP 15044196A JP 15044196 A JP15044196 A JP 15044196A JP 2945629 B2 JP2945629 B2 JP 2945629B2
Authority
JP
Japan
Prior art keywords
wall material
wall
existing
hole
renovation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP15044196A
Other languages
Japanese (ja)
Other versions
JPH09268576A (en
Inventor
秀光 角銅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shinko Kozai Co Ltd
Original Assignee
Shinko Kozai Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shinko Kozai Co Ltd filed Critical Shinko Kozai Co Ltd
Priority to JP15044196A priority Critical patent/JP2945629B2/en
Publication of JPH09268576A publication Critical patent/JPH09268576A/en
Application granted granted Critical
Publication of JP2945629B2 publication Critical patent/JP2945629B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Retaining Walls (AREA)
  • Revetment (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、擁壁や護岸壁など
既設構造物の壁面が汚れたり損傷した場合に、この壁面
をリフォームする既設壁面のリフォーム工法、および
フォーム壁材の取付位置の墨出しを行なう墨出し治具
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of renovating an existing wall, such as a retaining wall or a revetment wall, when the wall of the existing structure becomes dirty or damaged, and a renovation wall material. To a black-out jig for black-out of the mounting position
Related.

【0002】[0002]

【従来の技術】従来、河川の擁壁などが長年風雨に晒さ
れて壁面が損傷したり汚れたりすると、この壁面を取り
壊して除去し、再度その場に新たな壁面を構築する必要
があった。
2. Description of the Related Art Conventionally, when a retaining wall of a river is exposed to the wind and rain for many years and the wall is damaged or becomes dirty, it has been necessary to demolish and remove the wall, and construct a new wall again on the spot. .

【0003】[0003]

【発明が解決しようとする課題】しかしながら、既設の
構造物を取り壊してからその場に新たに壁を構築するの
では、古い壁を取り壊す手間と新たな壁を構築する手間
とが掛かってしまい、多大な労力と経費と時間を費やさ
なければならない。特に、合板型枠を使用して壁面を構
築する合板型枠工法を採用すると、熟練した型枠大工を
確保することが困難であるばかりでなく、資材の搬入と
搬出の手間を伴い、また作業の性質上機械化が容易でな
く、建設工事の合理化が困難である。
However, if the existing structure is demolished and a new wall is constructed on the spot, it takes time to demolish the old wall and to construct a new wall. You have to spend a lot of effort, money and time. In particular, if the plywood formwork method of constructing the wall surface using the plywood formwork is employed, not only is it difficult to secure skilled formwork carpenters, but also it takes time to load and unload materials, and Due to its nature, it is not easy to mechanize and it is difficult to rationalize construction work.

【0004】また、既設の構造物の壁面が汚れたり損傷
しても、実際にはその強度が不都合を生じる程に低下し
ていることは稀である。
Further, even if the wall surface of an existing structure becomes dirty or damaged, it is rare that the strength of the existing structure is actually reduced to a degree that causes inconvenience.

【0005】さらに、既設の構造物を取り壊すと廃材の
処理が問題になってくる。
[0005] Further, when existing structures are demolished, disposal of waste materials becomes a problem.

【0006】そこで、本発明は、既設構造物も資源の一
つと考え、その有効利用を図ることができる既設壁面の
リフォーム工法を提供することを目的とする。
[0006] Therefore, an object of the present invention is to provide a method of renovating an existing wall surface in which an existing structure is regarded as one of the resources and its effective use can be achieved.

【0007】また、既設壁面が曲面の場合に、リフォー
ム壁材の取付孔のピッチと同じピッチで既設壁面にアン
カー位置をマークしたのでは、既設壁面の曲率とリフォ
ーム壁材の曲率とがコンクリート打設間隔分だけ異なる
ので、誤差を生じてしまう。そして、取付孔を多少大き
く開設したとしても、隣合わせに順次設置する場合に
は、壁面の端に設置するリフォーム壁材の位置では上記
誤差が累積してしまい、取付孔内にアンカーボルトを通
すことができないなどの不都合を生じる。
Further, when the existing wall surface is a curved surface, if the anchor position is marked on the existing wall surface at the same pitch as the pitch of the mounting holes of the renovation wall material, the curvature of the existing wall surface and the curvature of the renovation wall material are changed to concrete. Since the distance differs by the setting interval, an error occurs. And even if the mounting hole is slightly larger, if the doors are sequentially installed side by side, the above errors will accumulate at the position of the reforming wall material installed at the end of the wall surface, and the anchor bolt must be passed through the mounting hole. Inconveniences such as not being able to do.

【0008】また、これらの不都合を解消するために、
リフォーム壁材自体を仮の位置に実際に置いてアンカー
孔の位置をマークしていたのでは、リフォーム壁材が約
200kgと重いので、作業能率を高めることができな
い。
In order to eliminate these inconveniences,
If the position of the anchor hole is marked by actually placing the reformed wall material itself at a temporary position, the work efficiency cannot be increased because the reformed wall material is as heavy as about 200 kg.

【0009】また、既設壁面が地盤沈降などの経年変化
でゆがんだ面となっていた場合、単にリフォーム壁材を
張っただけではリフォーム壁面が波打ってしまうし、リ
フォーム壁面を揃えるためにはリフォーム壁材の位置を
微調整するなど煩雑な作業を要し、これを怠るとリフォ
ーム壁材ががたつくなどの不都合を生じる。
In addition, if the existing wall surface is distorted due to aging such as ground subsidence, simply applying a renovation wall material will cause the renovation wall surface to undulate. Complicated work such as fine adjustment of the position of the wall material is required, and if this is neglected, inconvenience such as rattling of the reformed wall material occurs.

【0010】そこで、本発明は、重いリフォーム壁材を
実際に使用しなくても容易且つ正確にアンカー孔位置の
墨出し作業を行なうことができる既設壁面のリフォーム
工法およびリフォーム壁材取付位置墨出し治具を提供す
ることを目的とする。
Accordingly, the present invention provides a method of remodeling an existing wall surface and a method of remodeling a wall material mounting position of an existing wall, which can easily and accurately mark an anchor hole position without actually using a heavy remodeling wall material. Provide jig
The porpose is to do.

【0011】[0011]

【課題を解決するための手段】本発明は上記目的を達成
するために提案されたもので、請求項1に記載のリフォ
ーム工法は、リフォーム壁材の外形に合わせて成形した
ベース材と、該ベース材に、リフォーム壁材の取付孔の
位置に合わせて開口した墨出し孔と、ベース材の一方の
面から突設したスペーサ突部とを有するリフォーム壁材
取付位置墨出し治具を使用して、該リフォーム壁材取付
位置墨出し治具のスペーサ突部の先端を既設建築構造物
の壁面に当接した状態で墨出し孔内にマーカを挿入して
アンカー孔の位置を既設壁面にマークし、この操作を繰
り返し行なって既設壁面にリフォーム壁材のアンカー孔
の位置を順次決定する墨出し工程と、墨出し工程により
マークしたアンカー孔の位置に穿孔してアンカーボルト
を既設壁面に突設するアンカーボルト突設工程と、アン
カーボルトをリフォーム壁材の取付孔内に挿通し、該ア
ンカーボルトによりリフォーム壁材を既設壁面から所定
の間隔を空けた状態で取り付けるリフォーム壁材取付工
程と、既設壁面とリフォーム壁材との間隔内にコンクリ
ートを打ち込むコンクリート打ち込み工程と、からなる
ことを特徴とする。
Means for Solving the Problems The present invention has been proposed in order to achieve the above object, and a remodeling method according to claim 1 comprises a base material formed in accordance with the outer shape of a wall material for remodeling, A base material is provided with a refill wall material mounting position remarking jig having a remarkable hole that is opened in accordance with the position of the remodeling wall material mounting hole and a spacer protrusion protruding from one surface of the base material. Then, a marker is inserted into the blackout hole in a state where the tip of the spacer projection of the blackboard jig is in contact with the wall surface of the existing building structure, and the position of the anchor hole is marked on the existing wall surface. Then, this operation is repeatedly performed to sequentially determine the positions of the anchor holes of the renovation wall material on the existing wall surface, and the anchor bolts are protruded from the existing wall surface by piercing at the positions of the anchor holes marked by the blacking process. An anchor bolt protruding step, an anchor bolt being inserted into a mounting hole of the reforming wall material, and a reforming wall material mounting step of attaching the reforming wall material at a predetermined distance from the existing wall surface by the anchor bolt; And a concrete driving step of driving concrete into the space between the wall surface and the reformed wall material.

【0012】請求項2に記載のリフォーム壁材取付位置
墨出し治具は、リフォーム壁材の外形に合わせて成形し
たベース材と、該ベース材に、リフォーム壁材の取付孔
の位置に合わせて開口した墨出し孔と、ベース材の一方
の面から突設したスペーサ突部とを有することを特徴と
する。
According to a second aspect of the present invention, there is provided a jig for attaching a renovation wall material to a base material formed in accordance with the outer shape of the renovation wall material. It is characterized by having an opened blackout hole and a spacer protrusion protruding from one surface of the base material.

【0013】請求項3に記載のリフォーム壁材取付位置
墨出し治具は、請求項2に記載の構成に加えて、スペー
サ突部を筒材で構成し、該筒材の中空部をベース材の他
方の面に貫通させ、この筒材の貫通中空部を墨出し孔と
したことを特徴とする。
According to a third aspect of the present invention, in addition to the configuration of the second aspect, in addition to the configuration described in the second aspect, the spacer projection is formed of a cylindrical material, and the hollow portion of the cylindrical material is formed of a base material. Characterized in that the hollow portion of the cylindrical member is formed as a marking hole.

【0014】[0014]

【発明の実施の形態】以下、本発明の実施の形態を図面
に基づいて説明する。図1(A)は、リフォーム壁材1
の正面図、図1(B)はその右側面図、図1(C)は底
面図である。このリフォーム壁材1は、既設壁面を覆い
隠すようにして設置されるコンクリート製の壁材であ
り、ほぼ十字形のベース板部2と、該ベース板部2に開
設した取付孔3と、ベース板部2の表面に突出する状態
で一体成形した装飾部4とから構成されている。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1A shows a reformed wall material 1.
1 (B) is a right side view thereof, and FIG. 1 (C) is a bottom view thereof. The reforming wall material 1 is a concrete wall material that is installed so as to cover an existing wall surface, and has a substantially cross-shaped base plate portion 2, a mounting hole 3 formed in the base plate portion 2, The decorative part 4 is integrally formed in a state of protruding from the surface of the plate part 2.

【0015】ベース板部2は、図面に示す実施形態では
横幅が750mm、上下長さが800mmの中央部分の
左右に横幅370mm、上下長さ800mmの横ベース
を延設し、中央部分の上下に横幅750mm、上下長さ
200mmの上ベースと下ベースをそれぞれ延設した略
十字形のコンクリート製板材である。なお、上下のベー
スは、基端部分から先端部分に向かって次第に幅が減少
するテーパーを付けてある。
In the embodiment shown in the drawings, the base plate portion 2 has a horizontal base having a width of 750 mm, a vertical length of 800 mm, and a horizontal base having a width of 370 mm and a vertical length of 800 mm extending to the left and right of the central portion. This is a substantially cross-shaped concrete plate material having an upper base and a lower base each extending 750 mm in width and 200 mm in vertical length. The upper and lower bases are tapered so that the width gradually decreases from the base end to the tip.

【0016】このベース板部2の表面に一体成形する装
飾部4は、図1に示す実施形態では大きな玉石を模した
略円形の膨出部を複数形成してあり、その内で左右の横
ベース部の上端縁近傍および上ベース部に形成する装飾
部4は各ベース部の上端縁よりも上方に突出させること
により突出した部分を引っ掛け凸部5とし、また、一方
の横ベース部(本実施形態では図中右側の横ベース部)
の側端縁近傍に形成する装飾部4は当該横ベース部の側
端縁よりも横方向に突出させることにより突出した部分
を引っ掛け凸部5としてある。
In the embodiment shown in FIG. 1, the decorative portion 4 integrally formed on the surface of the base plate portion 2 has a plurality of substantially circular bulges imitating large cobblestones. The decorative portion 4 formed near the upper end edge of the base portion and on the upper base portion protrudes upward from the upper end edge of each base portion, so that the protruding portion serves as a hooking convex portion 5. In the embodiment, the horizontal base on the right side in the figure)
The decorative portion 4 formed in the vicinity of the side edge of the horizontal base portion protrudes in the lateral direction from the side edge of the horizontal base portion, so that the protruding portion serves as a hooking convex portion 5.

【0017】そして、積み上げて施工した際に、引っ掛
け凸部5が重なる部分には干渉を回避するための空部6
を形成する。すなわち、下段のリフォーム壁材1の左側
横ベース部の上縁から突出した引っ掛け凸部5が重なる
上段のリフォーム壁部の下ベース部の対応する右側下縁
部分には装飾部4も突出しない平坦なベース部(空部
6)とし、同様に、下段の上ベース部の上縁から突出し
た引っ掛け凸部5が重なる上段の左右の横ベース部の対
応する下縁部分、下段の右側横ベース部の上縁から突出
した引っ掛け凸部5が重なる上段のリフォーム壁部の左
側横ベース部の対応する下縁部分には装飾部4を突設す
ることなく平坦なベース部(空部6)とする。
When stacking and constructing, there is an empty space 6 for avoiding interference at the portion where the hooking projections 5 overlap.
To form In other words, the decorative portion 4 does not protrude at the corresponding lower right edge of the lower base portion of the upper remodeling wall portion where the hooking projection 5 projecting from the upper edge of the left horizontal base portion of the lower remodeling wall material 1 overlaps. Similarly, the corresponding lower edge portions of the upper left and right horizontal base portions, on which the hooking protrusions 5 projecting from the upper edge of the lower upper portion overlap, and the lower right lateral base portion A flat base portion (empty portion 6) is formed without protruding the decorative portion 4 at the corresponding lower edge portion of the left horizontal base portion of the upper reforming wall portion where the hooking convex portion 5 projecting from the upper edge overlaps. .

【0018】また、このリフォーム壁材1のベース板部
2には、上記した装飾部4を形成しない窪み部分に取付
孔3を開設する。
Further, in the base plate portion 2 of the reformed wall material 1, a mounting hole 3 is formed in a concave portion where the decorative portion 4 is not formed.

【0019】上記した構成から成るリフォーム壁材1を
既設の壁面に設置するためには、まず取付位置を決定す
る必要があり、このため本発明ではリフォーム壁材1と
同じ形状で同じ大きさのリフォーム壁材取付位置墨出し
治具10を使用してアンカー位置をマーク(墨出し)す
る。
In order to install the reformed wall material 1 having the above-described configuration on an existing wall surface, it is necessary to first determine a mounting position. For this reason, in the present invention, the same shape and the same size as the reformed wall material 1 are used in the present invention. The anchor position is marked (marked out) by using the reforming wall material mounting position marking-out jig 10.

【0020】このリフォーム壁材取付位置墨出し治具1
0は、図2に示すように、リフォーム壁材1の外形に合
わせて成形したベース材11と、該ベース材11に、リ
フォーム壁材1の取付孔3の位置に合わせて開口した墨
出し孔12と、ベース材11の一方の面から突設したス
ペーサ突部13とを有する。
This renovation wall material mounting position ink extraction jig 1
Reference numeral 0 denotes a base material 11 formed according to the outer shape of the reformed wall material 1 as shown in FIG. 2, and a blackout hole formed in the base material 11 so as to correspond to the position of the mounting hole 3 of the reformed wall material 1. 12 and a spacer protrusion 13 protruding from one surface of the base material 11.

【0021】ベース材11は、リフォーム壁材1の形状
及び大きさに合わせて(即ち、合同に)成形したプラス
チック板製であり、図面に示す実施形態では横幅が75
0mm、上下長さが800mmの中央部分の左右に横幅
370mm、上下長さ800mmの横ベースを延設し、
中央部分の上下に横幅750mm、上下長さ200mm
の上ベースと下ベースをそれぞれ延設した略十字形であ
り、上下のベースには僅かなテーパを付けてある。な
お、このベース材11は、リフォーム壁材1の外形の形
状及び大きさが分ればよく、また取り扱い性を向上させ
るためには軽量であることが望ましいので、薄いプラス
チック板で構成し、必要な強度を確保するために周縁や
途中に適宜補強リブ(図示せず)を設ける。また、ベー
ス材11の内部の面(外周縁の内側の部分)に開口部を
開設して枠体として構成すると、さらに軽量化を図るこ
とができる。
The base material 11 is made of a plastic plate which is molded (that is, jointly) in accordance with the shape and size of the reformed wall material 1, and has a width of 75 in the embodiment shown in the drawings.
0mm, the horizontal base of 370mm in width and 800mm in height is extended to the left and right of the center part of 800mm in height.
750mm width and 200mm length above and below the center
The upper base and the lower base are each formed in a generally cross shape extending, and the upper and lower bases are slightly tapered. The base material 11 only needs to know the shape and size of the outer shape of the reformed wall material 1, and it is desirable that the base material 11 be lightweight in order to improve handleability. Reinforcement ribs (not shown) are provided on the periphery or in the middle as needed to ensure high strength. Further, if an opening is formed on the inner surface of the base material 11 (the inner portion of the outer peripheral edge) to constitute a frame, the weight can be further reduced.

【0022】図面に示すリフォーム壁材取付位置墨出し
治具10の実施形態においては、スペーサ突部13を筒
材で構成し、該筒材の中空部をベース材11の他方の面
に貫通させ、この筒材の貫通中空部を墨出し孔12とし
た。したがって、このスペーサ突部13の位置は、リフ
ォーム壁材1の取付孔3の位置に対応させて、即ち取付
孔3の中心とスペーサ突部13の中空部の中心とが一致
する位置にベース材11に対して垂直に突設する。ま
た、このスペーサ突部13の長さは、既設壁面とリフォ
ーム壁材1との間の隙間に応じた長さに設定する。この
隙間の寸法は規格化、例えば100mmで統一してもよ
いが、現場に応じて変化する場合には、予め長さの異な
るパイプ製スペーサ突部13を複数種類準備しておき、
適宜交換できるように構成してもよい。スペーサ突部1
3を交換可能にするためには、例えばスペーサ突部13
の基部に雄ネジ部を形成し、この雄ネジ部を、ベース材
11の墨出し孔12に形成した雌ネジ部に螺合すること
により取り付ける構成にしてもよい。
In the embodiment of the refining wall material mounting position marking tool 10 shown in the drawing, the spacer projection 13 is formed of a cylindrical material, and the hollow portion of the cylindrical material is made to penetrate the other surface of the base material 11. The hollow portion of the cylindrical member was defined as a blackout hole 12. Therefore, the position of the spacer protrusion 13 is set to correspond to the position of the mounting hole 3 of the reforming wall material 1, that is, the base material is positioned at a position where the center of the mounting hole 3 matches the center of the hollow portion of the spacer protrusion 13. Projecting perpendicular to 11. The length of the spacer projection 13 is set to a length corresponding to the gap between the existing wall surface and the reformed wall material 1. The size of this gap may be standardized, for example, unified at 100 mm, but if it changes according to the site, a plurality of types of pipe spacer protrusions 13 having different lengths are prepared in advance,
You may comprise so that it can replace suitably. Spacer protrusion 1
3 can be replaced by, for example, a spacer projection 13.
A male screw portion may be formed at the base of the base member 11 and the male screw portion may be attached by screwing the female screw portion to a female screw portion formed in the ink outlet 12 of the base material 11.

【0023】なお、図面に示したリフォーム壁材取付位
置墨出し治具10の実施形態では筒材で構成したスペー
サ突部13の中空部を墨出し孔12としたが、墨出し孔
12を所定の位置に開設し、これとは異なる位置にスペ
ーサ突部13を独立させて設けてもよい。
Although the hollow portion of the spacer projection 13 made of a tubular material is used as the blackout hole 12 in the embodiment of the blackout jig 10 shown in FIG. And the spacer projection 13 may be provided independently at a different position.

【0024】次に、上記したリフォーム壁材取付位置墨
出し治具10を使用して墨出しを行いながら河川の擁壁
(既設壁面15)をリフォームする作業の手順を説明す
る。
Next, a procedure for renovating a retaining wall (existing wall surface 15) of a river while performing ink mark-out using the above-described ink mark-off jig 10 for attaching a reformed wall material will be described.

【0025】図3(A)に示すように、まず既設壁面1
5の基端の地面を掘り起こして基礎16を露出させ、図
3(B)に示すように、既設の基礎15の前部にリフォ
ーム壁材用基礎17を打ち継いで形成する。
First, as shown in FIG.
The ground at the base end of No. 5 is dug up to expose the foundation 16, and as shown in FIG. 3 (B), a foundation 17 for a reformed wall material is formed by joining to the front of the existing foundation 15.

【0026】次に、リフォーム壁材取付位置墨出し治具
10をリフォーム壁材用基礎17上に載せてスペーサ突
部13の先端を既設壁面15に当接する(図2(B),
図3(C))。なお、このリフォーム壁材取付位置墨出
し治具10を載せた位置にリフォーム壁材1が設置され
るので、その位置は適宜に調整する。そして、位置が決
定したならば、リフォーム壁材取付位置墨出し治具10
の表側から墨出し孔12内に墨出し筆記具(図示せず)
を挿入し、既設壁面15にアンカー孔位置をマークす
る。このマークしたアンカー孔位置は、実際のリフォー
ム壁材1を既設壁面15に当てて、取付孔3からアンカ
ーボルトの位置をマークするのと同じである。したがっ
て、高い精度で墨出しを行うことができる。
Next, the refining wall material mounting position inking jig 10 is placed on the remodeling wall material base 17 and the tip of the spacer projection 13 contacts the existing wall surface 15 (FIG. 2B,
(FIG. 3 (C)). In addition, since the reforming wall material 1 is installed at a position on which the blackout jig 10 is mounted, the position is appropriately adjusted. Then, when the position is determined, the renovation wall material mounting position inking jig 10
Ink writing instrument (not shown) in the ink hole 12 from the front side
To mark the position of the anchor hole on the existing wall surface 15. The marked anchor hole position is the same as when the actual reformed wall material 1 is applied to the existing wall surface 15 and the position of the anchor bolt is marked from the mounting hole 3. Therefore, blackout can be performed with high accuracy.

【0027】この位置でリフォーム壁材取付位置墨出し
治具10のすべての墨出し孔12でマークが終了したな
らば、この第1のリフォーム壁材取付位置墨出し治具1
0がずれないように注意しながら、もう一つ別個に用意
したリフォーム壁材取付位置墨出し治具10を基礎17
上に隣合わせにして載せる。なお、この第2のリフォー
ム壁材取付位置墨出し治具10を載せた位置にリフォー
ム壁材1が設置されるので、先に載せた第1のリフォー
ム壁材取付位置墨出し治具10と端部同士が重ならない
様に、また離れ過ぎない様に位置を調整する。そして、
位置を決定したならば、第2のリフォーム壁材取付位置
墨出し治具10の墨出し孔12内に墨出し筆記具を挿入
してアンカー孔位置をマークする。
At this position, if the marking is completed in all the ink-out holes 12 of the refining wall material mounting position inking jig 10, the first remodeling wall material mounting position inking jig 1
0, while taking care not to deviate, the refilling wall material mounting position ink extraction jig 10 prepared separately is used as the base 17.
Place it next to the top. In addition, since the renovation wall material 1 is installed at the position where the second renovation wall material mounting position ink removal jig 10 is placed, the first renovation wall material attachment position ink removal jig 10 is placed at the end. Adjust the position so that the parts do not overlap and are not too far apart. And
When the position is determined, a marking ink writing tool is inserted into the marking hole 12 of the second remodeling wall material mounting position marking tool 10 to mark the anchor hole position.

【0028】第2のリフォーム壁材取付位置墨出し治具
10の墨出しが終了したならば、この第2のリフォーム
壁材取付位置墨出し治具10がずれないように注意しな
がら、第1のリフォーム壁材取付位置墨出し治具10を
先の位置から第2のリフォーム壁材取付位置墨出し治具
10を超えて反対側である次の墨出し位置に移動して、
同様に墨出しを行う。
When the inking of the second renovation wall material mounting position inking tool 10 is completed, the first renovation wall material mounting position inking tool 10 is carefully checked so as not to shift. Is moved from the previous position to the next location on the opposite side beyond the second remodeling wall material mounting position inking jig 10 from the previous position,
In the same way, ink marking is performed.

【0029】なお、墨出しは、上記説明では第1と第2
のリフォーム壁材取付位置墨出し治具10を使用した
が、これに限定されるものではなく、1つのリフォーム
壁材取付位置墨出し治具10を使用して順次アンカー孔
の位置をマークしてもよい。この場合には、一度所定位
置にセットしてマークしたならば、このリフォーム壁材
取付位置墨出し治具10の側端部の位置を既設壁面に記
しておき、この記しを基準に、リフォーム壁材取付位置
墨出し治具10を移動して次の位置を決定し、それから
その位置で次のリフォーム壁材1のアンカー孔の位置を
マークしておき、この操作を順次繰り返すことにより最
下段に並べるリフォーム壁材1のアンカー孔の位置をマ
ークしてもよい。上段の墨出しも同様である。
In the above description, blackout is defined as the first and second
Although the renovation wall material attachment position ink extraction jig 10 was used, the present invention is not limited to this. Is also good. In this case, once the mark is set at a predetermined position and marked, the position of the side wall of the renovation wall material mounting position marking tool 10 is recorded on the existing wall surface, and the reformed wall material is determined based on this description. The next position is determined by moving the material mounting position inking jig 10 and then marking the position of the anchor hole of the next reformed wall material 1 at that position, and by repeating this operation sequentially, the lowermost stage is obtained. You may mark the position of the anchor hole of the side wall of the reformed wall material 1. The same applies to the sumi-up in the upper row.

【0030】上述した様にして、第1のリフォーム壁材
取付位置墨出し治具10と第2のリフォーム壁材取付位
置墨出し治具10とを交互に移動してリフォーム壁材1
の最下段分のアンカー孔の位置を順次マークする墨出し
工程を行なった後は、図3(D)及び図4(A)に示す
ように、マークした墨出し位置(アンカー孔の位置)に
アンカー孔(下孔19)を穿孔し、この下孔内に雌ネジ
を形成した打ち込みアンカー20を挿入し、十分な深さ
まで打ち込んで先端部分を拡径することにより強固に固
定し、この打ち込みアンカー20にアンカーボルト21
の基端を螺着して既設壁面15に突設する。
As described above, the first renovation wall material mounting position summing jig 10 and the second renovation wall material mounting position summing jig 10 are alternately moved to remodel the wall material 1.
After the blackout process of sequentially marking the positions of the anchor holes for the bottom row of FIG. 4B, as shown in FIG. 3D and FIG. An anchor hole (prepared hole 19) is pierced, and a driving anchor 20 having a female screw formed therein is inserted into the prepared hole, driven into a sufficient depth, and a distal end portion is expanded to be firmly fixed. 20 anchor bolts 21
Is screwed onto the existing wall surface 15 to project therefrom.

【0031】アンカーボルト21を突設するアンカーボ
ルト突設工程が終了したならば、既設壁面15から突出
しているアンカーボルト21の先端部分に位置決めナッ
ト22を螺合して間隔を調整し、図3(F)及び図4
(B)に示すように、車載クレーン等の軽便な荷役機器
を使用して基礎上にリフォーム壁材1を載せて、該リフ
ォーム壁材1の取付孔3内にアンカーボルト21の先端
部分を挿通し、リフォーム壁材1の表側に出たアンカー
ボルト21にワッシャを嵌めると共に固定用ナット23
を螺合してリフォーム壁材1を、間隔Dを空けて固定す
る(リフォーム壁材取付工程)。なお、固定用ナット2
3が突出しないように、図4(B)に示すように、リフ
ォーム壁材1の表面にナット収納凹部を形成しておき、
施工後はこのナット収納凹部内にコンクリートを詰めて
塞ぐと、ナット23やアンカーボルト21が隠れてしま
い、体裁が向上する。
When the anchor bolt projecting step of projecting the anchor bolt 21 is completed, the positioning nut 22 is screwed into the tip of the anchor bolt 21 projecting from the existing wall surface 15 to adjust the interval, and FIG. (F) and FIG.
As shown in (B), the renovation wall material 1 is placed on the foundation using a light-weight cargo handling device such as a vehicle-mounted crane, and the distal end portion of the anchor bolt 21 is inserted into the mounting hole 3 of the renovation wall material 1. Then, a washer is fitted to the anchor bolt 21 protruding from the front side of the reformed wall material 1 and the fixing nut 23 is fixed.
To fix the reformed wall material 1 at an interval D (reform wall material mounting step). In addition, fixing nut 2
As shown in FIG. 4 (B), a nut housing recess is formed on the surface of the reforming wall material 1 so that the protrusion 3 does not protrude.
When the concrete is filled and closed in the nut storage recess after construction, the nut 23 and the anchor bolt 21 are hidden, and the appearance is improved.

【0032】アンカーボルト21を突設する位置は、リ
フォーム壁材1と同じ形状及び大きさを有するリフォー
ム壁材取付位置墨出し治具10を使用し、しかも、間隔
Dに応じた長さを有するスペーサ突部13を当接しなが
らアンカー孔19の位置をマークしているので、既設壁
面15が曲面であっても、マークされたアンカー孔19
の位置は既設壁面15の曲率とリフォーム壁材1の設置
曲面とを考慮して調整された位置であり、この位置から
突設したアンカーボルト21はリフォーム壁材1の取付
孔3内に円滑に挿通される。したがって、既設壁面15
が凸曲面であっても、或は反対の凹曲面であっても、リ
フォーム壁材1の取付孔3内にアンカーボルト21を無
理なく挿通することができる。しかも、実際のリフォー
ム壁材1を使用することなく、軽量なリフォーム壁材取
付位置墨出し治具10を操作するだけで正確な墨出しを
行うことができるので、従来よりも短時間で誤差の少な
い墨出しが可能である。
The projecting position of the anchor bolt 21 is a relocation wall material mounting position marking tool 10 having the same shape and size as the renovation wall material 1, and has a length corresponding to the interval D. Since the position of the anchor hole 19 is marked while abutting the spacer projection 13, even if the existing wall surface 15 is a curved surface, the marked anchor hole 19 is marked.
Is a position adjusted in consideration of the curvature of the existing wall surface 15 and the installation curved surface of the reforming wall material 1, and the anchor bolt 21 protruding from this position is smoothly inserted into the mounting hole 3 of the reforming wall material 1. It is inserted. Therefore, the existing wall 15
The anchor bolt 21 can be easily inserted into the mounting hole 3 of the reformed wall material 1 regardless of whether the is a convex curved surface or a concave curved surface. In addition, accurate ink removal can be performed only by operating the lightweight renovation wall material attachment position inking jig 10 without using the actual renovation wall material 1, so that the error can be reduced in a shorter time than before. Less ink removal is possible.

【0033】そして、リフォーム壁材1の取付が終了し
たならば、図3(G)に示すように、既設壁面15とリ
フォーム壁材1との間の間隔内に生コンクリートを打設
する(コンクリート打ち込み工程)。
When the installation of the reformed wall material 1 is completed, as shown in FIG. 3 (G), the ready-mixed concrete is poured into the space between the existing wall surface 15 and the reformed wall material 1 (concrete). Driving step).

【0034】この様にして、最下段のリフォーム壁材1
を設置して生コンクリートがある程度養生したならば、
2段目もリフォーム壁材取付位置墨出し治具10を使用
して同様の操作を繰り返すことによりアンカー孔位置の
マーク(墨出し)を順次行なう。
In this manner, the lowermost reformed wall material 1
Once the concrete has been cured to some extent,
In the second stage, the same operation is repeated using the refining wall material mounting position inking jig 10 to sequentially mark the anchor hole positions (inking).

【0035】次に、このマークを基準にしてアンカーボ
ルト21を突設し、これらのアンカーボルト21を使用
して二段目のリフォーム壁材1を設置する。そして、リ
フォーム壁材1と既設壁面15との間隔内に生コンクリ
ートを打設する。
Next, anchor bolts 21 are protruded from this mark as a reference, and the second-stage reform wall material 1 is installed using these anchor bolts 21. Then, ready-mixed concrete is poured into the space between the reformed wall material 1 and the existing wall surface 15.

【0036】二段目のリフォーム壁材1を設置する場
合、本実施形態ではリフォーム壁材1のベース板部2の
上縁から引っ掛け凸部5が突出しているので、図5に示
すように、この引っ掛け凸部5に上段のリフォーム壁材
1のベース板部2の下端縁を引っ掛けた状態で積み上げ
る。この場合、上段のリフォーム壁材1の取付孔3内に
アンカーボルト21を通して積み上げる際に下段のリフ
ォーム壁材1から突出している引っ掛け凸部5が邪魔に
なることがあるので、図6に示すように、上段のリフォ
ーム壁材1の取付孔3を上下方向の長孔として開口して
おき、上段のリフォーム壁材1を持ち上げて引っ掛け凸
部5を回避しながら取付孔3内にアンカーボルト21を
通し、その後でリフォーム壁材1を所定の位置、即ち下
段のリフォーム壁材1の引っ掛け凸部5に引っ掛かる位
置まで移動できるように構成してもよい。
When the second-stage remodeling wall material 1 is installed, in the present embodiment, the hooking projections 5 protrude from the upper edge of the base plate portion 2 of the remodeling wall material 1, so as shown in FIG. Stacking is performed in a state where the lower edge of the base plate portion 2 of the upper reformed wall material 1 is hooked on the hook convex portion 5. In this case, when the anchor bolts 21 are stacked in the mounting holes 3 of the upper reformed wall material 1, the hooking protrusions 5 protruding from the lower reformed wall material 1 may hinder the stacking, as shown in FIG. 6. In the meantime, the mounting hole 3 of the upper reformed wall material 1 is opened as an elongated hole in the vertical direction, and the upper reformed wall material 1 is lifted and hooked so that the anchor bolt 21 is inserted into the mounting hole 3 while avoiding the convex portion 5. Then, it may be configured such that the reformed wall material 1 can be moved to a predetermined position, that is, a position where the wall material is hooked on the hooking protrusion 5 of the lower reformed wall material 1.

【0037】また、図面には示していないが、取付孔3
の内径に余裕を持たせて大きく開口しておき、アンカー
ボルト21を通してからリフォーム壁材1を所定の位置
まで移動できるように構成してもよい。
Although not shown in the drawings, the mounting holes 3
A large opening may be provided with an allowance in the inner diameter of the wall member so that the reformed wall member 1 can be moved to a predetermined position after passing through the anchor bolt 21.

【0038】この様に、下段のリフォーム壁材1から上
方に突出している引っ掛け凸部5に上段のベースの下端
縁を引っ掛けると、間隔D内に生コンクリートを打ち込
んだ際に、コンクリートの圧力により上段のリフォーム
壁材1が押し出される力をアンカーボルト21のみなら
ず下段のリフォーム壁材1によっても受けることができ
る。したがって、打設した生コンクリートの押し出し圧
力に対する耐力を確実に増大することができる。
As described above, when the lower edge of the upper base is hooked on the hooking projection 5 projecting upward from the lower reforming wall material 1, when the fresh concrete is driven into the space D, the pressure of the concrete causes The pushing force of the upper reformed wall material 1 can be received not only by the anchor bolt 21 but also by the lower reformed wall material 1. Therefore, the proof strength against the extrusion pressure of the poured ready-mixed concrete can be surely increased.

【0039】また、ベース板部2の端縁から装飾部4を
突出させて形成したリフォーム壁材1を積み重ねると、
図5に示すように、引っ掛け凸部5をはじめとする装飾
部4の上下左右突出部分が隣り合うベース板部2との継
目(目地)の線を部分的であっても覆い隠すことができ
る。更に、本実施形態ではリフォーム壁材1の外形形状
が略十字形であって、積み上げて設置した際に隣りのリ
フォーム壁材1との間の継目が長尺な一直線にならない
で何度も屈曲した線になる。したがって、リフォーム壁
材1を積み上げた壁面の継目の線を目立たなくすること
ができ、人工構造物の景観を払拭して、自然な美観(見
た目、印象)を与えることができる。
When the reformed wall material 1 formed by projecting the decorative portion 4 from the edge of the base plate portion 2 is stacked,
As shown in FIG. 5, the upper, lower, left, and right protruding portions of the decorative portion 4 including the hooking convex portion 5 can obscure even a partial line of a joint (joint) with the adjacent base plate portion 2. . Further, in the present embodiment, the outer shape of the renovation wall material 1 is substantially a cross shape, and when it is stacked and installed, the seam between the adjacent renovation wall material 1 does not become a long straight line and bends many times. It becomes a line. Therefore, the seam line of the wall surface on which the renovation wall material 1 is stacked can be made inconspicuous, and the landscape of the artificial structure can be wiped out to give a natural aesthetic appearance (look and impression).

【0040】上記したリフォーム壁材1は、壁面のリフ
ォームに使用するだけでなく、図7に示すように、新規
構造物のコンクリートパネル壁材としても使用すること
ができる。この場合、セパレータ30を使用して法面か
ら所定の間隔を空けてリフォーム壁材1を取り付け、こ
の間隔D内に生コンクリートを打設すれば施工を終了す
る。したがって、コンクリートを打設した後に型枠を取
り外す手間も不要であり、作業能率が良好である。
The above-described renovated wall material 1 can be used not only for reforming a wall surface but also as a concrete panel wall material for a new structure as shown in FIG. In this case, the renovation wall material 1 is attached at a predetermined interval from the slope using the separator 30, and the fresh concrete is poured into the interval D to complete the construction. Therefore, it is not necessary to remove the form after the concrete is cast, and the working efficiency is good.

【0041】また、既設壁面15をリフォームする場
合、スペース上の間題がなければ前記実施例の様に、既
設の壁面15との間に生コンクリートを打設する間隔D
を形成できるが、スペース上の問題から上記間隔Dを形
成できないことがある。この様な場合には、既設壁面1
5に前記リフォーム壁材1を短尺なアンカーボルト21
で固定するとともに、接着コンクリートにより密着させ
る。このときに、前記リフォーム壁材取付位置墨出し治
具10を使用すると、アンカーボルト21の位置を簡単
に墨出しを行うことができる。即ち、生コンクリート打
設用間隔を形成しないのであるから、スペーサ突部13
が突出していないベース材11を直接既設壁面15に当
てて、この状態で墨出し孔12から墨出し筆記具を挿入
してアンカー孔の位置をマークする。
When the existing wall surface 15 is to be reformed, if there is no problem in space, as in the above-described embodiment, the interval D at which fresh concrete is poured between the existing wall surface 15 and the existing wall surface 15 is used.
Can be formed, but the space D may not be formed due to a space problem. In such a case, the existing wall 1
5 is a short anchor bolt 21
And fix it with adhesive concrete. At this time, the use of the renovation wall material mounting position blacking-out jig 10 allows the position of the anchor bolt 21 to be easily blacked out. That is, since the interval for placing the ready-mixed concrete is not formed, the spacer projection 13
The base material 11, which does not protrude, is directly applied to the existing wall surface 15, and in this state, the position of the anchor hole is marked by inserting a black-out writing implement through the black-out hole 12.

【0042】この様にすれば、実際のリフォーム壁材1
を既設壁面15に当てて、取付孔3からアンカーボルト
21の位置を決定するのと同じことになり、容易な作業
によって高い精度で墨出しを行うことができる。
By doing so, the actual renovation wall material 1
Is applied to the existing wall surface 15 to determine the position of the anchor bolt 21 from the mounting hole 3, so that the ink can be marked out with high accuracy by an easy operation.

【0043】なお、前記実施形態では、リフォーム壁材
1を略十字形とし、これに合わせてリフォーム壁材取付
位置墨出し治具10も略十字形としたが、この形状はこ
れに限定されるものではなく、長方形でもよい。
In the above-described embodiment, the reforming wall material 1 has a substantially cross shape, and the renovation wall material mounting position summarizing jig 10 has a substantially cross shape accordingly. However, this shape is not limited to this. Instead of a thing, it may be a rectangle.

【0044】ところで、前記実施形態においては、既設
壁面15のアンカー孔(下孔19)に打ち込みアンカー
20を挿入固定し、この打ち込みアンカー20に対して
アンカーボルト21の基端を螺着して既設壁面15に突
設している。そして、アンカーボルト21の先端部分に
位置決めナット22を螺合し、この位置決めナット22
の位置を調整することにより既設壁面15との間隔Dを
調整し、リフォーム壁材1の取付孔3内にアンカーボル
ト21の先端部分を挿通し、リフォーム壁材1の表側に
出たアンカーボルト21に固定用ナット23を螺合して
リフォーム壁材1を固定している。
In the above embodiment, the driving anchor 20 is inserted and fixed in the anchor hole (the pilot hole 19) of the existing wall surface 15, and the base end of the anchor bolt 21 is screwed to the driving anchor 20 to fix the existing anchor. It protrudes from the wall surface 15. Then, a positioning nut 22 is screwed into a tip portion of the anchor bolt 21, and the positioning nut 22 is
Is adjusted to adjust the distance D from the existing wall surface 15, the distal end portion of the anchor bolt 21 is inserted into the mounting hole 3 of the reformed wall material 1, and the anchor bolt 21 protruding to the front side of the reformed wall material 1 is adjusted. A fixing nut 23 is screwed to the fixing wall material 1.

【0045】この場合、既設壁面15にゆがみが生じて
いた場合には、位置決めナット22の位置を既設壁面1
5のゆがみに応じてアンカーボルトごとに正確に調整す
ることが必要であり、これを怠るとリフォーム壁材1と
の位置が一致せず、この取付部分に無理なストレスがか
かったり、リフォーム壁材1ががたついた状態で取り付
けられてしまうなどの可能性がある。この場合、間隔D
が幅広でリフォーム壁材1の裏側から位置決めナット2
2を移動させることができれば上記不都合を予め防止す
ることができるが、既にリフォーム壁材1が取り付けら
れていて間隔Dが狭いと、腕を延ばして位置決めナット
22を回すことが困難であり、リフォーム壁材1を取り
外さなければ位置決めナット22の微調整ができないこ
ともある。
In this case, if the existing wall surface 15 is distorted, the position of the positioning nut 22 is changed to the existing wall surface 1.
It is necessary to accurately adjust each anchor bolt according to the distortion of 5, and if this is neglected, the position with the reforming wall material 1 will not match, and excessive stress will be applied to this mounting part, There is a possibility that 1 will be attached in a rattled state. In this case, the interval D
Is wide and the positioning nut 2
2 can be prevented in advance, but if the reforming wall material 1 is already attached and the interval D is small, it is difficult to extend the arm and turn the positioning nut 22, and the reforming is difficult. The fine adjustment of the positioning nut 22 may not be possible unless the wall material 1 is removed.

【0046】このような事情に鑑み、リフォーム壁材1
を取り付けた後でも表側から位置決め部材(位置決めナ
ット22に相当)の位置を調整可能とした実施形態につ
いて以下説明する。
In consideration of such circumstances, the reform wall material 1
An embodiment in which the position of the positioning member (corresponding to the positioning nut 22) can be adjusted from the front side even after the mounting is performed will be described below.

【0047】図8(A)は、位置決め部材の位置を調整
可能にしたアンカーボルト24の構成を説明する図であ
る。同図に示すようにアンカーボルト24は、軸部24
aと鍔部24eとから概略構成されている。軸部24a
の一端(先端)24b及び他端(基端)24cには、そ
れぞれ雄ネジが形成されている。そして、この軸部24
aの先端面24dには、工具係合部として、ネジ回し用
の溝24fが形成されている。また、鍔部24eは、軸
部24aの先端24b側の雄ネジの終端部分或は途中の
位置に軸部24aの周方向に延在する円盤状部材として
構成されており、リフォーム壁材1に対する位置決め部
材として機能する。なお、この鍔部24eと軸部24a
とは溶接などにより一体化(固定)されている。
FIG. 8A is a view for explaining the structure of the anchor bolt 24 in which the position of the positioning member can be adjusted. As shown in FIG.
a and a flange 24e. Shaft 24a
Male threads are formed at one end (distal end) 24b and the other end (base end) 24c, respectively. And this shaft portion 24
A groove 24f for screwdriver is formed on the distal end surface 24d of "a" as a tool engaging portion. The flange portion 24e is formed as a disk-shaped member extending in the circumferential direction of the shaft portion 24a at the end portion or at an intermediate position of the male screw on the tip end 24b side of the shaft portion 24a. Functions as a positioning member. The flange 24e and the shaft 24a
Are integrated (fixed) by welding or the like.

【0048】そして、このアンカーボルト24は、先に
説明したアンカーボルト21と同様に使用される。すな
わち、図8(B)に示すように、既設壁面15に雌ネジ
を形成した打ち込みアンカー20を挿入固定し、この打
ち込みアンカー20にアンカーボルト24の基端24c
を螺着して、アンカーボルト24の基端24cを既設壁
面15に突設する。このとき、打ち込みアンカー20の
雌ネジ部分の長さは、リフォーム壁材1が載せられた状
態のアンカーボルト24を支持するのに必要な螺合長さ
よりも長く形成されている。すなわち、ねじ込み代を有
する長さとする。例えば、リフォーム壁材1が載せられ
た状態のアンカーボルト24を支持するのに必要な螺合
長さ30mm(同図に符号S2で示す)に対し、打ち込
みアンカー20の雌ネジ部分の長さ50mm(同符号S
1で示す)とする。そして、アンカーボルト24の取付
基準となる螺合長さを40mmとする。
The anchor bolt 24 is used in the same manner as the anchor bolt 21 described above. That is, as shown in FIG. 8B, a driving anchor 20 having a female screw formed therein is inserted and fixed to the existing wall surface 15, and the driving anchor 20 has a base end 24 c of an anchor bolt 24.
, And the base end 24 c of the anchor bolt 24 protrudes from the existing wall surface 15. At this time, the length of the female screw portion of the driving anchor 20 is formed longer than the screwing length necessary to support the anchor bolt 24 on which the reforming wall material 1 is placed. That is, the length has a screwing allowance. For example, while the screwing length required to support the anchor bolt 24 on which the reformed wall material 1 is placed is 30 mm (indicated by reference numeral S2 in the figure), the length of the female screw portion of the driving anchor 20 is 50 mm. (Same symbol S
1). Then, the screwing length serving as the mounting reference of the anchor bolt 24 is set to 40 mm.

【0049】次に、リフォーム壁材1の取付孔3内にア
ンカーボルト24の先端24bを挿通し、リフォーム壁
材1の表側に出たアンカーボルト24に先端24bにワ
ッシャを嵌め、固定用ナット23を螺合してリフォーム
壁材1を固定する。
Next, the tip 24b of the anchor bolt 24 is inserted into the mounting hole 3 of the reforming wall material 1, a washer is fitted to the tip 24b of the anchor bolt 24 protruding to the front side of the reforming wall material 1, and the fixing nut 23 is fixed. To fix the reforming wall material 1.

【0050】そして、リフォーム壁材1とアンカーボル
ト24の鍔部24eの位置を微調整する必要がある場合
や、ずれていた場合には、固定用ナット23を緩めるか
外した後に、アンカーボルト24の先端面24dに設け
られた溝にネジ回し25を嵌合し、アンカーボルト24
自身をリフォーム壁材1の表側からの操作によって回動
させる。このアンカーボルト24の回動により、アンカ
ーボルト24と打ち込みアンカー20との螺合長さが変
化し、アンカーボルト24の既設壁面15から突出長さ
も変化する。これにより、位置決め部材である鍔部24
eの位置も変化するので、アンカーボルト24の回動に
より既設壁面15から鍔部24eまでの寸法も変化し
て、リフォーム壁材1の取付位置が既設壁面15の位置
に応じた最適位置に調整される。このとき、上述した例
のように、標準螺合長さを40mmとした場合には、前
後10mmの移動が可能となる。
When it is necessary to finely adjust the positions of the reforming wall member 1 and the flange portion 24e of the anchor bolt 24, or if the position is deviated, the fixing nut 23 is loosened or removed, and then the anchor bolt 24 is removed. A screwdriver 25 is fitted into a groove provided on the distal end face 24d of the anchor bolt 24.
The user himself / herself is rotated by an operation from the front side of the reforming wall material 1. The rotation of the anchor bolt 24 changes the screw length between the anchor bolt 24 and the driving anchor 20, and also changes the length of the anchor bolt 24 protruding from the existing wall surface 15. Thereby, the flange 24 serving as a positioning member
Since the position of e also changes, the dimension from the existing wall surface 15 to the flange portion 24e also changes due to the rotation of the anchor bolt 24, and the mounting position of the reforming wall material 1 is adjusted to an optimal position according to the position of the existing wall surface 15. Is done. At this time, when the standard screwing length is 40 mm as in the above-described example, it is possible to move back and forth by 10 mm.

【0051】なお、以上説明した実施形態においては、
先端面24dに設けられた溝を利用して、ネジ回しによ
りアンカーボルト24を回転させるように構成した例を
示したが、工具係合部はこれに限定されるものでなく、
工具が係合してアンカーボルトを回動することができれ
ばどのような構成でも良い。例えば、+形の溝として+
ドライバーで回すように構成してもよいし、アンカーボ
ルト24の先端24bを断面四角形や六角形のボルトヘ
ッドとし、ソケットレンチなどによりアンカーボルト2
4を回転させるように構成してもよい。
In the embodiment described above,
An example has been described in which the anchor bolt 24 is rotated by a screwdriver using a groove provided in the distal end surface 24d, but the tool engagement portion is not limited to this.
Any configuration may be used as long as the tool can be engaged to rotate the anchor bolt. For example, as a + shaped groove +
It may be configured to be turned with a screwdriver, or the tip 24b of the anchor bolt 24 may be a bolt head having a square or hexagonal cross section, and the anchor bolt 2 may be turned using a socket wrench or the like.
4 may be configured to rotate.

【0052】このように、本実施形態においては、リフ
ォーム壁材1を貫通して先端が表面側に露出しているア
ンカーボルト24をリフォーム壁材1の表側からの操作
によって回動させることにより、アンカーボルト24の
既設壁面15からの突出量、より詳細には、リフォーム
壁材1の位置決め部材として機能する鍔部24eの既設
壁面15からの離間距離を変えているので、既にリフォ
ーム壁材1が取り付けられていたとしても、このリフォ
ーム壁材1を取り外すことなく位置調整ができる。これ
により、既設壁面15のゆがみに応じた鍔部24e(位
置決め部材)の位置調整作業を容易にかつ迅速に行うこ
とができ、作業能率を向上させることができる。
As described above, in the present embodiment, by rotating the anchor bolt 24 penetrating the reforming wall material 1 and having its tip exposed on the surface side by operating the reforming wall material 1 from the front side, Since the amount of protrusion of the anchor bolt 24 from the existing wall surface 15, more specifically, the distance from the existing wall surface 15 of the flange portion 24 e that functions as a positioning member for the reform wall material 1, is changed. Even if it is attached, the position can be adjusted without removing the reforming wall material 1. Thereby, the position adjustment work of the flange portion 24e (positioning member) according to the distortion of the existing wall surface 15 can be performed easily and quickly, and the work efficiency can be improved.

【0053】さらに、アンカーボルト24の先端面に溝
を形成し、アンカーボルト24をネジ回しにより回動さ
せる構成にしたので、アンカーボルト24に対する加工
が最小限で済み、安価に構成することができる。
Further, since a groove is formed in the distal end surface of the anchor bolt 24 and the anchor bolt 24 is rotated by screwdriver, the processing for the anchor bolt 24 can be minimized and the structure can be made inexpensively. .

【0054】[0054]

【発明の効果】以上説明したように本発明によれば、以
下の効果を奏する。請求項1に記載のリフォーム工法の
発明は、既設の構造物の壁面をそのまま残して有効利用
するので、古い壁面を取り壊す手間が不要となり、労力
と経費と時間の節約になるばかりでなく、資源の無駄を
なくすことができる。また、既設の構造物を取り壊す必
要がないので、廃材の処理も問題にならない。
According to the present invention as described above, the following effects can be obtained. The invention of the renovation method according to claim 1 effectively saves the wall surface of the existing structure as it is, so that it is not necessary to tear down the old wall surface, which saves labor, cost and time, and also saves resources. Can be eliminated. Further, since there is no need to demolish the existing structure, disposal of waste materials does not pose a problem.

【0055】また、リフォーム壁材と同じ形状及び大き
さを有するリフォーム壁材取付位置墨出し治具を使用し
てアンカー孔の位置を墨出しするので、アンカーボルト
の位置を高い精度で突出させることができる。したがっ
て、実際のリフォーム壁材を設置する際に、取付孔内に
アンカーボルトを円滑に挿通することができ、リフォー
ム壁材の位置を現合させたりアンカーボルトを無理に曲
げるなどの修正作業が不要になり、作業の能率を向上さ
せることができる。そして、重いリフォーム壁材の代わ
りに軽い治具を操作して高い精度の墨出しができるの
で、墨出しに要する時間と労力を節約することができ
る。
Also, since the position of the anchor hole is determined using the relocation wall material mounting position refining jig having the same shape and size as the renovation wall material, the position of the anchor bolt can be projected with high precision. Can be. Therefore, when installing the actual renovation wall material, the anchor bolt can be smoothly inserted into the mounting hole, and no modification work such as repositioning the renovation wall material or forcibly bending the anchor bolt is required. And work efficiency can be improved. In addition, since a high-precision ink mark can be obtained by operating a light jig instead of a heavy reforming wall material, the time and labor required for the ink mark can be saved.

【0056】さらに、既設壁面が曲面であって、リフォ
ーム壁材の取付孔の位置に合わせて開口した墨出し孔
と、ベース材の一方の面から突設したスペーサ突部とを
有するリフォーム壁材取付位置墨出し治具を使用して、
スペーサ突部の先端を既設建築構造物の壁面に当接した
状態で墨出し孔内にマーカを挿入してアンカー孔の位置
をマークするので、既設壁面の曲率とリフォーム壁材の
曲率とがコンクリート打設間隔分だけ異なっても、リフ
ォーム壁材の取付孔から墨出し筆記具を挿入して既設壁
面にマークしたことと同じ状況で墨出しすることができ
る。
Further, a renovation wall material having an existing wall surface having a curved surface and having a blackout hole opened in accordance with the position of the mounting hole of the renovation wall material, and a spacer protrusion protruding from one surface of the base material. Attachment position
While the tip of the spacer projection is in contact with the wall of the existing building structure, a marker is inserted into the inking hole to mark the position of the anchor hole, so that the curvature of the existing wall and the curvature of the renovated wall material are concrete. Even if it differs by the installation interval, it is possible to ink out in the same situation as when the ink writing instrument is inserted from the mounting hole of the reformed wall material and marked on the existing wall surface.

【0057】したがって、既設壁面が曲面であってもア
ンカー孔の位置のマークに誤差を生じない。このため、
既設壁面が凹曲面や凸曲面であっても、実際のリフォー
ム壁材を既設曲面に所定の間隔を空け沿わせて設置する
際に、取付孔内にアンカーボルトが通らないなどの不都
合を解消して、円滑に挿通することができる。また、リ
フォーム壁材の位置を現合させたりアンカーボルトを無
理に曲げるなどの修正作業が著しく減少するので、作業
の能率を向上させることができる。
Therefore, even if the existing wall surface is a curved surface, no error occurs in the mark of the position of the anchor hole. For this reason,
Even if the existing wall surface is concave or convex, when installing the actual renovation wall material along the existing curved surface at a predetermined interval, it eliminates the inconvenience such that the anchor bolt does not pass through the mounting hole. Therefore, it can be inserted smoothly. Further, since the number of correction operations such as adjusting the position of the reforming wall material and forcibly bending the anchor bolt is significantly reduced, the efficiency of the operation can be improved.

【0058】請求項2に記載のリフォーム壁材取付位置
墨出し治具の発明は、リフォーム壁材の外形に合わせて
成形したベース材と、該ベース材に、リフォーム壁材の
取付孔の位置に合わせて開口した墨出し孔と、ベース材
の一方の面から突設したスペーサ突部とを有するので、
この治具を使用すれば、重いリフォーム壁材を実際に置
いて墨出ししたのと同じ状況で墨出しすることができ
る。
According to a second aspect of the present invention, there is provided a base material formed in accordance with the outer shape of a reformed wall material, and a base material formed in accordance with the outer shape of the reformed wall material. Since it has a blackout hole that has been opened and a spacer protrusion that protrudes from one surface of the base material,
By using this jig, it is possible to perform the ink marking in the same situation as when the heavy renovation wall material is actually placed and marked.

【0059】したがって、アンカー孔の位置を正確に墨
出しすることができるし、既設壁面が凹曲面や凸曲面で
あっても、リフォーム壁材を既設曲面に所定の間隔を空
けた状態で沿わせて設置する際に、取付孔内にアンカー
ボルトが通らないなどの不都合を解消して、円滑に挿通
することができる。また、リフォーム壁材の位置を現合
させたりアンカーボルトを無理に曲げるなどの修正作業
が著しく減少するので、作業の能率を向上させることが
できる。
Therefore, the position of the anchor hole can be accurately marked, and even if the existing wall surface is a concave curved surface or a convex curved surface, the reformed wall material is arranged along the existing curved surface at a predetermined interval. At the time of installation, the inconvenience such that the anchor bolt does not pass through the mounting hole can be eliminated, and it can be smoothly inserted. Further, since the number of correction operations such as adjusting the position of the reforming wall material and forcibly bending the anchor bolt is significantly reduced, the efficiency of the operation can be improved.

【0060】また、重いリフォーム壁材を仮に置いて墨
出しするよりも軽量な治具を使用した方が取り扱い操作
が容易である。したがって、墨出し作業の能率を高める
ことができる。
In addition, the handling operation is easier when a lightweight jig is used than when a heavy renovation wall material is temporarily placed and used for inking. Therefore, the efficiency of the blackout operation can be improved.

【0061】請求項3に記載の治具は、スペーサ突部を
筒材で構成し、該筒材の中空部をベース材の他方の面に
貫通させ、この筒材の貫通中空部を墨出し孔としたの
で、墨出し筆記具を筒材の中空部で案内して正確な位置
に導くことができる。したがって、一層正確な位置にマ
ークすることができる。
According to a third aspect of the present invention, in the jig, the spacer projection is formed of a cylindrical material, and the hollow portion of the cylindrical material is made to penetrate through the other surface of the base material. Since the holes are provided, the ink-out writing instrument can be guided to an accurate position by being guided in the hollow portion of the cylindrical member. Therefore, a more accurate position can be marked.

【0062】また、リフォーム壁材と既設壁面との間に
生コンクリート打設用の間隔を形成しない場合には、筒
材が突出していない面を既設壁面に当ててマークするこ
とができる。したがって、リフォーム壁材を既設壁面に
密着させてリフォームする工事でもアンカー孔の位置を
高い精度でマークすることができ、墨出し作業を正確且
つ容易に行うことができる。
In the case where no space for placing ready-mixed concrete is formed between the reformed wall material and the existing wall surface, the surface on which the tubular material does not protrude can be marked by contacting the existing wall surface. Therefore, even in the renovation work in which the renovation wall material is brought into close contact with the existing wall surface, the position of the anchor hole can be marked with high accuracy, and the blackout operation can be performed accurately and easily.

【図面の簡単な説明】[Brief description of the drawings]

【図1】リフォーム壁材の説明図であり、(A)は正面
図、(B)は右側面図、(C)は底面図である。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is an explanatory view of a reformed wall material, (A) is a front view, (B) is a right side view, and (C) is a bottom view.

【図2】リフォーム壁材取付位置墨出し治具の説明図で
あり、(A)は正面図、(B)は右側面図、(C)は底
面図である。
FIGS. 2A and 2B are explanatory diagrams of a refill wall material mounting position blacking-out jig, wherein FIG. 2A is a front view, FIG. 2B is a right side view, and FIG.

【図3】リフォーム工法の工程を示す説明図であり、
(A)は基礎を掘り起こした状態の側面図、(B)は基
礎を継ぎ足した状態の側面図、(C)は治具を既設壁面
に当てて墨出し工程を行っている状態の側面図、(D)
はアンカー孔を穿孔している状態の側面図、(E)はア
ンカーボルトを突設した状態の側面図、(F)はアンカ
ーボルトによりリフォーム壁材を取り付けた状態の側面
図、(G)はリフォーム壁材と既設壁面との間の間隔内
に生コンクリートを打ち込んだ状態の側面図、(H)は
リフォーム壁材を積み上げた状態の側面図である。
FIG. 3 is an explanatory view showing steps of a reforming method;
(A) is a side view of a state where the foundation is dug up, (B) is a side view of a state where the foundation is added, (C) is a side view of a state where a jig is applied to an existing wall surface and a blackout process is performed, (D)
Is a side view showing a state where an anchor hole is drilled, (E) is a side view showing a state where an anchor bolt is protruded, (F) is a side view showing a state where a reforming wall material is attached by an anchor bolt, and (G) is a side view. It is a side view in the state where ready-mixed concrete was driven into the space between the renovation wall material and the existing wall surface, and (H) is a side view in the state where the renovation wall material was piled up.

【図4】アンカーボルト突設工程とリフォーム壁材取付
工程の説明図であり、(A)は穿設した下孔に打ち込み
アンカーを打ち込んでアンカーボルトを螺着する状態を
示す側面図、(B)はアンカーボルトによりリフォーム
壁材を取り付けた状態の側面図である。
4A and 4B are explanatory views of an anchor bolt projecting step and a reforming wall material attaching step, wherein FIG. 4A is a side view showing a state in which a driving anchor is driven into a drilled pilot hole and an anchor bolt is screwed; () Is a side view of a state in which a reforming wall material is attached by anchor bolts.

【図5】リフォーム壁材を積み上げたリフォーム壁の一
部欠截正面図である。
FIG. 5 is a partially cutaway front view of a reformed wall in which the reformed wall materials are stacked.

【図6】取付孔を長孔にしたリフォーム壁材の概略正面
図である。
FIG. 6 is a schematic front view of a reformed wall material in which a mounting hole is a long hole.

【図7】リフォーム壁材と同じ壁材を新規構造物のコン
クリートパネル壁材として使用した擁壁の側面図であ
る。
FIG. 7 is a side view of a retaining wall using the same wall material as a reformed wall material as a concrete panel wall material of a new structure.

【図8】アンカーボルト突設工程とリフォーム壁材取付
工程の説明図であり、(A)はアンカーボルトの構成を
示す斜視図、(B)はアンカーボルトによりリフォーム
壁材を取り付けた状態の側面図である。
FIGS. 8A and 8B are explanatory views of an anchor bolt projecting step and a reforming wall material attaching step, wherein FIG. 8A is a perspective view showing a configuration of the anchor bolt, and FIG. FIG.

【符号の説明】[Explanation of symbols]

1 リフォーム壁材 2 ベース板部 3 取付孔 4 装飾部 5 引っ掛け凸部 6 空部 10 リフォーム壁材取付位置墨出し治具 11 ベース材 12 墨出し孔 13 スペーサ突部 15 既設壁面 16 基礎 17 継ぎ足したリフォーム壁材用基礎 19 アンカー孔(下孔) 20 打ち込みアンカー 21 アンカーボルト 22 位置決めナット 23 固定用ナット 24 アンカーボルト D 既設壁面とリフォーム壁材との間に形成した生コン
クリート打ち込み用の間隔
DESCRIPTION OF SYMBOLS 1 Reform wall material 2 Base plate part 3 Mounting hole 4 Decorative part 5 Hook convex part 6 Empty part 10 Reform wall material mounting position blacking jig 11 Base material 12 Blacking hole 13 Spacer protrusion 15 Existing wall surface 16 Foundation 17 Reforming wall material foundation 19 Anchor hole (prepared hole) 20 Driving anchor 21 Anchor bolt 22 Locating nut 23 Fixing nut 24 Anchor bolt D Spacing for ready-mixed concrete formed between existing wall surface and renovation wall material

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) E02D 29/02 301 E02B 3/12 E02D 37/00 ──────────────────────────────────────────────────続 き Continuation of front page (58) Investigated field (Int. Cl. 6 , DB name) E02D 29/02 301 E02B 3/12 E02D 37/00

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 リフォーム壁材の外形に合わせて成形し
たベース材と、該ベース材に、リフォーム壁材の取付孔
の位置に合わせて開口した墨出し孔と、ベース材の一方
の面から突設したスペーサ突部とを有するリフォーム壁
材取付位置墨出し治具を使用して、該リフォーム壁材取
付位置墨出し治具のスペーサ突部の先端を既設建築構造
物の壁面に当接した状態で墨出し孔内にマーカを挿入し
てアンカー孔の位置を既設壁面にマークし、この操作を
繰り返し行なって既設壁面にリフォーム壁材のアンカー
孔の位置を順次決定する墨出し工程と、 墨出し工程によりマークしたアンカー孔の位置に穿孔し
てアンカーボルトを既設壁面に突設するアンカーボルト
突設工程と、 アンカーボルトをリフォーム壁材の取付孔内に挿通し、
該アンカーボルトによりリフォーム壁材を既設壁面から
所定の間隔を空けた状態で取り付けるリフォーム壁材取
付工程と、 既設壁面とリフォーム壁材との間隔内にコンクリートを
打ち込むコンクリート打ち込み工程と、 からなることを特徴とする既設壁面のリフォーム工法。
1. A base material formed in accordance with the outer shape of a wall material for renovation, a mark-out hole opened in the base material in accordance with a position of a mounting hole of the wall material for remodeling, and a protrusion from one surface of the base material. A state in which the tip of the spacer projection of the renovation wall material mounting position inking jig is in contact with the wall surface of the existing building structure using a renovation wall material mounting position inking jig having the provided spacer projection. A marker is inserted into the blackout hole to mark the position of the anchor hole on the existing wall, and this operation is repeated to sequentially determine the positions of the anchor holes of the reformed wall material on the existing wall surface. An anchor bolt projecting step of piercing an anchor bolt on an existing wall surface by piercing at the position of the anchor hole marked by the process, and inserting the anchor bolt into the mounting hole of the reforming wall material,
A reforming wall material mounting step of attaching the reforming wall material at a predetermined distance from the existing wall surface by the anchor bolt, and a concrete driving step of driving concrete into the space between the existing wall surface and the reforming wall material. The feature is the renovation method of the existing wall.
【請求項2】 リフォーム壁材の外形に合わせて成形し
たベース材と、該ベース材に、リフォーム壁材の取付孔
の位置に合わせて開口した墨出し孔と、ベース材の一方
の面から突設したスペーサ突部とを有することを特徴と
するリフォーム壁材取付位置墨出し治具。
2. A base material formed in accordance with the outer shape of a wall material for renovation, a mark-out hole opened in the base material in accordance with a position of a mounting hole of the wall material for renovation, and a protrusion from one surface of the base material. A refilling wall material mounting position summing-out jig, which has a spacer projection provided.
【請求項3】 スペーサ突部を筒材で構成し、該筒材の
中空部をベース材の他方の面に貫通させ、この筒材の貫
通中空部を墨出し孔としたことを特徴とする請求項2に
記載のリフォーム壁材取付位置墨出し治具。
3. The method according to claim 1, wherein the spacer projection is formed of a cylindrical material, a hollow portion of the cylindrical material is penetrated through the other surface of the base material, and the hollow portion of the cylindrical material is formed as a marking hole. A jig for marking a relocation wall material mounting position according to claim 2.
JP15044196A 1996-01-29 1996-05-23 Reform foam on existing wall surfaces and relocation wall material attachment position Expired - Fee Related JP2945629B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15044196A JP2945629B2 (en) 1996-01-29 1996-05-23 Reform foam on existing wall surfaces and relocation wall material attachment position

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP8-33092 1996-01-29
JP3309296 1996-01-29
JP15044196A JP2945629B2 (en) 1996-01-29 1996-05-23 Reform foam on existing wall surfaces and relocation wall material attachment position

Publications (2)

Publication Number Publication Date
JPH09268576A JPH09268576A (en) 1997-10-14
JP2945629B2 true JP2945629B2 (en) 1999-09-06

Family

ID=26371736

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15044196A Expired - Fee Related JP2945629B2 (en) 1996-01-29 1996-05-23 Reform foam on existing wall surfaces and relocation wall material attachment position

Country Status (1)

Country Link
JP (1) JP2945629B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19808020C2 (en) * 1998-02-26 2000-09-21 Kurt G Ross Procedure for the renovation of retaining walls
JP4961128B2 (en) * 2005-10-14 2012-06-27 株式会社大林組 How to install the anti-corrosion board
DE102008018382A1 (en) * 2008-04-11 2009-10-15 Bau-Sanierungstechnik Gmbh Method for securing retaining walls
JP6139583B2 (en) * 2015-02-27 2017-05-31 旭コンクリート工業株式会社 Retaining wall and retaining wall installation method

Also Published As

Publication number Publication date
JPH09268576A (en) 1997-10-14

Similar Documents

Publication Publication Date Title
WO1996006985A1 (en) Foundation and floor construction means
JP2945629B2 (en) Reform foam on existing wall surfaces and relocation wall material attachment position
JP3100350B2 (en) Correction device and correction method for correcting settlement of building
EP0726361B1 (en) Method of forming pavement on automobile test road and pavement member for automobile test road
US20070215784A1 (en) Concrete anchor bolt holder
JP3185129B2 (en) Column-integrated column base fixed foundation structure and its construction method
JP2002371633A (en) Foundation anchor bolt of building and settlement correcting method of the building
JP2009091797A (en) Method of constructing steel pipe single pile by diagonal installation
JP2779892B2 (en) Building blocks and retaining walls using them
EP1666682A1 (en) Device for fastening posts on a surface, erection kit and fence
JP2000303426A (en) Coping concrete construction structure
JPH10237874A (en) Cofferdam box and construction method for structure using it
JP3748766B2 (en) Repair method and repair metal fittings for concrete structures
JP2000303453A (en) Coping concrete structure
JPS6343275Y2 (en)
JP3638031B2 (en) Foundation structure of building and piping construction method in foundation
JP3396812B2 (en) Underground foundation construction material, underground foundation and its construction method
JP2004137780A (en) Fixing structure and fixing method of steel pipe pole by anchor
JP2889500B2 (en) Floor level
JPH01198920A (en) Reinforcing method for underground earth guarding wall by earth anchor
JP3653706B2 (en) Caisson installation method
JP3156021B2 (en) Groove excavator for concrete
KR100767711B1 (en) The construction method of fence post
JP3137416U (en) Sheet pile fasteners and mountain clamp formwork fixing members used for sheet pile fasteners
AU2009100932A4 (en) Cast-in plate void former

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees