- CN206140039U CN206140039U CN201621059938.1U CN201621059938U CN206140039U CN 206140039 U CN206140039 U CN 206140039U CN 201621059938 U CN201621059938 U CN 201621059938U CN 206140039 U CN206140039 U CN 206140039U
- Authority
- CN
- China
- Prior art keywords
- steel
- plate
- bolt
- bow member
- connector plates
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 71
- 239000010959 steel Substances 0.000 title claims abstract description 71
- 238000003466 welding Methods 0.000 title abstract description 11
- 238000010276 construction Methods 0.000 description 3
- 210000004247 hand Anatomy 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model relates to a novel steel bow member and connector plates welding position ware, including bottom plate, curb plate and positioning bolt, the bottom plate welds into L shape with the curb plate, floor width is less than the groove width of the I -steel of steel bow member, curb plate bottom shape and size are the same with the slot cross -section of the I -steel of steel bow member, positioning bolt has two, and the parallel welds on the curb plate, positioning bolt's interval equals connector plates upper bolt hole's interval, positioning bolt's threaded outside diameter is less than connector plates upper bolt hole's diameter, the curb plate on still the welding have a handle, the positioning bolt strength grade be not less than 8.8 grades, the utility model discloses simple structure, the preparation is convenient, need not artifically guarantee with hand fixed connection steel sheet that the connector plates position of every unit of steel bow member is accurate, and bolt hole location is corresponding, guarantees accurately to connect, has lightened working strength simultaneously, has improved the operating efficiency.
Description
Technical field
This utility model is related to technical field of tunnel construction, more particularly to a kind of new steel arch-shelf is determined with junction steel plate welding
Position device.
Background technology
At present in the design of country's composite lining tunnel, steel arch-shelf Jing is often used, and it is applied to weak surrounding rock
Strong supporting.All it is, according to tunnel contour, steel arch-shelf to be divided into several units in normal construction, each unit two ends is welded to connect
Steel plate, is machined with two rows totally 4 bolts hole above junction steel plate, then each section steel arch-shelf is connected with bolt in tunnel
Connect, it is assembled integral.
General steel arch-shelf and junction steel plate welding are all artificial operations, with handss fixing connection steel plate and steel arch-shelf, Ran Houjin
Row welding.So junction steel plate is only felt and experience with the relative position of steel arch-shelf with the personal of workman, it is impossible to accomplish accurate fixed
Position, the adjacent steel arch-shelf of Unit two is when splicing, in fact it could happen that bolt hole cannot align or deviation is larger, and bolt cannot be worn
The phenomenon crossed.
The content of the invention
This utility model aims to solve the problem that the deficiencies in the prior art, and it is fixed with junction steel plate welding to provide a kind of new steel arch-shelf
Position device.
This utility model for achieving the above object, is employed the following technical solutions:A kind of new steel arch-shelf is welded with junction steel plate
Localizer, including base plate, side plate and bolt are connect, the base plate is L-shaped with plate-side plate welding, the baseplate width is less than steel arch
The groove width of the I-steel of frame, the side plate bottom shape and size it is identical with the slot cross-section of the I-steel of steel arch-shelf, the positioning
Bolt has two, and parallel to be welded on side plate, the spacing of the bolt is equal to the spacing of junction steel plate upper bolt hole, described
Diameter of the major diameter of thread of bolt less than junction steel plate upper bolt hole.
Further, also it is welded with handle on described side plate.
Further, described bolt strength grade is not less than 8.8 grades.
The beneficial effects of the utility model are:This utility model simple structure, it is easy to make, without manually with handss fixing company
Connect steel plate, it is ensured that accurately, bolt hole position is corresponding, it is ensured that can accurately connect for the junction steel plate position of steel arch-shelf each unit
Connect, while alleviating working strength, improve working performance.
Description of the drawings
Fig. 1 is structural representation front view of the present utility model;
Fig. 2 is structural representation left view of the present utility model;
Fig. 3 is steel arch-shelf and junction steel plate connection diagram;
Fig. 4 is connected A-A sectional views with junction steel plate for steel arch-shelf;
In figure:1- handles;2- side plates;3- bolts;4- base plates;5- I-steel;6- junction steel plates;
It is described in detail referring to the drawings below with reference to embodiment of the present utility model.
Specific embodiment
With reference to the accompanying drawings and examples the utility model is described in further detail:
As shown in figure 1, a kind of new steel arch-shelf and junction steel plate welded retainer, including base plate 4, side plate 2 and positioning spiral shell
Bolt 3, the base plate 4 welds L-shaped with side plate 2, and the width of the base plate 4 is less than the groove width of the I-steel 5 of steel arch-shelf, the side plate
2 bottom shapes and size are identical with the slot cross-section of the I-steel 5 of steel arch-shelf, and the bolt 3 has two, parallel to be welded in side
On plate 2, the spacing of the bolt 3 is equal to the spacing of the upper bolt hole of junction steel plate 6, the major diameter of thread of the bolt 3
Less than the diameter of the upper bolt hole of junction steel plate 6.
Further, also it is welded with handle 1 on described side plate 2.
Further, the described strength grade of bolt 3 is not less than 8.8 grades.
During construction, the localizer is enclosed within the end of the unit of steel arch-shelf one, then the bolt borehole jack above junction steel plate 6
On the bolt 3 of localizer, it is ensured that the relatively accurate position of junction steel plate 6 and steel arch-shelf, then welding worker is connected
The welding of steel plate 6 and steel arch-shelf is connect, an entirety is formed, welding is finished, and removes localizer, then carries out lower Pin steel arch-shelfs and company
Connect the weld job of steel plate 6.
This utility model is exemplarily described above in conjunction with accompanying drawing, it is clear that this utility model is implemented not to be received
The restriction of aforesaid way, if the various improvement that method design of the present utility model and technical scheme are carried out are employed, or without
Improvement directly applies to other occasions, within protection domain of the present utility model.
Claims (3)
1. a kind of new steel arch-shelf and junction steel plate welded retainer, it is characterised in that including base plate (4), side plate (2) and positioning
Bolt (3), the base plate (4) welds L-shaped with side plate (2), and base plate (4) width is less than the I-steel (5) of steel arch-shelf
Groove width, side plate (2) bottom shape and size it is identical with the slot cross-section of the I-steel of steel arch-shelf (5), the bolt (3)
There are two, parallel to be welded on side plate (2), the spacing of the bolt (3) is equal between junction steel plate (6) upper bolt hole
Away from the major diameter of thread of the bolt (3) is less than the diameter of junction steel plate (6) upper bolt hole.
2. new steel arch-shelf according to claim 1 and junction steel plate welded retainer, it is characterised in that described side plate
(2) handle (1) is also welded with.
3. new steel arch-shelf according to claim 1 and junction steel plate welded retainer, it is characterised in that described positioning
Bolt (3) strength grade is not less than 8.8 grades.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621059938.1U CN206140039U (en) | 2016-09-14 | 2016-09-14 | Novel steel bow member and connector plates welding position ware |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621059938.1U CN206140039U (en) | 2016-09-14 | 2016-09-14 | Novel steel bow member and connector plates welding position ware |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206140039U true CN206140039U (en) | 2017-05-03 |
Family
ID=58618768
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621059938.1U Expired - Fee Related CN206140039U (en) | 2016-09-14 | 2016-09-14 | Novel steel bow member and connector plates welding position ware |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206140039U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107829758A (en) * | 2017-11-16 | 2018-03-23 | 中国水利水电第十四工程局有限公司 | A kind of Tunnel steel arch-shelf connects plate positioning device |
CN109653776A (en) * | 2019-02-20 | 2019-04-19 | 中交公局厦门工程有限公司 | A kind of first connecting plate constructing device between branch steel arch-shelf in tunnel |
CN110052769A (en) * | 2019-05-17 | 2019-07-26 | 中交一公局第四工程有限公司 | A kind of tunnel steel arch frame junction steel plate apparatus for welding and positioning |
-
2016
- 2016-09-14 CN CN201621059938.1U patent/CN206140039U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107829758A (en) * | 2017-11-16 | 2018-03-23 | 中国水利水电第十四工程局有限公司 | A kind of Tunnel steel arch-shelf connects plate positioning device |
CN109653776A (en) * | 2019-02-20 | 2019-04-19 | 中交公局厦门工程有限公司 | A kind of first connecting plate constructing device between branch steel arch-shelf in tunnel |
CN110052769A (en) * | 2019-05-17 | 2019-07-26 | 中交一公局第四工程有限公司 | A kind of tunnel steel arch frame junction steel plate apparatus for welding and positioning |
CN110052769B (en) * | 2019-05-17 | 2024-02-20 | 中交一公局第四工程有限公司 | Tunnel steel arch connecting steel plate welding positioning device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206140039U (en) | Novel steel bow member and connector plates welding position ware | |
CN205967985U (en) | Flange welding set suitable for different specification corundum wear -resistant pipeline | |
CN103669432B (en) | A kind of jacking device for deviation rectification of steel pylon in mining area of coal mine | |
CN204940889U (en) | Novel compositions adjustment means | |
CN205778937U (en) | A kind of auxiliary device being accurately positioned preliminary bracing steel arch-shelf unit and junction steel plate | |
CN106239020A (en) | A kind of novel pipe fitting welder | |
CN204913165U (en) | Artifical assemblage bed -jig of welding H shaped steel | |
CN205888420U (en) | Steel bow member and connector plates welding position ware | |
CN203062161U (en) | Welding positioning device for tunnel steel arch truss and connecting steel plate | |
CN206393512U (en) | A kind of assembly mould of steel structural plant roof tie-rod | |
CN204075580U (en) | A kind of trucd mixer reductor limited block positioning tool | |
CN205772901U (en) | A kind of conduction rack | |
CN106089267A (en) | Excavator auxiliary steel arch-shelf mounting process | |
CN207260556U (en) | A kind of high-altitude operations tool Hanging Basket | |
CN205660331U (en) | Seamless steel pipe ring flange welding die set | |
CN202031315U (en) | A vertical rod of a fastener type steel pipe scaffold | |
CN205918380U (en) | To one side straight dual -purpose rat hole pipe | |
CN207930326U (en) | A kind of angle steel fixture | |
CN202317462U (en) | Dotting structure for wheel cover | |
CN206169543U (en) | Oil rig substructure's middle level welding frock | |
CN201091053Y (en) | Wiring equipment for laying underground cable | |
CN103912306B (en) | A kind of conveyer and intermediate channel thereof | |
CN207057925U (en) | Mining back timber side guard plate frock | |
CN108788618A (en) | The assembly tooling of cylinder segmentation and assembly method | |
CN107352386A (en) | The simple lifting tool and its application method of steel structural roof combined hanging |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: No.173, No.2 Xingang Road, Tanggu, Binhai New Area, Tianjin, 300456 Patentee after: Civil Aviation Airport Construction Engineering Co.,Ltd. Address before: No.173, No.2 Xingang Road, Tanggu, Binhai New Area, Tianjin, 300456 Patentee before: NO.4 ENGINEERING COMPANY LTD. OF CCCC FIRST HARBOR ENGINEERING Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170503 |