CN207245741U - Tunnel low-angle lift canopy - Google Patents

Tunnel low-angle lift canopy Download PDF

Info

Publication number
CN207245741U
CN207245741U CN201721004002.3U CN201721004002U CN207245741U CN 207245741 U CN207245741 U CN 207245741U CN 201721004002 U CN201721004002 U CN 201721004002U CN 207245741 U CN207245741 U CN 207245741U
Authority
CN
China
Prior art keywords
curb girder
tunnel
angle
onstructed
canopy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201721004002.3U
Other languages
Chinese (zh)
Inventor
胡小磊
马帅帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaibei Mining Group Co Ltd
Original Assignee
Huaibei Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaibei Mining Group Co Ltd filed Critical Huaibei Mining Group Co Ltd
Priority to CN201721004002.3U priority Critical patent/CN207245741U/en
Application granted granted Critical
Publication of CN207245741U publication Critical patent/CN207245741U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses tunnel low-angle to lift canopy, rack body including being located at anchor cable system bottom, the rack body is included to support the top beam at the top of tunnel, sidepiece of the top beam in smooth tunnel is equipped with the first horizontal curb girder, wherein, top beam is being equipped with second curb girder at an acute angle with surface water horizontal line close to the side in tunnel to be onstructed, and the first curb girder is directly provided with the slotting beam vertical with the first curb girder with the second curb girder, and the bottom of the top beam is equipped with the supporting part for bearing top pressure;Using the technical program, soldering angle is suitably adjusted according to door angle is dialled in the curb girder close to access adit to be onstructed, lift canopy length is reduced compared with limits, improve the usage safety performance of lift canopy, and the utilization rate of section at three-switch door is improved, tunnel working space is added, improves work efficiency.

Description

Tunnel low-angle lift canopy
Technical field
The utility model belongs to colliery field, more specifically, the utility model is related to tunnel low-angle lift canopy.
Background technology
During coal mining, when hacking shed tunnel low-angle helps lift canopy, often because two tunnel angles are smaller, it is difficult to really Drift section is protected, is unfavorable for follow-up work and carries out, to ensure enough drift sections, causes lift capplce longer, not only constructs Difficulty is big, and later stage lift canopy is yielding, and there are larger security risk, is unfavorable for keeping the safety in production.
Utility model content
Technical problem to be solved in the utility model, which is to provide, ensures enough drift sections, tunnel low-angle lift canopy.
To achieve these goals, the technical solution that the utility model is taken is:Tunnel low-angle lift canopy, including it is located at anchor The rack body of cable system bottom, the rack body are included to support the top beam at the top of tunnel, and the top beam is in smooth lane The sidepiece in road is equipped with the first horizontal curb girder, and horizontal gird is fixed in tunnel side wall, wherein, top beam is close to tunnel to be onstructed Side be equipped with second curb girder at an acute angle with surface water horizontal line, second curb girder along roadway direction to be onstructed and with it is to be onstructed It is close to set at the top of access adit, first curb girder is directly provided with the slotting beam vertical with the first curb girder, the top with the second curb girder The bottom of beam is equipped with the supporting part for bearing top pressure.
Tunnel low-angle disclosed in the utility model lifts canopy, second curb girder according to the driving angle in tunnel to be onstructed with The setting at an acute angle of surface water horizontal line, the slotting beam form corresponding soldering angle according to the angle of inclination of the second curb girder.
Tunnel low-angle disclosed in the utility model lifts canopy, and the supporting part includes column, the top beam by column and Tunnel bottom is connected, and the position that the first curb girder is connected with slotting beam is equipped with fixed part, and the top in column is connected with fixed part.
Tunnel low-angle disclosed in the utility model lifts canopy, and the fixed part includes gasket, and the gasket is fixed in first The bottom of curb girder and slotting beam connected position, is connected by fixing bolt respectively between gasket and the first curb girder and slotting beam.
Tunnel low-angle disclosed in the utility model lifts canopy, and the second curb girder end is fixed in the two of tunnel to be onstructed Side, the second curb girder section be with the setting at an acute angle of surface water horizontal line, the acute angle be 30 °~40 °.
Using the technical program, according to the spacing of diverse location between the first curb girder and the second curb girder, slotting beam length is pressed Trapezoidal increase, farthest reduces the loss of material, so that stock utilization is improved, close to the curb girder of access adit to be onstructed Soldering angle is suitably adjusted according to door angle is dialled, compared with the safety in utilization for reducing lift canopy length, improving lift canopy of limits Can, and the utilization rate of section at three-switch door is improved, tunnel working space is added, early period is provided for follow-up exploitation work Place mat, improve work efficiency.
Below with reference to drawings and examples, the utility model is described in detail.
Brief description of the drawings
The content expressed by each width attached drawing of this specification and the mark in figure are briefly described below:
Fig. 1 is the schematic diagram that the utility model tunnel low-angle lifts canopy;
Fig. 2 is the sectional view for the curb girder that the utility model tunnel low-angle lifts canopy.
In figure mark for:1st, smooth tunnel;2nd, tunnel to be onstructed;3rd, the first curb girder;4th, the second curb girder;5th, beam is inserted.
Embodiment
Below against attached drawing, by the description of the embodiment, to specific embodiment of the present utility model as involved Mutual alignment and connection relation, the effect of each several part and operation principle, manufacture between the shape of each component, construction, each several part Technique and operate with method etc., are described in further detail, to help those skilled in the art to the utility model Utility model design, technical solution have more complete, accurate and deep understanding.
Fig. 1 is the schematic diagram that the utility model tunnel low-angle lifts canopy, and Fig. 2 is that the utility model tunnel low-angle lifts canopy The sectional view of curb girder, tunnel low-angle as depicted lifts canopy, including is located at the rack body of anchor cable system bottom, rack body Including to support the top beam at the top of tunnel, sidepiece of the top beam in smooth tunnel 1 is equipped with the first horizontal curb girder 3, horizontal gird Tunnel side wall is fixed in, wherein, top beam is being equipped with second at an acute angle with surface water horizontal line close to the side in tunnel to be onstructed Curb girder 4, the second curb girder 4 is along roadway direction to be onstructed and with being close to set at the top of access adit to be onstructed, the first curb girder 3 and the second side Beam 4 is directly provided with the slotting beam 5 vertical with the first curb girder 3, and the bottom of top beam is equipped with the supporting part for bearing top pressure, the second curb girder The 3 driving angle and the setting at an acute angle of surface water horizontal line according to tunnel 2 to be onstructed, inserts angle of inclination of the beam 5 according to the second curb girder 3 Corresponding soldering angle is formed, supporting part includes column, and top beam is connected by column with tunnel bottom, and the first curb girder 3 is with inserting The position that beam is connected is equipped with fixed part, and the top in column is connected with fixed part, and fixed part includes gasket, and gasket is fixed in first The bottom of 5 connected position of curb girder 3 and slotting beam, is connected by fixing bolt respectively between gasket and the first curb girder 3 and slotting beam 5, the Two curb girders, 4 end is fixed in the both sides in tunnel 2 to be onstructed, 4 section of the second curb girder be with the setting at an acute angle of surface water horizontal line, it is described Acute angle is 30 °~40 °;Second curb girder 4 is according to the driving angle in tunnel 2 to be onstructed, accordingly along the second curb girder of axis trimming 4 In level angle, then the column that 4 frame of the second curb girder has been buried in tunnel, the second curb girder 4 is fastened by bolt, then will Beam 5 is inserted to be fixed by welding between the first curb girder 3 and the second curb girder 4.
Hacking shed tunnel low-angle disclosed in the utility model lifts canopy method, includes the following steps:
1) netted anchor cable is first laid on to side wall and the top in tunnel, then is passed through with by the gasket for being uniformly distributed in anchor cable net Fixing bolt is anchored on tunnel inner wall;
2) dig the needling of 30cm~40cm depth in tunnel bottom, then column be put into needling vertically, by the soil of surrounding and Column, which is fixed, to be beaten in fact, rivet is knocked in the fixed hole of column bottom;
3) the first curb girder 3 is lifted to by corresponding position at the top of tunnel by hydraulic cylinder, then bottom fastening will have been completed Column and the first curb girder 3 between mutually fixed by bolt;
5) the second curb girder 4 is postponed the section direction of access adit to be onstructed, 4 both ends of the second curb girder is fixed in drift section Side wall, the second curb girder 4 is according to the driving angle of access adit 2 to be onstructed along axis rotating avoiding;
6) again by slotting roof beam structure between the first curb girder 3 and the second curb girder 4, the both ends of slotting beam are fixed in first by welding The beam groove rim surface of 3 and second curb girder 4 of curb girder.
Using the technical program, according to the spacing of diverse location between the first curb girder 3 and the second curb girder 4, by slotting beam length By trapezoidal increase, the loss of material is farthest reduced, so that stock utilization is improved, close to the side of access adit to be onstructed Beam suitably adjusts soldering angle according to door angle is dialled, and reduces lift canopy length compared with limits, improves the safe to use of lift canopy Performance, and the utilization rate of section at three-switch door is improved, tunnel working space is added, before being provided for follow-up exploitation work The place mat of phase, improves work efficiency.
The utility model is exemplarily described above in conjunction with attached drawing, it is clear that the utility model implement and from The limitation of aforesaid way, as long as employing changing for the various unsubstantialities that the methodology of the utility model and technical solution carry out Into, or it is not improved the design of the utility model and technical solution are directly applied into other occasions, in the utility model Protection domain within.

Claims (5)

1. tunnel low-angle lifts canopy, it is characterised in that:Rack body including being located at anchor cable system bottom, the rack body bag Include to support the top beam at the top of tunnel, sidepiece of the top beam in smooth tunnel is equipped with the first horizontal curb girder, horizontal gird Tunnel side wall is fixed in, wherein, top beam is being equipped with second at an acute angle with surface water horizontal line close to the side in tunnel to be onstructed Curb girder, second curb girder along roadway direction to be onstructed and with access adit to be onstructed at the top of be close to set, first curb girder with Second curb girder is directly provided with the slotting beam vertical with the first curb girder, and the bottom of the top beam is equipped with the supporting part for bearing top pressure.
2. tunnel low-angle described in accordance with the claim 1 lifts canopy, it is characterised in that:Second curb girder is according to tunnel to be onstructed Driving angle and the setting at an acute angle of surface water horizontal line, the slotting beam forms corresponding weldering according to the angle of inclination of the second curb girder Connect angle.
3. tunnel low-angle described in accordance with the claim 1 lifts canopy, it is characterised in that:The supporting part includes column, the top Beam is connected by column with tunnel bottom, and the position that the first curb girder is connected with slotting beam is equipped with fixed part, the top in column with it is solid Determine portion to be connected.
4. tunnel low-angle described in accordance with the claim 3 lifts canopy, it is characterised in that:The fixed part includes gasket, the pad Piece is fixed in the bottom of the first curb girder and slotting beam connected position, passes through fixing bolt respectively between gasket and the first curb girder and slotting beam It is connected.
5. tunnel low-angle described in accordance with the claim 1 lifts canopy, it is characterised in that:The second curb girder end, which is fixed in, waits to apply The both sides in work tunnel, the second curb girder section be with the setting at an acute angle of surface water horizontal line, the acute angle be 30 °~40 °.
CN201721004002.3U 2017-08-11 2017-08-11 Tunnel low-angle lift canopy Withdrawn - After Issue CN207245741U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721004002.3U CN207245741U (en) 2017-08-11 2017-08-11 Tunnel low-angle lift canopy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721004002.3U CN207245741U (en) 2017-08-11 2017-08-11 Tunnel low-angle lift canopy

Publications (1)

Publication Number Publication Date
CN207245741U true CN207245741U (en) 2018-04-17

Family

ID=61879291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721004002.3U Withdrawn - After Issue CN207245741U (en) 2017-08-11 2017-08-11 Tunnel low-angle lift canopy

Country Status (1)

Country Link
CN (1) CN207245741U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107489440A (en) * 2017-08-11 2017-12-19 淮北矿业(集团)有限责任公司 Tunnel low-angle lift canopy and hacking shed tunnel low-angle lift canopy method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107489440A (en) * 2017-08-11 2017-12-19 淮北矿业(集团)有限责任公司 Tunnel low-angle lift canopy and hacking shed tunnel low-angle lift canopy method
CN107489440B (en) * 2017-08-11 2023-08-15 淮北矿业股份有限公司 Small-angle shed lifting method for roadway and small-angle shed lifting method for shed roadway

Similar Documents

Publication Publication Date Title
CN107060758B (en) A kind of section fender, which stays, sets construction method
CN204510205U (en) A kind of bamboo steel pile tube
CN109268027B (en) Tunnel top angle curved surface surrounding rock reinforcement control method
CN104074534B (en) A kind of combining adopts/the gob-side entry retaining method of fully mechanized coal face
CN213062029U (en) Energy-conserving pile roof beam erects anchor supporting construction based on excavation supporting
CN105134216A (en) Anti-collapse structure beside roadway based on breaking roof 110 construction method
CN206000543U (en) A kind of supporting construction protecting lane for gob side entry retaining
CN106121676A (en) A kind of supporting construction and method for protecting support thereof protecting lane for gob side entry retaining
CN108708284B (en) A kind of steel trestle construction method for resisting flood discharge bed scour
CN103669432B (en) A kind of jacking device for deviation rectification of steel pylon in mining area of coal mine
CN207245741U (en) Tunnel low-angle lift canopy
CN208328666U (en) A kind of Extended chemotherapy seat-plate type bridge abutment structure with anchor pole
CN207525758U (en) A kind of reinforced Structure About Soldier Pile
CN105736010A (en) Supporting structure for extremely-narrow coal pillar roadway driving along goaf and construction method of supporting structure
CN103882808B (en) Ramp bridge and main line bridge join the construction method across erecting beam support system
CN107489440A (en) Tunnel low-angle lift canopy and hacking shed tunnel low-angle lift canopy method
CN204849777U (en) Tilting board double row pile supporting construction that bears down on one
CN207987930U (en) One kind exempting from precipitation foundation pit supporting construction
CN104790991A (en) Mining roadway surrounding rock strong and long top anchoring technology
CN210177523U (en) Ecological bank protection drainage structures of prefabricated assembled
CN204780977U (en) Reduce steel column burried depth's type of putting more energy into and bury formula column base
CN106930779A (en) A kind of special-shaped canopy method for protecting support of micro- arch of high-dipping three soft coal layer re-exploration laneway battered leg
CN208870053U (en) Deep well dado steel construction supports
CN204252119U (en) The special-shaped supporting pile structure of X
CN203684102U (en) Supporting system for precast beam formed by connecting span erection of ramp bridge and main line bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20180417

Effective date of abandoning: 20230815

AV01 Patent right actively abandoned

Granted publication date: 20180417

Effective date of abandoning: 20230815

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned