Prior art keywords
curb girder
tunnel
angle
onstructed
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710686204.9A
Other languages
Chinese (zh)
Other versions
CN107489440B (en
Inventor
胡小磊
马帅帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaibei Mining Co Ltd
Original Assignee
Huaibei Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaibei Mining Group Co Ltd filed Critical Huaibei Mining Group Co Ltd
Priority to CN201710686204.9A priority Critical patent/CN107489440B/en
Publication of CN107489440A publication Critical patent/CN107489440A/en
Application granted granted Critical
Publication of CN107489440B publication Critical patent/CN107489440B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/04Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention discloses tunnel low-angle to lift canopy, rack body including being located at anchor cable system bottom, the rack body is included to support the back timber at the top of tunnel, sidepiece of the back timber in smooth tunnel is provided with the first horizontal curb girder, wherein, back timber is being provided with second curb girder at an acute angle with surface water horizontal line close to the side in tunnel to be onstructed, and the first curb girder is directly provided with the slotting beam vertical with the first curb girder with the second curb girder, and the bottom of the back timber is provided with the supporting part for bearing top pressure;Using the technical program, soldering angle is suitably adjusted according to door angle is dialled in the curb girder close to access adit to be onstructed, lift canopy length is reduced compared with limits, improve the usage safety performance of lift canopy, and the utilization rate of section at three-switch door is improved, tunnel working space is added, improves operating efficiency.

Description

Tunnel low-angle lift canopy and hacking shed tunnel low-angle lift canopy method
Technical field
The invention belongs to colliery field, it is more particularly related to tunnel low-angle lift canopy and the small angle of hacking shed tunnel Degree lift canopy method.
Background technology
During coal mining, when hacking shed tunnel low-angle helps lift canopy, often because two tunnel angles are smaller, it is difficult to really Drift section is protected, is unfavorable for follow-up work and carries out, to ensure enough drift sections, causes lift capplce longer, not only constructs Difficulty is big, and later stage lift canopy is yielding, larger potential safety hazard be present, is unfavorable for keeping the safety in production.
The content of the invention
The technical problems to be solved by the invention, which are to provide, ensures enough drift sections, tunnel low-angle lift canopy and frame canopy Tunnel low-angle lift canopy method.
To achieve these goals, the technical scheme taken of the present invention is:Tunnel low-angle lift canopy, including it is located at anchor cable system The rack body of system bottom, the rack body are included to support the back timber at the top of tunnel, and the back timber is in smooth tunnel Sidepiece is provided with the first horizontal curb girder, and horizontal gird is fixed in tunnel side wall, wherein, back timber is close to the one of tunnel to be onstructed Side is provided with second curb girder at an acute angle with surface water horizontal line, second curb girder along roadway direction to be onstructed and with tunnel to be onstructed It is close to set at the top of mouthful, first curb girder is directly provided with the slotting beam vertical with the first curb girder with the second curb girder, the back timber Bottom is provided with the supporting part for bearing top pressure.
Tunnel low-angle disclosed by the invention lifts canopy, and second curb girder is according to the driving angle in tunnel to be onstructed and ground Horizontal line setting at an acute angle, the slotting beam form corresponding soldering angle according to the angle of inclination of the second curb girder.
Tunnel low-angle disclosed by the invention lifts canopy, and the supporting part includes column, and the back timber passes through column and tunnel Bottom is connected, and the position that the first curb girder is connected with slotting beam is provided with fixed part, and the top in column is connected with fixed part.
Tunnel low-angle disclosed by the invention lifts canopy, and the fixed part includes pad, and the pad is fixed in the first curb girder With the bottom of slotting beam connected position, it is connected respectively by fixing bolt between pad and the first curb girder and slotting beam.
Tunnel low-angle disclosed by the invention lifts canopy, and the second curb girder end is fixed in the both sides in tunnel to be onstructed, the Two curb girder sections be with the setting at an acute angle of surface water horizontal line, the acute angle be 30 °~40 °.
Hacking shed tunnel low-angle disclosed by the invention lifts canopy method, comprises the following steps:
1) netted anchor cable is first laid on to side wall and the top in tunnel, then passed through with by the pad for being uniformly distributed in anchor cable net Fixing bolt is anchored on tunnel inwall;
2) the deep needlings of 30cm~40cm are dug in tunnel bottom, then column are put into needling vertically, by the soil of surrounding with Column, which is fixed, to be beaten in fact, rivet is knocked in the fixed via of column bottom;
3) the first curb girder is lifted to by position corresponding to the top of tunnel by hydraulic jack, then bottom fastening will have been completed Mutually fixed by bolt between column and the first curb girder;
5) the second curb girder is postponed the section direction of access adit to be onstructed, the second curb girder both ends is fixed in drift section Side wall, the second curb girder is according to the driving angle of access adit to be onstructed along axis rotating avoiding;
6) again by slotting roof beam structure between the first curb girder and the second curb girder, the both ends of slotting beam are fixed in the first side by welding The beam groove rim surface of beam and the second curb girder.
Using the technical program, according to the spacing of diverse location between the first curb girder and the second curb girder, slotting beam length is pressed Trapezoidal increase, the loss of material is farthest reduced, so as to improve stock utilization, close to the curb girder of access adit to be onstructed Soldering angle is suitably adjusted according to door angle is dialled, compared with the safety in utilization for reducing lift canopy length, improving lift canopy of limits Can, and the utilization rate of section at three-switch door is improved, tunnel working space is added, early stage is provided for follow-up exploitation work Place mat, improve operating efficiency.
Below with reference to drawings and examples, the present invention is described in detail.
Brief description of the drawings
The content expressed by each width accompanying drawing of this specification and the mark in figure are briefly described below:
Fig. 1 is the schematic diagram that tunnel low-angle of the present invention lifts canopy;
Fig. 2 is the sectional view for the curb girder that tunnel low-angle of the present invention lifts canopy.
In figure mark for:1st, smooth tunnel;2nd, tunnel to be onstructed;3rd, the first curb girder;4th, the second curb girder;5th, beam is inserted.
Embodiment
Below against accompanying drawing, by the description to embodiment, each structure for example involved to the embodiment of the present invention Mutual alignment and annexation, the effect of each several part and operation principle, manufacturing process between the shape of part, construction, each several part And operate with method etc., be described in further detail, with help those skilled in the art to the present invention inventive concept, Technical scheme has more complete, accurate and deep understanding.
Fig. 1 is the schematic diagram that tunnel low-angle of the present invention lifts canopy, and Fig. 2 is cuing open for the curb girder that tunnel low-angle of the present invention lifts canopy View, tunnel low-angle as depicted lifts canopy, including is located at the rack body of anchor cable system bottom, rack body include to The back timber at the top of tunnel is supported, sidepiece of the back timber in smooth tunnel 1 is provided with the first horizontal curb girder 3, and horizontal gird is fixed in lane Road side wall, wherein, back timber is provided with second curb girder 4 at an acute angle with surface water horizontal line in the side close to tunnel to be onstructed, the For two curb girders 4 along roadway direction to be onstructed and with being close to set at the top of access adit to be onstructed, the first curb girder 3 and the second curb girder 4 are direct Provided with the slotting beam 5 vertical with the first curb girder 3, the bottom of back timber is provided with the supporting part for bearing top pressure, and the second curb girder 3 is according to treating The driving angle of construction tunnel 2 and the setting at an acute angle of surface water horizontal line, insert beam 5 and phase is formed according to the angle of inclination of the second curb girder 3 Corresponding soldering angle, supporting part include column, and back timber is connected by column with tunnel bottom, and the first curb girder 3 is connected with slotting beam Position be provided with fixed part, the top in column is connected with fixed part, and fixed part includes pad, and pad is fixed in the first curb girder 3 With the bottom of the slotting connected position of beam 5, it is connected respectively by fixing bolt between pad and the first curb girder 3 and slotting beam 5, the second curb girder 4 ends are fixed in the both sides in tunnel 2 to be onstructed, and the section of the second curb girder 4 is to be with the setting at an acute angle of surface water horizontal line, the acute angle 30 °~40 °;Second curb girder 4 is according to the driving angle in tunnel 2 to be onstructed, accordingly along the horizontal angle of the second curb girder of axis trimming 4 Degree, then in the column that the frame of the second curb girder 4 has been buried in tunnel, is fastened the second curb girder 4 by bolt, then by slotting beam 5 It is fixed by welding between the first curb girder 3 and the second curb girder 4.
Hacking shed tunnel low-angle disclosed by the invention lifts canopy method, comprises the following steps:
1) netted anchor cable is first laid on to side wall and the top in tunnel, then passed through with by the pad for being uniformly distributed in anchor cable net Fixing bolt is anchored on tunnel inwall;
2) the deep needlings of 30cm~40cm are dug in tunnel bottom, then column are put into needling vertically, by the soil of surrounding with Column, which is fixed, to be beaten in fact, rivet is knocked in the fixed via of column bottom;
3) the first curb girder 3 is lifted to by position corresponding to the top of tunnel by hydraulic jack, then bottom fastening will have been completed Column and the first curb girder 3 between mutually fixed by bolt;
5) the second curb girder 4 is postponed the section direction of access adit to be onstructed, the both ends of the second curb girder 4 is fixed in drift section Side wall, the second curb girder 4 is according to the driving angle of access adit 2 to be onstructed along axis rotating avoiding;
6) again by slotting roof beam structure between the first curb girder 3 and the second curb girder 4, the both ends of slotting beam are fixed in first by welding The beam groove rim surface of the curb girder 4 of curb girder 3 and second.
Using the technical program, according to the spacing of diverse location between the first curb girder 3 and the second curb girder 4, by slotting beam length By trapezoidal increase, the loss of material is farthest reduced, so as to improve stock utilization, close to the side of access adit to be onstructed Beam suitably adjusts soldering angle according to door angle is dialled, and reduces lift canopy length compared with limits, improves the safe to use of lift canopy Performance, and the utilization rate of section at three-switch door is improved, tunnel working space is added, before being provided for follow-up exploitation work The place mat of phase, improve operating efficiency.
The present invention is exemplarily described above in conjunction with accompanying drawing, it is clear that present invention specific implementation is not by aforesaid way Limitation, as long as the improvement of the various unsubstantialities of inventive concept and technical scheme of the present invention progress is employed, or without changing Enter and the design of the present invention and technical scheme are directly applied into other occasions, within protection scope of the present invention.

Claims (6)

1. tunnel low-angle lifts canopy, it is characterised in that:Rack body including being located at anchor cable system bottom, the rack body bag Include to support the back timber at the top of tunnel, sidepiece of the back timber in smooth tunnel is provided with the first horizontal curb girder, horizontal gird Tunnel side wall is fixed in, wherein, back timber is being provided with second at an acute angle with surface water horizontal line close to the side in tunnel to be onstructed Curb girder, second curb girder along roadway direction to be onstructed and with access adit to be onstructed at the top of be close to set, first curb girder with Second curb girder is directly provided with the slotting beam vertical with the first curb girder, and the bottom of the back timber is provided with the supporting part for bearing top pressure.
2. according to the tunnel low-angle lift canopy described in claim 1, it is characterised in that:Second curb girder is according to tunnel to be onstructed Driving angle and the setting at an acute angle of surface water horizontal line, the slotting beam forms corresponding weldering according to the angle of inclination of the second curb girder Connect angle.
3. according to the tunnel low-angle lift canopy described in claim 1, it is characterised in that:The supporting part includes column, the top Beam is connected by column with tunnel bottom, and the position that the first curb girder is connected with slotting beam is provided with fixed part, the top in column with it is solid Determine portion to be connected.
4. according to the tunnel low-angle lift canopy described in claim 3, it is characterised in that:The fixed part includes pad, the pad Piece is fixed in the bottom of the first curb girder and slotting beam connected position, passes through fixing bolt respectively between pad and the first curb girder and slotting beam It is connected.
5. according to the tunnel low-angle lift canopy described in claim 1, it is characterised in that:The second curb girder end, which is fixed in, waits to apply The both sides in work tunnel, the second curb girder section be with the setting at an acute angle of surface water horizontal line, the acute angle be 30 °~40 °.
6. lift canopy method according to the hacking shed tunnel low-angle described in Claims 1 to 5, it is characterised in that:Comprise the following steps:
1) netted anchor cable is first laid on to side wall and the top in tunnel, then passes through fixation with by the pad for being uniformly distributed in anchor cable net Bolt is anchored on tunnel inwall;
2) the deep needlings of 30cm~40cm are dug in tunnel bottom, then column is put into needling vertically, by the soil and column of surrounding It is fixed to beat in fact, rivet is knocked in the fixed via of column bottom;
3) the first curb girder is lifted to by position corresponding to the top of tunnel by hydraulic jack, then the column of bottom fastening will have been completed Mutually fixed by bolt between the first curb girder;
5) the second curb girder is postponed the section direction of access adit to be onstructed, the second curb girder both ends is fixed in the side of drift section Wall, the second curb girder is according to the driving angle of access adit to be onstructed along axis rotating avoiding;
6) again by slotting roof beam structure between the first curb girder and the second curb girder, by welding by the both ends of slotting beam be fixed in the first curb girder and The beam groove rim surface of second curb girder.
CN201710686204.9A 2017-08-11 2017-08-11 Small-angle shed lifting method for roadway and small-angle shed lifting method for shed roadway Active CN107489440B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710686204.9A CN107489440B (en) 2017-08-11 2017-08-11 Small-angle shed lifting method for roadway and small-angle shed lifting method for shed roadway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710686204.9A CN107489440B (en) 2017-08-11 2017-08-11 Small-angle shed lifting method for roadway and small-angle shed lifting method for shed roadway

Publications (2)

Publication Number Publication Date
CN107489440A true CN107489440A (en) 2017-12-19
CN107489440B CN107489440B (en) 2023-08-15

Family

ID=60643637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710686204.9A Active CN107489440B (en) 2017-08-11 2017-08-11 Small-angle shed lifting method for roadway and small-angle shed lifting method for shed roadway

Country Status (1)

Country Link
CN (1) CN107489440B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612533A (en) * 2018-05-04 2018-10-02 淮南矿业(集团)有限责任公司 Dial the construction method in gate segment tunnel

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH377758A (en) * 1958-07-15 1964-05-31 Bochumer Eisen Heintzmann Auxiliary support for drifting, especially in underground mining
SU1606707A1 (en) * 1988-04-18 1990-11-15 Подмосковный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт Entry-driving support
RU2185514C1 (en) * 2001-02-14 2002-07-20 Открытое акционерное общество по добыче угля "Воркутауголь" Powered mining complex
US20070046094A1 (en) * 2005-08-24 2007-03-01 Peter Gross Method for pillar recovery in chamber-and-pillar working and tubbing unit for pillar recovery
CN202055821U (en) * 2011-04-25 2011-11-30 马晓山 Two-arm top slope anchor rod and anchor rope construction drill wagon with movable lifting platform
CN103422850A (en) * 2012-01-30 2013-12-04 哈尼施费格尔技术公司 System and method for remote monitoring of drilling equipment
CN104141504A (en) * 2014-07-14 2014-11-12 霍忠明 Arch-cross-section roadway tunneling support device
CN207245741U (en) * 2017-08-11 2018-04-17 淮北矿业(集团)有限责任公司 Tunnel low-angle lift canopy

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH377758A (en) * 1958-07-15 1964-05-31 Bochumer Eisen Heintzmann Auxiliary support for drifting, especially in underground mining
SU1606707A1 (en) * 1988-04-18 1990-11-15 Подмосковный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт Entry-driving support
RU2185514C1 (en) * 2001-02-14 2002-07-20 Открытое акционерное общество по добыче угля "Воркутауголь" Powered mining complex
US20070046094A1 (en) * 2005-08-24 2007-03-01 Peter Gross Method for pillar recovery in chamber-and-pillar working and tubbing unit for pillar recovery
CN202055821U (en) * 2011-04-25 2011-11-30 马晓山 Two-arm top slope anchor rod and anchor rope construction drill wagon with movable lifting platform
CN103422850A (en) * 2012-01-30 2013-12-04 哈尼施费格尔技术公司 System and method for remote monitoring of drilling equipment
CN104141504A (en) * 2014-07-14 2014-11-12 霍忠明 Arch-cross-section roadway tunneling support device
CN207245741U (en) * 2017-08-11 2018-04-17 淮北矿业(集团)有限责任公司 Tunnel low-angle lift canopy

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612533A (en) * 2018-05-04 2018-10-02 淮南矿业(集团)有限责任公司 Dial the construction method in gate segment tunnel

Also Published As

Publication number Publication date
CN107489440B (en) 2023-08-15

Similar Documents

Publication Publication Date Title
EP3489459B1 (en) Non-uniform support structure for gob-side entry driving under deep unstable overburden rock and construction method
CN105370299B (en) The buried empty roadway protection processing in high seam thin coal pillar edge of km
CN104061001B (en) Gob side entry retaining exploitation support process method
CN107165664A (en) A kind of slope thick seam tunnels superelevation stope drift active workings Qie Dingliu lanes method along top
CN103075165A (en) Composite supporting method of vertical beam of coal road
CN206000543U (en) A kind of supporting construction protecting lane for gob side entry retaining
CN105134216A (en) Anti-collapse structure beside roadway based on breaking roof 110 construction method
CN102102526A (en) Coal mine roadway supporting method and working face hole-cutting anchor mesh ladder and individual supporting device used by same
CN105003288A (en) Medium-thickness coal seam gob-side entry retaining method and support system
CN106121676A (en) A kind of supporting construction and method for protecting support thereof protecting lane for gob side entry retaining
CN209114476U (en) A kind of deep foundation pit fender post
CN109322241A (en) Trestle work structure and construction method
CN206768570U (en) A kind of foundation ditch assembled steel trestle
CN104405392B (en) Three soft high seam tunnel jackings are kept on file anchor rete cord active support longwall top coal caving method
CN105736010A (en) Supporting structure for extremely-narrow coal pillar roadway driving along goaf and construction method of supporting structure
CN107489440A (en) Tunnel low-angle lift canopy and hacking shed tunnel low-angle lift canopy method
CN207245741U (en) Tunnel low-angle lift canopy
CN106930779A (en) A kind of special-shaped canopy method for protecting support of micro- arch of high-dipping three soft coal layer re-exploration laneway battered leg
CN203684102U (en) Supporting system for precast beam formed by connecting span erection of ramp bridge and main line bridge
CN207987930U (en) One kind exempting from precipitation foundation pit supporting construction
CN207829905U (en) A kind of drift-sand stratum bored tunnel three-dimensional supporting construction in advance
CN207268050U (en) A kind of composite beam face reinforcing bar wears muscle system and its tool car
CN116658216A (en) Hydraulic support for temporary support of roadway
CN106150535A (en) A kind of strip-type wangeviry mining method technology offset method for protecting support
CN201982123U (en) Anchor mesh ladder and single body combined roadway support device for working face open-off cut of coal mine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20230721

Address after: No.276, Renmin Middle Road, Xiangshan District, Huaibei City, Anhui Province

Applicant after: HUAIBEI MINING INDUSTRY Co.,Ltd.

Address before: 235000 No. 276 Renmin Zhong Road, Huaibei City, Anhui Province

Applicant before: HUAIBEI MINING (GROUP) Co.,Ltd.

GR01 Patent grant