CN106121676A - A kind of supporting construction and method for protecting support thereof protecting lane for gob side entry retaining - Google Patents

A kind of supporting construction and method for protecting support thereof protecting lane for gob side entry retaining Download PDF

Info

Publication number
CN106121676A
CN106121676A CN201610738696.7A CN201610738696A CN106121676A CN 106121676 A CN106121676 A CN 106121676A CN 201610738696 A CN201610738696 A CN 201610738696A CN 106121676 A CN106121676 A CN 106121676A
Authority
CN
China
Prior art keywords
tunnel
back timber
supporting construction
anchor
goaf
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610738696.7A
Other languages
Chinese (zh)
Inventor
刘海
蒋运良
陈君龙
覃江省
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baise Bai Kuang Group Co ltd
Original Assignee
Baise Bai Kuang Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baise Bai Kuang Group Co ltd filed Critical Baise Bai Kuang Group Co ltd
Priority to CN201610738696.7A priority Critical patent/CN106121676A/en
Publication of CN106121676A publication Critical patent/CN106121676A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/006Lining anchored in the rock
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/152Laggings made of grids or nettings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/36Linings or supports specially shaped for tunnels or galleries of irregular cross-section
    • E21D11/367Linings or supports specially shaped for tunnels or galleries of irregular cross-section for junction with the longwall coal face

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The present invention provides a kind of supporting construction protecting lane for gob side entry retaining, including frame and many anchor poles, described many anchor poles are spaced along the width in tunnel and are located at the top in tunnel, described frame includes back timber and canopy lower limb, described back timber extends along the width in tunnel, and one end of described back timber is positioned at goaf side sideline, described back timber is connected with described anchor pole away from the one end in goaf, and described back timber supports the top board in described tunnel;Described canopy lower limb one end is installed in the base plate in tunnel, and the other end is connected near the end in goaf with described back timber.The present invention also provides for a kind of method for protecting support using above-mentioned supporting construction.Above-mentioned supporting construction and method for protecting support thereof can simplify gob side entry retaining and protect the technique in lane, reduces labor intensity and the cost of roadway support of workman.

Description

A kind of supporting construction and method for protecting support thereof protecting lane for gob side entry retaining
[technical field]
The present invention relates to Roadway Support Technology field, be specifically related to a kind of for gob side entry retaining protect lane supporting construction and Method for protecting support.
[background technology]
Edge air gallery technology has the history of decades at home, but current edge air gallery technology is usually and need to stay Mined out side, tunnel prefabricated section build a wall, formwork erection placing concrete wall or use full shed frame type to stay lane protect top and stop adopt Caving in mined area spoil channels in stayed tunnel.Although these techniques are effective, but complex process, labor strength is big, stays lane to prop up Protecting cost high, progress is slow simultaneously, can not meet the schedule requirement that fully-mechanized mining working advances.
[summary of the invention]
In view of the foregoing, it is necessary to a kind of supporting construction and method for protecting support thereof protecting lane for gob side entry retaining is provided, with Solving gob side entry retaining and protect lane structural manufacturing process complexity, labor strength is big, stays the problem that lane cost is high.
For reaching above-mentioned purpose, the technical solution adopted in the present invention is:
A kind of supporting construction protecting lane for gob side entry retaining, including frame and many anchor poles, described many anchor poles are along tunnel Width interval be located at the top in tunnel, described frame includes back timber and canopy lower limb, and described back timber is along the width in tunnel Extending, and one end of described back timber is positioned at goaf side sideline, described back timber is connected with described anchor pole away from the one end in goaf, Described back timber supports the top board in described tunnel;Described canopy lower limb one end is installed in the base plate in tunnel, and the other end is close with described back timber The end in goaf connects.
Further, described supporting construction also includes pushing up net and gear cash net, and described top net laying is located at the top in tunnel;Described Gear cash network folder is located between canopy lower limb and the crag in goaf, and overlaps with described top net.
Further, the height of described gear cash net is more than the height in described tunnel.
Further, described gear cash net is rhombus net.
Further, described canopy lower limb is connected by two single u-shaped steel and forms, and two single u-shaped steel are connected by fastening clamp.
Further, described back timber is U-shaped steel, the half of a length of span length of described back timber.
Further, described many anchor poles include strengthening anchor pole and many support anchor rods, and described many support anchor rods are equidistant From distribution;Described reinforcement anchor pole is located between adjacent two support anchor rod, and is positioned at the central region in tunnel, and described back timber is remote It is connected with described reinforcement anchor pole from the one end in goaf.
Further, described back timber has also set up monomer liquid more than the position in the range of top board work surface periodic weighting step pitch Pressure pillar, with strengthening supporting.
Further, described supporting construction also includes that at least two anchor cables, each anchor cable are located at the top in tunnel and are positioned at Between two adjacent anchor poles.
A kind of method for protecting support for gob side entry retaining, comprises the following steps:
Thering is provided one to protect the supporting construction in lane for gob side entry retaining, described supporting construction includes frame and many anchor poles, described Frame includes back timber and canopy lower limb;
Described many anchor poles interval is located at the top in tunnel, so that tunnel is carried out suspension roof support;
Being connected with described anchor pole one end of described back timber, the other end is located at goaf side sideline so that described back timber Support the top board in described tunnel;
Described canopy lower limb one end is installed in the base plate in tunnel, by the other end of described canopy lower limb with described back timber near goaf End connect.
Owing to using technique scheme, the method have the advantages that
1, the supporting construction and the method for protecting support thereof that protect lane for gob side entry retaining that the present invention provides, it uses single lower limb to carry out propping up Protect, compared to traditional full frame support technology, significantly simplify the support process of gob side entry retaining, alleviate workman and work by force Degree;The material used due to this supporting construction reduces, and therefore, reduces gob-side entry retaining support cost, propping up of this supporting construction Protect cost about to build by laying bricks or stones or placing concrete protects the 15% of lane supporting, be the 70% of full beam canopy frame support structure cost;Due to top Beam is connected with anchor pole, and therefore both interactions make the stability of this supporting construction more higher than full beam canopy frame support structure; Account for simultaneously this supporting construction 80% frame part the most recyclable.
2, the supporting construction and the method for protecting support thereof that protect lane for gob side entry retaining that the present invention provides, changes tradition edge, colliery Kong Liu Xiang Hu lane supporting construction, is organically combined into entirety scaffolding structure and anchor structure, increases prop to retaining top The supporting area of plate, and effectively control the laterally opposed displacement of top board and prop, solve edge under the conditions of loose roof The stability problem of Kong Liu lane top board.
3, the supporting construction and the method for protecting support thereof that protect lane for gob side entry retaining that the present invention provides, the length of its back timber is substantially For the half of the width in tunnel, further save material, reduce gob-side entry retaining support cost.
[accompanying drawing explanation]
Fig. 1 is the use view of the supporting construction of the present invention one better embodiment.
In accompanying drawing, 100-supporting construction, 2-anchor pole, 22-support anchor rod, 24-strengthen anchor pole, 4-frame, 42-back timber, 44- Canopy lower limb, 5-fastening clamp, 6-gear cash net, 7-hydraulic prop, 8-anchor cable, 200-tunnel, 210-top board, 230-base plate, 300-goaf.
[detailed description of the invention]
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under not making creative work premise Embodiment, broadly falls into the scope of protection of the invention.
It should be noted that when assembly is referred to as " being fixed on " another assembly, and it can be directly on another assembly Or assembly placed in the middle can also be there is.When an assembly is considered as " connection " another assembly, and it can be to be directly connected to To another assembly or may be simultaneously present assembly placed in the middle.When an assembly is considered as " being arranged at " another assembly, it Can be to be set directly on another assembly or may be simultaneously present assembly placed in the middle.Term as used herein is " vertical ", " level ", "left", "right" and similar statement for illustrative purposes only.
Unless otherwise defined, all of technology used herein and scientific terminology and the technical field belonging to the present invention The implication that technical staff is generally understood that is identical.The term used the most in the description of the invention is intended merely to describe tool The purpose of the embodiment of body, it is not intended that in limiting the present invention.Term as used herein " and/or " include one or more phase Arbitrary and all of combination of the Listed Items closed.
Referring to Fig. 1, embodiment of the present invention provides a kind of supporting construction 100 protecting lane for gob side entry retaining, including many Root anchor pole 2 and frame 4.
Described many anchor poles 2 are spaced along the width in tunnel 200 and are located at the top in tunnel 200.In the present embodiment, Described many anchor poles 2 include strengthening anchor pole 24 and Duo Gen support anchor rod 22.Many support anchor rods 22 equidistantly distribute;Strengthen anchor pole 24 are located between adjacent two piece support anchor rod 22, and are positioned at tunnel 200 central region in the direction of the width, to strengthen anchor pole The supporting effect of 2.
In the present embodiment, described supporting construction 100 also includes that tunnel 200 is located at by two anchor cables 8, each anchor cable 8 Top and between two adjacent support anchor rods 22.The setting of anchor cable 8 can improve the globality of rock mass, efficiently controls The displacement of rock mass, promotees to stabilize it.
Described frame 4 includes back timber 42 and canopy lower limb 44.In the present embodiment, described back timber 42 is U-shaped steel, and its length is slightly More than the half of tunnel 200 width, more full canopy frame support structure decreases the length of back timber 42, has saved cost.Described back timber 42 extend along the width in tunnel 200, and one end of described back timber 42 is positioned at goaf side sideline, another of described back timber 42 Hold and be connected with reinforcement anchor pole 24;Described back timber 42 supports the top board 210 in tunnel 200.Back timber 42 is connected with anchor pole 2, and frame is tied Structure and anchor structure are organically combined into entirety, and therefore, back timber 42 and anchor pole 2 the most individually work, but with an entirety Interact, add the supporting construction 100 supporting area to top board 210, and can effectively prevent top board 210 and supporting construction 100 laterally there is relative displacement, and depending merely on anchor pole under the conditions of solving loose roof can not the asking of controlroof 210 stability completely Topic, keeps the stability of top board 210 rock stratum.
Described canopy lower limb 44 one end is installed in the base plate 230 in tunnel 200, and the other end and described back timber 42 are near goaf 300 End connect.The support action utilizing canopy lower limb 44 can crush sillar to goaf 300 side inbreak top board 210 to be stopped, Prevent sillar from channeling in tunnel 200.In the present embodiment, described canopy lower limb 44 is connected by two single u-shaped steel and forms, two single u-shaped steel Connected by fastening clamp 5, to regulate the height of canopy lower limb 44.During use, described canopy lower limb 44 uses special prop raising tool, and (figure is not Show) rise tightly make the setting load of canopy lower limb 44 reach design load.
In the present embodiment, described supporting construction 100 also includes pushing up net (not shown) and gear cash net 6.Described top net laying Being located at the top in tunnel 200, described gear cash net 6 is located between canopy lower limb 44 and the crag in goaf, and overlaps with described top net, Stop with the little sillar that goaf side is loosened, prevent loosening little sillar and channel in tunnel 200.Preferably, described gear cash The height of net 6 is more than the height in described tunnel 200, so that the side that described gear cash net 6 is netted away from described top mops floor, to avoid Loosen little sillar to scurry in tunnel 200 from the gap of gear cash net 6 and tunnel 200 base plate 230.Preferably, described gear cash net 6 is Diamond mesh, the rock that goaf side is in small, broken bits can not only be stopped, and can provide certain by diamond mesh Supporting power, improves the force-bearing situation of rock stratum, surface, tunnel 200.
In the present embodiment, described back timber 42 is more than the position in the range of top board 210 work surface periodic weighting step pitch also Erection has hydraulic prop 7, with strengthening supporting.It is appreciated that and exceedes dismountable list after top board 210 periodic weighting coverage Body hydraulic prop 7.
The present invention also provides for a kind of method for protecting support for gob side entry retaining, comprises the following steps:
Above-mentioned supporting construction 100 is provided;
Anchor pole 2, anchor cable 8, top net supporting is carried out at the top in tunnel 200;
Lay gear cash net 6 in tunnel 200 near goaf side, and make to keep off side and the top net overlap joint of cash net 6;
Being connected with strengthening anchor pole 24 one end of described back timber 42, the other end is located at goaf side sideline so that described Back timber 42 supports the top board 210 in described tunnel 200;
Described canopy lower limb 44 one end is installed in the base plate 230 in tunnel 200, the other end and described back timber 42 near goaf The end of 300 connects.
It is appreciated that the length direction along tunnel 200 can be spaced and multiple supporting construction 100 is set.
Being appreciated that the quantity of anchor cable 8 is not limited to present embodiment, in other embodiments, the quantity of anchor cable 8 also may be used Think two or more.
It is appreciated that the length of described back timber 42 is not limited to present embodiment, as long as described back timber 42 length is less than described The width in tunnel 200.
Described above is the detailed description for the preferable possible embodiments of the present invention, but embodiment is not limited to this Bright patent claim, the equal change completed under the technical spirit suggested by all present invention or modification change, all should belong to In the contained the scope of the claims of the present invention.

Claims (10)

1. the supporting construction protecting lane for gob side entry retaining, it is characterised in that: include frame and many anchor poles, described many anchors Bar is spaced along the width in tunnel and is located at the top in tunnel, and described frame includes back timber and canopy lower limb, and described back timber is along tunnel Width extends, and one end of described back timber is positioned at goaf side sideline, described back timber away from the one end in goaf with described Anchor pole connects, and described back timber supports the top board in described tunnel;Described canopy lower limb one end is installed in the base plate in tunnel, and the other end is with described Back timber connects near the end in goaf.
2. supporting construction as claimed in claim 1, it is characterised in that: described supporting construction also includes pushing up net and gear cash net, institute State top net laying and be located at the top in tunnel;Described gear cash network folder is located between canopy lower limb and the crag in goaf, and takes with described top net Connect.
3. supporting construction as claimed in claim 2, it is characterised in that: the height of described gear cash net is more than the height in described tunnel Degree.
4. supporting construction as claimed in claim 2, it is characterised in that: described gear cash net is rhombus net.
5. supporting construction as claimed in claim 1, it is characterised in that: described canopy lower limb is connected by two single u-shaped steel and forms, two U Shaped steel is connected by fastening clamp.
6. supporting construction as claimed in claim 1, it is characterised in that: described back timber is U-shaped steel, a length of lane of described back timber The half of road width.
7. supporting construction as claimed in claim 6, it is characterised in that: described many anchor poles include strengthening anchor pole and many supportings Anchor pole, described many support anchor rods equidistantly distribute;Described reinforcement anchor pole is located between adjacent two support anchor rod, and is positioned at The central region in tunnel, described back timber is connected with described reinforcement anchor pole away from the one end in goaf.
8. supporting construction as claimed in claim 1, it is characterised in that: described back timber is more than top board work surface periodic weighting step pitch In the range of position also set up hydraulic prop, with strengthening supporting.
9. supporting construction as claimed in claim 1, it is characterised in that: described supporting construction also includes at least two anchor cables, often One anchor cable is located at the top in tunnel and between two adjacent anchor poles.
10., for a method for protecting support for gob side entry retaining, comprise the following steps:
Thering is provided one to protect the supporting construction in lane for gob side entry retaining, described supporting construction includes frame and many anchor poles, described frame Including back timber and canopy lower limb;
Described many anchor poles interval is located at the top in tunnel, so that tunnel is carried out suspension roof support;
Being connected with described anchor pole one end of described back timber, the other end is located at goaf side sideline so that described back timber supports The top board in described tunnel;
Described canopy lower limb one end is installed in the base plate in tunnel, by the other end of described canopy lower limb and the described back timber end near goaf Portion connects.
CN201610738696.7A 2016-08-26 2016-08-26 A kind of supporting construction and method for protecting support thereof protecting lane for gob side entry retaining Pending CN106121676A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610738696.7A CN106121676A (en) 2016-08-26 2016-08-26 A kind of supporting construction and method for protecting support thereof protecting lane for gob side entry retaining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610738696.7A CN106121676A (en) 2016-08-26 2016-08-26 A kind of supporting construction and method for protecting support thereof protecting lane for gob side entry retaining

Publications (1)

Publication Number Publication Date
CN106121676A true CN106121676A (en) 2016-11-16

Family

ID=57275405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610738696.7A Pending CN106121676A (en) 2016-08-26 2016-08-26 A kind of supporting construction and method for protecting support thereof protecting lane for gob side entry retaining

Country Status (1)

Country Link
CN (1) CN106121676A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868833A (en) * 2018-06-29 2018-11-23 河南理工大学 A method of it carries out cutting gob side entry retaining in the relieving roadway of top in U-shaped steel supported laneway
CN109026094A (en) * 2018-07-20 2018-12-18 河北充填采矿技术有限公司 A kind of auxiliary shoring device and method for protecting support that back inclination angle is adaptive
CN109632167A (en) * 2019-02-11 2019-04-16 鞍钢集团矿业有限公司 Rock mass stress monitoring device and monitoring method inside bare ground
CN110578540A (en) * 2019-09-09 2019-12-17 辽宁工程技术大学 Mining L shaped steel column shoes
CN114704324A (en) * 2022-03-28 2022-07-05 中国矿业大学 Gangue blocking tray and non-roadside filling gob-side entry retaining goaf side cooperative control structure
CN114718594A (en) * 2021-11-10 2022-07-08 中国矿业大学 Slow-inclination loose coal seam roadway roof and two-side anchoring structure and construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2007577C1 (en) * 1990-11-26 1994-02-15 Акционерное общество открытого типа по добыче и переработке угля "Гуковуголь" Method of guarding of workings in heaving soils
CN101761338A (en) * 2010-03-13 2010-06-30 中国矿业大学 Gob-side entry retaining method of a solid filling coal mining half-section one-leg shed
CN103758529A (en) * 2013-12-28 2014-04-30 北京昊华能源股份有限公司 Coal mine gob-side entry retaining side supporting method
CN203978443U (en) * 2014-04-30 2014-12-03 贵州永润煤业有限公司 A kind of suspension device of gob side entry retaining
CN104533419A (en) * 2014-12-16 2015-04-22 湖南科技大学 Method for partial recovery of residual coal from wide coal pillar
CN104929666A (en) * 2015-04-30 2015-09-23 中国矿业大学 Top breaking gob-side entry retaining method for tender roofs
CN205349380U (en) * 2016-02-03 2016-06-29 山西古县老母坡煤业有限公司 Prevent whole crest truncation support of gob entry pucking
CN206000543U (en) * 2016-08-26 2017-03-08 百色百矿集团有限公司 A kind of supporting construction protecting lane for gob side entry retaining

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2007577C1 (en) * 1990-11-26 1994-02-15 Акционерное общество открытого типа по добыче и переработке угля "Гуковуголь" Method of guarding of workings in heaving soils
CN101761338A (en) * 2010-03-13 2010-06-30 中国矿业大学 Gob-side entry retaining method of a solid filling coal mining half-section one-leg shed
CN103758529A (en) * 2013-12-28 2014-04-30 北京昊华能源股份有限公司 Coal mine gob-side entry retaining side supporting method
CN203978443U (en) * 2014-04-30 2014-12-03 贵州永润煤业有限公司 A kind of suspension device of gob side entry retaining
CN104533419A (en) * 2014-12-16 2015-04-22 湖南科技大学 Method for partial recovery of residual coal from wide coal pillar
CN104929666A (en) * 2015-04-30 2015-09-23 中国矿业大学 Top breaking gob-side entry retaining method for tender roofs
CN205349380U (en) * 2016-02-03 2016-06-29 山西古县老母坡煤业有限公司 Prevent whole crest truncation support of gob entry pucking
CN206000543U (en) * 2016-08-26 2017-03-08 百色百矿集团有限公司 A kind of supporting construction protecting lane for gob side entry retaining

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868833A (en) * 2018-06-29 2018-11-23 河南理工大学 A method of it carries out cutting gob side entry retaining in the relieving roadway of top in U-shaped steel supported laneway
CN109026094A (en) * 2018-07-20 2018-12-18 河北充填采矿技术有限公司 A kind of auxiliary shoring device and method for protecting support that back inclination angle is adaptive
CN109632167A (en) * 2019-02-11 2019-04-16 鞍钢集团矿业有限公司 Rock mass stress monitoring device and monitoring method inside bare ground
CN110578540A (en) * 2019-09-09 2019-12-17 辽宁工程技术大学 Mining L shaped steel column shoes
CN114718594A (en) * 2021-11-10 2022-07-08 中国矿业大学 Slow-inclination loose coal seam roadway roof and two-side anchoring structure and construction method
CN114704324A (en) * 2022-03-28 2022-07-05 中国矿业大学 Gangue blocking tray and non-roadside filling gob-side entry retaining goaf side cooperative control structure

Similar Documents

Publication Publication Date Title
CN106121676A (en) A kind of supporting construction and method for protecting support thereof protecting lane for gob side entry retaining
CN206000543U (en) A kind of supporting construction protecting lane for gob side entry retaining
CN103397906B (en) Slip casting type filling counterfort, construction process and Filling mine-out area system, placement method
CN101761338B (en) Gob-side entry retaining method of a solid filling coal mining half-section one-leg shed
CN101338679B (en) Deep well great section loose wall rock laneway support method
CN102661169B (en) Gob-side entry retaining method for anchor bolt network gangue bag wall body for coal mining without pillars
CN104061001B (en) Gob side entry retaining exploitation support process method
CN108316941B (en) Broken surrounding rock and soft rock roadway U-shaped steel canopy supporting method
CN103061788A (en) Loose broken tunnel top plate reinforcing and supporting method
CN104047613A (en) Method for anchoring coal mine tunnel bottom plate
CN106593467A (en) Supporting method for underground soft rock roadway of coal mine
CN103075170A (en) Method for controlling surrounding rock deformation of gateway subjected to repeated overhead mining by using hollow grouting anchor cable
CN109026099A (en) A kind of soft-rock tunnel full length fastening supporting construction and its construction method
CN104074534B (en) A kind of combining adopts/the gob-side entry retaining method of fully mechanized coal face
CN205172609U (en) Asymmetric supporting device in tunnel
CN205858371U (en) A kind of colliery big cross section digging laneway combined support structure
CN105649091A (en) High slope support method and structure
CN109578032A (en) A kind of high stress breaking surrounding rock chamber reinforcement means
CN106870001B (en) Tunnel is layered pocket type self-support filling counterfort construction method
CN107939419A (en) A kind of tunnel U-shaped steel covers canopy supporting construction
CN208456648U (en) A kind of soft-rock tunnel full length fastening supporting construction
CN203066986U (en) Composite truss for coal-rock roadway roof support
CN207987930U (en) One kind exempting from precipitation foundation pit supporting construction
CN204023587U (en) A kind of novel environment friendly slope reinforcement structure
CN207620820U (en) A kind of breaking surrounding rock and soft-rock tunnel U-shaped steel cover canopy supporting construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161116

RJ01 Rejection of invention patent application after publication