CN104763005A - Large steel spherical tank inclination rectification method - Google Patents

Large steel spherical tank inclination rectification method Download PDF

Info

Publication number
CN104763005A
CN104763005A CN201510117756.9A CN201510117756A CN104763005A CN 104763005 A CN104763005 A CN 104763005A CN 201510117756 A CN201510117756 A CN 201510117756A CN 104763005 A CN104763005 A CN 104763005A
Authority
CN
China
Prior art keywords
support leg
foundation concrete
lifting
jack
spherical tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510117756.9A
Other languages
Chinese (zh)
Inventor
赵兴品
肖立生
谢文鹏
姜旭民
焦乐辉
李文博
李东泗
李明
刘艳春
巩克峰
向东
刘世同
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Water Resources Research Institute of Shandong Province
Original Assignee
Water Resources Research Institute of Shandong Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Water Resources Research Institute of Shandong Province filed Critical Water Resources Research Institute of Shandong Province
Priority to CN201510117756.9A priority Critical patent/CN104763005A/en
Publication of CN104763005A publication Critical patent/CN104763005A/en
Pending legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a large steel spherical tank inclination rectification method. The method comprises 1) welding corbels on the two sides of support leg ear plates except a highest support leg to form supporting points; 2) measuring the lifting amount of the support legs with the highest support leg serving as the reference point; 3) selecting the lifting capacity and the largest lifting amount of spiral jacks; 4) loosening foundation bolts, putting the jacks between a foundation concrete bearing platform and the corbels symmetrically, performing jacking from the lowest support legs, and performing jacking by changing to the adjacent two-side support legs for every six time of rod pressing till the support legs reach the required lifting amount; 5) filling gaps between support leg bottom plates and the foundation concrete bearing platform with steel plates after the preset lifting amounts of the support legs are all reached, and performing spot welding on the support plates and the foundation concrete bearing platform; 6) erecting formwork on the upper portion of the foundation concrete bearing platform to be subjected to grouting pouring; cutting off the corbels on the support legs. By the aid of the method, the corbels are clamped welded and jacked on the support leg ear plates to create supporting points to form an equilibrium force system on the foundation concrete bearing platform, and accordingly, the method is safe and reliable, simple and convenient to operate, low in cost and high in efficiency.

Description

Large-sized steel spherical tank inclination correction method
Technical field
The present invention relates to a kind of large-sized steel spherical tank inclination correction method, belong to chemical industry, oil, water conservancy, building rectification technical field.
Background technology
Large-sized steel spherical tank is in During Process of Long-term Operation, and due to reasons such as damp sink of foundation, vibrating load, earthquakes, ground there will be differential settlement, then spherical tank can tilt, if correct not in time, partial structurtes distortion and stress will be brought to concentrate to tank body, produce potential safety hazard.Current inclination correction method mainly contains " crane traction " and " construction auxiliary rack " reaches rectification object.Have following shortcoming in this rectification implementation process: 1) crane drawing method is by the limitation in place, during traction, Uplifting amount is difficult to control, and has uncertain factor in process, and safety is difficult to ensure; 2) building auxiliary rack method is around tank body, scaffold erecting and set up counter-force platform.Consuming time many, costly, effect is extremely low.
Summary of the invention
Technical problem to be solved by this invention is the defect existed for prior art, provides a kind of large-sized steel spherical tank inclination correction method.
For solving this technical problem, the invention provides a kind of large-sized steel spherical tank inclination correction method, the whole tank body of involved large-sized steel spherical tank is supported on ten foundation concrete cushion caps by ten support leg, specifically comprises the steps:
1) weld bracket: find out the highest support leg, all the other nine support leg chosen beyond the highest support leg are respectively welded bracket respectively and are formed the strong point in the both sides of its otic placode; Adopt built-up welding welding manner between described otic placode and bracket, bead-on-plate weld length is not less than 20cm and reaches full weld;
2) measurement of the level: with the highest support leg for reference point, measures the Uplifting amount that each support leg needs;
3) jack is selected: select reliable and stable screw jack, weight and step 2 according to spherical tank) measured by the maximum Uplifting amount of support leg, choose the lifting capacity of jack and maximum lifting height and minimum altitude, each support leg arranges two jack;
4) lifting rectification: first releasably foot bolt, between each foundation concrete cushion cap and bracket, symmetry places two jack; First to minimum support leg jacking, the depression bar jacking simultaneously of two jack in each support leg, every depression bar pauses once for six times, and the support leg changing adjacent both sides into continues jacking, and same depression bar pauses once for six times, by that analogy; Return minimum support leg jacking, circulate successively, until each support leg all reaches the height needing lifting;
5) cushion block spot welding: reach the height of predetermined lifting in each support leg after, support leg base plate bottom support leg and height of formation space not etc. between foundation concrete cushion cap, with steel plate or bloom, this space is filled out tightly, measure again once, confirm levelling after by firm for the steel slide plate spot welding on this steel plate or bloom and foundation concrete cushion cap;
6) grouting material builds cushion cap: measure once before grouting material is built again, if any injustice, repeat preceding step 2) ~ 5), confirm levelling after, on foundation concrete cushion cap top, formwork grouting material is built, and fills up the vacancy position of foundation concrete cushion cap; After having built, slice off the bracket in each support leg.
Described bracket shape is right-angled trapezium, and employing thickness is that the Q345 steel plate of 20mm is made, and its two ends size is respectively 200mm and 60mm, and height is 320mm, and large end is welded on otic placode (2); Selection of electrodes E50.
The specification of described screw jack is specification QLD25, and lifting capacity is 25t, and lifting altitude is 125mm, minimum altitude 262mm.
Beneficial effect: the present invention is on the otic placode of spherical tank support column, and folder weldering two panels steel plate forms a little jacking bracket construction strong point, jacking counter-force is acted on pillar concrete cushion cap simultaneously, forms a balanced system of force, overcome the shortcoming of current additive method.The present invention is safe and reliable, easy and simple to handle, expense is low, efficiency is high, and 2-3 people just can complete the rectification workload of spherical tank ten support leg for one day.
Accompanying drawing explanation
Fig. 1 is enforcement schematic diagram of the present invention.
In figure: 1 support leg, 2 otic placodes, 3 brackets, 4 jack, 5 foundation concrete cushion caps, 6 support leg base plates, 7 stone bolt, 8 spherical tanks.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is specifically described.
Figure 1 shows that enforcement schematic diagram of the present invention.
The whole tank body of the large-sized steel spherical tank 8 that the present invention relates to is supported on ten foundation concrete cushion caps 5 by ten support leg 1, on the otic placode 2 of support leg 1, folder weldering two panels steel plate forms a little jacking bracket 3 and builds the strong point, jacking counter-force is acted on pillar concrete cushion cap 5 simultaneously, form a balanced system of force, specifically comprise the steps:
1) bracket is welded: find out the highest support leg, all the other nine support leg 1 chosen beyond the highest support leg are respectively welded bracket 3 in the both sides of its otic placode 2 respectively and formed the strong point; Adopt built-up welding welding manner between described otic placode 2 and bracket 3, bead-on-plate weld length is not less than 20cm and reaches full weld;
2) measurement of the level: with the highest support leg for reference point, measures the Uplifting amount that each support leg 1 needs;
3) jack is selected: select reliable and stable screw jack, weight and step 2 according to spherical tank 8) measured by the maximum Uplifting amount of support leg 1, choose the lifting capacity of jack 4 and maximum lifting height and minimum altitude, each support leg 1 arranges two jack 4;
4) lifting rectification: first releasably foot bolt 7, between each foundation concrete cushion cap 5 and bracket 3, symmetry places two jack 4; First to minimum support leg 1 jacking, the depression bar jacking simultaneously of two jack in each support leg 1, every depression bar pauses once for six times, and the support leg 1 changing adjacent both sides into continues jacking, and same depression bar pauses once for six times, by that analogy; Return minimum support leg jacking, circulate successively, until each support leg 1 all reaches the height needing lifting;
5) cushion block spot welding: after each support leg 1 reaches the height of predetermined lifting, support leg base plate 6 bottom support leg 1 and height of formation space not etc. between foundation concrete cushion cap 5, with steel plate or bloom, this space is filled out tightly, measure again once, confirm levelling after by firm for the steel slide plate spot welding on this steel plate or bloom and foundation concrete cushion cap 5;
6) grouting material builds cushion cap: measure once before grouting material is built again, if any injustice, repeat preceding step 2) ~ 5), confirm levelling after, on foundation concrete cushion cap 5 top, formwork grouting material is built, and fills up the vacancy position of foundation concrete cushion cap 5; After having built, slice off the bracket 3 in each support leg.
Described bracket 3 shape is right-angled trapezium, and employing thickness is that the Q345 steel plate of 20mm is made, and its two ends size is respectively 200mm and 60mm, and height is 320mm, and large end is welded on otic placode 2, and reaction support is on foundation concrete cushion cap 5; Selection of electrodes E50.
The specification of described screw jack 4 is specification QLD25, and lifting capacity is 25t, and lifting altitude is 125mm, minimum altitude 262mm.
The present invention is on the otic placode of spherical tank support column, and folder weldering two panels steel plate forms a little jacking bracket construction strong point, jacking counter-force is acted on pillar concrete cushion cap simultaneously, forms a balanced system of force, overcome the shortcoming of current additive method.The present invention is safe and reliable, easy and simple to handle, expense is low, efficiency is high, and 2-3 people just can complete the rectification workload of spherical tank ten support leg for one day.
The above-mentioned embodiment of the present invention, just illustrates, is not only, and the change within the scope of the present invention all or equivalent scope of the present invention is all surrounded by the present invention.

Claims (3)

1. a large-sized steel spherical tank inclination correction method, the whole tank body of involved large-sized steel spherical tank (8) is supported on ten foundation concrete cushion caps (5) by ten support leg (1), it is characterized in that, specifically comprises the steps:
1) weld bracket: find out the highest support leg, all the other nine support leg (1) chosen beyond the highest support leg are respectively welded bracket (3) respectively and are formed the strong point in the both sides of its otic placode (2); Adopt built-up welding welding manner between described otic placode (2) and bracket (3), bead-on-plate weld length is not less than 20cm and reaches full weld;
2) measurement of the level: with the highest support leg for reference point, measures the Uplifting amount that each support leg (1) needs;
3) jack is selected: select reliable and stable screw jack, weight and step 2 according to spherical tank (8)) measured by the maximum Uplifting amount of support leg (1), choose the lifting capacity of jack (4) and maximum lifting height and minimum altitude, each support leg (1) arranges two jack (4);
4) lifting rectification: first releasably foot bolt (7), between each foundation concrete cushion cap (5) and bracket (3), symmetry places two jack (4); First to minimum support leg (1) jacking, the depression bar jacking simultaneously of two jack in each support leg (1), every depression bar pauses once for six times, and the support leg (1) changing adjacent both sides into continues jacking, same depression bar pauses once for six times, by that analogy; Return minimum support leg jacking, circulate successively, until each support leg (1) all reaches the height needing lifting;
5) cushion block spot welding: after each support leg (1) reaches the height of predetermined lifting, be positioned at height of formation space not etc. between the support leg base plate (6) of support leg (1) bottom and foundation concrete cushion cap (5), with steel plate or bloom, this space is filled out tightly, measure again once, confirm levelling after by firm for the steel slide plate spot welding on this steel plate or bloom and foundation concrete cushion cap (5);
6) grouting material builds cushion cap: measure once before grouting material is built again, if any injustice, repeat preceding step 2) ~ 5), confirm levelling after, on foundation concrete cushion cap (5) top, formwork grouting material is built, and fills up the vacancy position of foundation concrete cushion cap (5); After having built, slice off the bracket (3) in each support leg.
2. large-sized steel spherical tank inclination correction method according to claim 1, it is characterized in that: described bracket (3) shape is right-angled trapezium, employing thickness is that the Q345 steel plate of 20mm is made, its two ends size is respectively 200mm and 60mm, height is 320mm, and large end is welded on otic placode (2); Selection of electrodes E50.
3. large-sized steel spherical tank inclination correction method according to claim 1 and 2, is characterized in that: the specification of described screw jack (4) is specification QLD25, and lifting capacity is 25t, and lifting altitude is 125mm, minimum altitude 262mm.
CN201510117756.9A 2015-03-18 2015-03-18 Large steel spherical tank inclination rectification method Pending CN104763005A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510117756.9A CN104763005A (en) 2015-03-18 2015-03-18 Large steel spherical tank inclination rectification method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510117756.9A CN104763005A (en) 2015-03-18 2015-03-18 Large steel spherical tank inclination rectification method

Publications (1)

Publication Number Publication Date
CN104763005A true CN104763005A (en) 2015-07-08

Family

ID=53645072

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510117756.9A Pending CN104763005A (en) 2015-03-18 2015-03-18 Large steel spherical tank inclination rectification method

Country Status (1)

Country Link
CN (1) CN104763005A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119260A (en) * 2019-12-26 2020-05-08 杭州敦固建筑特种工程有限公司 Deviation rectifying method applying dynamic monitoring and dynamic reinforcement
CN113818500A (en) * 2021-09-14 2021-12-21 杭州圣基建筑特种工程有限公司 Integral lifting and inclination-correcting construction method for high-rise building foundation and structure

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2195532C1 (en) * 2002-05-14 2002-12-27 Научно-производственная фирма "Интербиотех" Gear to correct position of building or structure
JP2005133417A (en) * 2003-10-30 2005-05-26 Jukankyo Sekkeishitsu:Kk Lifting device for building foundation, lifting method for building foundation using the same, and method of correcting sunk building foundation
CA2618521A1 (en) * 2008-01-24 2009-07-24 Monty Wensel Method and apparatus for raising buildings
CN101939493A (en) * 2007-12-31 2011-01-05 So.L.E.S.-索西埃塔拉沃里埃迪利赛培托伊公司 Method and system for raising a building structure
CN103669431A (en) * 2013-11-18 2014-03-26 国家电网公司 Device for adjusting inclined steel pylon in mining area of coal mine
CN103669432A (en) * 2013-11-18 2014-03-26 国家电网公司 Jacking device for deviation rectification of steel pylon in mining area of coal mine
CN103938663A (en) * 2013-10-29 2014-07-23 国家电网公司 Correction device of inclined power transmission tower made of signal-splicing steel angle principal material

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2195532C1 (en) * 2002-05-14 2002-12-27 Научно-производственная фирма "Интербиотех" Gear to correct position of building or structure
JP2005133417A (en) * 2003-10-30 2005-05-26 Jukankyo Sekkeishitsu:Kk Lifting device for building foundation, lifting method for building foundation using the same, and method of correcting sunk building foundation
CN101939493A (en) * 2007-12-31 2011-01-05 So.L.E.S.-索西埃塔拉沃里埃迪利赛培托伊公司 Method and system for raising a building structure
CA2618521A1 (en) * 2008-01-24 2009-07-24 Monty Wensel Method and apparatus for raising buildings
CN103938663A (en) * 2013-10-29 2014-07-23 国家电网公司 Correction device of inclined power transmission tower made of signal-splicing steel angle principal material
CN103669431A (en) * 2013-11-18 2014-03-26 国家电网公司 Device for adjusting inclined steel pylon in mining area of coal mine
CN103669432A (en) * 2013-11-18 2014-03-26 国家电网公司 Jacking device for deviation rectification of steel pylon in mining area of coal mine

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
周万发: "《2万m³浮顶罐局部顶起纠偏法》", 《石油工程建设》, no. 5, 31 May 1995 (1995-05-31), pages 10 - 14 *
徐至钧: "《顶升调正法纠正大型贮罐的不均匀沉降》", 《石油施工技术》, no. 4, 30 April 1983 (1983-04-30), pages 18 - 22 *
杨忠义: "《罐体顶升充砂法处理大型储罐倾斜工程实践》", 《石油化工设备技术》, vol. 27, no. 5, 31 December 2006 (2006-12-31), pages 21 - 24 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119260A (en) * 2019-12-26 2020-05-08 杭州敦固建筑特种工程有限公司 Deviation rectifying method applying dynamic monitoring and dynamic reinforcement
CN113818500A (en) * 2021-09-14 2021-12-21 杭州圣基建筑特种工程有限公司 Integral lifting and inclination-correcting construction method for high-rise building foundation and structure

Similar Documents

Publication Publication Date Title
CN102733316B (en) Integral synchronous rotary jacking construction method for small radius horizontal curved bridge
CN104110035A (en) Perpendicularity correcting device for concrete-filled steel tube columns constructed by top-down process and construction method implemented by perpendicularity correcting device
CN206233276U (en) A kind of pretest pile static pressure bringing device
CN204510005U (en) A kind of Coping Construction operating platform
CN105317052B (en) Tower crane foundation bolt fixing method
CN101839029A (en) Method for opening holes on self-balancing load bearing wall
CN104878786B (en) Tiltedly orthogonal is for group's Pile-soil-structure Interaction experimental model
CN106351462A (en) Temporary steel pipe supported prestressed reinforcement structure and construction method thereof
CN107524096A (en) A kind of continuous girders by suspension grouting 0# blocks cast-in-place support and erection method
KR101567628B1 (en) The jackup device for the extension and floor increase
CN104328810A (en) Improved method for detecting bearing capacity of precast pipe-pile single-pile foundation
CN110409624A (en) A kind of installation of large scale equipment and main structure be inverse to be made to calculate and construction method
CN104763005A (en) Large steel spherical tank inclination rectification method
CN104790299B (en) Internal-span unsupported convenient construction support and method for bridge cast-in-place box beam
CN108005132B (en) Compressive Bearing Capacity of Single Pile detection device and from anchor test method
CN104563525B (en) A kind of box steel arch beam Integral horizontal type group is to method
CN212336080U (en) Assembled tower crane foundation structure
CN109930858A (en) A kind of method and apparatus in building integral jacking bottom transformation market
CN204753656U (en) A clump of piles - soil - structure interact experimental model directly replaces to one side
CN107587770A (en) Disjunctor storehouse synchronization slding form operation method
CN214883824U (en) Pre-leveling tower foundation
CN101831969B (en) Method for opening cave in self-balancing type supporting and load bearing wall body
CN113293790B (en) Pre-leveling tower foundation and leveling construction method thereof
TWM510942U (en) Precasted concrete foundation for upright shape steel post
CN214328534U (en) 0# block bracket pre-pressing device of continuous rigid frame bridge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150708

RJ01 Rejection of invention patent application after publication