CN107587770A - Disjunctor storehouse synchronization slding form operation method - Google Patents

Disjunctor storehouse synchronization slding form operation method Download PDF

Info

Publication number
CN107587770A
CN107587770A CN201710906228.0A CN201710906228A CN107587770A CN 107587770 A CN107587770 A CN 107587770A CN 201710906228 A CN201710906228 A CN 201710906228A CN 107587770 A CN107587770 A CN 107587770A
Authority
CN
China
Prior art keywords
sliding
oil circuit
support body
operation method
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710906228.0A
Other languages
Chinese (zh)
Inventor
江春明
匡怡菁
黄俊杰
潘鸿
李建华
蒋峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongyifeng Construction Group Co Ltd
Original Assignee
Zhongyifeng Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongyifeng Construction Group Co Ltd filed Critical Zhongyifeng Construction Group Co Ltd
Priority to CN201710906228.0A priority Critical patent/CN107587770A/en
Publication of CN107587770A publication Critical patent/CN107587770A/en
Pending legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a kind of disjunctor storehouse synchronization slding form operation method; it is characterized in that; basis, which designs and produces, first measures unwrapping wire and then installation sliding formwork support body, operating platform, hydraulic lifting system, insertion support bar; complete whole sliding formwork installation; carry out concrete placings again and sliding formwork is sliding, last top specified location is stopped sliding, sliding formwork and removed;The sliding formwork support body is by symmetrical assembled, and the material on support body is evenly arranged, and door frame and jack are equidistantly evenly arranged along around silo, and all directions are arranged symmetrically;It is described install the operating platform in install spider in each silo, each silo inwall is integral by gaily decorated basket screw rod welding drawing fixation shape with spider.The present invention is easy for construction, shortens the construction period in disjunctor storehouse, ensure that the quality in disjunctor storehouse.

Description

Disjunctor storehouse synchronization slding form operation method
Technical field
The invention belongs to Group Buildings field of engineering technology, and in particular to a kind of disjunctor storehouse synchronization slding form operation method.
Background technology
Silo is more common in the industries such as factories and miness, grain, cement, one of main storage facilities as goods and materials in bulk, with society Meeting expanding economy, the rapid expansion of scale, single silo can not meet enterprise demand, and disjunctor storehouse is used as and mixed by many Interconnected large warehoused facility together of solidifying native silo (generally round storehouse), tangent occlusion between their bulkhead, is connected Socket part position shares bulkhead.This engineering occupied ground if using monotubular flowing water, full hall scaffold over-form construction is big, template demand Amount is big, and long construction period, efficiency are low, and quality is also difficult to ensure that, is then most economical, most rational side using synchronous slding form operation Method, its mechanization degree is high, labor intensity is low, can continuous operation, construction quality is high, cost is low.And in synchronous slding form operation When then require that all silos are simultaneously sliding, the stability of oil pressure, disjunctor storehouse sliding formwork support body to each silo hydraulic circuit and antitorque Property, the concrete property poured etc. require at a relatively high.
The content of the invention
The technical problems to be solved by the invention are:A kind of disjunctor storehouse synchronization slding form operation method, easy for construction, matter are provided Amount is stable, and structure is safe and reliable, accelerates the duration progress in disjunctor storehouse.
In order to reach above-mentioned technique effect, the technical solution adopted by the present invention is:
A kind of disjunctor storehouse synchronization slding form operation method, it is characterised in that comprise the following steps that:
S1. surveying setting-out, basis design and produce scheme and measured, and find out center line and unwrapping wire;
S2., sliding formwork support body is installed:On the basis of surveying setting-out install hoisting frame, inside and outside enclosure, and colligation vertical reinforcement and Horizontal reinforcement below hoisting frame crossbeam, then assembled formwork, installs jack, forms sliding formwork support body;
S3. install the operating platform:Platform is set on the basis of sliding formwork support body, and mounting platform is safeguarded column and built inside and outside Platform, spider and pull bar are installed, lay landing slab;
S4., hydraulic lifting system is installed:Hydraulic control panel and hydraulic press are installed, are laid out oil circuit, oil circuit is connected jack And hydraulic press;
S5. support bar is inserted:Support bar is inserted on jack;
S6. concrete placings and sliding formwork are sliding:
S7. top specified location stops sliding;
S8. sliding formwork is removed;
By symmetrical assembled, the material on support body is evenly arranged sliding formwork support body in the installation sliding formwork support body, door frame and very heavy Top is equidistantly evenly arranged along around silo, and all directions are arranged symmetrically;It is described install the operating platform in pacify in each silo If spider, each silo inwall is integral by the fixed shape of gaily decorated basket screw rod welding drawing with spider.
Further, the installation hydraulic lifting system includes the approximate consistent jack of stroke being located at same group of oil circuit In, oil circuit will be positioned, worn without cross-operation area, oil circuit under being stood from door frame in leg groove to platform lower when installing, and be converged from small oil circuit Always hung to total oil circuit, annular oil circuit with iron wire in platform beams bottom.
Further, when the insertion support bar is included in insertion support bar, the assembling fork jacket on jack, support bar Upper setting limiting block, makes the traveled distance of each jack be arranged to 25mm.
Further, the concrete placings and sliding formwork are sliding including initial rise, normal sliding and final rise, and the initial rise selection is mixed Native mould unloading strength is coagulated to carry out in 0.2mpa, need to be to operation platform system, lifting system, mould when rise reaches 15cm originally Plate system and water, electric match system once check comprehensively, after checking situation without exception, are allowed for access normal sliding.
Further, the concrete placings and sliding formwork it is sliding including during whole slip to the oil circuit of hydraulic system and spacing The leveling of gear, and often lift leveling of the 200mm to the oil circuit and limiting block of hydraulic system once.
Further, the concrete placings and sliding formwork it is sliding including levelness control, degree control and correction to cylinder, Antitorque measure.
Further, the concrete placings and sliding formwork it is sliding including construction when to each component burden control of the concrete poured Controlled with the slump of concrete, the slump control is in 200-220cm;The parts by weight of each component of the concrete are matched somebody with somebody It is than control:
Compared with prior art, the beneficial effects of the invention are as follows:
First, it is evenly arranged by the material on support body, door frame and jack are equidistantly evenly arranged along around silo, and respectively Direction is arranged symmetrically, while spider is installed in each silo, and each silo inwall is welded with spider by gaily decorated basket screw rod Drawing is fixed, and being interfixed between the sliding formwork support body of adjacent two silo makes multiple silo connections integral, improves each frame The overall stability of body and support body, improve disjunctor storehouse synchronously sliding reliability.
2nd, it is easy for construction by overall slding form operation, the duration progress in disjunctor storehouse is accelerated, efficiency is improved, ensure that Construction quality.
3rd, the quality proportioning and the slump of concrete are controlled, ensure when disjunctor storehouse synchronism is sliding template and concrete it Between cohesive force it is uniform, reduce concrete binding template and sliding formwork is had an impact, ensure that disjunctor storehouse is synchronously sliding smooth.
Described above is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention, And can be practiced according to the content of specification, and in order to allow the above and other objects, features and advantages of the present invention can Become apparent, below especially exemplified by preferred embodiment, and coordinate accompanying drawing, described in detail.
Brief description of the drawings
Fig. 1 is the process chart of the present invention.
Fig. 2 is the sliding formwork door frame layout of the present invention.
Fig. 3 is vertical observation figure of the present invention.
Embodiment
A kind of as shown in figure 1, disjunctor storehouse synchronization slding form operation method, it is characterised in that comprise the following steps that:
S1. surveying setting-out, basis design and produce scheme and measured, and find out center line and unwrapping wire;
S2., sliding formwork support body is installed:On the basis of surveying setting-out install hoisting frame, inside and outside enclosure, and colligation vertical reinforcement and Horizontal reinforcement below hoisting frame crossbeam, then assembled formwork, installs jack, forms sliding formwork support body;
S3. install the operating platform:Platform is set on the basis of sliding formwork support body, and mounting platform is safeguarded column and built inside and outside Platform, spider and pull bar are installed, lay landing slab;
S4., hydraulic lifting system is installed:Hydraulic control panel and hydraulic press are installed, are laid out oil circuit, oil circuit is connected jack And hydraulic press;
S5. support bar is inserted:Support bar is inserted on jack;
S6. concrete placings and sliding formwork are sliding:
S7. top specified location stops sliding;
S8. sliding formwork is removed;
By symmetrical assembled, the material on support body is evenly arranged sliding formwork support body in the installation sliding formwork support body, door frame and very heavy Top is equidistantly evenly arranged along around silo, and all directions are arranged symmetrically;It is described install the operating platform in pacify in each silo If spider, each silo inwall is integral by the fixed shape of gaily decorated basket screw rod welding drawing with spider.
Further, the installation hydraulic lifting system includes the approximate consistent jack of stroke being located at same group of oil circuit In, oil circuit will be positioned, worn without cross-operation area, oil circuit under being stood from door frame in leg groove to platform lower when installing, and be converged from small oil circuit Always hung to total oil circuit, annular oil circuit with iron wire in platform beams bottom.
Further, when the insertion support bar is included in insertion support bar, the assembling fork jacket on jack, support bar Upper setting limiting block, makes the traveled distance of each jack be arranged to 25mm.
Further, the concrete placings and sliding formwork are sliding including initial rise, normal sliding and final rise, and the initial rise selection is mixed Native mould unloading strength is coagulated to carry out in 0.2mpa, need to be to operation platform system, lifting system, mould when rise reaches 15cm originally Plate system and water, electric match system once check comprehensively, after checking situation without exception, are allowed for access normal sliding.
Further, the concrete placings and sliding formwork it is sliding including during whole slip to the oil circuit of hydraulic system and spacing The leveling of gear, and often lift leveling of the 200mm to the oil circuit and limiting block of hydraulic system once.
Further, the concrete placings and sliding formwork it is sliding including levelness control, degree control and correction to cylinder, Antitorque measure.
Further, the concrete placings and sliding formwork it is sliding including construction when to each component burden control of the concrete poured Controlled with the slump of concrete, the slump control is in 200-220cm;The parts by weight of each component of the concrete are matched somebody with somebody It is than control:
In the present invention during synchronous slding form operation, making is designed first, surveying setting-out, finds out center line and unwrapping wire, so Sliding formwork assembling is carried out afterwards, as shown in Fig. 2 disjunctor storehouse sliding formwork support body is assembled to support in thing, North and South direction, door frame and jack edge It is evenly arranged around silo, and ensures that thing all directions are arranged symmetrically, each silo inwall is pulled with gaily decorated basket screw rod and spider, Improve the resistance to overturning of each support body.Placing of material on sliding formwork support body strictly controls, uniformly reasonable in support body platform surrounding Put, ensure together with storehouse support body uniform stressed, avoid material concentration stack and cause the inclination and torsion of support body.Sliding formwork branch Strut is supported when installing using steel pipe.Sliding formwork support body is sliding along support bar by jack.First insertion jack Support bar its length must not be less than 4 kinds, two adjacent head height differences should be not less than 1m, and sustained height upper support bar joint quantity is not More than the 1/4 of total amount.Position base case is assembled according to sliding formwork, lower floor Ku Bi is inserted in lower end.Support bar is being propped up using welding Strut should be welded, polished when welding.It should be removed in time totally if any greasy dirt.Ensure that every support bar is vertical and smooth outer surface, Ensure jack smoothly sliding and ensure the synchronism in disjunctor storehouse and climb., should be by stroke approximation unanimously thousand when jack is installed Jin top is installed in same group of oil circuit as far as possible, and it is poor to be risen with profit adjustment, and after installation, the perpendicularity of jack is checked with plumb bob.Oil Road installation before to position, avoid cross-operation area as far as possible, worn under being stood from door frame in leg groove to platform lower, from small oil circuit collect to Total oil circuit, annular oil circuit is unified to be hung in platform beams bottom with iron wire.Hydraulic control panel is located at operating platform middle position, And make rain-proof shelter covering.Hydraulic control panel before the mounting, answers test running, checks whether the rotation direction of oil pump is correct, electric bell Whether signal is sensitive, and then the end for being grouped oil circuit petroleum pipeline is connected on the oil connection of hydraulic control panel, carries out pipeline Oil-filled exhaust work.Finally, total work pressure test is carried out, is forced into 10MPa, makees 5 circulations, detailed inspection whole oil circuit.According to Pressure testing result, determine hydraulic system to, oil extraction time and operating pressure.
In concrete placings and sliding sliding formwork, the proportioning of concrete directly affects concrete quality, influences sliding formwork support body indirectly It is sliding.Flyash in concrete proportioning has bond effect, prevents concrete disintegration, but can also bond template, influences sliding formwork. For ensure concrete conveniently pour, on the other hand can guarantee that concrete trickles in time, prevent concrete concentrate and cause support body by Power is uneven.Concrete slump is preferably 200-220cm.
During concreting, the interval time poured of each layer concrete cannot be greater than the setting time of concrete, preventing Long cause that to influence disjunctor storehouse Sliding mode synchronization sliding concrete initial set bonds template because entering the mould time difference to concrete.According to day Gas situation, the support body sliding formwork time is adjusted at any time.The test block of the first mould concrete should be carried out, grasps the initial rise time;Work as concrete Mould unloading strength reaches 0.2mpa, then can initial rise., need to be to operation platform system, lifting system, mould when rise reaches 15cm originally Plate system and water, electric match system once check comprehensively, after checking situation without exception, are allowed for access normal sliding.
Before sliding first, mouth carries out temporary weld with reinforcing bar waste material to support bar and vertical reinforcement and fixed under template, Ensuring the first mould concreting to vibrate, support bar perpendicularity is unaffected, and post position is ensured in bulkhead center..
The control of levelness:
The observation of levelness uses horizontal tube, template start it is sliding before, with spirit level to each position of whole operation platform The elevation of jack is observed, smoothed, and mark is made on support bar, and will according to each hoisting depth as datum mark Horizontal line moves up.The levelness of sliding form apparatus must be observed and be checked and suitably adjusted before per tour operation.Jack is every The height of secondary lifting is controlled by limit leveling device.
Using limiting card plus cylindrical sleeve control methods:Limiting card is set on the support bar above hoisting frame, and distance is with one Hoisting depth or a secondary control are highly defined, generally 300mm or so.
The control (as shown in Figure 3) of perpendicularity:
The observation of perpendicularity uses theodolite and plumb bob method for measuring.
Plumb bob determination method:Hammer is generally 1kg again, and with No. 20 steel wires, steel wire is around on roller, is shaken coil holder and is fixed on derrick On, steel wire is by roller or is directly put down by derrick iron plate centre bore.Should be noted that during measure steel wire whether with other object phases Touch, to prevent producing illusion.It must stop sliding during measured center and carry fortune cage.
Degree control can use platform inclination method to be corrected with being oriented to correction control methods and outer force method.
The rectifying a deviation of slding form operation middle cylinder body, antitorque measure:
Slding form operation is often because load is uneven, cylinder caused by sliding asynchronous and outside (such as strong wind) reason of jack Tilt and reverse, such as occur tilting and must be acted upon in time with reversing, inclination processing method one is artificial to make platform load Laid particular stress on to inclined opposite direction;Second, make platform be tilted to inclined opposite direction during sliding, sliding one is tilted to secondary, Smoothly once;3rd is door frame is tilted to opposite direction is tilted using jack limiter, and sliding one-time leveling is once.Latter two Method is adjusted during sliding, and it is not too big to pay special attention to adjustment amplitude, in order to avoid causing cylinder concrete drawing crack, is adjusting During whole, per it is sliding once, observation once, analyze its development trend in time, and be further processed.The processing side of torsion Method is mainly adjusted using jack limiter, is adjusted using the different jack limiter discrepancy in elevation, is made door frame to torsion Opposite direction order tilts, and the method such as DeGrain, counter-force can be artificially manufactured using jack to adjust.
During stopping sliding, whole sliding system takes the Hui Gu of reinforcement measure, especially support bar, all that bar is made by structure The form Hui Gu of post.
The vertical reinforcing bar at the sliding position of sky and ring muscle plum blossom-shaped spot welding, with the reinforcing bars of Ф 25 (double joint intersection) and all support bar water Flat welded, while welding manner is coupled with the ring-type mesh sheet that vertical reinforcing bar and ring muscle form.Vertical spacing is 300mm, makes to own Support bar connection is integral.Door-window opening is that 500mm sets horizontal cross brace reinforcing by spacing with frame pipe and fastener, and it is stable to increase its Property.
Hydraulic slip form of the present invention only needs the how high templates of a set of 1m and hydraulic lifting device, according to the flat of engineering design Face size is assembled into sliding form apparatus, it is possible to assembling reinforcement, casting concrete, continuously constructs, until structure is completed.Phase Than being constructed using common templates, template usage amount is greatly reduced, responds the requirement of low-carbon environment-friendly, green construction.Use simultaneously Sliding formwork, placing of material place is not required excessively so that live field appearance field looks are neat and artistic, accomplish civilized construction.It is in addition, sliding The mechanized construction that the application of mould improves template is horizontal, reduces the risk factor that a large amount of construction high and mediums set up operation, Safety construction, meet people-oriented, scientific development theory;Template need to only set up certain altitude simultaneously, with structure construction Together lift, save a large amount of templates and labour, low-carbon emission reduction excellent effect.
The present invention is not limited to above-mentioned specific embodiment, for the person of ordinary skill of the art from above-mentioned structure Think of sets out, and without performing creative labour, made a variety of conversion, is within the scope of the present invention.

Claims (9)

  1. A kind of 1. disjunctor storehouse synchronization slding form operation method, it is characterised in that comprise the following steps that:
    S1. surveying setting-out:Measured according to the scheme of designing and producing, find out center line and unwrapping wire;
    S2., sliding formwork support body is installed:Hoisting frame, inside and outside enclosure, and colligation vertical reinforcement and lifting are installed on the basis of surveying setting-out Horizontal reinforcement below frame crossbeam, then assembled formwork, installs jack, forms sliding formwork support body;
    S3. install the operating platform:Platform is set on the basis of synovial membrane support body, builds interior outer platform, installs spider and drawing Bar, lay landing slab;
    S4., hydraulic lifting system is installed:Hydraulic control panel and hydraulic press are installed, are laid out oil circuit, makes oil circuit connection jack and liquid Press;
    S5. support bar is inserted:Support bar is inserted on jack;
    S6. concrete placings and sliding formwork are sliding:
    S7. top specified location stops sliding;
    S8. sliding formwork is removed;
    Sliding formwork support body is pressed symmetrical assembled in the installation sliding formwork support body, and the material on support body is evenly arranged, door frame and jack edge Equidistantly it is evenly arranged around silo, and all directions are arranged symmetrically;It is described install the operating platform in install in each silo Cartridge, each silo inwall are integral by the fixed shape of gaily decorated basket screw rod welding drawing with spider.
  2. 2. a kind of disjunctor storehouse synchronization slding form operation method according to claim 1, it is characterised in that the installation hydraulic pressure carries The system of liter is included by the approximate consistent jack of stroke in same group of oil circuit, and oil circuit will position, without cross-operation when installing Area, oil circuit are worn to platform lower under being stood from door frame in leg groove, are collected from small oil circuit to total oil circuit, annular oil circuit and are hung with iron wire Platform beams bottom.
  3. A kind of 3. disjunctor storehouse synchronization slding form operation method according to claim 1, it is characterised in that the insertion support bar When being included in insertion support bar, the assembling fork jacket on jack, limiting block is set on support bar, makes the reality of each jack Stroke is arranged to 25mm.
  4. 4. a kind of disjunctor storehouse synchronization slding form operation method according to claim 1, it is characterised in that the concrete placings and cunning Mould is sliding to be carried out including initial rise, normal sliding and final rise, the initial rise selection when concrete mould unloading strength is in 0.2mpa, originally When rise reaches 15cm, operation platform system, lifting system, template system and water, electric match system need to be carried out once comprehensive Check, after checking situation without exception, be allowed for access normal sliding.
  5. 5. a kind of disjunctor storehouse synchronization slding form operation method according to claim 1, it is characterised in that the concrete placings and cunning The sliding leveling including during whole slip to the oil circuit and limiting block of hydraulic system of mould, and 200mm is often lifted to hydraulic pressure system The leveling of the oil circuit and limiting block of system is once.
  6. 6. a kind of disjunctor storehouse synchronization slding form operation method according to claim 1, it is characterised in that the concrete placings and cunning Mould is sliding including levelness control, degree control and to the rectifying a deviation of cylinder, antitorque measure.
  7. 7. a kind of disjunctor storehouse synchronization slding form operation method according to claim 1, it is characterised in that the concrete placings and cunning Mould it is sliding including construction when each component burden control of concrete and the slump of concrete that pour are controlled.
  8. A kind of 8. disjunctor storehouse synchronization slding form operation method according to claim 7, it is characterised in that the concrete it is each The parts by weight of component match:
  9. A kind of 9. disjunctor storehouse synchronization slding form operation method according to claim 7, it is characterised in that the slump control In 200-220cm.
CN201710906228.0A 2017-09-29 2017-09-29 Disjunctor storehouse synchronization slding form operation method Pending CN107587770A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710906228.0A CN107587770A (en) 2017-09-29 2017-09-29 Disjunctor storehouse synchronization slding form operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710906228.0A CN107587770A (en) 2017-09-29 2017-09-29 Disjunctor storehouse synchronization slding form operation method

Publications (1)

Publication Number Publication Date
CN107587770A true CN107587770A (en) 2018-01-16

Family

ID=61048006

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710906228.0A Pending CN107587770A (en) 2017-09-29 2017-09-29 Disjunctor storehouse synchronization slding form operation method

Country Status (1)

Country Link
CN (1) CN107587770A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158876A (en) * 2019-05-29 2019-08-23 云南建投建筑机械有限公司 Construction is stretched sun-shading rain-proof shed with Liftable type
CN110485570A (en) * 2019-08-07 2019-11-22 杨秀敏 The support top circulatory system and three-dimensional prefabricated full prefabricated concrete structure method
CN111719845A (en) * 2020-06-29 2020-09-29 中国化学工程第十一建设有限公司 Three-connected silo slip form construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52154222A (en) * 1976-06-16 1977-12-21 Obayashi Gumi Kk Slip form device for constructing group of silos
CN101126279A (en) * 2007-07-31 2008-02-20 中国建筑第七工程局 Silo slipform construction technique
CN103410320A (en) * 2013-08-20 2013-11-27 南通鑫金建设集团有限公司 Dual-barrel continuous-slipping construction method of flexible platform of silo
CN106836794A (en) * 2017-01-17 2017-06-13 浙江勤业建工集团有限公司 A kind of construction method of concatermer sliding formwork

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52154222A (en) * 1976-06-16 1977-12-21 Obayashi Gumi Kk Slip form device for constructing group of silos
CN101126279A (en) * 2007-07-31 2008-02-20 中国建筑第七工程局 Silo slipform construction technique
CN103410320A (en) * 2013-08-20 2013-11-27 南通鑫金建设集团有限公司 Dual-barrel continuous-slipping construction method of flexible platform of silo
CN106836794A (en) * 2017-01-17 2017-06-13 浙江勤业建工集团有限公司 A kind of construction method of concatermer sliding formwork

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158876A (en) * 2019-05-29 2019-08-23 云南建投建筑机械有限公司 Construction is stretched sun-shading rain-proof shed with Liftable type
CN110158876B (en) * 2019-05-29 2024-03-01 云南建投建筑机械有限公司 Lifting type telescopic sunshade awning for building construction
CN110485570A (en) * 2019-08-07 2019-11-22 杨秀敏 The support top circulatory system and three-dimensional prefabricated full prefabricated concrete structure method
CN111719845A (en) * 2020-06-29 2020-09-29 中国化学工程第十一建设有限公司 Three-connected silo slip form construction method

Similar Documents

Publication Publication Date Title
CN101435276B (en) Cabin top steel beam hydraulic hoisting and positioning apparatus of cylinder cabin structure building and construction method thereof
CN106894639B (en) The hanging reverse construction method of installation of steel construction under a kind of
CN106638940B (en) A kind of assembled high residential building concrete prefabricated element construction
CN108019076A (en) Large-size rebar concrete silo construction method and the device for conical shell construction
CN108265885B (en) Construction method of high-large non-orthogonal large-inclination-angle special-shaped concrete inclined column
CN103882813B (en) For calf support platform and the building method thereof of bridge pier and straining beam synchronous construction
CN104674945A (en) Tree-shaped steel pipe column structure and construction method thereof
CN105040970A (en) Comprehensive gymnasium high formwork support system and construction method of comprehensive gymnasium high formwork support system
CN107090975A (en) A kind of big across the cast-in-situ concrete beam Bailey bracket formwork construction method of superelevation
CN110629932B (en) High-rise steel pipe concrete composite column construction method
CN205025086U (en) Strength nature skeleton concrete beam construction suspend template in midair
CN114232805B (en) Construction method of ultrahigh-height large-span steel concrete beam hanging structure
CN102561690A (en) Construction method for supporting structures on two sides of post-cast strip by use of brick column
CN103981897A (en) Waterproof construction method of basement exterior wall stiffness pillar
CN107476583A (en) A kind of concrete assembled building builds construction method
CN107587770A (en) Disjunctor storehouse synchronization slding form operation method
CN106088327A (en) Manufacture method based on the assembling frame post that 3D prints
CN105317052B (en) Tower crane foundation bolt fixing method
CN102337782A (en) Lift system for constructing truss platform on top of tall and large space and construction method for lift system
CN107476597A (en) Integral roof synchronization of jacking up method
CN109457814B (en) Construction method for top cover of high-rise and large-diameter building based on Bailey truss structure
CN104929047A (en) V-shaped pier outer support construction method
CN110409624A (en) A kind of installation of large scale equipment and main structure be inverse to be made to calculate and construction method
CN106759943A (en) A kind of pre-assembled Anchor Bolts in Steel Column Bases structure
CN102777044A (en) Hoisting method of steel-structured spraying layer of urea prilling tower

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180116