CN206233276U - A kind of pretest pile static pressure bringing device - Google Patents

A kind of pretest pile static pressure bringing device Download PDF

Info

Publication number
CN206233276U
CN206233276U CN201621230012.4U CN201621230012U CN206233276U CN 206233276 U CN206233276 U CN 206233276U CN 201621230012 U CN201621230012 U CN 201621230012U CN 206233276 U CN206233276 U CN 206233276U
Authority
CN
China
Prior art keywords
cast
fixing bolt
screw jack
reaction frame
pretest
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621230012.4U
Other languages
Chinese (zh)
Inventor
沈志平
孙洪
陈德茂
付君宜
吴斌
王鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Zhengye Engineering & Investment Inc Ltd
Original Assignee
Guizhou Zhengye Engineering & Investment Inc Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Zhengye Engineering & Investment Inc Ltd filed Critical Guizhou Zhengye Engineering & Investment Inc Ltd
Priority to CN201621230012.4U priority Critical patent/CN206233276U/en
Application granted granted Critical
Publication of CN206233276U publication Critical patent/CN206233276U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of pretest pile static pressure bringing device, including cast-in fixing bolt(1), reaction frame(2), screw jack(3), manual tensiometer(4), steel plate cushion block(5)With prestress stake(6), described cast-in fixing bolt(1)One end is arranged in foundation platform;Cast-in fixing bolt(1)The other end and reaction frame(2)Threaded one end is connected, reaction frame(2)With cast-in fixing bolt(1)Connection end is supported on foundation platform;Screw jack(3)Welded top is in reaction frame(2)Inner chamber beam surface on;Manual tensiometer(4)Installed in screw jack(3)Handle on;Steel plate cushion block(5)Installed in prestress stake(6)Top and screw jack(3)Bottom centre position, using the technical solution of the utility model, can solve when prestress is applied to stake, it is impossible to the succinct problem for being quickly obtained applied prestressed size and the stake of quick envelope.

Description

A kind of pretest pile static pressure bringing device
Technical field
The utility model is related to a kind of static pressure bringing device, more particularly to a kind of pretest pile static pressure bringing device, belongs to and builds Build field.
Background technology
Pretest pile underpinning technique is initially to build a kind of ground of William street underground railway when institute utility model in New York Underpinning technique, people are again according to the principle of pretest pile underpinning technique, jacked pile underpinning technique of having extended out.The base of both technologies Present principles and basic construction method are identical, and its difference is that jacked pile does not consider to be pressed into resilience, and pretest pile is in this respect Consider more perfect.Pretest pile underpinning technique is mainly used in underpinning dilapidated house, ground foundation strengthening, and pile foundation strengthens, large-scale Equipment Foundations incline the aspects such as rectifying by jack up, and all kinds of stakes that the technology can be in advance to using apply a prestress, and usual The method for obtaining applying prestress size is read by pre-setting instrument pressure table, is needed after the completion of prestress applying Removing jack carries out envelope stake work, tedious process and duration lengthening.How succinct fast effect obtains the size for applying prestress, With realize prestress apply after the stake of quick envelope be the problem that needs in pretest pile underpinning technique to solve.
Utility model content
The purpose of this utility model is to provide a kind of pretest pile static pressure bringing device, is applied using a kind of pretest pile static pressure Device is solved when prestress is applied to stake, it is impossible to succinct to be quickly obtained applied prestressed size with the stake of quick envelope Problem.
The technical scheme of offer of the present utility model is:A kind of pretest pile static pressure bringing device, including cast-in fixing bolt, counter-force Frame, screw jack, manual tensiometer and steel plate cushion block, described cast-in fixing bolt one end are arranged in foundation platform;Pre-buried anchor The bolt other end and reaction frame threaded one end are connected, and reaction frame is supported on foundation platform with cast-in fixing bolt connection end;Spiral is very heavy Top welded top is in the inner chamber beam surface of reaction frame;Manual tensiometer is arranged on the handle of screw jack;Metal mat Block is arranged on prestress stake top portion and screw jack bottom centre position.
Described reaction frame is I-shaped steel frame, and described reaction frame has left supporting leg and right supporting leg.
With prestress stake on the same axis, described screw jack has for described screw jack welding position Self-locking function.
Described cushion block quantity is at least one piece cushion block, and described cushion block is the steel plate of 350mm × 350mm × 20mm.
Described cast-in fixing bolt anchorage depth and foundation platform consistency of thickness, cast-in fixing bolt use high duty metal material.
Described left supporting leg and right supporting leg respectively install two cast-in fixing bolts.
Using the technical solution of the utility model, cast-in fixing bolt is set by way of built-in fitting on the basis of first, with Foundation platform is poured together, cushion cap thickness based on anchorage depth;Reaction frame is arranged on foundation platform by cast-in fixing bolt On, and by screw jack welded top on the crossbeam of reaction frame, welding position makes screw jack exist with prestress stake On same axis.Cushion block is that many chip sizes are the steel plate of 350mm × 350mm × 20mm, for filling screw jack and pre-add Space between stress stake, screw jack has self-locking function, and manually tensiometer controls screw jack to pre-add Stress stake applies prestress, so as to realize function of the present utility model.
Reaction frame of the present utility model is I-shaped steel frame, and described reaction frame has left supporting leg and right supporting leg, is used I-shaped steel frame, I-shaped hardness of steel is high, highly reliable, and supporting leg can bear bigger load.
Screw jack welding position of the present utility model is with prestress stake on the same axis so that jack is being made With when will not produce skew and crooked so that preferably stress, described screw jack has self-locking function, is applying Convenient control during Prestressing.
Cushion block quantity of the present utility model is at least one piece cushion block, and described cushion block is 350mm × 350mm × 20mm's Steel plate, can by cushion block increase and reduce adjust jack raising and lowering highly, cushion block be 350mm × 350mm × The steel plate of 20mm, had both facilitated and has installed and transport, and was also convenient for adjustment position, improve operating efficiency.
Cast-in fixing bolt anchorage depth of the present utility model and foundation platform consistency of thickness, pre-buried depth can ensure pre-buried deeply Crab-bolt is more firm, and cast-in fixing bolt uses high duty metal material, and high duty metal increased by force intensity, improve reliability.
Left supporting leg of the present utility model and right supporting leg respectively install two cast-in fixing bolts, by the way of left and right is installed, Can ensure that supporting leg is more stable without producing displacement.
Manually tensiometer control screw jack applies prestress to prestress stake, is led to by the reading of tensiometer Crossing jack top power computing formula can quickly draw exerting oneself for current jack, when prestress design load is reached when exerting oneself, The auto-lock function of screw jack can play a part of to seal stake temporarily, and the screw thread of screw jack is welded can play succinct Quick long envelope stake effect.
In sum, using the technical solution of the utility model, can solve when prestress is applied to stake, it is impossible to letter The clean problem for being quickly obtained applied prestressed size and the stake of quick envelope.
Brief description of the drawings
Fig. 1 is the utility model structural representation elevation;
Fig. 2 is the utility model structural representation cast-in fixing bolt layout drawing;
Marked in figure:1st, cast-in fixing bolt, 2, reaction frame, 3, screw jack, 4, manual tensiometer, 5, steel plate cushion block, 6, Prestress stake.
Specific embodiment
The utility model is described in detail below in conjunction with accompanying drawing.
Referring to shown in Fig. 1~2, a kind of pretest pile static pressure bringing device, including cast-in fixing bolt 1, reaction frame 2, spiral are very heavy Top 3, manual tensiometer 4, steel plate cushion block 5 and prestress stake 6, the one end of cast-in fixing bolt 1 is arranged in foundation platform;Cast-in fixing bolt 1 other end and the threaded one end of reaction frame 2 are connected, and reaction frame 2 is supported on foundation platform with the connection end of cast-in fixing bolt 1;Spiral thousand 3 welded tops of jin top are in the inner chamber beam surface of reaction frame 2;Manual tensiometer 4 is arranged on the handle of screw jack 3; Steel plate cushion block 5 is arranged on the top of prestress stake 6 and the bottom centre position of screw jack 3.
During experiment, according to device needs, be ready to cast-in fixing bolt 1, reaction frame 2, screw jack 3, manual tensiometer 4, Steel plate cushion block 5 and prestress stake 6.
First by way of built-in fitting on foundation platform install cast-in fixing bolt 1, poured with foundation platform together with, anchor Gu cushion cap consistency of thickness based on depth, it is ensured that cast-in fixing bolt 1 will not cause situation about extracting to occur because of pulling force, improve Reliability.
In order to increase the intensity of reaction frame 2, reliability is improved so that supporting leg can bear bigger load, the utility model Reaction frame 2 select I-shaped steel frame, reaction frame 2 welds left supporting leg and right supporting leg, and left supporting leg and right supporting leg are respectively pacified Fill two cast-in fixing bolts 1.
After the construction of cast-in fixing bolt 1 is finished, reaction frame 2 is arranged on foundation platform by cast-in fixing bolt 1.
Then using welding basis and by the welded top of screw jack 3 on the crossbeam of reaction frame 2, welding position makes spiral shell Rotation jack 3 is with prestress stake 6 on the same axis so that jack will not be produced when effect and offset and crooked, So as to preferably stress.
It is 350mm × 350mm × 20mm thick steel plate cushion block 5 to prepare many chip sizes, for fill screw jack with it is pre- Plus the space between stress stake.
Space between observation screw jack and prestress stake, fills in steel plate cushion block 5 as needed, and cushion block is selected The steel plate of 350mm × 350mm × 20mm, can by cushion block increase and reduce adjust jack raising and lowering highly, Cushion block is the steel plate of 350mm × 350mm × 20mm, has both facilitated and has installed and transport, and is also convenient for adjustment position, improves work effect Rate.
Screw jack 3 has self-locking function, be unlikely to occur jack because it is unattended when there is misoperation.
Manual tensiometer 4 is installed on its handle, manually the control screw jack 3 of tensiometer 4 is to prestress stake 6 Apply prestress, pushing up power computing formula by screw jack 3 by the reading of manual tensiometer 4 can quickly draw current thousand What jin was pushed up exerts oneself.
When prestress design load is reached when exerting oneself, the auto-lock function of screw jack 3 can play the work of interim envelope stake With being welded screw thread can realize the succinct quick stake effect of envelope long.
The above, is only preferred embodiment of the present utility model, not makees any formal to utility model type Limitation, it is any without departing from technical solutions of the utility model content, according to technical spirit of the present utility model to above example Any simple modification, equivalent variations and the modification made, still fall within the range of technical solutions of the utility model.

Claims (6)

1. a kind of pretest pile static pressure bringing device, including cast-in fixing bolt(1), reaction frame(2), screw jack(3), manual pulling force Meter(4), steel plate cushion block(5)With prestress stake(6), it is characterised in that:Described cast-in fixing bolt(1)Held installed in basis one end In platform;Cast-in fixing bolt(1)The other end and reaction frame(2)Threaded one end is connected, reaction frame(2)With cast-in fixing bolt(1)Connection end branch Hold on foundation platform;Screw jack(3)Welded top is in reaction frame(2)Inner chamber beam surface on;Manual tensiometer(4) Installed in screw jack(3)Handle on;Steel plate cushion block(5)Installed in prestress stake(6)Top and screw jack(3) Bottom centre position.
2. a kind of pretest pile static pressure bringing device according to claim 1, it is characterised in that:Described reaction frame(2)For I-shaped steel frame, described reaction frame(2)There are left supporting leg and right supporting leg.
3. a kind of pretest pile static pressure bringing device according to claim 1, it is characterised in that:Described screw jack (3)Welding position and prestress stake(6)On the same axis, described screw jack(3)With self-locking function.
4. a kind of pretest pile static pressure bringing device according to claim 1, it is characterised in that:Described cushion block(5)Quantity It is at least one piece cushion block(5), described cushion block(5)It is the steel plate of 350mm × 350mm × 20mm.
5. a kind of pretest pile static pressure bringing device according to claim 1, it is characterised in that:Described cast-in fixing bolt(1) Anchorage depth and foundation platform consistency of thickness, cast-in fixing bolt(1)Using high duty metal material, described cast-in fixing bolt(1)With Foundation platform is poured together.
6. a kind of pretest pile static pressure bringing device according to claim 2, it is characterised in that:Described left supporting leg and the right side Supporting leg respectively installs two cast-in fixing bolts(1).
CN201621230012.4U 2016-11-16 2016-11-16 A kind of pretest pile static pressure bringing device Active CN206233276U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621230012.4U CN206233276U (en) 2016-11-16 2016-11-16 A kind of pretest pile static pressure bringing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621230012.4U CN206233276U (en) 2016-11-16 2016-11-16 A kind of pretest pile static pressure bringing device

Publications (1)

Publication Number Publication Date
CN206233276U true CN206233276U (en) 2017-06-09

Family

ID=58991301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621230012.4U Active CN206233276U (en) 2016-11-16 2016-11-16 A kind of pretest pile static pressure bringing device

Country Status (1)

Country Link
CN (1) CN206233276U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400859A (en) * 2016-11-16 2017-02-15 贵州正业工程技术投资有限公司 Static pressure applying system for pretest pile
CN107419725A (en) * 2017-08-28 2017-12-01 山东大学 A kind of system and method for strengthening trans reaction frame tensile property
CN108316328A (en) * 2018-03-02 2018-07-24 中铁上海工程局集团有限公司 A kind of pressurization sinking device and its construction method for open caisson construction
CN109183867A (en) * 2018-11-12 2019-01-11 中铁西北科学研究院有限公司 A kind of non-disturbance is adjusted fast short stopping and inclines method
CN114319462A (en) * 2021-12-23 2022-04-12 云南大学 Construction method and stress device for limiting sinking and floating of existing building foundation

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400859A (en) * 2016-11-16 2017-02-15 贵州正业工程技术投资有限公司 Static pressure applying system for pretest pile
CN107419725A (en) * 2017-08-28 2017-12-01 山东大学 A kind of system and method for strengthening trans reaction frame tensile property
CN107419725B (en) * 2017-08-28 2019-01-25 山东大学 A kind of system and method enhancing trans- reaction frame tensile property
CN108316328A (en) * 2018-03-02 2018-07-24 中铁上海工程局集团有限公司 A kind of pressurization sinking device and its construction method for open caisson construction
CN109183867A (en) * 2018-11-12 2019-01-11 中铁西北科学研究院有限公司 A kind of non-disturbance is adjusted fast short stopping and inclines method
CN114319462A (en) * 2021-12-23 2022-04-12 云南大学 Construction method and stress device for limiting sinking and floating of existing building foundation

Similar Documents

Publication Publication Date Title
CN206233276U (en) A kind of pretest pile static pressure bringing device
US20060147274A1 (en) Construction process for composite pile foundation
CN105863362B (en) A kind of deviation correcting device for being used to tilt electric power pylon
CN101876160A (en) Method for installing bracket used for in-situ casting concrete continuous girder bridge on soft soil foundation
CN103669431B (en) A kind of colliery minery electric power pylon inclination adjusting device
CN201770942U (en) Support for soft soil foundation cast-in-place concrete continuous beam bridge
CN206829148U (en) A kind of combined type shaped steel, concrete square pile bearing diagonal foundation pit enclosure structure
CN104878786B (en) Tiltedly orthogonal is for group's Pile-soil-structure Interaction experimental model
CN203768788U (en) Tool type foundation pit soil conveying trestle bridge
CN206591407U (en) A kind of skirt piles positioner constructed for roadbed, pavement engineering
CN206956735U (en) A kind of combined type shaped steel PHC pile tube bearing diagonal foundation pit enclosure structures
CN206494685U (en) A kind of pipeline lifting apparatus
CN202595758U (en) Batter post foundation structure for overhead transmission line
CN204753656U (en) A clump of piles - soil - structure interact experimental model directly replaces to one side
CN207079614U (en) A kind of building pile structure
CN203960920U (en) Colliery minery electric power pylon inclination adjusting device
CN207405617U (en) With reference to post jacking and the prestressed concrete pipe pile of expanding technology
CN203546745U (en) Civil engineering installation levelness control device for punching equipment
CN206859658U (en) A kind of adjustable slab form support system
CN203373769U (en) Draught fan foundation ring supporting structure arranged on soft soil foundation
CN206859249U (en) A kind of height-adjustable stand column device
CN112323798B (en) Prefabricated pipe pile static pressure construction device and method integrating positioning and pile sealing
CN201605533U (en) Continuous beam temporary support
CN204151670U (en) Pressure-adjusting type bridge bearing pad
CN105133851B (en) The method and its lift structure of terrace lifting leveling reparation on a kind of soft soil foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant