CN203546745U - Civil engineering installation levelness control device for punching equipment - Google Patents

Civil engineering installation levelness control device for punching equipment Download PDF

Info

Publication number
CN203546745U
CN203546745U CN201320559136.7U CN201320559136U CN203546745U CN 203546745 U CN203546745 U CN 203546745U CN 201320559136 U CN201320559136 U CN 201320559136U CN 203546745 U CN203546745 U CN 203546745U
Authority
CN
China
Prior art keywords
civil engineering
control device
dowel
engineering installation
buried plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320559136.7U
Other languages
Chinese (zh)
Inventor
刘喜春
沈山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Dongyan Intelligent Design And Research Institute Co ltd
Original Assignee
Dongfeng Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongfeng Design Institute Co Ltd filed Critical Dongfeng Design Institute Co Ltd
Priority to CN201320559136.7U priority Critical patent/CN203546745U/en
Application granted granted Critical
Publication of CN203546745U publication Critical patent/CN203546745U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to a civil engineering installation levelness control device for punching equipment, belonging to the technical field of machine tool equipment. The civil engineering installation levelness control device comprises a support buried plate provided with grouting holes and plug welding holes, and leveling anchor bars and fixing anchor bars welded in the plug welding holes. The civil engineering installation levelness control device is clear in design, and is easy and convenient for construction control. Construction errors can be reduced effectively.

Description

Pressing equipment civil engineering installation level control device
Technical field
The utility model belongs to machine tool technical field, is specifically related to a kind of pressing equipment civil engineering installation level control device.
Background technology
It is industry difficult point that the levelness that pressing equipment civil engineering is installed in automobile plant is controlled always.Pressing equipment generally has 4 stressed bearings, and each bearing requirement for bearing capacity reaches hundreds of tons, and the about 1000mm-1500mm of bearing buried plate size, bearing buried plate thickness are generally not less than 50mm, bearing buried plate dowel needs
Figure BDA0000379780720000011
bearing place concrete thickness reaches 1500mm.For meeting pressing equipment installation requirement, the levelness discrepancy in elevation that need control 4 bearing buried plate planes when civil engineering is in 2mm, and the levelness tolerance of each bearing buried plate plane is that two bearing buried plate spacings of 1000:0.15(are generally greater than 10m).Difficulty of construction is large, and is difficult to reach the requirement of equipment installation level.Adopt which kind of method can be when civil engineering the assurance equipment levelness of installing be technology emphasis.
Current existing method is that pressing equipment bearing buried plate and dowel are welded in advance, then by the fixing after-pouring concrete of this buried plate.Vibration during because of concreting causes buried plate displacement, makes the bad control of levelness tolerance of the levelness discrepancy in elevation and each bearing buried plate plane of buried plate plane, remedies very difficult as made a fault.
Utility model content
The purpose of this utility model is exactly the defect for prior art, and a kind of pressing equipment civil engineering installation level control device is provided, and is applicable to the levelness that in automobile plant, pressing equipment civil engineering is installed and controls.
The technical solution adopted in the utility model is: a kind of pressing equipment civil engineering installation level control device, it comprises and has the bearing buried plate of grout hole and plug welding hole and be welded on leveling dowel in plug welding hole and fixing dowel.
Further, described adjusting dowel and fixedly the height of dowel lower than the height of bearing buried plate.
Further, described plug welding hole outer end diameter is greater than inner diameter.
Further, described plug welding hole section is tapered.
Further, described adjusting dowel is welded in the plug welding hole of bearing buried plate edge.
Further, described fixedly dowel uniform welding is in the plug welding hole in the middle of bearing buried plate.
The utility model design is clear and definite, and construction control is easy, can effectively reduce the error of construction.
Accompanying drawing explanation
Fig. 1 is the utility model structure top view;
Fig. 2 is the utility model structure side view;
Fig. 3 is leveling dowel structural representation;
Fig. 4 is fixing dowel structural representation;
Fig. 5 is fixedly dowel plug welding and polishes rear view.
In figure, 1-bearing buried plate; 2-leveling dowel; 3-fixing dowel; 4-grout hole; 5-plug welding hole.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail, is convenient to be well understood to the utility model, but they do not form and limit the utility model.
As Figure 1-Figure 5, a kind of pressing equipment civil engineering installation level control device, it comprises and has the bearing buried plate 1 of grout hole 4 and plug welding hole 5 and be welded on leveling dowel 2 in plug welding hole 5 and fixing dowel 3.Described plug welding hole 5 outer end diameters are greater than inner diameter, and described plug welding hole 5 sections are tapered.Described adjusting dowel 2 is welded in the plug welding hole 5 of bearing buried plate 1 edge, in plug welding 5 holes of described fixedly dowel 3 uniform weldings in the middle of bearing buried plate 1.
During installation, by leveling dowel 2 and fixedly dowel 3 be embedded in concrete, regulate leveling dowel 2 to level; By 1 plug welding hole on bearing buried plate 5 aim at leveling dowels 2 and fixedly dowel 3 place bearing buried plates 1, and in 1 time reserved concrete space to be built of bearing buried plate, again regulate leveling dowel 2 to bearing buried plate 1 level; By bearing buried plate 1 and leveling dowel 2 and fixedly dowel 3 plug weldings, and excise leveling dowel 2 and fixedly dowel 3 upper surfaces after exposing the part of bearing buried plate 1, polish, the view shown in Fig. 5 for fixing dowel 3 plug weldings and after polishing; By 1 grout hole 4 concretings from bearing buried plate, 1 time reserved concrete space to be built of bearing buried plate is tamped.
The content that this manual is not described in detail belongs to the known prior art of professional and technical personnel in the field.

Claims (6)

1. a pressing equipment civil engineering installation level control device, is characterized in that: it comprises and has the bearing buried plate of grout hole and plug welding hole and be welded on leveling dowel in plug welding hole and fixing dowel.
2. pressing equipment civil engineering installation level control device according to claim 1, is characterized in that: the height of described adjusting dowel and fixedly dowel is lower than the height of bearing buried plate.
3. pressing equipment civil engineering installation level control device according to claim 1, is characterized in that: described plug welding hole outer end diameter is greater than inner diameter.
4. pressing equipment civil engineering installation level control device according to claim 3, is characterized in that: described plug welding hole section is tapered.
5. pressing equipment civil engineering installation level control device according to claim 4, is characterized in that: described adjusting dowel is welded in the plug welding hole of bearing buried plate edge.
6. pressing equipment civil engineering installation level control device according to claim 5, is characterized in that: described fixedly dowel uniform welding is in the plug welding hole in the middle of bearing buried plate.
CN201320559136.7U 2013-09-10 2013-09-10 Civil engineering installation levelness control device for punching equipment Expired - Lifetime CN203546745U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320559136.7U CN203546745U (en) 2013-09-10 2013-09-10 Civil engineering installation levelness control device for punching equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320559136.7U CN203546745U (en) 2013-09-10 2013-09-10 Civil engineering installation levelness control device for punching equipment

Publications (1)

Publication Number Publication Date
CN203546745U true CN203546745U (en) 2014-04-16

Family

ID=50464881

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320559136.7U Expired - Lifetime CN203546745U (en) 2013-09-10 2013-09-10 Civil engineering installation levelness control device for punching equipment

Country Status (1)

Country Link
CN (1) CN203546745U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469812A (en) * 2013-09-10 2013-12-25 东风设计研究院有限公司 Stamping device civil engineering installation level control device and installing method
CN104214473A (en) * 2014-09-16 2014-12-17 太仓市金达机械厂 Machine tool foundation plate structure
CN104234075A (en) * 2014-08-27 2014-12-24 中国科学院长春光学精密机械与物理研究所 Leveling mechanism for foundation ring

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469812A (en) * 2013-09-10 2013-12-25 东风设计研究院有限公司 Stamping device civil engineering installation level control device and installing method
CN104234075A (en) * 2014-08-27 2014-12-24 中国科学院长春光学精密机械与物理研究所 Leveling mechanism for foundation ring
CN104214473A (en) * 2014-09-16 2014-12-17 太仓市金达机械厂 Machine tool foundation plate structure

Similar Documents

Publication Publication Date Title
CN203546745U (en) Civil engineering installation levelness control device for punching equipment
CN104404882B (en) A kind of bearing auxiliary installation mold and construction method thereof
CN206233276U (en) A kind of pretest pile static pressure bringing device
CN103469812A (en) Stamping device civil engineering installation level control device and installing method
CN203960919U (en) Colliery minery electric power pylon correction lift-up device
CN201635410U (en) Temporary reinforcing device for concrete structure for bearing hoisting construction load
CN103669431B (en) A kind of colliery minery electric power pylon inclination adjusting device
CN203846359U (en) Compaction control device for railway ballastless track boards
CN103669432A (en) Jacking device for deviation rectification of steel pylon in mining area of coal mine
CN205243006U (en) Side form supports top and holds in palm
CN204252023U (en) Installation mold assisted by a kind of bearing
CN202000644U (en) Movable bearing bracket platform
CN103790176A (en) Embedded short limb column structure and construction method thereof
CN201982898U (en) Equipment installation base plate regulating device
CN104074275A (en) Prefabricated concrete column connecting joint structure
CN104405042A (en) Steel stand column beam
CN203960920U (en) Colliery minery electric power pylon inclination adjusting device
CN215256599U (en) Wind power mixed tower prefabricated tower barrel adopting stepless adjusting sleeve
CN202302573U (en) Base plate for inclined mortar filling
CN105155485A (en) Gate pier pre-stressed anchor cable sleeve installation device and construction method thereof
CN204645626U (en) Flue, ventilation stack reserved opening shutoff mould
CN203430027U (en) Adjustable large steel formwork
CN204059604U (en) Crab-bolt
CN204174752U (en) The syndeton of circular steel column and concrete beam
CN205907703U (en) Electric power tower pole base apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220105

Address after: 430056, No. 1, Dongfeng central, No. three Dongfeng Road, Wuhan economic and Technological Development Zone, Hubei, Wuhan, A

Patentee after: Wuhan Dongyan intelligent design and Research Institute Co.,Ltd.

Address before: 430056 Wuhan City, Hubei Province block a, Donghe center, No. 1, Dongfeng Third Road, Wuhan Economic and Technological Development Zone, Wuhan City, Hubei Province

Patentee before: DONGFENG DESIGN INSTITUTE Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140416