CN103039147A - Reclamation method for sunk paddy field caused by mining in mountainous regions - Google Patents
Reclamation method for sunk paddy field caused by mining in mountainous regions Download PDFInfo
- Publication number
- CN103039147A CN103039147A CN2013100037143A CN201310003714A CN103039147A CN 103039147 A CN103039147 A CN 103039147A CN 2013100037143 A CN2013100037143 A CN 2013100037143A CN 201310003714 A CN201310003714 A CN 201310003714A CN 103039147 A CN103039147 A CN 103039147A
- Authority
- CN
- China
- Prior art keywords
- soil
- paddy field
- mound
- crack
- field
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005065 mining Methods 0.000 title claims abstract description 24
- 238000000034 method Methods 0.000 title claims abstract description 22
- 239000002689 soil Substances 0.000 claims abstract description 62
- 239000000463 material Substances 0.000 claims abstract description 26
- 230000006872 improvement Effects 0.000 claims abstract description 10
- 235000007164 Oryza sativa Nutrition 0.000 claims description 9
- 235000009566 rice Nutrition 0.000 claims description 9
- 229910000278 bentonite Inorganic materials 0.000 claims description 7
- 239000000440 bentonite Substances 0.000 claims description 7
- SVPXDRXYRYOSEX-UHFFFAOYSA-N bentoquatam Chemical compound O.O=[Si]=O.O=[Al]O[Al]=O SVPXDRXYRYOSEX-UHFFFAOYSA-N 0.000 claims description 7
- 238000003973 irrigation Methods 0.000 claims description 7
- 230000002262 irrigation Effects 0.000 claims description 7
- 238000012545 processing Methods 0.000 claims description 6
- 230000008569 process Effects 0.000 claims description 5
- 238000011084 recovery Methods 0.000 claims description 5
- 238000005259 measurement Methods 0.000 claims description 3
- 230000002093 peripheral effect Effects 0.000 claims description 3
- 239000002994 raw material Substances 0.000 claims description 3
- 238000005096 rolling process Methods 0.000 claims description 3
- 229920006395 saturated elastomer Polymers 0.000 claims description 3
- 238000009331 sowing Methods 0.000 claims description 2
- 240000007594 Oryza sativa Species 0.000 claims 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 17
- 238000004519 manufacturing process Methods 0.000 abstract description 6
- 239000002002 slurry Substances 0.000 abstract 2
- 230000000813 microbial effect Effects 0.000 abstract 1
- 241000209094 Oryza Species 0.000 description 8
- 239000003245 coal Substances 0.000 description 6
- 238000009826 distribution Methods 0.000 description 6
- 230000006378 damage Effects 0.000 description 4
- 238000007493 shaping process Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000003756 stirring Methods 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 235000013339 cereals Nutrition 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005215 recombination Methods 0.000 description 2
- 230000006798 recombination Effects 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 238000012271 agricultural production Methods 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000035558 fertility Effects 0.000 description 1
- 230000005669 field effect Effects 0.000 description 1
- 239000008398 formation water Substances 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 239000013049 sediment Substances 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 230000004083 survival effect Effects 0.000 description 1
- 238000003971 tillage Methods 0.000 description 1
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Treatment Of Sludge (AREA)
Abstract
The invention relates to a reclamation method for a sunk paddy field caused by mining in mountainous regions and belongs to the technical field of improvement and utilization of environment, ecology and damaged fields. The method includes: performing topsoil stripping to fissured positions where fissures are created by mining sinking and lead to water leakage of the paddy field; covering water holding materials on fissured areas after topsoil stripping; compacting the covered water holding materials, pouring slurry and standing; performing topsoil backfilling and grinding to the fissured areas after slurry pouring and standing, and flattening to enable the fissured areas to be a whole with pieces of the paddy field around the fissured areas; and irrigating, nourishing and improving the paddy field after backfilling and grinding. By the method, the cultivation land where the fissures are created by mining sinking and lead to water leakage of the paddy field can restore the paddy field utilization mode and reach production level of a normal paddy field as soon as possible, a stable self-maintaining farmland ecological system can be formed, a paddy field protecting system can be formed, soil microbial content can be increased, physicochemical property of soil can be improved, and benign farmland ecological system circulation can be formed.
Description
Technical field
The invention belongs to environment, ecology and abandoned land and administer and utilize technical field, particularly crack, mountain region coal-mining subsidence paddy field reclamation method.
Background technology
China coal resource distribution mainly be distributed in, east, the west area, the coal resources important distribution of its southwest and center area in Yunnan, the ground such as Guizhou, Chongqing, Sichuan, the southwest is the most widely one of area of rice in China distribution simultaneously, is the larger coal of Chinese area-grain recombination region.Taking, damage a large amount of arable lands in the progress of coal mining has been undisputable fact.National economic development and human survival unavoidably display in each coal-grain recombination region area the contradiction of the requirement of grain-production.Coordinate contradiction between the two, in the short economic development of coal mining, guarantee grain-production on the ground normally carry out most important.
Mountain Area of Southwests such as Chongqing, Yunnan-Guizhou, the infringement of coal-mining subsidence ground causes that a large amount of soils are destroyed, such as surface subsidence hole, crack etc., wherein coal-mining subsidence ground causes the crack, paddy field, and it is comparatively general to cause the normal grain-production function of destruction of leaking, and damage area, the automatic recovery ability of dependence farmland system can't be realized its reparation.Think that the major part paddy field leakage cause that leaks is that the crack causes under the earth's surface, because coal-mining subsidence affects the paddy field topsoil and the crack occurs, causes the moisture holding capacity of paddy field topsoil destroyed through initial analysis, the paddy field leaks.Determine to leak under the prerequisite of position, consider the factor kept of environment and field ecosystem, the crack, coal-mining subsidence paddy field of reclaiming is crucial.At present in the theoretical research in this field and actual repair, all do not have good conclusion or way, thus crack, paddy field, coal-mining subsidence ground, mountain area reclaim be present coal-mining subsidence the emphasis of reclaiming, also be a job highly significant.
The applicant for the seimic arable land that subsides, invents a kind of reclamation method of subsided farm land after earthquake disaster, and patented power, and the method for this patent disclosure comprises: topsoil stripping is carried out in the seimic arable land that subsides; The zone that subsides after peeling off is filled and preliminary shaping; Isolated material is carried out in the zone that subsides after the preliminary shaping to be covered and rolls; To the regional earthing that subsides behind the covering isolated material, further shaping; The biological modification engineering is carried out in the zone that subsides after the earthing shaping.This invention can make the arable land that is subjected to eaerthquake damage recover to utilize and reach as early as possible the higher level level of production, form the stable field ecosystem of certainly keeping, improve edaphon content, the physicochemical property of improvement soil, form the advantages such as optimum field ecosystem circulation, but be applied in obvious deficiency is arranged in the coal mining subsidence area paddy field: aspect reclaiming in the paddy field that leaks, do not relate to; Detailed not etc. aspect the native protection at table.
Summary of the invention
The objective of the invention is for solving an above-mentioned difficult problem, a kind of Mountain Area of Southwest coal-mining subsidence paddy field reclamation method is proposed, being intended to administer coal-mining subsidence causes the crack and causes the arable land that the paddy field leaks, and rebuild paddy field, depression ground stable certainly keep field ecosystem, form the paddy field water retention system, improve edaphon content, the physicochemical property of improvement soil forms optimum field ecosystem circulation.
Crack, a kind of Mountain Area of Southwest coal-mining subsidence paddy field reclamation method that the present invention proposes is characterized in that, may further comprise the steps:
1) leak crack place, coal-mining subsidence paddy field, mountain region is carried out topsoil stripping: peel off the leak table soil at top, crack and edge of paddy field, cover thickness is 40-80cm, choose table mound plot point stored table soil around in the topsoil stripping district, and be divided into 2 kinds of table of upper and lower layer mound according to the amount of cure of peeling off soil layer, upper strata table mound is deposited the mellow soil that cover thickness is 0-35cm; Lower floor's table mound is deposited the soil that cover thickness is 35-80cm; The table soil of peeling off is deposited in respectively corresponding table mound plot point place according to its degree of depth of peeling off, forms upper and lower layer table mound;
2) water-keeping material covers and compacting: water-keeping material is covered in the crack district after step 1) is processed form cover layer, water-keeping material is mainly mixed by bentonite and soil, bentonite: the volume ratio of soil is 1:(1-4); With the cover layer compacting, the thickness after the cover layer compacting is 10-30cm;
3) annotating mud at cover layer leaves standstill: in step 2) crack district cover surface after processing injects mud and leaves standstill, and depth of mud left standstill 10-20 days for flooding cover layer 3-10cm; The mud raw material is the soil of lower floor's table mound;
4) table earthen backfill and roll smooth: the crack district after step 3) processed, carry out the earthen backfill of twice table, the order of backfill is for successively fetching earth from lower floor's table mound and upper strata table mound; In the soil course of backfill lower floor table mound, every backfill 20cm carries out rolling for 1-3 time, the height distance crack district peripheral ground 20-40cm after backfill is rolled; In the mellow soil process of backfill upper strata table mound, integral body is carried out smooth and is rolled for 1 time; Recovery or newly-built destroyed drainage and irrigation project and the bank protection of field protect bank simultaneously;
5) improvement engineering: to the paddy field after the step 4) processing, carry out raised path through fields shutoff, reduce paddy field field moisture flow measurement; Secondly to the continuous 5-15 of field days flood irrigation, make the soil moisture content of field be tending towards saturated; Sow local rice varieties season in sowing, keep the 2-3 ploughing.
Characteristics of the present invention and beneficial effect:
1) by flood irrigation and ploughing in water-keeping material covering, cover surface perfusion mud, the improvement engineering, form 3 layers of water resisting protection layer in the soil, and the structure of water resisting protection layer utilizes original soil as far as possible and utilizes in right amount the bentonite that agricultural production is gained everything and lose nothing.The method applicability and operability have greatly been improved.
2) will show soil protection and be divided into upper strata table mound and the long-pending form of lower floor's table mound two kinds of tables mound, pile up for the convenience of Reclamation Engineering adopts nearby multiple spot in field simultaneously; The selection of time of simultaneously Reclamation Engineering enforcement can finish in the month at 1-3 according to design in farm slack season, reduced the long-pending time of table mound, the very big loss that reduces the native nutriment of table.
3) covering the water-keeping material position is topsoil stripping, and the following 30-80cm in earth's surface place is the rice root lower space, avoids affecting paddy rice as far as possible and normally produces.
4) with protection table soil, cover water-keeping material, the Developing method is optimized and organically blend, can have the efficient recovery depression to plough and recover to utilize and improvement field biological environment; And rebuild the depression paddy field stable certainly keep field ecosystem, Reasonable Protection land resources, society, economy and environment high efficiency;
5) for destroying rear the reparation, the growing environments aquatic, the semi-aquatic crop such as paddy rice provide a kind of practical and technical methods of being convenient to promote.
To sum up, the present invention is directed to the paddy field and leak, the water barrier in the emphasis reconstruct soil, next the present invention adopts layer in the protection of table soil, and top layer mellow soil protection is paid attention in table soil protection relatively before more.
Description of drawings
Fig. 1 is terraced fields topsoil stripping schematic diagram of the present invention.
Fig. 2 is Reclaimed Soil sectional structural map of the present invention.
Embodiment
The present invention proposes the specific embodiment of crack, coal-mining subsidence paddy field, a kind of Southwest China mountain region reclamation method, is described with reference to the accompanying drawings as follows:
The present invention the site inspection in the paddy field that leaks with at first carrying out depression before reclaiming.Determine to cause paddy field leak crack location and scope, and investigation plot of living in, crack environment, design table mound seated position is calculated the backfill amount of water-keeping material and soil, modulation mud, and the reparation of reclaiming.1-3 month carry out before for winter in evening or the early spring rice growing embodiment engineering repair time of crack, Mountain Area of Southwest coal-mining subsidence paddy field of the present invention reclamation method, utilizes afterwards the biological means ability that further improves and resume production.Concrete steps are as follows:
1) leak crack place, coal-mining subsidence paddy field, mountain region is carried out topsoil stripping: peel off the leak table soil at top, crack and edge of paddy field, cover thickness is 50-70cm, choose table mound plot point stored table soil around in the topsoil stripping district, the table mound is conical, be divided into 2 kinds of table mounds, be divided into upper strata table mound according to the amount of cure of peeling off soil layer, deposit the mellow soil that cover thickness is 0-35cm; Lower floor's table mound is deposited the soil that cover thickness is 35-70cm.The table soil of peeling off is deposited in respectively corresponding table mound plot point place according to its degree of depth of peeling off; Show the concrete stacking of soil as shown in Figure 1, the terraced fields of same level are as a unit in charge of construction, shown in the square frame of Fig. 1; Measure distribution situation in unit in charge of construction internal fissure district shown in 11 among Fig. 1,12,13,14,15,16,17,18, totally 8 cracks district, according to the crack zone position, select to stack point, the stacking point in crack 11 is upper strata table mound 111 and lower floor's table mound 112 as shown in Figure 1; The stacking point in crack 12 is upper strata table mound 121 and lower floor's table mound 122; The stacking point in crack 13 is upper strata table mound 131 and lower floor's table mound 132; It is upper strata table mound 141 and lower floor's table mound 142 that crack 14 and crack 15 share the stacking point; It is upper strata table mound 161 and lower floor's table mound 162 that crack 16 and crack 18 share the stacking point; The stacking point in crack 17 is upper strata table mound 171 and lower floor's table mound 172.
2) water-keeping material covers and compacting: water-keeping material is covered in the crack district after step 1) is processed form cover layer, water-keeping material mainly mixes bentonite by the soil of bentonite and lower floor's table mound: the volume ratio of soil is 1:(2-4); With the cover layer compacting, the thickness after the cover layer compacting is 20-30cm, and the unit weight of water-keeping material reaches 1.4-2.0g/cm after the compacting
3If the cover layer area is Scm
2, calculate to cover need thus soil amount 28Sg-60Sg, and according to the unit weight 1.3-1.4g/cm of filling soil
3, the thickness that calculates the water-keeping material before the compacting is 20-46cm, and stirs also compacting in order to save acting for the water-keeping material water distribution, water-keeping material: the volume ratio of water is 1:(0.3-2).Even for guaranteeing compacting, realizations that come into force of water-keeping material effect be left standstill 24-48 hour after the need water distribution, and to the compacting material compaction in layers.The acting amount of compacting is 200-600 kilojoule/m
3
This step can form lower floor's water resisting protection layer.
3) annotating mud at cover layer leaves standstill: in step 2) crack district cover surface after processing injects mud and leaves standstill, and depth of mud left standstill 10-20 days for flooding cover layer 3-10cm; The mud raw material is the soil of lower floor table mound, configure water-keeping material after, lower floor's table mound soil surplus is greater than 20%.Therefore the part residue of lower floor's table mound covered on the water-keeping material, and utilize giant to make its thorough stirring, can form mud.
The purpose that the soil water filling stir is formed mud be so that in the soil clay in the process of leaving standstill by the effect stratified sedimentation of moisture, glutinous grain interacts and forms an impermeable stratum.This step can form middle level water resisting protection layer.
4) table earthen backfill and roll smooth: the crack district after step 3) processed, carry out the earthen backfill of twice table, the order of backfill is for successively fetching earth from lower floor's table mound and upper strata table mound; In the soil course of backfill lower floor table mound, every backfill 20cm carries out rolling for 1-3 time, the height distance crack district peripheral ground 30cm after backfill rolls; In the mellow soil process of backfill upper strata table mound, integral body is carried out smooth and is rolled for 1 time; Recovery or newly-built destroyed drainage and irrigation project and the bank protection of field protect bank simultaneously;
5) improvement engineering: to the paddy field after the step 4) processing, carry out raised path through fields shutoff, reduce paddy field field moisture flow measurement; Secondly to the continuous 5-15 of field days flood irrigation, make the soil moisture content of field be tending towards saturated; Sow again and sow local rice varieties season, keep the 2-3 ploughing.Promote gradually migration downwards of the glutinous grain of soil in the field, and below rice root, form tillage pan, reduce the downward seepage flow of moisture in the paddy field.
This step forms upper strata water resisting protection layer carrying out the process that agricultural planting increases soil fertility, and strengthens the paddy field effect of reclaiming.
The Reclaimed Soil profile construction of the inventive method as shown in Figure 2; be that lower floor's water resisting protection layer 22, mud sediment formation middle level water resisting protection layer 23, the lower floor's table mound backfill that engineering does not relate to undisturbed soil 21, water-keeping material formation is lower floor's topsoil 24 from bottom to up; thickness is that 5-10cm and upper strata table mound backfill are upper strata topsoil 25, and thickness is 30cm.The improvement engineering forms the bottom that upper strata water resisting protection layer 251(is positioned at upper strata table soil, and after the improvement engineering, the underwater cultivation degree of depth is following 15-25cm place, earth's surface, ploughs through the ox of 2-3, and meeting is formation water resisting protection layer bottom plow layer, and namely 251).
Claims (1)
1. coal-mining subsidence paddy field, mountain region reclamation method is characterized in that:
1) leak crack place, coal-mining subsidence paddy field, mountain region is carried out topsoil stripping: peel off the leak table soil at top, crack and edge of paddy field, cover thickness is 40-80cm, choose table mound plot point stored table soil around in the topsoil stripping district, and be divided into 2 kinds of table of upper and lower layer mound according to the amount of cure of peeling off soil layer, upper strata table mound is deposited the mellow soil that cover thickness is 0-35cm; Lower floor's table mound is deposited the soil that cover thickness is 35-80cm; The table soil of peeling off is deposited in respectively corresponding table mound plot point place according to its degree of depth of peeling off, forms upper and lower layer table mound;
2) water-keeping material covers and compacting: water-keeping material is covered in the crack district after step 1) is processed form cover layer, water-keeping material is mainly mixed by bentonite and soil, bentonite: the volume ratio of soil is 1:(1-4); With the cover layer compacting, the thickness after the cover layer compacting is 10-30cm;
3) annotating mud at cover layer leaves standstill: in step 2) crack district cover surface after processing injects mud and leaves standstill, and depth of mud left standstill 10-20 days for flooding cover layer 3-10cm; The mud raw material is the soil of lower floor's table mound;
4) table earthen backfill and roll smooth: the crack district after step 3) processed, carry out the earthen backfill of twice table, the order of backfill is for successively fetching earth from lower floor's table mound and upper strata table mound; In the soil course of backfill lower floor table mound, every backfill 20cm carries out rolling for 1-3 time, the height distance crack district peripheral ground 20-40cm after backfill is rolled; In the mellow soil process of backfill upper strata table mound, integral body is carried out smooth and is rolled for 1 time; Recovery or newly-built destroyed drainage and irrigation project and the bank protection of field protect bank simultaneously;
5) improvement engineering: to the paddy field after the step 4) processing, carry out raised path through fields shutoff, reduce paddy field field moisture flow measurement; Secondly to the continuous 5-15 of field days flood irrigation, make the soil moisture content of field be tending towards saturated; Sow local rice varieties season in sowing, keep the 2-3 ploughing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310003714.3A CN103039147B (en) | 2013-01-06 | 2013-01-06 | Reclamation method for sunk paddy field caused by mining in mountainous regions |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310003714.3A CN103039147B (en) | 2013-01-06 | 2013-01-06 | Reclamation method for sunk paddy field caused by mining in mountainous regions |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103039147A true CN103039147A (en) | 2013-04-17 |
CN103039147B CN103039147B (en) | 2014-12-31 |
Family
ID=48052199
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310003714.3A Active CN103039147B (en) | 2013-01-06 | 2013-01-06 | Reclamation method for sunk paddy field caused by mining in mountainous regions |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103039147B (en) |
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103283335A (en) * | 2013-05-22 | 2013-09-11 | 中国矿业大学(北京) | Filling reclamation method for reclaiming coal mining subsidence lands by Yellow River sediment |
CN103741698A (en) * | 2014-01-23 | 2014-04-23 | 西安科技大学 | Loess hilly-and-gully area coal-mining subsidence and crevice treatment method |
CN104499469A (en) * | 2015-01-06 | 2015-04-08 | 西安科技大学 | Novel method applicable to treatment of seasonal waterlogged coal-mining subsidence land |
CN104652451A (en) * | 2015-01-17 | 2015-05-27 | 西安科技大学 | Coal mining subsidence area administration method for loess hilly-gully region |
CN104686003A (en) * | 2014-12-30 | 2015-06-10 | 中国矿业大学 | Reconstruction method of reclaimed soil profile in coal mining subsidence area |
CN105123004A (en) * | 2015-07-29 | 2015-12-09 | 轻工业环境保护研究所 | Soil configuration during waste land second ploughing and land reclamation method |
CN105248007A (en) * | 2015-11-06 | 2016-01-20 | 中国矿业大学(北京) | Alternate, multilayer and repetitive filling soil reconstruction method by using Yellow River sediment in reclamation of coal mining subsidence land |
CN105766118A (en) * | 2016-03-31 | 2016-07-20 | 陕西省土地工程建设集团有限责任公司 | Method for reconstructing shoal soil mass for rice planting |
CN105900555A (en) * | 2016-03-31 | 2016-08-31 | 陕西省土地工程建设集团有限责任公司 | Land engineering design method |
CN106034440A (en) * | 2016-05-31 | 2016-10-26 | 黑龙江省农业科学院土壤肥料与环境资源研究所 | Method for building plough layer of paddy field |
CN106105470A (en) * | 2016-07-26 | 2016-11-16 | 中国科学院地理科学与资源研究所 | A kind of healthy soil body construction method of land control of giving up based on rural area sky |
CN106489591A (en) * | 2016-10-18 | 2017-03-15 | 中国矿业大学(北京) | A kind of substitution tables soil material for open coal mine |
CN107018698A (en) * | 2016-02-02 | 2017-08-08 | 中国矿业大学(北京) | The restorative procedure of coal mine small-sized Collapse Pit |
CN107371435A (en) * | 2017-06-07 | 2017-11-24 | 常州市天宁区鑫发织造有限公司 | The reclamation method in arable land is collapsed after a kind of earthquake |
CN107736100A (en) * | 2017-10-27 | 2018-02-27 | 广东省生态环境技术研究所 | A kind of fast and effective construction method for forming farming plough sole |
CN110108244A (en) * | 2019-04-30 | 2019-08-09 | 北部湾大学 | A kind of soil stripping of demand orientation covers meter and engineering method for measuring and calculating |
CN110140467A (en) * | 2019-06-21 | 2019-08-20 | 中国地质大学(北京) | A kind of reconstructing method of paddy fields in south china damage soil |
CN110222468A (en) * | 2019-06-20 | 2019-09-10 | 北部湾大学 | A kind of surface soil stacks the construction method of scene long-pending projectional technique and topsoil stripping |
CN110984119A (en) * | 2019-12-17 | 2020-04-10 | 河南省地质环境规划设计院有限公司 | Method for leveling fractured and subsided land |
CN111642167A (en) * | 2020-06-10 | 2020-09-11 | 海南瑞茗阁实业有限公司 | Water-retention, water-saving, fertilizer-retention and fertilizer-saving treatment method for transforming dry land and sand land into paddy field |
CN112685824A (en) * | 2021-01-12 | 2021-04-20 | 西安科技大学 | Terrace type reclamation parameter optimization method considering mining subsidence deformation |
CN112970369A (en) * | 2021-02-09 | 2021-06-18 | 中国矿业大学(北京) | Ecological reconstructed sponge structure of strip mine refuse dump and application thereof |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109854248B (en) * | 2019-03-03 | 2020-07-03 | 煤炭科学研究总院 | Water-retaining reclamation method for strip mine |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101138287A (en) * | 2007-10-25 | 2008-03-12 | 哈秋舲 | Desert greening water and soil conservation method and structure |
CN101422094A (en) * | 2007-11-02 | 2009-05-06 | 煤炭科学研究总院唐山研究院 | Thick-bed mining subsidence-land dynamic pre-reclamation method at plane mining-area |
CN101953245A (en) * | 2010-08-13 | 2011-01-26 | 中国矿业大学(北京) | Reclamation method of subsided farm land after earthquake disaster |
CN102177774A (en) * | 2010-12-06 | 2011-09-14 | 西南大学 | Method for enhancing evaporation resisting and water preserving ability of sandy soil |
CN102656971A (en) * | 2012-04-13 | 2012-09-12 | 郝国成 | Production method and application of sandy land conditioner made from bentonite |
CN102726187A (en) * | 2012-06-25 | 2012-10-17 | 西北综合勘察设计研究院 | Surface ecological management method for mining subsidence area of coal mine |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1507230A1 (en) * | 1987-07-28 | 1989-09-15 | Ленинградский горный институт им.Г.В.Плеханова | Method of recultivation in opencast mining of deposits of mineral resources |
-
2013
- 2013-01-06 CN CN201310003714.3A patent/CN103039147B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101138287A (en) * | 2007-10-25 | 2008-03-12 | 哈秋舲 | Desert greening water and soil conservation method and structure |
CN101422094A (en) * | 2007-11-02 | 2009-05-06 | 煤炭科学研究总院唐山研究院 | Thick-bed mining subsidence-land dynamic pre-reclamation method at plane mining-area |
CN101953245A (en) * | 2010-08-13 | 2011-01-26 | 中国矿业大学(北京) | Reclamation method of subsided farm land after earthquake disaster |
CN102177774A (en) * | 2010-12-06 | 2011-09-14 | 西南大学 | Method for enhancing evaporation resisting and water preserving ability of sandy soil |
CN102656971A (en) * | 2012-04-13 | 2012-09-12 | 郝国成 | Production method and application of sandy land conditioner made from bentonite |
CN102726187A (en) * | 2012-06-25 | 2012-10-17 | 西北综合勘察设计研究院 | Surface ecological management method for mining subsidence area of coal mine |
Non-Patent Citations (1)
Title |
---|
胡振祺: "煤矿山复垦土壤剖面重构的基本原理与方法", 《煤炭学报》, vol. 22, no. 6, 25 December 1997 (1997-12-25), pages 617 - 622 * |
Cited By (33)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103283335B (en) * | 2013-05-22 | 2015-05-06 | 中国矿业大学(北京) | Filling reclamation method for reclaiming coal mining subsidence lands by Yellow River sediment |
CN103283335A (en) * | 2013-05-22 | 2013-09-11 | 中国矿业大学(北京) | Filling reclamation method for reclaiming coal mining subsidence lands by Yellow River sediment |
CN103741698A (en) * | 2014-01-23 | 2014-04-23 | 西安科技大学 | Loess hilly-and-gully area coal-mining subsidence and crevice treatment method |
CN103741698B (en) * | 2014-01-23 | 2015-01-07 | 西安科技大学 | Loess hilly-and-gully area coal-mining subsidence and crevice treatment method |
CN104686003A (en) * | 2014-12-30 | 2015-06-10 | 中国矿业大学 | Reconstruction method of reclaimed soil profile in coal mining subsidence area |
CN104499469A (en) * | 2015-01-06 | 2015-04-08 | 西安科技大学 | Novel method applicable to treatment of seasonal waterlogged coal-mining subsidence land |
CN104652451B (en) * | 2015-01-17 | 2016-05-18 | 西安科技大学 | Coal mining subsidence area ground, Gullied Rolling Loess Region improvement method |
CN104652451A (en) * | 2015-01-17 | 2015-05-27 | 西安科技大学 | Coal mining subsidence area administration method for loess hilly-gully region |
CN105123004A (en) * | 2015-07-29 | 2015-12-09 | 轻工业环境保护研究所 | Soil configuration during waste land second ploughing and land reclamation method |
CN105248007A (en) * | 2015-11-06 | 2016-01-20 | 中国矿业大学(北京) | Alternate, multilayer and repetitive filling soil reconstruction method by using Yellow River sediment in reclamation of coal mining subsidence land |
CN107018698A (en) * | 2016-02-02 | 2017-08-08 | 中国矿业大学(北京) | The restorative procedure of coal mine small-sized Collapse Pit |
CN105766118A (en) * | 2016-03-31 | 2016-07-20 | 陕西省土地工程建设集团有限责任公司 | Method for reconstructing shoal soil mass for rice planting |
CN105900555A (en) * | 2016-03-31 | 2016-08-31 | 陕西省土地工程建设集团有限责任公司 | Land engineering design method |
CN105766118B (en) * | 2016-03-31 | 2018-11-20 | 陕西省土地工程建设集团有限责任公司 | A kind of shoal soil body reconstructing method for Rice Cropping |
CN105900555B (en) * | 2016-03-31 | 2018-05-25 | 陕西省土地工程建设集团有限责任公司 | A kind of design method of land engineering |
CN106034440A (en) * | 2016-05-31 | 2016-10-26 | 黑龙江省农业科学院土壤肥料与环境资源研究所 | Method for building plough layer of paddy field |
CN106105470A (en) * | 2016-07-26 | 2016-11-16 | 中国科学院地理科学与资源研究所 | A kind of healthy soil body construction method of land control of giving up based on rural area sky |
CN106105470B (en) * | 2016-07-26 | 2019-09-03 | 中国科学院地理科学与资源研究所 | A kind of healthy soil body construction method based on the useless land control of rural area sky |
CN106489591A (en) * | 2016-10-18 | 2017-03-15 | 中国矿业大学(北京) | A kind of substitution tables soil material for open coal mine |
CN107371435A (en) * | 2017-06-07 | 2017-11-24 | 常州市天宁区鑫发织造有限公司 | The reclamation method in arable land is collapsed after a kind of earthquake |
CN107736100A (en) * | 2017-10-27 | 2018-02-27 | 广东省生态环境技术研究所 | A kind of fast and effective construction method for forming farming plough sole |
CN110108244A (en) * | 2019-04-30 | 2019-08-09 | 北部湾大学 | A kind of soil stripping of demand orientation covers meter and engineering method for measuring and calculating |
CN110222468A (en) * | 2019-06-20 | 2019-09-10 | 北部湾大学 | A kind of surface soil stacks the construction method of scene long-pending projectional technique and topsoil stripping |
CN110222468B (en) * | 2019-06-20 | 2022-06-07 | 北部湾大学 | Calculation method of surface soil stacking field area and construction method for surface soil stripping |
CN110140467A (en) * | 2019-06-21 | 2019-08-20 | 中国地质大学(北京) | A kind of reconstructing method of paddy fields in south china damage soil |
CN110140467B (en) * | 2019-06-21 | 2021-08-24 | 中国地质大学(北京) | Reconstruction method of southern paddy field damaged soil |
CN110984119B (en) * | 2019-12-17 | 2022-03-04 | 河南省地质环境规划设计院有限公司 | Method for leveling fractured and subsided land |
CN110984119A (en) * | 2019-12-17 | 2020-04-10 | 河南省地质环境规划设计院有限公司 | Method for leveling fractured and subsided land |
CN111642167A (en) * | 2020-06-10 | 2020-09-11 | 海南瑞茗阁实业有限公司 | Water-retention, water-saving, fertilizer-retention and fertilizer-saving treatment method for transforming dry land and sand land into paddy field |
CN111642167B (en) * | 2020-06-10 | 2022-05-03 | 海南瑞茗阁实业有限公司 | Water-retention, water-saving, fertilizer-retention and fertilizer-saving treatment method for transforming dry land and sand land into paddy field |
CN112685824A (en) * | 2021-01-12 | 2021-04-20 | 西安科技大学 | Terrace type reclamation parameter optimization method considering mining subsidence deformation |
CN112685824B (en) * | 2021-01-12 | 2022-01-04 | 西安科技大学 | Terrace type reclamation parameter optimization method considering mining subsidence deformation |
CN112970369A (en) * | 2021-02-09 | 2021-06-18 | 中国矿业大学(北京) | Ecological reconstructed sponge structure of strip mine refuse dump and application thereof |
Also Published As
Publication number | Publication date |
---|---|
CN103039147B (en) | 2014-12-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103039147B (en) | Reclamation method for sunk paddy field caused by mining in mountainous regions | |
CN106900342B (en) | Integrated semi-lithologic high slope vegetation reconstruction protection method | |
CN101953245B (en) | Reclamation method of subsided farm land after earthquake disaster | |
CN101849454B (en) | Biological synthesis improvement method of salt-alkali shoaly land | |
CN102733401B (en) | Method for treating dump slope of surface mine | |
CN102067753B (en) | Long-term governance method for converting saline-alkali soil into fertile farmland | |
CN103262689A (en) | Coastal saline-alkali soil terrace type afforesting method for improvement of dredger fill | |
CN110832964A (en) | Building aggregate mine in-situ soil improvement and greening method | |
CN105519274A (en) | Integration method of large-scale coastal newly reclaimed beach agricultural land ecologicalization exploitation | |
CN104686003A (en) | Reconstruction method of reclaimed soil profile in coal mining subsidence area | |
CN103688617B (en) | A kind of method utilizing the waste rock patch of soil moved in improve the original regulation | |
CN114223344B (en) | Frozen soil layer repairing method for alpine mining areas in plateau | |
CN103141176A (en) | Method for improving saline soil in excavated grooves of border trees in coastal region | |
CN105248007B (en) | Alternate, multilayer and repetitive filling soil reconstruction method by using Yellow River sediment in reclamation of coal mining subsidence land | |
CN107787634A (en) | A kind of Honghe fault wetland salt-soda soil Suaeda heteroptera ecological restoring method | |
CN206599772U (en) | A kind of cover type biological checkboard | |
CN104396494A (en) | Method for greening original soil of heavy saline-alkali land | |
CN113875344A (en) | Ecological restoration method for coal mine mountain geological environment | |
CN109005722B (en) | Comprehensive reclamation method for land reclamation of iron ore waste stone yard | |
CN105594564A (en) | Rainwater collecting and deep infiltrating method for economic forest in mountainous region | |
CN115316066B (en) | Comprehensive water and soil resource renovation method for loess hilly and gully region channel | |
CN104294830A (en) | Side slope ecological protection and recovery method and arrangement structure | |
CN105672198B (en) | Land-building and plowing structure for reservoir inundation and immersion area and construction method thereof | |
CN106688800A (en) | Novel tailing pond moisture and fertilizer retention land reclamation process | |
CN104186178A (en) | Economical seashore saline soil greening quick planting method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |