CN102733401B - Method for treating dump slope of surface mine - Google Patents

Method for treating dump slope of surface mine Download PDF

Info

Publication number
CN102733401B
CN102733401B CN201210214485.5A CN201210214485A CN102733401B CN 102733401 B CN102733401 B CN 102733401B CN 201210214485 A CN201210214485 A CN 201210214485A CN 102733401 B CN102733401 B CN 102733401B
Authority
CN
China
Prior art keywords
slope
grade
horizontal
build
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210214485.5A
Other languages
Chinese (zh)
Other versions
CN102733401A (en
Inventor
燕建龙
王军
申红军
赵晓光
刘科
谭新平
赵治海
张海峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NORTHWEST RESEARCH INSTITUTE OF ENGINEERING INVESTIGATIONS AND DESIGN
Xian University of Science and Technology
Original Assignee
NORTHWEST RESEARCH INSTITUTE OF ENGINEERING INVESTIGATIONS AND DESIGN
Xian University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NORTHWEST RESEARCH INSTITUTE OF ENGINEERING INVESTIGATIONS AND DESIGN, Xian University of Science and Technology filed Critical NORTHWEST RESEARCH INSTITUTE OF ENGINEERING INVESTIGATIONS AND DESIGN
Priority to CN201210214485.5A priority Critical patent/CN102733401B/en
Publication of CN102733401A publication Critical patent/CN102733401A/en
Application granted granted Critical
Publication of CN102733401B publication Critical patent/CN102733401B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cultivation Of Plants (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a method for treating a dump slope of a surface mine. The method comprises the following steps of: treating to ensure that the side slope grade is (1:1.5)-(1:3), wherein if the slope is cohesive soil, the side slope grade is 1:1.5; if the slope is gravel, the side slope grade is 1:3; if the slope is other soil, the side slope grade is (1:1.5)-(1:3); building platforms (2), namely building a horizontal platform every 6 to 12 meters in the vertical height, wherein the width of the platform is 5 meters; building horizontal a drainage ditches (3), namely building the horizontal drainage ditches in the middles of the platforms; building discharging ditches (4), namely building the discharging ditch perpendicular to the horizontal drainage ditch every 30 meters on the slope surface in the horizontal direction, wherein the slope grade is determined according to the rainfall of the place where the slope is, the slope grade a in the north is 2 to 3 degrees, and the slope grade b in the south is 3 to 5 degrees; if the slope grade on the top of a dump cannot meet the requirement, building a canal and ditch net (6) on the top; and growing plant to protect the slope. The conventional dump is transformed by limited engineering and biological control measures, the potential safety hazard of strip mining dumps can be avoided completely, the water losses and soil erosion can be reduced greatly, ecological environment is improved, and mining areas and the environment around the same can be beautified. Meanwhile, the method has the characteristics of low investment and short construction period; and the structure is simple, so that later-stage maintenance cost is low.

Description

Surface mine refuse dump slope treatment method
Technical field
The invention belongs to mine construction, technical field of environmental management, be specifically related to a kind of surface mine refuse dump slope treatment method.
Background technology
Mining mainly contains the surface mining mining mode different with underground mining two kinds, the outdoor stripping during comprising mine capital construction and excavation developing; Dumping thing generally has corruption to plant table soil, weathered rock and soil, solid rock and mixing ground, and sometimes also comprising can recoverable unbalanced-ore, lean ore etc.When ore body bury more shallow or earth's surface have appear time, application strip mining transformation (surface mining) is the most superior.Compared with underground mining, strip mining transformation advantage is that the utilization of resources is abundant, high stoping rate, the rate of dilution are low, and be suitable for big machinery construction, build ore deposit fast, output is large, and labor productivity is high, and cost is low, and condition of labor is good, production safety.But need to dump a large amount of rocks, especially darker opencut, often take more farmland.
Refuse dump (dump), also known as waste-rock yard, refers to that mining dumps the place that thing concentrates discharge.Refuse dump is a kind of huge artificial loose heap pad, there is serious potential safety hazard.Refuse dump unstability will cause mine soil field disaster and Important Project accident, not only have influence on the normal production in mine, also will mine be made to suffer huge economic loss.Meanwhile, the soil erosion of refuse dump and barren hill make again ecological environment become bad.
Summary of the invention
The present invention is directed to the deficiencies in the prior art and provide a kind of surface mine refuse dump slope treatment method.
The present invention adopts following technical scheme:
A kind of surface mine refuse dump slope treatment method, being arranged by grade of side slope is 1: 1.5-1: 3, and cohesive soil gets 1: 1.5, and grit stone gets 1: 3, and other great soil group gets median; Build platform (2): vertical height often rising 6-12m builds levelling bench, and width is 5m; Build horizontal drainage ditch (3): in the middle part of platform, build horizontal drainage ditch, discharge section is trapezoidal, bottom width 1m, top width 2m, height 1m, with concrete precast block lining cutting or build; Build drain way (4): horizontal direction builds one perpendicular to the drain way of horizontal drainage ditch, in order to drain the current in horizontal ditch every 30m on domatic; Top, refuse dump is trimmed to certain slope, is convenient to rain drainage, the gradient depending on location precipitation size, northern α=2-3 °, southern α=3-5 °; If top, the refuse dump gradient does not reach aforementioned claim, build net of canals and ditches (6) at top, so that the excretion of rainfall runoff quick collecting, directly excavate and form, not lining cutting, and be connected to drain way; Vegetation slope pavement: be prevention soil and water loss, stable side slope, side slope is planted shrub (7), utilizes its root system soil and slope protection; Top, refuse dump plantation arbor.
Advantage of the present invention is: transformed by limited engineering and biological control measure on original refuse dump, can effect a radical cure the potential safety hazard of surface mining refuse dump, soil erosion greatly be alleviated, improves the ecological environment, beautify mining area and surrounding enviroment.Have small investment, the feature that the duration is short, because structure is simple, later maintenance expense is low simultaneously.
Accompanying drawing explanation
Fig. 1 is the inventive method schematic diagram.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is described in detail.
By with reference to figure 1, renovate side slope 1: being arranged by grade of side slope (tangent value of slope angle) is 1: 1.5-1: 3, and cohesive soil gets 1: 1.5, and grit stone gets 1: 3, and other great soil group gets median.
Build platform 2: the vertical height 6-12m (cohesive soil gets 12m, and grit stone gets 6m, and other great soil group gets median) that often rises builds levelling bench, and width is 5m.
Build horizontal drainage ditch 3: in the middle part of platform, build horizontal drainage ditch, discharge section is trapezoidal, bottom width 1m, top width 2m, height 1m, with concrete precast block lining cutting or build.
Build drain way 4: horizontal direction builds one perpendicular to the drain way of horizontal drainage ditch, in order to drain the current in horizontal ditch every 30m on domatic.Section configuration, size and lining cutting mode are the same.
Top, refuse dump is trimmed to certain slope, is convenient to rain drainage, the gradient depending on location precipitation size, northern α=2-3 °, southern α=3-5 °.If top, the refuse dump gradient does not reach aforementioned claim, build net of canals and ditches 6 at top, so that the excretion of rainfall runoff quick collecting, directly excavate and form, not lining cutting, and be connected to drain way.
Vegetation slope pavement: be prevention soil and water loss, stable side slope, side slope is planted shrub 7, utilizes its root system soil and slope protection; Top, refuse dump plantation arbor, density, depending on tree characteristics, under its normal growing conditions, adopts dense planting.Seeds select local autochthonal seeds, can ensure survival rate.
Should be understood that, for those of ordinary skills, can be improved according to the above description or convert, and all these improve and convert the protection domain that all should belong to claims of the present invention.

Claims (1)

1. a surface mine refuse dump slope treatment method, is characterized in that, being arranged by grade of side slope is 1: 1.5-1: 3, and cohesive soil gets 1: 1.5, and grit stone gets 1: 3, and other great soil group gets median; Build platform (2): vertical height often rising 6-12m builds levelling bench, and width is 5m; Build horizontal drainage ditch (3): in the middle part of platform, build horizontal drainage ditch, discharge section is trapezoidal, bottom width 1m, top width 2m, height 1m, with concrete precast block lining cutting or build; Build drain way (4): horizontal direction builds one perpendicular to the drain way of horizontal drainage ditch, in order to drain the current in horizontal ditch every 30m on domatic; Top, refuse dump is trimmed to certain slope, is convenient to rain drainage, the gradient depending on location precipitation size, northern α=2-3 °, southern α=3-5 °; If top, the refuse dump gradient does not reach aforementioned claim, build net of canals and ditches (6) at top, so that the excretion of rainfall runoff quick collecting, directly excavate and form, not lining cutting, and be connected to drain way; Vegetation slope pavement: be prevention soil and water loss, stable side slope, side slope is planted shrub (7), utilizes its root system soil and slope protection; Top, refuse dump plantation arbor.
CN201210214485.5A 2012-06-25 2012-06-25 Method for treating dump slope of surface mine Expired - Fee Related CN102733401B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210214485.5A CN102733401B (en) 2012-06-25 2012-06-25 Method for treating dump slope of surface mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210214485.5A CN102733401B (en) 2012-06-25 2012-06-25 Method for treating dump slope of surface mine

Publications (2)

Publication Number Publication Date
CN102733401A CN102733401A (en) 2012-10-17
CN102733401B true CN102733401B (en) 2015-05-06

Family

ID=46989658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210214485.5A Expired - Fee Related CN102733401B (en) 2012-06-25 2012-06-25 Method for treating dump slope of surface mine

Country Status (1)

Country Link
CN (1) CN102733401B (en)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102888832A (en) * 2012-10-22 2013-01-23 金丹越 Construction method of furrow-shaped slow flow ecological purification system
CN102913246B (en) * 2012-10-30 2014-10-08 中国科学院地质与地球物理研究所 Solid potash ore open-pit mining method under condition of tropical monsoon climate
CN103277136A (en) * 2013-04-15 2013-09-04 中国神华能源股份有限公司 Draining system
CN103866774B (en) * 2014-03-31 2016-11-23 张锦宇 For bank protection and the ditch pipe network protection body collapsing the solid soil of hilllock draining
CN105075551A (en) * 2014-05-07 2015-11-25 黄弘 Method for afforesting terrace planting tank type side slope
CN103999592B (en) * 2014-05-26 2016-08-24 华南农业大学 A kind of method preventing acid mining area waste-rock yard vegetation degeneration
CN104234010B (en) * 2014-08-15 2017-05-17 内蒙古大学 Construction method for ecological draining and accumulating water channel
CN105155555B (en) * 2015-06-20 2018-08-03 广东安元矿业勘察设计有限公司 Take precautions against a kind of method of soil erosion in refuse dump
CN106688357A (en) * 2016-12-19 2017-05-24 陈贺铭 Iron mine waste land vegetation recovery method
CN107152030A (en) * 2017-06-30 2017-09-12 西安科技大学 A kind of Slope of Open Pit Coal Mine administering method
CN107724402B (en) * 2017-11-08 2019-06-07 广西南宁胜祺安科技开发有限公司 A kind of spoil ground regulation method
CN109555139A (en) * 2018-12-29 2019-04-02 内蒙古蒙草生态环境(集团)股份有限公司 Extremely frigid zones collapsibility refuse dump abrupt slope means of defence
CN109566290A (en) * 2019-01-10 2019-04-05 辽宁大学 A kind of Mine production side slope vegetation restorative procedure
CN116137987A (en) * 2023-02-17 2023-05-23 黄河勘测规划设计研究院有限公司 Ecological restoration method for soil sampling field

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071697A (en) * 2011-02-12 2011-05-25 河海大学 Hard reinforced concrete revetment slope biological repairing method
CN102418346A (en) * 2011-10-13 2012-04-18 中钢集团马鞍山矿山研究院有限公司 Mine dump horizontal flat plate remediation and ecological restoration method
CN102444134A (en) * 2011-10-09 2012-05-09 东南大学 Slope protecting method based on slope with soil layer as upper part and rock layer as lower part

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0813500A (en) * 1994-07-04 1996-01-16 Studio Kiyabu:Kk Slope surface protection net for drainage channel
JP5065130B2 (en) * 2008-03-31 2012-10-31 公益財団法人鉄道総合技術研究所 Construction method of a mixture of long fiber, solidified material and soil
CN102080381B (en) * 2010-12-31 2012-02-01 佛山市顺德电力设计院有限公司 Method for managing landslip of side slope landslide for transformer substation

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071697A (en) * 2011-02-12 2011-05-25 河海大学 Hard reinforced concrete revetment slope biological repairing method
CN102444134A (en) * 2011-10-09 2012-05-09 东南大学 Slope protecting method based on slope with soil layer as upper part and rock layer as lower part
CN102418346A (en) * 2011-10-13 2012-04-18 中钢集团马鞍山矿山研究院有限公司 Mine dump horizontal flat plate remediation and ecological restoration method

Also Published As

Publication number Publication date
CN102733401A (en) 2012-10-17

Similar Documents

Publication Publication Date Title
CN102733401B (en) Method for treating dump slope of surface mine
CN103039147B (en) Reclamation method for sunk paddy field caused by mining in mountainous regions
CN104818721B (en) Geological environment treatment method suitable for steep wall and deep pit type abandoned mine
CN102392455A (en) Technique for safe improvement as well as ecological repair and reconstruction of mine soil discharge yard
CN106368227A (en) Water erosion prevention system and method for ecology of slope of abandoned rear-earth mine land
CN209941695U (en) Comprehensive treatment structure for steep slope type coal gangue dump
CN103485321A (en) Karst landform stony desertification treatment method
CN104396494A (en) Method for greening original soil of heavy saline-alkali land
CN110424421A (en) Abandoned mine raised fields goes along with sb. to guard him ecological restoring method
WO2024046326A1 (en) Water and soil resource comprehensive improvement method for loess hilly and gully region channels
CN114223344A (en) Frozen soil layer repairing method for alpine mining area in plateau
CN108166520B (en) Water and soil conservation method for electric power transmission line engineering construction
CN102418346A (en) Mine dump horizontal flat plate remediation and ecological restoration method
CN112627245A (en) Abandoned dreg site surveying and ecological restoration method based on in-situ recognition
CN104294830A (en) Side slope ecological protection and recovery method and arrangement structure
CN105672198B (en) Land-building and plowing structure for reservoir inundation and immersion area and construction method thereof
CN114134877B (en) Treatment method for mining ground cracks of shallow coal seam in hilly and hilly areas of peaked landform
CN102726141A (en) Saline-alkali soil improvement facility and method
CN106703053A (en) Construction method for reinforced soil drainage composite revetment structure
CN103650694B (en) A kind of erosion gully reclamation method
CN102704437A (en) Coal mining subsidence area cultivation water source reconstruction method suitable for complex mountain area
CN203096697U (en) Ballast field structure at earth and rockfill dam toe
CN206352302U (en) A kind of protective slope structure
CN202369883U (en) Road base treatment structure for soft soil region
CN205546463U (en) Ecological recovery system of slope vegetation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Northwest Research Institute of Engineering Investigations and Design

Document name: Notification to Pay the Fees

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150506

Termination date: 20160625