Method for treating dump slope of surface mine Download PDFInfo
- Publication number
- CN102733401A CN102733401A CN2012102144855A CN201210214485A CN102733401A CN 102733401 A CN102733401 A CN 102733401A CN 2012102144855 A CN2012102144855 A CN 2012102144855A CN 201210214485 A CN201210214485 A CN 201210214485A CN 102733401 A CN102733401 A CN 102733401A
- Authority
- CN
- China
- Prior art keywords
- slope
- grade
- build
- building
- soil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Cultivation Of Plants (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
The invention discloses a method for treating a dump slope of a surface mine. The method comprises the following steps of: treating to ensure that the side slope grade is (1:1.5)-(1:3), wherein if the slope is cohesive soil, the side slope grade is 1:1.5; if the slope is gravel, the side slope grade is 1:3; if the slope is other soil, the side slope grade is (1:1.5)-(1:3); building platforms (2), namely building a horizontal platform every 6 to 12 meters in the vertical height, wherein the width of the platform is 5 meters; building horizontal a drainage ditches (3), namely building the horizontal drainage ditches in the middles of the platforms; building discharging ditches (4), namely building the discharging ditch perpendicular to the horizontal drainage ditch every 30 meters on the slope surface in the horizontal direction, wherein the slope grade is determined according to the rainfall of the place where the slope is, the slope grade a in the north is 2 to 3 degrees, and the slope grade b in the south is 3 to 5 degrees; if the slope grade on the top of a dump cannot meet the requirement, building a canal and ditch net (6) on the top; and growing plant to protect the slope. The conventional dump is transformed by limited engineering and biological control measures, the potential safety hazard of strip mining dumps can be avoided completely, the water losses and soil erosion can be reduced greatly, ecological environment is improved, and mining areas and the environment around the same can be beautified. Meanwhile, the method has the characteristics of low investment and short construction period; and the structure is simple, so that later-stage maintenance cost is low.
Description
Technical field
The invention belongs to mine construction, environmental improvement technical field, be specifically related to a kind of surface mine refuse dump slope treatment method.
Background technology
Mining mainly contains two kinds of different mining modes of surface mining and underground mining, comprises peeling off with excavation during the mine capital construction in the open and opens up; Dumping thing generally has corruption to plant table soil, weathered rock and soil, solid rock and mixing ground, and also comprising sometimes can recoverable unbalanced-ore, lean ore etc.When ore body buries more shallow or there is when appearing on the face of land, it is the most superior to use strip mining transformation (surface mining).Compare with underground mining, the strip mining transformation advantage is that the utilization of resources is abundant, the rate of extraction is high, the rate of dilution is low, is suitable for the big machinery construction, and it is fast to build the ore deposit, and output is big, and labor productivity is high, and cost is low, and condition of labor is good, production safety.But need dump a large amount of rocks, especially darker opencut often takies more farmland.
The refuse dump (dump) claim waste-rock yard again, is meant that mining dumps the place that thing is concentrated discharging.The refuse dump is the loose heap pad of a kind of huge manual work, has serious potential safety hazard.The refuse dump unstability will cause a mine soil disaster and Important Project accident, not only have influence on the ordinary production in mine, also will make the mine suffer enormous economic loss.Simultaneously, the soil erosion of refuse dump and barren hill make ecological environment become bad again.
Summary of the invention
The deficiency that the present invention is directed to prior art provides a kind of surface mine refuse dump slope treatment method.
The present invention adopts following technical scheme:
A kind of surface mine refuse dump slope treatment method is 1 with the grade of side slope arrangement: 1.5-1: 3, and cohesive soil was got 1: 1.5, and grit stone was got 1: 3, and other great soil group is got median; Build platform (2): the every rising 6-12m of vertical height builds levelling bench, and width is 5m; Build horizontal rows ditch (3): build the horizontal rows ditch at the platform middle part, discharge section is trapezoidal, bottom width 1m, and top width 2m, height 1m is with the concrete precast block lining cutting or build; Build drain way (4): horizontal direction is every on domatic builds a drain way perpendicular to the horizontal rows ditch at a distance from 30m, in order to drain the current in the horizontal ditch; The top, refuse dump is trimmed to certain slope, is convenient to rain drainage, and the gradient is looked location precipitation size and decided, and northern α=2-3 °, southern α=3-5 °; If top, the refuse dump gradient does not reach aforementioned requirement, build net of canals and ditches (6) at the top, so that rainfall runoff compiles drainage fast, directly excavation forms, not lining cutting, and be connected to drain way; Vegetation slope pavement: be prevention soil and water loss, stable side slope is planted shrub (7) on side slope, utilize its root system soil and slope protection; The plantation arbor at the top, refuse dump.
Advantage of the present invention is: on original refuse dump through limited engineering and biological control measure transformation, can effect a radical cure the potential safety hazard of surface mining refuse dump, soil erosion is greatly alleviated, improve the ecological environment, beautify mining area and surrounding enviroment.Have small investment simultaneously, the characteristics that the duration is short, because simple in structure, the later maintenance expense is low.
Description of drawings
Fig. 1 is the inventive method sketch map.
The specific embodiment
Below in conjunction with specific embodiment, the present invention is elaborated.
Press with reference to figure 1 regulation side slope 1: with grade of side slope (tangent value of slope angle) arrangement is 1: 1.5-1: 3, and cohesive soil was got 1: 1.5, and grit stone was got 1: 3, and other great soil group is got median.
Build platform 2: the every rising 6-12m of vertical height (cohesive soil is got 12m, and grit stone is got 6m, and other great soil group is got median) and build levelling bench, width is 5m.
Build horizontal rows ditch 3: build the horizontal rows ditch at the platform middle part, discharge section is trapezoidal, bottom width 1m, and top width 2m, height 1m is with the concrete precast block lining cutting or build.
Build drain way 4: horizontal direction is every on domatic builds a drain way perpendicular to the horizontal rows ditch at a distance from 30m, in order to drain the current in the horizontal ditch.Section configuration, size and lining cutting mode are the same.
The top, refuse dump is trimmed to certain slope, is convenient to rain drainage, and the gradient is looked location precipitation size and decided, and northern α=2-3 °, southern α=3-5 °.If top, the refuse dump gradient does not reach aforementioned requirement, build net of canals and ditches 6 at the top, so that rainfall runoff compiles drainage fast, directly excavation forms, not lining cutting, and be connected to drain way.
Vegetation slope pavement: be prevention soil and water loss, stable side slope, plantation shrub 7 utilizes its root system soil and slope protection on side slope; The plantation arbor at the top, refuse dump, density is looked tree characteristics and is decided, and under its normal growth condition, adopts dense planting.Seeds are selected local autochthonal seeds for use, can guarantee survival rate.
Should be understood that, concerning those of ordinary skills, can improve or conversion, and all these improvement and conversion all should belong to the protection domain of accompanying claims of the present invention according to above-mentioned explanation.
Claims (1)
1. a surface mine refuse dump slope treatment method is characterized in that, is 1 with the grade of side slope arrangement: 1.5-1: 3, and cohesive soil was got 1: 1.5, and grit stone was got 1: 3, and other great soil group is got median; Build platform (2): the every rising 6-12m of vertical height builds levelling bench, and width is 5m; Build horizontal rows ditch (3): build the horizontal rows ditch at the platform middle part, discharge section is trapezoidal, bottom width 1m, and top width 2m, height 1m is with the concrete precast block lining cutting or build; Build drain way (4): horizontal direction is every on domatic builds a drain way perpendicular to the horizontal rows ditch at a distance from 30m, in order to drain the current in the horizontal ditch; The top, refuse dump is trimmed to certain slope, is convenient to rain drainage, and the gradient is looked location precipitation size and decided, and northern α=2-3 °, southern α=3-5 °; If top, the refuse dump gradient does not reach aforementioned requirement, build net of canals and ditches (6) at the top, so that rainfall runoff compiles drainage fast, directly excavation forms, not lining cutting, and be connected to drain way; Vegetation slope pavement: be prevention soil and water loss, stable side slope is planted shrub (7) on side slope, utilize its root system soil and slope protection; The plantation arbor at the top, refuse dump.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210214485.5A CN102733401B (en) | 2012-06-25 | 2012-06-25 | Method for treating dump slope of surface mine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210214485.5A CN102733401B (en) | 2012-06-25 | 2012-06-25 | Method for treating dump slope of surface mine |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102733401A true CN102733401A (en) | 2012-10-17 |
CN102733401B CN102733401B (en) | 2015-05-06 |
Family
ID=46989658
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210214485.5A Expired - Fee Related CN102733401B (en) | 2012-06-25 | 2012-06-25 | Method for treating dump slope of surface mine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102733401B (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102888832A (en) * | 2012-10-22 | 2013-01-23 | 金丹越 | Construction method of furrow-shaped slow flow ecological purification system |
CN102913246A (en) * | 2012-10-30 | 2013-02-06 | 中国科学院地质与地球物理研究所 | Solid potash ore open-pit mining method under condition of tropical monsoon climate |
CN103277136A (en) * | 2013-04-15 | 2013-09-04 | 中国神华能源股份有限公司 | Draining system |
CN103866774A (en) * | 2014-03-31 | 2014-06-18 | 张锦宇 | Ditch pipe network protection body for slope protection and collapsing hill drainage and soil fixation |
CN103999592A (en) * | 2014-05-26 | 2014-08-27 | 华南农业大学 | Method for avoiding vegetation degradation of acid mine waste rock yard |
CN104234010A (en) * | 2014-08-15 | 2014-12-24 | 内蒙古大学 | Construction method for ecological draining and accumulating water channel |
CN105075551A (en) * | 2014-05-07 | 2015-11-25 | 黄弘 | Method for afforesting terrace planting tank type side slope |
CN105155555A (en) * | 2015-06-20 | 2015-12-16 | 广东安元矿业勘察设计有限公司 | Method for preventing water and soil loss in refuse dump |
CN106688357A (en) * | 2016-12-19 | 2017-05-24 | 陈贺铭 | Iron mine waste land vegetation recovery method |
CN107152030A (en) * | 2017-06-30 | 2017-09-12 | 西安科技大学 | A kind of Slope of Open Pit Coal Mine administering method |
CN107724402A (en) * | 2017-11-08 | 2018-02-23 | 广西南宁胜祺安科技开发有限公司 | A kind of spoil ground regulation method |
CN109555139A (en) * | 2018-12-29 | 2019-04-02 | 内蒙古蒙草生态环境(集团)股份有限公司 | Extremely frigid zones collapsibility refuse dump abrupt slope means of defence |
CN109566290A (en) * | 2019-01-10 | 2019-04-05 | 辽宁大学 | A kind of Mine production side slope vegetation restorative procedure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0813500A (en) * | 1994-07-04 | 1996-01-16 | Studio Kiyabu:Kk | Slope surface protection net for drainage channel |
JP2009243225A (en) * | 2008-03-31 | 2009-10-22 | Railway Technical Res Inst | Method for forming mixture of long fiber-hardener-soil |
CN102071697A (en) * | 2011-02-12 | 2011-05-25 | 河海大学 | Hard reinforced concrete revetment slope biological repairing method |
CN102080381A (en) * | 2010-12-31 | 2011-06-01 | 佛山市顺德电力设计院有限公司 | Method for managing landslip of side slope landslide for transformer substation |
CN102418346A (en) * | 2011-10-13 | 2012-04-18 | 中钢集团马鞍山矿山研究院有限公司 | Mine dump horizontal flat plate remediation and ecological restoration method |
CN102444134A (en) * | 2011-10-09 | 2012-05-09 | 东南大学 | Slope protecting method based on slope with soil layer as upper part and rock layer as lower part |
-
2012
- 2012-06-25 CN CN201210214485.5A patent/CN102733401B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0813500A (en) * | 1994-07-04 | 1996-01-16 | Studio Kiyabu:Kk | Slope surface protection net for drainage channel |
JP2009243225A (en) * | 2008-03-31 | 2009-10-22 | Railway Technical Res Inst | Method for forming mixture of long fiber-hardener-soil |
CN102080381A (en) * | 2010-12-31 | 2011-06-01 | 佛山市顺德电力设计院有限公司 | Method for managing landslip of side slope landslide for transformer substation |
CN102071697A (en) * | 2011-02-12 | 2011-05-25 | 河海大学 | Hard reinforced concrete revetment slope biological repairing method |
CN102444134A (en) * | 2011-10-09 | 2012-05-09 | 东南大学 | Slope protecting method based on slope with soil layer as upper part and rock layer as lower part |
CN102418346A (en) * | 2011-10-13 | 2012-04-18 | 中钢集团马鞍山矿山研究院有限公司 | Mine dump horizontal flat plate remediation and ecological restoration method |
Non-Patent Citations (1)
Title |
---|
刘陶安等: ""铀矿山废石场边坡稳定化设计"", 《铀矿冶》 * |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102888832A (en) * | 2012-10-22 | 2013-01-23 | 金丹越 | Construction method of furrow-shaped slow flow ecological purification system |
CN102913246A (en) * | 2012-10-30 | 2013-02-06 | 中国科学院地质与地球物理研究所 | Solid potash ore open-pit mining method under condition of tropical monsoon climate |
CN102913246B (en) * | 2012-10-30 | 2014-10-08 | 中国科学院地质与地球物理研究所 | Solid potash ore open-pit mining method under condition of tropical monsoon climate |
CN103277136A (en) * | 2013-04-15 | 2013-09-04 | 中国神华能源股份有限公司 | Draining system |
CN103866774A (en) * | 2014-03-31 | 2014-06-18 | 张锦宇 | Ditch pipe network protection body for slope protection and collapsing hill drainage and soil fixation |
CN105075551A (en) * | 2014-05-07 | 2015-11-25 | 黄弘 | Method for afforesting terrace planting tank type side slope |
CN103999592A (en) * | 2014-05-26 | 2014-08-27 | 华南农业大学 | Method for avoiding vegetation degradation of acid mine waste rock yard |
CN103999592B (en) * | 2014-05-26 | 2016-08-24 | 华南农业大学 | A kind of method preventing acid mining area waste-rock yard vegetation degeneration |
CN104234010B (en) * | 2014-08-15 | 2017-05-17 | 内蒙古大学 | Construction method for ecological draining and accumulating water channel |
CN104234010A (en) * | 2014-08-15 | 2014-12-24 | 内蒙古大学 | Construction method for ecological draining and accumulating water channel |
CN105155555A (en) * | 2015-06-20 | 2015-12-16 | 广东安元矿业勘察设计有限公司 | Method for preventing water and soil loss in refuse dump |
CN106688357A (en) * | 2016-12-19 | 2017-05-24 | 陈贺铭 | Iron mine waste land vegetation recovery method |
CN107152030A (en) * | 2017-06-30 | 2017-09-12 | 西安科技大学 | A kind of Slope of Open Pit Coal Mine administering method |
CN107724402A (en) * | 2017-11-08 | 2018-02-23 | 广西南宁胜祺安科技开发有限公司 | A kind of spoil ground regulation method |
CN107724402B (en) * | 2017-11-08 | 2019-06-07 | 广西南宁胜祺安科技开发有限公司 | A kind of spoil ground regulation method |
CN109555139A (en) * | 2018-12-29 | 2019-04-02 | 内蒙古蒙草生态环境(集团)股份有限公司 | Extremely frigid zones collapsibility refuse dump abrupt slope means of defence |
CN109566290A (en) * | 2019-01-10 | 2019-04-05 | 辽宁大学 | A kind of Mine production side slope vegetation restorative procedure |
Also Published As
Publication number | Publication date |
---|---|
CN102733401B (en) | 2015-05-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102733401B (en) | Method for treating dump slope of surface mine | |
CN103039147B (en) | Reclamation method for sunk paddy field caused by mining in mountainous regions | |
CN105230323B (en) | A kind of growth-promoting binary stereoscopic configurations pattern against corrosion suitable for feldspathic sandstone small watershed | |
CN101580305B (en) | Wetland governance method for improving ecological environmental in reservoir falling zone | |
CN106759104B (en) | Ecological slope protection structure and construction method | |
CN102392455A (en) | Technique for safe improvement as well as ecological repair and reconstruction of mine soil discharge yard | |
CN102392454A (en) | Adverse-slope flat-plate treating and ecological restorative measure for refuse dump | |
CN204220612U (en) | Repair the green of heavy metals mining area soil and plant structure | |
CN210827501U (en) | Greening structure of stock ground rock slope | |
CN106368227A (en) | Water erosion prevention system and method for ecology of slope of abandoned rear-earth mine land | |
CN203977363U (en) | A kind of ecological slope protection | |
CN109005722B (en) | Comprehensive reclamation method for land reclamation of iron ore waste stone yard | |
CN102418346A (en) | Mine dump horizontal flat plate remediation and ecological restoration method | |
CN110424421A (en) | Abandoned mine raised fields goes along with sb. to guard him ecological restoring method | |
CN104294830A (en) | Side slope ecological protection and recovery method and arrangement structure | |
CN105672198B (en) | Land-building and plowing structure for reservoir inundation and immersion area and construction method thereof | |
CN114134877B (en) | Treatment method for mining ground cracks of shallow coal seam in hilly and hilly areas of peaked landform | |
CN105340408A (en) | Afforestation and soil preparation method for rocky barren mountains in semi-arid regions | |
CN202509509U (en) | Novel slope protection structure | |
CN211922648U (en) | Ecological restoration type rare earth tailings | |
CN104695379A (en) | Ecological river channel revetment structure | |
CN203096697U (en) | Ballast field structure at earth and rockfill dam toe | |
CN202369883U (en) | Road base treatment structure for soft soil region | |
CN206245319U (en) | A kind of anti-rare earth slash side slope water erosion system | |
CN205546463U (en) | Ecological recovery system of slope vegetation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
DD01 | Delivery of document by public notice |
Addressee: Northwest Research Institute of Engineering Investigations and Design Document name: Notification to Pay the Fees |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150506 Termination date: 20160625 |
|
CF01 | Termination of patent right due to non-payment of annual fee |