CN103001104A - 10kV、35kV电力配电电缆铜屏蔽层剥切方法 - Google Patents
10kV、35kV电力配电电缆铜屏蔽层剥切方法 Download PDFInfo
- Publication number
- CN103001104A CN103001104A CN2012105363515A CN201210536351A CN103001104A CN 103001104 A CN103001104 A CN 103001104A CN 2012105363515 A CN2012105363515 A CN 2012105363515A CN 201210536351 A CN201210536351 A CN 201210536351A CN 103001104 A CN103001104 A CN 103001104A
- Authority
- CN
- China
- Prior art keywords
- constant force
- force spring
- copper
- power distribution
- distribution cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Removal Of Insulation Or Armoring From Wires Or Cables (AREA)
Abstract
一种10kV、35kV电力配电电缆铜屏蔽层剥切方法,步骤如下:在铜屏蔽层上待切断位置做出标记;将恒力弹簧套装在铜屏蔽层外;在铜屏蔽层与恒力弹簧交界处最上层的铜带与恒力弹簧的交界点上切割豁口;紧贴恒力弹簧端面将铜带撕开,并沿铜屏蔽层的缠绕方向拆解铜带;继续剥切电力配电电缆工作。由于采用切割豁口,并沿豁口撕断铜带以剥切铜屏蔽层,不会伤及半导电层,保证了电缆接头的质量。由于恒力弹簧为刚性,且其端面整齐,沿恒力弹簧端面撕开铜带,铜带断口整齐,剥切质量好。由于恒力弹簧的抱紧力足够大,避免了因恒力弹簧窜动导致撕歪的现象,保证了电力配电电缆电缆头的连接质量。过程方便快捷,操作简便,节约时间,工作效率增加。
Description
技术领域
本发明涉及一种电力配电电缆电缆头的安装方法,特别涉及一种10kV、35kV电力配电电缆铜屏蔽层剥切方法。
背景技术
为实现电力配电电缆与电力设备之间的连接,需要在电力配电电缆上安装电缆头。一般,电缆由外至内包括外被层、铠装层、内护套、填料、铜屏蔽层、半导电层、主绝缘层、导体共八个层次,其中,铜屏蔽层是由一条完整的铜带螺旋叠层缠绕而成。为安装电缆头,必须将电力配电电缆的主绝缘层以外的各层剥离。电缆头是电力配电电缆线路中最薄弱的部分,其安装质量的好坏决定电缆线路是否能够安全运行,而其安装质量的好坏取决于剥离的工作质量,剥离中非常关键的一步在于电力配电电缆铜屏蔽层的剥切。
传统的剥切铜屏蔽层的方法是:将电力配电电缆铜屏蔽层以外的各层剥离,在铜屏蔽层上待切断位置做出标记,沿标记直接用刀进行环切,将切断的铜屏蔽层的铜带剥离。该方法费时费力,且易切歪,影响剥切质量。
与其它等级的电力配电电缆相比,10kV、35kV电力配电电缆的结构具有特殊性:10kV以下级别的电缆不设置铜屏蔽层,35kV以上级别的电缆的铜屏蔽层厚度大,10kV、35kV电力配电电缆的铜屏蔽层薄,在进行环切时极易伤及电缆的半导电层、主绝缘层,进而影响电力配电电缆电缆头处的电磁场,传统方法的剥切质量差,且会造成电缆头内电缆本体损伤,从而缩短电缆头运行时间。
发明内容
本发明要解决的技术问题是提供一种安全、快速、便捷,可有效避免切歪以及伤及半导电层的10kV、35kV电力配电电缆铜屏蔽层剥切方法。
本发明是这样实现的:
一种10kV、35kV电力配电电缆铜屏蔽层剥切方法,其特殊之处是具体步骤如下:
1、将电力配电电缆铜屏蔽层以外各层剥离,预备;
2、在铜屏蔽层上待切断位置做出标记;
3、选取恒力弹簧,该恒力弹簧的内径小于铜屏蔽层的外径,将恒力弹簧套装在铜屏蔽层外,使恒力弹簧的一端与标记平齐,另一端位于铜屏蔽层待保留的一侧;
4、在铜屏蔽层与恒力弹簧交界处最上层的铜带与恒力弹簧的交界点上切割豁口,所述切割豁口的具体要求如下:铜带的厚度≤轴向的切割深度<两层铜带的厚度;
5、紧贴恒力弹簧端面将铜带撕开,并沿铜屏蔽层的缠绕方向拆解铜带;
6、拆下恒力弹簧,继续剥切电力配电电缆工作。
选取恒力弹簧时,恒力弹簧的直径参数条件如下:电力配电电缆的直径的65%≤恒力弹簧的直径≤电力配电电缆的直径的75%,以保证恒力弹簧对电力配电电缆的抱箍力且不损伤电缆的铜屏蔽层。
切割豁口时,该豁口紧贴恒力弹簧的端面,以避免切割、拆解完成后,剩余部分产生毛边。
本发明的有益效果是:
1、由于采用切割豁口,并沿豁口撕断铜带以剥切铜屏蔽层,不会伤及半导电层,保证了电缆接头的质量。
2、由于恒力弹簧为刚性,且其端面整齐,沿恒力弹簧端面撕开铜带,铜带断口整齐,剥切质量好。
3、由于恒力弹簧的抱紧力足够大,避免了因恒力弹簧窜动导致撕歪的现象,保证了电力配电电缆电缆头的连接质量。
4、整个过程方便快捷,操作简便,节约时间,工作效率大大增加。
附图说明
图1请给出剥切时电缆各层的状态示意图。
图中:铜屏蔽层1,恒力弹簧2。
具体实施方式
为方便说明,以35kV电力配电电缆为例,进行说明。所述35kV电力配电电缆的直径为95mm。
如图所示,该35kV电力配电电缆铜屏蔽层剥切方法,具体步骤如下:
1、将35kV电力配电电缆铜屏蔽层以外的外被层、铠装层、内护套、填料剥离,预备。
2、在铜屏蔽层1上待切断位置,在本实施例中,所述带切断位置为与35kV电力配电电缆一端距离35mm处,做出色相标记。
3、选取恒力弹簧,该恒力弹簧2的直径为65mm,将恒力弹簧2套装在铜屏蔽层外,使恒力弹簧2的一端与标记平齐,另一端位于铜屏蔽层1待保留的一侧。
4、在铜屏蔽层1与恒力弹簧2交界处最上层的铜带与恒力弹簧2的交界点上切割豁口,切割时,将最上层的铜带切透,且不能切透第二层铜带,切口需紧贴恒力弹簧2的端面。
5、紧贴恒力弹簧2端面将铜带撕开,并沿铜屏蔽层1的缠绕方向拆解铜带。
6、拆下恒力弹簧2,继续剥切电力配电电缆工作。
Claims (3)
1.一种10kV、35kV电力配电电缆铜屏蔽层剥切方法,其特征是具体步骤如下:
(1)、将电力配电电缆铜屏蔽层以外各层剥离,预备;
(2)、在铜屏蔽层上待切断位置做出标记;
(3)、选取恒力弹簧,该恒力弹簧的内径小于铜屏蔽层的外径,将恒力弹簧套装在铜屏蔽层外,使恒力弹簧的一端与标记平齐,另一端位于铜屏蔽层待保留的一侧;
(4)、在铜屏蔽层与恒力弹簧交界处最上层的铜带与恒力弹簧的交界点上切割豁口,所述切割豁口的具体要求如下:铜带的厚度≤轴向的切割深度<两层铜带的厚度;
(5)、紧贴恒力弹簧端面将铜带撕开,并沿铜屏蔽层的缠绕方向拆解铜带;
(6)、拆下恒力弹簧,继续剥切电力配电电缆工作。
2.根据权利要求1所述的10kV、35kV电力配电电缆铜屏蔽层剥切方法,其特征是:选取恒力弹簧时,恒力弹簧的直径参数条件如下:电力配电电缆的直径的65%≤恒力弹簧的直径≤电力配电电缆的直径的75%。
3.根据权利要求1所述的10kV、35kV电力配电电缆铜屏蔽层剥切方法,其特征是:切割豁口时,该豁口紧贴恒力弹簧的端面。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012105363515A CN103001104A (zh) | 2012-12-13 | 2012-12-13 | 10kV、35kV电力配电电缆铜屏蔽层剥切方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012105363515A CN103001104A (zh) | 2012-12-13 | 2012-12-13 | 10kV、35kV电力配电电缆铜屏蔽层剥切方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103001104A true CN103001104A (zh) | 2013-03-27 |
Family
ID=47929381
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012105363515A Pending CN103001104A (zh) | 2012-12-13 | 2012-12-13 | 10kV、35kV电力配电电缆铜屏蔽层剥切方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103001104A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103928822A (zh) * | 2014-04-23 | 2014-07-16 | 北方国际合作股份有限公司 | 一种高压电缆绝缘屏蔽层剥离后的清理装置 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101252266A (zh) * | 2008-04-14 | 2008-08-27 | 吉福合成电气(北京)有限公司 | 三芯电缆冷缩终端安装工艺 |
CN101465527A (zh) * | 2008-12-12 | 2009-06-24 | 河南省电力公司信阳供电公司 | 电缆中间接头接地故障绕包抢修方法 |
CN102377127A (zh) * | 2010-08-12 | 2012-03-14 | 五冶集团上海有限公司 | 苯加氢工程高压电力电缆终端头制作方法 |
CN102570374A (zh) * | 2012-03-27 | 2012-07-11 | 齐齐哈尔电业局 | 加长型10kV热缩三芯交联聚乙烯电缆中间接头的连接方法 |
CN102780195A (zh) * | 2012-07-27 | 2012-11-14 | 中国二十二冶集团有限公司 | 10-35kv冷缩电缆终端头及其制作方法 |
-
2012
- 2012-12-13 CN CN2012105363515A patent/CN103001104A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101252266A (zh) * | 2008-04-14 | 2008-08-27 | 吉福合成电气(北京)有限公司 | 三芯电缆冷缩终端安装工艺 |
CN101465527A (zh) * | 2008-12-12 | 2009-06-24 | 河南省电力公司信阳供电公司 | 电缆中间接头接地故障绕包抢修方法 |
CN102377127A (zh) * | 2010-08-12 | 2012-03-14 | 五冶集团上海有限公司 | 苯加氢工程高压电力电缆终端头制作方法 |
CN102570374A (zh) * | 2012-03-27 | 2012-07-11 | 齐齐哈尔电业局 | 加长型10kV热缩三芯交联聚乙烯电缆中间接头的连接方法 |
CN102780195A (zh) * | 2012-07-27 | 2012-11-14 | 中国二十二冶集团有限公司 | 10-35kv冷缩电缆终端头及其制作方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103928822A (zh) * | 2014-04-23 | 2014-07-16 | 北方国际合作股份有限公司 | 一种高压电缆绝缘屏蔽层剥离后的清理装置 |
CN103928822B (zh) * | 2014-04-23 | 2016-01-06 | 北方国际合作股份有限公司 | 一种高压电缆绝缘屏蔽层剥离后的清理装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105390907A (zh) | 新型电缆自动剥皮机 | |
WO2012135485A3 (en) | Split conductive mid-span ground clamp | |
CN103001104A (zh) | 10kV、35kV电力配电电缆铜屏蔽层剥切方法 | |
CN106159818A (zh) | 废旧线缆切削用刀具 | |
CN202058874U (zh) | 一种电缆接头 | |
CN203883633U (zh) | 一种大功率永磁发电机磁钢安装装置 | |
KR20100012665U (ko) | 케이블용 피복 탈피 및 심선 면취기 | |
JP2012016257A (ja) | 電線被覆剥離工具 | |
CN206908084U (zh) | 绝缘层切削机构 | |
CN207490425U (zh) | 一种便携式lgj-钢芯铝绞线定位把持器 | |
CN203932644U (zh) | 一种钢芯铝绞线剥丝器 | |
CN210296007U (zh) | 一种电线 | |
CN210326753U (zh) | 一种高压电缆局部剥切的固定装置 | |
CN107706834A (zh) | 剥离废电线外皮的刀头装置 | |
CN110993176B (zh) | 一种岸电供电用卷筒电缆 | |
CN210350641U (zh) | 一种电缆剥皮器 | |
JP2006331654A (ja) | アース線付き電線 | |
JP6214649B2 (ja) | ケーブル端子用入口漏斗 | |
CN102062261B (zh) | 一种开关设备的自封式电缆进出线装置 | |
CN203134401U (zh) | 强磁场用电源线 | |
CN217306892U (zh) | 一种稳定型dc共插线 | |
CN220984221U (zh) | 一种易撕电缆 | |
CN103151675B (zh) | 剥离装置 | |
CN201274319Y (zh) | 一种快速接线的动力电缆接头 | |
CN204615289U (zh) | 废旧线缆绝缘层的剥离器 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130327 |