CN102884960A - Wire-type greening material and method for setting the same - Google Patents

Wire-type greening material and method for setting the same Download PDF

Info

Publication number
CN102884960A
CN102884960A CN2012100961048A CN201210096104A CN102884960A CN 102884960 A CN102884960 A CN 102884960A CN 2012100961048 A CN2012100961048 A CN 2012100961048A CN 201210096104 A CN201210096104 A CN 201210096104A CN 102884960 A CN102884960 A CN 102884960A
Authority
CN
China
Prior art keywords
wire
greening
bolt
buckling parts
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100961048A
Other languages
Chinese (zh)
Other versions
CN102884960B (en
Inventor
牧隆
猪俣景悟
久保田依秀
清水克哉
大桥丰
泷泽哲也
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OHSHIMA ZOEN DOBOKU KK
DAITO TECHNO GREEN KK
Toyota Motor Corp
Original Assignee
OHSHIMA ZOEN DOBOKU KK
DAITO TECHNO GREEN KK
Toyota Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OHSHIMA ZOEN DOBOKU KK, DAITO TECHNO GREEN KK, Toyota Motor Corp filed Critical OHSHIMA ZOEN DOBOKU KK
Publication of CN102884960A publication Critical patent/CN102884960A/en
Application granted granted Critical
Publication of CN102884960B publication Critical patent/CN102884960B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Plants (AREA)
  • Finishing Walls (AREA)
  • Cultivation Of Plants (AREA)

Abstract

The invention provides a wire-type greening material and a method for setting the same. In a method for fixing wire ropes of wire-type greening materials one by one at the top and bottom, the climbing of a climbing plant is slow and the plant easily slides down. If a lattice-shaped material is used, exclusive node fixtures or node anchor fixtures are required and work in site is inefficient and the material is expensive. Although a tension introducing mechanism for preventing the swinging or vibration of wire ropes is provided, a mark for determining the introduced tension cannot be easily discriminated because the mark comes to a position at the upper end of a greening wall surface if the mark is disposed at the upper end of a wire. If wires are manually pulled, the pulling forces are different among individuals and there is a risk of the wire falling off an angle at the top or a risk of the angle itself being ripped off the greening surface if the pulling force is too strong. The wire-type greening material (1) is composed of a pair of parallel wires and a stay laid between the wires. The wires of the greening material are stretched over a greening surface by connecting the proximal ends of the wires to the greening surface via a tension introducing mechanism and connecting the other ends directly to the greening surface.

Description

The greening of wire type material and method to set up thereof
Technical field
The present invention relates to greening material and the method to set up thereof of wire type, open at greening face and establish wire, plant is extended as guiding piece with this wire, thereby greening face is afforested.
Background technology
As the wall greening that need to watch towards the wall greening of the daylighting of building inboard, from the inboard under the wall greening that also can guarantee to a certain extent view and the situation that can not be directly fixed on the building wall wall materials such as curtain wall, existing with wire or the fleece method of seeking connections with the type that auxiliary material afforest as plant.The method is wire or fleece to be set and method that vining plant is sought connections with, but mostly is greatly steel wire rope fixing method up and down, even steel wire rope is clathrate, owing to must be fixed etc. the intersection point accessory of special use or intersection point, price is high mostly.
In addition, when using steel wire rope to afforest, the steel wire rope of setting mostly because of the time through and the impact of temperature etc. relax, the steel wire rope of setting produces upset, vibration etc. because of wind etc., thereby becomes the one of the main reasons of obstruction vining plant smooth growth.Therefore, need to import tension force to steel wire rope, with the swing that prevents from causing because of blast etc., and the tendril of vining plant is not come off from wire, but this operation bother very much.
In patent documentation 1 (TOHKEMY 2006-36 communique), put down in writing and used the first ironware and the second ironware when the wire that is used for the wall greening imported tension force.For the structure of the first ironware 10, in the 0019th section, be illustrated, for setting position, in Fig. 2, be illustrated in the upper end of ALC plate 4.In addition, for the structure of the second ironware 11, in the 0021st section, be illustrated, for setting position, in Fig. 2, be illustrated in the bottom of ALC plate 4.
About wire 6b is imported tension force, put down in writing later at the 0022nd section the 5th row " ... the other end (lower end) side of wire 6b is remained in the second ironware on the angle steel parts that are installed in the below successively.Continue to draw, in the time on wire 6b, will feeling elastic force, be compressed at tension buffer spring 19 and stop when moderate.", hence one can see that, is to come stretched wire with manpower.
Patent documentation 1: TOHKEMY 2006-36 communique
Generally speaking, in the method that the steel wire rope of each root is fixed up and down, seeking connections with of vining plant is slow, and the easy landing of plant.In addition, cancellate steel wire rope must use intersection point accessory and the intersection point fixture of the special use that patent documentation 1 puts down in writing, and therefore, on-the-spot operating efficiency is poor, and price is high mostly.
In addition, in order further to improve the anti-slip effect, need to prevent simultaneously that blast etc. from causing wire to wave, and can not come off from wire the tendril of vining plant usually.
As the lax upset that causes that prevents steel wire rope and the invention of vibration, be provided with the tension force introducing mechanism that patent documentation 1 is put down in writing.But the sign 36 of the benchmark that imports as tension force is arranged at wire 6b, and this sign is 36 both little, be positioned at again the upper end of wall, sees and maybe can't distinguish etc. possible so exist to leak.Because wire is stretched by manpower, so there is individual differences in the power of stretching, has served as when stretching doughtily, exist the first ironware from angle steel element falling, angle steel parts itself from possibilities such as wall peel off.
Summary of the invention
The greening of the wire type that (technical scheme 1) the present invention relates to is made of the pair of metal silk that walks abreast and the stay that is set up between this wire with material (following with " the greening material of wire type " referred to as " greening use material ").
This greening covers the wall, enclosure wall, slope of greening face, for example building and is installed on this greening face with material.Greening face is generally such facade, in the situation of the plant that laterally seeks connections with form, the situation that forms horizontal plane is arranged also.This installs and uses bolt, nut directly carries out at greening face, perhaps pair of metal silk support member is set up in parallel in the both ends of greening face, and wire is opened be located between two wire support member.Can certainly adopt these methods installation method in addition.Use material, pair of metal silk to come Bao to hold Yi by stay for this greening and Ding De Inter every walking abreast, therefore, easy with respect to the laying of greening face, tendril etc. are wound in stay, thereby plant extends easily.
When planting vining plant by planting machine, this planting machine is disposed at the distolateral of greening face, perhaps directly plant in one of the greening face distolateral ground, while so that plant is wound in the greening of wire type grows with material.At early growth period, while making tendril be wound in wire, vining plant grows down.
When vining plant arrived greening with the decorating position of the stay of material, the tendril of a part was twined this stay, while main tendril and then be wound in wire and grow down, therefore, plant can easily seek connections with.And because materials'use wire use in this greening, so can its length of free setting, large-scale greening face can be covered with single material, so workability can be improved.
Generally speaking, in the method that each root steel wire rope is fixed up and down, seeking connections with of vining plant is slow, and the easy landing of plant.In addition, cancellate steel wire rope must use intersection point accessory and the intersection point fixture of the special use that patent documentation 1 puts down in writing, and therefore, on-the-spot operating efficiency is poor, and price is high mostly.According to the present invention, can make in advance parallel pair of metal silk and be set up in stay between this wire in factory, can be made into web-like and carry, can cut off this wire according to the length of greening face and use, thereby make on-the-spot operation become easy.
(technical scheme 2) this stay also can be for being adapted to many bracing bars of ladder shape.
(technical scheme 3) this stay also can be by a kind of this wire that is installed in riveted joint, chock, coil, the bonding and welding.
(technical scheme 4) this stay also can for consist of terrible pin figure (claim again picture ghost pin, a kind of lot or the method for salary distribution, the Japanese original text is that A Mituo signs, あ body だ く じ) random arrangement of a part of shape configuration.
A described greening in (technical scheme 5) technical scheme 1 to 4 is opened on the greening face of being located at this wire of material.This base end part wiry is connected and fixed on this greening face via the tension force introducing mechanism.And this other end wiry directly is connected and fixed on this greening face.
(technical scheme 6) this greening face also can be facade, and this tension force introducing mechanism is equipped on the bottom of this greening face.
(technical scheme 7) also can be, this tension force introducing mechanism comprises extension spring and tensioning apparatus, this extension spring has coil portion, at one end possesses fixing buckling parts across this coil portion, possesses movable buckling parts at the other end, this tensioning apparatus possesses bolt, clamp nut and be installed on the wire support member of the bottom of this greening face, this wire is connected in this extension spring, the buckling parts that should fix of this extension spring was fastened on this bolt with this movable buckling parts, this bolt loosely is inserted through the screw hole of the horizontal plane that passes this wire support member from this wire side, and this clamp nut is screwed together in from the outstanding protuberance of this horizontal plane.
(technical scheme 8) also can be, this tension force introducing mechanism comprises Compress Spring and tensioning apparatus, this Compress Spring has coil portion, at one end possesses fixing buckling parts across this coil portion, possesses movable buckling parts at the other end, buckling parts that should be fixing and this movable buckling parts are positioned at the end of the wrist of giving prominence to from each end of this coil portion with the state that intersects in the end view of this Compress Spring and vertical view, adopt and above-mentioned this same tensioning apparatus, this wire is connected in this Compress Spring, and with this Compress Spring should be fixing buckling parts and this movable buckling parts be fastened on this bolt, formation in the same manner as described above afterwards.
(technical scheme 9) also can be, this tension force introducing mechanism comprises torsionspring, cover body and tensioning apparatus, this torsionspring is coiled type, this cover body has: by sidewall and the resettlement section of end wall restriction, the screw hole that passes this end wall and this installation portion wiry, adopt this tensioning apparatus same as described above, this wire is connected in this installation portion, this torsionspring coiling is installed on this bolt and is loaded to this cover body, make this bolt outstanding to the outside from this screw hole, consist of in the same manner as described above afterwards.
(technical scheme 10) also can be, this tension force introducing mechanism comprises flat spring and tensioning apparatus, this flat spring disposes the spring that forms for the sheet material with pair of curved relatively so that form the mode in spring space between two sheet materials, this inserting hole wiry passes both ends, through hole passes this spring space segment, adopt this tensioning apparatus same as described above, this wire is inserted through this inserting hole of this spring part, and this bolt loosely is being inserted through this through hole, consist of in the same manner as described above afterwards.
(technical scheme 11) also can be provided with on this bolt and import the mark that tension force is used.
The invention effect
According to the greening material that the present invention relates to, parallel pair of metal silk and the operation of setting up stay between this wire can be carried out in factory in advance, also can be made into web-like carries, and can cut off this wire and use according to the length of greening face, therefore can improve workability, when vining plant arrives the decorating position of stay, the tendril of a part is wound in this stay, main tendril and then grow down while being wound in wire, therefore, plant seeks connections with easily, can eliminate that vining plant seeks connections with slowly in the situation of steel cable, and the shortcoming of the easy landing of plant.
According to the method to set up of the greening that the present invention relates to material, can between greening face and each wire, keep seeking connections with the gap, can afforest greening face by seeking connections with of plant, can import needed tension force to wire, therefore, help to prevent from waving etc.
Description of drawings
Fig. 1 erects greening that the use STA representation of setting the present invention relates to the front view of the concrete example of material.
Fig. 2 erects greening that the use STA representation of setting the present invention relates to the right side view of the concrete example of material.
Fig. 3 is that expression is afforested with the end view of material with respect to the concrete example on the top that is connected and fixed structure of greening face.
Fig. 4 is the end view of the concrete example of expression tension force introducing mechanism.
Fig. 5 is the front view of the concrete example of expression tension force introducing mechanism.
Fig. 6 is the end view of concrete example of the operating state of expression tension force introducing mechanism.
Fig. 7 is the end view of other concrete examples of expression tension force introducing mechanism.
Fig. 8 represents the vertical view of same spring part.
The end view of the another concrete example of the tension force introducing mechanism when Fig. 9 is expression employing cylindrical shell.
The end view of the another concrete example of the tension force introducing mechanism when Figure 10 is expression employing framework.
Figure 11 is the stereogram of framework.
Figure 12 is the vertical view of part of the framework of Figure 10.
The end view of the another concrete example of the tension force introducing mechanism when Figure 13 is expression employing flat spring.
Figure 14 is the vertical view of sheet material.
Label declaration
1 greening material
1a~1d unit
2 wires
The 2a base end part
2b the other end
3 stays
P afforests face
P ' bottom
The S plant
The B planting machine
Karat gold belongs to the silk support member
The L mounting screw
4 tension force introducing mechanisms
51 extension springs
52 Compress Springs
53 torsionsprings
54 flat springs
6 tensioning apparatus
71,72 coil portions
81,82 buckling parts of fixing
91,92 movable buckling parts
10 bolts
The H bolt head
J, J ' nut
11 clamp nuts
12 wire support member
13 horizontal planes
14 screw holes
15 protuberances
16,17 wrists
18 cover bodies
19 sidewalls
20 end walls
21 resettlement sections
22 screw holes
23 installation portions
24,25 sheet materials
26 spring spaces
27,28 inserting holes
29,30 through holes
31 marks
Embodiment
Below, with reference to the state of setting that erects of accompanying drawing embodiments of the present invention are described.Greening face P is generally the facade as the wall of building, but such horizontal plane of the roof greening of such inclined plane, slope, building etc. is also arranged.The present invention also can be applied to these greening faces.
(technical scheme 1) Fig. 1 and Fig. 2 use the concrete example of material 1 with the greening that represents with state the present invention relates to.This greening with material 1 by parallel pair of metal silk 2,2 and the stay 3 that is set up between these wires 2,2 consist of.In Fig. 1, be expressed as situation: with four greenings that so consist of with material 1 set as a unit, four 1a of unit~1d along continuous straight runs are located between the wire support member K and 12 of upper and lower side by side, cover greening face P.
Each stay 3 is expressed as different arrangements in each 1a~1d of unit, this only is used for reference, can be unified into same arrangement or be combined into different arrangement etc., can freely select.
Greening in the example of Fig. 1 is as follows with the arrangement of material 1 and stay 3.
In the 1a of unit, four greenings are compiled with material 1 along continuous straight runs, prolong each greening and form integrated with the stay 3 of material 1.
At this moment, between adjacent greening is with material 1,1, also set up stay 3.Owing to will afforest easily with material 1 component unit 1a, so, can improve workability with respect to the face of greening P by forming the 1a of unit.Because the tendril of plant S also is wound in adjacent greening with the stay 3 between the material 1,1, becomes easy so seek connections with.If exceedingly extend towards horizontal direction, then the elongated portion excision is got final product.
The 1b of unit that is positioned at the right neighbour of the 1a of unit is that four groups of greenings that six roots of sensation stay 3 equally spaced are disposed at above-below direction keep the compartment of terrain to be set up in parallel with material 1 forming in the horizontal direction.
At this moment, owing between adjacent greening is with material 1,1, do not have stay 3, thereby can prevent that plant S from extending with material 1 direction towards adjacent greening with material 1 from a greening by means of stay 3.In addition, because can free setting adjacent greening is with the interval between the material 1,1, so can realize being fit to the greening of greening face P with the configuration of material 1.Enumerate an example, when situation that greening face forms for the steel plate that is set up in parallel in the horizontal direction the channel-section steel shape, even the width change of the steel plate that adopts also can easily be tackled with the interval between the material 1,1 by adjusting adjacent greening.
Because righter neighbour's the 1c of unit and the situation of the 1a of unit are also set up three stays 3 in the same manner between adjacent greening is with material 1,1, the position of the above-below direction of stay 3 is being afforested with material 1 and is being staggered half pitch between afforesting with material 1,1.
At this moment, plant S is wound in tendril wire 2 elongation on one side on one side, when there is the position of stay 3 in arrival, the part of tendril is wrapped on this stay 3, and then goes down along stay 3 elongations.Because coming component unit 1c with greening with material 1 easily, so, can improve with respect to the workability of afforesting face P by component unit 1c.Even the tendril of plant S is wound in stay 3 and elongation, because this stay 3 stops at wire 2 places of adjacent greening with material 1, plant S also together stops with stay 3 towards the elongation of horizontal direction, thereby along wire 2 conversion directions.
The 1d of unit of right-hand member between wire 2,2 itself, adjacent greening is with between material 1,1 the relative wire 2,2, stay 3 equal randomized arrangement.This random arrangement also comprises horizontal arrangement, tilted configuration of stay 3 etc.
At this moment and since can be with comparalive ease will greening with material 1 1d of the unit of constituting, so, can improve workability with respect to the face of greening P by component unit 1d.In addition, even the tendril of plant S is wound in stay 3 and elongation, because this stay 3 stops at wire 2 places of adjacent greening with material 1, plant S also together stops with stay 3 towards the elongation of horizontal direction, along wire 2 conversion directions.And, because the prolonging direction of plant S is at random, so, the greening of greening face P is changed.
Greening with material 1 end is set after, plant S plants near the wire support member 12 of bottom.In the situation that plant S is planted by planting machine B, near wire support member 12, this planting machine B is arranged on the ground.In the situation of not using planting machine B, near wire support member 12, plant S is directly planted in ground.Plant S is wound in tendril wire 2,2 growth on one side on one side and goes down.
Plant S growth, when the leading section of tendril arrives the decorating position of afforesting the stay 3 of using material 1, the tendril of a part is twined this stay 3, main tendril and then grow down while being wound in wire 2, therefore, can not come off with material 1 from greening even plant S is subject to blast etc. yet, be easy to seek connections with.
This greening can be in plant produced with material 1, also can make web-like carries, owing to use wire 2, so the length of wire 2 can be cut off according to the length of greening face and is used, can cover large-scale greening face P with material 1 with single greening, therefore can improve workability.
(technical scheme 2) stay 3 is for being adapted to many bracing bars of ladder shape.
At this moment, even greening face P needs on a large scale long greening with material 1, owing on wire 2, prepare that along its length direction many bracing bars 3 are arranged, so while plant S also can be wound in wire 2 or stay 3 is sought connections with down, seek connections with not only easily but also practical.
(technical scheme 3) stay 3 is by a kind of wire 2 that is installed in riveted joint, chock, coil, the bonding and welding.
At this moment, any operation all can be carried out in factory, therefore can set up effectively wire 2.
(technical scheme 4) stay 3 is the random arrangement of the part of formation terrible pin figure (あ body だ く じ) shape configuration.
At this moment, adjacent stay 3 is not on a horizontal line, and therefore, the terminal by a bracing bars 3 stops plant S to extend towards horizontal direction, and makes plant S towards the top conversion direction, can realize afforesting the rapid greening of face P.
A described greening in (technical scheme 5) technical scheme 1 to 4 is as follows with the method to set up of material 1.2 in wire is located on the greening face P, and described base end part 2a wiry is connected and fixed on greening face P via tension force introducing mechanism 4, and the other end 2b directly is connected and fixed on greening face P.
At this moment, greening decides the size of above-below direction with material 1 with the length of wire 2, so can easily make it meet the size of the above-below direction of greening face P.In addition, be connected and fixed under the state of greening face P when making base end part 2a tensioning by tension force introducing mechanism 4 at the other end 2b with wire 2, can import tension force to wire 2.Thus, can prevent greening with material 1 establish under the state wire 2 or stay 3 because of swings such as blast, can stop the tendril of plant S to break away from from wire 2 or stay 3, thereby the greening of the face of greening P can form rapidly.
(technical scheme 6) greening face P is facade, and tension force introducing mechanism 4 is equipped on the bottom P ' of greening face P.
At this moment, can close-ups with respect to the importing situation of the tension force of wire 2, can remove the mistake and deficiency of tension force.
(technical scheme 7) tension force introducing mechanism 4 comprises extension spring 51 and tensioning apparatus 6.This extension spring 51 has coil portion 71, at one end possesses fixing buckling parts 81, possesses movable buckling parts 91 at the other end across this coil portion 71.Tensioning apparatus 6 possesses the wire support member 12 of the bottom of bolt 10, clamp nut 11 and the greening face of being installed on P.
Wire 2 is connected in extension spring 51, the fixing buckling parts 81 of this extension spring 51 and movable buckling parts 91 are fastened on bolt 10, from wire 2 sides, be that the top of wire support member 12 loosely is inserted through the screw hole 14 of the horizontal plane 13 that passes wire support member 12 with this bolt 10, and clamp nut 11 is screwed together in from horizontal plane 13 protuberance 15 outstanding towards the below.
At this moment, can not set movable range according to the size of extension spring 51, can import tension force to wire 2 so that tightening of clamp nut 11 is next, so enough import easily and effectively operation.
(technical scheme 8) tension force introducing mechanism 4 comprises Compress Spring 52 and tensioning apparatus 6.
This Compress Spring 52 has coil portion 72, at one end possesses fixing buckling parts 82, possesses movable buckling parts 92 at the other end across this coil portion 72.Buckling parts 82 that should be fixing and movable buckling parts 92 are positioned at the wrist 16 given prominence to from each end of coil portion 72 and 17 end separately with the state that intersects in the end view (Fig. 7) of Compress Spring 52 and vertical view (Fig. 8).
Tensioning apparatus 6 is identical with described structure, so description thereof is omitted.
Wire 2 is connected in Compress Spring 52, the fixing buckling parts 82 of this Compress Spring 52 and movable buckling parts 92 are fastened on bolt 10, from wire 2 sides this bolt 10 loosely is inserted through the screw hole 14 of the horizontal plane 13 that passes wire support member 12, and clamp nut 11 is screwed together in from the outstanding protuberance 15 of horizontal plane 13.
At this moment, cheap for manufacturing cost, be difficult to occur plastic deformation, therefore can steady in a long-termly use.
(technical scheme 9) tension force introducing mechanism 4 comprises torsionspring 53, cover body 18 and tensioning apparatus 6.This torsionspring 53 forms coiled type.Cover body 18 is cylindrical shell in Fig. 9, but is the framework of " コ " font in Figure 10~12.Cover body 18 has: by the resettlement section 21 of sidewall 19 and end wall 20 restrictions, pass the screw hole 22 of end wall 20 and the installation portion 23 of wire 2.The structure of tensioning apparatus 4 is same as described above.
Wire 2 is connected in installation portion 23, torsionspring 53 coilings are installed on bolt 10 and are loaded to cover body 18, make bolt 10 outstanding to the outside from screw hole 22, and this bolt 10 loosely inserted the logical screw hole 14 that passes the horizontal plane 13 of wire support member 12 from wire 2 sides, clamp nut 11 is screwed together in from the outstanding protuberance 15 of this horizontal plane 13.
At this moment, torsionspring 53 is surrounded by cover body 18, plant S be held and damage or infringement that the breakage of torsionspring 53 etc. is artificial seldom, preferred at design aspect, be difficult to occur plastic deformation.
(technical scheme 10) tension force introducing mechanism 4 comprises flat spring 54 and tensioning apparatus 6.Flat spring 54 so that be formed with the mode in spring space 26 between two sheet materials and be oppositely arranged, is equipped with the inserting hole 27 and 28 of wire 2 with the sheet material 24 of pair of curved and 25 at both ends, 26 parts are equipped with through hole 29 and 30 in the spring space.The structure of tensioning apparatus 6 is same as described above.
Wire 2 is inserted through the inserting hole 27,28 of spring part 5, bolt 10 loosely is inserted through through hole 29 and 30 and loosely be inserted through the horizontal plane 13 of wire support member 12, clamp nut 11 is screwed together in from the outstanding protuberance 14 of horizontal plane 13.
At this moment, owing to higher tension force can be directed into wire 2, so, can prevent from making wire 2 occur to swing and prevent peeling off of plant S because of blast etc., be difficult to occur plastic deformation, so can steady in a long-termly use.
(technical scheme 11) is provided with at bolt 10 and imports the mark 31 that tension force is used.
At this moment, confirm the situation of tightening of clamp nut 11 certain tension force to be directed into wire 2 effectively thus by the mark 31 that is positioned at utmost point near position.
In addition, in the accompanying drawings, H is bolt head, and J and J ' are that to use nut, K be the wire support member angle steel on top in the location, and L is the installation screw of the wire support member 12 of the wire support member K on top and bottom, and M is the wire retainer, and N is strengthening part.

Claims (11)

1. the greening material of a wire type is characterized in that,
Consisted of by parallel pair of metal silk and the stay that is set up between this wire.
2. the greening material of wire type according to claim 1, wherein,
This stay is the many bracing bars that are adapted to the ladder shape.
3. the greening material of wire type according to claim 1 and 2, wherein,
This stay is by a kind of this wire that is installed in riveted joint, chock, coil, the bonding and welding.
4. the greening material of each described wire type in 3 according to claim 1, wherein,
This stay is the random arrangement of the part of the terrible pin figure shape configuration of formation.
5. the greening of a wire type is characterized in that with the method to set up of material,
The greening of a described wire type in the claim 1 to 4 is opened on the greening face of being located at this wire of material, described base end part wiry is connected and fixed on this greening face via the tension force introducing mechanism, and the other end directly is connected and fixed on this greening face.
6. the greening of wire type according to claim 5 is with the method to set up of material, wherein,
This greening face is facade, and this tension force introducing mechanism is equipped on the bottom of this greening face.
According to claim 5 or the greening of 6 described wire types with the method to set up of material, wherein,
This tension force introducing mechanism comprises extension spring and tensioning apparatus,
This extension spring has coil portion, and at one end possess fixing buckling parts, possess movable buckling parts at the other end across this coil portion,
This tensioning apparatus possesses bolt, clamp nut and is installed on the wire support member of the bottom of this greening face,
This wire is connected in this extension spring, buckling parts and this movable buckling parts that should fix of this extension spring were fastened on this bolt, this bolt loosely is inserted through the screw hole of the horizontal plane that passes this wire support member from this wire side, and this clamp nut is screwed together in from the outstanding protuberance of this horizontal plane.
According to claim 5 or the greening of 6 described wire types with the method to set up of material, wherein,
This tension force introducing mechanism comprises Compress Spring and tensioning apparatus,
This Compress Spring has coil portion, at one end possess fixing buckling parts, possess movable buckling parts at the other end across this coil portion, buckling parts that should be fixing and this movable buckling parts are positioned at the end of the wrist of giving prominence to from each end of this coil portion with the state that intersects in the end view of this Compress Spring and vertical view
This tensioning apparatus possesses bolt, clamp nut and is installed on the wire support member of the bottom of this greening face,
This wire is connected in this Compress Spring, buckling parts and this movable buckling parts that should fix of this Compress Spring were fastened on this bolt, this bolt is loosely inserted the logical screw hole that passes the horizontal plane of this wire support member from the wire side, and this clamp nut is screwed together in from the outstanding protuberance of this horizontal plane.
According to claim 5 or the greening of 6 described wire types with the method to set up of material, wherein,
This tension force introducing mechanism comprises torsionspring, cover body and tensioning apparatus,
This torsionspring is coiled type,
This cover body has: by sidewall and the resettlement section of end wall restriction, the screw hole that passes this end wall and this installation portion wiry,
This tensioning apparatus possesses bolt, clamp nut and is installed on the wire support member of the bottom of this greening face,
This wire is connected in this installation portion, this torsionspring coiling is installed on this bolt and is loaded to this cover body, make this bolt outstanding to the outside from this screw hole, and this bolt loosely is inserted through the screw hole of the horizontal plane that passes this wire support member from the wire side, this clamp nut is screwed together in from the outstanding protuberance of this horizontal plane.
According to claim 5 or the greening of 6 described wire types with the method to set up of material, wherein,
This tension force introducing mechanism comprises flat spring and tensioning apparatus,
This flat spring is equipped with this inserting hole wiry for the sheet material with pair of curved is oppositely arranged the spring that forms so that form the mode in spring space between two sheet materials at both ends, be equipped with through hole at this spring space segment,
This tensioning apparatus possesses bolt, clamp nut and is installed on the wire support member of the bottom of this greening face,
This wire is inserted through this inserting hole of this spring part, this bolt loosely is inserted through this through hole and loosely is inserted through the screw hole of the horizontal plane that passes this wire support member from this wire side, this clamp nut is screwed together in from the outstanding protuberance of this horizontal plane.
11. according to claim 7 in 10 the greening of each described wire type with the method to set up of material, wherein,
Be provided with the mark that importing tension force is used at this bolt.
CN201210096104.8A 2011-04-01 2012-04-01 The greening material of wire type and method to set up thereof Active CN102884960B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011082052A JP5830261B2 (en) 2011-04-01 2011-04-01 Wire type greening materials
JP2011-082052 2011-04-01

Publications (2)

Publication Number Publication Date
CN102884960A true CN102884960A (en) 2013-01-23
CN102884960B CN102884960B (en) 2016-04-20

Family

ID=47266841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210096104.8A Active CN102884960B (en) 2011-04-01 2012-04-01 The greening material of wire type and method to set up thereof

Country Status (2)

Country Link
JP (1) JP5830261B2 (en)
CN (1) CN102884960B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113795143A (en) * 2019-05-07 2021-12-14 大岛造园土木株式会社 Method for cultivating attached sprawling plant and auxiliary cultivating device
CN114466588A (en) * 2020-09-02 2022-05-10 大东绿化技术株式会社 Cultivation device for attached type trailing plants in rainfall-free environment

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2159538C2 (en) * 1996-09-10 2000-11-27 Верещагин Александр Васильевич Trellis for tall and liana-type plants
JP2003319719A (en) * 2002-05-02 2003-11-11 Ryozo Takano Greening method using wire mesh block on rise building wall surface
CN1952327A (en) * 2006-11-10 2007-04-25 徐林波 Tension-stretched guardrail and fence wall
CN101748719A (en) * 2009-12-23 2010-06-23 南京大学 Method of vegetation restoration and reconstruction of bare rock slope in East China
CN201528978U (en) * 2009-10-21 2010-07-21 宁波黛牡塑化有限公司 Plant shielding curtain apparatus
CN101779562A (en) * 2010-03-02 2010-07-21 贵州黔达喀斯特生态科技有限公司 Method for afforesting wall surfaces and side slopes with climbing-vine curtain wall
CN201601999U (en) * 2009-10-14 2010-10-13 芜湖欧标农业发展有限公司 Plant curtain wall with connection device
CN201700186U (en) * 2009-09-29 2011-01-12 丁达人 Movable green plant curtain wall
KR20110137065A (en) * 2010-06-16 2011-12-22 한수그린텍 주식회사 Rapidly greening method of wall

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1189447A (en) * 1997-09-17 1999-04-06 Techno Kenzai Kogyo Kk Material for inducing greening and greening
JP2002272274A (en) * 2001-03-21 2002-09-24 Nishimatsu Constr Co Ltd Plant support material for greening wall surface and method for greening wall surface
JP2004211784A (en) * 2002-12-27 2004-07-29 Shoei Kogyo Kk Wire extending instrument
JP4488802B2 (en) * 2004-06-16 2010-06-23 株式会社アルティマ Wall greening method and wire tensioning device
JP2006028848A (en) * 2004-07-15 2006-02-02 Asahi Intecc Co Ltd Tension mechanism between members, assembly having tension mechanism between members, and loading structure / frame body using them
JP4832337B2 (en) * 2007-02-28 2011-12-07 小岩金網株式会社 Greening induction member
JP2010068787A (en) * 2008-09-22 2010-04-02 Fujiwara:Kk Wire fixing tool
JP5411593B2 (en) * 2009-06-19 2014-02-12 浅野金属工業株式会社 Wire tensioner

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2159538C2 (en) * 1996-09-10 2000-11-27 Верещагин Александр Васильевич Trellis for tall and liana-type plants
JP2003319719A (en) * 2002-05-02 2003-11-11 Ryozo Takano Greening method using wire mesh block on rise building wall surface
CN1952327A (en) * 2006-11-10 2007-04-25 徐林波 Tension-stretched guardrail and fence wall
CN201700186U (en) * 2009-09-29 2011-01-12 丁达人 Movable green plant curtain wall
CN201601999U (en) * 2009-10-14 2010-10-13 芜湖欧标农业发展有限公司 Plant curtain wall with connection device
CN201528978U (en) * 2009-10-21 2010-07-21 宁波黛牡塑化有限公司 Plant shielding curtain apparatus
CN101748719A (en) * 2009-12-23 2010-06-23 南京大学 Method of vegetation restoration and reconstruction of bare rock slope in East China
CN101779562A (en) * 2010-03-02 2010-07-21 贵州黔达喀斯特生态科技有限公司 Method for afforesting wall surfaces and side slopes with climbing-vine curtain wall
KR20110137065A (en) * 2010-06-16 2011-12-22 한수그린텍 주식회사 Rapidly greening method of wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113795143A (en) * 2019-05-07 2021-12-14 大岛造园土木株式会社 Method for cultivating attached sprawling plant and auxiliary cultivating device
CN114466588A (en) * 2020-09-02 2022-05-10 大东绿化技术株式会社 Cultivation device for attached type trailing plants in rainfall-free environment

Also Published As

Publication number Publication date
CN102884960B (en) 2016-04-20
JP5830261B2 (en) 2015-12-09
JP2012213372A (en) 2012-11-08

Similar Documents

Publication Publication Date Title
WO2010006460A3 (en) Solar installation
ITMI20100147A1 (en) SUPPORT DEVICE FOR ANCHORING PHOTOVOLTAIC PANELS ON A ROOF.
WO2010057781A3 (en) Mounting arrangement for solar panels
US11414821B2 (en) Expandable modular energy-dissipation protection net unit group and protection net system formed by the same
CN204407844U (en) A kind of cable folding and retraction device
CN206107501U (en) Showy formula photovoltaic array's on water body, photovoltaic array and photovoltaic power plant
CN102296829B (en) Method for constructing three-dimensional cable net curtain wall
CN102884960A (en) Wire-type greening material and method for setting the same
CN103001146A (en) Steel pipe pole operation platform and usage method thereof
NO20024861D0 (en) Procedure for maintenance of telecommunications airline systems
DE60120299D1 (en) Rope arrangement for a tower crane
CN107453690A (en) A kind of connection floating body of Overwater-floating floating photovoltaic array
CN107453689A (en) A kind of modularization floatation type photovoltaic array
CN110401137A (en) Transmission line wire replacing options
CN205024700U (en) Follow -on flexible passive protection net
CN101793094A (en) Multiple suspended truss gradual tensioning construction method
US20100212236A1 (en) Gin Pole Device for Raising and Lowering a Tower
CN201742024U (en) City overhead cable line protection slot
CN103246034B (en) Anchoring mounting method for overhead laying of self-supporting bow-type rubber-insulated fiber cable
CN203774728U (en) Pre-twisted damping wire
CN206418682U (en) It is a kind of to be used for the lightning-arrest support on green assembled architecture roof
CN216252595U (en) Axillary pole stretch-draw structure and flexible photovoltaic support thereof
CN108417165B (en) Balloon scroll
CN202211012U (en) Vertical three-dimensional greening device convenient in assembly and disassembly
CN206727573U (en) A kind of cable wiring structure of staged bridge joint

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant