CN103001146A - Steel pipe pole operation platform and usage method thereof - Google Patents

Steel pipe pole operation platform and usage method thereof Download PDF

Info

Publication number
CN103001146A
CN103001146A CN2012105003238A CN201210500323A CN103001146A CN 103001146 A CN103001146 A CN 103001146A CN 2012105003238 A CN2012105003238 A CN 2012105003238A CN 201210500323 A CN201210500323 A CN 201210500323A CN 103001146 A CN103001146 A CN 103001146A
Authority
CN
China
Prior art keywords
steel pipe
ladder type
chain
pole
type underframe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105003238A
Other languages
Chinese (zh)
Other versions
CN103001146B (en
Inventor
张留岗
王继双
李树平
刘明亮
梁河雷
尚建广
王进朝
何义良
魏朋
白龙
赵建辉
常存稳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Original Assignee
Hengshui Power Supply Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hengshui Power Supply Co filed Critical Hengshui Power Supply Co
Priority to CN201210500323.8A priority Critical patent/CN103001146B/en
Publication of CN103001146A publication Critical patent/CN103001146A/en
Application granted granted Critical
Publication of CN103001146B publication Critical patent/CN103001146B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention belongs to the technical field of power supply maintenance machines and discloses a steel pipe pole operation platform and a usage method thereof. The steel pipe pole operation platform is characterized by comprising a horizontal ladder type bottom frame with a slope-shaped guardrail, wherein a vertical rope suspension loop which is used for suspending a vertical rope is arranged at the top end of the horizontal ladder type bottom frame, the tail end of the horizontal ladder type bottom frame is connected with a holding pole through a rotating shaft, one end of the holding pole is provided with a chain tension adjusting device with a chain, the other end of the holding pole is provided with a chain clamping groove, the slope-shaped guardrail is provided with a hanging rope suspension loop, and a hanging rope of which one end is fixed with the hanging rope suspension loop is connected with a pulley. The steel pipe pole operation platform is safe to use, applicable to steel pipe poles of different specifications, quick to install and disassemble, capable of meeting transportation and high-altitude installation requirements, meeting special requirements of high-altitude operation, improving the working efficiency and greatly improving the maintenance efficiency, applicable to various occasions and low in cost, operation can be conducted simultaneously at a plurality of working points, and the steel pipe pole operation platform has the certain live operation capability.

Description

Steel pipe pole job platform and using method thereof
Technical field
The invention belongs to power supply maintenance apparatus technical field, relate to concretely a kind of steel pipe pole job platform and using method thereof.
Background technology
The characteristics such as steel pipe pole is attractive in appearance owing to its structure, and floor space is few, and capital construction is convenient have been widely used in ultra-high-tension power transmission line, have particularly obtained on every side in the urban district using on a large scale.But there is the operational difficulty problem in present steel pipe pole in maintenance, and cross-arm is long and narrow and do not borrow the force, and take modal 110kV power line steel tuble pole as example, its cross arm end only has 10---25 centimetres width, and length is 1.5---2.5 meters.The operating personnel is the mobile operating difficulty on cross-arm, very inconvenience when the maintenance construction, a lot of events in operation can't be carried out, and can only carry out operation with bucket arm vehicle, and that the operation of bucket arm vehicle is subject to the environment site influence is larger, so the normal repair and maintenance work of circuit is very limited.And some multi circuit transmission lines safe distance is inadequate, can only power failure operation.
Summary of the invention
First technical problem that the present invention will solve just provides a kind of safe and convenient to use, steel pipe pole job platform that cost is low.
For solving the problems of the technologies described above, the technical solution used in the present invention is: comprise the flat ladder type underframe with the domatic guardrail, the top of described flat ladder type underframe is provided with the vertical rope link that hangs the rope that hangs down, the tail end of flat ladder type underframe is connected with pole by rotating shaft, described pole one end is provided with the chain slack adjuster with chain, the other end is provided with the chain clamp bar slot, and described domatic guardrail is provided with the lifting rope link, and an end is connected with pulley with the lifting rope that the lifting rope link fixes.
Its additional technical feature is: the front portion of described flat ladder type underframe is provided with insulation board; Described vertical rope link and lifting rope link arrange in pairs, and the lifting rope link is arranged on the middle branch place of domatic guardrail peace ladder type underframe weight; Described pole is setting up and down two; Described domatic guardrail and flat ladder type underframe are flexibly connected.
Second technical problem that the present invention will solve just provides a kind of using method of steel pipe pole job platform.
For solving the problems of the technologies described above, the technical solution used in the present invention comprises the following steps:
First step assembling
Flat ladder type underframe each several part is fitted together, and at the front portion of flat ladder type underframe laying insulation board, then domatic guardrail and flat ladder type underframe are fixed, by rotating shaft the tail end of pole with flat ladder type underframe is connected, one end and the chain slack adjuster of chain are fixed, one end of the rope that hangs down is fixed with the rope link that hangs down, an end and the lifting rope link of lifting rope fixed, the other end of lifting rope passes pulley;
Second step is installed
First carry the pulley that is installed with lifting rope by operating personnel and climb up steel pipe pole, pulley is fixed on correct position, spur lifting rope by other operating personnel of ground again, flat ladder type underframe with the domatic guardrail is risen, when the flat ladder type underframe with the domatic guardrail arrives the appropriate location, operating personnel on the steel pipe pole make pole contact with steel pipe pole, the chain that one end and chain slack adjuster fix is walked around steel pipe pole, make the chain other end snap in the chain clamp bar slot, turn again the chain slack adjuster chain is tightened up, make with flat ladder type underframe and the steel pipe pole of domatic guardrail tightly fixing;
The construction of the 3rd step
Operating personnel on the steel pipe pole walk at the flat ladder type underframe with the domatic guardrail, finish steel pipe and change insulator, change stockbridge damper, change suspension clamp, repair the upkeep operation project that checks the transmission lines such as wire around the hitch point; Ground operating personnel spur the rope that hangs down as required, and flat ladder type underframe can realize 0 take rotating shaft as fulcrum---120 ° of rotations, the needs of adaptation diverse location;
The 4th step removed stage makeup and costume
The upkeep operation project of transmission line is finished, operating personnel on the steel pipe pole turn the chain slack adjuster chain are unclamped, the chain other end that snaps in the chain clamp bar slot is taken out, other operating personnel of ground become flexible lifting rope, make the flat ladder type underframe with the domatic guardrail drop to ground, then the operating personnel on the steel pipe pole take off pulley, by getting off on the steel pipe pole;
The 5th step was torn fortune open
Lifting rope detached pulley and by taking off on the lifting rope link, to hang down rope by taking off on the rope link that hangs down, with chain by taking off on the chain slack adjuster, the tail end of pole with flat ladder type underframe separated, the domatic guardrail is separated with flat ladder type underframe, flat ladder type underframe each several part is taken apart, then each assembly vanning is transported.
When steel pipe pole job platform provided by the invention uses, electric power maintenance vehicle reach the spot rear first the assembling, flat ladder type underframe each several part is fitted together, and at the front portion of flat ladder type underframe laying insulation board, then domatic guardrail and flat ladder type underframe are fixed, by rotating shaft the tail end of pole with flat ladder type underframe is connected, one end and the chain slack adjuster of chain are fixed, one end of the rope that hangs down is fixed with the rope link that hangs down, one end and the lifting rope link of lifting rope are fixed, and the other end of lifting rope passes pulley.Then install, first carry the pulley that is installed with lifting rope by operating personnel and climb up steel pipe pole, pulley is fixed on correct position, spur lifting rope by other operating personnel of ground again, flat ladder type underframe with the domatic guardrail is risen, when the flat ladder type underframe with the domatic guardrail arrives the appropriate location, operating personnel on the steel pipe pole make pole contact with steel pipe pole, the chain that one end and chain slack adjuster fix is walked around steel pipe pole, make the chain other end snap in the chain clamp bar slot, turn again the chain slack adjuster chain is tightened up, make with flat ladder type underframe and the steel pipe pole of domatic guardrail tightly fixing.Thereafter construct, the operating personnel on the steel pipe pole walk at the flat ladder type underframe with the domatic guardrail, finish steel pipe and change insulator, change stockbridge damper, change suspension clamp, repair the upkeep operation project that checks the transmission lines such as wire around the hitch point; Ground operating personnel spur the rope that hangs down as required, and flat ladder type underframe can realize 0 take rotating shaft as fulcrum---120 ° of rotations, the needs of adaptation diverse location.The upkeep operation project of transmission line is finished and is removed stage makeup and costume, operating personnel on the steel pipe pole turn the chain slack adjuster chain are unclamped, the chain other end that snaps in the chain clamp bar slot is taken out, other operating personnel of ground become flexible lifting rope, make the flat ladder type underframe with the domatic guardrail drop to ground, then the operating personnel on the steel pipe pole take off pulley, by getting off on the steel pipe pole.Tear at last fortune open, lifting rope detached pulley and by taking off on the lifting rope link, to hang down rope by taking off on the rope link that hangs down, with chain by taking off on the chain slack adjuster, the tail end of pole with flat ladder type underframe separated, the domatic guardrail is separated with flat ladder type underframe, flat ladder type underframe each several part is taken apart, then each assembly vanning is transported.And the front portion of flat ladder type underframe is provided with insulation board, handled easily personnel construction.Vertical rope link and lifting rope link arrange in pairs, and the lifting rope link is arranged on the middle branch place of domatic guardrail peace ladder type underframe weight, is conducive to the adjustment of flat ladder type underframe position.Pole is setting up and down two, and it is fastening that pole is connected with steel pipe pole.Domatic guardrail and flat ladder type underframe are flexibly connected, convenient disassembly, favourable transportation.
Steel pipe pole job platform provided by the invention, each parts adopts insulating material, guarantees operating personnel's personal safety and device security.Pole possesses versatility, can adapt to the steel pipe pole of different size model, can satisfy the job requirements of the multiple steel pipe poles such as straight line pole, tension-resistant rod, single time, double-circuit line.The steel pipe pole job platform can Fast Installation, dismounting, satisfies transportation and high-altitude installation requirement, can adapt to the specific (special) requirements of work high above the ground, and the raising operating efficiency is applicable to various occasions.Steel pipe pole job platform provided by the invention can be eliminated the work of steel pipe pole power transmission lines overhauling to the dependence of bucket arm vehicle, and the compensation for crops that when having avoided bucket arm vehicle to enter the scene farmland under the operation dotted line, orchard etc. has been produced is used.When one or several circuit of maintenance, can carry out simultaneously operation in a plurality of working points, greatly improve overhaul efficiency.This platform cost is thousands of units only, uses this platform to substitute bucket arm vehicle and carries out operation, can save a large amount of funds.This platform has certain live line working ability simultaneously, in particular cases playing a significant role that rush repair maybe can not have a power failure.
Description of drawings
Fig. 1 is the structural representation of steel pipe pole job platform of the present invention.
Embodiment
Be described further below in conjunction with the structure of accompanying drawing to steel pipe pole job platform proposed by the invention.
As shown in Figure 1, steel pipe pole job platform of the present invention comprises flat ladder type underframe 1, flat ladder type underframe 1 is with domatic guardrail 2, domatic guardrail 2 is flexibly connected with flat ladder type underframe 1, the top of flat ladder type underframe 1 is provided with the vertical rope link 4 that hangs the rope 3 that hangs down, the tail end of flat ladder type underframe 1 is connected with pole 6 by rotating shaft 5, pole 6 one ends are provided with the chain slack adjuster 8 with chain 7, the other end is provided with chain clamp bar slot 9, domatic guardrail 2 is provided with lifting rope link 10, one end is connected with pulley 12 with the lifting rope 11 that lifting rope link 10 fixes, the front portion of flat ladder type underframe 1 is provided with insulation board 13, vertical rope link 4 and lifting rope link 10 arrange in pairs, and lifting rope link 10 is arranged on the middle branch place of domatic guardrail 2 peaceful ladder type underframe 1 weight, and pole 6 is setting up and down two.
When steel pipe pole job platform provided by the invention uses, electric power maintenance vehicle reach the spot rear first the assembling, flat ladder type underframe 1 each several part is fitted together, and at the front portion of flat ladder type underframe 1 laying insulation board 13, then domatic guardrail 2 and flat ladder type underframe 1 are fixed, by rotating shaft 5 tail end of pole 6 with flat ladder type underframe 1 is connected, one end and the chain slack adjuster 8 of chain 7 are fixed, one end of the rope 3 that hangs down is fixed with the rope link 4 that hangs down, one end and the lifting rope link 10 of lifting rope 11 are fixed, and the other end of lifting rope 11 passes pulley 12.Then install, first carry the pulley 12 that is installed with lifting rope 11 by operating personnel and climb up steel pipe pole, pulley 12 is fixed on correct position, spur lifting rope 11 by other operating personnel of ground again, flat ladder type underframe 1 with domatic guardrail 2 is risen, when the flat ladder type underframe 1 with domatic guardrail 2 arrives the appropriate location, operating personnel on the steel pipe pole make pole 6 contact with steel pipe pole, the chain 7 that one end and chain slack adjuster 8 fix is walked around steel pipe pole, make chain 7 other ends snap in chain clamp bar slot 9, turn again chain slack adjuster 8 chain 7 is tightened up, make with the flat ladder type underframe 1 of domatic guardrail 2 tightly fixing with steel pipe pole.Construct thereafter, operating personnel on the steel pipe pole are in flat ladder type underframe 1 walking with domatic guardrail 2, finish steel pipe and change insulator, change stockbridge damper, change suspension clamp, repair the upkeep operation project that checks the transmission lines such as wire around the hitch point; Ground operating personnel spur the rope 3 that hangs down as required, and flat ladder type underframe 1 can realize 0 take rotating shaft 5 as fulcrum---120 ° of rotations, the needs of adaptation diverse location.The upkeep operation project of transmission line is finished and is removed stage makeup and costume, operating personnel on the steel pipe pole turn chain slack adjuster 8 chain 7 are unclamped, chain 7 other ends that snap in chain clamp bar slot 9 are taken out, other operating personnel of ground become flexible lifting rope 3, make the flat ladder type underframe 1 with domatic guardrail 2 drop to ground, then the operating personnel on the steel pipe pole take off pulley 12, by getting off on the steel pipe pole.Tear at last fortune open, lifting rope 11 detached pulley 12 and by taking off on the lifting rope link 10, to hang down rope 3 by taking off on the rope link 4 that hangs down, with chain 7 by taking off on the chain slack adjuster 8, the tail end of pole 6 with flat ladder type underframe 1 separated, domatic guardrail 2 is separated with flat ladder type underframe 1, flat ladder type underframe 1 each several part is taken apart, then each assembly vanning is transported.And the front portion of flat ladder type underframe 1 is provided with insulation board 13, handled easily personnel construction.Vertical rope link 4 and lifting rope link 10 arrange in pairs, and lifting rope link 10 is arranged on the middle branch place of domatic guardrail 2 peaceful ladder type underframe 1 weight, is conducive to the adjustment of flat ladder type underframe 1 position.Pole 6 is setting up and down two, and it is fastening that pole 6 is connected with steel pipe pole.Domatic guardrail 2 is flexibly connected convenient disassembly, favourable transportation with flat ladder type underframe 1.
Protection scope of the present invention not only is confined to above-described embodiment, as long as structure is identical with steel pipe pole job platform structure of the present invention, just drops on the scope of protection of the invention.

Claims (6)

1. steel pipe pole job platform, it is characterized in that: comprise the flat ladder type underframe with the domatic guardrail, the top of described flat ladder type underframe is provided with the vertical rope link that hangs the rope that hangs down, the tail end of flat ladder type underframe is connected with pole by rotating shaft, described pole one end is provided with the chain slack adjuster with chain, the other end is provided with the chain clamp bar slot, and described domatic guardrail is provided with the lifting rope link, and an end is connected with pulley with the lifting rope that the lifting rope link fixes.
2. steel pipe pole job platform according to claim 1, it is characterized in that: the front portion of described flat ladder type underframe is provided with insulation board.
3. steel pipe pole job platform according to claim 1, it is characterized in that: described vertical rope link and lifting rope link arrange in pairs, and the lifting rope link is arranged on the middle branch place of domatic guardrail peace ladder type underframe weight.
4. steel pipe pole job platform according to claim 1, it is characterized in that: described pole is setting up and down two.
5. steel pipe pole job platform according to claim 1 is characterized in that: described domatic guardrail and the flexible connection of flat ladder type underframe.
6. the using method of each described steel pipe pole job platform of claim 1 to 5 is characterized in that comprising the following steps:
First step assembling
Flat ladder type underframe each several part is fitted together, and at the front portion of flat ladder type underframe laying insulation board, then domatic guardrail and flat ladder type underframe are fixed, by rotating shaft the tail end of pole with flat ladder type underframe is connected, one end and the chain slack adjuster of chain are fixed, one end of the rope that hangs down is fixed with the rope link that hangs down, an end and the lifting rope link of lifting rope fixed, the other end of lifting rope passes pulley;
Second step is installed
First carry the pulley that is installed with lifting rope by operating personnel and climb up steel pipe pole, pulley is fixed on correct position, spur lifting rope by other operating personnel of ground again, flat ladder type underframe with the domatic guardrail is risen, when the flat ladder type underframe with the domatic guardrail arrives the appropriate location, operating personnel on the steel pipe pole make pole contact with steel pipe pole, the chain that one end and chain slack adjuster fix is walked around steel pipe pole, make the chain other end snap in the chain clamp bar slot, turn again the chain slack adjuster chain is tightened up, make with flat ladder type underframe and the steel pipe pole of domatic guardrail tightly fixing;
The construction of the 3rd step
Operating personnel on the steel pipe pole walk at the flat ladder type underframe with the domatic guardrail, finish steel pipe and change insulator, change stockbridge damper, change suspension clamp, repair the upkeep operation project that checks the transmission lines such as wire around the hitch point; Ground operating personnel spur the rope that hangs down as required, and flat ladder type underframe can realize 0 take rotating shaft as fulcrum---120 ° of rotations, the needs of adaptation diverse location;
The 4th step removed stage makeup and costume
The upkeep operation project of transmission line is finished, operating personnel on the steel pipe pole turn the chain slack adjuster chain are unclamped, the chain other end that snaps in the chain clamp bar slot is taken out, other operating personnel of ground become flexible lifting rope, make the flat ladder type underframe with the domatic guardrail drop to ground, then the operating personnel on the steel pipe pole take off pulley, by getting off on the steel pipe pole;
The 5th step was torn fortune open
Lifting rope detached pulley and by taking off on the lifting rope link, to hang down rope by taking off on the rope link that hangs down, with chain by taking off on the chain slack adjuster, the tail end of pole with flat ladder type underframe separated, the domatic guardrail is separated with flat ladder type underframe, flat ladder type underframe each several part is taken apart, then each assembly vanning is transported.
CN201210500323.8A 2012-11-30 2012-11-30 Usage method of steel pipe pole operation platform Active CN103001146B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210500323.8A CN103001146B (en) 2012-11-30 2012-11-30 Usage method of steel pipe pole operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210500323.8A CN103001146B (en) 2012-11-30 2012-11-30 Usage method of steel pipe pole operation platform

Publications (2)

Publication Number Publication Date
CN103001146A true CN103001146A (en) 2013-03-27
CN103001146B CN103001146B (en) 2015-03-25

Family

ID=47929423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210500323.8A Active CN103001146B (en) 2012-11-30 2012-11-30 Usage method of steel pipe pole operation platform

Country Status (1)

Country Link
CN (1) CN103001146B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103618237A (en) * 2013-10-30 2014-03-05 合保电气(芜湖)有限公司 An insulating overhead platform
CN104485605A (en) * 2014-12-03 2015-04-01 国家电网公司 Steel pipe pole operating platform
CN106476668A (en) * 2015-08-28 2017-03-08 中国石油化工股份有限公司 Vehicle-mounted automatic loading and unloading oil pipe device
CN107724660A (en) * 2017-11-07 2018-02-23 张钦 A kind of multi-functional power equipment maintaining operating platform
CN108847613A (en) * 2018-06-29 2018-11-20 国家电网公司 A kind of aerial suspension device overhauling transmission pressure
CN108899807A (en) * 2018-07-20 2018-11-27 中铁六局集团有限公司 Subway long steep grade entrance electromechanics construction method of installation

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201838934U (en) * 2010-08-20 2011-05-18 胜利石油管理局电力管理总公司东区供电公司 Novel portable adjustable rod upper platform
CN202474702U (en) * 2012-03-20 2012-10-03 上海市电力公司 Platform mounting support for live operation of power distribution line

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201838934U (en) * 2010-08-20 2011-05-18 胜利石油管理局电力管理总公司东区供电公司 Novel portable adjustable rod upper platform
CN202474702U (en) * 2012-03-20 2012-10-03 上海市电力公司 Platform mounting support for live operation of power distribution line

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘明亮: "110kV钢管杆作业平台的研制与应用", 《电气应用》, vol. 30, no. 9, 30 September 2011 (2011-09-30), pages 90 - 92 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103618237A (en) * 2013-10-30 2014-03-05 合保电气(芜湖)有限公司 An insulating overhead platform
CN103618237B (en) * 2013-10-30 2017-02-22 合保电气(芜湖)有限公司 An insulating overhead platform
CN104485605A (en) * 2014-12-03 2015-04-01 国家电网公司 Steel pipe pole operating platform
CN106476668A (en) * 2015-08-28 2017-03-08 中国石油化工股份有限公司 Vehicle-mounted automatic loading and unloading oil pipe device
CN107724660A (en) * 2017-11-07 2018-02-23 张钦 A kind of multi-functional power equipment maintaining operating platform
CN108847613A (en) * 2018-06-29 2018-11-20 国家电网公司 A kind of aerial suspension device overhauling transmission pressure
CN108899807A (en) * 2018-07-20 2018-11-27 中铁六局集团有限公司 Subway long steep grade entrance electromechanics construction method of installation

Also Published As

Publication number Publication date
CN103001146B (en) 2015-03-25

Similar Documents

Publication Publication Date Title
CN103001146B (en) Usage method of steel pipe pole operation platform
CN201458596U (en) Crane with self-dismounting device
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN102882157A (en) Portable tool for replacing tension wire shockproof hammer in power cut
CN102344092B (en) Single-rope double-suspension-point horizontal suspension arm retracting and folding mechanism
CN201215595Y (en) Remote controlled electric trolley for installing special optical cable on electric line
CN202840371U (en) Portable tool for replacing tension wire shockproof hammers in outage
CN105186378A (en) Power transmission line channel crossing protection mechanism
CN202906301U (en) Steel-pipe pole operation platform
CN203799586U (en) Signboard mounting support for power transmission line steel tube tower
CN204179605U (en) A kind of cable clip
CN203439984U (en) Handjack for pole
CN203255914U (en) Unit-typed curtain wall lifting device
CN202744233U (en) Crawling ladder installing structure of tower-type crane
CN105932601A (en) Method for repairing break strand of overhead ground wire
CN205442567U (en) Steel -pipe pole operation platform
CN206188299U (en) Dedicated assembled handling instrument of fan cabin internal
CN206727573U (en) A kind of cable wiring structure of staged bridge joint
CN202395384U (en) Operation tool for multiloop of 110-220kV electric transmission line
CN202899720U (en) Steel pole provided with foot treadles and used for high-tension transmission line iron tower
CN202474699U (en) Portable heavy object transmitter for telegraph pole
CN201809032U (en) Self-adjusting stay device with combinable hanger
CN204703489U (en) Fast-assembled insulating scaffold special fixing device
CN203612819U (en) H-shaped steel hanger
CN204778289U (en) Cable support tower construction reinforcing bar festival section hoist

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20131224

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: Hengshui Power Supply Branch, State Grid Hebei Electric Power Co., Ltd.

Applicant after: State Grid Hebei Electric Power Company

Address before: 053000 Hengshui East Road, Hebei, No. 185

Applicant before: Hengshui Power Supply Company

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 053000 HENGSHUI, HEBEI PROVINCE TO: 100031 XICHENG, BEIJING

ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: HENGSHUI POWER SUPPLY COMPANY

Effective date: 20131224

Owner name: HENGSHUI POWER SUPPLY BRANCH COMPANY, STATE GRID H

Effective date: 20131224

C14 Grant of patent or utility model
GR01 Patent grant