CN102884960B - The greening material of wire type and method to set up thereof - Google Patents

The greening material of wire type and method to set up thereof Download PDF

Info

Publication number
CN102884960B
CN102884960B CN201210096104.8A CN201210096104A CN102884960B CN 102884960 B CN102884960 B CN 102884960B CN 201210096104 A CN201210096104 A CN 201210096104A CN 102884960 B CN102884960 B CN 102884960B
Authority
CN
China
Prior art keywords
wire
greening
face
tension force
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210096104.8A
Other languages
Chinese (zh)
Other versions
CN102884960A (en
Inventor
牧隆
猪俣景悟
久保田依秀
清水克哉
大桥丰
泷泽哲也
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OHSHIMA ZOEN DOBOKU KK
DAITO TECHNO GREEN KK
Toyota Motor Corp
Original Assignee
OHSHIMA ZOEN DOBOKU KK
DAITO TECHNO GREEN KK
Toyota Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OHSHIMA ZOEN DOBOKU KK, DAITO TECHNO GREEN KK, Toyota Motor Corp filed Critical OHSHIMA ZOEN DOBOKU KK
Publication of CN102884960A publication Critical patent/CN102884960A/en
Application granted granted Critical
Publication of CN102884960B publication Critical patent/CN102884960B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides greening material and the method to set up thereof of wire type, in the method for fix each root of steel wire rope of wire type greening material up and down, vining plant seeks connections with slowly, easy landing.Clathrate steel wire rope need use special intersection point accessory or intersection point fixture, and field operation efficiency is poor, and price is high.Though there is the tension force introducing mechanism for preventing steel wire rope from overturning or vibrating, when importing tension force judgement mark is located at wire upper part, position is positioned at greening wall upper end so that is difficult to distinguish.There is individual differences with during manpower stretched wire, exist when crossing strong come off from the angle steel on top, that angle steel itself peels off from greening face is possible.The greening material of wire type of the present invention is made up of the pair of metal silk walked abreast and the stay be set up between this wire.This wire is opened and is set as its base end part and is connected and fixed on this greening face via tension force introducing mechanism by this greening material on greening face, and the other end is directly connected and fixed on this greening face.

Description

The greening material of wire type and method to set up thereof
Technical field
The present invention relates to greening material and the method to set up thereof of wire type, greening face is opened and establishes wire, plant is extended as guiding piece using this wire, thus greening face is afforested.
Background technology
As wall greening needing afforest towards the wall of the daylighting inside building, also can guarantee to a certain extent from inner side viewing the wall greening of view and can not be directly fixed on the building wall wall materials such as curtain wall, have and wire or fleece are sought connections with as plant the method that auxiliary material carry out the type of afforesting.The method arranges wire or fleece and the method that vining plant is sought connections with, but be mostly the method for being fixed up and down by steel wire rope, even if steel wire rope is clathrate, owing to must be fixed special intersection point accessory or intersection point, most price is high.
In addition, when using steel wire rope to afforest, the steel wire rope of setting mostly because of the time through and temperature etc. impact and relax, the steel wire rope of setting produces upset, vibration etc. because of wind etc., thus becomes the one of the main reasons of obstruction vining plant smooth growth.Therefore, need to import tension force to steel wire rope, to prevent the swing caused because of blast etc., and the tendril of vining plant is not come off from wire, but this operation bothers very much.
Describe in patent document 1 (Japanese Unexamined Patent Publication 2006-36 publication) when tension force is imported to the wire of afforesting for wall and use the first ironware and the second ironware.For the structure of the first ironware 10, be illustrated in the 0019th section, for setting position, represent the upper end at ALC plate 4 in fig. 2.In addition, for the structure of the second ironware 11, be illustrated in the 0021st section, for setting position, represent the bottom at ALC plate 4 in fig. 2.
Tension force is imported about to wire 6b, describe after the 5th row of the 0022nd section " ... the other end (lower end) side of wire 6b is held in successively the second ironware on the angle steel parts being arranged on below.Continue to draw, when to feel on wire 6b elastic force time, when tension buffer spring 19 is compressed into moderate stop.", it can thus be appreciated that, be carry out stretched wire with manpower.
Patent document 1: Japanese Unexamined Patent Publication 2006-36 publication
Generally speaking, in the method for being fixed up and down by the steel wire rope of each root, seeking connections with of vining plant is slow, and the easy landing of plant.In addition, cancellate steel wire rope must use special intersection point accessory described in patent document 1 and intersection point fixture, and therefore, on-the-spot operating efficiency is poor, and most price is high.
In addition, in order to improve anti-slip effect further, need to prevent blast etc. from causing wire to wave simultaneously, the tendril of vining plant can not be come off from wire usually.
As the invention of the lax upset that causes preventing steel wire rope and vibration, be provided with the tension force introducing mechanism described in patent document 1.But the mark 36 of benchmark imported as tension force is arranged at wire 6b, this mark 36 not only little, but also be positioned at the upper end of wall, so exist leakage see maybe cannot distinguish wait possible.Because wire is stretched by manpower, so the power of stretching exists individual differences, served as when stretching by force, exist the first ironware from angle steel element falling, angle steel parts itself to peel off etc. from wall may.
Summary of the invention
The greening material of the wire type that (technical scheme 1) the present invention relates to (following by " the greening material of wire type " referred to as " greening material ") is made up of the pair of metal silk walked abreast and the stay be set up between this wire.
This greening material covers greening face, the wall of such as building, enclosure wall, slope and be installed on this greening face.Greening face is generally such facade, when laterally seeking connections with the plant of form, also has the situation forming horizontal plane.This is installed and used bolt, nut and directly carries out in greening face, or pair of metal silk support member is juxtaposed on the both ends in greening face, and is located between two wire support member by wire.The installation method beyond these methods can certainly be adopted.For this greening material, pair of metal silk by stay come Bao hold Yi Ding Inter every and walk abreast, therefore, easy relative to the laying in greening face, tendril etc. are wound in stay, thus plant easily extends.
When planted by planting machine vining plant time, this planting machine is configured at the end side in greening face, or directly plants in the ground of end side in greening face, the greening material making plant be wound in wire type grows.At early growth period, vining plant makes tendril be wound in wire to grow down.
When vining plant arrives the decorating position of the stay of greening material, the tendril of a part is wound around this stay, main tendril and then be wound in wire and grow down, and therefore, plant can easily seek connections with.And due to this greening materials'use wire, so can its length of free setting, can cover with single material and afforest face on a large scale, therefore, it is possible to improve workability.
Generally speaking, in the method for being fixed up and down by every steel cable, seeking connections with of vining plant is slow, and the easy landing of plant.In addition, cancellate steel wire rope must use special intersection point accessory described in patent document 1 and intersection point fixture, and therefore, on-the-spot operating efficiency is poor, and most price is high.According to the present invention, the stay that can manufacture parallel pair of metal silk in advance in factory and be set up between this wire, can be made into web-like and carries, and can cut off this wire to use according to the length in greening face, thus make on-the-spot operation become easy.
(technical scheme 2) this stay also can for being arranged to many bracing bars of ladder shape.
(technical scheme 3) this stay also can be installed on this wire by riveted joint, chock, coil, bonding and in welding one.
(technical scheme 4) this stay also can be the random arrangement of the part forming terrible pin figure (also known as the terrible pin of picture, one is drawn lots or the method for salary distribution, and Japanese original text is A Mituo label, あ body だ く じ) shape configuration.
This wire of the greening material described in (technical scheme 5) technical scheme 1 to 4 is located on greening face.This base end part wiry is connected and fixed on this greening face via tension force introducing mechanism.Further, this other end wiry is directly connected and fixed on this greening face.
(technical scheme 6) this greening face can be also facade, and this tension force introducing mechanism is disposed in the bottom in this greening face.
(technical scheme 7) also can be, this tension force introducing mechanism comprises extension spring and tensioning apparatus, this extension spring has coil portion, fixing buckling parts is at one end possessed across this coil portion, movable buckling parts is possessed at the other end, this tensioning apparatus possesses bolt, clamp nut and be installed on the wire support member of bottom in this greening face, this wire is connected to this extension spring, this fixing buckling parts of this extension spring and this movable buckling parts are fastened on this bolt, this bolt is loosely inserted through the screw hole of the horizontal plane through this wire support member from this wire side, and this clamp nut is screwed together in from the outstanding protuberance of this horizontal plane.
(technical scheme 8) also can be, this tension force introducing mechanism comprises Compress Spring and tensioning apparatus, this Compress Spring has coil portion, fixing buckling parts is at one end possessed across this coil portion, movable buckling parts is possessed at the other end, this fixing buckling parts and this movable buckling parts are positioned at the end of the wrist given prominence to from each end of this coil portion with the state of intersecting in the end view and vertical view of this Compress Spring, adopt this tensioning apparatus similar to the above, this wire is connected to this Compress Spring, and this fixing buckling parts of this Compress Spring and this movable buckling parts are fastened on this bolt, form in the same manner as described above afterwards.
(technical scheme 9) also can be, this tension force introducing mechanism comprises torsionspring, cover body and tensioning apparatus, this torsionspring is coiled type, this cover body has: the resettlement section limited by sidewall and end wall, through the screw hole of this end wall and this installation portion wiry, adopt this tensioning apparatus same as described above, this wire is connected to this installation portion, this torsionspring winding is installed on this bolt and is loaded to this cover body, this bolt is externally given prominence to from this screw hole, forms in the same manner as described above afterwards.
(technical scheme 10) also can be, this tension force introducing mechanism comprises flat spring and tensioning apparatus, this flat spring is that the sheet material of pair of curved is oppositely disposed to make the mode forming spring compartment between two sheet materials the spring formed, this inserting hole wiry is through both ends, through hole is through this spring compartment part, adopt this tensioning apparatus same as described above, this wire is inserted through this inserting hole of this spring part, and this bolt relaxation is inserted through this through hole, form in the same manner as described above afterwards.
(technical scheme 11) also can be provided with the mark importing tension force on this bolt.
Invention effect
According to the greening material that the present invention relates to, parallel pair of metal silk and the operation of setting up stay between this wire can be carried out in factory in advance, also can be made into web-like to carry, and can this wire be cut off according to the length in greening face and use, therefore, it is possible to raising workability, when vining plant arrives the decorating position of stay, the tendril of a part is wound in this stay, main tendril and then be wound in wire while grow down, therefore, plant easily seeks connections with, can eliminate the vining plant when steel cable seeks connections with slowly, and the shortcoming of the easy landing of plant.
According to the method to set up of the greening material that the present invention relates to, can keep seeking connections with gap between greening face and each wire, can be afforested greening face by seeking connections with of plant, the tension force required for can importing to wire, therefore, contribute to preventing from waving.
Accompanying drawing explanation
Fig. 1 is the front view that the using state that erects setting represents the concrete example of the greening material that the present invention relates to.
Fig. 2 is the right side view that the using state that erects setting represents the concrete example of the greening material that the present invention relates to.
Fig. 3 represents the end view that be connected and fixed the concrete example on the top of structure of greening material relative to greening face.
Fig. 4 is the end view of the concrete example representing tension force introducing mechanism.
Fig. 5 is the front view of the concrete example representing tension force introducing mechanism.
Fig. 6 is the end view of the concrete example of the operating state representing tension force introducing mechanism.
Fig. 7 is the end view of other concrete examples representing tension force introducing mechanism.
Fig. 8 represents the vertical view of same spring part.
Fig. 9 is the end view of the another concrete example of the tension force introducing mechanism represented when adopting cylindrical shell.
Figure 10 is the end view of the another concrete example of the tension force introducing mechanism represented when adopting framework.
Figure 11 is the stereogram of framework.
Figure 12 is the vertical view of the part of the framework of Figure 10.
Figure 13 is the end view of the another concrete example of the tension force introducing mechanism represented when adopting flat spring.
Figure 14 is the vertical view of sheet material.
Label declaration
1 greening material
1a ~ 1d unit
2 wires
2a base end part
2b the other end
3 stays
P afforests face
P ' bottom
S plant
B planting machine
Karat gold belongs to silk support member
L mounting screw
4 tension force introducing mechanisms
51 extension springs
52 Compress Springs
53 torsionsprings
54 flat springs
6 tensioning apparatus
71,72 coil portions
81,82 buckling parts fixed
91,92 movable buckling parts
10 bolts
H bolt head
J, J ' nut
11 clamp nuts
12 wire support member
13 horizontal planes
14 screw holes
15 protuberances
16,17 wrists
18 cover bodies
19 sidewalls
20 end walls
21 resettlement sections
22 screw holes
23 installation portions
24,25 sheet materials
26 spring compartment
27,28 inserting holes
29,30 through holes
31 marks
Embodiment
Below, the state of setting that erects with reference to accompanying drawing is described embodiments of the present invention.Greening face P is generally the facade as the wall of building, but the horizontal plane etc. that the roof greening of the inclined plane also having slope such, building is such.The present invention also can be applied to these greening faces.
(technical scheme 1) Fig. 1 and Fig. 2 represents the concrete example of the greening material 1 that the present invention relates to using state.This greening material 1 is made up of the pair of metal silk 2,2 walked abreast and the stay 3 be set up between these wires 2,2.In FIG, be expressed as situation: gathered by the greening material 1 that four are so formed and as a unit, be located between the wire support member K of upper and lower and 12 side by side in the horizontal direction by four unit 1a ~ 1d, covering greening face P.
Each stay 3 is expressed as different arrangements in each unit 1a ~ 1d, and this is only for reference, can be unified into same arrangement or be combined into different arrangements etc., can unrestricted choice.
Greening material 1 in the example of Fig. 1 and the arrangement of stay 3 as follows.
In unit 1a, four greening materials 1 are collected in the horizontal direction, extend the stay 3 of each greening material 1 and form integration.
Now, between adjacent greening material 1,1, also erection has stay 3.Due to easily by greening material 1 component unit 1a, so, improve the workability relative to greening face P by formation unit 1a.Tendril due to plant S is also wound in the stay 3 between adjacent greening material 1,1, becomes easy so seek connections with.If exceedingly extend towards horizontal direction, then elongated portion is excised.
The unit 1b being positioned at the right neighbour of unit 1a is that four groups of greening materials 1 six roots of sensation stay 3 being equally spaced configured at above-below direction keep compartment of terrain to be set up in parallel forming in the horizontal direction.
Now, owing to there is not stay 3 between adjacent greening material 1,1, thus can prevent plant S from extending towards adjacent greening material 1 direction from a greening material 1 by means of stay 3.In addition, due to can interval between the adjacent greening material 1,1 of free setting, so the configuration of the greening material 1 of applicable greening face P can be realized.Enumerate an example, when greening face is the situation of the steel plate being set up in parallel channel-section steel shape in the horizontal direction, even if the width change of the steel plate adopted, also easily can be tackled by the interval adjusted between adjacent greening material 1,1.
Unit 1c due to righter neighbour also sets up three stays 3 identically with the situation of unit 1a between adjacent greening material 1,1, staggers half pitch in the position of the above-below direction of stay 3 between greening material 1 and greening material 1,1.
Now, tendril is wound in wire 2 while extend by plant S, when arrival exists the position of stay 3, a part for tendril is wrapped on this stay 3, and then extends along stay 3.Owing to easily carrying out component unit 1c with greening material 1, so, can by component unit 1c improve relative to greening face P workability.Even if the tendril of plant S is wound in stay 3 and extends, because this stay 3 stops at wire 2 place of adjacent greening material 1, plant S also together stops with stay 3 towards the elongation of horizontal direction, thus along wire 2 conversion direction.
The unit 1d of right-hand member is between the wire 2,2 of itself, between the relative wire 2,2 of adjacent greening material 1,1, stay 3 is randomized arrangement all.This random arrangement also comprises the horizontal arrangement, inclined etc. of stay 3.
Now, owing to comparalive ease greening material 1 can be configured to unit 1d, so, can by component unit 1d improve relative to greening face P workability.In addition, even if the tendril of plant S is wound in stay 3 and extends, because this stay 3 stops at wire 2 place of adjacent greening material 1, plant S also together stops with stay 3, along wire 2 conversion direction towards the elongation of horizontal direction.And the prolonging direction due to plant S is random, so, the greening of greening face P can be made to change.
Greening material 1 end is set after, cultivated plant S near the wire support member 12 of bottom.When plant S is planted by planting machine B, near wire support member 12, this planting machine B is arranged on the ground.When not using planting machine B, near wire support member 12, plant S is directly planted in ground.Plant S is while be wound in wire 2,2 while growth is gone down by tendril.
Plant S grows, when the leading section of tendril arrives the decorating position of greening with the stay 3 of material 1, the tendril of a part is wound around this stay 3, main tendril and then be wound in wire 2 while grow down, therefore, also can not come off from greening material 1 even if plant S is subject to blast etc., be easy to seek connections with.
This greening material 1 can in plant produced, also can make web-like to carry, owing to using wire 2, so the length of wire 2 can be cut off according to the length in greening face and uses, large-scale greening face P can be covered, therefore, it is possible to improve workability with single greening material 1.
(technical scheme 2) stay 3 is for being arranged to many bracing bars of ladder shape.
Now, even if greening face P on a large scale in need long greening material 1, owing to preparing there are many bracing bars 3 along its length direction on wire 2, so plant S also can be wound in wire 2 or stay 3 is sought connections with down, seek connections with not only easy but also practical.
(technical scheme 3) stay 3 is installed on wire 2 by riveted joint, chock, coil, bonding and in welding one.
Now, any operation all can be carried out in factory, therefore can set up wire 2 effectively.
(technical scheme 4) stay 3 is the random arrangement of the part forming the configuration of terrible pin figure (あ body だ く じ) shape.
Now, adjacent stay 3, not on a horizontal line, therefore, stops plant S to extend towards horizontal direction by the terminal of a bracing bars 3, and makes plant S conversion direction upward, can realize the rapid greening of greening face P.
The method to set up of the greening material 1 described in (technical scheme 5) technical scheme 1 to 4 is as follows.Be located at by wire 2 on the P of greening face, described base end part 2a wiry is connected and fixed on greening face P via tension force introducing mechanism 4, and the other end 2b is directly connected and fixed on greening face P.
Now, greening material 1 decides the size of above-below direction with the length of wire 2, therefore, it is possible to easily make it meet the size of the above-below direction of greening face P.In addition, when making base end part 2a tensioning by tension force introducing mechanism 4 under the state that the other end 2b of wire 2 is connected and fixed on greening face P, tension force can be imported to wire 2.Thereby, it is possible to prevent from because of swings such as blast, the tendril of plant S can be stoped to depart from from wire 2 or stay 3, thus the greening of greening face P can being formed rapidly to establish wire 2 or the stay 3 under state of greening material 1.
(technical scheme 6) greening face P is facade, and tension force introducing mechanism 4 is disposed in the bottom P ' of greening face P.
Now, can close-ups relative to the importing situation of the tension force of wire 2, the mistake of tension force and deficiency can be removed.
(technical scheme 7) tension force introducing mechanism 4 comprises extension spring 51 and tensioning apparatus 6.This extension spring 51 has coil portion 71, at one end possesses fixing buckling parts 81 across this coil portion 71, possesses movable buckling parts 91 at the other end.Tensioning apparatus 6 possesses the wire support member 12 of the bottom of bolt 10, clamp nut 11 and the greening face of being installed on P.
Wire 2 is connected to extension spring 51, the fixing buckling parts 81 of this extension spring 51 is fastened on bolt 10 with movable buckling parts 91, from the top of wire 2 side, i.e. wire support member 12, this bolt 10 is loosely inserted through the screw hole 14 of the horizontal plane 13 through wire support member 12, and clamp nut 11 is screwed together in the protuberance 15 given prominence to downward from horizontal plane 13.
Now, movable range can not be set according to the size of extension spring 51, tension force can be imported with tightening of clamp nut 11 to wire 2, thus enough easily and carry out importing operation effectively.
(technical scheme 8) tension force introducing mechanism 4 comprises Compress Spring 52 and tensioning apparatus 6.
This Compress Spring 52 has coil portion 72, at one end possesses fixing buckling parts 82 across this coil portion 72, possesses movable buckling parts 92 at the other end.This fixing buckling parts 82 and movable buckling parts 92 are positioned at the respective end of the wrist 16 and 17 given prominence to from each end of coil portion 72 with the state of intersecting in the end view (Fig. 7) and vertical view (Fig. 8) of Compress Spring 52.
Tensioning apparatus 6 is identical with described structure, so omit the description.
Wire 2 is connected to Compress Spring 52, the fixing buckling parts 82 of this Compress Spring 52 is fastened on bolt 10 with movable buckling parts 92, from wire 2 side, this bolt 10 is loosely inserted through the screw hole 14 of the horizontal plane 13 through wire support member 12, and clamp nut 11 is screwed together in from the outstanding protuberance 15 of horizontal plane 13.
Now, cheap for manufacturing cost, be difficult to plastic deformation occurs, use therefore, it is possible to steady in a long-term.
(technical scheme 9) tension force introducing mechanism 4 comprises torsionspring 53, cover body 18 and tensioning apparatus 6.This torsionspring 53 is formed as coiled type.Cover body 18 is cylindrical shell in fig .9, but is the framework of " コ " font in Figure 10 ~ 12.Cover body 18 has: the resettlement section 21 limited by sidewall 19 and end wall 20, through the screw hole 22 of end wall 20 and the installation portion 23 of wire 2.The structure of tensioning apparatus 4 is same as described above.
Wire 2 is connected to installation portion 23, torsionspring 53 winding is installed on bolt 10 and is loaded to cover body 18, bolt 10 is externally given prominence to from screw hole 22, and this bolt 10 is loosely inserted the screw hole 14 of the horizontal plane 13 through wire support member 12 from wire 2 side, clamp nut 11 is screwed together in from the outstanding protuberance 15 of this horizontal plane 13.
Now, torsionspring 53 is surrounded by cover body 18, and the infringement that plant S is damaged by clamping or the breakage etc. of torsionspring 53 is artificial is little, preferred at design aspect, is difficult to plastic deformation occurs.
(technical scheme 10) tension force introducing mechanism 4 comprises flat spring 54 and tensioning apparatus 6.The sheet material 24 and 25 of pair of curved is oppositely arranged to make the mode being formed with spring compartment 26 between two sheet materials by flat spring 54, is equipped with the inserting hole 27 and 28 of wire 2, is equipped with through hole 29 and 30 in spring compartment 26 part at both ends.The structure of tensioning apparatus 6 is same as described above.
Wire 2 is inserted through the inserting hole 27,28 of spring part 5, bolt 10 is loosely inserted through the horizontal plane 13 that through hole 29 and 30 is also loosely inserted through wire support member 12, clamp nut 11 is screwed together in from the outstanding protuberance 14 of horizontal plane 13.
Now, owing to higher tension force can be directed into wire 2, so, can prevent from because blast etc. makes wire 2 occur swing and prevent peeling off of plant S, being difficult to plastic deformation occurs, so can steady in a long-termly use.
(technical scheme 11) is provided with the mark 31 importing tension force on bolt 10.
Now, what confirm clamp nut 11 by the mark 31 being positioned at very close position tightens situation, certain tension force can be directed into wire 2 effectively thus.
In addition, in the accompanying drawings, H is bolt head, J and J ' is location nut, and K is the wire support member angle steel on top, and L is the installation screw of the wire support member K on top and the wire support member 12 of bottom, and M is wire retainer, and N is strengthening part.

Claims (10)

1. a greening material for wire type, is located on greening face,
Be made up of the pair of metal silk walked abreast and the stay be set up between this wire, described base end part wiry is connected and fixed on this greening face via tension force introducing mechanism, and the other end is directly connected and fixed on this greening face, it is characterized in that,
This tension force introducing mechanism comprises extension spring and tensioning apparatus,
This extension spring has coil portion, at one end possesses fixing buckling parts across this coil portion, possesses movable buckling parts at the other end,
This tensioning apparatus possesses bolt, clamp nut and is installed on the wire support member of bottom in this greening face,
This wire is connected to this extension spring, this fixing buckling parts of this extension spring and this movable buckling parts are fastened on this bolt, this bolt is loosely inserted through the screw hole of the horizontal plane through this wire support member from this wire side, and this clamp nut is screwed together in from the outstanding protuberance of this horizontal plane.
2. a greening material for wire type, is located on greening face,
Be made up of the pair of metal silk walked abreast and the stay be set up between this wire, described base end part wiry is connected and fixed on this greening face via tension force introducing mechanism, and the other end is directly connected and fixed on this greening face, it is characterized in that,
This tension force introducing mechanism comprises Compress Spring and tensioning apparatus,
This Compress Spring has coil portion, at one end possess fixing buckling parts across this coil portion, possess movable buckling parts at the other end, this fixing buckling parts and this movable buckling parts are positioned at the end of the wrist given prominence to from each end of this coil portion with the state of intersecting in the end view and vertical view of this Compress Spring
This tensioning apparatus possesses bolt, clamp nut and is installed on the wire support member of bottom in this greening face,
This wire is connected to this Compress Spring, this fixing buckling parts of this Compress Spring and this movable buckling parts are fastened on this bolt, this bolt is loosely inserted the screw hole of the horizontal plane through this wire support member from wire side, and this clamp nut is screwed together in from the outstanding protuberance of this horizontal plane.
3. a greening material for wire type, is located on greening face,
Be made up of the pair of metal silk walked abreast and the stay be set up between this wire, described base end part wiry is connected and fixed on this greening face via tension force introducing mechanism, and the other end is directly connected and fixed on this greening face, it is characterized in that,
This tension force introducing mechanism comprises torsionspring, cover body and tensioning apparatus,
This torsionspring is coiled type,
This cover body has: the resettlement section limited by sidewall and end wall, through the screw hole of this end wall and this installation portion wiry,
This tensioning apparatus possesses bolt, clamp nut and is installed on the wire support member of bottom in this greening face,
This wire is connected to this installation portion, this torsionspring winding is installed on this bolt and is loaded to this cover body, this bolt is externally given prominence to from this screw hole, and this bolt is loosely inserted through the screw hole of the horizontal plane through this wire support member from wire side, this clamp nut is screwed together in from the outstanding protuberance of this horizontal plane.
4. a greening material for wire type, is located on greening face,
Be made up of the pair of metal silk walked abreast and the stay be set up between this wire, described base end part wiry is connected and fixed on this greening face via tension force introducing mechanism, and the other end is directly connected and fixed on this greening face, it is characterized in that,
This tension force introducing mechanism comprises flat spring and tensioning apparatus,
This flat spring is that the sheet material of pair of curved is oppositely arranged to make the mode forming spring compartment between two sheet materials the spring formed, and is equipped with this inserting hole wiry, is equipped with through hole in this spring compartment part at both ends,
This tensioning apparatus possesses bolt, clamp nut and is installed on the wire support member of bottom in this greening face,
This wire is inserted through this inserting hole of this flat spring, this bolt relaxation is inserted through this through hole and is loosely inserted through the screw hole of the horizontal plane through this wire support member from this wire side, this clamp nut is screwed together in from the outstanding protuberance of this horizontal plane.
5. the greening material of wire type according to any one of claim 1 to 4, wherein,
This stay is the many bracing bars being arranged to ladder shape.
6. the greening material of wire type according to any one of claim 1 to 4, wherein,
This stay is installed on this wire by riveted joint, chock, coil, bonding and in welding one.
7. the greening material of wire type according to any one of claim 1 to 4, wherein,
This stay is the random arrangement of the part forming the configuration of terrible pin figure shape.
8. a method to set up for the greening material of wire type, is characterized in that,
This wire of the greening material of the wire type described in Claims 1-4 is located on greening face, described base end part wiry is connected and fixed on this greening face via tension force introducing mechanism, and the other end is directly connected and fixed on this greening face.
9. the method to set up of the greening material of wire type according to claim 8, wherein,
This greening face is facade, and this tension force introducing mechanism is disposed in the bottom in this greening face.
10. the method to set up of the greening material of wire type according to claim 8 or claim 9, wherein,
This bolt is provided with the mark importing tension force.
CN201210096104.8A 2011-04-01 2012-04-01 The greening material of wire type and method to set up thereof Active CN102884960B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011-082052 2011-04-01
JP2011082052A JP5830261B2 (en) 2011-04-01 2011-04-01 Wire type greening materials

Publications (2)

Publication Number Publication Date
CN102884960A CN102884960A (en) 2013-01-23
CN102884960B true CN102884960B (en) 2016-04-20

Family

ID=47266841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210096104.8A Active CN102884960B (en) 2011-04-01 2012-04-01 The greening material of wire type and method to set up thereof

Country Status (2)

Country Link
JP (1) JP5830261B2 (en)
CN (1) CN102884960B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020225855A1 (en) * 2019-05-07 2020-11-12 大島造園土木株式会社 Method for growing self-adhesive climbing plant and growth support instrument
CN114466588A (en) * 2020-09-02 2022-05-10 大东绿化技术株式会社 Cultivation device for attached type trailing plants in rainfall-free environment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2159538C2 (en) * 1996-09-10 2000-11-27 Верещагин Александр Васильевич Trellis for tall and liana-type plants
CN1952327A (en) * 2006-11-10 2007-04-25 徐林波 Tension-stretched guardrail and fence wall
CN101748719A (en) * 2009-12-23 2010-06-23 南京大学 Method of vegetation restoration and reconstruction of bare rock slope in East China
CN201528978U (en) * 2009-10-21 2010-07-21 宁波黛牡塑化有限公司 Plant shielding curtain apparatus
CN101779562A (en) * 2010-03-02 2010-07-21 贵州黔达喀斯特生态科技有限公司 Method for afforesting wall surfaces and side slopes with climbing-vine curtain wall
CN201601999U (en) * 2009-10-14 2010-10-13 芜湖欧标农业发展有限公司 Plant curtain wall with connection device
CN201700186U (en) * 2009-09-29 2011-01-12 丁达人 Movable green plant curtain wall

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1189447A (en) * 1997-09-17 1999-04-06 Techno Kenzai Kogyo Kk Material for inducing greening and greening
JP2002272274A (en) * 2001-03-21 2002-09-24 Nishimatsu Constr Co Ltd Plant support material for greening wall surface and method for greening wall surface
JP3642056B2 (en) * 2002-05-02 2005-04-27 良三 高野 Greening method using mesh wire mesh block on the wall of multi-story building.
JP2004211784A (en) * 2002-12-27 2004-07-29 Shoei Kogyo Kk Wire extending instrument
JP4488802B2 (en) * 2004-06-16 2010-06-23 株式会社アルティマ Wall greening method and wire tensioning device
JP2006028848A (en) * 2004-07-15 2006-02-02 Asahi Intecc Co Ltd Tension mechanism between members, assembly having tension mechanism between members, and loading structure / frame body using them
JP4832337B2 (en) * 2007-02-28 2011-12-07 小岩金網株式会社 Greening induction member
JP2010068787A (en) * 2008-09-22 2010-04-02 Fujiwara:Kk Wire fixing tool
JP5411593B2 (en) * 2009-06-19 2014-02-12 浅野金属工業株式会社 Wire tensioner
KR101116242B1 (en) * 2010-06-16 2012-03-09 한수그린텍 주식회사 Rapidly greening method of wall

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2159538C2 (en) * 1996-09-10 2000-11-27 Верещагин Александр Васильевич Trellis for tall and liana-type plants
CN1952327A (en) * 2006-11-10 2007-04-25 徐林波 Tension-stretched guardrail and fence wall
CN201700186U (en) * 2009-09-29 2011-01-12 丁达人 Movable green plant curtain wall
CN201601999U (en) * 2009-10-14 2010-10-13 芜湖欧标农业发展有限公司 Plant curtain wall with connection device
CN201528978U (en) * 2009-10-21 2010-07-21 宁波黛牡塑化有限公司 Plant shielding curtain apparatus
CN101748719A (en) * 2009-12-23 2010-06-23 南京大学 Method of vegetation restoration and reconstruction of bare rock slope in East China
CN101779562A (en) * 2010-03-02 2010-07-21 贵州黔达喀斯特生态科技有限公司 Method for afforesting wall surfaces and side slopes with climbing-vine curtain wall

Also Published As

Publication number Publication date
CN102884960A (en) 2013-01-23
JP2012213372A (en) 2012-11-08
JP5830261B2 (en) 2015-12-09

Similar Documents

Publication Publication Date Title
ITMI20100147A1 (en) SUPPORT DEVICE FOR ANCHORING PHOTOVOLTAIC PANELS ON A ROOF.
ITMI20091559A1 (en) IMPROVED FOUNDATION FOR WIND TOWER
CN104978907B (en) LED display modules and pedestal disk used and light-operated circuit plate
CN102884960B (en) The greening material of wire type and method to set up thereof
CA2968035A1 (en) Link-plate connection for monopole reinforcing bars
CN102296829B (en) Method for constructing three-dimensional cable net curtain wall
CN202139895U (en) Improved fence
KR100982047B1 (en) Multifunction overhead wire supporter
RU57324U1 (en) TRANSMISSION SUPPORT OF LINES OF ELECTRIC TRANSMISSIONS
KR101066637B1 (en) Drooping prevention device of power-transmission line
JP6013144B2 (en) Rain shelter for flat shelf and its installation method
US20100212236A1 (en) Gin Pole Device for Raising and Lowering a Tower
CN103956683A (en) Crossing frame system used for 220-KV outgoing line engineering wire erection of 500-KV transformer substation
KR101066815B1 (en) Anchor connector for preventing loosing of overhead line
CN103246034B (en) Anchoring mounting method for overhead laying of self-supporting bow-type rubber-insulated fiber cable
CN204146121U (en) One protects tree support
DE60033265D1 (en) Production method for a superconducting wire
CN216252595U (en) Axillary pole stretch-draw structure and flexible photovoltaic support thereof
KR101206495B1 (en) Connection support apparatus for changing pylon
CN204030412U (en) There is engineering stringing crossing frame system in a kind of 500 kv substation 220 kilovolts
CN205511177U (en) Dendrobii officmalis caulis plants canopy
JP2010057420A (en) Plant supporter
KR101843696B1 (en) Fixing system for fence
TWI700885B (en) Suspended solar tracking system
CN206784547U (en) Job site is faced near water is electrically integrated arrangement system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant