CN101718982A - System and method for integrally controlling loading, transportation and unloading - Google Patents

System and method for integrally controlling loading, transportation and unloading Download PDF

Info

Publication number
CN101718982A
CN101718982A CN200910220078A CN200910220078A CN101718982A CN 101718982 A CN101718982 A CN 101718982A CN 200910220078 A CN200910220078 A CN 200910220078A CN 200910220078 A CN200910220078 A CN 200910220078A CN 101718982 A CN101718982 A CN 101718982A
Authority
CN
China
Prior art keywords
vehicle
information
card
time
remote monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910220078A
Other languages
Chinese (zh)
Other versions
CN101718982B (en
Inventor
周巍
石庆生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang New Generation Information Technology Co., Ltd.
Original Assignee
周巍
石庆生
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 周巍, 石庆生 filed Critical 周巍
Priority to CN2009102200783A priority Critical patent/CN101718982B/en
Publication of CN101718982A publication Critical patent/CN101718982A/en
Application granted granted Critical
Publication of CN101718982B publication Critical patent/CN101718982B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a system and a method for integrally controlling loading, transportation and unloading. The system consists of a motor truck scale device, an electronic display screen or a screen, a video monitoring device, a satellite positioning navigation device, a computer and a remote monitoring platform, wherein the remote monitoring platform mainly consists of a hardware part and a software part, wherein the hardware part comprises a GPS navigation signal receiving and transmitting device, a remote video receiving device, a server and a computer, and the software part comprises a weight comparison module, a travel track comparison module, an inquiry module, a data processing module and a database. The method comprises the steps of: typing-in a contract, metering the loading (delivery), monitoring the transportation process of a vehicle, metering the unloading (delivery), settlement, arranging the data and uploading the record. The invention strengthens the monitoring of the vehicle and the remote supervisory of a driver in the transportation process, improves the transportation efficiency, strengthens the supervision of the cargo, protects the cargo and provides reasonable paths so that a transportation corporation can master the overall travel information and the position information of the vehicle in an all-round way.

Description

Loading, transportation, discharging line control integrated system and method
Technical field:
The present invention relates to loading, transportation, discharging line control integrated system and method in the logistics carrier.
Background technology:
At present, mainly there are the following problems for freight transportation in the logistics carrier: goods is unfavorable to vehicle monitoring in transportation, working time is done private business, freight transportation is untimely, arbitrarily berthing time is long, it is unfavorable in transit goods to be kept an eye on, and causes loss of goods easily, travels not according to prescribed path and causes oil consumption excessive.Traffic unit can't be omnidistance, grasp vehicle traveling information and positional information comprehensively, can't fully utilize these information, these vehicles dispatched again.When a certain link went wrong, selling party, transporter, purchaser three parts can't determine responsibility.Therefore, develop a kind of loading, transportation, discharging line control integrated system and method is important topic anxious to be solved always.
Summary of the invention:
The objective of the invention is to have more above-mentioned problem and shortage, and a kind of loading, transportation, discharging line control integrated system and method are provided at present freight transportation.This system can be to the loading and the vehicle running state real-time monitoring of goods, carry out satellite positioning navigation, the application management module is analyzed and contrasted, then information is put in order, at last the analysis result of all information in the transportation is fed back to selling party, purchaser, transporter and other need know management of information side.
The object of the present invention is achieved like this: a kind of loading, transportation, discharging line control integrated system and method, and system is made up of truck scale device, electronic display or screen, video monitoring apparatus, satellite positioning and navigation device, computing machine, remote monitoring platform; The truck scale device is to be used for weighing to weighing and arrive the destination after the vehicle loading, and with the device of data upload to remote monitoring platform; Electronic display or screen are continuous data and the devices of metering time that is used for the display automobile weighing apparatus; Be used to record haulage vehicle situation in the process of moving during video monitoring apparatus, and with the device of data upload to remote monitoring platform; Satellite positioning and navigation device is to be used to indicate vehicle to arrive all paths of destination, and points out its best route, again information such as vehicle actual travel trajectory coordinates, time is sent to remote monitoring platform; Computing machine is the device that is used for purchaser, selling party, transporter typing contract, also is used for information typing and management in loading metering, unloading metering simultaneously; Remote monitoring platform mainly is made up of hardware and software two parts: wherein hardware comprises satellite positioning navigation signal receiving/transmission device, long-distance video receiving trap, server, computing machine, and software section comprises weight comparing module, driving trace comparing module, enquiry module, data processing module and database; Loading, transportation, the control integrated method of discharging line comprise 7 steps: 1) typing contract; 2) loading (handing-over) metering; 3) vehicle transport process monitoring; 4) unloading (handing-over) metering; 5) clearing; 6) data preparation; 7) record is uploaded; Truck scale device, electronic display or screen, real-time video monitoring device, satellite positioning navigation dress are connected with remote control table by wireless network respectively, and Information Monitoring are uploaded in the database of remote control table system; Real-time video monitoring device, satellite positioning and navigation device are installed in the relevant position of haulage vehicle respectively; The truck scale device is connected with electronic display or screen, shows data and the metering time that the weighing apparatus device is measured on electronic display or screen; Weight ratio is installed respectively in server software module, driving trace comparison software module, enquiry module, data processing module; Purchase contract information, freight transport contract information, selling party and transporter loading handing-over metrical information, the track of transportation (coordinate), time and video information, transporter and the purchaser handing-over metrical information of unloading, can by rule, authorize to the related side open; The satellite positioning navigation signal receiving/transmission device of remote monitoring platform hardware components is to be used to receive and store the signal of being uploaded by satellite positioning and navigation device, data processing module by remote monitoring platform is analyzed it, and feedback information is sent to satellite positioning and navigation device; Described long-distance video receiving trap is to be used to receive and store the video file information that haulage vehicle real-time video monitoring device is uploaded; Described server is the carrier as software and database, also is the media of data storage; Described computing machine is the device as information typing, user inquiring, data processing, data analysis; Described goods weight comparing module is to be used for twice received goods weight information is compared, and the difference of calculating and the standard of error in dipping are compared, to examine whether unloading is midway arranged in goods weight and the transportation; Described driving trace comparing module is the driving trace information that is used for received, and the path indicated with satellite positioning and navigation device compares, and calculates path length difference automatically and oil consumption is poor; Described enquiry module is that all data of being used to upload to remote monitoring platform offer the user or the supvr inquires about; Described data processing module is the data that are used to handle and analytically pass to remote monitoring platform; Described database is to be used to store all data that upload to remote monitoring platform; Remote monitoring platform can be used as the public information service platform of mechanisms such as upstream enterprise marketing, down-stream enterprise's buying and cargo transport enterprises; Simultaneously, also be between the upstream and downstream enterprise, upstream and downstream enterprise is connected hinge with informationization between the transport enterprise, all purchasers, selling party and transporter are linked together; Loading, transportation, the control integrated method of discharging line, comprise 7 steps: 1) typing contract: typing purchase order in the contract management of computing machine at first by purchaser or selling party, content comprises standard, clearing form, the clearing time of Contract NO, contract title, signing time, selling party's essential information, purchaser's essential information, goods production unit essential information, Description of Goods, cargo type model, quantity of goods, the goods amount of money, dilivery term, goods metering difference, confirms by both party by rule; Then by purchaser or selling party and transporter typing carriage contract in the contract management of computing machine, its content comprises: selling party's essential information, purchaser's essential information, the transporter essential information, type of vehicle, the number-plate number, the vehicle drivers name, the zero load of vehicle standard and all-up weight, the shipping goods title, the cargo type model, quantity of goods, the standard of goods metering difference, the vehicle place of shipping, start shipment the time, transportation range, haulage time, the transportation amount of money, the vehicle place of arrival, time of arrival, the delivery personnel, the personnel that receive confirm by both party by rule; After treating that contract inputting is finished, be submitted to remote monitoring platform automatically, three parts according to the contract content fulfils separately obligation; 2) loading (handing-over) metering: at first selling party in required time, lade is carried out to haulage vehicle in the place, loading process is divided into five steps: the first step, the vehicle registration of marching into the arena: register when haulage vehicle drives to the entrance guard of selling party unit, the vehicle that IC-card is arranged is swiped the card on the IC-card reader device, the essential information of vehicle promptly is presented in the computing machine, then by gate clerk's log into thr computer call in the remote monitoring platform with the carriage contract of this vehicle and with purchaser's purchase order, based on contract content is filled in registration form, and information and the IC-card filled in are bound temporarily; To there not being the vehicle of IC-card, registration form fill in complete after, get a new IC-card and registration form information is bound by the gate clerk, and give vehicle drivers this IC-card; After registration finished, vehicle can leave and enter next link, this computer-chronograph automatically with the registration form information uploading to remote monitoring platform; Second step, weigh for the first time: vehicle ' is to the truck scale device the time, at first on the IC-card reader device, swipe the card by vehicle drivers, after the data stabilization to be weighed, the truck scale device is weighed to vehicle automatically, weight information and metering time showing are on electronic display or screen then, and the prompting vehicle can enter next link, and system binds weight information and metering time and IC-card automatically temporarily, and the information uploading of this IC-card being bound by network is to remote monitoring platform; The 3rd step, loading: vehicle ' is freighted to the delivery location of appointment, loading finishes the back vehicle drivers and will swipe the card on Warehouse Keeper's handheld reader, loading information is confirmed last information is bound with IC-card automatically temporarily, vehicle can leave and enter next link at this moment; The 4th step, the second time weigh: need before vehicle appears on the scene after loading to weigh for the second time, its method of operating is weighed identical with the first time; Weigh for the second time and finish the computer-chronograph data of can automatic discharging of goods weighing for twice, and calculating goods weight, simultaneously these data are confirmed by vehicle drivers and metrological personnel both sides then, confirm errorless after, computer system is bound data and IC-card automatically temporarily, and is uploaded to remote monitoring platform by network; The 5th step, vehicle appear on the scene: when vehicle ' prepares to exit to the entrance guard, swipe the card on the IC-card reader device by vehicle drivers, by gate clerk's log into thr computer once more, access vehicle appearance registration form, automatically show the information of the thing of freighting, the weight information of goods etc. and vehicle time for competiton at this moment in the appearance registration form, and calculate the time that vehicle stops inside automatically; To carry out manual typing or selection to what information can not generate automatically; Gate clerk and vehicle drivers are preserved after errorless all validation of information in the appearance registration form, print shipping ticket and give the driver, and computer system is uploaded to remote monitoring platform with registration form by network automatically; With the interim information of binding of IC-card, only keep original haulage vehicle and driver's essential information after the removing vehicle is marched into the arena in computing machine at last, vehicle can be held the IC-card appearance; For the march into the arena IC-card of after discharge of vehicle, if this vehicle will be cooperated in the future for a long time, IC-card will not be regained, and vehicle is bound therewith, treat to use next time; Will be regaining to the vehicle of interim transportation, and remove the information of all IC-cards bindings.Wherein all can select the video monitoring system device that it is monitored, and video file is uploaded to remote monitoring platform automatically each process of vehicle loading (handing-over) metering; 3) vehicle transport process monitoring: haulage vehicle is at first opened satellite positioning and navigation device before travelling, suggested optimal path in the selecting arrangement; If what select is not optimal path or Iterim Change route in the process of moving, illustration; The trajectory coordinates of vehicle ' and time information corresponding and the path of selecting in satellite positioning and navigation device will be uploaded to the satellite positioning navigation signal receiving/transmission device of remote monitoring platform automatically, carry out analyzing and processing by track contrast module again, and feedback information sent to satellite positioning and navigation device, work will travel by correct line with the prompting to the driver; At last will be in system the contrast images of store car travel route and optimal path; Simultaneously according to attention degree to shipping goods, can open video monitoring apparatus when haulage vehicle begins to travel or in the driving process, record haulage vehicle situation in the process of moving, and automatically video file and trajectory coordinates, temporal information are uploaded to remote monitoring platform together; 4) unloading (handing-over) metering: when haulage vehicle reaches the destination, to unload and measure haulage vehicle, be divided into five steps: the first step, the vehicle registration of marching into the arena: register when haulage vehicle drives to the entrance guard of purchaser unit, the vehicle that IC-card is arranged is swiped the card on the IC-card reader device, the essential information of vehicle promptly is presented in the computing machine, then by gate clerk's log into thr computer call in the remote monitoring platform with the carriage contract of this vehicle and and purchase order, based on contract content is filled in registration form, and information and the IC-card filled in are bound temporarily; To there not being the vehicle of IC-card, registration form fill in complete after, get a new IC-card and registration form information is bound by the gate clerk, and give vehicle drivers this IC-card; After registration finished, vehicle can leave and enter next link, this computer-chronograph automatically with the registration form information uploading to remote monitoring platform; Second step, weigh for the first time: vehicle ' is to the truck scale device the time, at first on the IC-card device, swipe the card by vehicle drivers, after the data stabilization to be weighed, the truck scale device is weighed to vehicle automatically, then weight information and the metering time showing on electronic display or screen, and the prompting vehicle can enter next link.System binds weight information and metering time and IC-card automatically temporarily, and by network with the information uploading of this IC-card binding to remote monitoring platform; The 3rd step, unloading: vehicle ' is to specifying discharge location to unload, vehicle drivers will be swiped the card on Warehouse Keeper's handheld reader behind the unloading EO, unloading information is confirmed last information is bound with IC-card automatically temporarily, vehicle can leave and enter next link at this moment; The 4th step, the second time weigh: need before vehicle appears on the scene after unloading to weigh for the second time, its method of operating is weighed identical with the first time.This computer-chronograph data of can automatic discharging of goods weighing for twice, and calculating goods weight, or by metrological personnel by the weight information of this goods in the network call remote monitoring platform in the metering of selling party unit, and check with goods error in dipping standard, confirm errorless after, computer system is bound data and IC-card automatically temporarily, and is uploaded to long distance control system by network; The 5th step, vehicle appear on the scene: vehicle ' is to the entrance guard, and vehicle drivers is swiped the card on the IC reader device; By gate clerk's log into thr computer once more, access vehicle appearance registration form, show the weight information etc. and the vehicle time for competiton at this moment of thing information, the goods of freighting in the appearance registration form automatically, and calculate the time that vehicle stops inside automatically; To carry out manual typing or selection to what information can not generate automatically; Gate clerk and vehicle drivers are preserved after errorless all validation of information in the appearance registration form, give the driver after printing receipt, and computer system is uploaded to remote monitoring platform with registration form by network automatically; Will remove the march into the arena information of back and the interim binding of IC-card of vehicle at last in computing machine, only keep original haulage vehicle and driver's essential information, vehicle can be held IC-card and appear on the scene.For the march into the arena IC-card of after discharge of vehicle, if this vehicle will be cooperated in the future for a long time, IC-card will not be regained, and vehicle is bound therewith, treat to use next time; Will be regaining to the vehicle of interim transportation, and remove the information of all IC-cards bindings.Wherein all can select video monitoring apparatus that it is monitored, and video file is uploaded to remote monitoring platform automatically each process of vehicle unloading (handing-over) metering; 5) clearing: the purchaser receive goods acceptance that transporter transports errorless after, confirm that on computer system system generates statement of account according to purchase order, carriage contract automatically, is settled accounts according to statement of account by the related side; 6) data preparation: after the data that the remote monitoring platform system is uploaded in receiving whole loading, transportation, unloading process, integration and the storage data carried out by data processing module, form complete record, can be provided in the inquiry and the investigation of selling party, transporter, purchaser and other administrative authoritys; 7) record is uploaded: after whole loading, transportation, unloading flow process finish, by the keeper in the record of bad behavior system, write down produce in the relevant flow process dispute on, the information of mistake, and be uploaded to remote monitoring platform, for constituent parts with reference to use.
Main points of the present invention are its equipment and job step.Its principle of work is: at first sign purchase order by purchaser and selling party; errorless be transported to the purchaser for guaranteeing that goods is normal from selling party; sign carriage contract by purchaser or selling party and transporter again, and after confirming by rule, the three parts fulfils relevant obligation separately.Haulage vehicle is freighted in official hour by selling party then, carrying out truck scale again weighs, after both sides confirm, haulage vehicle begins to travel to the purchaser, can select real-time video monitoring system that the vehicle ' situation is recorded a video according to the attention degree of institute's shipping goods simultaneously, and in satellite positioning and navigation device, select best driving path, the actual travel route of vehicle is uploaded to remote monitoring platform, for not selecting will being explained of optimal path; After haulage vehicle arrives at the purchaser, on the truck scale device it is weighed, by measuring control person the difference of weighing for twice and the standard of the error in dipping in the contract are compared, the standard compliant unloading finished transport; Non-compliant will be in the sincere system of remote monitoring platform with information uploading.The present invention is that the whole flow process of will freight, transport, unload combines, and utilizes advanced equipment that haulage vehicle is carried out real-time follow-up, monitoring, by the application management module various information of uploading is analyzed, handles, is issued and feeds back.
Loading; transportation; discharging line control integrated system and method are compared with prior art; have and strengthened in the transportation to the monitoring of vehicle and to driver's remote supervisory; improved conevying efficiency; strengthened supervision to goods; the protection goods is not lost in transportation; for haulage vehicle provides reasonable path; avoid the range of driving to go the long way round or travel not according to prescribed path; control oil consumption to greatest extent; carrier grasps the driving information and the positional information of vehicle whole process comprehensively; fully utilize these information; vehicle is carried out rational management; goods weight loaded and landing weight are exercised supervision; further guaranteed the advantage of the safety of goods, will be widely used in the traffic transport industry.
Description of drawings:
Fig. 1 is a system architecture synoptic diagram of the present invention.
Fig. 2 is a workflow diagram of the present invention.
Embodiment:
With reference to accompanying drawing, a kind of loading, transportation, discharging line control integrated system and method are made up of truck scale device, electronic display or screen, video monitoring apparatus, satellite positioning and navigation device, computing machine, remote monitoring platform; Wherein truck scale device, electronic display or screen, video monitoring apparatus, satellite positioning and navigation device are connected with remote monitoring platform by wireless network respectively; The truck scale device is used for haulage vehicle is weighed; Electronic display or screen are used for the continuous data and the metering time of display automobile weighing apparatus; Video monitoring apparatus is used to record haulage vehicle situation in the process of moving; Satellite positioning and navigation device is used to indicate vehicle to arrive all paths of destination, and points out its best route, again information such as vehicle driving trace, geographic location signal is sent to remote monitoring platform; Computing machine is used for purchaser, selling party, transporter typing contract, also is used for the information typing and the management of freighting metering, unloading and measuring simultaneously; Remote monitoring platform mainly is made up of hardware and software two parts: wherein hardware comprises satellite positioning navigation signal receiving/transmission device, long-distance video receiving trap, server, computing machine; Software section comprises weight comparing module, driving trace comparing module, enquiry module, data processing module and database; The satellite positioning navigation signal receiving/transmission device of remote monitoring platform hardware components is used to receive the signal of being uploaded by satellite positioning and navigation device, by the data processing module of remote control table it is analyzed, and feedback information is sent to satellite positioning and navigation device; The long-distance video receiving trap is used to receive the video information that haulage vehicle real-time video monitoring device is uploaded; Server is as the carrier of software and database; Computing machine is the device as information typing, user inquiring, data processing, data analysis; The goods weight comparing module of remote monitoring platform software section is used for twice received goods weight information is compared, and the difference of calculating and the standard of error in dipping are compared; The driving trace comparing module is used for received driving trace information, and the path indicated with satellite positioning and navigation device compares, and calculates path length difference automatically and oil consumption is poor; All data that enquiry module is used to upload to remote monitoring platform offer the user or the supvr inquires about; Data processing module is to be used for handling and analytically passing to remote monitoring platform; Database is used to store all data that upload to remote monitoring platform.
The method of work of loading, transportation, discharging line control integrated system comprises the steps: 1, the typing contract: the typing purchase order in the contract management of computing machine by purchaser or selling party at first, content comprises standard, clearing form, the clearing time of Contract NO, contract title, signing time, selling party's essential information, purchaser's essential information, goods production unit essential information, Description of Goods, cargo type model, quantity of goods, the goods amount of money, dilivery term, goods metering difference, confirms by both party by rule; Then by purchaser or selling party and transporter typing carriage contract in the contract management of computing machine, its content comprises: selling party's essential information, purchaser's essential information, the transporter essential information, type of vehicle, the number-plate number, the vehicle drivers name, the zero load of vehicle standard and all-up weight, the shipping goods title, the cargo type model, quantity of goods, the standard of goods metering difference, the vehicle place of shipping, start shipment the time, transportation range, haulage time, the transportation amount of money, the vehicle place of arrival, time of arrival, the delivery personnel, the personnel that receive confirm by both party by rule; After treating that contract inputting is finished, be submitted to remote monitoring platform automatically, three parts according to the contract content fulfils separately obligation; 2, loading (handing-over) metering: at first selling party in required time, lade is carried out to haulage vehicle in the place, loading process is divided into five steps: the first step, the vehicle registration of marching into the arena: register when haulage vehicle drives to the entrance guard of selling party unit, the vehicle that IC-card is arranged is swiped the card on the IC-card reader device, the essential information of vehicle promptly is presented in the computing machine, then by gate clerk's log into thr computer call in the remote monitoring platform with the carriage contract of this vehicle and with purchaser's purchase order, based on contract content is filled in registration form, and information and the IC-card filled in are bound temporarily; To there not being the vehicle of IC-card, registration form fill in complete after, get a new IC-card and registration form information is bound by the gate clerk, and give vehicle drivers this IC-card; After registration finished, vehicle can leave and enter next link, this computer-chronograph automatically with the registration form information uploading to remote monitoring platform; Second step, weigh for the first time: vehicle ' is to the truck scale device the time, at first on the IC-card reader device, swipe the card by vehicle drivers, after the data stabilization to be weighed, the truck scale device is weighed to vehicle automatically, weight information and metering time showing are on electronic display or screen then, and the prompting vehicle can enter next link, and system binds weight information and metering time and IC-card automatically temporarily, and the information uploading of this IC-card being bound by network is to remote monitoring platform; The 3rd step, loading: vehicle ' is freighted to the delivery location of appointment, loading finishes the back vehicle drivers and will swipe the card on Warehouse Keeper's handheld reader, loading information is confirmed last information is bound with IC-card automatically temporarily, vehicle can leave and enter next link at this moment; The 4th step, the second time weigh: need before vehicle appears on the scene after loading to weigh for the second time, its method of operating is weighed identical with the first time.Weigh for the second time and finish the computer-chronograph data of can automatic discharging of goods weighing for twice, and calculating goods weight, simultaneously these data are confirmed by vehicle drivers and metrological personnel both sides then, confirm errorless after, computer system is bound data and IC-card automatically temporarily, and is uploaded to remote monitoring platform by network; The 5th step, vehicle appear on the scene: when vehicle ' prepares to exit to the entrance guard, swipe the card on the IC-card reader device by vehicle drivers, by gate clerk's log into thr computer once more, access vehicle appearance registration form, automatically show the information of the thing of freighting, the weight information of goods etc. and vehicle time for competiton at this moment in the appearance registration form, and calculate the time that vehicle stops inside automatically; To carry out manual typing or selection to what information can not generate automatically; Gate clerk and vehicle drivers are preserved after errorless all validation of information in the appearance registration form, print shipping ticket and give the driver, and computer system is uploaded to remote monitoring platform with registration form by network automatically; With the interim information of binding of IC-card, only keep original haulage vehicle and driver's essential information after the removing vehicle is marched into the arena in computing machine at last, vehicle can be held the IC-card appearance; For the march into the arena IC-card of after discharge of vehicle, if this vehicle will be cooperated in the future for a long time, IC-card will not be regained, and vehicle is bound therewith, treat to use next time; Will be regaining to the vehicle of interim transportation, and remove the information of all IC-cards bindings.Wherein all can select the video monitoring system device that it is monitored, and video file is uploaded to remote monitoring platform automatically each process of vehicle loading (handing-over) metering.3, vehicle transport process monitoring: haulage vehicle is at first opened satellite positioning and navigation device before travelling, suggested optimal path in the selecting arrangement; If what select is not optimal path or Iterim Change route in the process of moving, illustration; The trajectory coordinates of vehicle ' and time information corresponding and the path of selecting in satellite positioning and navigation device will be uploaded to the satellite positioning navigation signal receiving/transmission device of remote monitoring platform automatically, carry out analyzing and processing by track contrast module again, and feedback information sent to satellite positioning and navigation device, work will travel by correct line with the prompting to the driver; At last will be in system the contrast images of store car travel route and optimal path; Simultaneously according to attention degree to shipping goods, can open video monitoring apparatus when haulage vehicle begins to travel or in the driving process, record haulage vehicle situation in the process of moving, and automatically video file and trajectory coordinates, temporal information are uploaded to remote monitoring platform together.4, unloading (handing-over) metering: when haulage vehicle reaches the destination, to unload and measure haulage vehicle, be divided into five steps: the first step, the vehicle registration of marching into the arena: register when haulage vehicle drives to the entrance guard of purchaser unit, the vehicle that IC-card is arranged is swiped the card on the IC-card reader device, the essential information of vehicle promptly is presented in the computing machine, then by gate clerk's log into thr computer call in the remote monitoring platform with the carriage contract of this vehicle and and purchase order, based on contract content is filled in registration form, and information and the IC-card filled in are bound temporarily; To there not being the vehicle of IC-card, registration form fill in complete after, get a new IC-card and registration form information is bound by the gate clerk, and give vehicle drivers this IC-card; After registration finished, vehicle can leave and enter next link, this computer-chronograph automatically with the registration form information uploading to remote monitoring platform; Second step, weigh for the first time: vehicle ' is to the truck scale device the time, at first on the IC-card device, swipe the card by vehicle drivers, after the data stabilization to be weighed, the truck scale device is weighed to vehicle automatically, then weight information and the metering time showing on electronic display or screen, and the prompting vehicle can enter next link.System binds weight information and metering time and IC-card automatically temporarily, and by network with the information uploading of this IC-card binding to remote monitoring platform; The 3rd step, unloading: vehicle ' is to specifying discharge location to unload, vehicle drivers will be swiped the card on Warehouse Keeper's handheld reader behind the unloading EO, unloading information is confirmed last information is bound with IC-card automatically temporarily, vehicle can leave and enter next link at this moment; The 4th step, the second time weigh: need before vehicle appears on the scene after unloading to weigh for the second time, its method of operating is weighed identical with the first time.This computer-chronograph data of can automatic discharging of goods weighing for twice, and calculating goods weight, or by metrological personnel by the weight information of this goods in the network call remote monitoring platform in the metering of selling party unit, and check with goods error in dipping standard, confirm errorless after, computer system is bound data and IC-card automatically temporarily, and is uploaded to long distance control system by network; The 5th step, vehicle appear on the scene: vehicle ' is to the entrance guard, and vehicle drivers is swiped the card on the IC reader device; By gate clerk's log into thr computer once more, access vehicle appearance registration form, show the weight information etc. and the vehicle time for competiton at this moment of thing information, the goods of freighting in the appearance registration form automatically, and calculate the time that vehicle stops inside automatically; To carry out manual typing or selection to what information can not generate automatically; Gate clerk and vehicle drivers are preserved after errorless all validation of information in the appearance registration form, give the driver after printing receipt, and computer system is uploaded to remote monitoring platform with registration form by network automatically; Will remove the march into the arena information of back and the interim binding of IC-card of vehicle at last in computing machine, only keep original haulage vehicle and driver's essential information, vehicle can be held IC-card and appear on the scene.For the march into the arena IC-card of after discharge of vehicle, if this vehicle will be cooperated in the future for a long time, IC-card will not be regained, and vehicle is bound therewith, treat to use next time; Will be regaining to the vehicle of interim transportation, and remove the information of all IC-cards bindings.Wherein all can select video monitoring apparatus that it is monitored, and video file is uploaded to remote monitoring platform automatically each process of vehicle unloading (handing-over) metering.5, clearing: the purchaser receive goods acceptance that transporter transports errorless after, confirm that on computer system system generates statement of account according to purchase order, carriage contract automatically, is settled accounts according to statement of account by the related side.6, data preparation: after the data that the remote monitoring platform system is uploaded in receiving whole loading, transportation, unloading process, integration and the storage data carried out by data processing module, form complete record, can be provided in the inquiry and the investigation of selling party, transporter, purchaser and other administrative authoritys.7, record is uploaded: after whole loading, transportation, unloading flow process finish, by the keeper in the record of bad behavior system, write down produce in the relevant flow process dispute on, the information of mistake, and be uploaded to remote monitoring platform, for constituent parts with reference to use.

Claims (9)

1. a loading, transportation, discharging line control integrated system and method, system is made up of truck scale device, electronic display or screen, video monitoring apparatus, satellite positioning and navigation device, computing machine, remote monitoring platform; It is characterized in that: the truck scale device is to be used for weighing to weighing and arrive the destination after the vehicle loading, and with the device of data upload to remote monitoring platform; Electronic display or screen are continuous data and the devices of metering time that is used for the display automobile weighing apparatus; Be used to record haulage vehicle situation in the process of moving during video monitoring apparatus, and with the device of data upload to remote monitoring platform; Satellite positioning and navigation device is to be used to indicate vehicle to arrive all paths of destination, and points out its best route, again information such as vehicle actual travel trajectory coordinates, time is sent to remote monitoring platform; Computing machine is the device that is used for purchaser, selling party, transporter typing contract, also is used for information typing and management in loading metering, unloading metering simultaneously; Remote monitoring platform mainly is made up of hardware and software two parts: wherein hardware comprises satellite positioning navigation signal receiving/transmission device, long-distance video receiving trap, server, computing machine, and software section comprises weight comparing module, driving trace comparing module, enquiry module, data processing module and database; Loading, transportation, the control integrated method of discharging line comprise 7 steps: 1) typing contract; 2) loading (handing-over) metering; 3) vehicle transport process monitoring; 4) unloading (handing-over) metering; 5) clearing; 6) data preparation; 7) record is uploaded.
2. loading according to claim 1, transportation, discharging line control integrated system and method, it is characterized in that: truck scale device, electronic display or screen, real-time video monitoring device, satellite positioning navigation dress are connected with remote control table by wireless network respectively, and Information Monitoring are uploaded in the database of remote control table system.
3. loading according to claim 1, transportation, discharging line control integrated system and method is characterized in that: real-time video monitoring device, satellite positioning and navigation device are installed in the relevant position of haulage vehicle respectively.
4. loading according to claim 1, transportation, discharging line control integrated system and method, it is characterized in that: the truck scale device is connected with electronic display or screen, shows data and the metering time that the weighing apparatus device is measured on electronic display or screen.
5. loading according to claim 1, transportation, discharging line control integrated system and method is characterized in that: weight ratio is installed in server respectively software module, driving trace comparison software module, enquiry module, data processing module.
6. loading according to claim 1, transportation, discharging line control integrated system and method, it is characterized in that: purchase contract information, freight transport contract information, selling party and transporter loading handing-over metrical information, the track of transportation (coordinate), time and video information, transporter and the purchaser handing-over metrical information of unloading, can by rule, authorize to the related side open.
7. loading according to claim 1, transportation, discharging line control integrated system and method, it is characterized in that: the satellite positioning navigation signal receiving/transmission device of described remote monitoring platform hardware components is to be used to receive and store the signal of being uploaded by satellite positioning and navigation device, data processing module by remote monitoring platform is analyzed it, and feedback information is sent to satellite positioning and navigation device; Described long-distance video receiving trap is to be used to receive and store the video file information that haulage vehicle real-time video monitoring device is uploaded; Described server is the carrier as software and database, also is the media of data storage; Described computing machine is the device as information typing, user inquiring, data processing, data analysis; Described goods weight comparing module is to be used for twice received goods weight information is compared, and the difference of calculating and the standard of error in dipping are compared, to examine whether unloading is midway arranged in goods weight and the transportation; Described driving trace comparing module is the driving trace information that is used for received, and the path indicated with satellite positioning and navigation device compares, and calculates path length difference automatically and oil consumption is poor; Described enquiry module is that all data of being used to upload to remote monitoring platform offer the user or the supvr inquires about; Described data processing module is the data that are used to handle and analytically pass to remote monitoring platform; Described database is to be used to store all data that upload to remote monitoring platform.
8. loading according to claim 1, transportation, discharging line control integrated system and method is characterized in that: remote monitoring platform can be used as the public information service platform of mechanisms such as upstream enterprise marketing, down-stream enterprise's buying and cargo transport enterprises; Simultaneously, also be between the upstream and downstream enterprise, upstream and downstream enterprise is connected hinge with informationization between the transport enterprise, all purchasers, selling party and transporter are linked together.
9. loading according to claim 1, transportation, discharging line control integrated system and method is characterized in that: described loading, transportation, the control integrated method of discharging line comprise 7 steps:
1) typing contract: typing purchase order in the contract management of computing machine at first by purchaser or selling party, content comprises standard, clearing form, the clearing time of Contract NO, contract title, signing time, selling party's essential information, purchaser's essential information, goods production unit essential information, Description of Goods, cargo type model, quantity of goods, the goods amount of money, dilivery term, goods metering difference, confirms by both party by rule; Then by purchaser or selling party and transporter typing carriage contract in the contract management of computing machine, its content comprises: selling party's essential information, purchaser's essential information, the transporter essential information, type of vehicle, the number-plate number, the vehicle drivers name, the zero load of vehicle standard and all-up weight, the shipping goods title, the cargo type model, quantity of goods, the standard of goods metering difference, the vehicle place of shipping, start shipment the time, transportation range, haulage time, the transportation amount of money, the vehicle place of arrival, time of arrival, the delivery personnel, the personnel that receive confirm by both party by rule; After treating that contract inputting is finished, be submitted to remote monitoring platform automatically, three parts according to the contract content fulfils separately obligation;
2) loading (handing-over) metering: at first selling party in required time, lade is carried out to haulage vehicle in the place, loading process is divided into five steps: the first step, the vehicle registration of marching into the arena: register when haulage vehicle drives to the entrance guard of selling party unit, the vehicle that IC-card is arranged is swiped the card on the IC-card reader device, the essential information of vehicle promptly is presented in the computing machine, then by gate clerk's log into thr computer call in the remote monitoring platform with the carriage contract of this vehicle and with purchaser's purchase order, based on contract content is filled in registration form, and information and the IC-card filled in are bound temporarily; To there not being the vehicle of IC-card, registration form fill in complete after, get a new IC-card and registration form information is bound by the gate clerk, and give vehicle drivers this IC-card; After registration finished, vehicle can leave and enter next link, this computer-chronograph automatically with the registration form information uploading to remote monitoring platform; Second step, weigh for the first time: vehicle ' is to the truck scale device the time, at first on the IC-card reader device, swipe the card by vehicle drivers, after the data stabilization to be weighed, the truck scale device is weighed to vehicle automatically, weight information and metering time showing are on electronic display or screen then, and the prompting vehicle can enter next link, and system binds weight information and metering time and IC-card automatically temporarily, and the information uploading of this IC-card being bound by network is to remote monitoring platform; The 3rd step, loading: vehicle ' is freighted to the delivery location of appointment, loading finishes the back vehicle drivers and will swipe the card on Warehouse Keeper's handheld reader, loading information is confirmed last information is bound with IC-card automatically temporarily, vehicle can leave and enter next link at this moment; The 4th step, the second time weigh: need before vehicle appears on the scene after loading to weigh for the second time, its method of operating is weighed identical with the first time; Weigh for the second time and finish the computer-chronograph data of can automatic discharging of goods weighing for twice, and calculating goods weight, simultaneously these data are confirmed by vehicle drivers and metrological personnel both sides then, confirm errorless after, computer system is bound data and IC-card automatically temporarily, and is uploaded to remote monitoring platform by network; The 5th step, vehicle appear on the scene: when vehicle ' prepares to exit to the entrance guard, swipe the card on the IC-card reader device by vehicle drivers, by gate clerk's log into thr computer once more, access vehicle appearance registration form, automatically show the information of the thing of freighting, the weight information of goods etc. and vehicle time for competiton at this moment in the appearance registration form, and calculate the time that vehicle stops inside automatically; To carry out manual typing or selection to what information can not generate automatically; Gate clerk and vehicle drivers are preserved after errorless all validation of information in the appearance registration form, print shipping ticket and give the driver, and computer system is uploaded to remote monitoring platform with registration form by network automatically; With the interim information of binding of IC-card, only keep original haulage vehicle and driver's essential information after the removing vehicle is marched into the arena in computing machine at last, vehicle can be held the IC-card appearance; For the march into the arena IC-card of after discharge of vehicle, if this vehicle will be cooperated in the future for a long time, IC-card will not be regained, and vehicle is bound therewith, treat to use next time; Will be regaining to the vehicle of interim transportation, and remove the information of all IC-cards bindings.Wherein all can select the video monitoring system device that it is monitored, and video file is uploaded to remote monitoring platform automatically each process of vehicle loading (handing-over) metering;
3) vehicle transport process monitoring: haulage vehicle is at first opened satellite positioning and navigation device before travelling, suggested optimal path in the selecting arrangement; If what select is not optimal path or Iterim Change route in the process of moving, illustration; The trajectory coordinates of vehicle ' and time information corresponding and the path of selecting in satellite positioning and navigation device will be uploaded to the satellite positioning navigation signal receiving/transmission device of remote monitoring platform automatically, carry out analyzing and processing by track contrast module again, and feedback information sent to satellite positioning and navigation device, work will travel by correct line with the prompting to the driver; At last will be in system the contrast images of store car travel route and optimal path; Simultaneously according to attention degree to shipping goods, can open video monitoring apparatus when haulage vehicle begins to travel or in the driving process, record haulage vehicle situation in the process of moving, and automatically video file and trajectory coordinates, temporal information are uploaded to remote monitoring platform together;
4) unloading (handing-over) metering: when haulage vehicle reaches the destination, to unload and measure haulage vehicle, be divided into five steps: the first step, the vehicle registration of marching into the arena: register when haulage vehicle drives to the entrance guard of purchaser unit, the vehicle that IC-card is arranged is swiped the card on the IC-card reader device, the essential information of vehicle promptly is presented in the computing machine, then by gate clerk's log into thr computer call in the remote monitoring platform with the carriage contract of this vehicle and and purchase order, based on contract content is filled in registration form, and information and the IC-card filled in are bound temporarily; To there not being the vehicle of IC-card, registration form fill in complete after, get a new IC-card and registration form information is bound by the gate clerk, and give vehicle drivers this IC-card; After registration finished, vehicle can leave and enter next link, this computer-chronograph automatically with the registration form information uploading to remote monitoring platform; Second step, weigh for the first time: vehicle ' is to the truck scale device the time, at first on the IC-card device, swipe the card by vehicle drivers, after the data stabilization to be weighed, the truck scale device is weighed to vehicle automatically, then weight information and the metering time showing on electronic display or screen, and the prompting vehicle can enter next link.System binds weight information and metering time and IC-card automatically temporarily, and by network with the information uploading of this IC-card binding to remote monitoring platform; The 3rd step, unloading: vehicle ' is to specifying discharge location to unload, vehicle drivers will be swiped the card on Warehouse Keeper's handheld reader behind the unloading EO, unloading information is confirmed last information is bound with IC-card automatically temporarily, vehicle can leave and enter next link at this moment; The 4th step, the second time weigh: need before vehicle appears on the scene after unloading to weigh for the second time, its method of operating is weighed identical with the first time.This computer-chronograph data of can automatic discharging of goods weighing for twice, and calculating goods weight, or by metrological personnel by the weight information of this goods in the network call remote monitoring platform in the metering of selling party unit, and check with goods error in dipping standard, confirm errorless after, computer system is bound data and IC-card automatically temporarily, and is uploaded to long distance control system by network; The 5th step, vehicle appear on the scene: vehicle ' is to the entrance guard, and vehicle drivers is swiped the card on the IC reader device; By gate clerk's log into thr computer once more, access vehicle appearance registration form, show the weight information etc. and the vehicle time for competiton at this moment of thing information, the goods of freighting in the appearance registration form automatically, and calculate the time that vehicle stops inside automatically; To carry out manual typing or selection to what information can not generate automatically; Gate clerk and vehicle drivers are preserved after errorless all validation of information in the appearance registration form, give the driver after printing receipt, and computer system is uploaded to remote monitoring platform with registration form by network automatically; Will remove the march into the arena information of back and the interim binding of IC-card of vehicle at last in computing machine, only keep original haulage vehicle and driver's essential information, vehicle can be held IC-card and appear on the scene.For the march into the arena IC-card of after discharge of vehicle, if this vehicle will be cooperated in the future for a long time, IC-card will not be regained, and vehicle is bound therewith, treat to use next time; Will be regaining to the vehicle of interim transportation, and remove the information of all IC-cards bindings.Wherein all can select video monitoring apparatus that it is monitored, and video file is uploaded to remote monitoring platform automatically each process of vehicle unloading (handing-over) metering;
5) clearing: the purchaser receive goods acceptance that transporter transports errorless after, confirm that on computer system system generates statement of account according to purchase order, carriage contract automatically, is settled accounts according to statement of account by the related side;
6) data preparation: after the data that the remote monitoring platform system is uploaded in receiving whole loading, transportation, unloading process, integration and the storage data carried out by data processing module, form complete record, can be provided in the inquiry and the investigation of selling party, transporter, purchaser and other administrative authoritys;
7) record is uploaded: after whole loading, transportation, unloading flow process finish, by the keeper in the record of bad behavior system, write down produce in the relevant flow process dispute on, the information of mistake, and be uploaded to remote monitoring platform, for constituent parts with reference to use.
CN2009102200783A 2009-11-23 2009-11-23 System and method for integrally controlling loading, transportation and unloading Expired - Fee Related CN101718982B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102200783A CN101718982B (en) 2009-11-23 2009-11-23 System and method for integrally controlling loading, transportation and unloading

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102200783A CN101718982B (en) 2009-11-23 2009-11-23 System and method for integrally controlling loading, transportation and unloading

Publications (2)

Publication Number Publication Date
CN101718982A true CN101718982A (en) 2010-06-02
CN101718982B CN101718982B (en) 2011-11-09

Family

ID=42433565

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102200783A Expired - Fee Related CN101718982B (en) 2009-11-23 2009-11-23 System and method for integrally controlling loading, transportation and unloading

Country Status (1)

Country Link
CN (1) CN101718982B (en)

Cited By (54)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102298838A (en) * 2010-06-25 2011-12-28 宝山钢铁股份有限公司 Group dynamic centralized control method for detachable frame vehicle
CN102752579A (en) * 2012-06-05 2012-10-24 深圳市粮食集团有限公司 Real time monitoring method and system for grain unloading
CN103020798A (en) * 2012-12-08 2013-04-03 武钢集团昆明钢铁股份有限公司 Off-line hand-held terminal unloading management system and method
CN103542923A (en) * 2013-11-01 2014-01-29 江苏三力衡器有限公司 Intelligent truck scale internet-of-things system
CN103676882A (en) * 2013-12-13 2014-03-26 上海精星仓储设备工程有限公司 System and method for remote scheduling of shuttle trolley group
CN104504546A (en) * 2014-12-09 2015-04-08 淮海中联水泥有限公司 Internet-based goods monitoring system
CN104792394A (en) * 2015-04-20 2015-07-22 郝俊 Method and device for acquiring materials information in road construction process
CN105319994A (en) * 2015-12-07 2016-02-10 中国包装科研测试中心 Simulative transportation monitoring device and simulative transportation monitoring method of tank packing material
CN105389989A (en) * 2015-11-13 2016-03-09 合肥安奎思成套设备有限公司 Transportation safety online monitoring system
CN106919090A (en) * 2015-12-28 2017-07-04 航天信息股份有限公司 Material shipment transport control method, equipment and system
CN107016581A (en) * 2017-03-29 2017-08-04 杭州小针智能科技有限公司 The method of commerce and system of a kind of goods and materials of weighing
CN107277465A (en) * 2017-08-03 2017-10-20 武汉远众科技有限公司 A kind of video evidence collecting method based on vehicle automatic opening and closing door
CN107370988A (en) * 2017-07-05 2017-11-21 深圳市宏鑫源投资咨询有限公司 A kind of method and server that alarm video is provided to user terminal
CN107506809A (en) * 2017-08-23 2017-12-22 卡车司机(北京)科技有限公司 A kind of intelligent pound room automatization operation system, method and intelligent pound room interconnected method
CN107563694A (en) * 2017-09-01 2018-01-09 陈飞 A kind of devices and methods therefor transported safely based on third party's unblock
CN108197875A (en) * 2018-01-23 2018-06-22 浙江大仓信息科技股份有限公司 A kind of harmful influence transportation management system
CN108230036A (en) * 2018-01-10 2018-06-29 四川隧唐科技股份有限公司 A kind of methods of marking and system
CN108257258A (en) * 2017-12-13 2018-07-06 珠海港鑫和码头有限公司 Adapt to the bulk cargo terminals shipment planing method of supply chain management
CN108256800A (en) * 2018-01-10 2018-07-06 四川隧唐科技股份有限公司 A kind of data processing method and oil truck running orbit system
CN109002421A (en) * 2018-06-25 2018-12-14 深圳市四叶草物联网科技有限公司 Slag-soil truck transports yardage statistical method, system and server, storage medium
CN109064102A (en) * 2018-08-29 2018-12-21 山东矩阵软件工程股份有限公司 A kind of bulk products flow to management-control method, system, device and storage medium
CN109377047A (en) * 2018-10-22 2019-02-22 广州汽车集团乘用车(杭州)有限公司 Intelligent logistic Monitoring and managing system
CN109669427A (en) * 2018-07-12 2019-04-23 北京图森未来科技有限公司 Realize the system and relevant device of automatic transport of goods
CN109754196A (en) * 2019-03-15 2019-05-14 雷嗣制 It is a kind of to load and the supervision of haulage vehicle coordinated operation, statistical system and method
CN109830005A (en) * 2018-12-20 2019-05-31 上海建工集团股份有限公司 A kind of construction site material metage method and system
CN110033221A (en) * 2019-04-15 2019-07-19 陕西中矿科技有限公司 A kind of bulk supply tariff supply chain SaaS platform based on intelligence fortune box
CN110122437A (en) * 2019-06-14 2019-08-16 中国水产科学研究院渔业机械仪器研究所 Large-scale live fish transports marketing system
CN110572470A (en) * 2019-09-18 2019-12-13 中国二十二冶集团有限公司 Method for monitoring transportation of steel structural member
CN110675100A (en) * 2019-08-06 2020-01-10 西安艾润物联网技术服务有限责任公司 Vehicle data processing method, system and device
CN110717001A (en) * 2019-09-25 2020-01-21 上海中旖能源科技有限公司 Parking point data-based goods receiving behavior analysis method, device and equipment
CN110750076A (en) * 2019-08-06 2020-02-04 张家港宏昌钢板有限公司 Quality control and tracing method for material finished product handover process
CN110769042A (en) * 2019-10-11 2020-02-07 北京经纬信息技术有限公司 System for railway loading and unloading operation information acquisition
CN110853278A (en) * 2019-11-05 2020-02-28 浙江大华技术股份有限公司 Article loss warning method and device, storage medium and electronic device
CN111127896A (en) * 2019-12-16 2020-05-08 苏州水易数据科技有限公司 Intelligent transportation control method and system based on big data processing and analysis
CN111144809A (en) * 2019-12-23 2020-05-12 拉货宝网络科技有限责任公司 Freight automatic settlement method based on safety check and error judgment
CN111199374A (en) * 2019-12-31 2020-05-26 河南云煤网网络科技有限责任公司 Goods in-and-out-of-factory identity recognition and metering settlement method and system
CN111252723A (en) * 2020-02-26 2020-06-09 山东奥克智能系统工程有限公司 Oil depot and oil refinery oil loading and unloading management system
CN111737644A (en) * 2020-06-12 2020-10-02 鞍钢集团矿业有限公司 Open pit truck loading and unloading metering method
CN112053118A (en) * 2020-09-11 2020-12-08 辽宁省交通高等专科学校 Mobile terminal-based vehicle-free carrying supervision system and method
CN112306048A (en) * 2019-07-23 2021-02-02 丰田自动车株式会社 Vehicle control system, vehicle control device, and vehicle control method
CN112293978A (en) * 2020-10-30 2021-02-02 钟世强 Digital management system using big data
CN112486124A (en) * 2020-12-01 2021-03-12 瑞驰博方(北京)科技有限公司 Material mixing method and device, transportation equipment and storage medium
CN112508468A (en) * 2019-09-16 2021-03-16 北京京东振世信息技术有限公司 Cargo handover method and system based on block chain
CN112686592A (en) * 2020-12-03 2021-04-20 盐城市联鑫钢铁有限公司 Remote goods butt-joint metering method
CN112677325A (en) * 2021-01-08 2021-04-20 南京维拓科技股份有限公司 Commercial concrete transportation monitoring and early warning method
CN112712306A (en) * 2019-10-09 2021-04-27 湖州鹿山坞建材科技有限公司 Green mine vehicle management method and system
CN112906947A (en) * 2021-01-29 2021-06-04 中科大路(青岛)科技有限公司 Management and control method and system for automatic driving container pallet truck in airport
CN113538748A (en) * 2021-06-04 2021-10-22 镇江港务集团有限公司 State monitoring and remote operation system for automatic port loading and unloading
CN113642961A (en) * 2021-08-13 2021-11-12 京东科技信息技术有限公司 Monitoring method and device in cargo carrying process
CN114202290A (en) * 2021-12-24 2022-03-18 中寰卫星导航通信有限公司 Driving route recommendation method and device, electronic equipment and storage medium
CN114331298A (en) * 2022-03-11 2022-04-12 山东矩阵软件工程股份有限公司 Method for identifying and controlling logistics equipment by using multidimensional data model
US11315423B2 (en) 2017-06-02 2022-04-26 Nanjing Starton Technology Co. Ltd. System for monitoring tank truck operation platform and for guiding and positioning vehicle and method for using the same
CN114677105A (en) * 2022-03-08 2022-06-28 深圳市天健(集团)股份有限公司 Method for tracking resource utilization of construction waste by using block chain technology
CN117094632A (en) * 2023-10-20 2023-11-21 山东龙拓新材料有限公司 Plastic master batch transportation management method and system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1962380A (en) * 2005-11-09 2007-05-16 刘德义 Integrated loading and unloading process and apparatus for grain and bulk goods in container
CN101304546A (en) * 2007-05-08 2008-11-12 厦门雅迅网络股份有限公司 Method for processing freight data through mobile communication
CN101059860A (en) * 2007-06-20 2007-10-24 四川亚元防伪科技有限公司 Bulk commodity quantity-checking bill-checking tax-controlling method, system, net station and terminal
CN101315731B (en) * 2008-07-17 2011-08-31 上海途锐信息技术有限公司 System for implementing vehicle monitoring scheduling by GPS intelligent vehicle mounted terminal

Cited By (66)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102298838B (en) * 2010-06-25 2013-10-30 宝山钢铁股份有限公司 Group dynamic centralized control method for detachable frame vehicle
CN102298838A (en) * 2010-06-25 2011-12-28 宝山钢铁股份有限公司 Group dynamic centralized control method for detachable frame vehicle
CN102752579A (en) * 2012-06-05 2012-10-24 深圳市粮食集团有限公司 Real time monitoring method and system for grain unloading
CN103020798A (en) * 2012-12-08 2013-04-03 武钢集团昆明钢铁股份有限公司 Off-line hand-held terminal unloading management system and method
CN103542923A (en) * 2013-11-01 2014-01-29 江苏三力衡器有限公司 Intelligent truck scale internet-of-things system
CN103676882A (en) * 2013-12-13 2014-03-26 上海精星仓储设备工程有限公司 System and method for remote scheduling of shuttle trolley group
CN104504546A (en) * 2014-12-09 2015-04-08 淮海中联水泥有限公司 Internet-based goods monitoring system
CN104792394B (en) * 2015-04-20 2018-01-16 郝俊 A kind of acquisition method and device of road construction process in which materials information
CN104792394A (en) * 2015-04-20 2015-07-22 郝俊 Method and device for acquiring materials information in road construction process
CN105389989A (en) * 2015-11-13 2016-03-09 合肥安奎思成套设备有限公司 Transportation safety online monitoring system
CN105319994A (en) * 2015-12-07 2016-02-10 中国包装科研测试中心 Simulative transportation monitoring device and simulative transportation monitoring method of tank packing material
CN106919090A (en) * 2015-12-28 2017-07-04 航天信息股份有限公司 Material shipment transport control method, equipment and system
CN106919090B (en) * 2015-12-28 2019-09-10 航天信息股份有限公司 Material shipment transport control method, equipment and system
CN107016581A (en) * 2017-03-29 2017-08-04 杭州小针智能科技有限公司 The method of commerce and system of a kind of goods and materials of weighing
US11315423B2 (en) 2017-06-02 2022-04-26 Nanjing Starton Technology Co. Ltd. System for monitoring tank truck operation platform and for guiding and positioning vehicle and method for using the same
CN107370988A (en) * 2017-07-05 2017-11-21 深圳市宏鑫源投资咨询有限公司 A kind of method and server that alarm video is provided to user terminal
CN107277465A (en) * 2017-08-03 2017-10-20 武汉远众科技有限公司 A kind of video evidence collecting method based on vehicle automatic opening and closing door
CN107506809A (en) * 2017-08-23 2017-12-22 卡车司机(北京)科技有限公司 A kind of intelligent pound room automatization operation system, method and intelligent pound room interconnected method
CN107563694A (en) * 2017-09-01 2018-01-09 陈飞 A kind of devices and methods therefor transported safely based on third party's unblock
CN108257258A (en) * 2017-12-13 2018-07-06 珠海港鑫和码头有限公司 Adapt to the bulk cargo terminals shipment planing method of supply chain management
CN108230036A (en) * 2018-01-10 2018-06-29 四川隧唐科技股份有限公司 A kind of methods of marking and system
CN108230036B (en) * 2018-01-10 2023-04-07 四川隧唐科技股份有限公司 Grading method and system
CN108256800A (en) * 2018-01-10 2018-07-06 四川隧唐科技股份有限公司 A kind of data processing method and oil truck running orbit system
CN108197875A (en) * 2018-01-23 2018-06-22 浙江大仓信息科技股份有限公司 A kind of harmful influence transportation management system
CN109002421A (en) * 2018-06-25 2018-12-14 深圳市四叶草物联网科技有限公司 Slag-soil truck transports yardage statistical method, system and server, storage medium
CN109002421B (en) * 2018-06-25 2023-04-18 深圳市四叶草物联网科技有限公司 Muck truck transportation earth square number statistical method, muck truck transportation earth square number statistical system, muck truck transportation earth square number statistical server and storage medium
CN109669427A (en) * 2018-07-12 2019-04-23 北京图森未来科技有限公司 Realize the system and relevant device of automatic transport of goods
CN109064102A (en) * 2018-08-29 2018-12-21 山东矩阵软件工程股份有限公司 A kind of bulk products flow to management-control method, system, device and storage medium
CN109377047A (en) * 2018-10-22 2019-02-22 广州汽车集团乘用车(杭州)有限公司 Intelligent logistic Monitoring and managing system
CN109377047B (en) * 2018-10-22 2021-06-15 广汽乘用车(杭州)有限公司 Intelligent logistics monitoring and management system
CN109830005B (en) * 2018-12-20 2023-08-11 上海建工集团股份有限公司 Method and system for weighing materials on construction site
CN109830005A (en) * 2018-12-20 2019-05-31 上海建工集团股份有限公司 A kind of construction site material metage method and system
CN109754196A (en) * 2019-03-15 2019-05-14 雷嗣制 It is a kind of to load and the supervision of haulage vehicle coordinated operation, statistical system and method
CN110033221A (en) * 2019-04-15 2019-07-19 陕西中矿科技有限公司 A kind of bulk supply tariff supply chain SaaS platform based on intelligence fortune box
CN110122437A (en) * 2019-06-14 2019-08-16 中国水产科学研究院渔业机械仪器研究所 Large-scale live fish transports marketing system
CN112306048A (en) * 2019-07-23 2021-02-02 丰田自动车株式会社 Vehicle control system, vehicle control device, and vehicle control method
CN110750076A (en) * 2019-08-06 2020-02-04 张家港宏昌钢板有限公司 Quality control and tracing method for material finished product handover process
CN110675100A (en) * 2019-08-06 2020-01-10 西安艾润物联网技术服务有限责任公司 Vehicle data processing method, system and device
CN110750076B (en) * 2019-08-06 2022-04-22 张家港宏昌钢板有限公司 Quality control and tracing method for material finished product handover process
CN112508468A (en) * 2019-09-16 2021-03-16 北京京东振世信息技术有限公司 Cargo handover method and system based on block chain
CN110572470A (en) * 2019-09-18 2019-12-13 中国二十二冶集团有限公司 Method for monitoring transportation of steel structural member
CN110717001A (en) * 2019-09-25 2020-01-21 上海中旖能源科技有限公司 Parking point data-based goods receiving behavior analysis method, device and equipment
CN112712306A (en) * 2019-10-09 2021-04-27 湖州鹿山坞建材科技有限公司 Green mine vehicle management method and system
CN110769042A (en) * 2019-10-11 2020-02-07 北京经纬信息技术有限公司 System for railway loading and unloading operation information acquisition
CN110769042B (en) * 2019-10-11 2022-12-09 北京经纬信息技术有限公司 System for railway loading and unloading operation information acquisition
CN110853278A (en) * 2019-11-05 2020-02-28 浙江大华技术股份有限公司 Article loss warning method and device, storage medium and electronic device
CN111127896A (en) * 2019-12-16 2020-05-08 苏州水易数据科技有限公司 Intelligent transportation control method and system based on big data processing and analysis
CN111144809A (en) * 2019-12-23 2020-05-12 拉货宝网络科技有限责任公司 Freight automatic settlement method based on safety check and error judgment
CN111199374B (en) * 2019-12-31 2023-07-21 河南云煤网网络科技有限责任公司 Method and system for identifying, metering and settling identity of goods entering and exiting factory
CN111199374A (en) * 2019-12-31 2020-05-26 河南云煤网网络科技有限责任公司 Goods in-and-out-of-factory identity recognition and metering settlement method and system
CN111252723A (en) * 2020-02-26 2020-06-09 山东奥克智能系统工程有限公司 Oil depot and oil refinery oil loading and unloading management system
CN111737644A (en) * 2020-06-12 2020-10-02 鞍钢集团矿业有限公司 Open pit truck loading and unloading metering method
CN112053118B (en) * 2020-09-11 2024-05-24 辽宁省交通高等专科学校 Mobile terminal-based vehicle-free carrier supervision system and method
CN112053118A (en) * 2020-09-11 2020-12-08 辽宁省交通高等专科学校 Mobile terminal-based vehicle-free carrying supervision system and method
CN112293978A (en) * 2020-10-30 2021-02-02 钟世强 Digital management system using big data
CN112486124A (en) * 2020-12-01 2021-03-12 瑞驰博方(北京)科技有限公司 Material mixing method and device, transportation equipment and storage medium
CN112686592A (en) * 2020-12-03 2021-04-20 盐城市联鑫钢铁有限公司 Remote goods butt-joint metering method
CN112677325A (en) * 2021-01-08 2021-04-20 南京维拓科技股份有限公司 Commercial concrete transportation monitoring and early warning method
CN112906947A (en) * 2021-01-29 2021-06-04 中科大路(青岛)科技有限公司 Management and control method and system for automatic driving container pallet truck in airport
CN113538748A (en) * 2021-06-04 2021-10-22 镇江港务集团有限公司 State monitoring and remote operation system for automatic port loading and unloading
CN113642961A (en) * 2021-08-13 2021-11-12 京东科技信息技术有限公司 Monitoring method and device in cargo carrying process
CN113642961B (en) * 2021-08-13 2024-04-16 京东科技信息技术有限公司 Monitoring method and device in cargo handling process
CN114202290A (en) * 2021-12-24 2022-03-18 中寰卫星导航通信有限公司 Driving route recommendation method and device, electronic equipment and storage medium
CN114677105A (en) * 2022-03-08 2022-06-28 深圳市天健(集团)股份有限公司 Method for tracking resource utilization of construction waste by using block chain technology
CN114331298A (en) * 2022-03-11 2022-04-12 山东矩阵软件工程股份有限公司 Method for identifying and controlling logistics equipment by using multidimensional data model
CN117094632A (en) * 2023-10-20 2023-11-21 山东龙拓新材料有限公司 Plastic master batch transportation management method and system

Also Published As

Publication number Publication date
CN101718982B (en) 2011-11-09

Similar Documents

Publication Publication Date Title
CN101718982B (en) System and method for integrally controlling loading, transportation and unloading
US11004028B2 (en) Blockchain-based logistics systems
CN104571044B (en) A kind of Cold Chain Logistics Visualized Monitoring System and method
JP4276700B2 (en) Container monitoring system and method
US6915268B2 (en) Transport logistics systems and methods
US8478619B2 (en) Transport vehicle capacity maximization logistics system and method of same
CN108681850A (en) A kind of logistic management system Internet-based
CN102282447A (en) Systems and methods for freight tracking and monitoring
CN105637545A (en) Method and system for monitoring deliveries
US20190251508A1 (en) Systems and methods for facilitating freight transportation
Ioannou et al. Advanced material handling: Automated guided vehicles in agile ports
JP6836251B2 (en) Container terminal transportation management system
Higginson Modeling shipper costs in physical distribution analysis
KR102395527B1 (en) Computing system of managing logistics service based on big data
KR102010786B1 (en) Apparatus and method for calculating shipping costs for car products and computer program for the same
JP2022013837A (en) Hub-based distribution and delivery network for autonomous trucking service
Zhanna Rail transport in e-commerce: an overview of the opportunities
Ross et al. Transportation management
Fiocco US Freight: Economy in Motion 1998
CN117973982A (en) A governing system for vehicle transportation goods
Muñuzuri et al. Development of a Cost Model for Intermodal Transport in Spain
Ho Public logistics network cost analysis
Martel et al. Transportation in the Supply Chain
Marshfield et al. Módulo 6: Operações de Frete, Intermodais e de Veículos Comerciais
Cavinato CCCC

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: SHI QINGSHENG

Effective date: 20150812

Owner name: SHENYANG NEW GENERATION INFORMATION TECHNOLOGY CO.

Free format text: FORMER OWNER: ZHOU WEI

Effective date: 20150812

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150812

Address after: Three road 110179 in Liaoning Province, Shenyang Hunnan Hunnan No. 152 1-5

Patentee after: Shenyang New Generation Information Technology Co., Ltd.

Address before: Three road 110179 in Liaoning Province, Shenyang Hunnan Hunnan No. 152 1-5

Patentee before: Zhou Wei

Patentee before: Shi Qingsheng

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111109

Termination date: 20181123

CF01 Termination of patent right due to non-payment of annual fee