CN104792394B - A kind of acquisition method and device of road construction process in which materials information - Google Patents

A kind of acquisition method and device of road construction process in which materials information Download PDF

Info

Publication number
CN104792394B
CN104792394B CN201510188516.8A CN201510188516A CN104792394B CN 104792394 B CN104792394 B CN 104792394B CN 201510188516 A CN201510188516 A CN 201510188516A CN 104792394 B CN104792394 B CN 104792394B
Authority
CN
China
Prior art keywords
terminal
transport material
material vehicle
card
vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510188516.8A
Other languages
Chinese (zh)
Other versions
CN104792394A (en
Inventor
郝俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510188516.8A priority Critical patent/CN104792394B/en
Publication of CN104792394A publication Critical patent/CN104792394A/en
Application granted granted Critical
Publication of CN104792394B publication Critical patent/CN104792394B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention discloses the acquisition method and system of road construction process in which materials information, including:When transporting material vehicle upper pound for the first time, first terminal gathers the first weight;When inserting the IC-card of unique mark transport material vehicle on first terminal, first terminal is by the first weight write-in IC-card of collection;When transporting second of upper pound of material vehicle, second terminal gathers the second weight;When inserting IC-card in second terminal, second terminal reads the first weight in IC-card and transports the identification information of material vehicle, and identification information, the first weight and the second weight are established into corresponding relation;The identification information for establishing corresponding relation, the first weight and the second weight are uploaded to home server by second terminal.The present invention by each stage in road construction, the material information precise integration in each place, finally uploads home server, so that manager can understand the concrete condition of Road construction by accessing home server using IC-card as data exchange medium.

Description

A kind of acquisition method and device of road construction process in which materials information
Technical field
The present invention relates to road construction field, and in particular to a kind of acquisition method of road construction process in which materials information and Device.
Background technology
Road construction is a kind of more complicated engineering type of construction environment, and the quantity of material that road construction uses is huge, example The material as used in a small project portion has tons up to a million, not to mention needs the large project of more than 300 ten thousand tons of materials.Separately Outside, the supplier of material up to tens, upper hundred, and the vehicle for transporting material is more likely hundreds and thousands of.Again because road is applied Work project human hand is few, and stock ground present position is more remote, so in work progress, often continual continuously applies within 24 hours Work.That is, the vehicle of up to up to a hundred transport materials, constantly charging, discharging, the time of usual 40 seconds can just cross one Material-conveying vehicle.So the material constantly fed during discharging currently for the vehicle of the transport material of road construction is believed The collection of breath, not a kind of highly developed mode can be applied to the so complicated road construction of construction environment.
At present, the material information acquisition mode during the charging discharging of road construction, is also to rely on staff and shows Bill is write in field, with the material information during record charging discharging, wherein, material information includes feeding the material during discharging Weight, into grading information.But most normal produced problem is exactly material loss in road construction, material loss is main The reason for have three:First, ticket is not inconsistent in fact, as the car of actual shipment material has drawn 30 tons of materials, and staff makes out an invoice and is write as 50 Ton, or a car material has been drawn, it is split into the bill of two cars;Second, unload goods less, usually relatively valuable material in this case, As drawn 50 tons of pitch prills only to unload 40 tons;Third, material is resell at a profit, third party has been sold to after loading onto tank car such as concrete.Always It, due to it is artificial carry out material information collection in itself it is existing it is inaccurate, easily distort the defects of, so, gathered in material information During, and the problem of various can be shown during follow-up construction statistics.
The content of the invention
In view of this, the invention provides a kind of acquisition method and system of road construction process in which materials information.
The invention provides a kind of acquisition method of road construction process in which materials information, methods described includes:
When transporting material vehicle upper pound for the first time, the first weight of the first terminal collection transport material vehicle;
When inserting the IC-card that material vehicle is transported described in unique mark on the first terminal, the first terminal will First weight collected is write in the IC-card;
When second of upper pound of transport material vehicle, the second weight of the second terminal collection transport material vehicle Amount;
When inserting the IC-card in the second terminal, the second terminal reads the transport in the IC-card The identification information of first weight of material vehicle and the transport material vehicle, and the mark of the transport material vehicle is believed Breath, the first weight and the second weight establish corresponding relation;
The second terminal will establish the identification information of the transport material vehicle of corresponding relation, the first weight and second Weight is uploaded to home server.
Preferably, methods described also includes:
When the transport material vehicle upper pound for the first time, the first terminal passes through camera collection first time upper pound Field data;
When inserting the IC-card on the first terminal, the first terminal reads the transport in the IC-card The identification information of material vehicle, and establish the corresponding relation of the identification information and the field data of the transport material vehicle;
The first terminal will establish the identification information of the transport material vehicle of corresponding relation and the field data It is uploaded to home server;
When second of upper pound of transport material vehicle, the second terminal passes through second of upper pound of camera collection Field data;
After the second terminal reads the identification information of the transport material vehicle in the IC-card, the fortune is established The identification information of defeated material vehicle and the corresponding relation of the field data;
The second terminal will establish the identification information of the transport material vehicle of corresponding relation and the field data It is uploaded to home server.
Preferably, methods described also includes:
The second terminal is according to the identification information for the transport material vehicle for establishing corresponding relation, the first weight and Two weight generate bill;
The second terminal removes the other information in addition to the identification information of the transport material vehicle in IC.
Preferably, the charging stage during road construction, the first time, upper pound was pound on loaded vehicle, described second Upper pound is pound on empty wagons;
Discharging stage during road construction, the first time, upper pound was pound on empty wagons, and second of upper pound is Pound on loaded vehicle.
Preferably, it is the charging stage during road construction, described on the transport material vehicle empty wagons before pound Method also includes:When the transport material vehicle enters discharging place, the transport material vehicle is inserted on third terminal IC-card so that the third terminal to the IC-card write discharging information;When inserting the IC-card in the second terminal When, the second terminal reads the discharging information in the IC-card, and verifies the discharging information;It is described when being verified Second terminal performs the step of the second weight of the collection transport material vehicle;
Discharging stage during road construction, on the transport material vehicle loaded vehicle before pound, methods described is also Including:When the transport material vehicle enters mixing station charging, the IC-card of the transport material vehicle is inserted in the 4th terminal, So that the 4th terminal writes the combined information of material to the IC-card;When inserting the IC-card in the second terminal When, the second terminal reads the combined information of the material in the IC-card, and by the combined information of the material and the fortune The identification information of defeated material vehicle establishes corresponding relation;The second terminal will establish the transport material vehicle of corresponding relation The combined information of identification information and the material be uploaded to home server.
Preferably, the discharging stage during road construction, when the transport material vehicle enters job site, The IC-card of the transport material vehicle is inserted in 5th terminal, so that the 5th terminal reads the transport in the IC-card The identification information of material vehicle;5th terminal establishes the identification information and job site information of the transport material vehicle Corresponding relation, and the identification information for the transport material vehicle for establishing corresponding relation and job site information are uploaded to local Server.
The invention provides a kind of acquisition system of road construction process in which materials information, the system includes first eventually End, second terminal, IC-card and home server, wherein,
When transporting material vehicle upper pound for the first time, the first terminal, for gathering the of the transport material vehicle One weight;
When inserting the IC-card that material vehicle is transported described in unique mark on the first terminal, the first terminal, For first weight collected to be write in the IC-card;
When second of upper pound of transport material vehicle, the second terminal, for gathering the transport material vehicle The second weight;
When inserting the IC-card in the second terminal, the second terminal, for reading the institute in the IC-card State the first weight of transport material vehicle and the identification information of the transport material vehicle, and by the transport material vehicle Identification information, the first weight and the second weight establish corresponding relation;
The second terminal, for identification information, the first weight of the transport material vehicle of corresponding relation will to be established Home server is uploaded to the second weight.
Preferably, the system also includes at least one camera, wherein,
When the transport material vehicle upper pound for the first time, the first terminal, for being gathered for the first time by camera The field data of upper pound;
When inserting the IC-card on the first terminal, the first terminal, for reading the institute in the IC-card The identification information of transport material vehicle is stated, and the identification information for establishing the transport material vehicle is corresponding with the field data Relation;
The first terminal, for the identification information of the transport material vehicle of corresponding relation and the scene will to be established Information is uploaded to home server;
When second of upper pound of transport material vehicle, the second terminal, for passing through second of camera collection The field data of upper pound;
After the second terminal reads the identification information of the transport material vehicle in the IC-card, described second eventually End, the corresponding relation of identification information and the field data for establishing the transport material vehicle;
The second terminal, for the identification information of the transport material vehicle of corresponding relation and the scene will to be established Information is uploaded to home server.
Preferably, the system also includes three cameras, wherein,
Respectively one camera of installation, the camera are fixedly mounted on 1.7 meters of pole at weighbridge two;
One camera of installation, the camera are fixedly mounted on 8 meters of high bar among weighbridge.
Preferably, the second terminal, for the identification information according to the transport material vehicle for establishing corresponding relation, First weight and the second weight generation bill;
The second terminal, it is additionally operable to remove other letters in addition to the identification information of the transport material vehicle in IC Breath.
Preferably, the system also includes third terminal and the 4th terminal, wherein,
Charging stage during road construction, the first time, upper pound was pound on loaded vehicle, and second of upper pound is Pound on empty wagons;
Discharging stage during road construction, the first time, upper pound was pound on empty wagons, and second of upper pound is Pound on loaded vehicle;
Charging stage during road construction, on the transport material vehicle empty wagons before pound, in third terminal The IC-card of the upper insertion transport material vehicle, the third terminal, for writing discharging information to the IC-card;When described When the IC-card is inserted in second terminal, the second terminal, for reading the discharging information in the IC-card, and described in checking Discharging information;When being verified, the second terminal, for gathering the second weight of the transport material vehicle;
Discharging stage during road construction, on the transport material vehicle loaded vehicle before pound, in the 4th terminal The IC-card of the upper insertion transport material vehicle, the 4th terminal, for writing the combined information of material to the IC-card;When When inserting the IC-card in the second terminal, the second terminal, the combination for reading the material in the IC-card is believed Breath, and the identification information of the combined information of the material and the transport material vehicle is established into corresponding relation;Described second eventually End, for the identification information of the transport material vehicle for establishing corresponding relation to be uploaded into this with the combined information of the material Ground server.
Preferably, the system also includes the 5th terminal, wherein,
Discharging stage during road construction, when the transport material vehicle enters job site, the 5th eventually When the IC-card of the transport material vehicle is inserted on end, the 5th terminal, for reading the transport material in the IC-card The identification information of truck;5th terminal, the identification information for establishing the transport material vehicle are believed with job site The corresponding relation of breath, and the identification information for the transport material vehicle for establishing corresponding relation is uploaded to job site information Home server.
In the present invention, when transporting material vehicle upper pound for the first time, the of the first terminal collection transport material vehicle One weight;When inserting the IC-card that material vehicle is transported described in unique mark on the first terminal, the first terminal will First weight collected is write in the IC-card;When second of upper pound of transport material vehicle, second terminal is adopted Collect the second weight of the transport material vehicle;When inserting the IC-card in the second terminal, the second terminal is read The first weight of the transport material vehicle in the IC-card and the identification information of the transport material vehicle are taken, and by institute Identification information, the first weight and the second weight for stating transport material vehicle establish corresponding relation;The second terminal will foundation pair Identification information, the first weight and the second weight for the transport material vehicle that should be related to are uploaded to home server.The present invention Using IC-card as data exchange medium, the material information in each stage in road construction, each place is subjected to precise integration, Home server finally is uploaded to, so that manager can understand the specific feelings of Road construction by accessing home server Condition.
Brief description of the drawings
In order to illustrate more clearly of the technical scheme in the embodiment of the present application, make required in being described below to embodiment Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present application, for For those of ordinary skill in the art, without having to pay creative labor, it can also be obtained according to these accompanying drawings His accompanying drawing.
Fig. 1 is a kind of acquisition method flow chart for road construction process in which materials information that the embodiment of the present invention one provides;
Fig. 2 is a kind of acquisition method flow chart for road construction process in which materials information that the embodiment of the present invention two provides;
Fig. 3 is a kind of acquisition method flow chart for road construction process in which materials information that the embodiment of the present invention three provides;
Fig. 4 is a kind of acquisition system structural representation for road construction process in which materials information that the embodiment of the present invention four provides Figure;
Fig. 5 is that a kind of camera that the embodiment of the present invention four provides disposes schematic diagram.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present application, the technical scheme in the embodiment of the present application is carried out clear, complete Site preparation describes, it is clear that described embodiment is only some embodiments of the present application, rather than whole embodiments.It is based on Embodiment in the application, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of the application protection.
Because the construction environment of road construction is more complicated, so, during road construction, the management to construction material Belong to extensive management, such as in the rewinding stage of road construction and material issuing stage usually using manual type.So also occur as soon as The problem of difficult, the audit difficulty of statistics during road construction etc. is hiding or produced problem, wherein, it is most common and most The problem of serious is exactly that material loses problem, such as some big Road constructions are possible to lose one hundred million on material Fund.Due to the evidence in no work progress and the support of data, so making a thorough investigation and solving and very intractable, most It can only may end up with nothing definite afterwards.In addition, even if the project administrator of road construction recognizes problem above, but applied based on road The construction environment of work is so complicated, as the severe place of construction environment may not network, so, effectively solve problem above Method also is difficult to be implemented.
The present invention believes the material in each stage in road construction, each place using IC-card as data exchange medium Breath carries out precise integration, finally uploads to home server, so that manager can understand road by accessing home server The concrete condition of project under construction.
Embodiment one
It is a kind of acquisition method flow of road construction process in which materials information provided in an embodiment of the present invention with reference to figure 1 Figure, methods described can specifically include:
S101:When transporting material vehicle upper pound for the first time, the first weight of the first terminal collection transport material vehicle Amount.
, it is necessary to be fed and discharged using material vehicle is transported in road construction.Either the charging stage still In discharging stage, when transporting material vehicle into stock ground and upper pound for the first time, weighbridge can weigh up the transport material vehicle Weight, now, the first terminal being connected with the weighbridge of stock ground entrance can collect the transport material vehicle that weighbridge weighs up Weight is as the first weight.Wherein, the weighbridge in stock ground can be the weighing-appliances such as electronic platform scale, the first terminal being connected with weighbridge It can be the similar intelligent terminal such as notebook computer, tablet personal computer.Specifically, the connected mode of weighbridge and first terminal can be with It is wired connection, can also be wireless connection.
In addition, in pound on the transport material vehicle first time, the camera around weighbridge can pass through bat According to or shooting mode, the field data of collection upper pound for the first time, the field data can include the transport stores van Car plate, headstock, car body top, the pictorial information of staff etc., or video information.The first terminal and the shooting Head connection, specifically, the first terminal can also obtain the field data for the first time upper pound that camera collects.
S102:When inserting the IC-card that material vehicle is transported described in unique mark on the first terminal, described first Terminal writes first weight collected in the IC-card.
In the present embodiment, in pound on transporting material vehicle first time, driver or field personnel can be first The IC-card of transport material vehicle described in unique mark is capable of in insertion in terminal.Wherein, the transport material is stored in the IC-card The identification information of truck, license plate number, driver's certificate number etc. can transport the information of material vehicle as described in unique mark.It is described First weight of the transport material vehicle collected can be written in the IC-card by first terminal, so as in the IC The first weight of the transport material vehicle is carried in card.
In addition, if when inserting the IC on the first terminal, the first terminal is exactly in networking state, then should First terminal can read the identification information of the transport material vehicle in the IC-card first, and establish the transport material The corresponding pass of the field data for the first time upper pound that the camera that the identification information of vehicle connects with the first terminal collects System.Secondly, the first terminal will establish the identification information of the transport material vehicle of corresponding relation and the field data It is uploaded to home server.When the manager of road construction wants to know about the situation of the charging discharging of certain car, or solve During the problems such as material loses, effective evidence can be provided by being uploaded to the field data of home server.
S103:When second of upper pound of transport material vehicle, the of the second terminal collection transport material vehicle Two weight.
During road construction, either charging stage or discharging stage, material vehicle is transported after completion task, It is required to carry out pound on second before stock ground is outputed.Now, weighbridge can weigh up the transport material that will output stock ground again The weight of truck, and can collect the transport material vehicle at this moment with the second terminal that is connected of weighbridge of stock ground outlet Weight, and the second weight the most.
Likewise, in pound on second of the transport material vehicle, the camera around weighbridge can pass through The mode taken pictures or imaged, the field data of second of upper pound of collection, the field data can include the transport material The pictorial information of the car plate of vehicle, headstock, car body top, staff etc., or video information.The second terminal is taken the photograph with described As head connection, specifically, the second terminal can also obtain the field data for second of upper pound that camera collects.
S104:When inserting the IC-card in the second terminal, the second terminal reads the institute in the IC-card State the first weight of transport material vehicle and the identification information of the transport material vehicle, and by the transport material vehicle Identification information, the first weight and the second weight establish corresponding relation.
In the present embodiment, in pound on transporting material vehicle second, driver or field personnel still need The IC-card for being capable of transport material vehicle described in unique mark is inserted in second terminal.Now, the second terminal can read and deposit The first weight of the transport material vehicle in the IC-card and the identification information of the transport material vehicle are stored up, and establishes institute State the corresponding relation of the identification information for transporting material vehicle, the first weight and the second weight.
In addition, the mark of the transport material vehicle can also be included in the above-mentioned corresponding relation that the second terminal is established The corresponding relation of the field data for second of upper pound that the camera that information is connected with the second terminal collects.
S105:The second terminal will establish the identification information of the transport material vehicle of corresponding relation, the first weight Home server is uploaded to the second weight.
In the present embodiment, after the material information that second terminal collects on the transport material vehicle, by the material Material information and the identification information of the transport material vehicle are uploaded to home server.In practical application, the second terminal The field data for second of the upper pound that the camera that the second terminal connects can be collected together is also corresponding to be uploaded to The home server.So, the manager of road construction can understand the specific of road construction by accessing home server Situation.
In addition, the second terminal can be according to the identification information of the transport material vehicle for establishing corresponding relation, One weight and the second weight generation bill, and the bill printing is come out, give the driver of the transport material vehicle.In order that Obtaining the IC-card can just be often used in charging or discharging stage next time, and the present embodiment can also be in the second terminal The upper other information in addition to the identification information for identifying the transport material vehicle removed in the IC-card, it is such as described Transport the first weight, second weight of material vehicle etc..
In the present embodiment, when transporting material vehicle upper pound for the first time, the first terminal collection transport material vehicle First weight;When inserting the IC-card that material vehicle is transported described in unique mark on the first terminal, the first terminal First weight collected is write in the IC-card;When second of upper pound of transport material vehicle, second terminal Gather the second weight of the transport material vehicle;When inserting the IC-card in the second terminal, the second terminal The first weight of the transport material vehicle in the IC-card and the identification information of the transport material vehicle are read, and will Identification information, the first weight and the second weight of the transport material vehicle establish corresponding relation;The second terminal will be established Identification information, the first weight and the second weight of the transport material vehicle of corresponding relation are uploaded to home server.This reality Example is applied using IC-card as data exchange medium, the material information in each stage in road construction, each place is carried out accurate Integrate, finally upload to home server, so that manager can understand Road construction by accessing home server Concrete condition.
Embodiment two
With reference to figure 2, a kind of acquisition method of the road construction process in which materials information provided for the present embodiment, methods described The charging stage of road construction is applied particularly to, wherein, first terminal, second terminal, third terminal in the present embodiment It is thought as the similar intelligent terminal such as notebook computer, tablet personal computer.Methods described can include:
S201:When transporting pound on material vehicle loaded vehicle, the first terminal being connected with weighbridge gathers the transport stores van Loaded vehicle weight, in addition, the first terminal by camera gather loaded vehicle on pound field data.
If first terminal is exactly in networking state, the first terminal can by the field data collected with it is described The corresponding relation of transport material vehicle loaded vehicle is uploaded to home server.In addition, the field data that the first terminal collects Home server can also be uploaded to default frequency, often be uploaded once daily in practical operation, when specifically uploading Between it is unrestricted.
S202:When inserting the IC-card that material vehicle is transported described in unique mark on the first terminal, described first Terminal writes the loaded vehicle weight collected in the IC-card.
S203:When the entrance discharging place, the IC-card of the transport material vehicle is inserted on third terminal, so that The third terminal writes discharging information to the IC-card.
Wherein, the discharging information can be used to indicate that the transport material vehicle performs the action of discharging really.
S204:When pound on the transport material vehicle empty wagons, the IC-card is inserted in the second terminal;Described Two terminals read the discharging information in the IC-card, and verify the discharging information.
When pound on the transport material vehicle empty wagons, driver or staff insert in the second terminal first The IC-card, the second terminal read discharging information first, and verify the discharging information.That is, described second is whole End judges whether the transport material vehicle really performs the action of discharging.Moved when the second terminal performs discharging really After work, weighbridge can be just that the empty wagons of the transport material vehicle is weighed.
S205:When being verified, the curb weight of the second terminal collection transport material vehicle, in addition, institute State the field data that second terminal gathers pound on empty wagons by camera.
The field data that the second terminal collects can also be uploaded to home server, actual behaviour with default frequency Often uploaded once daily in work, specific uplink time is unrestricted.Or the second terminal can also in real time on Pass.
S206:The second terminal reads the loaded vehicle weight of the transport material vehicle in the IC-card and the fortune The identification information of defeated material vehicle, and the transport identification information of material vehicle, loaded vehicle weight and the curb weight are established pair It should be related to.
In addition, the second terminal can be according to identification information, the sky of the transport material vehicle for establishing corresponding relation Car weight amount and loaded vehicle weight generation bill, and the bill printing is come out, give the driver of the transport material vehicle.
In order that the IC-card can be just often used in charging or discharging stage next time, the present embodiment can be with Removed in the second terminal in the IC-card except for identify it is described transport material vehicle identification information in addition to Other information.
S207:The second terminal will establish the identification information of the transport material vehicle of corresponding relation, loaded vehicle weight Home server is uploaded to curb weight.
In the present embodiment, in the charging stage of road construction, by the use of IC-card as data exchange medium, by the charging stage The material information in each place carries out precise integration, finally uploads to home server, so that manager can be by accessing this Ground server understands the concrete condition of the charging stage of road construction, and can be carried for the solution of charging stage produced problem Provide evidence evidence.
Embodiment three
With reference to figure 3, a kind of acquisition method flow chart of the road construction process in which materials information provided for this implementation is described Method is applied particularly to the discharging stage of road construction, wherein, first terminal, second terminal, the 4th terminal in the present embodiment, 5th terminal can be thought as the similar intelligent terminal such as notebook computer, tablet personal computer.Methods described can include:
S301:When transporting pound on material vehicle empty wagons, the first terminal being connected with weighbridge gathers the transport stores van Curb weight, in addition, the first terminal by camera gather empty wagons on pound field data.
If first terminal is exactly in networking state, the first terminal can by the field data collected with it is described The corresponding relation of transport material vehicle empty wagons is uploaded to home server.In addition, the field data that the first terminal collects Home server can also be uploaded to default frequency, often be uploaded once daily in practical operation, when specifically uploading Between it is unrestricted.
S302:When inserting the IC-card that material vehicle is transported described in unique mark on the first terminal, described first Terminal writes the curb weight collected in the IC-card.
S303:When the transport material vehicle, which enters mixing station, to feed, the transport material is inserted in the 4th terminal The IC-card of vehicle, so that the 4th terminal writes the combined information of material to the IC-card.
Wherein, the combined information of the material can include the composition details of compound and raw material, for representing State the constituent of the material of transport material vehicle dress.
S304:When pound on the transport material vehicle loaded vehicle, the loaded vehicle of the second terminal collection transport material vehicle Weight, and the field data by pound on camera collection loaded vehicle.In addition, the IC-card is inserted in the second terminal.
The field data that the second terminal collects can also be uploaded to home server, actual behaviour with default frequency Often uploaded once daily in work, specific uplink time is unrestricted.Or the second terminal can also in real time on Pass.
S305:When inserting the IC-card in the second terminal, the second terminal reads the material in the IC-card The identification information of the combined information of material, curb weight and the transport material vehicle, and by the combined information of the material, empty wagons Weight, loaded vehicle weight and the identification information of the transport material vehicle establish corresponding relation.
S306:The second terminal will establish the combined information of the material of corresponding relation, curb weight, loaded vehicle weight Home server is uploaded to the identification information of the transport material vehicle.
S307:When the transport material vehicle enters job site, the transport stores van is inserted in the 5th terminal IC-card so that the 5th terminal reads the identification information of the transport material vehicle in the IC-card.
S308:5th terminal establishes the identification information pass corresponding with job site information of the transport material vehicle System, and the identification information for the transport material vehicle for establishing corresponding relation and job site information are uploaded to local service Device.
Specifically, storing job site information in the 5th terminal at the construction field (site), the job site information includes Construction part, workmen, vehicle transport goods information.That is, the manager of road construction can be local by accessing Server understands whether any one transport material vehicle is accurate to up to job site
In the present embodiment, in the discharging stage of road construction, by the use of IC-card as data exchange medium, by the charging stage The material information in each place carries out precise integration, finally uploads to home server, so that manager can be by accessing this Ground server understands the concrete condition of the discharging stage of road construction, and can be carried for the solution of discharging stage produced problem Provide evidence evidence.
Example IV
With reference to figure 4, a kind of acquisition system structural representation of the road construction process in which materials information provided for the present embodiment Figure, the system include first terminal 401, second terminal 402, IC-card 403 and home server 404, wherein, first terminal 401 are connected with weighbridge 401A, and second terminal 402 is connected with weighbridge 402A, and second terminal 402 is also connected with home server 404.
When transporting material vehicle upper pound (weighbridge 401A) for the first time, the first terminal 401, for gathering the transport First weight of material vehicle.
When inserting the IC-card 403 that material vehicle is transported described in unique mark on the first terminal, described first eventually End 401, for first weight collected to be write in the IC-card 403.
As second of upper pound (weighbridge 402A) of transport material vehicle, the second terminal 402 is described for gathering Transport the second weight of material vehicle;
When inserting the IC-card 403 in the second terminal 402, the second terminal 402, for reading the IC The identification information of first weight of the transport material vehicle in card 403 and the transport material vehicle, and by the fortune Identification information, the first weight and the second weight of defeated material vehicle establish corresponding relation.
The second terminal 402, for identification information, the first weight of the transport material vehicle of corresponding relation will to be established Amount and the second weight are uploaded to home server 404.
In another implementation, the system also includes at least one camera, wherein,
When the transport material vehicle upper pound for the first time, the first terminal, for being gathered for the first time by camera The field data of upper pound;
When inserting the IC-card on the first terminal, the first terminal, for reading the institute in the IC-card The identification information of transport material vehicle is stated, and the identification information for establishing the transport material vehicle is corresponding with the field data Relation;
The first terminal, for the identification information of the transport material vehicle of corresponding relation and the scene will to be established Information is uploaded to home server;
When second of upper pound of transport material vehicle, the second terminal, for passing through second of camera collection The field data of upper pound;
After the second terminal reads the identification information of the transport material vehicle in the IC-card, described second eventually End, the corresponding relation of identification information and the field data for establishing the transport material vehicle;
The second terminal, for the identification information of the transport material vehicle of corresponding relation and the scene will to be established Information is uploaded to home server.
In addition, in another embodiment, the system of the present embodiment can also at least include three cameras, with three Exemplified by camera 501, with reference to figure 5, a kind of camera that the present embodiment provides disposes schematic diagram, wherein,
Respectively one camera 501 of installation, the camera 501 are fixedly mounted on 1.7 meters of pole at the two of weighbridge 502;
One camera 501 of installation, the camera 501 are fixedly mounted on 8 meters of high bar among weighbridge 502.
Specifically, the height that camera is fixedly mounted is the optimal height that inventor tests to obtain, it is highly higher than most having Point or low spot can not directly affect the protection domain of the present embodiment.
In practical operation, the second terminal, for the mark according to the transport material vehicle for establishing corresponding relation Information, the first weight and the second weight generation bill;
The second terminal, it is additionally operable to remove other letters in addition to the identification information of the transport material vehicle in IC Breath.
In another preferred embodiment, the system also include can with third terminal and the 4th terminal, wherein, the Three terminals and the 4th terminal can be the intelligent terminals such as notebook computer, tablet personal computer.
Charging stage during road construction, the first time, upper pound was pound on loaded vehicle, and second of upper pound is Pound on empty wagons;
Discharging stage during road construction, the first time, upper pound was pound on empty wagons, and second of upper pound is Pound on loaded vehicle;
Charging stage during road construction, on the transport material vehicle empty wagons before pound, in third terminal The IC-card of the upper insertion transport material vehicle, the third terminal, for writing discharging information to the IC-card;When described When the IC-card is inserted in second terminal, the second terminal, for reading the discharging information in the IC-card, and described in checking Discharging information;When being verified, the second terminal, for gathering the second weight of the transport material vehicle;
Discharging stage during road construction, on the transport material vehicle loaded vehicle before pound, in the 4th terminal The IC-card of the upper insertion transport material vehicle, the 4th terminal, for writing the combined information of material to the IC-card;When When inserting the IC-card in the second terminal, the second terminal, the combination for reading the material in the IC-card is believed Breath, and the identification information of the combined information of the material and the transport material vehicle is established into corresponding relation;Described second eventually End, for the identification information of the transport material vehicle for establishing corresponding relation to be uploaded into this with the combined information of the material Ground server.
In addition, the system can also include the 5th terminal, wherein,
Discharging stage during road construction, when the transport material vehicle enters job site, the 5th eventually When the IC-card of the transport material vehicle is inserted on end, the 5th terminal, for reading the transport material in the IC-card The identification information of truck;5th terminal, the identification information for establishing the transport material vehicle are believed with job site The corresponding relation of breath, and the identification information for the transport material vehicle for establishing corresponding relation is uploaded to job site information Home server.
In the acquisition system for the road construction process in which materials information that the present embodiment provides, the system includes first eventually End, second terminal, IC-card and home server, wherein, when transporting material vehicle upper pound for the first time, the first terminal, use In the first weight for gathering the transport material vehicle;When being inserted on the first terminal stores van is transported described in unique mark IC-card when, the first terminal, for first weight collected to be write in the IC-card;When the transport material During second of truck on pound, the second terminal, for gathering the second weight of the transport material vehicle;When described When inserting the IC-card in two terminals, the second terminal, for reading of the transport material vehicle in the IC-card The identification information of one weight and the transport material vehicle, and by the transport identification information of material vehicle, the first weight Corresponding relation is established with the second weight;The second terminal, for the mark of the transport material vehicle of corresponding relation will to be established Know information, the first weight and the second weight and be uploaded to home server.The present embodiment is using IC-card as data exchange medium, by road The material information in each stage, each place in the construction of road carries out precise integration, home server is finally uploaded to, so as to pipe Reason person can understand the concrete condition of Road construction by accessing home server.
For device embodiment, because it corresponds essentially to embodiment of the method, so related part is real referring to method Apply the part explanation of example.Device embodiment described above is only schematical, wherein described be used as separating component The unit of explanation can be or may not be physically separate, can be as the part that unit is shown or can also It is not physical location, you can with positioned at a place, or can also be distributed on multiple NEs.Can be according to reality Need to select some or all of module therein to realize the purpose of this embodiment scheme.Those of ordinary skill in the art are not In the case of paying creative work, you can to understand and implement.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that Other identical element also be present in process, method, article or equipment including the key element.
The acquisition method and system of a kind of road construction process in which materials information provided above the embodiment of the present invention It is described in detail, specific case used herein is set forth to the principle and embodiment of the present invention, and the above is real The explanation for applying example is only intended to help the method and its core concept for understanding the present invention;Meanwhile for the general technology of this area Personnel, according to the thought of the present invention, there will be changes in specific embodiments and applications, in summary, this theory Bright book content should not be construed as limiting the invention.

Claims (12)

1. a kind of acquisition method of road construction process in which materials information, it is characterised in that methods described includes:
When transporting material vehicle upper pound for the first time, the first weight of the first terminal collection transport material vehicle;
When inserting the IC-card that material vehicle is transported described in unique mark on the first terminal, the first terminal will gather To first weight write in the IC-card;
When second of upper pound of transport material vehicle, the second weight of the second terminal collection transport material vehicle;
When inserting the IC-card in the second terminal, the second terminal reads the transport material in the IC-card First weight of vehicle and it is described transport material vehicle identification information, and by it is described transport material vehicle identification information, First weight and the second weight establish corresponding relation;
The second terminal will establish identification information, the first weight and the second weight of the transport material vehicle of corresponding relation It is uploaded to home server;
Wherein, the charging stage during road construction, the first time, upper pound was pound on loaded vehicle, and second of upper pound is Pound on empty wagons;
Charging stage during road construction, on the transport material vehicle empty wagons before pound, methods described also includes: When the transport material vehicle enters discharging place, the IC-card of the transport material vehicle is inserted on third terminal, so that The third terminal writes discharging information to the IC-card;When inserting the IC-card in the second terminal, described second Terminal reads the discharging information in the IC-card, and verifies the discharging information;When being verified, the second terminal performs The step of gathering the second weight of the transport material vehicle.
2. according to the method for claim 1, it is characterised in that methods described also includes:
When the transport material vehicle upper pound for the first time, the first terminal passes through the scene that camera gathers upper pound for the first time Information;
When inserting the IC-card on the first terminal, the first terminal reads the transport material in the IC-card The identification information of vehicle, and establish the corresponding relation of the identification information and the field data of the transport material vehicle;
The first terminal will establish the identification information of the transport material vehicle of corresponding relation and the field data uploads To home server;
When second of upper pound of transport material vehicle, the second terminal passes through the scene that camera gathers second of upper pound Information;
After the second terminal reads the identification information of the transport material vehicle in the IC-card, the transport material is established The corresponding relation of the identification information of truck and the field data;
The second terminal will establish the identification information of the transport material vehicle of corresponding relation and the field data uploads To home server.
3. according to the method for claim 1, it is characterised in that methods described also includes:
The second terminal is according to identification information, the first weight and the second weight of the transport material vehicle for establishing corresponding relation Amount generation bill;
The second terminal removes the other information in addition to the identification information of the transport material vehicle in IC.
4. according to the method for claim 1, it is characterised in that
Discharging stage during road construction, the first time, upper pound was pound on empty wagons, and second of upper pound is loaded vehicle Upper pound.
5. according to the method for claim 4, it is characterised in that
Discharging stage during road construction, on the transport material vehicle loaded vehicle before pound, methods described also includes: When the transport material vehicle enters mixing station charging, the IC-card of the transport material vehicle is inserted in the 4th terminal, so that 4th terminal writes the combined information of material to the IC-card;When inserting the IC-card in the second terminal, institute State the combined information that second terminal reads the material in the IC-card, and by the combined information of the material and the transport material The identification information of vehicle establishes corresponding relation;The second terminal will establish the mark of the transport material vehicle of corresponding relation Information and the combined information of the material are uploaded to home server.
6. according to the method for claim 5, it is characterised in that the discharging stage during road construction, when the fortune When defeated material vehicle enters job site, the IC-card of the transport material vehicle is inserted in the 5th terminal, so that the described 5th Terminal reads the identification information of the transport material vehicle in the IC-card;5th terminal establishes the transport stores van Identification information and job site information corresponding relation, and the mark of the transport material vehicle of corresponding relation will be established Information is uploaded to home server with job site information.
7. a kind of acquisition system of road construction process in which materials information, it is characterised in that the system includes first terminal, the Two terminals, IC-card and home server, wherein,
When transporting material vehicle upper pound for the first time, the first terminal, for gathering the first weight of the transport material vehicle Amount;
When inserting the IC-card that material vehicle is transported described in unique mark on the first terminal, the first terminal, it is used for First weight collected is write in the IC-card;
When second of upper pound of transport material vehicle, the second terminal, for gathering the of the transport material vehicle Two weight;
When inserting the IC-card in the second terminal, the second terminal, for reading the fortune in the IC-card First weight of defeated material vehicle and it is described transport material vehicle identification information, and by it is described transport material vehicle mark Information, the first weight and the second weight establish corresponding relation;
The second terminal, for identification information, the first weight and of the transport material vehicle of corresponding relation will to be established Two weight are uploaded to home server;
The system also includes third terminal;Charging stage during road construction, the first time, upper pound was on loaded vehicle Pound, second of upper pound is pound on empty wagons;
Charging stage during road construction, on the transport material vehicle empty wagons before pound, inserted on third terminal Enter the IC-card of the transport material vehicle, the third terminal, for writing discharging information to the IC-card;When described second When the IC-card is inserted in terminal, the second terminal, for reading the discharging information in the IC-card, and the discharging is verified Information;When being verified, the second terminal, for gathering the second weight of the transport material vehicle.
8. system according to claim 7, it is characterised in that the system also includes at least one camera, wherein,
When the transport material vehicle upper pound for the first time, the first terminal, for passing through camera collection first time upper pound Field data;
When inserting the IC-card on the first terminal, the first terminal, for reading the fortune in the IC-card The identification information of defeated material vehicle, and establish the identification information pass corresponding with the field data of the transport material vehicle System;
The first terminal, for the identification information of the transport material vehicle of corresponding relation and the field data will to be established It is uploaded to home server;
When second of upper pound of transport material vehicle, the second terminal, for passing through second of upper pound of camera collection Field data;
After the second terminal reads the identification information of the transport material vehicle in the IC-card, the second terminal, For the corresponding relation of the identification information and the field data of establishing the transport material vehicle;
The second terminal, for the identification information of the transport material vehicle of corresponding relation and the field data will to be established It is uploaded to home server.
9. system according to claim 8, it is characterised in that the system also includes three cameras, wherein,
Respectively one camera of installation, the camera are fixedly mounted on 1.7 meters of pole at weighbridge two;
One camera of installation, the camera are fixedly mounted on 8 meters of high bar among weighbridge.
10. system according to claim 7, it is characterised in that
The second terminal, for the identification information according to the transport material vehicle for establishing corresponding relation, the first weight and Second weight generates bill;
The second terminal, it is additionally operable to remove the other information in addition to the identification information of the transport material vehicle in IC.
11. system according to claim 7, it is characterised in that the system also includes the 4th terminal, wherein,
Discharging stage during road construction, the first time, upper pound was pound on empty wagons, and second of upper pound is loaded vehicle Upper pound;
Discharging stage during road construction, on the transport material vehicle loaded vehicle before pound, inserted in the 4th terminal Enter the IC-card of the transport material vehicle, the 4th terminal, for writing the combined information of material to the IC-card;When institute State when the IC-card is inserted in second terminal, the second terminal, for reading the combined information of the material in the IC-card, and The identification information of the combined information of the material and the transport material vehicle is established into corresponding relation;The second terminal, use In the identification information of the transport material vehicle of corresponding relation will be established local clothes are uploaded to the combined information of the material Business device.
12. system according to claim 11, it is characterised in that the system also includes the 5th terminal, wherein,
Discharging stage during road construction, when the transport material vehicle enters job site, in the 5th terminal When inserting the IC-card of the transport material vehicle, the 5th terminal, for reading the transport stores van in the IC-card Identification information;5th terminal, for establishing the identification information and job site information of the transport material vehicle Corresponding relation, and the identification information for the transport material vehicle for establishing corresponding relation and job site information are uploaded to local Server.
CN201510188516.8A 2015-04-20 2015-04-20 A kind of acquisition method and device of road construction process in which materials information Active CN104792394B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510188516.8A CN104792394B (en) 2015-04-20 2015-04-20 A kind of acquisition method and device of road construction process in which materials information

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510188516.8A CN104792394B (en) 2015-04-20 2015-04-20 A kind of acquisition method and device of road construction process in which materials information

Publications (2)

Publication Number Publication Date
CN104792394A CN104792394A (en) 2015-07-22
CN104792394B true CN104792394B (en) 2018-01-16

Family

ID=53557390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510188516.8A Active CN104792394B (en) 2015-04-20 2015-04-20 A kind of acquisition method and device of road construction process in which materials information

Country Status (1)

Country Link
CN (1) CN104792394B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111667211B (en) * 2020-04-27 2023-07-28 中国铁道科学研究院集团有限公司电子计算技术研究所 Intelligent weight detection method and system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101718982A (en) * 2009-11-23 2010-06-02 周巍 System and method for integrally controlling loading, transportation and unloading
CN101739003A (en) * 2009-11-11 2010-06-16 周巍 Weighing, metering and control integrated system and method for weighter
CN201946048U (en) * 2011-03-16 2011-08-24 合肥开元精密工程有限责任公司 Weighing cheating prevention device
CN102313591A (en) * 2010-07-07 2012-01-11 航天信息股份有限公司 Weighing processing method and system
CN203606682U (en) * 2013-11-29 2014-05-21 葛洲坝当阳水泥有限公司 Control system for quantitative cement loading
CN104299304A (en) * 2014-09-29 2015-01-21 神华集团有限责任公司 Material loading and unloading control method and material loading and unloading control device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080024874A (en) * 2006-09-15 2008-03-19 (주)코스코 Automatic unmanned truck weighing system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101739003A (en) * 2009-11-11 2010-06-16 周巍 Weighing, metering and control integrated system and method for weighter
CN101718982A (en) * 2009-11-23 2010-06-02 周巍 System and method for integrally controlling loading, transportation and unloading
CN102313591A (en) * 2010-07-07 2012-01-11 航天信息股份有限公司 Weighing processing method and system
CN201946048U (en) * 2011-03-16 2011-08-24 合肥开元精密工程有限责任公司 Weighing cheating prevention device
CN203606682U (en) * 2013-11-29 2014-05-21 葛洲坝当阳水泥有限公司 Control system for quantitative cement loading
CN104299304A (en) * 2014-09-29 2015-01-21 神华集团有限责任公司 Material loading and unloading control method and material loading and unloading control device

Also Published As

Publication number Publication date
CN104792394A (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN104637016B (en) A kind of rural collective land property right information investigation system and method
CN104200341A (en) Metering monitoring management system and implementation method thereof
CN107085761A (en) Road maintenance methods, devices and systems
CN106257500B (en) Road sanitation intelligent operation and inspection management system and method
CN205176897U (en) Go into factory's coal system that checks and accepts
WO2005100917A1 (en) Method and device for dispatching a plurality of physical objects
CN111814240A (en) Highway engineering agronomy worker management system based on BIM technique
CN104574531B (en) Method and system, RSU and the background system that toll administration is carried out by OBU
CN109636567A (en) Business handling method, server, storage medium and device based on big data
CN109178724A (en) Classification recycling client, checks and accepts device, recovery system and method at recycling bins
CN106651679A (en) Property management system
JP2003513366A (en) System for monitoring product characteristics
CN108931458A (en) It is a kind of come coal quality amount detection systems and method
CN109754292A (en) Stop self-service billing method, device and electronic equipment
CN104792394B (en) A kind of acquisition method and device of road construction process in which materials information
KR20160054451A (en) System and Method for Providing Real Estate Information
CN106004716A (en) Intelligent logistics Internet-of-vehicles system
CN110009116A (en) Civil air defense constructions and installations lifecycle management system
DE112005003453T5 (en) A service system for providing various services, including mobile body diagnostics, and auto-audio / video devices used for the system
CN110490560A (en) Hydraulic and hydroelectric engineering migrates object research method and immigrant's information acquisition system
CN216621410U (en) Automatic weighing management system for unattended weight house
CN110223104A (en) A kind of client model building system based on big data
CN115796902A (en) Information acquisition system and method based on green planting and breeding circulating manure returning
CN103208141A (en) Examination method and system in gate
CN115375864A (en) Unmanned aerial vehicle-based completion acceptance method for high-speed railway

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant