BR112013024018A2 - sistema de posicionamento de ferramenta de trabalho - Google Patents

sistema de posicionamento de ferramenta de trabalho

Info

Publication number
BR112013024018A2
BR112013024018A2 BR112013024018A BR112013024018A BR112013024018A2 BR 112013024018 A2 BR112013024018 A2 BR 112013024018A2 BR 112013024018 A BR112013024018 A BR 112013024018A BR 112013024018 A BR112013024018 A BR 112013024018A BR 112013024018 A2 BR112013024018 A2 BR 112013024018A2
Authority
BR
Brazil
Prior art keywords
distances
shortest distances
positioning system
floor
calculation
Prior art date
Application number
BR112013024018A
Other languages
English (en)
Inventor
Benedikt Zebhauser
Bo Pettersson
Jürg Hinderling
Original Assignee
Hexagon Technology Ct Gmbh
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hexagon Technology Ct Gmbh filed Critical Hexagon Technology Ct Gmbh
Publication of BR112013024018A2 publication Critical patent/BR112013024018A2/pt

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q17/00Arrangements for observing, indicating or measuring on machine tools
    • B23Q17/22Arrangements for observing, indicating or measuring on machine tools for indicating or measuring existing or desired position of tool or work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H1/00Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
    • B25H1/0021Stands, supports or guiding devices for positioning portable tools or for securing them to the work
    • B25H1/0078Guiding devices for hand tools
    • B25H1/0092Guiding devices for hand tools by optical means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H1/00Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B29/00Accessories
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25FCOMBINATION OR MULTI-PURPOSE TOOLS NOT OTHERWISE PROVIDED FOR; DETAILS OR COMPONENTS OF PORTABLE POWER-DRIVEN TOOLS NOT PARTICULARLY RELATED TO THE OPERATIONS PERFORMED AND NOT OTHERWISE PROVIDED FOR
    • B25F5/00Details or components of portable power-driven tools not particularly related to the operations performed and not otherwise provided for

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Length Measuring Devices By Optical Means (AREA)
  • Length Measuring Devices With Unspecified Measuring Means (AREA)
  • Manipulator (AREA)
  • Machine Tool Sensing Apparatuses (AREA)

Abstract

resumo patente de invenção: "sistema de posicionamento de ferramenta de trabalho". a presente invenção refere-se a um método e sistema para a determinação da posição (23) de uma ferramenta elétrica manual (1) sobre uma parede (22). o método compreende a medição de distâncias (11) dentro de um plano (9) perpendicular a um eixo de ferramenta (8) em pelo menos duas direções, compreendendo pelo menos a direção até uma parede lateral e a direção até o chão ou até o teto. pelo menos um módulo de sensor de medição sem contato (3) mede as distâncias (11) em uma multiplicidade de ângulos em uma faixa angular de pelo menos 1° em torno das pelo menos duas direções. a partir da sequência de distâncias (11) medida por meio do pelo menos um módulo de sensor de medição (3), uma unidade de cálculo e armazenamento (4) calcula automaticamente uma função (11'), em que os extremos, particularmente os mínimos (11a' - 11d') representam as distâncias mais curtas (11a - 11d) até as paredes, o chão e/ou o teto adjacentes à parede (22). a partir da dita função (11'), a unidade de cálculo e armazenamento (4) deduz as distâncias mais curtas (11a - 11d), e um meio de saída, em particular uma unidade de vídeo (18) e/ou um meio de saída acústico, provém informações sobre as distâncias mais curtas (11a - 11d) de modo a permitir um posicionamento com relação às distâncias mais curtas (11a - 11d).
BR112013024018A 2011-03-23 2012-03-22 sistema de posicionamento de ferramenta de trabalho BR112013024018A2 (pt)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
EP11159457A EP2502712A1 (en) 2011-03-23 2011-03-23 Working tool positioning system
PCT/EP2012/055155 WO2012127018A1 (en) 2011-03-23 2012-03-22 Working tool positioning system

Publications (1)

Publication Number Publication Date
BR112013024018A2 true BR112013024018A2 (pt) 2016-12-13

Family

ID=44489162

Family Applications (1)

Application Number Title Priority Date Filing Date
BR112013024018A BR112013024018A2 (pt) 2011-03-23 2012-03-22 sistema de posicionamento de ferramenta de trabalho

Country Status (9)

Country Link
US (1) US9114493B2 (pt)
EP (2) EP2502712A1 (pt)
JP (1) JP2014514170A (pt)
KR (1) KR20130133284A (pt)
CN (1) CN103429395B (pt)
AU (1) AU2012230294B2 (pt)
BR (1) BR112013024018A2 (pt)
CA (1) CA2829713C (pt)
WO (1) WO2012127018A1 (pt)

Families Citing this family (42)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10480940B2 (en) 2009-03-13 2019-11-19 Otl Dynamics Llc Leveling and positioning system and method
US10502565B2 (en) 2009-03-13 2019-12-10 Otl Dynamics Llc Leveling and positioning system and method
DE102012219397A1 (de) * 2012-07-04 2014-01-09 Robert Bosch Gmbh Schnittlängenanzeigevorrichtung
US8869412B2 (en) * 2012-09-20 2014-10-28 Otl Dynamics Llc Work-tool positioning system and method
US9676073B2 (en) 2012-09-20 2017-06-13 Otl Dynamics Llc Work-tool control system and method
CN103963018B (zh) * 2013-02-06 2016-08-03 苏州宝时得电动工具有限公司 电动工具
US9114494B1 (en) * 2013-03-14 2015-08-25 Kenneth Jack Mah Electronic drill guide
DE102013108355A1 (de) * 2013-08-02 2015-02-05 Rhodius Schleifwerkzeuge Gmbh & Co. Kg Anordnung mit einer handgeführten Werkzeugmaschine und einer Schruppscheibe
DE102014206289A1 (de) * 2014-04-02 2015-10-08 Robert Bosch Gmbh Handwerkzeugsystem, Verfahren zum Betreiben
DE102014206271B4 (de) * 2014-04-02 2024-02-22 Robert Bosch Gmbh Handwerkzeugmaschine, Verfahren zum Betreiben einer Handwerkzeugmaschine
RU2559866C1 (ru) * 2014-05-14 2015-08-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Российский государственный университет физической культуры, спорта, молодежи и туризма (ГЦОЛИФК)" (РГУФКСМиТ) Устройство для измерения дальности горизонтальных прыжков в легкой атлетике
EP3101381A1 (en) * 2015-06-03 2016-12-07 AC (Macao Commerical Offshore) Limited Method and apparatus for measuring an area of a target surface
DE102015219564A1 (de) * 2015-10-09 2017-04-13 Robert Bosch Gmbh Werkzeuganalyseeinrichtung und verfahren zur analyse einer bearbeitung eines werkstücks mit einem werkzeug
US10377008B2 (en) 2015-10-30 2019-08-13 Transform Sr Brands Llc Position feedback control method and power tool
US10339831B2 (en) * 2015-11-20 2019-07-02 United Arab Emirates University Smart drill guide device for muscle training of hand drilling operations
DE102015226021A1 (de) * 2015-12-18 2017-06-22 Robert Bosch Gmbh Absaugvorrichtung
US10078322B2 (en) * 2016-01-08 2018-09-18 Newfrey Llc Power tool system having in-station verification utilizing radio frequency signal strength
US10924881B2 (en) * 2016-03-03 2021-02-16 Husqvarna Ab Device for determining construction device and worker position
EP3222969B1 (en) 2016-03-22 2018-09-26 Hexagon Technology Center GmbH Construction site referencing
KR101803783B1 (ko) 2016-03-31 2017-12-05 창원대학교 산학협력단 가공원점 설정이 가능한 절삭장치
DE102016217845A1 (de) * 2016-09-19 2018-03-22 Robert Bosch Gmbh Verfahren zur Übertragung einer Ausgabe von mindestens einem externen Gerät zu mindestens einer Werkzeugmaschine und/oder mindestens einer Aufbewahrungsvorrichtung
WO2018050124A1 (zh) 2016-09-19 2018-03-22 苏州宝时得电动工具有限公司 安装定位方法及装置
JP6834735B2 (ja) * 2016-10-19 2021-02-24 日本製鉄株式会社 距離測定装置および距離測定方法
CN108267130A (zh) * 2016-12-30 2018-07-10 郑州玄机器人有限公司 一种固定式探洞测深车
CN108267091A (zh) * 2016-12-30 2018-07-10 郑州玄机器人有限公司 一种固定式探洞测深飞行器
CN108267092A (zh) * 2016-12-30 2018-07-10 郑州玄机器人有限公司 一种固定式探洞测深装置
EP3367057B1 (en) * 2017-02-23 2020-08-26 Hexagon Technology Center GmbH Surveying instrument for scanning an object and image acquisition of the object
DE102017107570A1 (de) * 2017-04-07 2018-10-11 Testo SE & Co. KGaA Markiervorrichtung
DE102017218676B4 (de) * 2017-10-19 2023-03-23 Robert Bosch Gmbh LIDAR-Sensor mit einer Vorrichtung zur kontaktlosen Übertragung von Daten und von Energie und zur Winkelmessung
EP3527938A1 (en) * 2018-02-15 2019-08-21 Leica Geosystems AG Distance measuring system with layout generation functionality
DE102018107726B4 (de) * 2018-03-31 2024-02-29 Natev GmbH Werkzeug zur Bearbeitung eines Werkstücks und zur Erfassung von Bearbeitungsstellen
WO2020037141A1 (en) * 2018-08-17 2020-02-20 Milwaukee Electric Tool Corporation Powered fastener driver and extension
EP3614101B1 (en) 2018-08-22 2021-03-31 Leica Geosystems AG Construction task referencing
US11103980B2 (en) * 2018-10-12 2021-08-31 Ingersoll-Rand Industrial U.S., Inc. Assembly tool smart configuration selector by means of orientation detection
US11947330B2 (en) * 2019-03-06 2024-04-02 The Boeing Company Tool orientation systems and methods
CN109732123B (zh) * 2019-03-11 2020-06-12 深圳宏业基岩土科技股份有限公司 可探测钢筋位置的电钻锤
DE102019119484A1 (de) * 2019-07-18 2021-01-21 Benedikt Pfaff Laser-Positionierungssystem zur Anordnung an Lochtischen
DE102019006186A1 (de) * 2019-08-22 2021-02-25 Tobias Schnur Schienenbezogenes mess - und positionierungssystem
KR102217247B1 (ko) * 2020-06-08 2021-02-18 주식회사 지오시스템 스마트 드릴머신, 스마트 드릴 시스템 및 이의 제어방법
DE102020212399A1 (de) 2020-09-30 2022-03-31 Fraunhofer-Gesellschaft zur Förderung der angewandten Forschung eingetragener Verein Rotierendes Element
IL288499B2 (en) * 2021-11-28 2023-09-01 Lavy Avraham Handles with tool-guided measurement
CN117754026B (zh) * 2024-02-22 2024-06-04 山西建通四方装配式建筑材料有限公司 一种钢结构加工用定位打孔装置

Family Cites Families (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2769552B1 (fr) 1997-10-10 2001-03-23 Martine Losego Systeme de motorisation d'un chariot de transport d'objets
DE19836812A1 (de) * 1998-08-14 2000-02-24 Leica Geosystems Ag Handlasermessgerät
AU7145000A (en) * 1999-11-03 2001-05-10 Avos Developments Limited Guiding accessories for power tools
US6692200B2 (en) * 2001-01-16 2004-02-17 Nesson Enterprises Alignment system for hand-held tools
EP1393140A4 (en) * 2001-02-22 2013-04-24 Robert Bosch Co Ltd TOOLS WITH ORIENTATION DETECTION
DE10116015A1 (de) * 2001-03-30 2002-10-02 Lindner Ag Verfahren und Vorrichtung zum Positionieren eines Handgeräts auf einer Baustelle
DE10117953A1 (de) * 2001-04-10 2002-10-24 Hilti Ag Positionierhilfe für Handwerkzeuggerät
DE10133321A1 (de) 2001-07-09 2003-01-30 Metabowerke Gmbh Einrichtung zum zielgeführten Positionieren eines handgeführten Werkzeuggeräts
US20060076385A1 (en) * 2002-04-18 2006-04-13 Etter Mark A Power tool control system
CN2576386Y (zh) * 2002-11-19 2003-10-01 南京泉峰国际贸易有限公司 用在钻类工具上的带激光定位标尺的副把手
EP1517117A1 (de) 2003-09-22 2005-03-23 Leica Geosystems AG Verfahren und System zur Bestimmung einer Aktualposition eines Positionierungsgerätes
DE102004024990A1 (de) * 2004-05-21 2005-12-08 Robert Bosch Gmbh Eindringtiefenbestimmungsvorrichtung
DE202004018003U1 (de) 2004-11-19 2005-02-24 Gmeiner, Josef Joachim Positioniergerät
DE102005049130A1 (de) * 2005-10-14 2007-04-19 Robert Bosch Gmbh Handwerkzeugmaschine
US7331113B1 (en) * 2007-04-19 2008-02-19 Algird Patrick Tool alignment device
EP2053353A1 (de) * 2007-10-26 2009-04-29 Leica Geosystems AG Distanzmessendes Verfahren und ebensolches Gerät
DE102009014301A1 (de) 2008-03-28 2009-10-01 Marquardt Gmbh Bearbeitungsverfahren mit Elektrowerkzeug
US7992311B2 (en) * 2008-04-17 2011-08-09 John Cerwin Rotary boring tool alignment and depth indication system
DE102008042349A1 (de) * 2008-09-25 2010-04-01 Robert Bosch Gmbh Ausrichtungsvorrichtung, Handwerkzeug und Verfahren zum Betrieb einer Ausrichtungsvorrichtung
DE102009046789A1 (de) * 2009-11-17 2011-05-19 Robert Bosch Gmbh Handwerkzeugmaschinenvorrichtung
US8578621B2 (en) * 2010-06-24 2013-11-12 Chang Type Industrial Company, Ltd. Drill presses having laser alignment systems and methods therefor
JP5796816B2 (ja) * 2010-09-30 2015-10-21 日立工機株式会社 動力工具
JP6078413B2 (ja) * 2013-04-30 2017-02-08 Dmg森精機株式会社 工具交換方法及び工作機械

Also Published As

Publication number Publication date
JP2014514170A (ja) 2014-06-19
WO2012127018A1 (en) 2012-09-27
CA2829713A1 (en) 2012-09-27
CN103429395B (zh) 2016-10-05
EP2502712A1 (en) 2012-09-26
AU2012230294B2 (en) 2015-04-30
KR20130133284A (ko) 2013-12-06
CN103429395A (zh) 2013-12-04
EP2688716B1 (en) 2015-05-06
EP2688716A1 (en) 2014-01-29
US9114493B2 (en) 2015-08-25
AU2012230294A1 (en) 2013-09-05
US20140007442A1 (en) 2014-01-09
CA2829713C (en) 2015-07-07

Similar Documents

Publication Publication Date Title
BR112013024018A2 (pt) sistema de posicionamento de ferramenta de trabalho
GB2505354A (en) Laser tracker with enhanced handling features
WO2010057169A3 (en) Device and method for measuring six degrees of freedom
AU2012246152A8 (en) Techniques for positioning a vehicle
BR112013016891A2 (pt) sistemas e métodos de flutuação de pulverização que inclui um dispositivo de entrada
GB2513806A (en) Laser tracker used with six degree-of-freedom probe having separable spherical retroreflector
WO2011155749A3 (ko) 타워크레인 네비게이션 시스템
BR112015001895A2 (pt) sistema cirúrgico robótico, e método robótico
BR112013032144A2 (pt) alinhamento cirúrgico utilizando referências
GB201309053D0 (en) Systems and methods for compensating nonlinearities in a navigational model
BR112015024512A2 (pt) método e sistema para determinar a estrutura espacial de um objeto
BR112015007176A2 (pt) dispositivo e método de cálculo de distância percorrível
BR112014002671A2 (pt) previsão de fator de sinuosidade em tempo real
EP2827170A3 (en) Method and system for determining position and orientation of a measuring instrument
BR112014005130A2 (pt) método e sistema para recalibragem de sensor
FI20115729A0 (fi) Menetelmä ja järjestelmä valvontaan
BR112019007000A2 (pt) sistema e método para teste de diagnóstico de nuvem de pontos de forma e posição de objeto
BR112015007129A2 (pt) instrumento de mapeamento de volume desdobrável dentro de um volume anatômico delimitado, sistema de mapeamento de volume, e método de mapeamento de volumes
BR112017008685A2 (pt) sistema de medição inercial para um projétil longitudinal, e, método para correção de ângulo de rolamento.
BR112014015673A8 (pt) sistema de intervenção; estação de trabalho de intervenção
BR112015004495A2 (pt) sistema e método de navegação
NZ602342A (en) Universal framing square
BR112017026137A2 (pt) método para calcular e apresentar regiões alcançáveis com viabilidade de terreno
BR112015020061A2 (pt) tratamento de câncer à base de estratificação de caix
AR109434A1 (es) Método de calibración de herramientas y sistema de exploración electromagnética

Legal Events

Date Code Title Description
B06F Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette]
B06U Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette]
B09A Decision: intention to grant [chapter 9.1 patent gazette]
B11D Dismissal acc. art. 38, par 2 of ipl - failure to pay fee after grant in time