ZA200504808B - Method and system for restarting a project management system scheduling engine based on user input of contractual start/finish data - Google Patents
Method and system for restarting a project management system scheduling engine based on user input of contractual start/finish dataInfo
- Publication number
- ZA200504808B ZA200504808B ZA200504808A ZA200504808A ZA200504808B ZA 200504808 B ZA200504808 B ZA 200504808B ZA 200504808 A ZA200504808 A ZA 200504808A ZA 200504808 A ZA200504808 A ZA 200504808A ZA 200504808 B ZA200504808 B ZA 200504808B
- Authority
- ZA
- South Africa
- Prior art keywords
- restarting
- user input
- project management
- engine based
- management system
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/868,517 US20050278208A1 (en) | 2004-06-15 | 2004-06-15 | Method and system for restarting a project management system scheduling engine based on user input of contractual start/finish data |
Publications (1)
Publication Number | Publication Date |
---|---|
ZA200504808B true ZA200504808B (en) | 2007-03-28 |
Family
ID=34940113
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ZA200504808A ZA200504808B (en) | 2004-06-15 | 2005-06-13 | Method and system for restarting a project management system scheduling engine based on user input of contractual start/finish data |
Country Status (12)
Country | Link |
---|---|
US (1) | US20050278208A1 (de) |
EP (1) | EP1607895A3 (de) |
JP (1) | JP2006004430A (de) |
KR (1) | KR101153018B1 (de) |
CN (1) | CN1728168A (de) |
AU (1) | AU2005202445B2 (de) |
BR (1) | BRPI0502196A (de) |
CA (1) | CA2509784A1 (de) |
MX (1) | MXPA05006430A (de) |
RU (1) | RU2005118391A (de) |
TW (1) | TWI390456B (de) |
ZA (1) | ZA200504808B (de) |
Families Citing this family (34)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050228710A1 (en) * | 2004-04-09 | 2005-10-13 | Sam Richards | Asset scheduling management in media production |
US20100010856A1 (en) * | 2006-02-08 | 2010-01-14 | Kim Huat David Chua | Method and system for constraint-based project scheduling |
JP4144890B2 (ja) * | 2006-06-08 | 2008-09-03 | インターナショナル・ビジネス・マシーンズ・コーポレーション | 開発プロジェクトの日程表作成を支援するシステムおよびその方法 |
US20080115077A1 (en) * | 2006-11-09 | 2008-05-15 | International Business Machines Corporation | Persistent status indicator for calendar |
US8249906B2 (en) * | 2007-02-12 | 2012-08-21 | Pma Technologies, Llc | Interactive graphics-based planning systems |
US8666794B1 (en) * | 2007-03-26 | 2014-03-04 | Sprint Communications Company L.P. | Project management tool |
US10255583B2 (en) * | 2007-05-01 | 2019-04-09 | Oracle International Corporation | Nested hierarchical rollups by level using a normalized table |
US20080300945A1 (en) * | 2007-05-31 | 2008-12-04 | Michel Shane Simpson | Techniques for sharing resources across multiple independent project lifecycles |
US8082274B2 (en) * | 2007-06-28 | 2011-12-20 | Microsoft Corporation | Scheduling application allowing freeform data entry |
US20090048894A1 (en) * | 2007-08-14 | 2009-02-19 | Michel Shane Simpson | Techniques for propagating changes in projects |
US20090234699A1 (en) * | 2008-03-15 | 2009-09-17 | Microsoft Corporation | User Interface For Scheduling Resource Assignments |
KR101020022B1 (ko) * | 2008-06-30 | 2011-03-09 | 이주호 | 인터페이스 전환 방법 및 시스템과 이를 위한 기록매체 |
US8219435B2 (en) * | 2009-01-21 | 2012-07-10 | Microsoft Corporation | Determining task status based upon identifying milestone indicators in project-related files |
US8661447B1 (en) * | 2009-03-23 | 2014-02-25 | Symantec Corporation | Method and apparatus for managing execution of a plurality of computer tasks based on availability of computer resources |
US8160911B2 (en) * | 2009-05-19 | 2012-04-17 | Microsoft Corporation | Project management applications utilizing summary tasks for top-down project planning |
US10339479B2 (en) * | 2009-12-15 | 2019-07-02 | International Business Machines Corporation | Dynamic aggregation of disparate enterprise data |
US20110145913A1 (en) * | 2009-12-15 | 2011-06-16 | International Business Machines Corporation | Project Management |
CN102592193A (zh) * | 2011-12-29 | 2012-07-18 | 杭州新中大软件股份有限公司 | 一种通过资源驱控进度的方法 |
US8990777B2 (en) | 2013-05-21 | 2015-03-24 | Concurix Corporation | Interactive graph for navigating and monitoring execution of application code |
US9734040B2 (en) | 2013-05-21 | 2017-08-15 | Microsoft Technology Licensing, Llc | Animated highlights in a graph representing an application |
CN103337004A (zh) * | 2013-05-27 | 2013-10-02 | 李庆吉 | 一种开放式工程实施动态监控系统和方法 |
US9280841B2 (en) | 2013-07-24 | 2016-03-08 | Microsoft Technology Licensing, Llc | Event chain visualization of performance data |
US9292415B2 (en) | 2013-09-04 | 2016-03-22 | Microsoft Technology Licensing, Llc | Module specific tracing in a shared module environment |
US10346292B2 (en) | 2013-11-13 | 2019-07-09 | Microsoft Technology Licensing, Llc | Software component recommendation based on multiple trace runs |
AU2014366891A1 (en) * | 2013-12-19 | 2016-08-04 | South Australian Technology Group Pty Limited | A method and system for monitoring behaviour |
US20160026952A1 (en) * | 2014-07-28 | 2016-01-28 | Robin Systems, Inc. | System and method performing job management |
CN104240027A (zh) * | 2014-09-10 | 2014-12-24 | 南京跃豚智能科技有限公司 | 事务进度跟踪管理方法及装置 |
US10437707B2 (en) * | 2015-03-19 | 2019-10-08 | Teachers Insurance And Annuity Association Of America | Evaluating and presenting software testing project status indicators |
US10310849B2 (en) | 2015-11-24 | 2019-06-04 | Teachers Insurance And Annuity Association Of America | Visual presentation of metrics reflecting lifecycle events of software artifacts |
US11175914B2 (en) | 2019-06-28 | 2021-11-16 | Aras Corporation | Calculation engine for performing calculations based on dependencies in a self-describing data system |
US20210158264A1 (en) * | 2019-11-22 | 2021-05-27 | Rev 1 Power Services, Inc. | Automated system for tracking progress of operations deliverables |
FR3106227B1 (fr) * | 2020-01-15 | 2023-06-30 | Freshcore | Procédé et système de traitement de données pour la réalisation d’un travail d’impression |
TWI816110B (zh) * | 2021-04-27 | 2023-09-21 | 捷拓科技股份有限公司 | 產品開發專案之多目標時程管理方法 |
US12094014B2 (en) * | 2022-04-27 | 2024-09-17 | Procore Technologies, Inc. | Computer systems and methods for dynamic pull planning |
Family Cites Families (38)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5381332A (en) * | 1991-12-09 | 1995-01-10 | Motorola, Inc. | Project management system with automated schedule and cost integration |
JPH06348720A (ja) * | 1993-06-14 | 1994-12-22 | Toshiba Corp | 生産開発管理表示装置 |
US5548506A (en) * | 1994-03-17 | 1996-08-20 | Srinivasan; Seshan R. | Automated, electronic network based, project management server system, for managing multiple work-groups |
US5974391A (en) * | 1994-07-12 | 1999-10-26 | Fujitsu Limited | Device and method for project management |
US5765140A (en) * | 1995-11-17 | 1998-06-09 | Mci Corporation | Dynamic project management system |
AUPN773496A0 (en) * | 1996-01-25 | 1996-02-15 | Task Solutions Pty Ltd | Task management system |
JPH10240804A (ja) * | 1997-02-21 | 1998-09-11 | Nec Corp | プロジェクト管理システム |
US6609100B2 (en) * | 1997-03-07 | 2003-08-19 | Lockhead Martin Corporation | Program planning management system |
JP4312846B2 (ja) * | 1997-07-14 | 2009-08-12 | 株式会社日立製作所 | 取引進捗管理方法 |
JPH1196222A (ja) * | 1997-09-17 | 1999-04-09 | Hitachi Ltd | 工程進捗管理方法および工程管理装置 |
JP2000001988A (ja) * | 1998-06-17 | 2000-01-07 | Daiken Trade & Ind Co Ltd | 建築物施工に対する工程管理支援装置及び建築物施工に対する工程管理支援プログラムを記録したコンピュータ読み取り可能な記録媒体 |
US6351734B1 (en) * | 1998-09-09 | 2002-02-26 | Unisys Corporation | System and method for resource allocation and planning |
US6487469B1 (en) * | 1998-11-13 | 2002-11-26 | Texas Instruments Incorporated | System and method for integrating schedule and design environments |
US6501473B1 (en) * | 1999-03-18 | 2002-12-31 | Lucent Technologies Inc. | Method and system for theory of constraints buffer graphing, tracking and management |
US7139719B1 (en) * | 1999-10-08 | 2006-11-21 | I2 Technologies Us, Inc. | System for scheduling product planning |
US6581040B1 (en) * | 2000-02-18 | 2003-06-17 | Daniel B. Wright | Project specific communications system and method |
EP1128455A1 (de) * | 2000-02-22 | 2001-08-29 | Matsushita Electric Industrial Co., Ltd. | Verfahren zur Herstellung von Batterieelektrodenplatten |
JP2001306718A (ja) * | 2000-04-27 | 2001-11-02 | Tic:Kk | コンピュータ及び通信技術を使った情報関連事業を提供する事業システム |
US6714829B1 (en) * | 2000-06-22 | 2004-03-30 | Thomas K F Wong | Dual path scheduling method |
JP2002024495A (ja) * | 2000-07-11 | 2002-01-25 | Honda Motor Co Ltd | スケジュール管理システム |
DE10051456A1 (de) * | 2000-10-17 | 2002-04-25 | Siemens Ag | Verfahren zum Referenzieren von zeitbezogenen Einträgen in verschiedenen Dateien eines Planungsprogramms |
US20020128895A1 (en) * | 2001-01-11 | 2002-09-12 | International Business Machines Corporation | Project management method for optimizing information technology resources |
JP2002229634A (ja) * | 2001-02-06 | 2002-08-16 | Seisan Gijutsu Kenkyusho:Kk | 進捗管理装置 |
JP2002236788A (ja) * | 2001-02-09 | 2002-08-23 | Kawasaki Steel Corp | コンピュータ支援設計用プロジェクト進捗管理装置 |
US6963930B2 (en) * | 2001-02-15 | 2005-11-08 | Centric Software, Inc. | Automatic transfer and expansion of application-specific data for display at a website |
JP2002288406A (ja) * | 2001-03-27 | 2002-10-04 | Nec Fielding Ltd | プロジェクト進捗状況監視システム及びプログラム |
US7406432B1 (en) * | 2001-06-13 | 2008-07-29 | Ricoh Company, Ltd. | Project management over a network with automated task schedule update |
US7349863B1 (en) * | 2001-06-14 | 2008-03-25 | Massachusetts Institute Of Technology | Dynamic planning method and system |
US20030067492A1 (en) * | 2001-09-17 | 2003-04-10 | Cadwallader Charles W. | Flashwarn (FW) |
JP2003223486A (ja) * | 2002-01-30 | 2003-08-08 | Fujitsu Ltd | 工程管理システム |
CN1438596A (zh) * | 2002-02-10 | 2003-08-27 | 宫本保 | 进度表管理方法 |
JP2003303268A (ja) * | 2002-04-11 | 2003-10-24 | Denso Corp | 業務管理方法 |
US7644007B2 (en) * | 2002-06-17 | 2010-01-05 | King Fahd University Of Petroleum & Minerals | Method and apparatus for finance-based scheduling of construction projects |
US20030233268A1 (en) * | 2002-06-17 | 2003-12-18 | Ehsan Taqbeem | Multi-dimensional interdependency based project management |
US20040024629A1 (en) * | 2002-08-02 | 2004-02-05 | Kirby Jack Reese | Methods and apparatus for project management |
US6824694B2 (en) * | 2002-11-04 | 2004-11-30 | Chemco Systems L.P. | Method for treating waste by application of energy waves |
JP2004240486A (ja) * | 2003-02-03 | 2004-08-26 | Hitachi Ltd | プロジェクトの変更管理方法および装置 |
US7734491B2 (en) * | 2004-06-15 | 2010-06-08 | Microsoft Corporation | Hierarchical projects in a computer-enabled project management method and system |
-
2004
- 2004-06-15 US US10/868,517 patent/US20050278208A1/en not_active Abandoned
-
2005
- 2005-06-06 AU AU2005202445A patent/AU2005202445B2/en not_active Ceased
- 2005-06-08 EP EP05104999A patent/EP1607895A3/de not_active Ceased
- 2005-06-13 ZA ZA200504808A patent/ZA200504808B/xx unknown
- 2005-06-13 CA CA002509784A patent/CA2509784A1/en not_active Abandoned
- 2005-06-14 TW TW094119680A patent/TWI390456B/zh not_active IP Right Cessation
- 2005-06-14 BR BR0502196-0A patent/BRPI0502196A/pt not_active IP Right Cessation
- 2005-06-14 RU RU2005118391/09A patent/RU2005118391A/ru unknown
- 2005-06-15 KR KR1020050051333A patent/KR101153018B1/ko not_active IP Right Cessation
- 2005-06-15 JP JP2005175168A patent/JP2006004430A/ja active Pending
- 2005-06-15 CN CNA2005100923864A patent/CN1728168A/zh active Pending
- 2005-06-15 MX MXPA05006430A patent/MXPA05006430A/es active IP Right Grant
Also Published As
Publication number | Publication date |
---|---|
US20050278208A1 (en) | 2005-12-15 |
JP2006004430A (ja) | 2006-01-05 |
KR101153018B1 (ko) | 2012-06-04 |
EP1607895A2 (de) | 2005-12-21 |
TW200602941A (en) | 2006-01-16 |
MXPA05006430A (es) | 2006-01-31 |
AU2005202445B2 (en) | 2010-12-16 |
KR20060046452A (ko) | 2006-05-17 |
RU2005118391A (ru) | 2006-12-20 |
BRPI0502196A (pt) | 2006-01-24 |
CA2509784A1 (en) | 2005-12-15 |
CN1728168A (zh) | 2006-02-01 |
EP1607895A3 (de) | 2006-09-27 |
TWI390456B (zh) | 2013-03-21 |
AU2005202445A1 (en) | 2006-01-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ZA200504808B (en) | Method and system for restarting a project management system scheduling engine based on user input of contractual start/finish data | |
HK1106357A1 (en) | Device management system and device management command scheduling method thereof | |
GB0621791D0 (en) | Method and system for forecasting events and results based on geispatial modeling | |
EP1834386A4 (de) | System und verfahren zur optischen bestromung einer fernnetzkomponente | |
GB2412753B (en) | Control system for gas-turbine engine | |
ZA200504810B (en) | Hierarchical projects in a computer-enabled project management method and system | |
EP1735716A4 (de) | System und verfahren zur erzeugung von mit elektronischen bilddateien verknüpften tasks | |
GB0302558D0 (en) | Method for determination of fuel usage for a vehicle in a vehicle navigation system | |
GB2414570B (en) | Control system for gas-turbine engine | |
GB2433349B (en) | A method and system for assessing a musical performance | |
GB0413624D0 (en) | A queue management system and method | |
IL178606A0 (en) | System and method for topology-aware job scheduling and backfilling in an hpc environment | |
SG121065A1 (en) | Improved user interface for providing task management and calendar information | |
AU2003243627A8 (en) | Microturbine engine system | |
GB0514442D0 (en) | System and method for starting a vehicle | |
GB2412752B (en) | Control system for gas-turbine engine | |
EP1820151A4 (de) | System und verfahren zur verwendung einer ersten elektronischen repräsentation von vertragsbedingungen für die erzeugung einer zweiten elektronischen repräsentation der vertragsbedingungen | |
GB2410232B (en) | An optical system and method of taking a number of photographs | |
EP1766866A4 (de) | Vorrichtungsverwaltungssystem und befehlskoordinationsverfahren für die vorrichtungsverwaltung | |
HK1111541A1 (en) | A method and system for user information management in instant communication system | |
HK1115202A1 (en) | Watchcase including a back cover and method for fixing a back cover on a watch case | |
DE50212015D1 (de) | Ladesystem für eine Brennkraftmaschine sowie Verfahren zu dessen Regelung | |
ZA200704429B (en) | Method and system for reducing fuel consumption in a diesel engine | |
DE60301830D1 (de) | System, Verfahren und Computerprogramm zur Steuerung der Kraftstoffeinspritzung für einen Motor | |
DE50306666D1 (de) | Verfahren zur regelung einer brennkraftmaschinen-generator-einheit |