WO2023210294A1 - 昇降搬送装置 - Google Patents

昇降搬送装置 Download PDF

Info

Publication number
WO2023210294A1
WO2023210294A1 PCT/JP2023/014247 JP2023014247W WO2023210294A1 WO 2023210294 A1 WO2023210294 A1 WO 2023210294A1 JP 2023014247 W JP2023014247 W JP 2023014247W WO 2023210294 A1 WO2023210294 A1 WO 2023210294A1
Authority
WO
WIPO (PCT)
Prior art keywords
conveyor line
elevating
article
section
boxes
Prior art date
Application number
PCT/JP2023/014247
Other languages
English (en)
French (fr)
Inventor
正和 峯松
Original Assignee
村田機械株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 村田機械株式会社 filed Critical 村田機械株式会社
Publication of WO2023210294A1 publication Critical patent/WO2023210294A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G1/00Storing articles, individually or in orderly arrangement, in warehouses or magazines
    • B65G1/02Storage devices
    • B65G1/04Storage devices mechanical
    • B65G1/137Storage devices mechanical with arrangements or automatic control means for selecting which articles are to be removed

Definitions

  • One aspect of the present invention relates to an elevating conveyance device.
  • a picking system that supports sorting work by taking out items according to an order from a product display shelf provided in a picking area and storing the taken out items in objects to be transported (delivery boxes) that are transported to the picking area is disclosed in patent documents, for example. It is described in 1.
  • a picking system is widely known that supports sorting work by taking out items according to orders from items to be transported (goods boxes) that are transported from automated warehouses etc. to picking areas, and storing the removed items in delivery boxes. It is being
  • an object of one aspect of the present invention is to provide an elevating and lowering conveyance device that can perform efficient sorting work at a work location where sorting processing is performed.
  • the work area where the sorting process is performed is configured from the first conveyor line connected to the supply part of the conveyed objects, and the work area is different in the vertical direction with respect to the first conveyor line.
  • an elevating section that vertically conveys objects to be conveyed to a second conveyor line provided at a certain location; a buffer section between which objects can be transferred, a first process for retracting objects received from the first conveyor line in the elevating section to the buffer section, and a buffer section for transferring objects received from the first conveyor line after the first processing.
  • At least the elevating section is configured to perform a second process in which the conveyed object is delivered to the second conveyor line, and a third process in which the conveyed object, which has been evacuated to the buffer section after the second process, is delivered to the second conveyor line. and a control unit that changes the order of the transported objects arriving at the work location.
  • the object to be conveyed later is sent out in advance to the above-mentioned work area that is formed as a part of the second conveyor line,
  • the evacuated object to be transported is then sent to the above-mentioned work location.
  • the second process means delivering at least one object to the buffer section.
  • a plurality of buffer sections are provided, and the plurality of buffer sections may be arranged at the same height position.
  • the order of the objects to be transported to the work location can be changed among three or more objects to be transported.
  • the lifting and lowering operation of the lifting section can be omitted, so that the cycle time can be shortened.
  • the elevating and lowering conveyance device may be configured to be able to place a plurality of objects to be conveyed. With this configuration, the order of the objects to be transported to the work location can be changed among three or more objects to be transported.
  • the elevating section may be configured to be able to convey objects to be conveyed in both directions between the first conveyor line and the second conveyor line. With this configuration, the objects to be transported after sorting can be returned to the first conveyor line.
  • efficient sorting work can be performed at a work location where sorting processing is performed.
  • FIG. 1 is a schematic configuration diagram of a picking system.
  • FIG. 2 is a perspective view of a sorting station including an elevating conveyance device.
  • FIG. 3 is a perspective view of the sorting station of FIG. 2 from another angle.
  • FIG. 4 is an enlarged perspective view of a portion of the first conveyance path and the second conveyance path.
  • 5(A) to 5(D) are diagrams showing the operation of the elevating conveyance device.
  • FIGS. 6(A) and 6(B) are diagrams simply showing the configuration of an elevating and lowering conveyance device according to a modification.
  • the sorting station 5 including the elevating and lowering conveyance device 71 will be described with reference to the drawings.
  • the same elements are denoted by the same reference numerals, and redundant description will be omitted.
  • the X direction, Y direction, and Z direction shown in FIG. 1 will be defined for convenience of explanation.
  • the X direction, Y direction, and Z direction are orthogonal to each other.
  • the picking system 100 takes out goods of the type and quantity according to the order of the shipping destination from each goods box warehouse (supply department) 1 provided for each type of goods, and aggregates them.
  • This is a system that supports sorting work (picking) in which items are stored in shipping boxes. More specifically, the picking system 100 transports article boxes B (objects to be transported) containing articles from each article box warehouse 1 that stores articles to the sorting station 5.
  • a worker performs a sorting operation in which the types and quantities of products based on the order are taken out from the transported goods boxes B and placed in delivery boxes.
  • the picking system 100 transports the goods box B from which the goods have been taken out at the sorting station 5 to the goods box warehouse 1 from which it was taken out, and re-enters the goods box warehouse 1.
  • the goods box warehouse 1 stores a plurality of goods boxes B in which different types of goods are stored, and takes out the goods boxes B based on orders, and also stores the goods boxes B that have returned after being sent out, and stores the goods boxes B again. This is an automated warehouse where Box B can be stored.
  • the goods box warehouse 1 includes a first rack 11, a first conveyor 12, a first conveyance device 13, a vertical conveyor 14, and a second conveyor 15.
  • the first rack 11 is a shelf that stores the article boxes B.
  • the first rack 11 is provided so that a plurality of article boxes B can be placed along one horizontal direction (the X direction shown in FIG. 1).
  • the first racks 11 are arranged in multiple stages along the vertical direction (Z direction).
  • the first racks 11 are arranged facing each other with the first transport device 13 interposed therebetween in a direction (Y direction) orthogonal to the extending direction (X direction) of the first racks 11 .
  • the picking system 100 may include a plurality of article box warehouses 1 that store article boxes B of the same type.
  • the number of article box warehouses 1 included in the picking system 100 is not particularly limited. Further, the type and size of the goods box warehouse 1 (the number of stored goods boxes B), etc. are not particularly limited, and the types and sizes of the plurality of goods box warehouses 1 may be different from each other.
  • the first transport device 13 transports the article boxes B placed on the first rack 11 and the first conveyor 12 to another location on the first rack 11 and the first conveyor 12.
  • the type of the first conveyance device 13 is not particularly limited, and for example, the first conveyance device 13 includes a rail laid at a position corresponding to each stage of the first rack 11, and a rail placed for each rail. This is a transport device consisting of a trolley and a trolley.
  • the first conveyance device 13 includes a transfer device that can travel along the extending direction of the first rack 11 and that can transfer the article boxes B to the respective placement portions of the first rack 11 and the first conveyor 12. It may be a stacker crane with a When employing a stacker crane, the vertical conveyor 14, which will be described in detail later, may be omitted.
  • the rail is arranged to extend along the first rack 11 up to the first conveyor 12, and the cart reciprocates along the rail while holding the article box B.
  • the truck has a transfer device that can transfer the article box B between the first rack 11 and the first conveyor 12
  • the first conveyor 12 is arranged at a position corresponding to each stage of the pair of first racks 11, 11.
  • One of the first conveyors 12 transports the article boxes B along the extending direction of one of the first racks 11, and carries out the article boxes B to the vertical conveyor 14.
  • the other first conveyor 12 transports the article boxes B along the extending direction of the other first rack 11 and delivers the article boxes B carried in from the vertical conveyor 14 to the first conveying device 13.
  • the type of first conveyor 12 is not particularly limited, and may be, for example, a roller conveyor or a belt conveyor.
  • the vertical conveyor 14 conveys the article boxes B along the vertical direction (Z direction).
  • a pair of vertical conveyors 14, 14 respectively corresponding to the pair of first conveyors 12, 12 are provided.
  • One vertical conveyor 14 conveys the article box B carried in from the first conveyor 12 along the vertical direction, and carries it out to the second conveyor 15.
  • the other vertical conveyor 14 conveys the article box B carried in from the second conveyor 15 in the Z direction, and carries it out to the first conveyor 12 at a predetermined stage.
  • the second conveyor 15 transports the article boxes B in the X direction between the main transport device 3 and the vertical conveyor 14.
  • a pair of second conveyors 15, 15 respectively corresponding to the pair of vertical conveyors 14, 14 are provided.
  • One of the second conveyors 15 conveys the article boxes B carried in from the vertical conveyor 14 in the X direction, and carries them out to the main conveyance device 3 .
  • the other second conveyor 15 conveys the article box B carried in from the main conveyance device 3 in the X direction, and carries it out to the vertical conveyor 14 .
  • the main transport device 3 transports the article boxes B taken out (delivered) from the article box warehouse 1 to each sorting station 5, and also transports the article boxes B taken out from each sorting station 5 to the article box warehouse 1. Transport to.
  • the main transport device 3 transports the article boxes B in one direction.
  • the type of main transport device 3 is not particularly limited, and may be configured by combining multiple types of transport devices.
  • the main conveyance device 3 of this embodiment includes, for example, a main conveyance roller 31 and a connected conveyance roller 33.
  • the main conveyance roller 31 is a roller conveyor that supports the article box B from below the bottom surface and conveys it in one direction.
  • the connecting conveyance roller 33 is disposed at a connection portion of the sorting station 5 to the second conveyance path 63, which will be described in detail later.
  • the connected conveyance roller 33 conveys the article box B in the one direction, and also conveys the article box B in a direction (X direction) orthogonal to the one direction. That is, the connected conveyance roller 33 can carry the article box B into and out of the second conveyance path 63.
  • the configuration of the connecting conveyance roller 33 is the same as that of the first conversion conveyance path 53B, which will be described in detail later, so detailed description thereof will be omitted here.
  • the sorting station 5 constitutes a work area 55 where workers perform sorting work on articles.
  • the sorting station 5 includes a lower conveyor line (second conveyor line) 51, an upper conveyor line (first conveyor line) 61, and an elevating conveyance device 71.
  • the lower conveyor line 51 is provided at different positions in the vertical direction with respect to the upper conveyor line 61.
  • the lower conveyor line 51 has a circular first conveyance path 53 that conveys the article boxes B in one direction.
  • the lower conveyor line 51 is provided with a work area 55 in a part of the first conveyance path 53 where an operator performs sorting work.
  • the first conveyance path 53 is configured to include a first linear conveyance path 53A and a first conversion conveyance path 53B.
  • the first linear conveyance path 53A supports the bottom surface of the article box B from below and conveys it in one direction (X direction).
  • the type of first linear conveyance path 53A is not particularly limited, and is, for example, a roller conveyor or a belt conveyor.
  • the first conversion conveyance path 53B conveys the article box B along one direction (X direction), and also conveys the article box B by switching the conveyance direction to a direction perpendicular to the one direction (Y direction). More specifically, as shown in FIG. 4, the first conversion conveyance path 53B includes a long roller 53Ba and a rotating roller 53Bb.
  • the long rollers 53Ba are arranged along the transport direction of the article boxes B.
  • a plurality of rotating rollers 53Bb are arranged between adjacent long rollers 53Ba and 53Ba along the extending direction (Y direction) of long rollers 53Ba.
  • the long roller 53Ba is provided to be movable in the vertical direction between an advanced position located at a first height and a retracted position located at a second height lower than the first height.
  • the height position of the rotating roller 53Bb (the position that supports the article box B from below) is changed from the height position of the long roller 53Ba (the position that supports the article box B from below). (from the position supporting the article box B).
  • the article box B is conveyed in the X direction by rotationally driving all the long rollers 53Ba or some of the long rollers 53Ba with the long rollers 53Ba positioned at the advanced position. do.
  • the article box B is conveyed in the Y direction by rotationally driving the rotary roller 53Bb with the elongated roller 53Ba positioned at the retracted position. That is, in the first conversion conveyance path 53B, the article box B can be moved in both the Y direction and the X direction.
  • the work location 55 is a location where the worker performs the article sorting work, as described above. More specifically, there is a stopping position for the article box B, and a space for the worker to work is located nearby.
  • a terminal device 91 At the work location 55, a terminal device 91, a completion button for inputting work completion, etc. may be arranged.
  • the display unit (display) of the terminal device 91 displays the type (product name) of the product to be taken out by the worker from the product box B and the number of products to be put in based on the above-described order. Based on the content displayed on the display section of the terminal device 91, the worker takes out the product from the transported product box B and presses the completion button. When the completion button is pressed, the type and number of products to be taken out next from the product box B are displayed on the display section.
  • the upper conveyor line 61 is arranged above the lower conveyor line 51 and is connected to the article box warehouse 1, which is a supply section for the article boxes B.
  • the upper conveyor line 61 has a second conveyance path 63 that conveys the article boxes B in one direction from one end to the other end.
  • the second conveyance path 63 is connected to the main conveyance device 3 at one end and the other end.
  • the second conveyance path 63 of this embodiment is formed in a U-shape when viewed from above in the vertical direction.
  • the second conveyance path 63 is configured to include a second linear conveyance path 63A and a second conversion conveyance path 63B.
  • the second linear conveyance path 63A supports the article box B from below the bottom surface and conveys it in one direction.
  • the type of the second linear conveyance path 63A is not particularly limited, and may be, for example, a roller conveyor or a belt conveyor.
  • the second conversion conveyance path 63B conveys the article box B along one direction (X direction), and also conveys the article box B by switching the conveyance direction to a direction perpendicular to the one direction (Y direction). More specifically, as shown in FIG. 4, the second conversion conveyance path 63B includes a long roller 63Ba and a rotating roller 63Bb.
  • the long rollers 63Ba are arranged along the transport direction (X direction) of the article box B.
  • a plurality of rotating rollers 63Bb are arranged between adjacent long rollers 63Ba and 63Ba along the extending direction (Y direction) of long rollers 63Ba. Note that the configuration in which the second conversion conveyance path 63B can move the article box B in both the Y direction and the X direction is the same as the configuration of the first conversion conveyance path 53B, so a detailed description will be given here. is omitted.
  • the elevating conveyance device 71 conveys the article boxes B along the vertical direction and delivers the article boxes B from the upper conveyor line 61 to the lower conveyor line 51.
  • the article boxes B can be transported in both directions between the upper conveyor line 61 and the lower conveyor line 51.
  • the elevating conveyance device 71 is arranged slightly downstream of one end of the second conveyance path 63.
  • the arrangement position of the elevating conveyance device 71 is not limited to this position, and is not particularly limited as long as it is a position where the second conveyance path 63, the first conveyance path 53, and the article box B can be carried in and taken out.
  • the elevating conveyance device 71 includes an elevating section 73, a plurality of buffer sections 81, and a control section 87.
  • the elevating part 73 is provided so as to be movable in the vertical direction, and is moved in the vertical direction by transmission of the driving force of the movable body driving part.
  • the elevating section 73 includes a plurality of conveyance rollers 77 and a conveyance drive section 79. Some or all of the plurality of conveyance rollers 77 are driven by a conveyance drive section 79.
  • the conveyance roller 77 rotates when the driving force of the conveyance drive section 79 is transmitted, and carries the article box B from the first conveyance path 53 or the second conveyance path 63 to the central part of the elevating section 73.
  • the conveyance roller 77 rotates when the driving force of the conveyance drive section 79 is transmitted, and conveys the article box B from the center of the elevating section 73 to the first conveyance path 53 or the second conveyance path 63.
  • the elevating section 73 moves in the Z direction with the article box B positioned at the center of the moving body.
  • the conveyance drive section 79 is provided, for example, in a frame that constitutes the elevating section 73.
  • the operation of transporting the article box B from the first conveyance path 53 to the elevating conveyance device 71 and the operation of carrying out the article box B from the elevating conveyance device 71 to the first conveyance path 53 are performed simultaneously. Further, the operation of carrying the article box B from the second conveyance path 63 to the elevating conveyance device 71 and the operation of carrying out the article box B from the elevating conveyance device 71 to the second conveyance path 63 are performed simultaneously.
  • the direction in which the article box B is carried in from the first conveyance path 53 to the elevating conveyor device 71 and the direction in which the article box B is carried out from the elevating conveyor device 71 to the first conveyor path 53 match
  • the direction in which the article box B is carried in from the second conveyance path 63 to the elevating conveyor device 71 and the direction in which the article box B is carried out from the elevating conveyor device 71 to the second conveyor path 63 match.
  • the elevating and lowering conveyance device 71 is illustrated in a box shape along the moving direction of the elevating and lowering section 73, but such a cover-like casing may or may not be provided. .
  • the operation of transporting the article box B from the first conveyance path 53 to the elevating conveyor device 71 may be performed consecutively to the operation of conveying the article box B from the elevating conveyor device 71 to the first conveyor path 53. Furthermore, the operation of transporting the article box B from the second conveyance path 63 to the elevating conveyor device 71 may be performed consecutively to the operation of conveying the article box B from the elevating conveyor device 71 to the second conveyor path 63.
  • the buffer section 81 is disposed between the upper conveyor line 61 and the lower conveyor line 51 in the vertical direction, and is provided to be able to transfer the article boxes B to and from the elevating section 73.
  • a plurality of buffer sections 81 are provided, and the plurality of buffer sections 81 are arranged at the same height position.
  • two buffer sections 81 are provided, and the two buffer sections 81 are arranged to face each other with the elevating section 73 in between.
  • the buffer section 81 includes a conveyance roller 83 and a conveyance drive section 85. Some or all of the plurality of conveyance rollers 83 are driven by a conveyance drive section 85.
  • the conveyance roller 83 rotates when the driving force of the conveyance drive section 85 is transmitted, and carries the article box B from the elevating section 73 to the buffer section 81 .
  • the conveyance roller 83 rotates when the driving force of the conveyance drive section 85 is transmitted, and conveys the article box B from the buffer section 81 to the elevating section 73.
  • the elevating section 73 moves in the Z direction with the article box B positioned at the center of the moving body.
  • the conveyance drive section 79 is provided on a frame that constitutes the elevating section 73.
  • the control unit 87 is a part that executes various control processes in the elevating conveyance device 71, and is composed of, for example, a CPU, ROM, RAM, etc. As shown in FIG. 2, the control unit 87 can be configured as software in which a program stored in a ROM is loaded onto a RAM and executed by a CPU, for example. Note that the control unit 87 may be configured as hardware such as an electronic circuit.
  • the control unit 87 carries out a first process in which the goods boxes B received from the upper conveyor line 61 are evacuated to the buffer part 81 in the lifting part 73, and after the first process, the goods boxes B received from the upper conveyor line 61 are transferred to the lower conveyor line. At least the elevating section 73 is controlled so as to perform the second process of transferring the article box B to the lower conveyor line 51 and the third process of transferring the article box B, which has been evacuated to the buffer section 81 after the second process, to the lower conveyor line 51. The order of the article boxes B arriving at the location 55 is changed.
  • the article boxes B carried in from the main conveyance device 3 are conveyed along the second conveyance path 63 of the upper conveyor line 61 to the front side of the elevating conveyance device 71.
  • a product box B product box Ba
  • a product box B product box Bb
  • a product box B product box B
  • a product box B product box B containing product c
  • the control unit 87 normally controls the elevating unit 73 into which the article boxes B have been carried in from the upper conveyor line 61 so as to directly transfer them to the lower conveyor line 51. That is, the elevating section 73 moves the article boxes B to the lower conveyor while maintaining the order of the article boxes B that have been conveyed to the front of the elevating conveyance device 71 (the order of article boxes Ba, article boxes Bb, and article boxes Bc). Pass it to line 51. In this case, the article boxes B arrive at the work location 55 in the order in which the article boxes B have been conveyed to the front of the elevating conveyor device 71 (the order of article boxes Ba, article boxes Bb, and article boxes Bc).
  • control unit 87 determines the order in which the article boxes B have been conveyed to the front of the elevating conveyance device 71 and the order in which the article boxes B are delivered to the lower conveyor line 51 based on an order transmitted to the terminal device 91. Replace with.
  • control section 87 controls the elevating section 73 and the buffer section 81 so that the article boxes B arrive at the work location 55 in the order of article box Bc, article box Bb, and article box Ba.
  • the control unit 87 controls the article boxes B that have been conveyed in the order of article boxes Ba, article boxes Bb, and article boxes Bc up to the front of the elevating and lowering conveyance device 71.
  • the article box Ba is evacuated to the first buffer section 81A, which is one of the buffer sections 81
  • the article box Bb is evacuated to the second buffer section, which is one of the buffer sections 81.
  • the elevating part 73 and the buffer part 81 are controlled so as to be evacuated to 81B (first process).
  • the control unit 87 controls the elevating unit 73 to transfer the article box Bc from the upper conveyor line 61 to the lower conveyor line 51 (second process).
  • the control unit 87 controls the elevating unit 73 to transfer the article box Bb evacuated to the second buffer unit 81B from the second buffer unit 81B to the lower conveyor line 51, and then The elevating section 73 is controlled so as to transfer the article box Ba evacuated to 81A from the first buffer section 81A to the lower conveyor line 51 (third process).
  • the article boxes B are sent to the lower conveyor line 51 in the order of article box Bc, article box Bb, and article box Ba, and are delivered to the work area 55.
  • the goods boxes B arrive in this order.
  • the elevating conveyance device 71 of the above embodiment After at least one article box B is evacuated to the buffer section, the article box B to be conveyed later is located at a work location 55 that is formed as a part of the lower conveyor line 51.
  • the article box B which was sent out and evacuated in advance, is then sent out to the work location 55.
  • the article boxes B are conveyed to the work location 55 in a different order from the order in which they are conveyed on the upper conveyor line 61.
  • the worker can perform efficient sorting work according to orders, for example, at the work location 55.
  • the goods boxes B are delivered to the work place 55 in accordance with the type of product displayed on the terminal device 91 of the work place 55. For example, they may wait somewhere on the main transport device 3 or wait their turn to join.
  • the elevating conveyance device 71 of the embodiment described above since it is not necessary to carry out such processing in the upstream process, retention in the main conveyance device 3 can be suppressed and conveyance efficiency can be increased.
  • the product boxes B may not be transported in the order according to the order. Even in a case where the upper conveyor line 61 is connected to such an article box warehouse 1, the article boxes B are conveyed to the work location 55 in an order different from the order in which they are conveyed on the upper conveyor line 61. be able to.
  • the elevating conveyance device 71 of the above embodiment is provided with a plurality of buffer sections. Thereby, the order of the article boxes B to be sent to the work area 55 can be changed among three or more article boxes B. Moreover, in the elevating conveyance device 71 of the above embodiment, the first buffer section 81A and the second buffer section 81B are arranged at the same height position. Thereby, when the article boxes B are delivered to and from the first buffer section 81A and the second buffer section 81B in succession, the lifting and lowering operation of the lifting section can be omitted, so that the cycle time can be shortened.
  • the elevating section 73 is configured to be able to convey the article boxes B in both directions between the upper conveyor line 61 and the lower conveyor line 51. Thereby, the article box B after the article has been picked up by the worker can be returned to the upper conveyor line 61.
  • the two buffer sections 81 are arranged at the same height position, but instead of or in addition to this configuration, the buffer sections 81 are arranged at different heights. It may be placed in the same position. For example, as shown in FIG. 6(A), they may be arranged in multiple stages. Furthermore, when a plurality of buffer sections 81 are arranged at the same height position, the number may be three or more. Even in these cases, the order of the article boxes B to be sent to the work location 55 can be changed between three or more article boxes B.
  • Modification 2 In the elevating and lowering conveyance device 71 of the above-described embodiments and modifications, the configuration in which only one article box B can be evacuated to one buffer section 81 has been described as an example, but as shown in FIG. 6(B), for example, It may be configured such that a plurality (for example, two) of article boxes B can be placed (evacuated) therein. Even with this configuration, the order of the article boxes B to be sent to the work location 55 can be changed among three or more article boxes B. Furthermore, instead of the buffer section 81 that can only place one article box B, which is arranged in the above embodiment and modification example 1, a buffer section 81 that can place a plurality of article boxes B may be arranged.
  • each buffer section 81 may be provided with a plate or the like on which the article box B can be placed, instead of the structure provided with the transport roller 83 and the transport drive section 82. good.
  • the elevating and lowering conveyance device 71 of the above embodiments and modified examples has been described using as an example a configuration in which only one article box B (article box B) can be conveyed at one time, but it is also possible to convey a plurality of article boxes B at the same time. may be provided. Specifically, by configuring the length of the elevating section 73 to a length that allows a plurality of article boxes B to be placed thereon, a plurality of article boxes B may be transported simultaneously.
  • a roller conveyor was used as an example of the main conveyance device 3, but it may be a belt conveyor or a tracked truck. Further, an example of the main conveyance device 3 may be a conveyance vehicle such as a stacker crane that transfers articles to and from shelves where articles are stored.
  • Sorting may be performed by an operator putting necessary products into delivery boxes (objects to be transported) that are transported on the lower conveyor line 51.
  • the worker takes out the product displayed on the terminal device 91 located at the work location 55 from a shelf or the like located around the work location 55 and places it in a delivery box.
  • the conveyor line connected to the goods box warehouse 1 for goods boxes B is the upper conveyor line 61
  • the conveyor where the work area 55 is configured is the lower conveyor line 51
  • the conveyor line connected to the product box warehouse 1 for the product boxes B may be the lower conveyor line 51
  • the conveyor on which the work area 55 is configured may be the upper conveyor line 61.
  • the sorting process is described using an example of taking out products from the goods box B based on an order or putting the products into a delivery box, but the present invention is not limited to this.
  • the worker may take out the article boxes B and stack them on pallets placed around the work area 55 (palletizing work) as the sorting process.
  • the lower conveyor line 51 as the second conveyor line may have the work location 55 as the final transport point, and constitute a transport path for returning the article boxes B or delivery boxes from the work location 55 to the elevating transport device 71. You don't have to.
  • the sorting process may also be performed by a robot.
  • a terminal device 91 such as a display for displaying order information, and information regarding the order may be directly transmitted to the robot.
  • At least the elevating section is configured to perform a second process of transferring the object to the conveyor line, and a third process of transferring the conveyed object, which has been evacuated to the buffer section after the second process, to the second conveyor line.
  • An elevating and lowering conveyance device comprising: a control unit that controls and changes the order of the conveyed objects arriving at the work location.
  • the buffer section is provided in plurality, The elevating conveyance device according to [1], wherein the plurality of buffer parts are arranged at the same height position.
  • the elevator according to any one of [1] to [3], wherein the elevating section is configured to be able to transport the object in both directions between the first conveyor line and the second conveyor line. Lifting conveyance device.
  • SYMBOLS 1 Goods box warehouse (supply department), 5... Sorting station, 51... Lower conveyor line (second conveyor line), 55... Work area, 61... Upper conveyor line (first conveyor line), 71... Elevating conveyance device, 73... Lifting section, 77... Conveyance roller, 79... Conveyance drive section, 81... Buffer section, 81A... First buffer section, 81B... Second buffer section, 83... Conveyance roller, 85... Conveyance drive section, 87... Control section , 91... Terminal device, 100... Picking system, B... Article box (object to be transported).

Abstract

昇降搬送装置(71)は、第一コンベヤライン(61)から第二コンベヤライン(51)へ被搬送物(B)を鉛直方向に沿って搬送する昇降部(73)と、鉛直方向において第一コンベヤライン(61)と第二コンベヤライン(51)との間に配置されると共に、昇降部(73)との間で被搬送物(B)を受け渡し可能なバッファ部(81)と、被搬送物(B)をバッファ部(81)に退避させる第一処理と、第一処理の後に被搬送物(B)を第二コンベヤライン(51)に受け渡す第二処理と、第二処理の後にバッファ部(81)に退避させた被搬送物(B)を第二コンベヤライン(51)に受け渡す第三処理と、を実行するように少なくとも昇降部(73)を制御し、作業箇所(55)に到着する被搬送物(B)の順序を入れ替える制御部(87)と、を備える。

Description

昇降搬送装置
 本発明の一側面は、昇降搬送装置に関する。
 ピッキングエリアに設けられる商品陳列棚からオーダーに応じた物品を取り出し、取り出した物品をピッキングエリアに搬送されてくる被搬送物(配送箱)に収容する仕分作業を支援するピッキングシステムが、例えば特許文献1に記載されている。また、自動倉庫等からピッキングエリアに搬送されてくる被搬送物(物品箱)からオーダーに応じた物品を取り出し、取り出した物品を配送箱に収容する仕分作業を支援するためのピッキングシステムも広く知られている。
国際公開第2012/147261号公報
 このようなピッキングシステムにおいては、上流側から搬送されてくる被搬送物の順序を入れ替えて、仕分処理を実施する作業箇所において効率的に仕分作業を実施したいという要望がある。
 そこで、本発明の一側面の目的は、仕分処理を行う作業箇所において効率的な仕分作業を実施することができる、昇降搬送装置を提供することにある。
 本発明の一側面に係る昇降搬送装置は、被搬送物の供給部に接続される第一コンベヤラインから、仕分処理が行われる作業箇所が構成され、第一コンベヤラインに対して鉛直方向に異なる位置に設けられる第二コンベヤラインへ、被搬送物を鉛直方向に沿って搬送する昇降部と、鉛直方向において第一コンベヤラインと第二コンベヤラインとの間に配置されると共に、昇降部との間で被搬送物を受け渡し可能なバッファ部と、昇降部において第一コンベヤラインから受け取った被搬送物を前記バッファ部に退避させる第一処理と、第一処理の後に第一コンベヤラインから受け取った被搬送物を第二コンベヤラインに受け渡す第二処理と、第二処理の後にバッファ部に退避させた被搬送物を第二コンベヤラインに受け渡す第三処理とを実行するように少なくとも昇降部を制御し、作業箇所に到着する被搬送物の順序を入れ替える制御部と、を備える。
 この構成では、少なくとも一つの被搬送物がバッファに退避させられた後、後から搬送されてくる被搬送物が第二コンベヤラインの一部に構成される上記作業箇所に先行して送り出され、退避させられた被搬送物は、その後に上記作業箇所に送り出される。これにより、作業箇所には、第一コンベヤラインにおいて搬送されてくる順序とは異なる順序で被搬送物が搬送されてくるようになるので、作業者は、作業箇所において効率的な仕分作業を実施することができる。なお、上記第二処理は、少なくとも一つの被搬送物をバッファ部に受け渡すことを意味する。
 本発明の一側面に係る昇降搬送装置では、バッファ部は、複数設けられており、複数のバッファ部は、同じ高さ位置に配置されてもよい。この構成では、三個以上の被搬送物との間で、上記作業箇所に送り出す被搬送物の順序を入れ替えることができる。また、同じ高さ位置に配置されたバッファ部に連続して被搬送物を受け渡しする場合に、昇降部の昇降動作を省略することができるので、サイクルタイムを短くすることができる。
 本発明の一側面に係る昇降搬送装置では、複数の被搬送物を載置可能に構成されてもよい。この構成では、三個以上の被搬送物との間で、上記作業箇所に送り出す被搬送物の順序を入れ替えることができる。
 本発明の一側面に係る昇降搬送装置では、昇降部は、第一コンベヤラインと第二コンベヤラインとの間で双方向に被搬送物を搬送可能に構成されてもよい。この構成では、仕分作業後の被搬送物を第一コンベヤラインに戻すことができる。
 本発明の一側面によれば、仕分処理を行う作業箇所において効率的な仕分作業を実施することができる。
図1は、ピッキングシステムの概略構成図である。 図2は、昇降搬送装置を含む仕分ステーションを示す斜視図である。 図3は、図2の仕分ステーションを別の角度から見た斜視図である。 図4は、第一搬送路及び第二搬送路の一部を拡大して示した斜視図である。 図5(A)~図5(D)は、昇降搬送装置の動作を示す図である。 図6(A)及び図6(B)は、変形例に係る昇降搬送装置の構成を簡易に示す図である。
 以下、図面を参照して一実施形態に係る昇降搬送装置71を含む仕分ステーション5について説明する。図面の説明において、同一要素には同一符号を付し、重複する説明を省略する。なお、以下の説明では、説明の便宜のため図1に示されるX方向、Y方向及びZ方向を定義する。X方向、Y方向及びZ方向は、互いに直交する。
 図1に示されるように、ピッキングシステム100は、物品の種類別に設けられた物品箱倉庫(供給部)1のそれぞれから、出荷先のオーダーに合わせた種類及び数量の物品を取り出し、これらを集約して配送箱に収容する仕分作業(ピッキング)を支援するシステムである。より詳細には、ピッキングシステム100は、商品を保管する物品箱倉庫1のそれぞれから商品が収容された物品箱B(被搬送物)を仕分ステーション5に搬送する。仕分ステーション5では、搬送されてきた物品箱Bからオーダーに基づいた種類・数量の商品を取り出して配送箱に収容する仕分作業が作業者によって行われる。ピッキングシステム100は、仕分ステーション5にて商品が取り出された物品箱Bを出庫元の物品箱倉庫1にまで搬送し、物品箱倉庫1に再入庫させる。
 物品箱倉庫1は、異なる種類の物品がそれぞれ収容される複数の物品箱Bを保管し、オーダーに基づいて物品箱Bを出庫すると共に、出庫後に戻ってきた物品箱Bを入庫させ、再び物品箱Bを保管することができる自動倉庫である。物品箱倉庫1は、第一ラック11と、第一コンベヤ12と、第一搬送装置13と、バーチカルコンベヤ14と、第二コンベヤ15と、を備える。
 第一ラック11は、物品箱Bを保管する棚である。第一ラック11は、水平方向の一方向(図1に示されるX方向)に沿って複数の物品箱Bを載置可能に設けられている。第一ラック11は、垂直方向(Z方向)に沿って複数段配列されている。第一ラック11は、第一ラック11の延在方向(X方向)と直交する方向(Y方向)に第一搬送装置13を挟んで向かい合って配置される。ピッキングシステム100は、同種の物品箱Bを保管する物品箱倉庫1を複数備えてもよい。ピッキングシステム100が備える物品箱倉庫1の数は、特に限定されない。また、物品箱倉庫1の種類や大きさ(物品箱Bの保管数)等は特に限定されず、複数の物品箱倉庫1の種類及び大きさが互いに異なっていてもよい。
 第一搬送装置13は、第一ラック11及び第一コンベヤ12に載置される物品箱Bを第一ラック11及び第一コンベヤ12の別の場所に移送する。第一搬送装置13の種類は、特に限定されるものではなく、例えば、第一搬送装置13は、第一ラック11の各段に対応する位置にそれぞれ敷設されるレールと、レール毎に配置される台車と、によって構成される搬送装置である。なお、第一搬送装置13は、第一ラック11の延在方向に沿って走行可能かつ第一ラック11及び第一コンベヤ12の各載置部に物品箱Bを移載可能な移載装置を有する、スタッカクレーンであってもよい。スタッカクレーンを採用する場合には、後段にて詳述するバーチカルコンベヤ14を省略してもよい。また、レールは、第一ラック11に沿って第一コンベヤ12に至るまで延在して配置され、台車は、物品箱Bを保持した状態でレールに沿って往復動する。台車には、第一ラック11及び第一コンベヤ12と台車との間で物品箱Bを移載可能な移載装置を有する。
 第一コンベヤ12は、一対の第一ラック11,11の各段に対応する位置にそれぞれ配置されている。一方の第一コンベヤ12は、一方の第一ラック11の延在方向に沿って物品箱Bを搬送し、バーチカルコンベヤ14に物品箱Bを搬出する。他方の第一コンベヤ12は、他方の第一ラック11の延在方向に沿って物品箱Bを搬送し、バーチカルコンベヤ14から搬入された物品箱Bを第一搬送装置13に受け渡す。第一コンベヤ12の種類は、特に限定されるものではなく、例えば、ローラコンベヤ又はベルトコンベヤ等である。
 バーチカルコンベヤ14は、物品箱Bを鉛直方向(Z方向)に沿って搬送する。本実施形態では、一対の第一コンベヤ12,12のそれぞれに対応する一対のバーチカルコンベヤ14,14が設けられている。一方のバーチカルコンベヤ14は、第一コンベヤ12から搬入された物品箱Bを鉛直方向に沿って搬送し、第二コンベヤ15に搬出する。他方のバーチカルコンベヤ14は、第二コンベヤ15から搬入された物品箱BをZ方向に搬送し、所定の段の第一コンベヤ12に搬出する。
 第二コンベヤ15は、主搬送装置3とバーチカルコンベヤ14との間で物品箱BをX方向に搬送する。本実施形態では、一対のバーチカルコンベヤ14,14のそれぞれに対応する一対の第二コンベヤ15,15が設けられている。一方の第二コンベヤ15は、バーチカルコンベヤ14から搬入された物品箱BをX方向に搬送し、主搬送装置3に搬出する。他方の第二コンベヤ15は、主搬送装置3から搬入された物品箱BをX方向に搬送し、バーチカルコンベヤ14に搬出する。
 主搬送装置3は、物品箱倉庫1から出庫された(受け渡された)物品箱Bを各仕分ステーション5にまで搬送すると共に、各仕分ステーション5から搬出された物品箱Bを物品箱倉庫1まで搬送する。主搬送装置3は、一方向に物品箱Bを搬送する。主搬送装置3の種類は、特に限定されるものではなく、複数種類の搬送装置が組み合わされて構成されてもよい。本実施形態の主搬送装置3は、例えば、主搬送ローラ31と、接続搬送ローラ33と、を備える。
 主搬送ローラ31は、物品箱Bの底面の下方から支持して一方向に搬送するローラコンベヤである。接続搬送ローラ33は、後段にて詳述する仕分ステーション5の第二搬送路63に対する接続部分に配置される。接続搬送ローラ33は、物品箱Bを上記一方向に搬送すると共に、上記一方向に直交する方向(X方向)に物品箱Bを搬送する。すなわち、接続搬送ローラ33は、第二搬送路63に対して物品箱Bの搬入及び搬出が可能である。接続搬送ローラ33の構成は、後段にて詳述する第一転換搬送路53Bと同じであるので、ここでの詳細な説明は省略する。
 仕分ステーション5は、作業者による物品の仕分作業が実施される作業箇所55を構成する。仕分ステーション5は、下層コンベヤライン(第二コンベヤライン)51と、上層コンベヤライン(第一コンベヤライン)61と、昇降搬送装置71と、を備える。
 図2及び図3に示されるように、下層コンベヤライン51は、上層コンベヤライン61に対して鉛直方向に異なる位置に設けられる。下層コンベヤライン51は、物品箱Bを一方向に搬送する周回状の第一搬送路53を有する。下層コンベヤライン51には、第一搬送路53の一部に作業者が仕分作業を実施する作業箇所55が設けられる。第一搬送路53は、第一直線搬送路53Aと、第一転換搬送路53Bと、を含んで構成される。第一直線搬送路53Aは、物品箱Bの底面を下方から支持して一方向(X方向)に搬送する。第一直線搬送路53Aの種類は、特に限定されるものではなく、例えば、ローラコンベヤ又はベルトコンベヤである。
 第一転換搬送路53Bは、一方向(X方向)に沿って物品箱Bを搬送すると共に、搬送方向を一方向に直交する方向(Y方向)に切り替えて物品箱Bを搬送する。より詳細には、図4に示されるように、第一転換搬送路53Bは、長尺ローラ53Baと、回転ローラ53Bbと、を有している。長尺ローラ53Baは、物品箱Bの搬送方向に沿って配列されている。回転ローラ53Bbは、隣り合う長尺ローラ53Baと長尺ローラ53Baとの間に、長尺ローラ53Baの延在方向(Y方向)に沿って複数配列されている。
 長尺ローラ53Baは、第一高さに位置する進出位置と、第一高さよりも低い第二高さに位置する退避位置との間で、上下方向に移動可能に設けられている。第一転換搬送路53Bでは、長尺ローラ53Baが退避位置に位置したときに、回転ローラ53Bbの高さ位置(下方から物品箱Bを支持する位置)が長尺ローラ53Baの高さ位置(下方から物品箱Bを支持する位置)よりも高くなるように配置されている。
 第一転換搬送路53Bでは、長尺ローラ53Baを進出位置に位置させた状態で、全ての長尺ローラ53Ba又は一部の長尺ローラ53Baを回転駆動させることによって物品箱BをX方向に搬送する。第一転換搬送路53Bでは、長尺ローラ53Baを退避位置に位置させた状態で、回転ローラ53Bbを回転駆動させることによって物品箱BをY方向に搬送する。すなわち、第一転換搬送路53Bでは、物品箱BをY方向及びX方向の両方に移動させることができる。
 図2~図4に示されるように、作業箇所55は、上述したとおり、作業者による物品の仕分作業が実施される箇所である。より詳細には、物品箱Bの停止位置があり、作業者が作業するスペースが近傍に配置されている。作業箇所55には、端末装置91及び作業完了を入力する完了ボタン等が配置されてもよい。端末装置91の表示部(ディスプレイ)には、上述したオーダーに基づいて作業者が物品箱Bから取り出すべき商品の種類(商品名)及び投入すべき商品の数が表示される。作業者は、端末装置91の表示部に表示される内容に基づいて、搬送されてくる物品箱Bから商品を取り出し、完了ボタンを押下する。完了ボタンが押下されると、次に物品箱Bから取り出すべき商品の種類及び数が表示部に表示される。
 上層コンベヤライン61は、下層コンベヤライン51の上方に配置され、物品箱Bの供給部である物品箱倉庫1に接続されている。上層コンベヤライン61は、一端から他端まで一方向に物品箱Bを搬送する第二搬送路63を有する。第二搬送路63は、その一端と他端とが、主搬送装置3に接続されている。本実施形態の第二搬送路63は、鉛直方向から見た平面視において、U字状に形成されている。
 第二搬送路63は、第二直線搬送路63Aと、第二転換搬送路63Bと、を含んで構成される。第二直線搬送路63Aは、物品箱Bの底面の下方から支持して一方向に搬送する。第二直線搬送路63Aの種類は、特に限定されるものではなく、例えば、ローラコンベヤ又はベルトコンベヤ等である。第二転換搬送路63Bは、一方向(X方向)に沿って物品箱Bを搬送すると共に、搬送方向を一方向に直交する方向(Y方向)に切り替えて物品箱Bを搬送する。より詳細には、図4に示されるように、第二転換搬送路63Bは、長尺ローラ63Baと、回転ローラ63Bbと、を有している。長尺ローラ63Baは、物品箱Bの搬送方向(X方向)に沿って配列されている。回転ローラ63Bbは、隣り合う長尺ローラ63Baと長尺ローラ63Baとの間に、長尺ローラ63Baの延在方向(Y方向)に沿って複数配列されている。なお、第二転換搬送路63Bが、物品箱BをY方向及びX方向の両方に移動させることができる構成は、第一転換搬送路53Bの構成と同じであるので、ここでの詳細な説明は省略する。
 図2~図4に示されるように、昇降搬送装置71は、鉛直方向に沿って物品箱Bを搬送し、上層コンベヤライン61から下層コンベヤライン51に物品箱Bを受け渡す。なお、本実施形態では、上層コンベヤライン61と下層コンベヤライン51との間で双方向に物品箱Bを搬送可能に構成されている。昇降搬送装置71は、第二搬送路63の一端の少し下流側に配置されている。なお、昇降搬送装置71の配置位置は、この位置に限定されず、第二搬送路63及び第一搬送路53と物品箱Bが搬入及び搬出ができる位置であれば特に限定されない。
 昇降搬送装置71は、昇降部73と、複数のバッファ部81と、制御部87と、を備える。昇降部73は、上下方向に移動可能に設けられており、移動体駆動部の駆動力が伝達されることによって上下方向に移動する。
 昇降部73は、複数の搬送ローラ77と、搬送駆動部79とを有している。複数の搬送ローラ77の一部又は全ては、搬送駆動部79によって駆動する。搬送ローラ77は、搬送駆動部79の駆動力が伝達されることによって回転し、第一搬送路53又は第二搬送路63から昇降部73の中央部へ物品箱Bを搬入する。同様に、搬送ローラ77は、搬送駆動部79の駆動力が伝達されることによって回転し、昇降部73の中央部から第一搬送路53又は第二搬送路63へ物品箱Bを搬出する。昇降部73は、物品箱Bを移動体の中央部に位置させた状態でZ方向に移動する。搬送駆動部79は、例えば、昇降部73を構成するフレームに設けられている。
 本実施形態では、第一搬送路53から昇降搬送装置71への物品箱Bの搬入動作と、昇降搬送装置71から第一搬送路53への物品箱Bの搬出動作とが同時に実行される。また、第二搬送路63から昇降搬送装置71への物品箱Bの搬入動作と、昇降搬送装置71から第二搬送路63への物品箱Bの搬出動作とが同時に実行される。なお、本実施形態では、第一搬送路53から昇降搬送装置71への物品箱Bの搬入方向と、昇降搬送装置71から第一搬送路53への物品箱Bの搬出方向とが一致し、第二搬送路63から昇降搬送装置71への物品箱Bの搬入方向と、昇降搬送装置71から第二搬送路63への物品箱Bの搬出方向とが一致する。図1及び図2では、昇降搬送装置71が昇降部73の移動方向に沿って箱状に図示されているが、このようなカバー状の筐体は、設けられても設けられなくてもよい。
 なお、第一搬送路53から昇降搬送装置71への物品箱Bの搬入動作は、昇降搬送装置71から第一搬送路53への物品箱Bの搬出動作に連続して実行されてもよい。また、第二搬送路63から昇降搬送装置71への物品箱Bの搬入動作は、昇降搬送装置71から第二搬送路63への物品箱Bの搬出動作に連続して実行されてもよい。
 バッファ部81は、鉛直方向において上層コンベヤライン61と下層コンベヤライン51との間に配置されると共に、昇降部73との間で物品箱Bを受け渡し可能に設けられている。バッファ部81は、複数設けられており、複数のバッファ部81は、同じ高さ位置に配置されている。本実施形態では、二つのバッファ部81が設けられており、二つのバッファ部81は、昇降部73を挟むようにかつ対向するように配置されている。
 バッファ部81は、搬送ローラ83と、搬送駆動部85と、を有している。複数の搬送ローラ83の一部又は全ては、搬送駆動部85によって駆動する。搬送ローラ83は、搬送駆動部85の駆動力が伝達されることによって回転し、昇降部73からバッファ部81に物品箱Bを搬入する。同様に、搬送ローラ83は、搬送駆動部85の駆動力が伝達されることによって回転し、バッファ部81から昇降部73へ物品箱Bを搬出する。昇降部73は、物品箱Bを移動体の中央部に位置させた状態でZ方向に移動する。搬送駆動部79は、昇降部73を構成するフレームに設けられている。
 制御部87は、昇降搬送装置71における各種制御処理を実行する部分であり、例えば、CPU、ROM、RAM等で構成される。図2に示されるように、制御部87は、例えばROMに格納されているプログラムがRAM上にロードされてCPUで実行されるソフトウェアとして構成することができる。なお、制御部87は、電子回路等によるハードウェアとして構成されてもよい。
 制御部87は、昇降部73において上層コンベヤライン61から受け取った物品箱Bをバッファ部81に退避させる第一処理と、第一処理の後に上層コンベヤライン61から受け取った物品箱Bを下層コンベヤライン51に受け渡す第二処理と、第二処理の後にバッファ部81に退避させた物品箱Bを下層コンベヤライン51に受け渡す第三処理とを実行するように少なくとも昇降部73を制御し、作業箇所55に到着する物品箱Bの順序を入れ替える。
 次に、上記のように構成された昇降搬送装置71の動作について説明する。主搬送装置3から搬入された物品箱Bは、上層コンベヤライン61の第二搬送路63を昇降搬送装置71の手前まで搬送されてくる。以下、昇降搬送装置71の手前に、商品aが収容された物品箱B(物品箱Ba)、商品bが収容された物品箱B(物品箱Bb)及び商品cが収容された物品箱B(物品箱Bc)が、この順序で搬送されてきた場合を例に挙げて説明する。
 制御部87は、通常、上層コンベヤライン61から物品箱Bが搬入された昇降部73を、そのまま下層コンベヤライン51に受け渡すように制御する。すなわち、昇降部73は、昇降搬送装置71の手前にまで搬送されてきた物品箱Bの順序(物品箱Ba、物品箱Bb、物品箱Bcの順序)を維持したまま、物品箱Bを下層コンベヤライン51に受け渡す。この場合、作業箇所55には、昇降搬送装置71の手前にまで搬送されてきた物品箱Bの順序(物品箱Ba、物品箱Bb、物品箱Bcの順序)で、物品箱Bが到着する。
 制御部87は、例えば、端末装置91に送信されるオーダーに基づいて、昇降搬送装置71の手前にまで搬送されてきた物品箱Bの順序と、下層コンベヤライン51に物品箱Bを受け渡す順序とを入れ替える。例えば、制御部87は、物品箱Bc、物品箱Bb、物品箱Baの順序で、物品箱Bが作業箇所55に到着するように、昇降部73とバッファ部81とを制御する。
 具体的には、図5(A)に示されるように、制御部87は、昇降搬送装置71の手前にまで物品箱Ba、物品箱Bb、物品箱Bcの順序で搬送されてきた物品箱Bについて、図5(B)に示されるように、物品箱Baをバッファ部81の一つである第一バッファ部81Aに退避させ、物品箱Bbをバッファ部81の一つである第二バッファ部81Bに退避させるように、昇降部73及びバッファ部81を制御する(第一処理)。次に、図5(C)に示されるように、制御部87は、物品箱Bcを上層コンベヤライン61から下層コンベヤライン51に受け渡すように、昇降部73を制御する(第二処理)。
 次に、制御部87は、第二バッファ部81Bに退避させた物品箱Bbを、第二バッファ部81Bから下層コンベヤライン51に受け渡すように昇降部73を制御し、続けて第一バッファ部81Aに退避させた物品箱Baを、第一バッファ部81Aから下層コンベヤライン51に受け渡すように昇降部73を制御する(第三処理)。これにより、図5(D)に示されるように、下層コンベヤライン51には、物品箱Bが物品箱Bc、物品箱Bb、物品箱Baの順序で物品箱Bが送り出され、作業箇所55には、この順番で物品箱Bが到着する。
 上記実施形態の昇降搬送装置71における作用効果について説明する。上記実施形態の昇降搬送装置71では、少なくとも一つの物品箱Bがバッファ部に退避させられた後、後から搬送されてくる物品箱Bが下層コンベヤライン51の一部に構成される作業箇所55に先行して送り出され、退避させられた物品箱Bは、その後に作業箇所55に送り出される。これにより、作業箇所55には、上層コンベヤライン61において搬送されてくる順序とは異なる順序で物品箱Bが搬送されてくるようになる。作業者は、作業箇所55において、例えばオーダーに応じた効率的な仕分作業を実施することができる。
 上記実施形態のように物品箱倉庫1から物品箱Bが搬出される場合には、作業箇所55の端末装置91に表示される商品の種類に合わせて物品箱Bを作業箇所55に到着させるため、例えば、主搬送装置3のどこかで待機したり、合流の順番を待ったりすることがある。上記実施形態の昇降搬送装置71では、上流工程でこのような処理をさせなくて済むようになるので主搬送装置3における滞留等を抑制することができ搬送効率を高めることができる。また、例えば、複数の物品箱Bをまとめて搬出する物品箱倉庫1では、オーダーに沿った順番で物品箱Bを搬出できない場合もある。このような物品箱倉庫1に上層コンベヤライン61が接続されるような場合であっても、作業箇所55に、上層コンベヤライン61において搬送されてくる順序とは異なる順序で物品箱Bを搬送させることができる。
 上記実施形態の昇降搬送装置71では、複数のバッファ部が設けられている。これにより、三個以上の物品箱Bとの間で、上記作業箇所55に送り出す物品箱Bの順序を入れ替えることができる。また、上記実施形態の昇降搬送装置71では、第一バッファ部81A及び第二バッファ部81Bは、同じ高さ位置に配置されている。これにより、第一バッファ部81A及び第二バッファ部81Bに連続して物品箱Bを受け渡しする場合に、昇降部の昇降動作を省略することができるので、サイクルタイムを短くすることができる。
 上記実施形態の昇降搬送装置71では、昇降部73は、上層コンベヤライン61と下層コンベヤライン51との間で双方向に物品箱Bを搬送可能に構成されている。これにより、商品が作業者によってピックアップされた後の物品箱Bを上層コンベヤライン61に戻すことができる。
 以上、一実施形態について説明したが、本発明の一側面は、上記実施形態に限られない。発明の趣旨を逸脱しない範囲で種々の変更が可能である。
(変形例1)
 上記実施形態の昇降搬送装置71では、二つのバッファ部81は、同じ高さ位置に配置されている例を挙げて説明したが、この構成に代えて又は加えて、バッファ部81は互いに異なる高さ位置に配置されてもよい。例えば、図6(A)に示されるように、多段に配置されてもよい。更に、同じ高さ位置に複数のバッファ部81が配置される場合、その数は三つ以上であってもよい。これらの場合であっても、三個以上の物品箱Bとの間で、作業箇所55に送り出す物品箱Bの順序を入れ替えることができる。
(変形例2)
 上記実施形態及び変形例の昇降搬送装置71では、一つのバッファ部81には一つの物品箱Bしか退避できない構成を例に挙げて説明したが、例えば図6(B)に示されるように、複数(例えば二つ)の物品箱Bを載置(退避)可能に構成されてもよい。この構成であっても、三個以上の物品箱Bとの間で、作業箇所55に送り出す物品箱Bの順序を入れ替えることができる。また、上記実施形態及び変形例1において配置されている一つの物品箱Bしか載置できないバッファ部81に代えて、複数の物品箱Bを載置できるバッファ部81を配置してもよい。
(その他の変形例)
 上記実施形態及び変形例の昇降搬送装置71における昇降部73は、搬送ローラ77によって物品箱Bを搬入・搬出する例を挙げて説明したが、これらの搬送ローラ77に代えて移載アームを備えてもよい。この場合であっても、下層コンベヤライン51、上層コンベヤライン61、バッファ部81との間で物品箱Bを受け渡しすることが可能である。また、昇降部73が移載アームを備える場合、各バッファ部81は、搬送ローラ83及び搬送駆動部82を備える構成に代えて、物品箱Bを載置できるような板等を備える構成としてもよい。
 上記実施形態及び変形例の昇降搬送装置71は、一度の搬送で一つの物品箱B(物品箱B)しか搬送できない構成を例に挙げて説明したが、複数の物品箱Bを同時に搬送可能に設けられてもよい。具体的には、昇降部73の長さを複数台の物品箱Bを載置可能な長さに構成することで、複数の物品箱Bを同時に搬送できるようにしてもよい。
 上記実施形態及び変形例では、主搬送装置3の例としてローラコンベヤを例に挙げて説明したが、ベルトコンベヤであってもよいし、有軌道台車であってもよい。また、主搬送装置3の例は、物品を保管する棚との間で物品をやりとりするスタッカクレーン等の搬送台車であってもよい。
 上記実施形態及び変形例では、作業箇所55において下層コンベヤライン51を搬送されてくる物品箱Bから作業者が必要な商品を取り出すことによって仕分けを行う例を挙げて説明したが、作業箇所55において下層コンベヤライン51を搬送されてくる配送箱(被搬送物)に作業者が必要な商品を投入することによって仕分けを行ってもよい。この場合には、作業者は、作業箇所55に配置された端末装置91に表示される商品を作業箇所55の周辺に配置された棚等から取り出して、配送箱に投入する。
 上記実施形態及び変形例では、物品箱Bの物品箱倉庫1に接続されるコンベヤラインを上層コンベヤライン61とし、作業箇所55が構成されるコンベヤを下層コンベヤライン51として構成される例を挙げて説明したが、物品箱Bの物品箱倉庫1に接続されるコンベヤラインを下層コンベヤライン51とし、作業箇所55が構成されるコンベヤを上層コンベヤライン61として構成してもよい。
 上記実施形態及び変形例では、仕分処理の例として、オーダーに基づいて物品箱Bから商品を取り出す例、又は配送箱に商品を投入する例を挙げて説明したが、これに限定されない。例えば、作業者は、物品箱Bを取り出して、作業箇所55の周辺に置かれたパレットに積み上げる作業(パレタイズ作業)を仕分処理として行ってもよい。この場合、第二コンベヤラインとしての下層コンベヤライン51は、作業箇所55を最終搬送地点とすればよく、作業箇所55から昇降搬送装置71にまで物品箱B又は配送箱を戻す搬送路を構成しなくてもよい。
 上記実施形態及び変形例では、作業箇所55において作業者が仕分処理を実施する例を挙げて説明したが、ロボットによって仕分処理が実行されてもよい。この場合、オーダー情報を表示するディスプレイ等の端末装置91を備える必要は必ずしも無く、オーダーに関する情報をロボットに直接送信すればよい。
 本発明の一側面の技術主題は以下のとおりに記載され得る。
[1]
 被搬送物の供給部に接続される第一コンベヤラインから、仕分処理が行われる作業箇所が構成され、前記第一コンベヤラインに対して鉛直方向に異なる位置に設けられる第二コンベヤラインへ、前記被搬送物を鉛直方向に沿って搬送する昇降部と、
 鉛直方向において前記第一コンベヤラインと前記第二コンベヤラインとの間に配置されると共に、前記昇降部との間で前記被搬送物を受け渡し可能なバッファ部と、
 前記昇降部において前記第一コンベヤラインから受け取った前記被搬送物を前記バッファ部に退避させる第一処理と、前記第一処理の後に前記第一コンベヤラインから受け取った前記被搬送物を前記第二コンベヤラインに受け渡す第二処理と、前記第二処理の後に前記バッファ部に退避させた前記被搬送物を前記第二コンベヤラインに受け渡す第三処理とを実行するように少なくとも前記昇降部を制御し、前記作業箇所に到着する前記被搬送物の順序を入れ替える制御部と、を備える、昇降搬送装置。
[2]
 前記バッファ部は、複数設けられており、
 複数の前記バッファ部は、同じ高さ位置に配置されている、[1]記載の昇降搬送装置。
[3]
 一つの前記バッファ部は、複数の前記被搬送物を載置可能に構成されている、[1]又は[2]記載の昇降搬送装置。
[4]
 前記昇降部は、前記第一コンベヤラインと前記第二コンベヤラインとの間で双方向に前記被搬送物を搬送可能に構成されている、[1]~[3]の何れか一項記載の昇降搬送装置。
 1…物品箱倉庫(供給部)、5…仕分ステーション、51…下層コンベヤライン(第二コンベヤライン)、55…作業箇所、61…上層コンベヤライン(第一コンベヤライン)、71…昇降搬送装置、73…昇降部、77…搬送ローラ、79…搬送駆動部、81…バッファ部、81A…第一バッファ部、81B…第二バッファ部、83…搬送ローラ、85…搬送駆動部、87…制御部、91…端末装置、100…ピッキングシステム、B…物品箱(被搬送物)。

Claims (5)

  1. 被搬送物の供給部に接続される第一コンベヤラインから、仕分処理が行われる作業箇所が構成され、前記第一コンベヤラインに対して鉛直方向に異なる位置に設けられる第二コンベヤラインへ、前記被搬送物を鉛直方向に沿って搬送する昇降部と、
     鉛直方向において前記第一コンベヤラインと前記第二コンベヤラインとの間に配置されると共に、前記昇降部との間で前記被搬送物を受け渡し可能なバッファ部と、
     前記昇降部において前記第一コンベヤラインから受け取った前記被搬送物を前記バッファ部に退避させる第一処理と、前記第一処理の後に前記第一コンベヤラインから受け取った前記被搬送物を前記第二コンベヤラインに受け渡す第二処理と、前記第二処理の後に前記バッファ部に退避させた前記被搬送物を前記第二コンベヤラインに受け渡す第三処理とを実行するように少なくとも前記昇降部を制御し、前記作業箇所に到着する前記被搬送物の順序を入れ替える制御部と、を備える、昇降搬送装置。
  2.  前記バッファ部は、複数設けられており、
     複数の前記バッファ部は、同じ高さ位置に配置されている、請求項1記載の昇降搬送装置。
  3.  一つの前記バッファ部は、複数の前記被搬送物を載置可能に構成されている、請求項1又は2記載の昇降搬送装置。
  4.  前記昇降部は、前記第一コンベヤラインと前記第二コンベヤラインとの間で双方向に前記被搬送物を搬送可能に構成されている、請求項1又は2記載の昇降搬送装置。
  5.  前記昇降部は、前記第一コンベヤラインと前記第二コンベヤラインとの間で双方向に前記被搬送物を搬送可能に構成されている、請求項3記載の昇降搬送装置。
PCT/JP2023/014247 2022-04-27 2023-04-06 昇降搬送装置 WO2023210294A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2022-072983 2022-04-27
JP2022072983 2022-04-27

Publications (1)

Publication Number Publication Date
WO2023210294A1 true WO2023210294A1 (ja) 2023-11-02

Family

ID=88518765

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2023/014247 WO2023210294A1 (ja) 2022-04-27 2023-04-06 昇降搬送装置

Country Status (1)

Country Link
WO (1) WO2023210294A1 (ja)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51120565A (en) * 1975-04-16 1976-10-21 Mitsubishi Heavy Ind Ltd Load handling device
JP2001233446A (ja) * 2000-02-21 2001-08-28 New Tokyo International Airport Authority 手荷物用仕分けシステム
JP2006315809A (ja) * 2005-05-12 2006-11-24 Murata Mach Ltd 仕分け設備
JP2020040774A (ja) * 2018-09-10 2020-03-19 株式会社日立製作所 搬送システム、搬送管理装置及び物流レイアウト
JP2021024659A (ja) * 2019-07-31 2021-02-22 株式会社ダイフク ピッキング設備

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51120565A (en) * 1975-04-16 1976-10-21 Mitsubishi Heavy Ind Ltd Load handling device
JP2001233446A (ja) * 2000-02-21 2001-08-28 New Tokyo International Airport Authority 手荷物用仕分けシステム
JP2006315809A (ja) * 2005-05-12 2006-11-24 Murata Mach Ltd 仕分け設備
JP2020040774A (ja) * 2018-09-10 2020-03-19 株式会社日立製作所 搬送システム、搬送管理装置及び物流レイアウト
JP2021024659A (ja) * 2019-07-31 2021-02-22 株式会社ダイフク ピッキング設備

Similar Documents

Publication Publication Date Title
JP6995466B2 (ja) 立体自動倉庫
JP7268267B2 (ja) 立体自動倉庫
US11180327B2 (en) Method for automatically stacking packages in layers on a support
WO2022258004A1 (zh) 物品转运装置和仓储系统
JP6694126B2 (ja) 立体自動倉庫
JP2019172448A (ja) 物流システム
JP5930406B2 (ja) ピッキング設備
JPH0891579A (ja) パレタイズシステム
WO2023210294A1 (ja) 昇降搬送装置
JP2018154479A (ja) 立体自動倉庫
JP5760925B2 (ja) ピッキングシステム
JP2019172446A (ja) 物流システム
WO2023189045A1 (ja) 仕分ステーション
JP4029688B2 (ja) 自動倉庫設備
JP7234470B2 (ja) 立体自動倉庫
JPS63112305A (ja) 自動倉庫
JP7459754B2 (ja) ピッキングシステム
JP2019172447A (ja) 物流システム
JP3684891B2 (ja) 物品仕分け設備
JP2013249156A (ja) ピッキングシステム
JPH0752082Y2 (ja) 物品の取扱い装置
JP3541768B2 (ja) ピッキング装置及びピッキング方法
JPS6212523A (ja) 移載装置
JP5811838B2 (ja) 物品収納設備
JPH03147620A (ja) クリーンルーム内の荷取扱い設備

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 23796040

Country of ref document: EP

Kind code of ref document: A1