WO2022219899A1 - 建築物の柱梁構造、建築物、建築物の施工方法、及び建築部材 - Google Patents

建築物の柱梁構造、建築物、建築物の施工方法、及び建築部材 Download PDF

Info

Publication number
WO2022219899A1
WO2022219899A1 PCT/JP2022/005094 JP2022005094W WO2022219899A1 WO 2022219899 A1 WO2022219899 A1 WO 2022219899A1 JP 2022005094 W JP2022005094 W JP 2022005094W WO 2022219899 A1 WO2022219899 A1 WO 2022219899A1
Authority
WO
WIPO (PCT)
Prior art keywords
frame
bolt
building
column
joint
Prior art date
Application number
PCT/JP2022/005094
Other languages
English (en)
French (fr)
Inventor
進一 津村
Original Assignee
株式会社Jts
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP2021069156A external-priority patent/JP7015592B1/ja
Application filed by 株式会社Jts filed Critical 株式会社Jts
Publication of WO2022219899A1 publication Critical patent/WO2022219899A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/30Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts being composed of two or more materials; Composite steel and concrete constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements

Definitions

  • the present invention relates to a beam-column structure of a building, a building, a building construction method, and a building member, and more particularly to a beam-column structure of a steel frame building.
  • Patent Document 1 describes, "In a column-beam structure of a plate-shaped building, a plurality of exclusive parts are arranged in the girder direction on each floor of the hierarchical structure. An inter-beam steel beam extending in the inter-beam direction, a girder steel beam extending in the girder direction, and a reinforced concrete column extending in the height direction and to which the inter-beam steel beam and the girder steel beam are joined (summary excerpt)” is disclosed. It is disclosed.
  • FIG. 6 is a diagram showing a beam-column structure 200 by a conventional construction method.
  • FIG. 7 is a schematic diagram of a column joint 220 used in the conventional construction method disclosed in Non-Patent Document 1. As shown in FIG.
  • the upper end of the lower story column 210u and the lower end of the column joint 220, and the upper end of the column joint 220 and the upper story column 210t are welded at the construction site. , constitute the column 210 .
  • the names of the lower floor pillar 210u and the upper floor pillar 210t are called the lower floor and the upper floor based on the column joint 220 of interest. Therefore, if the column joint 220 of interest changes, the names of the lower floor and the upper floor also change.
  • a plurality of pillars 210 are erected at intervals in the horizontal direction (in FIG. 6, the inter-beam direction (Z direction)) in the structure, and are connected by beams 250 extending in the inter-beam direction (Z direction).
  • the column joint 220 includes a panel portion 221 made of a steel pipe, a lower diaphragm 222u welded to the lower end portion of the panel portion 221, and an upper diaphragm 222t welded to the upper end portion of the panel portion 221.
  • the column joint 220 includes one or more and four or less brackets 230 for joining beams.
  • FIG. 8 is an enlarged exploded view showing the joining process of the column joint 220 and the beam 250.
  • FIG. 9 is a partially enlarged explanatory view showing a state in which the joint processing between the column joint 220 and the beam 250 is completed.
  • FIG. 10 is a partially enlarged side view showing a state in which the joining process between the column joint 220 and the beam 250 is completed.
  • the bracket 230 is made of H-beam steel and includes a lower flange 231u, an upper flange 231t, and a web 232 orthogonal to the lower flange 231u and the upper flange 231t.
  • the lower flange 231 u is welded to the lower diaphragm 222 u
  • the upper flange 231 t is welded to the upper diaphragm 222 t
  • the web 232 is welded to the panel portion 221 .
  • the column joint 220 is shipped from the factory with the bracket 230 welded to the lower diaphragm 222u, the panel portion 221, and the upper diaphragm 222t.
  • brackets 230 At the construction site, beams 250 made of H-shaped steel are joined to brackets 230 .
  • the lower splice plate (large) 240u and the lower splice plate (small) 240uh1, 240uh2 having half widths of the lower splice plate (large) 240u are used to form the lower flange 231u of the bracket 230 and the lower flange of the beam 250.
  • upper splice plates (large) 240t and upper splice plates (small) 240th1 and 240th2 each having a half width of the upper splice plate (large) 240t are used to sandwich the upper flange 231t of the bracket 230 and the upper flange 251t of the beam 250. , are fastened with high-strength bolts 260 .
  • the web 232 of the bracket 230 and the web 252 of the beam 250 are sandwiched along the plate thickness direction of the web 232 of the bracket 230 and the web 252 of the beam 250 using two lateral splice plates 240w1 and 240w2, thereby Tighten with force bolts 260 .
  • the bracket 230 is welded to the column joint 220 in advance, thereby connecting the lower floor column 210u and the upper floor column 210t via the column joint 220, and attaching the beam to the bracket 230.
  • a rigid joint connecting the columns and the beams 250 is realized.
  • the bracket 230 protrudes from the panel portion 221, the lower diaphragm 222u, and the upper diaphragm 222t. There is a problem that it is difficult to transport because it cannot be placed in parallel or stacked.
  • a lower splice plate (large) 240u a lower splice plate (small) 240uh1, 240uh2, an upper splice plate (large) 240t, and an upper splice It is necessary to weld the plates (small) 240th1, 240th2, the side splice plates 240w1, 240w2, the bracket 230 and the beam 250, and there is a problem that there are many welding points.
  • lower splice plate (large) 240u In order to join one beam 250, lower splice plate (large) 240u, lower splice plate (small) 240uh1, 240uh2, upper splice plate (large) 240t, upper splice plate (small) 240th1, 240th2, side splice Since the plates 240w1 and 240w2 are required, the demand for cost reduction by reducing the number of joint fittings has not been met.
  • the column joint 220 has a high rigidity against the force applied from the beam 250 .
  • the lower diaphragm 222u and the upper diaphragm 222t are used to increase the rigidity, but since the panel section 221 is configured using a steel pipe column, there is room for further improvement.
  • the present invention has been made in view of the above problems and circumstances, and aims to improve transportability and construction workability, improve the rigidity of column joints, and reduce the number of parts required for column-to-beam joints. do.
  • the column-to-beam structure of the building according to the present invention is A beam-column structure of a building, lower floor pillars and upper floor pillars made of square steel pipes; a joint that connects the lower floor pillar and the upper floor pillar in the height direction to form a pillar; A composite beam extending in the girder direction or inter-beam direction of the building,
  • the joint is a frame made of a square steel pipe having a thickness that can be regarded as the same as the outer diameters of the lower floor pillars and the upper floor pillars; an inner bottom surface provided inside the frame;
  • the composite beam is a beam body made of H-shaped steel; a connection plate welded to each of the ends of the beam body in the extending direction, A through hole for passing the first bolt or the second bolt is formed in the joint plate of the composite beam, The composite beam is joined to the joint by passing the first bolt or the second bolt through the through hole of the joint plate and fitting a nut, thereby welding the joint plate and the frame.
  • FIG. 3 is a partially enlarged view of the joint of the beam of the joint (side view);
  • FIG. 3 is a partially enlarged cross-sectional view of a joint portion of a joint with a beam (side view);
  • FIG. 4 is a partially enlarged explanatory view showing a state in which joining processing between a column joint and a beam is completed;
  • FIG. 4 is a partially enlarged side view showing a state in which the joint processing between the column joint and the beam is completed;
  • FIG. 1 is a diagram showing a beam-column structure 100 according to this embodiment.
  • FIG. 2 is a diagram showing a part of the construction procedure of the beam-column structure 100. As shown in FIG.
  • the beam-to-column structure 100 shown in FIG. 1 is a structure used in steel-framed buildings.
  • the column-beam structure 100 has lower floor columns 20a and 20b made of square steel pipes erected on foundations 10a and 10b, respectively.
  • Composite beams 50a are provided in one direction (the Z direction), and upper floor columns 40a and 40b made of square steel pipes are erected at the upper ends of joints 30a and 30b, respectively.
  • a composite beam 50b is also connected to the joints 30a and 30b in the girder direction (X direction).
  • the joint between the lower floor pillar 20a and the joint 30 and the joint between the upper floor pillar 40a and the joint 30 are fixed by welding.
  • the joint 30a is formed in the shape of a prism which is substantially equal to the outer diameter of the lower floor pillar 20a and the upper floor pillar 40a (the thickness may be considered to be the same, and the outer diameter may differ within a predetermined allowable range). . Since the joint 30a and the joint 30b are the same member, the joints 30a and 30b and the composite beams 50a and 50b will be referred to as the joint 30 and the composite beam 50 unless it is necessary to distinguish them.
  • FIG. 3 is an exploded explanatory view of the joint 30.
  • FIG. FIG. 4 is a partially enlarged view (side view) of the joint portion of the composite beam 50 of the joint 30.
  • FIG. 5 is a partially enlarged cross-sectional view (side view) of the joint portion of the composite beam 50 of the joint 30. As shown in FIG.
  • the joint 30 includes a frame 31 made of steel pipe and an inner bottom surface 32 (see FIG. 5) provided inside the frame 31.
  • the plate thickness d2 (see FIG. 5) of the frame body 31 should be at least twice the plate thickness d1 (see FIG. 5) of the lower floor pillar 20a and the upper floor pillar 40a.
  • the above definition of "more than twice" is to comply with the requirements of the Building Standards Law, and the ratio of the plate thickness d2 of the joint 30 to the plate thickness d1 of the steel pipe column is changed as appropriate in accordance with the revision of the Building Standards Law. be done.
  • Both ends of each of the bolts 341 and 342 protrude outward from the frame 31 .
  • the ends of the bolts 341 and 342 are threaded, and the nuts 35 are detachably fitted therein.
  • a total of 24 nuts 35 are attached to the ends of the bolts 341 and 342 .
  • the joint 30 is shipped with the nuts 35 fitted to the bolts 341 and 342 .
  • the joint 30 forms a solid portion 36 in which the inside of the frame 31 is filled with expanded concrete and hardened while twelve bolts 341 and 342 are passed through the frame 31 .
  • the inner surface of the frame 31 restricts expansion of the expansive concrete during the hardening process, and a gap is less likely to occur between the frame 31 and the solid portion 36 .
  • the solid portion 36 applies an outward force to the inner surface of the frame 31 , thereby suppressing deformation of the frame 31 due to the force received from the composite beam 50 . That is, it is possible to improve the rigidity against the force applied to the joint 30 from the composite beam 50 without using the flat diaphragm used for the column joint 220 of the conventional construction method.
  • the composite beam 50 is formed by previously welding a beam body 53 made of H-shaped steel and joint plates 55 perpendicular to the extension direction to both ends of the beam body 53 in the extension direction.
  • the beam body 53 includes a web 52, and an upper flange 51t and a lower flange 51u facing each other with the web 52 interposed therebetween.
  • connection plate 55 is made of an iron plate and welded to each of the upper flange 51t, the web 52, and the lower flange 51u.
  • the joint plate 55 has six bolt holes 56 through which the bolts 341 or 342 protruding from the side surface 331 of the frame 31 are passed. Since the bolts 341 and 342 are provided in the joint 30 with different positions in the height direction, the positions of the bolt holes 56 are also changed accordingly. Therefore, the position of the bolt hole 56 provided in the joint plate 55 differs between the composite beam 50 joined to the side surfaces 331 and 333 of the joint 30 and the composite beam 50 joined to the side surfaces 332 and 334 of the joint 30 . For convenience of explanation, in FIG. Illustration is omitted.
  • a method of constructing a building including the beam-column structure 100 according to this embodiment will be described.
  • building members including joints 30 and composite beams 50 are manufactured, and these building members (building member kits) are brought to the construction site.
  • the joint 30 is made by pouring expansive concrete into the frame 31 with the bolts 341 and 342 penetrating the frame 31 and hardening it.
  • the bolts 341 and 342 are shipped with the nuts 35 fitted thereon.
  • the composite beam 50 is shipped after welding connection plates 55 to both ends of a beam body 53 made of H-shaped steel.
  • the construction method (joining process of the joint 30 and the composite beam 50) at the construction site is as follows. (1) Weld the joint 30 to the upper end of the lower floor pillar 20 . (2) Remove the nut 35 fitted on the bolt 341 . (3) The connection plate 55 of the composite beam 50 is opposed to the side surface 331 of the joint 30 , and the bolt 311 is passed through the bolt hole 56 of the connection plate 55 to bring the connection plate 55 into contact with the side surface 331 of the frame 31 . . (4) Fit the nut 35 onto the bolt 341 . (5) Weld the connection plate 55 and the joint 30 together. (6) Weld the upper floor pillar 40 to the upper end of the joint 30 .
  • the nut 35 is fitted to the bolt 341 with the joint plate 55 interposed therebetween.
  • the joint 30 can be configured to have an outer diameter shape based on the frame 31 and the bolts 341 and 342 protruding slightly. Therefore, the joint 30 can be formed in a substantially rectangular parallelepiped shape, can be loaded on a vehicle or can be loaded side by side, and transportation efficiency can be improved.
  • the number of bolts 341 and 342 provided on the frame 31 is not limited to six on one side surface of the frame 31 .

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

下階柱(20)及び上階柱(40)を連結する継ぎ手(30)は、枠体(31)と枠体側面を貫通するボルト(341)と、枠体の内部に膨張コンクリートを充填して硬化させた充実部(36)とを備える。合成梁(50)は、H形鋼からなる梁本体と、梁本体の延伸方向の両端部のそれぞれに溶接された仕口プレート(55)と、を備え、仕口プレート(55)はボルトを貫通させるための貫通孔(56)が形成される。下階柱(20)の上端に継ぎ手(30)を固定し、仕口プレート(55)の貫通孔(56)にボルト(341)を貫通させてナット(35)をはめ合わせ、仕口プレート(55)と枠体(31)とを溶接して接合する。

Description

建築物の柱梁構造、建築物、建築物の施工方法、及び建築部材
 本発明は、建築物の柱梁構造、建築物、建築物の施工方法、及び建築部材に係り、特に鉄骨建築物の柱梁構造に関する。
 角型鋼管柱を用いた柱梁構造の一例として、特許文献1には、「板状建築物の柱梁構造は、階層構造の各階で複数の専有部分が桁行方向に並べられるものであり、梁間方向に延びる梁間鉄骨梁と、桁行方向に延びる桁行鉄骨梁と、高さ方向に延びると共に梁間鉄骨梁及び桁行鉄骨梁が接合される鉄筋コンクリート柱とを備える(要約抜粋)」との記載が開示されている。
 鉄骨建築物において、在来工法では柱と梁との非接合部に特許文献1に開示されるような柱継ぎ手が用いられる。図6は、在来工法による柱梁構造200を示す図である。図7は、非特許文献1に開示された在来工法に用いられる柱継ぎ手220の模式図である。
 図6に示すように、従来の柱梁構造200は、施工現場にて下階柱210uの上端部と柱継ぎ手220の下端部、及び柱継ぎ手220の上端部と上階柱210tとを溶接し、柱210を構成する。下階柱210u、上階柱210tの名称は、注目する柱継ぎ手220を基準として下階、上階と称している。従って、注目する柱継ぎ手220が変われば、下階、上階の呼び名も変わる。構造物内において複数の柱210が水平方向(図6では梁間方向(Z方向))に間隔をあけて立設し、それらを梁間方向(Z方向)に延伸する梁250により連結される。
 図7に示すように、柱継ぎ手220は、鋼管からなるパネル部221と、パネル部221の下端部に溶接される下ダイヤフラム222uと、パネル部221の上端部に溶接される上ダイヤフラム222tとを備える。更に柱継ぎ手220は、梁を接合させるための一つ以上、四つ以下のブラケット230を備える。
 図8、図9、図10を参照して、在来工法による柱梁接合処理について説明する。図8は、柱継ぎ手220と梁250との接合処理を示す分解拡大図である。図9は、柱継ぎ手220と梁250との接合処理が完了した状態を示す部分拡大説明図である。図10は、柱継ぎ手220と梁250との接合処理が完了した状態を示す部分拡大側面図である。
 ブラケット230はH形鋼からなり、下フランジ231u、上フランジ231t、下フランジ231u及び上フランジ231tに直交するウェブ232を含む。下フランジ231uは下ダイヤフラム222uと、上フランジ231tは上ダイヤフラム222tと、ウェブ232はパネル部221と溶接される。
 柱継ぎ手220は、工場において下ダイヤフラム222u、パネル部221、上ダイヤフラム222tにブラケット230が溶接されて出荷される。
 施工現場では、H形鋼からなる梁250がブラケット230に接合される。具体的には、下スプライスプレート(大)240u及び下スプライスプレート(大)240uの半値幅からなる下スプライスプレート(小)240uh1,240uh2を用いて、ブラケット230の下フランジ231u及び梁250の下フランジ251uを挟み込み、高力ボルト260で締結する。同様に上スプライスプレート(大)240t及び上スプライスプレート(大)240tの半値幅からなる上スプライスプレート(小)240th1,240th2を用いて、ブラケット230の上フランジ231t及び梁250の上フランジ251tを挟み込み、高力ボルト260で締結する。更に、ブラケット230のウェブ232と梁250のウェブ252とは、二枚の側方スプライスプレート240w1、240w2を用いてブラケット230のウェブ232と梁250のウェブ252の板厚方向に沿って挟み込み、高力ボルト260で締結する。ブラケット230、梁250のそれぞれと上スプライスプレート(大)240t、上スプライスプレート(小)240th1,240th2、下スプライスプレート(大)240u、下スプライスプレート(小)240uh1,240uh2、側方スプライスプレート240w1、240w2とは溶接する。
 こうして在来工法に係る柱梁構造200では、柱継ぎ手220にブラケット230を予め溶接することで、下階柱210uと上階柱210tとを柱継ぎ手220を介して連結すると共に、ブラケット230に梁250を接合することで柱と梁250とを連結した剛接合を実現している。
特開2017-155415号公報
https://seko-kanri.com/diaphragm/
 従来の柱継ぎ手220は、ブラケット230がパネル部221、下ダイヤフラム222u、上ダイヤフラム222tから突出しているため、柱継ぎ手220を工場から施工現場に運搬する際に、柱継ぎ手220を運搬車両の荷台に並列に載置したり、積み上げたりできず、運搬がしづらいという課題がある。
 更に柱継ぎ手220に梁250を接合する際に、一つの梁250を接合するために下スプライスプレート(大)240u、下スプライスプレート(小)240uh1,240uh2、上スプライスプレート(大)240t、上スプライスプレート(小)240th1,240th2、側方スプライスプレート240w1、240w2とブラケット230及び梁250とを溶接する必要があり、溶接箇所が多いという課題がある。
 また、一つの梁250を接合するために下スプライスプレート(大)240u、下スプライスプレート(小)240uh1,240uh2、上スプライスプレート(大)240t、上スプライスプレート(小)240th1,240th2、側方スプライスプレート240w1、240w2を要することから、接合金具を減らしてコストダウンを図りたいという要望には応えられていない。
 加えて、柱継ぎ手220に梁250からかかる力に対する剛性は高い方が好ましい。柱継ぎ手220では、下ダイヤフラム222u及び上ダイヤフラム222tを用いて剛性を高めているものの、パネル部221は鋼管柱を用いて構成されるので、更なる工夫の余地がある。
 本発明は上記課題及び実情に鑑みてなされたものであり、運搬性及び施工作業性の改善、柱継ぎ手の剛性の向上、及び柱梁接合に必要な部品点数の削減を実現することを目的とする。
 上記課題を解決するため、本発明は特許請求の範囲に記載の構成を備える。その一例をあげるならば、本発明に係る建築物の柱梁構造は、
 建築物の柱梁構造であって、
 角型鋼管からなる下階柱及び上階柱と、
 前記下階柱及び上階柱を高さ方向に連結して柱を形成する継ぎ手と、
 前記建築物の桁行方向又は梁間方向に延伸する合成梁と、を備え、
 前記継ぎ手は、
  前記下階柱及び前記上階柱の外周径と同一とみなせる太さの角型鋼管からなる枠体と、
  前記枠体の内側に備えられた内底面と、
  前記枠体の四つの側面のうち、一組の対向する側面を前記枠体から両端部を突出させて貫通する第1ボルト及び前記枠体の四つの側面のうち、残りの一組の対向する側面を前記枠体から両端部を突出させて貫通する第2ボルトと、
  前記枠体の内部に膨張コンクリートを充填して硬化させた充実部と、を備え、
  前記第1ボルト及び前記第2ボルトの各先端にはねじ溝が形成され、
 前記合成梁は、
  H形鋼からなる梁本体と、
  前記梁本体の延伸方向の両端部のそれぞれに溶接された仕口プレートと、を備え、
 前記合成梁の仕口プレートには、前記第1ボルト又は前記第2ボルトを貫通させるための貫通孔が形成され、
 前記仕口プレートの貫通孔に前記第1ボルト又は前記第2ボルトを貫通させてナットをはめ合わせることで前記合成梁を前記継ぎ手に接合し、前記仕口プレートと前記枠体とが溶接される、
 ことを特徴とする。
 本発明によれば、運搬性及び施工作業性の改善、柱継ぎ手の剛性の向上、及び柱梁接合に必要な部品点数の削減を実現することができる。なお、上述した以外の目的、構成、効果については以下の実施形態において明らかにされる。
本実施形態に係る柱梁構造を示す図。 柱梁構造の施工手順の一部を示す図。 継ぎ手の分解説明図。 継ぎ手の梁の接合部の部分拡大図(側面視)。 継ぎ手の梁との接合部の部分拡大断面図(側面視)。 在来工法による柱梁構造を示す図。 在来工法に用いられる柱継ぎ手の模式図。 柱継ぎ手と梁との接合処理を示す分解拡大図。 柱継ぎ手と梁との接合処理が完了した状態を示す部分拡大説明図。 柱継ぎ手と梁との接合処理が完了した状態を示す部分拡大側面図。
 以下、図面を参照しながら本発明の実施形態を説明する。全図と通じて同一の構成には同一の符号を付し、重複説明を省略する。
<柱梁構造>
 図1は、本実施形態に係る柱梁構造100を示す図である。図2は、柱梁構造100の施工手順の一部を示す図である。
 図1に示す柱梁構造100は、鉄骨造りの建築物に用いられる構造である。柱梁構造100は、基礎10a、10bのそれぞれに角型鋼管からなる下階柱20a、20bを立設し、下階柱20a、20bの上端に接合された継ぎ手30a、30bを介して水平方向の一方向である梁間方向(Z方向)を合成梁50aし、更に継ぎ手30a、30bの上端に角型鋼管からなる上階柱40a、40bをそれぞれ立設して構成される。
 図2に示すように、継ぎ手30a、30bには、桁行方向(X方向)にも合成梁50bが連結される。下階柱20aと継ぎ手30との接合部、及び上階柱40aと継ぎ手30との接合部のそれぞれは溶接により固定する。継ぎ手30aは下階柱20a及び上階柱40aの外周径とほぼ等しい(同一とみなせる太さでよく予め定めた許容範囲内の外周径の差があってもよい。)角柱状に形成される。継ぎ手30aと継ぎ手30bとは同一部材であるので、以下の説明では継ぎ手30a、30bと合成梁50a、50bとを特に区別する必要がない場合は継ぎ手30、合成梁50として説明する。
 図3は、継ぎ手30の分解説明図である。図4は、継ぎ手30の合成梁50の接合部の部分拡大図(側面視)である。図5は、継ぎ手30の合成梁50の接合部の部分拡大断面図(側面視)である。
 図3に示すように、継ぎ手30は、鋼管からなる枠体31と、枠体31の内側に設けられた内底面32(図5参照)とを備える。
 枠体31の板厚d2(図5参照)は、下階柱20a及び上階柱40aの板厚d1(図5参照)の2倍以上とする。上記“2倍以上”と規定したのは、建築基準法からの要請に従うためであり、建築基準法の更改に伴って、鋼管柱の板厚d1に対する継ぎ手30の板厚d2の比は適宜変更される。
 枠体31の各側面331,332,333,334には、2列3段、合計6個の貫通孔が設けられる。対向する側面331,333の各貫通孔に合計6本のボルト341を貫通させる。同様に対向する側面332,334の各貫通孔に合計6本のボルト342を貫通させる。ボルト341,342は枠体31の内部で交差するので、干渉しないよう高さ方向の位置を替えて枠体31を貫通して配置される。ボルト341,342は、第1ボルト、第2ボルトに相当する。
 ボルト341,342のそれぞれは両端部を枠体31の外に向けて突出させる。ボルト341,342の端部にはねじ溝が設けられており、ナット35が着脱可能にははめ込まれる。ナット35は、ボルト341,342の各先端、合計24個が装着される。継ぎ手30の出荷時にはナット35がボルト341,342にはめ込まれた状態で出荷される。
 継ぎ手30は、枠体31に12本のボルト341,342を貫通させた状態で、枠体31の内部を膨張コンクリートで充填し硬化させた充実部36を形成する。枠体31の内部を膨張コンクリートで充填することにより、枠体31の内側表面は硬化過程における膨張コンクリートの膨張に拘束を与え、枠体31と充実部36との間に隙間が生じにくくなる。充実部36は枠体31の内側表面に対して外側に向かう力を与えることで、枠体31が合成梁50から受ける力による変形を抑制する。すなわち、在来工法の柱継ぎ手220に用いた平板上のダイヤフラムを用いることなく、継ぎ手30に合成梁50から加わる力に対する剛性を向上させることができる。
 合成梁50は、H形鋼からなる梁本体53と、梁本体53の延伸方向両端部のそれぞれに、延伸方向に対して直交する仕口プレート55を予め溶接して形成される。梁本体53は、ウェブ52と、ウェブ52を上下に挟んで対向する上フランジ51t及び下フランジ51uを含む。
 仕口プレート55は鉄板により構成され、上フランジ51t,ウェブ52,下フランジ51uのそれぞれに溶接される。
 仕口プレート55は、枠体31の側面331から突出しているボルト341、又はボルト342を貫通させるためのボルト孔56を6つ備える。ボルト341とボルト342とは高さ方向の位置を変えて継ぎ手30に備えられているので、ボルト孔56の位置もそれに応じて変える。従って、継ぎ手30の側面331,333に接合する合成梁50と、継ぎ手30の側面332,334に接合する合成梁50とは、仕口プレート55に設けられるボルト孔56の位置が異なる。図3では説明の便宜のため、枠体31の側面332に接合する仕口プレート55については、この仕口プレート55に溶接されている合成梁50の上フランジ51t,ウェブ52,下フランジ51uの図示を省略している。
 本実施形態にかかる柱梁構造100を含む建築物の施工方法について説明する。工場では、継ぎ手30と合成梁50とを含む建築部材を製造し、これらの建築部材(建築部材のキット)が施工現場に運び込まれる。
 継ぎ手30は、枠体31にボルト341,342を貫通させた状態で膨張コンクリートを枠体31に流し込み、硬化させる。そしてボルト341,342にナット35をはめた状態で出荷する。
 合成梁50は、H形鋼からなる梁本体53の両端部に仕口プレート55を溶接してから出荷する。
 施工現場における施工方法(継ぎ手30と合成梁50との接合処理)は以下のとおりである。
(1)下階柱20の上端部に継ぎ手30を溶接する。
(2)ボルト341にはまっているナット35を取り外す。
(3)合成梁50の仕口プレート55を継ぎ手30の側面331に対向させ、仕口プレート55のボルト孔56にボルト311を貫通させて仕口プレート55を枠体31の側面331に当接する。
(4)ボルト341にナット35をはめ合わせる。
(5)仕口プレート55と継ぎ手30とを溶接する。
(6)継ぎ手30の上端部に上階柱40を溶接する。
 従って、図4、図5に示すように、仕口プレート55をはさんでボルト341にナット35をはめ合わせた状態となる。
 本実施形態によれば、継ぎ手30は、枠体31を基本とし、ボルト341,342がわずかに突出した外径形状として構成できる。よって、継ぎ手30がほぼ直方体形状に形成でき、車両に積載して、又は並列させて積載でき、運搬効率を向上させることができる。
 更に在来工法では図7、図10に示すように柱継ぎ手220に合成梁50を溶接する際は、下スプライスプレート(大)240u、下スプライスプレート(小)240u1,240u2、上スプライスプレート(大)240t、上スプライスプレート(小)240t1,240t2、側方スプライスプレート240w1、240w2をブラケット230及び梁250のそれぞれに溶接する。これに対して本実施形態によれば、スプライスプレートを使うことなく、合成梁50の仕口プレート55の四辺を継ぎ手30に溶接すればよい。そのため、在来工法に比べて柱梁接合に際して接合金具を減らし、更に柱梁接合時の溶接箇所を減らし施工作業性を向上させることができる。
 上記実施形態は本発明の一実施形態を表したにすぎず、本発明の趣旨を逸脱しない各種変形態様は、本発明に含まれる。
 例えば、枠体31に設けるボルト341,342の本数は、枠体31の一側面に6本に限定されない。
 また本発明は、下階柱20及び上階柱40を構成する角型鋼管からなる柱部材と、仕口プレート55を延伸方向の両端に備えるH形鋼(梁鋼材)と、継ぎ手30とを含む建築部材のキット、継ぎ手30、合成梁50の各建築部材は、本発明に係る建築部材の権利範囲に含まれる。また、継ぎ手30、合成梁50を用いた柱梁構造100を含む建築物、その施工方法も本発明に含まれる。
10a,10b   :基礎
20,20a,20b   :下階柱
30,30a,30b   :継ぎ手
31    :枠体
32    :内底面
35    :ナット
36    :充実部
40,40a,40b    :上階柱
50,50a,50b   :合成梁
51t   :上フランジ
51u   :下フランジ
52    :ウェブ
53    :梁本体
55    :仕口プレート
56    :ボルト孔
100   :柱梁構造
200   :柱梁構造(在来工法)
210   :柱
210t  :上階柱
210u  :下階柱
220   :柱継ぎ手
221   :パネル部
222t  :上ダイヤフラム
222u  :下ダイヤフラム
230   :ブラケット
231t  :上フランジ
231u  :下フランジ
232   :ウェブ
240t  :上スプライスプレート(大)
240th1,240th2:上スプライスプレート(小)
240u  :下スプライスプレート(大)
240uh1,240uh2:下スプライスプレート(小)
240w1,240w2 :側方スプライスプレート
250   :梁
251t  :上フランジ
251u  :下フランジ
252   :ウェブ
260   :高力ボルト
311   :ボルト
331,332,333,334   :側面
341,342   :ボルト
A,B   :領域
d1,d2 :板厚
wl     :溶接部

Claims (8)

  1.  建築物の柱梁構造であって、
     角型鋼管からなる下階柱及び上階柱と、
     前記下階柱及び上階柱を高さ方向に連結して柱を形成する継ぎ手と、
     前記建築物の桁行方向又は梁間方向に延伸する合成梁と、を備え、
     前記継ぎ手は、
      前記下階柱及び前記上階柱の外周径と同一とみなせる太さの角型鋼管からなる枠体と、
      前記枠体の内側に備えられた内底面と、
      前記枠体の四つの側面のうち、一組の対向する側面を前記枠体から両端部を突出させて貫通する第1ボルト及び前記枠体の四つの側面のうち、残りの一組の対向する側面を前記枠体から両端部を突出させて貫通する第2ボルトと、
      前記枠体の内部に膨張コンクリートを充填して硬化させた充実部と、を備え、
      前記第1ボルト及び前記第2ボルトの各先端にはねじ溝が形成され、
     前記合成梁は、
      H形鋼からなる梁本体と、
      前記梁本体の延伸方向の両端部のそれぞれに溶接された仕口プレートと、を備え、
     前記合成梁の仕口プレートには、前記第1ボルト又は前記第2ボルトを貫通させるための貫通孔が形成され、
     前記仕口プレートの貫通孔に前記第1ボルト又は前記第2ボルトを貫通させてナットをはめ合わせることで前記合成梁を前記継ぎ手に接合し、前記仕口プレートと前記枠体とが溶接される、
     ことを特徴とする建築物の柱梁構造。
  2.  請求項1に記載の建築物の柱梁構造であって、
     前記枠体を構成する角型鋼管の板厚は、前記下階柱及び前記上階柱を構成する角型鋼管の壁厚の2倍以上である、
     ことを特徴とする建築物の柱梁構造。
  3.  請求項1又は請求項2に記載の建築物の柱梁構造を有することを特徴とする建築物。
  4.  柱梁構造を有する建築物の施工方法であって、
     前記柱梁構造は、角型鋼管からなる下階柱及び上階柱と、前記下階柱及び上階柱を高さ方向に連結して柱を形成する継ぎ手と、前記建築物の桁行方向又は梁間方向に延伸する合成梁と、を備え、
     前記継ぎ手は、前記下階柱及び前記上階柱の外周径と同一とみなせる太さの角型鋼管からなる枠体と、前記枠体の内側に備えられた内底面と、前記枠体の四つの側面のうち、一組の対向する側面を前記枠体から両端部を突出させて貫通する第1ボルト及び前記枠体の四つの側面のうち、残りの一組の対向する側面を前記枠体から両端部を突出させて貫通する第2ボルトと、前記枠体の内部に膨張コンクリートを充填して硬化させた充実部と、を備え、前記第1ボルト及び前記第2ボルトの各先端にはねじ溝が形成され、
     前記合成梁は、H形鋼からなる梁本体と、前記梁本体の延伸方向の両端部のそれぞれに溶接された仕口プレートと、を備え、前記合成梁の仕口プレートには、前記第1ボルト又は前記第2ボルトを貫通させるための貫通孔が形成され、
     前記下階柱の上端部に前記継ぎ手を接合するステップと、
     前記仕口プレートの貫通孔に前記第1ボルト又は前記第2ボルトを貫通させてナットをはめ合わせるステップと、
     前記仕口プレートと前記枠体の側面とを溶接するステップと、
     を含むことを特徴とする建築物の施工方法。
  5.  建築物の柱梁構造に用いられる建築部材であって、
     角型鋼管からなる枠体と、
     前記枠体の内側に備えられた内底面と、
     前記枠体の四つの側面のうち、一組の対向する側面を前記枠体から両端部を突出させて貫通する第1ボルト及び前記枠体の四つの側面のうち、残りの一組の対向する側面を前記枠体から両端部を突出させて貫通する第2ボルトと、
     前記枠体の内部に膨張コンクリートを充填して硬化させた充実部と、を備え、
     前記第1ボルト及び前記第2ボルトの各先端にはねじ溝が形成される、
     ことを特徴とする建築部材。
  6.  請求項5に記載の建築部材であって、
     前記第1ボルトと前記第2ボルトとは、前記建築部材の高さ方向の位置を変えて備えられる、
     ことを特徴とする建築部材。
  7.  建築物の柱梁構造に用いられる建築部材であって、
     H形鋼からなる梁本体と、
     前記梁本体の延伸方向の両端部のそれぞれに溶接された仕口プレートと、を備え、
     前記仕口プレートには、柱に取り付けられたボルトを貫通させるための貫通孔が形成される、
     ことを特徴とする建築部材。
  8.  建築物の柱梁構造に用いられる建築部材であって、
     角型鋼管からなる柱部材と、
     合成梁と、
     前記柱部材及び前記合成梁を連結する継ぎ手と、を備え、
     前記継ぎ手は、
      前記柱部材の外周径と同じ太さ又は更に太い角型鋼管からなる枠体と、
      前記枠体の内側に備えられた内底面と、
      前記枠体の四つの側面のうち、一組の対向する側面を前記枠体から両端部を突出させて貫通する第1ボルト及び前記枠体の四つの側面のうち、残りの一組の対向する側面を前記枠体から両端部を突出させて貫通する第2ボルトと、
      前記第1ボルト及び前記第2ボルトにはめ合わせるナットと、
      前記枠体の内部に膨張コンクリートを充填して硬化させた充実部と、を備え、
     前記合成梁は、
      H形鋼からなる梁本体と、
      前記梁本体の延伸方向の両端部のそれぞれに溶接された仕口プレートと、を備え、
      前記合成梁の仕口プレートには、前記第1ボルト又は前記第2ボルトを貫通させるための貫通孔が形成される、
     ことを特徴とする建築部材。
PCT/JP2022/005094 2021-04-15 2022-02-09 建築物の柱梁構造、建築物、建築物の施工方法、及び建築部材 WO2022219899A1 (ja)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2021069156A JP7015592B1 (ja) 2021-04-15 2021-04-15 建築物の柱梁構造、建築物、及び建築物の施工方法
JP2021-069156 2021-04-15
JP2021213919A JP7061822B1 (ja) 2021-04-15 2021-12-28 建築部材
JP2021-213919 2021-12-28

Publications (1)

Publication Number Publication Date
WO2022219899A1 true WO2022219899A1 (ja) 2022-10-20

Family

ID=83639567

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/005094 WO2022219899A1 (ja) 2021-04-15 2022-02-09 建築物の柱梁構造、建築物、建築物の施工方法、及び建築部材

Country Status (2)

Country Link
JP (1) JP7061822B1 (ja)
WO (1) WO2022219899A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102200137B1 (ko) * 2018-07-31 2021-01-11 주식회사 아이센스 연속 혈당 측정용 신체 부착 유닛

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4831604Y1 (ja) * 1965-07-28 1973-09-27
JPH02272122A (ja) * 1989-04-14 1990-11-06 Kajima Corp 柱・梁接合部構造
JP2007177403A (ja) * 2005-12-27 2007-07-12 Nippon Steel Corp コンクリート充填角形鋼管柱と梁の高力ボルト引張接合構造
JP6765735B1 (ja) * 2019-11-25 2020-10-07 黒沢建設株式会社 3軸圧縮柱梁接合部を有する鉄骨構造及びその構築方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0586645A (ja) * 1991-05-10 1993-04-06 Asahi Chem Ind Co Ltd 柱梁の接合部構造
JP2927402B2 (ja) * 1995-03-30 1999-07-28 株式会社淺沼組 コンクリート建造物の柱・梁接合部構造

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4831604Y1 (ja) * 1965-07-28 1973-09-27
JPH02272122A (ja) * 1989-04-14 1990-11-06 Kajima Corp 柱・梁接合部構造
JP2007177403A (ja) * 2005-12-27 2007-07-12 Nippon Steel Corp コンクリート充填角形鋼管柱と梁の高力ボルト引張接合構造
JP6765735B1 (ja) * 2019-11-25 2020-10-07 黒沢建設株式会社 3軸圧縮柱梁接合部を有する鉄骨構造及びその構築方法

Also Published As

Publication number Publication date
JP2022164551A (ja) 2022-10-27
JP7061822B1 (ja) 2022-05-02

Similar Documents

Publication Publication Date Title
US10378199B2 (en) Dry joint joining device between columns and beams of precast reinforced concrete
WO2019074050A1 (ja) H形鋼の接合構造
WO2022219899A1 (ja) 建築物の柱梁構造、建築物、建築物の施工方法、及び建築部材
JP6763653B2 (ja) ユニット建物
JP7015592B1 (ja) 建築物の柱梁構造、建築物、及び建築物の施工方法
JPH1122001A (ja) 閉鎖形断面柱と梁の接合部構造
KR102453459B1 (ko) 플랜지 결합부를 구비한 결합조립체를 이용한 기둥-보의 결합구조 및 기둥-보 시공방법
JPH0978692A (ja) 建築骨組用の角柱連結ブロック、梁、およびそれらを用いた連結構造
JP2022122012A (ja) 接合構造および接合構造の構築方法
WO1997017504A1 (fr) Rattachement d'un montant et d'une poutre ou de deux montants entre eux
JP2766815B2 (ja) 建築・土木構造用継手
JP7533181B2 (ja) 鉄骨柱梁の接合工法
JPH04366247A (ja) 角形鋼管柱とはりの接合部及び接合金物
JPH08144368A (ja) エンドプレート形式鉄骨構造体の接合構造およびその接合方法
JP2002322735A (ja) 低層階住宅用重量鉄骨の柱と梁の取付け構造
JP7127921B1 (ja) 建物ユニット
JP7211915B2 (ja) 耐震補強構造
JP7502033B2 (ja) 柱梁仕口構造
JP2702104B2 (ja) 鋼管柱の梁,柱,柱脚部の接合構造
KR102175363B1 (ko) 기둥과 보의 접합을 위한 접합부 코어
JP7335114B2 (ja) トラス梁接合方法
JP3966613B2 (ja) 鉄骨架構の施工方法
JP2003013498A (ja) 鉄骨構造建物の柱体
JP3010003B2 (ja) 鉄骨造に於ける柱と梁の仕口構造
JP2002242308A (ja) 閉鎖形断面柱と梁の接合部構造

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22787827

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 22787827

Country of ref document: EP

Kind code of ref document: A1