WO2022137513A1 - 情報処理装置、特定方法、および特定プログラム - Google Patents

情報処理装置、特定方法、および特定プログラム Download PDF

Info

Publication number
WO2022137513A1
WO2022137513A1 PCT/JP2020/048768 JP2020048768W WO2022137513A1 WO 2022137513 A1 WO2022137513 A1 WO 2022137513A1 JP 2020048768 W JP2020048768 W JP 2020048768W WO 2022137513 A1 WO2022137513 A1 WO 2022137513A1
Authority
WO
WIPO (PCT)
Prior art keywords
objects
processing
work
devices
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2020/048768
Other languages
English (en)
French (fr)
Japanese (ja)
Inventor
猪谷宜彦
長門毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Fujitsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd filed Critical Fujitsu Ltd
Priority to EP20966999.3A priority Critical patent/EP4270125A4/en
Priority to CN202080107188.3A priority patent/CN116490831B/zh
Priority to JP2022570955A priority patent/JP7368785B2/ja
Priority to PCT/JP2020/048768 priority patent/WO2022137513A1/ja
Publication of WO2022137513A1 publication Critical patent/WO2022137513A1/ja
Priority to US18/307,844 priority patent/US20240095428A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • G06F30/27Design optimisation, verification or simulation using machine learning, e.g. artificial intelligence, neural networks, support vector machines [SVM] or training a model
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Program-control systems
    • G05B19/02Program-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32252Scheduling production, machining, job shop
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32256Due dates, pieces must be ready, priority of dates, deadline
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32263Afo products, their components to be manufactured, lot selective
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/06Multi-objective optimisation, e.g. Pareto optimisation using simulated annealing [SA], ant colony algorithms or genetic algorithms [GA]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Definitions

  • This case relates to information processing equipment, specific methods, and specific programs.
  • Patent Documents 1 to 3 A technique for automatically providing information on a work plan for a work line such as a production line is disclosed (see, for example, Patent Documents 1 to 3).
  • the KPI Key Performance Indicator
  • the KPI may not satisfy the desired condition. In that case, it is required to improve the KPI by increasing or decreasing the number of working devices.
  • the specific program obtains first information on a computer indicating a processing order for processing a plurality of objects including a plurality of types, and each of the plurality of working devices among the plurality of types is used.
  • the process of obtaining the simulation result regarding the processing of the plurality of working devices and the processing of each of the plurality of objects can be performed by the working device capable of processing the object.
  • (A) to (c) are diagrams for explaining the outline of the production line.
  • (A) to (c) are diagrams for explaining the outline of the production line. It is a figure which illustrates the production line model.
  • (A) is a functional block diagram showing an overall configuration of an information processing apparatus, and
  • (b) is a block diagram illustrating a hardware configuration of each part of the information processing apparatus. It is a figure which illustrates the relationship between the product which can carry out the manufacturing process by each manufacturing apparatus, and the process time of the manufacturing process for each product.
  • (A) to (d) are diagrams illustrating the count of the number of products N1 and the number of products N2.
  • (A) and (b) are diagrams illustrating the result of step S3.
  • (A)-(e) are diagrams illustrating another aspect of step S9.
  • FIG. 1A to 1 (c) are diagrams for explaining an outline of a production line.
  • FIG. 1A is a diagram illustrating a cell production type production line.
  • FIG. 1B is a diagram illustrating a production line of a line production type.
  • the unfinished product raw material
  • FIG. 1A or FIG. 1B a machining step, a drilling step, and a planing step are carried out as an example.
  • the manufacturing process to be carried out differs depending on the product number (product type).
  • product number product type
  • the product # 1 is completed by first performing a machining step and second performing a planing step.
  • the drilling process is performed first, and the planing process is performed second.
  • the content of drilling may differ depending on the type of product.
  • the manufacturing process is complicated in high-mix low-volume production. Therefore, it is conceivable to improve the efficiency of the manufacturing line by arranging a plurality of manufacturing devices capable of carrying out each manufacturing process.
  • each product For example, as illustrated in FIG. 2A, the input order of each product is defined. In the example of FIG. 2A, the charging order is determined from top to bottom. As illustrated in FIG. 2B, each product that has flowed to the beginning of the standby area is distributed to each manufacturing apparatus. The distribution destination of each product is a manufacturing device capable of carrying out the necessary manufacturing process for the leading product. As illustrated in FIG. 2 (c), a product capable of carrying out a manufacturing process required by each manufacturing apparatus and a process time required for the manufacturing process of the product are determined. The products that can be manufactured differ depending on the manufacturing equipment.
  • the manufacturing apparatus a can carry out the manufacturing process of the product # 1 and the product # 3, but cannot carry out the manufacturing of the product # 2 and the product # 4.
  • the manufacturing apparatus b can carry out the manufacturing process of the product # 2, but cannot carry out the manufacturing of the products # 1, # 3, # 4.
  • the manufacturing apparatus c can carry out any manufacturing process of products # 1 to # 4.
  • the product will stand by at the head of the standby area. ..
  • the sorting destination is selected according to a predetermined rule. For example, a manufacturing apparatus having a short process time, a manufacturing apparatus having a low manufacturing cost, or the like is selected.
  • the first product is sequentially distributed to each manufacturing apparatus, so if the first product is on standby, other products are also on standby.
  • a general-purpose device with a large number of product types capable of carrying out the manufacturing process is used, the operating efficiency of each manufacturing device is improved and the waiting time for each product is shortened.
  • general-purpose equipment tends to be expensive and the manufacturing process time tends to be long.
  • the reason why the manufacturing process becomes long is that, for example, setting change work (step change work) according to the product type is required.
  • a dedicated device having a small number of product types capable of carrying out a manufacturing process tends to be inexpensive and the manufacturing process time tends to be short, but the manufacturing process cannot be carried out for other product types.
  • the general-purpose device and the dedicated device have advantages and disadvantages, the general-purpose device and the dedicated device tend to coexist on the production line.
  • the manufacturing cost varies depending on the installation cost of each manufacturing device, the operating time of each manufacturing device, and the like. Therefore, it is required that a plurality of KPIs satisfy a predetermined condition.
  • the plurality of KPIs include the number of stages of each manufacturing device, the delivery delay time of each product, the number of delays of each product, and the like.
  • FIG. 3 is a diagram illustrating a production line model.
  • the product put into the production line model moves to the next cell after staying for a specified process time in the cell corresponding to each production apparatus.
  • a predetermined number of cells are set. As a result, the predetermined number of products can stand by in the standby area.
  • the line simulator performs a simulation from the start of loading of each product to the start cell at predetermined time intervals according to the loading order until all the products reach the goal.
  • the line simulator By using the line simulator, it is possible to optimize the input order so that the objective function determined by the input order satisfies a predetermined condition with KPIs such as manufacturing lead time and manufacturing cost as objective functions.
  • the objective function may be one or more. If there is one objective function, unidirectional optimization is performed. If there are two or more objective functions, multi-objective optimization is performed. From the obtained results, an input plan that meets the desired conditions will be adopted. However, if there is no result that meets the desired conditions of KPI, it is required to adjust the type and number of manufacturing equipment, for example. At this time, it is required to increase or decrease the number of manufacturing appliances.
  • FIG. 4A is a functional block diagram showing the overall configuration of the information processing apparatus 100 according to the first embodiment.
  • the information processing device 100 is a server or the like for optimization processing.
  • the information processing apparatus 100 includes a manufacturing line model storage unit 10, a manufacturing master storage unit 20, an input order storage unit 30, a calculation result storage unit 40, an acquisition unit 50, and an optimization execution unit. It includes 60, a counting unit 70, a specific unit 80, a result output unit 90, and the like.
  • FIG. 4B is a block diagram illustrating a hardware configuration of each part of the information processing apparatus 100.
  • the information processing device 100 includes a CPU 101, a RAM 102, a storage device 103, an input device 104, a display device 105, and the like.
  • the CPU (Central Processing Unit) 101 is a central processing unit.
  • the CPU 101 includes one or more cores.
  • the RAM (Random Access Memory) 102 is a volatile memory that temporarily stores a program executed by the CPU 101, data processed by the CPU 101, and the like.
  • the storage device 103 is a non-volatile storage device. As the storage device 103, for example, a ROM (Read Only Memory), a solid state drive (SSD) such as a flash memory, a hard disk driven by a hard disk drive, or the like can be used.
  • the storage device 103 stores the specific program according to this embodiment.
  • the input device 104 is an input device such as a mouse and a keyboard.
  • the display device 105 is a display device such as a liquid crystal display. The display device 105 displays the result output by the result output unit 90.
  • each part of FIG. 4A is realized.
  • hardware such as a dedicated circuit may be used as each part of FIG. 4A.
  • the production line model storage unit 10 stores the production line model as illustrated in FIG.
  • the manufacturing master storage unit 20 stores a manufacturing master in which each product type and a manufacturing apparatus capable of carrying out a manufacturing process for each product type are associated with each other.
  • FIG. 5 is a diagram illustrating a manufacturing master.
  • the manufacturing apparatus a can carry out the necessary manufacturing process for the product # 1, the product # 3, and the product # 4, but is necessary for the product # 2 and the product # 5. The manufacturing process cannot be carried out.
  • the input order storage unit 30 stores the initial input order as illustrated in FIG. 2 (a).
  • the initial input order is, for example, an order in which the order is arranged as ordered from the customer, and the user may input in advance using the input device 104.
  • the initial input order may be generated by a random number. Since the initial input order is generated without considering the objective function, it is often not a good value for any objective function.
  • the acquisition unit 50 acquires information necessary for the optimization calculation (step S1).
  • the information required for the optimization calculation includes the production line model stored in the production line model storage unit 10. Further, the information required for the optimization calculation includes the manufacturing master illustrated in FIG. Further, the information required for the optimization calculation includes the initial input order stored in the input order storage unit 30.
  • the optimization execution unit 60 performs an optimization calculation using the information acquired by the acquisition unit 50 in step S1 (step S2).
  • a line simulation is performed according to the input order, and the manufacturing lead time and the manufacturing cost are acquired as objective functions for the simulation results from the start of product introduction to the start until all the products reach the goal.
  • An evolutionary algorithm for example, Genetic Algorithm (GA) optimizes the input order so that the specified objective function becomes good.
  • the counting unit 70 is not in the process of performing the manufacturing process, but is capable of performing the manufacturing process on the product.
  • the number of products N1 transferred to the manufacturing apparatus is counted.
  • the counting unit 70 carries out a manufacturing process for another product even though the manufacturing process can be carried out for the product.
  • the number of products N2 that have been put on standby because they are inside are counted (step S3).
  • the standby here means to stop at the beginning of the standby area for a specified time (0 ⁇ 0) or more.
  • FIG. 7A it is assumed that product # 3, product # 2, and product # 1 are waiting in this order from the beginning to the end in the standby area.
  • FIG. 7B it is assumed that the manufacturing apparatus b is in the process of manufacturing the product # 5, and the manufacturing apparatus c is in the process of manufacturing the product # 4. ..
  • the product # 3 can be distributed to the manufacturing apparatus a or the manufacturing apparatus d.
  • the process time in the manufacturing apparatus d is longer than the process time in the manufacturing apparatus a, it is assumed that the product # 3 has been moved to the manufacturing apparatus a as illustrated in FIG. 7B.
  • the manufacturing apparatus d when the product arrives at the head of the standby area, the manufacturing apparatus d is not in the process of performing the manufacturing process, and the manufacturing process can be performed on the product, but the product is manufactured in another manner. It will be in the state of being moved to the device. Therefore, as illustrated in FIG. 7 (c), the number of products N1 of the manufacturing apparatus d is accumulated by one.
  • the product # 2 moves to the top of the standby area as illustrated in FIG. 7 (a). In this state, since the manufacturing apparatus b and the manufacturing apparatus c are carrying out the manufacturing process for other products, the product # 2 stands by in the standby area from the manufacturing master of FIG.
  • the manufacturing devices b and c are carrying out the manufacturing process for the other product even though the manufacturing process can be carried out for the product. That's why I made it stand by. Therefore, as illustrated in FIG. 7D, the number of products N2 of the manufacturing devices b and c is accumulated by one.
  • FIG. 8 (a) and 8 (b) are diagrams illustrating the results of step S3.
  • the number of products N1 is counted for each manufacturing apparatus.
  • the number of products N2 is counted for each manufacturing apparatus.
  • the number of products N1 and the number of products N2 are cumulative values for all the input orders simulated in the process of optimization in step S2. For example, when the charging order is changed 99 times from the initial loading order, the count values of the number of products N1 and the number of products N2 are the cumulative values of the number of products N1 and the number of products N2 for the simulation result for 100 times.
  • the count values of the number of products N1 and the number of products N2 are stored in the calculation result storage unit 40.
  • step S4 determines whether or not the KPI satisfies a predetermined condition with respect to the result of the line simulation in the optimum input order obtained by the execution of step S2 (step S4). If it is determined as "Yes” in step S4, it is not necessary to add or delete the manufacturing apparatus because the desired KPI is obtained. Therefore, when it is determined as "Yes” in step S4, the result output unit 90 causes the display device 105 to display the result of step S2, the result of step S3, and the like (step S5). After that, the execution of the flowchart ends.
  • step S4 When it is determined as "No” in step S4, the specific unit 80 sets a threshold value for each of the number of products N1 and the number of products N2 (step S6). Next, the specifying unit 80 determines whether or not the number of products N1 is equal to or greater than the threshold value set in step S6 for each manufacturing apparatus (step S7). If there is a manufacturing apparatus determined to be "Yes” in step S7, the specific unit 80 deletes the manufacturing apparatus from the production line model as illustrated in FIG. 8A (step S8). The production line model storage unit 10 stores the updated production line model. In step S8, the result output unit 90 may display the manufacturing device to be deleted on the display device 105 so that the user can delete the manufacturing device from the manufacturing line model.
  • the specifying unit 80 determines whether or not the number of products N2 is equal to or greater than the threshold value set in step S6 for each manufacturing apparatus (step S9). If there is a manufacturing apparatus determined to be "Yes” in step S9, the specific unit 80 adds another manufacturing apparatus to the production line model as illustrated in FIG. 8B (b). Step S10).
  • the production line model storage unit 10 stores the updated production line model. After that, it is executed again from step S1.
  • the result output unit 90 may display the manufacturing device to be added on the display device 105 so that the user can add the manufacturing device to the manufacturing line model.
  • step S9 is executed without executing step S8. If “No” is determined in step S9, step S10 is not executed and is executed again from step S1.
  • the manufacturing equipment by counting the number of products N1 and the number of products N2, it is possible to specify the manufacturing equipment to be increased or decreased. For example, by counting the number of products N1, the number of times the products are not distributed can be counted, so that the number of products N1 can be used as an index for the necessity of each manufacturing apparatus. Further, by counting the number of products N2, the number of times the product is kept on standby can be counted, so that the number of products N2 can be used as an index for the necessity of each manufacturing apparatus. By comparing the number of products N1 with the threshold value, it is possible to specify the manufacturing equipment to be deleted. Further, by comparing the number of products N2 with the threshold value, it is possible to specify the manufacturing equipment to be added.
  • step S9 in FIG. 6 will be described with reference to FIGS. 9 (a) to 9 (e).
  • the manufacturing master storage unit 20 stores the manufacturing master as illustrated in FIG. 9A.
  • the manufacturing apparatus a is a dedicated apparatus capable of performing a manufacturing process necessary only for the product # 4.
  • the manufacturing apparatus b is a dedicated apparatus capable of carrying out a manufacturing process necessary only for the product # 3.
  • the manufacturing apparatus c is a general-purpose apparatus capable of carrying out a manufacturing process necessary for the product # 2, the product # 4, and the product # 5.
  • the manufacturing devices d and e are also general-purpose devices like the manufacturing device c.
  • step S3 it is assumed that the number of products N2 is obtained as shown in FIG. 9B. Further, as a result of step S3, it is assumed that the number of free waiting times waited at the beginning of the waiting area is obtained for each product type as shown in FIG. 9 (c).
  • the results of FIGS. 9 (b) and 9 (c) are cumulative values for all input sequences simulated in the process of optimization in step S2.
  • a manufacturing equipment having a product number N2 larger than a threshold value is a candidate.
  • a threshold value for example, an average value
  • the manufacturing devices b, c, and e are candidates. From these, a manufacturing apparatus capable of carrying out the manufacturing process for all the products in which the number of waiting times in FIG. 9 (c) is larger than the threshold value (for example, the average value) is selected. The selected manufacturing apparatus is deleted in step S8.
  • FIG. 9D is a diagram illustrating the fixed cost required when adding a manufacturing apparatus. It is preferable to determine the number of manufacturing equipment to be added within the range that satisfies the desired cost. In order to keep the allowable cost (for example, 5000) as illustrated in FIG. 9 (e), the manufacturing process is performed for all the products (# 3, # 4, # 5) having a higher than average number of waiting times. If it is not possible to select a feasible manufacturing device, a manufacturing device capable of performing a manufacturing process is preferentially selected for a product having a large number of waiting times (# 4, # 3, # 5 in descending order).
  • the type and number of manufacturing equipment for which the formula (n1 x x1 + n2 x x2 + n3 x x3 + n4 x x4 + n5 x x5) with the number of waiting times for each product as a coefficient is the largest is added to the additional manufacturing to shorten the manufacturing lead time. Select as a device. In this way, by multiplying the number of waiting times for each product as a coefficient, it becomes possible to add a manufacturing apparatus that can be preferentially manufactured to a product having a large number of waiting times.
  • products # 1 to product # 5 are examples of a plurality of objects including a plurality of types.
  • the order in which products are put into a production line is an example of a processing order in which a plurality of objects including a plurality of types are processed.
  • a manufacturing device is an example of a working device.
  • the acquisition unit 50 acquires first information indicating a processing order for processing a plurality of objects including a plurality of types, and among the plurality of types, a second indicating a type that can be processed by each of the plurality of working devices.
  • This is an example of an acquisition unit that acquires information. Simulation of processing of the plurality of working devices based on the result of the counting unit 70 distributing each of the plurality of objects to any of the plurality of working devices based on the first information and the second information. The result of the simulation is obtained on the condition that each of the plurality of objects waits if the working device capable of processing the object is performing the processing on the other object.
  • processing can be performed on the object to be sorted next, but the number N1 of the objects moved to the other working device is counted, and the object to be sorted next is counted.
  • This is an example of a counting unit that counts the number of objects N2 that have been made to stand by because the processing can be performed but the processing is being performed for another object.
  • the specific unit 80 is an example of a specific unit that specifies a work device to be increased / decreased with respect to the plurality of work devices according to at least one of the number of objects N1 and the number of objects N2.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Artificial Intelligence (AREA)
  • Medical Informatics (AREA)
  • Software Systems (AREA)
  • Computer Hardware Design (AREA)
  • Geometry (AREA)
  • Automation & Control Theory (AREA)
  • Quality & Reliability (AREA)
  • Manufacturing & Machinery (AREA)
  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
PCT/JP2020/048768 2020-12-25 2020-12-25 情報処理装置、特定方法、および特定プログラム Ceased WO2022137513A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
EP20966999.3A EP4270125A4 (en) 2020-12-25 2020-12-25 Information processing device, designation method, and designation program
CN202080107188.3A CN116490831B (zh) 2020-12-25 2020-12-25 信息处理装置、确定方法、以及存储有确定程序的非暂态计算机可读记录介质
JP2022570955A JP7368785B2 (ja) 2020-12-25 2020-12-25 情報処理装置、特定方法、および特定プログラム
PCT/JP2020/048768 WO2022137513A1 (ja) 2020-12-25 2020-12-25 情報処理装置、特定方法、および特定プログラム
US18/307,844 US20240095428A1 (en) 2020-12-25 2023-04-27 Information processing device, specifying method, and non-transitory computer-readable recording medium storing specifying program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2020/048768 WO2022137513A1 (ja) 2020-12-25 2020-12-25 情報処理装置、特定方法、および特定プログラム

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US18/307,844 Continuation US20240095428A1 (en) 2020-12-25 2023-04-27 Information processing device, specifying method, and non-transitory computer-readable recording medium storing specifying program

Publications (1)

Publication Number Publication Date
WO2022137513A1 true WO2022137513A1 (ja) 2022-06-30

Family

ID=82157440

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/048768 Ceased WO2022137513A1 (ja) 2020-12-25 2020-12-25 情報処理装置、特定方法、および特定プログラム

Country Status (5)

Country Link
US (1) US20240095428A1 (https=)
EP (1) EP4270125A4 (https=)
JP (1) JP7368785B2 (https=)
CN (1) CN116490831B (https=)
WO (1) WO2022137513A1 (https=)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4557190A4 (en) * 2022-07-13 2025-08-06 Fujitsu Ltd PLANNING PROGRAM, PLANNING METHOD AND INFORMATION PROCESSING DEVICE

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11282923A (ja) * 1998-03-31 1999-10-15 Mitsubishi Electric Corp 循環型製造プロセス日程計画方法
JP2002182732A (ja) * 2000-12-19 2002-06-26 Toyota Motor Corp 製造原価見積りシステム
JP2005055956A (ja) * 2003-08-05 2005-03-03 Toyota Central Res & Dev Lab Inc 原因・経路推定方法
JP2005301653A (ja) 2004-04-12 2005-10-27 Oki Electric Ind Co Ltd 製造工程管理方法
JP2006512628A (ja) * 2002-06-07 2006-04-13 日本電産サンキョー株式会社 自動誘導式パレットを用いた生産ラインおよび生産ライン設計支援システム本出願は米国特許法(35U.S.C.)第119条に基づく2002年6月7日出願の米国仮出願No.60/387,347の優先権を主張するものであり、当該仮出願の全開示もまた参照により本出願に包含される。
JP2015087803A (ja) 2013-10-28 2015-05-07 株式会社日立製作所 部品設備割付装置、部品設備割付方法、及びプログラム
JP2016024799A (ja) * 2014-07-25 2016-02-08 Jfeスチール株式会社 鉄鋼製品の生産計画方法およびプログラム
JP2020047301A (ja) 2016-11-30 2020-03-26 パナソニックIpマネジメント株式会社 設備構成作成支援システムおよび設備構成作成支援方法

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006160487A (ja) * 2004-12-09 2006-06-22 Matsushita Electric Ind Co Ltd 搬送順序管理方法、搬送装置、生産ライン、及びシミュレーション装置
JP5688864B2 (ja) * 2013-09-03 2015-03-25 株式会社レクサー・リサーチ 生産システムシミュレーション装置、生産システムシミュレーション方法及び生産システムシミュレーションプログラム
EP3451094A4 (en) * 2016-04-26 2019-05-22 Fujitsu Limited PRODUCT DEVICE PLAN DEVELOPMENT DEVICE, PRODUCT ENTRY PLAN DEVELOPMENT PROCESS AND PRODUCT DEPARTMENT DEVELOPMENT PROGRAM
EP3451093B1 (en) * 2016-04-26 2019-10-09 Fujitsu Limited Work assistance device, work assistance method, and work assistance program
CN108460463B (zh) * 2018-03-20 2020-09-01 合肥工业大学 基于改进遗传算法的高端装备流水线生产调度方法
JP7066589B2 (ja) * 2018-05-28 2022-05-13 株式会社神戸製鋼所 シミュレーション装置、シミュレーション方法及びシミュレーションプログラム
JP6962900B2 (ja) * 2018-12-03 2021-11-05 ファナック株式会社 生産計画装置
CN111291995B (zh) * 2020-02-14 2024-02-23 广东省智能制造研究所 一种基于moea的生产线设备资源优化配置方法及装置

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11282923A (ja) * 1998-03-31 1999-10-15 Mitsubishi Electric Corp 循環型製造プロセス日程計画方法
JP2002182732A (ja) * 2000-12-19 2002-06-26 Toyota Motor Corp 製造原価見積りシステム
JP2006512628A (ja) * 2002-06-07 2006-04-13 日本電産サンキョー株式会社 自動誘導式パレットを用いた生産ラインおよび生産ライン設計支援システム本出願は米国特許法(35U.S.C.)第119条に基づく2002年6月7日出願の米国仮出願No.60/387,347の優先権を主張するものであり、当該仮出願の全開示もまた参照により本出願に包含される。
JP2005055956A (ja) * 2003-08-05 2005-03-03 Toyota Central Res & Dev Lab Inc 原因・経路推定方法
JP2005301653A (ja) 2004-04-12 2005-10-27 Oki Electric Ind Co Ltd 製造工程管理方法
JP2015087803A (ja) 2013-10-28 2015-05-07 株式会社日立製作所 部品設備割付装置、部品設備割付方法、及びプログラム
JP2016024799A (ja) * 2014-07-25 2016-02-08 Jfeスチール株式会社 鉄鋼製品の生産計画方法およびプログラム
JP2020047301A (ja) 2016-11-30 2020-03-26 パナソニックIpマネジメント株式会社 設備構成作成支援システムおよび設備構成作成支援方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP4270125A4

Also Published As

Publication number Publication date
CN116490831A (zh) 2023-07-25
JP7368785B2 (ja) 2023-10-25
CN116490831B (zh) 2025-10-17
EP4270125A4 (en) 2024-02-21
EP4270125A1 (en) 2023-11-01
US20240095428A1 (en) 2024-03-21
JPWO2022137513A1 (https=) 2022-06-30

Similar Documents

Publication Publication Date Title
Kulak et al. Joint order batching and picker routing in single and multiple-cross-aisle warehouses using cluster-based tabu search algorithms
Pickardt et al. Evolutionary generation of dispatching rule sets for complex dynamic scheduling problems
US8849733B2 (en) Benchmarking progressive systems for solving combinatorial problems
JP6962539B2 (ja) 業務計画最適化方法
JP2019075159A (ja) 学習モデル選択システム、学習モデル選択方法およびプログラム
TWI633504B (zh) 基於樹狀搜尋的排程方法與使用此方法的電子裝置
CN110147596B (zh) 一种航空产品生产能力评估方法
WO2022137513A1 (ja) 情報処理装置、特定方法、および特定プログラム
JP2003280714A (ja) 生産スケジューリング方法及び生産スケジューリング装置
Ebrahim et al. Understanding responsiveness in manufacturing operations
JP6688616B2 (ja) シミュレーション装置
JP6214835B2 (ja) 作業指導割当システム及び作業指導割当方法
Xie et al. Efficient order picking methods in robotic mobile fulfillment systems
JP6995694B2 (ja) 加工設備特定支援装置、加工設備特定支援方法、および、加工設備特定支援システム
JP2016076026A (ja) 問題構造抽出装置および問題構造抽出方法
TWI883768B (zh) 生產排程方法及生產管理系統
Wang et al. An improved MOEA/D algorithm for the carbon black production line static and dynamic multiobjective scheduling problem
WO2022013921A1 (ja) 作業計画特定プログラム、作業計画特定方法、および情報処理装置
WO2021234903A1 (ja) 情報処理装置、作業計画特定方法、および作業計画特定プログラム
WO2023276108A1 (ja) シミュレーションプログラム、シミュレーション方法、および情報処理装置
JPWO2022137513A5 (https=)
CN113762872B (zh) 一种组单方法和装置
JP7410345B1 (ja) 生産計画立案装置、生産計画立案プログラム、および生産計画立案方法
JP4930152B2 (ja) 条鋼製品の生産計画方法、その製造方法及びプログラム
Du et al. Integration of PCB assembly process planning and scheduling

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20966999

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2022570955

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 202080107188.3

Country of ref document: CN

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2020966999

Country of ref document: EP

Effective date: 20230725

WWG Wipo information: grant in national office

Ref document number: 202080107188.3

Country of ref document: CN