CN116490831B - 信息处理装置、确定方法、以及存储有确定程序的非暂态计算机可读记录介质 - Google Patents
信息处理装置、确定方法、以及存储有确定程序的非暂态计算机可读记录介质Info
- Publication number
- CN116490831B CN116490831B CN202080107188.3A CN202080107188A CN116490831B CN 116490831 B CN116490831 B CN 116490831B CN 202080107188 A CN202080107188 A CN 202080107188A CN 116490831 B CN116490831 B CN 116490831B
- Authority
- CN
- China
- Prior art keywords
- processing
- objects
- work
- information
- types
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Program-control systems
- G05B19/02—Program-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
- G06F30/27—Design optimisation, verification or simulation using machine learning, e.g. artificial intelligence, neural networks, support vector machines [SVM] or training a model
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32252—Scheduling production, machining, job shop
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32256—Due dates, pieces must be ready, priority of dates, deadline
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32263—Afo products, their components to be manufactured, lot selective
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/06—Multi-objective optimisation, e.g. Pareto optimisation using simulated annealing [SA], ant colony algorithms or genetic algorithms [GA]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Artificial Intelligence (AREA)
- Medical Informatics (AREA)
- Software Systems (AREA)
- Computer Hardware Design (AREA)
- Geometry (AREA)
- Automation & Control Theory (AREA)
- Quality & Reliability (AREA)
- Manufacturing & Machinery (AREA)
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/JP2020/048768 WO2022137513A1 (ja) | 2020-12-25 | 2020-12-25 | 情報処理装置、特定方法、および特定プログラム |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN116490831A CN116490831A (zh) | 2023-07-25 |
| CN116490831B true CN116490831B (zh) | 2025-10-17 |
Family
ID=82157440
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202080107188.3A Active CN116490831B (zh) | 2020-12-25 | 2020-12-25 | 信息处理装置、确定方法、以及存储有确定程序的非暂态计算机可读记录介质 |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US20240095428A1 (https=) |
| EP (1) | EP4270125A4 (https=) |
| JP (1) | JP7368785B2 (https=) |
| CN (1) | CN116490831B (https=) |
| WO (1) | WO2022137513A1 (https=) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP4557190A4 (en) * | 2022-07-13 | 2025-08-06 | Fujitsu Ltd | PLANNING PROGRAM, PLANNING METHOD AND INFORMATION PROCESSING DEVICE |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109074053A (zh) * | 2016-04-26 | 2018-12-21 | 富士通株式会社 | 产品投入计划制定装置、产品投入计划制定方法以及产品投入计划制定程序 |
| CN111291995A (zh) * | 2020-02-14 | 2020-06-16 | 广东省智能制造研究所 | 一种基于moea的生产线设备资源优化配置方法及装置 |
Family Cites Families (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH11282923A (ja) * | 1998-03-31 | 1999-10-15 | Mitsubishi Electric Corp | 循環型製造プロセス日程計画方法 |
| JP2002182732A (ja) * | 2000-12-19 | 2002-06-26 | Toyota Motor Corp | 製造原価見積りシステム |
| WO2003104113A2 (en) * | 2002-06-07 | 2003-12-18 | Sankyo Seiki Mfg. Co., Ltd. | Production lines utilizing auto guided pallet and production line design support system |
| JP4196764B2 (ja) * | 2003-08-05 | 2008-12-17 | 株式会社豊田中央研究所 | 原因・経路推定方法および原因推定装置 |
| JP4181522B2 (ja) | 2004-04-12 | 2008-11-19 | 沖電気工業株式会社 | 製造工程管理方法 |
| JP2006160487A (ja) * | 2004-12-09 | 2006-06-22 | Matsushita Electric Ind Co Ltd | 搬送順序管理方法、搬送装置、生産ライン、及びシミュレーション装置 |
| JP5688864B2 (ja) * | 2013-09-03 | 2015-03-25 | 株式会社レクサー・リサーチ | 生産システムシミュレーション装置、生産システムシミュレーション方法及び生産システムシミュレーションプログラム |
| JP6317910B2 (ja) | 2013-10-28 | 2018-04-25 | 株式会社日立製作所 | 部品設備割付装置、部品設備割付方法、及びプログラム |
| JP6086102B2 (ja) * | 2014-07-25 | 2017-03-01 | Jfeスチール株式会社 | 鉄鋼製品の生産計画方法およびプログラム |
| EP3451093B1 (en) * | 2016-04-26 | 2019-10-09 | Fujitsu Limited | Work assistance device, work assistance method, and work assistance program |
| JP6982741B2 (ja) | 2016-11-30 | 2021-12-17 | パナソニックIpマネジメント株式会社 | 設備構成作成支援システムおよび設備構成作成支援方法 |
| CN108460463B (zh) * | 2018-03-20 | 2020-09-01 | 合肥工业大学 | 基于改进遗传算法的高端装备流水线生产调度方法 |
| JP7066589B2 (ja) * | 2018-05-28 | 2022-05-13 | 株式会社神戸製鋼所 | シミュレーション装置、シミュレーション方法及びシミュレーションプログラム |
| JP6962900B2 (ja) * | 2018-12-03 | 2021-11-05 | ファナック株式会社 | 生産計画装置 |
-
2020
- 2020-12-25 JP JP2022570955A patent/JP7368785B2/ja active Active
- 2020-12-25 EP EP20966999.3A patent/EP4270125A4/en active Pending
- 2020-12-25 CN CN202080107188.3A patent/CN116490831B/zh active Active
- 2020-12-25 WO PCT/JP2020/048768 patent/WO2022137513A1/ja not_active Ceased
-
2023
- 2023-04-27 US US18/307,844 patent/US20240095428A1/en active Pending
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109074053A (zh) * | 2016-04-26 | 2018-12-21 | 富士通株式会社 | 产品投入计划制定装置、产品投入计划制定方法以及产品投入计划制定程序 |
| CN111291995A (zh) * | 2020-02-14 | 2020-06-16 | 广东省智能制造研究所 | 一种基于moea的生产线设备资源优化配置方法及装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN116490831A (zh) | 2023-07-25 |
| WO2022137513A1 (ja) | 2022-06-30 |
| JP7368785B2 (ja) | 2023-10-25 |
| EP4270125A4 (en) | 2024-02-21 |
| EP4270125A1 (en) | 2023-11-01 |
| US20240095428A1 (en) | 2024-03-21 |
| JPWO2022137513A1 (https=) | 2022-06-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110766269A (zh) | 一种任务分配方法、装置、可读存储介质及终端设备 | |
| US11321722B2 (en) | Assortment optimization using incremental swapping with demand transference | |
| CN109800936B (zh) | 基于树状搜寻的调度方法与使用该方法的电子装置 | |
| CN113468157B (zh) | 一种基于能耗分析的相似建筑挑选方法和装置 | |
| CN108959783A (zh) | 一种智能车间的布局仿真优化方法及装置 | |
| CN116490831B (zh) | 信息处理装置、确定方法、以及存储有确定程序的非暂态计算机可读记录介质 | |
| CN111080126A (zh) | 任务分配方法和装置 | |
| CN115658271B (zh) | 一种基于目标任务列表获取目标任务对象的方法 | |
| CN110087228A (zh) | 一种业务套餐的确定方法及装置 | |
| CN112085644B (zh) | 多列数据排序方法、装置、可读存储介质和电子设备 | |
| CN110084634A (zh) | 广告投放优化方法、装置、计算机设备及存储介质 | |
| CN1802657A (zh) | 自动规划试验的方法和系统 | |
| CN109783513B (zh) | 数据处理方法、装置、服务器和计算机可读存储介质 | |
| CN104866697A (zh) | 一种生产线工序编排及平衡控制方法 | |
| CN116802575A (zh) | 作业计划制定方法、作业计划制定程序、以及信息处理装置 | |
| JP2017021764A (ja) | シミュレーション装置 | |
| CN110705839B (zh) | 建筑材料信息处理和优化方法、系统及计算机可读存储介质 | |
| CN113053476A (zh) | 一种提升平面材料切割时利用率的方法和系统 | |
| US20250225458A1 (en) | Production scheduling method and production management system | |
| CN116910345B (zh) | 一种标签推荐方法、装置、设备及存储介质 | |
| CN116976637A (zh) | 变压器硅钢卷裁剪方法、装置、终端及存储介质 | |
| CN103389946B (zh) | 去碎片化方法及系统 | |
| WO2022013921A1 (ja) | 作業計画特定プログラム、作業計画特定方法、および情報処理装置 | |
| CN111507527B (zh) | 考虑原材料多样性及不确定性的家具下料排版优化方法 | |
| CN121210147B (zh) | 矩阵计算优化方法、装置、电子设备和存储介质 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |