WO2021053712A1 - 工事用エレベーター - Google Patents

工事用エレベーター Download PDF

Info

Publication number
WO2021053712A1
WO2021053712A1 PCT/JP2019/036346 JP2019036346W WO2021053712A1 WO 2021053712 A1 WO2021053712 A1 WO 2021053712A1 JP 2019036346 W JP2019036346 W JP 2019036346W WO 2021053712 A1 WO2021053712 A1 WO 2021053712A1
Authority
WO
WIPO (PCT)
Prior art keywords
machine room
room unit
emergency stop
stop device
guide rail
Prior art date
Application number
PCT/JP2019/036346
Other languages
English (en)
French (fr)
Inventor
悠人 樋野
章智 五十嵐
萩原 高行
Original Assignee
株式会社日立製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社日立製作所 filed Critical 株式会社日立製作所
Priority to JP2021546074A priority Critical patent/JP7340025B2/ja
Priority to PCT/JP2019/036346 priority patent/WO2021053712A1/ja
Priority to CN201980099855.5A priority patent/CN114364627B/zh
Publication of WO2021053712A1 publication Critical patent/WO2021053712A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B5/00Applications of checking, fault-correcting, or safety devices in elevators
    • B66B5/02Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B9/00Kinds or types of lifts in, or associated with, buildings or other structures
    • B66B9/16Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure
    • B66B9/187Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure with a liftway specially adapted for temporary connection to a building or other structure

Definitions

  • the present invention relates to a construction elevator.
  • construction elevators have been proposed as elevators for transporting materials and workers when constructing building structures.
  • This construction elevator expands the range in which the car can be raised and lowered by raising the machine room unit having a hoisting machine, a control panel, and the like according to the progress of construction of the building structure.
  • the construction elevator is provided with an emergency stop device for stopping the ascending / descending movement of the machine room unit in an emergency in order to prevent the machine room unit from falling (see, for example, Patent Document 1). ..
  • the brake element of the emergency stop device that sandwiches the guide rail and stops the ascending / descending movement of the machine room unit is always in contact with the guide rail. Therefore, when the machine room unit is moved up and down, the brake element may rub the guide rail and the guide rail may be damaged.
  • the purpose of this purpose is to provide a construction elevator that can easily install the machine room unit without damaging the guide rail in consideration of the above problems.
  • the construction elevator is provided with a guide rail erected on the hoistway of the building structure, a machine room unit, a car, and a lifting machine.
  • the machine room unit is supported by a guide rail so as to be able to move up and down, and has a frame on which a hoist is mounted.
  • the car is supported by a guide rail so as to be able to move up and down, and is connected to a rope wound around a hoist.
  • the lifting machine moves the machine room unit up and down.
  • the machine room unit is provided on the frame body and has an emergency stop device for stopping the ascending / descending movement of the machine room unit. It has a speed detection device that operates the device.
  • the emergency stop device has a brake that faces the guide rail with a gap in the normal state when the emergency stop device is not operating and comes into contact with the guide rail when the emergency stop device is operated.
  • the installation work of the machine room unit can be easily performed without damaging the guide rail.
  • FIG. 1 is a schematic configuration diagram showing a construction elevator of this example.
  • the elevator shown in Fig. 1 is a construction elevator used to transport materials and workers when constructing a building structure.
  • the construction elevator 1 includes a guide rail 2 erected along the hoistway 201 of the building structure 200, a machine room unit 3, a car 4 on which workers and materials are placed, and the like.
  • a support member 5 and a lifting machine 6 for lifting the machine room unit 3 are provided.
  • the car 4 and the machine room unit 3 move up and down along the guide rail 2.
  • the direction in which the car 4 and the machine room unit 3 move up and down is referred to as the vertical direction.
  • a support recess 202 is formed on the wall surface 201a of the hoistway 201 to support the support member 5 and the machine room unit 3.
  • the machine room unit 3 has a frame body 10, a hoisting machine 11, a fixing mechanism 15, a guide portion 16, an emergency stop device 20, and a speed detection device 21. Inside the frame body 10, a drive device for moving the car 4 up and down, such as a hoisting machine 11 and a control panel (not shown) for controlling the drive of the hoisting machine 11, is placed.
  • the frame body 10 is provided with a guide portion 16.
  • the guide portion 16 is a slider that slidably engages with the guide rail 2. Then, the frame body 10 is supported by the guide rail 2 so as to be able to move up and down via the guide portion 16.
  • a fixing mechanism 15 and two emergency stopping devices 20 and 20 are arranged at the lower part of the frame body 10 in the vertical direction.
  • a speed detection device 21 is arranged above the frame 10 in the vertical direction. The speed detection device 21 detects the ascending / descending speed of the frame body 10, and when the descending speed of the frame body 10 reaches a predetermined speed, the emergency stop device 20 is operated via the pulling rod 22.
  • the two emergency stop devices 20 and 20 are arranged at positions facing the guide rail 2 at the lower part of the frame body 10. Further, the two emergency stop devices 20 and 20 are connected via a link member (not shown). Then, the two emergency stop devices 20 and 20 are operated in conjunction with each other by a link member (not shown). When the emergency stop device 20 operates, it sandwiches the guide rail 2 and makes an emergency stop of the ascending / descending movement of the frame body 10. The detailed configuration of the emergency stop device 20 and the speed detection device 21 will be described later.
  • the fixing mechanism 15 is configured to be expandable and contractible from the frame body 10 toward the wall surface 201a of the hoistway 201.
  • the fixing mechanism 15 is inserted into the support recess 202 formed in the hoistway 201. Then, the fixing mechanism 15 supports the machine room unit 3 at a predetermined position on the hoistway 201.
  • the fixing mechanism 15 is not limited to the above-mentioned one, and various other types such as an engaging member that engages with the guide rail 2 and the wall surface 201a of the hoistway 201, a fastening member that fastens and fixes to the wall surface 201a, and the like.
  • a fixing mechanism may be applied.
  • the hoisting machine 11 is installed in the frame body 10.
  • a rope 13 is wound around the sheave of the hoisting machine 11, and both ends thereof hang down downward in the vertical direction of the frame body 10.
  • a car 4 is connected to one end of the rope 13, and a balance weight (not shown) is connected to the other end of the rope 13.
  • the car 4 is arranged below the machine room unit 3 in the vertical direction.
  • the car 4 is provided with a car-side guide portion 26 that is slidably engaged with the guide rail 2.
  • the car 4 moves up and down along the guide rail 2 via the car side guide portion 26.
  • a support member 5 is arranged above the machine room unit 3 in the vertical direction.
  • the support member 5 supports the machine room unit 3 via the lifting machine 6.
  • Movable support portions 25 are provided at both ends of the support member 5.
  • the movable support portion 25 is configured to be expandable and contractible.
  • the support member 5 is conveyed to a predetermined position in the hoistway 201 by a crane or a worker. Then, the support member 5 is installed in the hoistway 201 by inserting the movable support portion 25 into the support recess 202.
  • the configuration in which the support member 5 is installed in the hoistway 201 is not limited to the above-mentioned example. Similar to the fixing mechanism 15 of the machine room unit 3, the support member 5 includes various other configurations such as an engaging member that engages with the guide rail 2 and the wall surface 201a of the hoistway 201, and a fastening member that is fastened and fixed to the wall surface 201a. May be applied.
  • the lifting machine 6 is installed above the frame body 10 of the machine room unit 3 in the vertical direction.
  • the lifting rope 6a of the lifting machine 6 is connected to the support member 5. Then, when the lifting machine 6 is driven, the frame body 10 of the machine room unit 3 moves up and down along the guide rail 2.
  • the lifting machine 6 may be installed on the support member 5, and the lifting rope 6a may be connected to the frame body 10 of the machine room unit 3.
  • FIG. 2 is a front view showing the speed detection device 21.
  • the speed detection device 21 includes a support base 31 mounted on the upper portion of the frame body 10, a frame 32, a rotating body 33, two pendulums 34 and 35, and an operating mechanism 36. Have.
  • the frame 32 is placed on the support base 31 and fixed to the support base 31 via a fixing member (not shown).
  • the frame 32 is provided with a rotating shaft 41.
  • a rotating body 33 is rotatably supported on the rotating shaft 41.
  • the rotating body 33 is rotatably supported by the frame 32, and its outer peripheral surface is in contact with the guide rail 2. Therefore, when the frame body 10 moves up and down, the rotating body 33 rotates about the rotating shaft 41.
  • Two pendulum shafts 42 and 43 are fixed to the rotating body 33.
  • the first pendulum shaft 42 and the second pendulum shaft 43 are arranged at positions facing each other with the rotation shaft 41 in between.
  • the first pendulum 34 is rotatably supported on the first pendulum shaft 42.
  • a second pendulum 35 is rotatably supported on the second pendulum shaft 43.
  • the first pendulum 34 and the second pendulum 35 are formed in a substantially arc shape.
  • the pendulum shafts 42 and 43 penetrate the positions deviated from the center of gravity of the pendulums 34 and 35.
  • the first pendulum 34 has one end 34a and the other end 34b with the first pendulum shaft 42 as a boundary.
  • the one end 34a is set to be heavier than the other end 34b.
  • the second pendulum 35 has one end 35a and the other end 35b with the second pendulum shaft 43 as a boundary.
  • the one end 35a is set to be heavier than the other end 35b.
  • the pendulums 34 and 35 rotate around the pendulum shafts 42 and 43 due to centrifugal force. Then, the one end portions 34a, 35a of the pendulums 34, 35 are displaced in the direction away from the rotating shaft 41, that is, outward in the radial direction of the rotating body 33. Further, the other ends 34b and 35b of the pendulums 34 and 35 are displaced in a direction approaching the rotation shaft 41. Further, the first pendulum 34 and the second pendulum 35 are connected by a connecting member 44. Therefore, the displacement amount (rotation amount) when the centrifugal force of the first pendulum 34 is applied and the displacement amount when the centrifugal force of the second pendulum 35 is applied are the same.
  • the equilibrium spring 45 creates a resistance force against the displacement of the other end 34b of the second pendulum 35 in the direction approaching the rotation shaft 41. That is, when the centrifugal force acting on the pendulums 34 and 35 exceeds the resistance force of the equilibrium spring 45, the equilibrium spring 45 elastically deforms (compresses) and the pendulums 34 and 35 rotate around the pendulum shafts 42 and 43. To do.
  • the operating mechanism 36 has a hook member 51, an operating arm 52, and an urging member 54.
  • the hook member 51 is rotatably supported by a hook rotation shaft 53 provided on the frame 32.
  • a locking portion 51a is formed at one end of the hook member 51.
  • the other end 51b of the hook member 51 is inserted inside the rotating body in the radial direction. Then, when the pendulums 34 and 35 rotate around the pendulum shafts 42 and 43 due to centrifugal force and the one ends 34a and 35a of the pendulums 34 and 35 are displaced outward in the radial direction of the rotating body 33, the pendulums 34 and 35 One ends 34a and 35a of the hook member 51 come into contact with the other end 51b of the hook member 51.
  • One end of the operating arm 52 in the longitudinal direction is provided on the support base 31 and is rotatably supported by the support portion 31a via the rotation shaft 55.
  • the other end of the operating arm 52 in the longitudinal direction is connected to the pulling rod 22 by the connecting portion 57.
  • a locking pin 56 is provided at an intermediate portion in the longitudinal direction of the operating arm 52.
  • the locking portion 51a of the hook member 51 is unlockably locked to the locking pin 56. When the locking portion 51a is locked to the locking pin 56, the rotational operation of the operating arm 52 is restricted.
  • the urging member 54 is interposed between the support base 31 and the operating arm 52 in a compressed state.
  • the urging member 54 is urged in a direction in which the other end of the operating arm 52 rotates upward in the vertical direction.
  • a compression coil spring is applied as the urging member 54.
  • the urging member 54 is not limited to the compression coil spring, and other members having various elasticity such as rubber and leaf springs may be applied.
  • the operating arm 52 is urged upward by the urging member 54 in the vertical direction. Then, the operating arm 52 rotates about the rotation shaft 55, and the other end of the operating arm 52 faces upward in the vertical direction. As a result, the pulling rod 22 connected to the operating arm 52 via the connecting portion 57 is pulled upward in the vertical direction.
  • the configurations of the speed detection device 21 and the operating mechanism 36 are not limited to those described above, and various other configurations such as providing two equilibrium springs and providing a ratchet mechanism can be applied.
  • FIG. 3 is a schematic configuration diagram showing an emergency stop device 20.
  • the emergency stop device 20 has a housing 71, a pair of brakes 72 and 72, a pair of rollers 73, and a pair of guide members 74 and 74.
  • a pair of brakes 72, 72, a pair of rollers 73, and a pair of guide members 74 are arranged in the housing 71.
  • the pair of guide members 74, 74 are supported by the housing 71 and are arranged at positions facing each other with the guide rail 2 in between. The distance between the pair of guide members 74, 74 is maintained at a constant distance by the housing 71.
  • An inclined surface portion 74a is formed on the guide member 74.
  • the inclined surface portion 74a is formed on the surfaces of the pair of guide members 74 facing each other.
  • the inclined surface portion 74a is inclined so as to continuously approach the guide rail 2 as it goes upward in the vertical direction. Therefore, the distance between the inclined surface portions 74a of the pair of guide members 74, 74 becomes narrower toward the upper side in the vertical direction.
  • a roller 73 is arranged on the inclined surface portion 74a.
  • the roller 73 guides the pair of brakes 72, 72 so as to be movable along the vertical direction.
  • the pair of brakes 72, 72 are supported by holding members (not shown) so as to be movable in directions that approach and separate from each other. Further, the brake element 72 is formed in a wedge shape.
  • the pair of brakes 72, 72 are arranged between the guide rail 2, the roller 73, and the guide member 74. Further, in the normal state in which the emergency stop device 20 shown in FIG. 3 is not operating, the pair of brakes 72 are arranged below the guide member 74 in the vertical direction due to their own weight. At this time, the brake element 72 is arranged with a gap S1 between the brake element 72 and the guide rail 2.
  • the pulling rod 22 (see FIGS. 2 and 3) is connected to the pair of brakes 72 and 72. Then, when the pulling rod 22 is pulled upward in the vertical direction, the pair of brakes 72, 72 move upward along the roller 73 together with the pulling rod 22.
  • the present invention is not limited to this, and the brake element 72 may be formed in a spherical shape.
  • the shape of the braker 72 is preferably wedge-shaped rather than spherical in order to increase the contact area with the guide rail 2 during operation.
  • an urging member that holds the pair of guide members 74, 74 at regular intervals may be provided, and the configuration of the emergency stop device 20 is not limited to that described above.
  • Example of installation operation of machine room unit Next, according to the progress of construction of the building structure 200, in order to widen the range in which the car 2 can be raised and lowered, the machine room unit 3 is raised and the hoistway 201 is arbitrarily set. An example of installation at the position of will be described with reference to FIGS. 4 to 6. 4 to 6 are explanatory views showing the installation operation of the machine room unit 3.
  • the machine room unit 3 is lifted by the lifting machine 6.
  • the load applied to the fixing mechanism 15 is eliminated.
  • the fixing mechanism 15 is contracted, and the fixing mechanism 15 is pulled out from the support recess 202A.
  • the lifting machine 6 raises the machine room unit 3 to a predetermined position.
  • the pair of brakes 72, 72 of the emergency stop device 20 are not in contact with the guide rail 2.
  • the brake element 72 it is possible to prevent the brake element 72 from rubbing against the guide rail 2 and damaging the guide rail 2.
  • the rotating body 33 (see FIG. 2) of the speed detection device 21 rotates.
  • the centrifugal force acting on the pendulums 34 and 35 rises at a speed that does not exceed the resistance force of the equilibrium spring 45. Therefore, the emergency stop device 20 does not operate due to the operating mechanism 36 of the speed detection device 21.
  • the downward speed of the machine room unit 3 is a speed at which the centrifugal force acting on the pendulums 34 and 35 does not exceed the resistance force of the equilibrium spring 45, and the pair of braking of the emergency stop device 20.
  • the children 72 and 72 are not in contact with the guide rail 2. Therefore, when the machine room unit 3 moves downward, the emergency stop device 20 does not operate unintentionally.
  • the fixing mechanism 15 can be smoothly placed in the support recess 202B, and the installation work of the machine room unit 3 can be easily performed. Further, the machine room unit 3 can be immediately moved up and down without returning the emergency stop device 20.
  • a speed governor that detects the speed of the car is installed at the top of the hoistway, and a speed control rope that is connected to the car is wound around the pulley of the speed governor.
  • the speed detection device 21 that detects the speed of the machine room unit 3 is installed in the frame body 10 that moves up and down. This eliminates the need for a speed governor rope, pulley, etc., and can reduce the number of parts. Further, since the machine room unit 3 does not have the speed control rope, even if the machine room unit 3 moves up and down and the position in the hoistway 201 changes, the work of adjusting the length, tension, etc. of the speed control rope becomes unnecessary. The installation work of the machine room unit 3 can be easily performed.
  • FIG. 7 is a diagram showing a state in which the speed detection device 21 is operating
  • FIG. 8 is a diagram showing a state in which the emergency stop device 20 is operating.
  • the rotation speed of the rotating body 33 of the speed detection device 21 increases. .. Then, the pendulums 34 and 35 rotate around the pendulum shafts 42 and 43 due to the centrifugal force, and the one ends 34a and 35a of the pendulums 34 and 35 resist the resistance force of the equilibrium spring 45 and the rotating body 33. Displace outward in the radial direction. Therefore, as shown in FIG. 7, one ends 34a and 35a of the pendulums 34 and 35 come into contact with the other end 51b of the hook member 51.
  • the hook member 51 rotates about the hook rotation shaft 53, and the locking pin 56 and the locking portion 51a are released from locking.
  • the operating arm 52 rotates about the rotation shaft 55 by the urging force of the urging member 54, and the other end of the operating arm 52 faces upward in the vertical direction.
  • the pulling rod 22 connected to the operating arm 52 via the connecting portion 57 is pulled upward in the vertical direction.
  • a pair of brakes 72, 72 connected to the pulling rod 22 moves upward in the vertical direction along the roller 73 and the guide member 74. Moving. Further, the pair of brakes 72, 72 move in the direction approaching the guide rail 2 by moving upward in the vertical direction, and come into contact with the guide rail 2. As a result, the pair of brakes 72, 72 sandwich the guide rail 2, and the downward movement of the machine room unit 3 is mechanically stopped. As a result, the machine room unit 3 can be prevented from falling, and the safety of the construction elevator 1 can be enhanced.
  • FIG. 9 is a plan view showing a guide portion and a speed detection device of the construction elevator according to the second embodiment.
  • the construction elevator according to the second embodiment is different from the construction elevator 1 according to the first embodiment in that the guide portion is configured and the rotating body 33 of the speed detection device 21 is rotated. It is a composition. Therefore, here, the same reference numerals are given to the parts common to the construction elevator 1 according to the first embodiment, and duplicate description will be omitted.
  • a guide portion 80 and a speed detection device 21 are arranged on the upper portion of the frame body 10.
  • the guide portion 80 has a rotation support portion 82 and three guide rollers 84A, 84B, and 84C rotatably supported by the rotation support portion 82.
  • the second guide roller 84B and the third guide roller 84C are arranged so as to face each other with the guide rail 2 sandwiched between them. Further, the first guide roller 84A is arranged between the second guide roller 84B and the third guide roller 84C so as to face the guide rail 2. The three guide rollers 84A, 84B, and 84C are in contact with the guide rail 2. Then, the three guide rollers 84A, 84B, and 84C rotate as the frame body 10 of the machine room unit 3 moves up and down.
  • first guide roller 84A and the rotating body 33 of the speed detection device 21 are connected by a synchronization shaft 85. Then, the rotational force of the first guide roller 84A is transmitted to the rotating body 33 of the speed detection device 21 by the synchronous shaft 85. Therefore, when the frame body 10 moves up and down and the first guide roller 84A rotates, the rotating body 33 of the speed detection device 21 also rotates. Thereby, the ascending / descending speed of the frame body 10 can be detected.
  • the rotating speed of the rotating body 33 of the speed detecting device 21 increases.
  • the operating mechanism 36 (see FIG. 7) of the speed detection device 21 operates.
  • the pulling rod 22 is pulled upward in the vertical direction by the operating arm 52 of the speed detection device 21, and the emergency stop device 20 is operated.
  • a construction elevator having such a configuration can also obtain the same effects as the construction elevator 1 according to the first embodiment described above.
  • the synchronous shaft 85 may be provided with an adjusting mechanism for adjusting the rotation speed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Transportation (AREA)
  • Automation & Control Theory (AREA)
  • Maintenance And Inspection Apparatuses For Elevators (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

工事用エレベーターは、ガイドレールと、機械室ユニットと、乗りかごと、揚重機と、を備えている。機械室ユニットは、巻上機が載置された枠体を有する。機械室ユニットは、機械室ユニットの昇降移動を停止させる非常止め装置と、枠体に設けられ、機械室ユニットの昇降速度が所定の速度以上に達した際に、非常止め装置を作動させる速度検出装置と、を有している。そして、非常止め装置は、非常止め装置が作動していない通常状態ではガイドレールと隙間を空けて対向し、作動時にガイドレールに接触する制動子を有する。

Description

工事用エレベーター
 本発明は、工事用エレベーターに関するものである。
 近年、建築構造物を建設する際に資材や作業員を運搬するためのエレベーターとして工事用エレベーターが提案されている。この工事用エレベーターは、建築構造物の建設の進捗状況に応じて、巻上機や制御盤等を有する機械室ユニットを上昇させることで、乗りかごが昇降する範囲を拡大させている。
 また、工事用エレベーターには、安全装置として、機械室ユニットの落下を防止するために、非常時に機械室ユニットの昇降移動を停止させる非常止め装置が設けられている(例えば、特許文献1参照)。
国際公開第2012/072860号
 しかしながら、特許文献1に開示された技術では、ガイドレールを挟持して機械室ユニットの昇降移動を停止させる非常止め装置の制動子が常にガイドレールに接触していた。そのため、機械室ユニットを昇降移動させる際に、制動子がガイドレールを擦り、ガイドレールに傷がつくおそれがあった。
 さらに、機械室ユニットを昇降路の所定の位置に設置する際は、一度機械室ユニットを所定の位置よりも上方に上昇させ、その後、機械室ユニットを下降させて所定の位置に設置している。そのため、特許文献1に開示された技術では、機械室ユニットを下降させる際に、非常止め装置が作動するため、再度機械室ユニットを昇降移動させる際には、非常止め装置の作動を解除する必要があった。その結果、特許文献1に開示された技術では、機械室ユニットを昇降移動させて所定の位置に設置する作業が大変煩雑なものとなっていた。
 本目的は、上記の問題点を考慮し、ガイドレールを傷つけることなく、機械室ユニットの設置作業を容易に行うことができる工事用エレベーターを提供することにある。
 上記課題を解決し、目的を達成するため、工事用エレベーターは、建築構造物の昇降路に立設されたガイドレールと、機械室ユニットと、乗りかごと、揚重機と、を備えている。
 機械室ユニットは、ガイドレールに昇降可能に支持され、巻上機が載置された枠体を有する。乗りかごは、ガイドレールに昇降可能に支持され、巻上機に巻き掛けられたロープに接続される。揚重機は、機械室ユニットを昇降移動させる。
 機械室ユニットは、枠体に設けられ、機械室ユニットの昇降移動を停止させる非常止め装置と、枠体に設けられ、機械室ユニットの昇降速度が所定の速度以上に達した際に、非常止め装置を作動させる速度検出装置と、を有している。そして、非常止め装置は、非常止め装置が作動していない通常状態ではガイドレールと隙間を空けて対向し、作動時にガイドレールに接触する制動子を有する。
 上記構成の工事用エレベーターによれば、ガイドレールを傷つけることなく、機械室ユニットの設置作業を容易に行うことができる。
第1の実施の形態例にかかる工事用エレベーターを示す概略構成図である。 第1の実施の形態例にかかる工事用エレベーターの速度検出装置を示す正面図である。 第1の実施の形態例にかかる工事用エレベーターの非常止め装置を示す概略構成図である。 第1の実施の形態例にかかる工事用エレベーターの機械室ユニットの設置動作を示す説明図である。 第1の実施の形態例にかかる工事用エレベーターの機械室ユニットの設置動作を示す説明図である。 第1の実施の形態例にかかる工事用エレベーターの機械室ユニットの設置動作を示す説明図である。 第1の実施の形態例にかかる工事用エレベーターの速度検出装置が作動した状態を示す正面図である。 第1の実施の形態例にかかる工事用エレベーターの非常止め装置が作動した状態を示す概略構成図である。 第2の実施の形態例にかかる工事用エレベーターの速度検出装置及びガイド部を示す概略構成図である。
 以下、実施の形態例にかかる工事用エレベーターについて、図1~図9を参照して説明する。なお、各図において共通の部材には、同一の符号を付している。
1.第1の実施の形態例
1-1.工事用エレベーターの構成例
 まず、第1の実施の形態例(以下、「本例」という。)にかかる工事用エレベーターの構成について、図1を参照して説明する。
 図1は、本例の工事用エレベーターを示す概略構成図である。
 図1に示すエレベーターは、建築構造物を建設する際に資材や作業員を運搬するために用いられる工事用エレベーターである。図1に示すように、工事用エレベーター1は、建築構造物200の昇降路201に沿って立設されたガイドレール2と、機械室ユニット3と、作業員や資材を載せる乗りかご4と、支持部材5と、機械室ユニット3を揚重する揚重機6とを備えている。乗りかご4及び機械室ユニット3は、ガイドレール2に沿って昇降移動する。以下、乗りかご4及び機械室ユニット3が昇降移動する方向を上下方向とする。また、昇降路201の壁面201aには、支持部材5や機械室ユニット3を支持するために支持凹部202が形成されている。
 機械室ユニット3は、枠体10と、巻上機11と、固定機構15と、ガイド部16と、非常止め装置20と、速度検出装置21とを有している。枠体10内には、巻上機11や巻上機11の駆動を制御する不図示の制御盤等の乗りかご4を昇降移動させるための駆動機器が載置される。
 枠体10には、ガイド部16が設けられている。ガイド部16は、ガイドレール2に摺動可能に係合するスライダである。そして、枠体10は、ガイド部16を介してガイドレール2に昇降可能に支持される。
 また、枠体10の上下方向の下部には、固定機構15と、2つの非常止め装置20、20が配置されている。枠体10の上下方向の上部には、速度検出装置21が配置されている。速度検出装置21は、枠体10の昇降速度を検知し、枠体10の下降速度が所定速度に達した際に、引き上げ棒22を介して、非常止め装置20を作動させる。
 2つの非常止め装置20、20は、枠体10の下部におけるガイドレール2と対向する位置に配置されている。また、2つの非常止め装置20、20は、不図示のリンク部材を介して連結されている。そして、2つの非常止め装置20、20は、不図示のリンク部材によって連動して作動する。非常止め装置20は、作動した際に、ガイドレール2を挟持し、枠体10の昇降移動を非常停止させる。なお、非常止め装置20及び速度検出装置21の詳細な構成については、後述する。
 固定機構15は、枠体10から昇降路201の壁面201aに向けて伸縮可能に構成されている。固定機構15は、昇降路201に形成された支持凹部202に挿入される。そして、固定機構15は、昇降路201における所定の位置で機械室ユニット3を支持する。なお、固定機構15としては、上述したものに限定されるものではなく、ガイドレール2や昇降路201の壁面201aに係合する係合部材や、壁面201aに締結固定する締結部材等その他各種の固定機構を適用してもよい。
 巻上機11は、枠体10に設置されている。巻上機11の綱車にはロープ13が巻き掛けられ、その両端部は、枠体10の上下方向の下方に垂れ下がっている。ロープ13の一端部には、乗りかご4が接続され、ロープ13の他端部には、不図示の釣合おもりが接続される。
 乗りかご4は、機械室ユニット3よりも上下方向の下方に配置される。乗りかご4には、ガイドレール2に摺動可能に係合するかご側ガイド部26が設けられている。巻上機11が駆動することで、乗りかご4は、かご側ガイド部26を介してガイドレール2に沿って昇降移動する。
 機械室ユニット3の上下方向の上方には、支持部材5が配置されている。支持部材5は、揚重機6を介して機械室ユニット3を支持する。支持部材5の両端部には、可動支持部25が設けられている。可動支持部25は、伸縮可能に構成されている。支持部材5は、クレーンや作業員によって昇降路201における所定の位置に搬送される。そして、支持部材5は、可動支持部25を支持凹部202に挿入することで、昇降路201に設置される。
 支持部材5を昇降路201に設置する構成は、上述した例に限定されるものではない。支持部材5としては、機械室ユニット3の固定機構15と同様に、ガイドレール2や昇降路201の壁面201aに係合する係合部材や、壁面201aに締結固定する締結部材等その他各種の構成を適用してもよい。
 揚重機6は、機械室ユニット3の枠体10の上下方向の上部に設置される。揚重機6の揚重ロープ6aは、支持部材5に接続されている。そして、揚重機6が駆動することで、機械室ユニット3の枠体10は、ガイドレール2に沿って昇降移動する。なお、本例では、揚重機6を機械室ユニット3に設け、揚重ロープ6aを支持部材5に接続した例を説明したが、これに限定されるものではない。例えば、支持部材5に揚重機6を設置し、揚重ロープ6aを機械室ユニット3の枠体10に接続してもよい。
1-2.速度検出装置の構成例
 次に、図2を参照して速度検出装置21の構成について説明する。
 図2は、速度検出装置21を示す正面図である。
 図2に示すように、速度検出装置21は、枠体10の上部に載置される支持台31と、フレーム32と、回転体33と、2つの振り子34、35と、作動機構36とを有している。
 フレーム32は、支持台31に載置されて不図示の固定部材を介して支持台31に固定される。フレーム32には、回転軸41が設けられている。回転軸41には、回転体33が回転可能に支持されている。回転体33は、フレーム32に回転可能に支持されて、その外周面がガイドレール2に当接している。そのため、枠体10が昇降移動すると、回転体33は、回転軸41を中心に回転する。
 回転体33をガイドレール2に直接接触させて回転させることで、回転体33を回転させるための部品が不要となり、部品点数の削減を図ることができる。
 回転体33には、2つの振り子軸42、43が固定されている。第1振り子軸42と第2振り子軸43は、回転軸41を間に挟んで対向する位置に配置されている。
 第1振り子軸42には、第1振り子34が回動可能に支持されている。第2振り子軸43には、第2振り子35が回動可能に支持されている。第1振り子34及び第2振り子35は、略円弧状に形成されている。振り子軸42、43は、振り子34、35の重心からずれた位置を貫通している。
 第1振り子34は、第1振り子軸42を境にした一端部34aと、他端部34bとを有している。そして、一端部34aは、他端部34bよりも重く設定されている。第2振り子35は、第2振り子軸43を境にした一端部35aと、他端部35bとを有している。そして、一端部35aは、他端部35bよりも重く設定されている。
 回転体33が回転すると、遠心力により振り子34、35が振り子軸42、43を中心に回動する。そして、振り子34、35の一端部34a、35aは、回転軸41から離れる方向、すなわち回転体33の半径方向外側に変位する。また、振り子34、35の他端部34b、35bは、回転軸41に接近する方向に変位する。また、第1振り子34と第2振り子35は、連結部材44によって連結されている。そのため、第1振り子34における遠心力が作用した場合の変位量(回動量)と、第2振り子35における遠心力が作用した場合の変位量が同じになる。
 第2振り子35の他端部35bには、平衡ばね45の一端が固定されている。平衡ばね45の他端は、回転体33に固定されている。平衡ばね45は、第2振り子35の他端部34bが回転軸41に接近する方向へ変位することに対して抵抗力を生じさせる。すなわち、振り子34、35に作用する遠心力が平衡ばね45の抵抗力を越えた場合に、平衡ばね45が弾性変形(圧縮)し、振り子34、35が振り子軸42、43を中心に回動する。
 作動機構36は、フック部材51と、作動アーム52と、付勢部材54とを有している。フック部材51は、フレーム32に設けたフック回動軸53に回動可能に支持されている。フック部材51の一端部には、係止部51a形成されている。フック部材51の他端部51bは、回転体の半径方向の内側に挿入されている。そして、遠心力により振り子34、35が振り子軸42、43を中心に回動し、振り子34、35の一端部34a、35aが回転体33の半径方向外側に変位した際に、振り子34、35の一端部34a、35aは、フック部材51の他端部51bに当接する。
 作動アーム52の長手方向の一端部は、支持台31に設けられ支持部31aに回動軸55を介して回動可能に支持されている。作動アーム52の長手方向の他端部は、連結部57により引き上げ棒22に連結されている。また、作動アーム52の長手方向の中間部には、係止ピン56が設けられている。係止ピン56には、フック部材51の係止部51aが解除可能に係止している。係止ピン56に係止部51aが係止しているとき、作動アーム52の回動動作が規制される。
 また、支持台31と作動アーム52の間には、付勢部材54が圧縮された状態で介在されている。付勢部材54は、作動アーム52の他端部が上下方向の上方に回動する向きに付勢している。付勢部材54としては、例えば、圧縮コイルばねが適用されている。なお、付勢部材54は、圧縮コイルばねに限定されるものではなく、ゴムや板ばね等その他各種の弾性を有する部材を適用してもよい。
 係止ピン56と係止部51aの係止が解除されると、作動アーム52は、付勢部材54により上下方向の上方に向けて付勢される。そして、作動アーム52は、回動軸55を中心に回動し、作動アーム52の他端部が上下方向の上方を向く。その結果、作動アーム52に連結部57を介して連結された引き上げ棒22が、上下方向の上方に引き上げられる。
 速度検出装置21や作動機構36の構成は、上述したものに限定されるものではなく、平衡ばねを2つ設けたり、ラチェット機構を設けたりする等その他各種の構成を適用できるものである。
1-3.非常止め装置の構成例
 次に、図3を参照して非常止め装置20の構成について説明する。
 図3は、非常止め装置20を示す概略構成図である。
 図3に示すように、非常止め装置20は、筐体71と、一対の制動子72、72と、一対のローラ73と、一対のガイド部材74、74とを有している。筐体71内には、一対の制動子72、72、一対のローラ73及び一対のガイド部材74が配置されている。一対のガイド部材74、74は、筐体71に支持されて、ガイドレール2を間に挟んで互いに対向する位置に配置されている。一対のガイド部材74、74の間隔は、筐体71により一定の間隔に保持されている。
 ガイド部材74には、傾斜面部74aが形成されている。傾斜面部74aは、一対のガイド部材74における互いに対向する面に形成されている。傾斜面部74aは、上下方向の上方に向かうにつれてガイドレール2に連続して接近するように傾斜している。そのため、一対のガイド部材74、74における傾斜面部74aの間隔は、上下方向の上方に向かうにつれて狭まる。
 傾斜面部74aには、ローラ73が配置されている。ローラ73は、一対の制動子72、72を上下方向に沿って移動可能に案内する。一対の制動子72、72は、不図示の保持部材により互いに接近及び離反する向きに移動可能に支持されている。また、制動子72は、くさび状に形成されている。
 一対の制動子72、72は、ガイドレール2と、ローラ73及びガイド部材74の間に配置される。また、図3に示す非常止め装置20が作動していない通常状態では、一対の制動子72は、その自重によりガイド部材74の上下方向の下部に配置されている。このとき、制動子72は、ガイドレール2との間に隙間S1を空けて配置される。
 また、一対の制動子72、72は、引き上げ棒22(図2及び図3参照)が接続される。そして、引き上げ棒22が上下方向の上方に引き上げられると、一対の制動子72、72は、引き上げ棒22と共にローラ73に沿って上下方向の上方に移動する。
 制動子72をくさび状に形成した例を説明したが、これに限定されるものではなく、制動子72を球状に形成してもよい。なお、制動子72の形状は、作動時にガイドレール2との接触面積を大きくするために、球状よりもくさび状のほうが好ましい。また、一対のガイド部材74、74を一定の間隔で保持する付勢部材を設けてもよく、非常止め装置20の構成は、上述したものに限定されるものではない。
1-4.機械室ユニットの設置動作例
 次に、建築構造物200の建設の進捗状況に応じて、乗りかご2の昇降可能な範囲を広げるために、機械室ユニット3を上昇させて、昇降路201の任意の位置に設置する例について図4から図6を参照して説明する。
 図4から図6は、機械室ユニット3の設置動作を示す説明図である。
 まず、図4に示すように、揚重機6により機械室ユニット3を持ち上げる。これにより、固定機構15に加わる荷重がなくなる。そして、固定機構15を収縮させて、固定機構15を支持凹部202Aから抜き出す。
 次に、揚重機6により機械室ユニット3を所定の位置まで上昇させる。このとき、図3に示すように、非常止め装置20の一対の制動子72、72は、ガイドレール2に接触していない。その結果、機械室ユニット3が昇降移動する際に、制動子72がガイドレール2に擦れて、ガイドレール2に傷がつくことを防止することができる。
 また、機械室ユニット3の上昇移動に伴い、速度検出装置21の回転体33(図2参照)が回転する。機械室ユニット3は、振り子34、35に作用する遠心力が平衡ばね45の抵抗力を越えない速度で上昇する。そのため、速度検出装置21の作動機構36によって非常止め装置20は、作動しない。
 次に、図5に示すように、固定機構15が支持凹部202Aの上方に配置された支持凹部202Bを臨む位置まで機械室ユニット3の枠体10を上昇させると、揚重機6の駆動を停止させる。これにより、機械室ユニット3の上昇移動が停止する。このとき、機械室ユニット3を設置する位置よりも上下方向の上方まで機械室ユニット3を上昇させて、機械室ユニット3を停止させる。そして、固定機構15を伸張させて、固定機構15を支持凹部202Bに挿入させる。
 図6に示すように、固定機構15が支持凹部202Bに挿入されると、揚重機6を駆動させて、機械室ユニット3を下降させる。これにより、固定機構15が支持凹部202Bに載置され、固定機構15により機械室ユニット3の枠体10が任意の位置で支持される。これにより、機械室ユニット3の設置作業が完了し、乗りかご4の昇降可能な範囲が拡大する。
 機械室ユニット3を下降移動させる際、機械室ユニット3の下降速度は、振り子34、35に作用する遠心力が平衡ばね45の抵抗力を越えない速度であり、非常止め装置20の一対の制動子72、72は、ガイドレール2に接触していない。そのため、機械室ユニット3が下降移動する際に、非常止め装置20は、意図に反して作動しない。
 その結果、固定機構15をスムーズに支持凹部202Bに載置させることができ、機械室ユニット3の設置作業を容易に行うことができる。さらに、非常止め装置20の復帰作業を行うことなく、機械室ユニット3を直ぐに昇降移動させることができる。
 また、一般的なエレベーターでは、乗りかごの速度を検出する調速機を昇降路の上部に設置し、調速機のプーリに乗りかごと連結される調速ロープを巻き掛けている。これに対して、本例の工事用エレベーター1では、機械室ユニット3の速度を検出する速度検出装置21を昇降移動する枠体10に設置している。これにより、調速ロープやプーリ等が不要となり部品点数を削減することができる。さらに、調速ロープを有していないため、機械室ユニット3が昇降移動し、昇降路201内での位置が変化しても、調速ロープの長さや張力等を調整する作業が不要となり、機械室ユニット3の設置作業を容易に行うことができる。
1-5.速度検出装置及び非常止め装置の作動
 次に、上述した構成を有する速度検出装置21及び非常止め装置の作動例について図7及び図8を参照して説明する。
 図7は、速度検出装置21が作動した状態を示す図、図8は、非常止め装置20が作動した状態を示す図である。
 揚重機6の異常や揚重ロープ6aが切断される等により機械室ユニット3の下降速度(昇降速度)が所定の速度以上に達すると、速度検出装置21の回転体33の回転速度が上昇する。そして、回遠心力により振り子34、35が振り子軸42、43を中心に回動し、振り子34、35の一端部34a、35aは、平衡ばね45の抵抗力に抗して、回転体33の半径方向外側に変位する。そのため、図7に示すように、振り子34、35の一端部34a、35aは、フック部材51の他端部51bに当接する。
 そして、フック部材51がフック回動軸53を中心に回動し、係止ピン56と係止部51aの係止が解除される。これにより、作動アーム52は、付勢部材54の付勢力により回動軸55を中心に回動し、作動アーム52の他端部が上下方向の上方を向く。その結果、作動アーム52に連結部57を介して連結された引き上げ棒22が、上下方向の上方に引き上げられる。
 引き上げ棒22が上下方向の上方に引き上げられることで、図8に示すように、引き上げ棒22に接続された一対の制動子72、72がローラ73及びガイド部材74に沿って上下方向の上方に移動する。また、一対の制動子72、72は、上下方向の上方に移動することで、ガイドレール2に接近する方向に移動し、ガイドレール2に接触する。これにより、一対の制動子72、72がガイドレール2を挟持し、機械室ユニット3の下降移動が機械的に停止される。その結果、機械室ユニット3の落下を防止することができ、工事用エレベーター1の安全性を高めることができる。
2.第2の実施の形態例
 次に、図9を参照して第2の実施の形態例にかかる工事用エレベーターについて説明する。
 図9は、第2の実施の形態例にかかる工事用エレベーターのガイド部及び速度検出装置を示す平面図である。
 この第2の実施の形態例にかかる工事用エレベーターが、第1の実施の形態例にかかる工事用エレベーター1と異なる点は、ガイド部の構成と、速度検出装置21の回転体33を回転させる構成である。そのため、ここでは、第1の実施の形態例にかかる工事用エレベーター1と共通する部分には、同一の符号を付して重複した説明を省略する。
 図9に示すように、枠体10の上部には、ガイド部80と、速度検出装置21が配置されている。ガイド部80は、回転支持部82と、回転支持部82に回転可能に支持される3つのガイドローラ84A、84B、84Cとを有している。
 第2ガイドローラ84Bと第3ガイドローラ84Cは、ガイドレール2を間に挟んで対向して配置される。また、第1ガイドローラ84Aは、第2ガイドローラ84Bと第3ガイドローラ84Cの間において、ガイドレール2と対向して配置されている。3つのガイドローラ84A、84B、84Cは、ガイドレール2に接触している。そして、機械室ユニット3の枠体10の昇降移動に伴い、3つのガイドローラ84A、84B、84Cは回転する。
 また、第1ガイドローラ84Aと速度検出装置21の回転体33は、同期軸85によって連結されている。そして、第1ガイドローラ84Aの回転力は、同期軸85により速度検出装置21の回転体33に伝達される。そのため、枠体10が昇降移動し、第1ガイドローラ84Aが回転すると、速度検出装置21の回転体33も回転する。これにより、枠体10の昇降速度を検出することができる。
 この第2の実施の形態例にかかる工事用エレベーターにおいても、機械室ユニット3の下降速度(昇降速度)が所定の速度以上に達すると、速度検出装置21の回転体33の回転速度が上昇し、速度検出装置21の作動機構36(図7参照)が作動する。その結果、速度検出装置21の作動アーム52により引き上げ棒22が上下方向の上方に引き上げられて、非常止め装置20が作動する。
 その他の構成は、第1の実施の形態例にかかる工事用エレベーター1と同様であるため、それらの説明は省略する。このような構成を有する工事用エレベーターによっても、上述した第1の実施の形態例にかかる工事用エレベーター1と同様の作用効果を得ることができる。
 また、第2の実施の形態例にかかる工事用エレベーターにおいて、同期軸85に回転数を調整する調整機構を設けてもよい。
 なお、本発明は上述しかつ図面に示した実施の形態に限定されるものではなく、請求の範囲に記載した発明の要旨を逸脱しない範囲内で種々の変形実施が可能である。
 なお、本明細書において、「平行」及び「直交」等の単語を使用したが、これらは厳密な「平行」及び「直交」のみを意味するものではなく、「平行」及び「直交」を含み、さらにその機能を発揮し得る範囲にある、「略平行」や「略直交」の状態であってもよい。
 1…工事用エレベーター、 2…ガイドレール、 3…機械室ユニット、 4…乗りかご、 5…支持部材、 6…揚重機、 6a…揚重ロープ、 10…枠体、 11…巻上機、 13…ロープ、 15…固定機構、 16…ガイド部、 20…非常止め装置、 21…速度検出装置、 22…引き上げ棒、 25…可動支持部、 31…支持台、 31a…支持部、 32…フレーム、 33…回転体、 34、35…振り子、 36…作動機構、 41、42…回転軸、 44…連結部材、 51…フック部材、 51a…係止部、 51b…他端部、 52…作動アーム、 53…フック回動軸、 54…付勢部材、 55…回動軸、 56…係止ピン、 57…連結部、 71…筐体、 72…制動子、 73…ローラ、 74…ガイド部材、 74a…傾斜面部、 80…ガイド部、 82…回転支持部、 84A、84B、84C…ガイドローラ、 85…同期軸、 200…建築構造物、 201…昇降路、 201a…壁面、 202、202A、202B…支持凹部、 S1…隙間

Claims (7)

  1.  建築構造物の昇降路に立設されたガイドレールと、
     前記ガイドレールに昇降可能に支持され、巻上機が載置された枠体を有する機械室ユニットと、
     前記ガイドレールに昇降可能に支持され、前記巻上機に巻き掛けられたロープに接続される乗りかごと、
     前記機械室ユニットを昇降移動させる揚重機と、を備え、
     前記機械室ユニットは、
     前記枠体に設けられ、前記機械室ユニットの昇降移動を停止させる非常止め装置と、
     前記枠体に設けられ、前記機械室ユニットの昇降速度が所定の速度以上に達した際に、前記非常止め装置を作動させる速度検出装置と、を有し、
     前記非常止め装置は、前記非常止め装置が作動していない通常状態では前記ガイドレールと隙間を空けて対向し、作動時に前記ガイドレールに接触する制動子を有する
     工事用エレベーター。
  2.  前記速度検出装置は、
     前記機械室ユニットの昇降移動に伴い回転する回転体と、
     前記回転体に回動可能に取り付けられ、前記回転体が回転した場合に作用する遠心力により回動する振り子と、
     前記振り子が回動した際に前記非常止め装置を作動させる作動機構と、を有する
     請求項1に記載の工事用エレベーター。
  3.  前記速度検出装置は、前記枠体の上下方向の上部に設けられ、
     前記非常止め装置は、前記枠体の上下方向の下部に設けられ、
     前記機械室ユニットは、前記作動機構に連結され、前記非常止め装置の制動子に接続される引き上げ棒を有する
     請求項2に記載の工事用エレベーター。
  4.  前記回転体は、前記ガイドレールに接触して配置される
     請求項2に記載の工事用エレベーター。
  5.  前記機械室ユニットは、
     前記枠体に設けられ、前記ガイドレールに接触するガイドローラと、
     前記ガイドローラと前記回転体を連結し、前記ガイドローラの回転力を前記回転体に伝達する同期軸と、を有する
     請求項2に記載の工事用エレベーター。
  6.  前記制動子は、前記ガイドレールを間に挟んで一対設けられ、
     前記非常止め装置は、一対の前記制動子を移動可能に支持するガイド部と、を有し、
     前記制動子は、くさび状に形成される
     請求項1に記載の工事用エレベーター。
  7.  前記機械室ユニットは、前記枠体を前記昇降路に支持する固定機構を有する
     請求項1に記載の工事用エレベーター。
PCT/JP2019/036346 2019-09-17 2019-09-17 工事用エレベーター WO2021053712A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2021546074A JP7340025B2 (ja) 2019-09-17 2019-09-17 工事用エレベーター
PCT/JP2019/036346 WO2021053712A1 (ja) 2019-09-17 2019-09-17 工事用エレベーター
CN201980099855.5A CN114364627B (zh) 2019-09-17 2019-09-17 施工用升降机

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2019/036346 WO2021053712A1 (ja) 2019-09-17 2019-09-17 工事用エレベーター

Publications (1)

Publication Number Publication Date
WO2021053712A1 true WO2021053712A1 (ja) 2021-03-25

Family

ID=74883056

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/036346 WO2021053712A1 (ja) 2019-09-17 2019-09-17 工事用エレベーター

Country Status (3)

Country Link
JP (1) JP7340025B2 (ja)
CN (1) CN114364627B (ja)
WO (1) WO2021053712A1 (ja)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5366044A (en) * 1992-10-23 1994-11-22 Otis Elevator Company Bidirectional eddy current overspeed protection for elevators
JP2001322778A (ja) * 2000-05-17 2001-11-20 Hitachi Building Systems Co Ltd 工事用エレベータの解体方法および工事用エレベータの本設エレベータへの盛り替え方法
JP2002068634A (ja) * 2000-08-29 2002-03-08 Hitachi Ltd エレベータの非常止め装置
JP2004277108A (ja) * 2003-03-17 2004-10-07 Toshiba Elevator Co Ltd エレベータ用調速装置
JP2015067378A (ja) * 2013-09-27 2015-04-13 株式会社日立製作所 エレベータ装置
JP2018100146A (ja) * 2016-12-19 2018-06-28 東芝エレベータ株式会社 エレベータの非常止め装置および制動子

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2873672B1 (fr) * 2004-07-30 2008-02-01 Xavier Lombard Ensemble elevateur
JP4797786B2 (ja) * 2006-05-15 2011-10-19 株式会社日立製作所 エレベーター用非常止め装置及びエレベーター
CN102992133A (zh) * 2012-12-03 2013-03-27 福建省连江县迅捷技术孵化有限公司 一种施工电梯的防坠系统
CN103848302A (zh) * 2012-12-03 2014-06-11 福建省连江县迅捷技术孵化有限公司 一种在建建筑的施工升降机
JP2014181123A (ja) * 2013-03-21 2014-09-29 Hitachi Ltd エレベータ装置
CN204958051U (zh) * 2015-07-28 2016-01-13 天津京龙工程机械有限公司 一种施工升降机
CN105314503A (zh) * 2015-11-26 2016-02-10 张家港市荣达建筑机械制造有限公司 施工升降机驱动系统与吊笼的连接装置
CN110092264B (zh) * 2019-04-29 2022-04-05 北京天恒建设集团有限公司 一种建筑施工阶段电梯井内的物料提升系统

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5366044A (en) * 1992-10-23 1994-11-22 Otis Elevator Company Bidirectional eddy current overspeed protection for elevators
JP2001322778A (ja) * 2000-05-17 2001-11-20 Hitachi Building Systems Co Ltd 工事用エレベータの解体方法および工事用エレベータの本設エレベータへの盛り替え方法
JP2002068634A (ja) * 2000-08-29 2002-03-08 Hitachi Ltd エレベータの非常止め装置
JP2004277108A (ja) * 2003-03-17 2004-10-07 Toshiba Elevator Co Ltd エレベータ用調速装置
JP2015067378A (ja) * 2013-09-27 2015-04-13 株式会社日立製作所 エレベータ装置
JP2018100146A (ja) * 2016-12-19 2018-06-28 東芝エレベータ株式会社 エレベータの非常止め装置および制動子

Also Published As

Publication number Publication date
CN114364627B (zh) 2023-07-14
CN114364627A (zh) 2022-04-15
JPWO2021053712A1 (ja) 2021-03-25
JP7340025B2 (ja) 2023-09-06

Similar Documents

Publication Publication Date Title
JP2007119131A (ja) エレベータロープ揺れ止め装置
JP6854974B2 (ja) エレベーターの安全装置、及びエレベーターの安全システム
US9388018B2 (en) Supply of rope to an elevator speed limiter
US20080142313A1 (en) Elevator Apparatus
JP2010037060A (ja) エレベータシステム
KR101036020B1 (ko) 산업용 리프트의 추락방지장치
JP5809755B2 (ja) エレベーターの非常止め装置およびエレベーター
EP1454867A1 (en) Elevator
US20180208433A1 (en) Safety block for elevator
US11261056B2 (en) Elevator safety actuator systems
JP4862296B2 (ja) エレベータの検査方法
WO2021053712A1 (ja) 工事用エレベーター
CN110054057B (zh) 电梯装置
JP4391872B2 (ja) 免震建物用エレベーター装置
JP4658067B2 (ja) エレベータ装置
WO2015125288A1 (ja) エレベーター装置
CN108116959B (zh) 调速器和电梯装置
KR101830837B1 (ko) 엘리베이터 조속기 로프 텐션 장치
WO2018179182A1 (ja) エレベータ装置
JP6636409B2 (ja) 調速機及びエレベーター
JP6799021B2 (ja) ガバナテンション機構、ガバナ装置及びエレベーター
CN109720959B (zh) 调速器和电梯
JP6585852B2 (ja) 調速機、および、エレベータ装置
JPH058964A (ja) エレベータ装置
KR102179010B1 (ko) 케이지의 추락방지 장치

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19946062

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2021546074

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19946062

Country of ref document: EP

Kind code of ref document: A1