WO2020119451A1 - 一种轨道列车及列车新风进气融雪装置 - Google Patents

一种轨道列车及列车新风进气融雪装置 Download PDF

Info

Publication number
WO2020119451A1
WO2020119451A1 PCT/CN2019/120993 CN2019120993W WO2020119451A1 WO 2020119451 A1 WO2020119451 A1 WO 2020119451A1 CN 2019120993 W CN2019120993 W CN 2019120993W WO 2020119451 A1 WO2020119451 A1 WO 2020119451A1
Authority
WO
WIPO (PCT)
Prior art keywords
fresh air
air inlet
melting device
grille
air intake
Prior art date
Application number
PCT/CN2019/120993
Other languages
English (en)
French (fr)
Inventor
曹艳华
赵金龙
李长胜
Original Assignee
中车长春轨道客车股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from CN201811503092.XA external-priority patent/CN109353362A/zh
Priority claimed from CN201822067450.9U external-priority patent/CN209191959U/zh
Application filed by 中车长春轨道客车股份有限公司 filed Critical 中车长春轨道客车股份有限公司
Priority to EP19895761.5A priority Critical patent/EP3895953A4/en
Priority to SG11202008048WA priority patent/SG11202008048WA/en
Publication of WO2020119451A1 publication Critical patent/WO2020119451A1/zh

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61DBODY DETAILS OR KINDS OF RAILWAY VEHICLES
    • B61D27/00Heating, cooling, ventilating, or air-conditioning
    • B61D27/0018Air-conditioning means, i.e. combining at least two of the following ways of treating or supplying air, namely heating, cooling or ventilating

Definitions

  • the invention relates to the technical field of rail trains, in particular to a rail train and a fresh air intake snow melting device of the train.
  • the rail train air conditioning system needs to cope with various complex external environmental conditions during operation to meet the comfort requirements of the internal passenger room.
  • snow is likely to accumulate at the air inlet of the air intake of the air conditioning unit, resulting in an increase in the resistance of the fresh air inlet and a decrease in the amount of fresh air, which affects the performance of the air conditioning system and thus affects passenger comfort.
  • the first object of the present invention is to provide a train fresh air intake snow melting device to achieve the purpose of making it able to cope with blizzard weather and low temperature conditions, and ensure that the vehicle can adapt to such low temperature and harsh environmental conditions.
  • the second object of the present invention is to provide a rail train including the above-mentioned train fresh air intake snow melting device.
  • the present invention provides the following technical solutions:
  • a train fresh air intake snow-melting device including an inlet grille, a rainwater separator and a heating device, the rainwater separator is arranged behind the inlet grille, the rainwater separator has a labyrinth inlet for separating rainwater A wind channel and a drain hole for draining rainwater.
  • the rainwater separator is provided with the heating device on a side close to the inlet grille.
  • the rainwater separator includes a row of arch-shaped baffles and at least one row of U-shaped baffles that are sequentially arranged from near to far and staggered relative to the inlet grille, and the arched baffles face The direction of the entrance grille is arched, and the opening of the U-shaped baffle faces the direction of the entrance grille.
  • the drain hole is provided under each U-shaped baffle.
  • the heating device includes an electric heating tube, and the electric heating tubes are arranged on a side of the arched baffle away from the inlet grille in a one-to-one correspondence.
  • the rainwater separator further includes a V-shaped baffle plate, and the V-shaped baffle plate is connected to the arched baffle plate to enclose a volume containing the electric heating tube.
  • the rainwater separator includes a row of first U-shaped baffles and a row of second U-shaped baffles, and the tip of the V-shaped baffle is formed to extend to two adjacent first U-shaped baffles
  • the first U-shaped baffle is formed with a second deflector extending to between two adjacent second U-shaped baffles.
  • a flange extending into the U-shaped baffle is formed on both sides of the opening of the U-shaped baffle, and the distance between the two flanges gradually decreases along the extending direction.
  • it further includes a temperature sensor and a controller, the temperature sensor is disposed at the air inlet of the intake grille, and the controller is used for the temperature at the air inlet of the intake grille to be lower than a preset
  • the heating device is controlled to start when it is on value and the heating device is controlled to be turned off when the temperature at the air inlet of the intake grille is higher than a preset value.
  • it further includes a pressure wave valve plate arranged behind the rainwater separator along the wind inlet direction.
  • a rail train includes the train fresh air intake snow melting device as described in any one of the above.
  • the train fresh air intake snow melting device includes an inlet grille, a rainwater separator and a heating device, wherein the rainwater separator is disposed behind the inlet grille to separate the inlet wind Entrained snow water, the rainwater separator has a labyrinth air inlet channel for separating rainwater, and a drain hole for draining rainwater.
  • the drain hole is usually formed at the bottom of the rainwater separator.
  • the rainwater separator is on the side near the inlet grille.
  • the heating device when snow is formed at the air inlet of the intake grille, the heating device can be turned on to melt the snow, and the labyrinth air inlet channel of the rainwater separator can entrain the snow due to the melting snow.
  • the water is separated and discharged from the drain hole.
  • train fresh air intake snow melting device integrates a heating device on the rainwater separator, takes up little space, does not need to change the existing structure, and can enter the inlet style.
  • the snow at the tuyere melts, eliminating the air intake resistance, ensuring the air intake of the air conditioner, while avoiding the snow water entering the air conditioning system, and ensuring the performance of the train air conditioning system under heavy snow conditions and low temperature conditions.
  • the present invention also provides a rail train, which includes the above-mentioned train fresh air intake and snow melting device. Since the above train fresh air intake and snow melting device has the above technical effect, it has the train fresh air intake The track train of the gas snow melting device should also have corresponding technical effects.
  • FIG. 1 is an isometric view of a fresh air intake snow melting device provided by an embodiment of the present invention
  • FIG. 2 is a top view of a fresh air intake snow melting device provided by an embodiment of the present invention.
  • FIG. 3 is a partially enlarged view at B in FIG. 2.
  • FIG. 1 is an axonometric view of a fresh air intake snow melting device provided by an embodiment of the present invention
  • FIG. 2 is a top view of a fresh air intake snow melting device provided by an embodiment of the present invention
  • FIG. 3 is a diagram 2 Partial enlarged view at B.
  • the embodiment of the present invention provides a fresh air intake snow melting device for a train.
  • the fresh air intake snow melting device for a train includes a intake grille 1, a rainwater separator 2 and a heating device.
  • the rainwater separator 2 is disposed behind the inlet grille 1 along the air inlet direction to separate snow water entrained in the inlet wind
  • the rainwater separator 2 has a labyrinth air inlet channel and a drain hole 206, a labyrinth air inlet channel Block and collide the incoming wind to change its direction and speed, so as to separate the snow water entrained and discharge it from the drainage hole 206.
  • the drainage hole 206 is usually formed at the bottom of the rainwater separator 2 and the rainwater separator 2 is close to A heating device is provided on one side of the grille 1.
  • the train fresh air intake snow melting device provided by the embodiment of the present invention can turn on the heating device to melt the snow and separate the rainwater when the snow is formed at the air inlet of the intake grille 1
  • the labyrinth air inlet channel of the device 2 can separate the water entrained in the inlet air due to snow melting and discharge it from the drain hole 206.
  • the above train fresh air intake snow melting device integrates a heating device on the rain water separator 2 It takes less space and does not need to change the existing structure. It can melt the snow at the air inlet of the intake grille 1 to eliminate the resistance of the air intake, ensure the air intake of the air conditioner, and prevent the snow water from entering the air conditioning system. And train air conditioning system performance under low temperature conditions.
  • the rainwater separator 2 includes a row of arched baffles 201 and at least one row of U-shaped baffles arranged in a sequence from near to far and staggered relative to the inlet grille 1 and at least one row of arched baffles 201.
  • the wind grille 1 is arched in the direction, that is, the arch surface of the arched baffle 201 affects the air intake, and the intake air is diverted and guided.
  • the intake air enters the rainwater separator 2 from the gap between the two arched baffles 201, due to the U shape
  • the opening of the baffle is oriented in the direction of the inlet grille 1.
  • the inlet air entering from the gap between the two arch-shaped baffles 201 enters the interior of the U-shaped baffle through the middle of the opening of the U-shaped baffle, and passes through the interior of the U-shaped baffle.
  • the inner wall diversion of the U-shaped baffle flows backward from the opening edge of the U-shaped baffle, and continues to move backward through the gap between the arched baffle 201 and the U-shaped baffle.
  • the rainwater separator 2 of this structure has a simple structure It only needs a few rows of staggered baffles to realize the labyrinth air inlet channel, which is convenient for mass production.
  • the rainwater separator 2 further includes a housing, an opening formed toward the inlet grille 1 is formed on the housing, a U-shaped baffle and an arched baffle 201 are both disposed in the housing, and the U-shaped baffle and the arch are formed Both ends of the baffle 201 are respectively connected to the top plate and the bottom plate of the housing.
  • each U-shaped baffle Drainage holes 206 are provided below, that is, drainage holes 206 are provided at corresponding positions on the bottom plate of the housing of the rainwater separator 2, so that when the incoming air collides with the inner wall of the U-shaped baffle, the inner wall of the U-shaped baffle Water droplets formed by snow water are formed, and the water droplets collect and flow down into the drain hole 206 to be discharged.
  • a water collecting tray may be provided under all U-shaped baffles, and a drain hole 206 may be provided at the lowest point of the water collecting tray.
  • the heating device includes an electric heating tube 202, and the electric heating tubes 202 are provided on the side of the arched baffle 201 away from the inlet grille 1 in a one-to-one correspondence.
  • the heating device may also be a heating film, a heating wire, etc., which are provided on the surface or inside of the arched baffle 201.
  • a heating device may also be provided on the U-shaped baffle.
  • the rainwater separator 2 further includes a V-shaped baffle 203, the opening of the V-shaped baffle 203 faces the arched baffle 201, and the V-shaped The baffle 203 and the arched baffle 201 are connected to enclose a cavity containing the electric heating tube 202, so that the V-shaped baffle 203 and the arched baffle 201 and the top plate and bottom plate of the rainwater separator 2 can enclose a closed cavity To isolate the electric heating tube 202 from the outside world.
  • the rainwater separator 2 includes a row of first U-shaped baffles 205 and a row of second U-shaped baffles 209. It takes two times of water filtration to enter the air-conditioning system. At the same time, the flow direction of the inlet air after the U-shaped baffle changes.
  • the V-shaped baffle 203 The tip is formed with a first deflector 204 that extends to between two adjacent first U-shaped baffles 205, and the first U-shaped baffle 205 is formed to extend to two adjacent second U-shaped baffles 209 Between the second deflector 207, so that after the inlet air flows out from the first U-shaped baffle 205, under the action of the first deflector 204, it flows to the second U-shaped baffle 209 and from the second U-shaped baffle 209 After flowing out, it flows into the air conditioning system under the action of the second deflector 207.
  • the structure of the rainwater separator 2 is not limited to the above-mentioned arched baffle 201, U-shaped baffle, V-shaped baffle 203, etc., and other regular or irregular structures may be used to form a labyrinth aisle.
  • a folded edge 208 extending into the U-shaped baffle is formed on both sides of the opening of the U-shaped baffle, and the two folded edges 208 are along the extending direction
  • the spacing is gradually reduced, and the two folded edges 208 at the opening of the U-shaped baffle can force the air to change its direction again when the air flows out of the U-shaped baffle, thereby causing the air to change twice in the U-shaped baffle. Good separation effect.
  • the fresh air intake snow melting device of the train further includes a temperature sensor and a controller.
  • the temperature sensor is provided at the air inlet of the air intake grille 1 for measuring the temperature of the air intake of the air intake grille 1, the temperature sensor and Controller signal connection, the controller is used to control the heating device to start when the temperature at the air inlet of the grille 1 is lower than the preset value and to control when the temperature at the air inlet of the grille 1 is higher than the preset value
  • the heating device is turned off to realize automatic control of the snow melting device, which is convenient for use.
  • the fresh air intake snow melting device of the train further includes a temperature sensor connected to the signal of the controller.
  • the temperature sensor is used to monitor the temperature of the heating device. When the heating device overheats, the controller turns off the heating device to avoid its failure due to overheating.
  • the train fresh air intake snow melting device further includes a pressure wave valve plate 3 disposed behind the rainwater separator 2 along the wind inlet direction.
  • the present invention also provides a rail train, which includes the train fresh air intake snow melting device as described in any one of the above. Since the rail train adopts the fresh air intake snow melting device of the above-mentioned embodiment, for the beneficial effects of the rail train, please refer to the above-mentioned embodiment.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Railway Tracks (AREA)

Abstract

一种列车新风进气融雪装置,包括进风格栅(1)、雨水分离器(2)以及加热装置,其中,雨水分离器(2)设置于进风格栅后,具有迷宫型进风通道以及排水孔(206),雨水分离器内在靠近进风格栅的一侧设置有加热装置;当进风格栅进风口处形成积雪时,可开启加热装置融化积雪,同时雨水分离器的迷宫型进风通道能够将由于融雪而夹带在进风中的水分离出来并从排水孔(206)排出,所述装置消除进风阻力,保证空调进风量,同时避免雪水进入空调系统,保证在暴雪天气和低温工况下的列车空调系统性能。还提供具有所述新风进气融雪装置的一种轨道列车。

Description

一种轨道列车及列车新风进气融雪装置
本申请要求于2018年12月10日提交中国专利局、申请号为201811503092.X、发明名称为“一种轨道列车及列车新风进气融雪装置”的中国专利申请的优先权,其全部内容通过引用结合在本申请中。
本申请要求于2018年12月10日提交中国专利局、申请号为201822067450.9、发明名称为“一种轨道列车及列车新风进气融雪装置”的中国专利申请的优先权,其全部内容通过引用结合在本申请中。
技术领域
本发明涉及轨道列车技术领域,特别涉及一种轨道列车及列车新风进气融雪装置。
背景技术
轨道列车空调系统在运行中需应对各种复杂的外部环境条件,满足内部客室的舒适度需求。在暴雪的环境条件下,积雪易堆积在空调机组进风格栅的进风口处,导致新风入口阻力增加,新风量变小,影响空调系统性能,进而影响旅客舒适度。
因此,如何提供一种新型的进气装置,以应对暴雪天气和低温工况,保证车辆能够适应此种低温恶劣环境条件,成为本领域技术人员亟待解决的重要技术问题。
发明内容
有鉴于此,本发明的第一个目的在于提供一种列车新风进气融雪装置,以达到使其能够应对暴雪天气和低温工况,保证车辆能够适应此种低温恶劣环境条件的目的。
本发明的第二目的在于提供一种包括上述列车新风进气融雪装置的轨道列车。
为实现上述目的,本发明提供如下技术方案:
一种列车新风进气融雪装置,包括进风格栅、雨水分离器以及加热装置, 所述雨水分离器设置于所述进风格栅后,所述雨水分离器具有用于分离雨水的迷宫型进风通道以及用于将雨水排出排水孔,所述雨水分离器内在靠近所述进风格栅的一侧设置有所述加热装置。
优选地,所述雨水分离器包括相对于所述进风格栅由近及远依次设置且相互错落的一排拱形挡板以及至少一排U形挡板,所述拱形挡板向所述进风格栅方向拱起,所述U形挡板的开口朝向所述进风格栅方向。
优选地,每个所述U形挡板下方均设置有所述排水孔。
优选地,所述加热装置包括电加热管,所述电加热管一一对应地设置于所述拱形挡板远离所述进风格栅的一侧。
优选地,所述雨水分离器还包括V形挡板,所述V形挡板与所述拱形挡板连接围成容纳所述电加热管的容腔。
优选地,所述雨水分离器包括一排第一U形挡板以及一排第二U形挡板,所述V形挡板的尖端形成有延伸至相邻两个所述第一U形挡板之间的第一导流板,所述第一U形挡板上形成有延伸至相邻两个所述第二U形挡板之间的第二导流板。
优选地,所述U形挡板的开口两侧形成有向所述U形挡板内延伸的折边,两个所述折边沿延伸方向间距逐渐缩小。
优选地,还包括温度传感器以及控制器,所述温度传感器设置于所述进风格栅的进风口处,所述控制器用于在所述进风格栅的进风口处的温度低于预设值时控制所述加热装置启动以及在所述进风格栅的进风口处的温度高于预设值时控制所述加热装置关闭。
优选地,还包括沿进风方向设置于所述雨水分离器后的压力波阀板。
一种轨道列车,包括如上任意一项所述的列车新风进气融雪装置。
为实现上述第一个目的,本发明提供的列车新风进气融雪装置包括进风格栅、雨水分离器以及加热装置,其中,雨水分离器设置于进风格栅后,用于分离进风中夹带的雪水,雨水分离器具有用于分离雨水的迷宫型进风通道以及用于将雨水排出排水孔,排水孔通常形成于雨水分离器的底部,雨水分离器内在靠近进风格栅的一侧设置有加热装置;在应用时,当进风格栅进风口处形成积雪时,可开启加热装置融化积雪,同时雨水分离器的迷宫型进风通道能够将由 于融雪而夹带在进风中的水分离出来并从排水孔排出,由此可见,上述列车新风进气融雪装置在雨水分离器上集成了加热装置,占用空间小,无需对现有结构进行改变,能够将进风格栅进风口处的积雪融化,消除进风阻力,保证空调进风量,同时避免雪水进入空调系统,保证在暴雪天气和低温工况下的列车空调系统性能。
为实现上述第二个目的,本发明还提供了一种轨道列车,该轨道列车包括上述的列车新风进气融雪装置,由于上述的列车新风进气融雪装置具有上述技术效果,具有该列车新风进气融雪装置的轨道列车也应具有相应的技术效果。
附图说明
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1为本发明实施例提供的列车新风进气融雪装置的轴测图;
图2为本发明实施例提供的列车新风进气融雪装置的俯视图;
图3为图2中B处的局部放大图。
其中,1为进风格栅;2为雨水分离器;201为拱形挡板;202为电加热管;203为V形挡板;204为第一导流板;205为第一U形挡板;206为排水孔;207为第二导流板;208为折边;209为第二U形挡板;3为压力波阀板。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参阅图1-图3,图1为本发明实施例提供的列车新风进气融雪装置的轴测图,图2为本发明实施例提供的列车新风进气融雪装置的俯视图,图3为图2中B处的局部放大图。
本发明实施例提供了一种列车新风进气融雪装置,该列车新风进气融雪装置包括进风格栅1、雨水分离器2以及加热装置。
其中,雨水分离器2沿进风方向设置于进风格栅1之后,用于分离进风中夹带的雪水,雨水分离器2具有迷宫型进风通道以及排水孔206,迷宫型进风通道对进风进行阻挡、碰撞,使其变向、变速,从而将其夹带的雪水分离出来从排水孔206中排出,排水孔206通常形成于雨水分离器2的底部,雨水分离器2内在靠近进风格栅1的一侧设置有加热装置。
综上所述,与现有技术相比,本发明实施例提供的列车新风进气融雪装置当其进风格栅1进风口处形成积雪时,可开启加热装置融化积雪,同时雨水分离器2的迷宫型进风通道能够将由于融雪而夹带在进风中的水分离出来并从排水孔206排出,由此可见,上述列车新风进气融雪装置在雨水分离器2上集成了加热装置,占用空间小,无需对现有结构进行改变,能够将进风格栅1进风口处的积雪融化,消除进风阻力,保证空调进风量,同时避免雪水进入空调系统,保证在暴雪天气和低温工况下的列车空调系统性能。
作为优选地,上述雨水分离器2包括相对于进风格栅1由近及远依次设置且相互错落的一排拱形挡板201以及至少一排U形挡板,拱形挡板201向进风格栅1方向拱起,即拱形挡板201的拱面影响进风,对进风进行分流引导,进风从两个拱形挡板201的间隙进入雨水分离器2内部,由于U形挡板的开口朝向进风格栅1方向,从两个拱形挡板201的间隙进入的进风经U形挡板的开口中部进入U形挡板的内部,在U形挡板的内部经U形挡板的内壁导流变向后从U形挡板的开口边缘流出,并经拱形挡板201与U形挡板的间隙继续向后移动,该种结构的雨水分离器2结构简单,仅需要几排错落布置的挡板即可实现迷宫型进风通道,便于批量制造。
更进一步,雨水分离器2还包括壳体,壳体上形成由朝向进风格栅1的开口,U形挡板以及拱形挡板201均设置于壳体内,且U形挡板以及拱形挡板201的两端分别于壳体的顶板以及底板连接。
当然上述结构仅仅是本发明实施例提供的一种优选实施方案,实际并不局限于此,本领域技术人员可根据实际需要对其进行适当调整,在此不做限定。
进一步地,由上述进风流动过程可知,进风与雨水的分离主要发生在U 形挡板内,因此,为便于将雪水排出,在本发明一种实施例中,每个U形挡板下方均设置排水孔206,即在雨水分离器2壳体的底板上的对应位置开设有排水孔206,这样,当进风与U形挡板的内壁发生碰撞后,U形挡板的内壁上会形成由雪水形成的水滴,水滴汇集向下流入排水孔206排出。
在其他实施例中,也可以在所有的U形挡板下方设置集水盘,并在集水盘的最低点设置排水孔206。
作为优选地,在本发明实施例中,加热装置包括电加热管202,电加热管202一一对应地设置于拱形挡板201远离进风格栅1的一侧。
需要说明的是,加热装置也可以为加热膜、加热丝等,设置于拱形挡板201的表面或内部,当然,除拱形挡板201外,U形挡板上也可以设置加热装置。
为避免电加热管202与雨水、雪水接触,在本发明实施例中,雨水分离器2还包括V形挡板203,该V形挡板203的开口朝向拱形挡板201,且V形挡板203与拱形挡板201连接围成容纳电加热管202的容腔,这样V形挡板203与拱形挡板201以及雨水分离器2的顶板以及底板能够围成一封闭的容腔,将电加热管202与外界隔离。
进一步优化上述技术方案,为提高雨水分离器2的分离效果,在本发明实施例中,雨水分离器2包括一排第一U形挡板205以及一排第二U形挡板209,进风需要经过两次滤水后才能够进入空调系统,同时经过U形挡板后的进风的流向发生改变,为避免同一排各个U形挡板流出的进风相互干扰,V形挡板203的尖端形成有延伸至相邻两个第一U形挡板205之间的第一导流板204,第一U形挡板205上形成有延伸至相邻两个第二U形挡板209之间的第二导流板207,这样进风从第一U形挡板205流出后,在第一导流板204的作用下流向第二U形挡板209,从第二U形挡板209流出后在第二导流板207的作用下流入空调系统。
可以理解的是,雨水分离器2的构成并不局限于上述的拱形挡板201、U形挡板、V形挡板203等等,还可以采用其他的规则或不规则结构以形成迷宫型通道。
为进一步提高U形挡板对雨水的分离效果,在本发明实施例中,U形挡 板的开口两侧形成有向U形挡板内延伸的折边208,两个折边208沿延伸方向间距逐渐缩小,利用U形挡板开口处的两个折边208能够在进风流出U形挡板时再次迫使其变向,从而使进风在U形挡板内形成两次变向,更好地实现分离效果。
作为优选地,列车新风进气融雪装置还包括温度传感器以及控制器,温度传感器设置于进风格栅1的进风口处,用于测量进风格栅1的进风口处的温度,温度传感器与控制器信号连接,控制器用于在进风格栅1的进风口处的温度低于预设值时控制加热装置启动以及在进风格栅1的进风口处的温度高于预设值时控制加热装置关闭,以实现对融雪装置的自动控制,便于使用。
进一步地,列车新风进气融雪装置还包括与控制器信号连接的温度传感器,温度传感器用于监测加热装置的温度,当加热装置发生过热,控制器关闭加热装置避免其因过热而失效。
进一步优化上述技术方案,在本发明实施例中,列车新风进气融雪装置还包括沿进风方向设置于雨水分离器2后的压力波阀板3。
基于上述实施例中提供的,本发明还提供了一种轨道列车,该轨道列车包括如上任一项所述的列车新风进气融雪装置。由于该轨道列车采用了上述实施例中的列车新风进气融雪装置,所以轨道列车的有益效果请参考上述实施例。
本说明书中各个实施例采用递进的方式描述,每个实施例重点说明的都是与其他实施例的不同之处,各个实施例之间相同相似部分互相参见即可。
对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本发明。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本发明的精神或范围的情况下,在其它实施例中实现。因此,本发明将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。

Claims (10)

  1. 一种列车新风进气融雪装置,其特征在于,包括进风格栅、雨水分离器以及加热装置,所述雨水分离器设置于所述进风格栅后,所述雨水分离器具有用于分离雨水的迷宫型进风通道以及用于将雨水排出排水孔,所述雨水分离器内在靠近所述进风格栅的一侧设置有所述加热装置。
  2. 根据权利要求1所述的列车新风进气融雪装置,其特征在于,所述雨水分离器包括相对于所述进风格栅由近及远依次设置且相互错落的一排拱形挡板以及至少一排U形挡板,所述拱形挡板向所述进风格栅方向拱起,所述U形挡板的开口朝向所述进风格栅方向。
  3. 根据权利要求2所述的列车新风进气融雪装置,其特征在于,每个所述U形挡板下方均设置有所述排水孔。
  4. 根据权利要求2或3所述的列车新风进气融雪装置,其特征在于,所述加热装置包括电加热管,所述电加热管一一对应地设置于所述拱形挡板远离所述进风格栅的一侧。
  5. 根据权利要求4所述的列车新风进气融雪装置,其特征在于,所述雨水分离器还包括V形挡板,所述V形挡板与所述拱形挡板连接围成容纳所述电加热管的容腔。
  6. 根据权利要求5所述的列车新风进气融雪装置,其特征在于,所述雨水分离器包括一排第一U形挡板以及一排第二U形挡板,所述V形挡板的尖端形成有延伸至相邻两个所述第一U形挡板之间的第一导流板,所述第一U形挡板上形成有延伸至相邻两个所述第二U形挡板之间的第二导流板。
  7. 根据权利要求2、3、5、6任意一项所述的列车新风进气融雪装置,其特征在于,所述U形挡板的开口两侧形成有向所述U形挡板内延伸的折边,两个所述折边沿延伸方向间距逐渐缩小。
  8. 根据权利要求1-3及5-6任意一项所述的列车新风进气融雪装置,其特征在于,还包括温度传感器以及控制器,所述温度传感器设置于所述进风格栅的进风口处,所述控制器用于在所述进风格栅的进风口处的温度低于预设值 时控制所述加热装置启动以及在所述进风格栅的进风口处的温度高于预设值时控制所述加热装置关闭。
  9. 根据权利要求1-3及5-6任意一项所述的列车新风进气融雪装置,其特征在于,还包括沿进风方向设置于所述雨水分离器后的压力波阀板。
  10. 一种轨道列车,其特征在于,包括如权利要求1-9任意一项所述的列车新风进气融雪装置。
PCT/CN2019/120993 2018-12-10 2019-11-26 一种轨道列车及列车新风进气融雪装置 WO2020119451A1 (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP19895761.5A EP3895953A4 (en) 2018-12-10 2019-11-26 RAILWAY TRAIN AND FRESH AIR INLET SNOW MELTING DEVICE OF A TRAIN
SG11202008048WA SG11202008048WA (en) 2018-12-10 2019-11-26 Railway train and fresh air inlet snow-melting device of train

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN201822067450.9 2018-12-10
CN201811503092.X 2018-12-10
CN201811503092.XA CN109353362A (zh) 2018-12-10 2018-12-10 一种轨道列车及列车新风进气融雪装置
CN201822067450.9U CN209191959U (zh) 2018-12-10 2018-12-10 一种轨道列车及列车新风进气融雪装置

Publications (1)

Publication Number Publication Date
WO2020119451A1 true WO2020119451A1 (zh) 2020-06-18

Family

ID=71075724

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2019/120993 WO2020119451A1 (zh) 2018-12-10 2019-11-26 一种轨道列车及列车新风进气融雪装置

Country Status (3)

Country Link
EP (1) EP3895953A4 (zh)
SG (1) SG11202008048WA (zh)
WO (1) WO2020119451A1 (zh)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3023236A1 (de) * 1980-06-21 1982-01-14 Daimler-Benz Ag, 7000 Stuttgart Zwischen dem motor- bzw. kofferraum und der spritzwand eines kraftwagens angeordneter aggregateraum
CN101078562A (zh) * 2007-06-29 2007-11-28 泰州泰怡热工电器有限公司 空气预热器
EP2000338A1 (en) * 2007-06-06 2008-12-10 Calsonic Kansei Corporation Water discharge structure of vehicle air-conditioning system
CN203126861U (zh) * 2012-11-16 2013-08-14 江苏新誉空调系统有限公司 轨道交通空调机组雨水分离装置
CN203888576U (zh) * 2014-05-26 2014-10-22 南车青岛四方机车车辆股份有限公司 一种车辆、空调及其顶置新风口结构
CN206679002U (zh) * 2017-04-13 2017-11-28 重庆公共运输职业学院 一种节能环保的轨道客运列车用空调的新风节能装置
JP2018144522A (ja) * 2017-03-01 2018-09-20 株式会社ヴァレオジャパン 車両用空気調和装置
CN109353362A (zh) * 2018-12-10 2019-02-19 中车长春轨道客车股份有限公司 一种轨道列车及列车新风进气融雪装置
CN209191959U (zh) * 2018-12-10 2019-08-02 中车长春轨道客车股份有限公司 一种轨道列车及列车新风进气融雪装置

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204674593U (zh) * 2015-05-18 2015-09-30 江苏荣邦机械制造有限公司 轨道车辆空调机组电加热雨水分离器
CN205652133U (zh) * 2016-05-13 2016-10-19 上海飞特亚空气过滤有限公司 电加热融雪雨水分离器
CH713147B1 (de) * 2016-11-18 2020-07-15 Gk Gruenenfelder Ag Fahrzeugaufbau für ein Fahrzeug zum Gütertransport, mit einer Dachkonstruktion mit mindestens einer Platte und mindestens einer elektrischen Heizeinrichtung.
DE102018000998A1 (de) * 2018-02-07 2018-08-02 Daimler Ag Aufdachwärmepumpe für einen Kraftwagen, insbesondere für ein Nutzfahrzeug

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3023236A1 (de) * 1980-06-21 1982-01-14 Daimler-Benz Ag, 7000 Stuttgart Zwischen dem motor- bzw. kofferraum und der spritzwand eines kraftwagens angeordneter aggregateraum
EP2000338A1 (en) * 2007-06-06 2008-12-10 Calsonic Kansei Corporation Water discharge structure of vehicle air-conditioning system
CN101078562A (zh) * 2007-06-29 2007-11-28 泰州泰怡热工电器有限公司 空气预热器
CN203126861U (zh) * 2012-11-16 2013-08-14 江苏新誉空调系统有限公司 轨道交通空调机组雨水分离装置
CN203888576U (zh) * 2014-05-26 2014-10-22 南车青岛四方机车车辆股份有限公司 一种车辆、空调及其顶置新风口结构
JP2018144522A (ja) * 2017-03-01 2018-09-20 株式会社ヴァレオジャパン 車両用空気調和装置
CN206679002U (zh) * 2017-04-13 2017-11-28 重庆公共运输职业学院 一种节能环保的轨道客运列车用空调的新风节能装置
CN109353362A (zh) * 2018-12-10 2019-02-19 中车长春轨道客车股份有限公司 一种轨道列车及列车新风进气融雪装置
CN209191959U (zh) * 2018-12-10 2019-08-02 中车长春轨道客车股份有限公司 一种轨道列车及列车新风进气融雪装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3895953A4

Also Published As

Publication number Publication date
EP3895953A1 (en) 2021-10-20
SG11202008048WA (en) 2020-09-29
EP3895953A4 (en) 2022-09-07

Similar Documents

Publication Publication Date Title
JP4819408B2 (ja) 吸気システム
JP5758901B2 (ja) 車両用空気調和装置におけるサクション装置
EP1340634B1 (en) Automotive air conditioning system
JPH04228317A (ja) 車両通風装置用の新鮮な空気供給システム
CN104149804A (zh) 具有防风沙功能的轨道车辆顶置式空调机组
JP5018967B2 (ja) 車両の吸気構造
WO2020119451A1 (zh) 一种轨道列车及列车新风进气融雪装置
CN209191959U (zh) 一种轨道列车及列车新风进气融雪装置
JP6121200B2 (ja) 車両の空調用気液分離構造
CN109353362A (zh) 一种轨道列车及列车新风进气融雪装置
CN207975706U (zh) 侧吸式油烟机
WO2015158126A1 (zh) 机车复合冷却器空气过滤装置
CN214800446U (zh) 一种有轨电车散热系统
CN211032483U (zh) 一种客车格栅的防水结构
EP2168796B1 (en) Air conditioning system for a car
JP2007045326A (ja) 空気調和装置
CN110843834A (zh) 一种轨道列车空调新鲜空气导入装置及轨道列车空调
CN205569970U (zh) 一种空气过滤装置
CN206067754U (zh) 轨道车辆用冷凝水排水装置
CN207546123U (zh) 柴油机中冷后气水分离装置
RU113704U1 (ru) Система вентиляции тяговых двигателей локомотива
CN215429608U (zh) 一种基于静电除尘的新能源汽车充电桩除尘装置
CN107191984B (zh) 一种用于吸油烟机的过滤装置
CN216684297U (zh) 车辆
CN205818871U (zh) 一种具有空气净化功能的布风器

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19895761

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2019895761

Country of ref document: EP

Effective date: 20210712