EP3895953A1 - Railway train and fresh air inlet snow-melting device of train - Google Patents
Railway train and fresh air inlet snow-melting device of train Download PDFInfo
- Publication number
- EP3895953A1 EP3895953A1 EP19895761.5A EP19895761A EP3895953A1 EP 3895953 A1 EP3895953 A1 EP 3895953A1 EP 19895761 A EP19895761 A EP 19895761A EP 3895953 A1 EP3895953 A1 EP 3895953A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- air inlet
- snow
- grating
- train
- melting device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61D—BODY DETAILS OR KINDS OF RAILWAY VEHICLES
- B61D27/00—Heating, cooling, ventilating, or air-conditioning
- B61D27/0018—Air-conditioning means, i.e. combining at least two of the following ways of treating or supplying air, namely heating, cooling or ventilating
Definitions
- the present application relates to the technical field of railway trains, and particularly to a railway train and a fresh air inlet snow-melting device of a train.
- a running air conditioning system of the railway train usually deals with various complex environmental conditions to meet the requirements of comfort in passenger compartment.
- deep snow is easily banked up at the inlet of the air inlet grating of the air conditioning unit, which causes increasing of the fresh air inlet resistance and decreasing of the fresh air inlet volume, thereby affecting the performance of the air conditioning system and further affecting the comfort of passengers.
- a first object of the present application is to provide a fresh air inlet snow-melting device of a train, so that the device can deal with the working conditions of snowstorm and low temperature, so as to ensure that the railway train can ran safely at such severe environmental conditions as low temperature.
- a second object of the present application is to provide a railway train including the above fresh air inlet snow-melting device of the train.
- a fresh air inlet snow-melting device of a train includes an air inlet grating, a snow-water separator and a heating device.
- the snow-water separator is arranged behind the air inlet grating, and is provided with a labyrinth air inlet channel for separating snow-water from snow and water dischargers for discharging the snow-water.
- the heating device is provided on a side, facing the air inlet grating, in the snow-water separator.
- the snow-water separator includes a row of arched baffles and at least one row of U-shaped baffles which are sequentially staggered from near to far relative to the air inlet grating, and the arched baffles are arched toward the direction of the air inlet grating, and an opening of each U-shaped baffle faces the direction of the air inlet grating.
- each of the water dischargers is provided under the corresponding U-shaped baffle.
- the heating device includes an electric heating pipe, and the electric heating pipe is arranged in one-to-one correspondence with a side, away from the air inlet grating, of each arched baffle.
- the snow-water separator further includes a V-shaped baffle, and the V-shaped baffle is connected with the corresponding arched baffle to form a cavity for accommodating the electric heating pipe.
- the snow-water separator includes a row of first U-shaped baffles and a row of second U-shaped baffles.
- a first flow guiding plate extending between the two adjacent first U-shaped baffles is formed on a tip of the V-shaped baffle, and a second flow guiding plate extending between two adjacent second U-shaped baffles is formed on the first U-shaped baffle.
- bent edges extending into the corresponding U-shaped baffle are formed on two sides of the opening of each U-shaped baffle, and the spacing between the two bent edges gradually reduces along the extension direction.
- the fresh air inlet snow-melting device of the train further includes a temperature sensor and a controller.
- the temperature sensor is arranged at an air inlet of the air inlet grating
- the controller is configured to control the heating device to be turned on when the temperature at the air inlet of the air inlet grating is lower than a preset value, and to control the heating device to be turned off when the temperature at the air inlet of the air inlet grating is higher than the preset value.
- the fresh air inlet snow-melting device further includes a pressure wave valve plate provided behind the snow-water separator in a direction of the air inlet direction.
- a railway train includes the fresh air inlet snow-melting device of the train described in any one of the above.
- the fresh air inlet snow-melting device of the train includes the air inlet grating, the snow-water separator and the heating device.
- the snow-water separator is arranged behind the air inlet grating and is configured to separate snow-water carried in the inlet air.
- the snow-water separator is provided with a labyrinth air inlet channel for separating snow-water from snow and water dischargers for discharging the snow-water.
- the water dischargers are generally formed on the bottom of the snow-water separator.
- the heating device is provided on a side, facing the air inlet grating, in the snow-water separator.
- the heating device when the deep snow is banked up at the air inlet of the air inlet grating, the heating device can be started to melt the deep snow, meanwhile, the labyrinth air inlet channel of the snow-water separator can separate water carried in inlet air from snow due to the melting snow and discharge the water from the water dischargers.
- the fresh air inlet snow-melting device of the train integrates the heating device with the snow-water separator, which occupies a small occupation space, does not need to change the existing structure, can melt the deep snow at the air inlet of air inlet grating, eliminates air inlet resistance, ensures the inlet air volume of an air conditioner, also prevents snow-water from entering into an air-conditioning system, and ensures the performance of the air-conditioning system of the train under the working conditions of snowstorm weather and low temperatures.
- a railway train is further provided according to the present application.
- the railway train includes the above fresh air inlet snow-melting device of the train. Since the fresh air inlet snow-melting device of the train has the technical effects described above, the railway train having the above fresh air inlet snow-melting device of the train should also have corresponding technical effects.
- Figure 1 is an axonometric view of a fresh air inlet snow-melting device of a train according to an embodiment of the present application
- Figure 2 is a top view of the fresh air inlet snow-melting device of the train according to the embodiment of the present application
- Figure 3 is a partially enlarged view of portion B in Figure 2 .
- a fresh air inlet snow-melting device of a train is provided according to the embodiment of the present application.
- the fresh air inlet snow-melting device of the train includes an air inlet grating 1, a snow-water separator 2 and a heating device.
- the snow-water separator 2 is arranged behind the air inlet grating 1 in the air inlet direction, and is configured to separate the snow-water carried in inlet air.
- the snow-water separator 2 has a labyrinth air inlet channel and water dischargers 206.
- the labyrinth air inlet channel blocks and collides the inlet air, so that the inlet air changes a direction and a speed, so as to separate the snow-water carried in the inlet air and discharge the water from the water dischargers 206.
- the water dischargers 206 are generally formed at the bottom of the snow-water separator 2, and the heating device is provided on a side, facing the air inlet grating 1, in the snow-water separator 2.
- the heating device when deep snow is banked up at the air inlet of the air inlet grating 1, the heating device can be started to melt the deep snow, meanwhile, the labyrinth air inlet channel of the snow-water separator 2 can separate water carried in inlet air from snow due to the melting snow and discharge the water from the water dischargers 206.
- the fresh air inlet snow-melting device of the train integrates the heating device with the snow-water separator 2, which occupies a small occupation space, does not need to change the existing structure, can melt the deep snow at the air inlet of air inlet grating 1, eliminates air inlet resistance, ensures the inlet air volume of an air conditioner, also prevents snow-water from entering into an air-conditioning system, and ensures the performance of the air-conditioning system of the train under the working conditions of snowstorm weather and low temperatures.
- the snow-water separator 2 includes a row of arched baffles 201 and at least one row of U-shaped baffles which are sequentially staggered from near to far relative to the air inlet grating, and the arched baffles 201 are arched toward the air inlet grating 1, that is, an arched surface of each arched baffle 201 affects the inlet air, shunts and guides the inlet air.
- the inlet air enters into the snow-water separator 2 from a gap between the two arched baffles 201.
- each U-shaped baffle Since an opening of each U-shaped baffle is toward the air inlet grating 1, the inlet air entering from the gap between the two arched baffles 201 enters into the interior of the U-shaped baffle through the middle of the opening of the U-shaped baffle, the inlet air is guided by the inner wall of the U-shaped baffle to change direction inside the U-shaped baffle and flows out of an edge of the opening of the U-shaped baffle, and continues to move backward through a gap between the arched baffle 201 and the U-shaped baffle.
- Such snow-water separator 2 has a simple structure, and the labyrinth air inlet channel can be realized by only a few rows of baffles, which is convenient for mass production.
- the snow-water separator 2 further includes a housing.
- An opening facing the air inlet grating 1 is formed on the housing.
- the U-shaped baffles and the arched baffles 201 are arranged in the housing, and two ends of each U-shaped baffle and two ends of each arched baffle 201 are respectively connected with a top plate and a bottom plate of the housing.
- each of the water dischargers 206 is arranged under the corresponding U-shaped baffle, that is, each water discharger 206 is arranged at the corresponding position on the bottom plate of the housing of the snow-water separator 2. In this way, after the inlet air collides with the inner wall of the U-shaped baffle, water droplets formed by snow-water will be formed on the inner wall of the U-shaped baffle, and the water droplets are collected downward and flow into the dischargers 206 for discharging.
- a catchment pan may also be provided under each of the U-shaped baffles, and the water discharger 206 is arranged at the lowest point of the catchment pan.
- the heating device includes an electric heating pipe 202.
- the electric heating pipe 202 is arranged in one-to-one correspondence with a side, away from the air inlet grating 1, of the arched baffle 201.
- the heating device may also be a heating film, a heating wire and the like, and is arranged on a surface or inside of the arched baffle 201.
- the U-shaped baffle may also be provided with the heating device.
- the snow-water separator 2 further includes a V-shaped baffle 203, an opening of the V-shaped baffle 203 faces the arched baffle 201.
- the V-shaped baffle 203 is connected with the corresponding arched baffle 201 to form a cavity for accommodating the electric heating pipe 202, so that a closed cavity can be formed by the V-shaped baffle 203, the arched baffle 201, the top plate and the bottom plate of the snow-water separator 2, which is isolated the electric heating pipe 202 from the outside.
- the snow-water separator 2 includes a row of first U-shaped baffles 205 and a row of second U-shaped baffles 209.
- the inlet air can enter into an air-conditioning system only after two times of filtration of water.
- the flow direction of the inlet air after passing through the U-shaped baffle changes, in order to avoid mutual interference between the inlet air flowing out of the U-shaped baffles in the same row, a first flow guiding plate 204 extending between the two adjacent first U-shaped baffles 205 is formed on a tip of the V-shaped baffle 203.
- a second flow guiding plate 207 extending between the two adjacent second U-shaped baffles 209 is formed on the first U-shaped baffle 205. So that the inlet air flows to the second U-shaped baffle 209 under the action of the first flow guiding plate 204 after flowing out of the first U-shaped baffle 205, and flows into the air-conditioning system under the action of the second flow guiding plate 207 after flowing out of the second U-shaped baffle 209.
- the construction of the snow-water separator 2 is not limited to the arched baffle 201, the U-shaped baffle, the V-shaped baffle 203 and the like, and other regular or irregular structures can be used to form a labyrinth channel.
- bent edges 208 extending into the U-shaped baffle are formed on two sides of the opening of the U-shaped baffle.
- the spacing between the two bent edges 208 gradually reduces in the extension direction.
- the inlet air may be forced to change direction again by using the two bent edges 208 at the opening of the U-shaped baffle when the inlet air flows out of the U-shaped baffle, so that the direction of the inlet air is changed twice in the U-shaped baffle, thereby achieving better separation effect.
- the fresh air inlet snow-melting device of the train further includes a temperature sensor and a controller.
- the temperature sensor is arranged at the air inlet of the air inlet grating 1 and is configured to measure the temperature at the air inlet of the air inlet grating 1.
- the temperature sensor is connected with a controller signal, and the controller is configured to control the heating device to be turned on when the temperature at the air inlet of the air inlet grating 1 is lower than a preset value, and to control the heating device to be turned off when the temperature at the air inlet of air inlet grating 1 is higher than the preset value, so as to realize the automatic control of the snow-melting device and facilitate the use.
- the fresh air inlet snow-melting device of the train further includes the temperature sensor connected with the controller signal.
- the temperature sensor is configured to monitor the temperature of the heating device. When the heating device overheats, the controller turns off the heating device to avoid failure due to overheating.
- the fresh air inlet snow-melting device of the train further includes a pressure wave valve plate 3 provided behind the snow-water separator 2 in a direction of the air inlet.
- a railway train is further provided according to the present application.
- the railway train includes the fresh air inlet snow-melting device of the train described in any one of the above. Since the railway train adopts the fresh air inlet snow-melting device of the train according to the above embodiments, the railway train has the same beneficial effect as the fresh air inlet snow-melting device of the train according to the above embodiments.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Railway Tracks (AREA)
Abstract
Description
- This application claims the priority to
Chinese Patent Application No. 201811503092.X - This application claims the priority to
Chinese Patent Application No. 201822067450.9 - The present application relates to the technical field of railway trains, and particularly to a railway train and a fresh air inlet snow-melting device of a train.
- A running air conditioning system of the railway train usually deals with various complex environmental conditions to meet the requirements of comfort in passenger compartment. In the environment of snowstorm, deep snow is easily banked up at the inlet of the air inlet grating of the air conditioning unit, which causes increasing of the fresh air inlet resistance and decreasing of the fresh air inlet volume, thereby affecting the performance of the air conditioning system and further affecting the comfort of passengers.
- Therefore, those skilled in the art has a strong desire to provide a new air inlet device to deal with working conditions of snowstorm and low temperature, so as to ensure that the railway train can run safely at such severe environmental conditions as low temperature.
- In view of this, a first object of the present application is to provide a fresh air inlet snow-melting device of a train, so that the device can deal with the working conditions of snowstorm and low temperature, so as to ensure that the railway train can ran safely at such severe environmental conditions as low temperature.
- A second object of the present application is to provide a railway train including the above fresh air inlet snow-melting device of the train.
- The following technical solutions are provided according to the present application.
- A fresh air inlet snow-melting device of a train includes an air inlet grating, a snow-water separator and a heating device. The snow-water separator is arranged behind the air inlet grating, and is provided with a labyrinth air inlet channel for separating snow-water from snow and water dischargers for discharging the snow-water. The heating device is provided on a side, facing the air inlet grating, in the snow-water separator.
- Preferably, the snow-water separator includes a row of arched baffles and at least one row of U-shaped baffles which are sequentially staggered from near to far relative to the air inlet grating, and the arched baffles are arched toward the direction of the air inlet grating, and an opening of each U-shaped baffle faces the direction of the air inlet grating.
- Preferably, each of the water dischargers is provided under the corresponding U-shaped baffle.
- Preferably, the heating device includes an electric heating pipe, and the electric heating pipe is arranged in one-to-one correspondence with a side, away from the air inlet grating, of each arched baffle.
- Preferably, the snow-water separator further includes a V-shaped baffle, and the V-shaped baffle is connected with the corresponding arched baffle to form a cavity for accommodating the electric heating pipe.
- Preferably, the snow-water separator includes a row of first U-shaped baffles and a row of second U-shaped baffles. A first flow guiding plate extending between the two adjacent first U-shaped baffles is formed on a tip of the V-shaped baffle, and a second flow guiding plate extending between two adjacent second U-shaped baffles is formed on the first U-shaped baffle.
- Preferably, bent edges extending into the corresponding U-shaped baffle are formed on two sides of the opening of each U-shaped baffle, and the spacing between the two bent edges gradually reduces along the extension direction.
- Preferably, the fresh air inlet snow-melting device of the train further includes a temperature sensor and a controller. The temperature sensor is arranged at an air inlet of the air inlet grating, and the controller is configured to control the heating device to be turned on when the temperature at the air inlet of the air inlet grating is lower than a preset value, and to control the heating device to be turned off when the temperature at the air inlet of the air inlet grating is higher than the preset value.
- Preferably, the fresh air inlet snow-melting device further includes a pressure wave valve plate provided behind the snow-water separator in a direction of the air inlet direction.
- A railway train includes the fresh air inlet snow-melting device of the train described in any one of the above.
- In order to achieve the first object, the fresh air inlet snow-melting device of the train according to the present application includes the air inlet grating, the snow-water separator and the heating device. The snow-water separator is arranged behind the air inlet grating and is configured to separate snow-water carried in the inlet air. The snow-water separator is provided with a labyrinth air inlet channel for separating snow-water from snow and water dischargers for discharging the snow-water. The water dischargers are generally formed on the bottom of the snow-water separator. The heating device is provided on a side, facing the air inlet grating, in the snow-water separator. In application, when the deep snow is banked up at the air inlet of the air inlet grating, the heating device can be started to melt the deep snow, meanwhile, the labyrinth air inlet channel of the snow-water separator can separate water carried in inlet air from snow due to the melting snow and discharge the water from the water dischargers. It can be seen that the fresh air inlet snow-melting device of the train integrates the heating device with the snow-water separator, which occupies a small occupation space, does not need to change the existing structure, can melt the deep snow at the air inlet of air inlet grating, eliminates air inlet resistance, ensures the inlet air volume of an air conditioner, also prevents snow-water from entering into an air-conditioning system, and ensures the performance of the air-conditioning system of the train under the working conditions of snowstorm weather and low temperatures.
- In order to achieve the second object, a railway train is further provided according to the present application. The railway train includes the above fresh air inlet snow-melting device of the train. Since the fresh air inlet snow-melting device of the train has the technical effects described above, the railway train having the above fresh air inlet snow-melting device of the train should also have corresponding technical effects.
- To illustrate technical schemes according to the embodiments of the present application or in the conventional technology more clearly, the drawings to be used in the description of the conventional technology or the embodiments are described briefly hereinafter. Apparently, the drawings described hereinafter are only some embodiments of the present application, and other drawings may be obtained by those skilled in the art based on those drawings without creative effort.
-
Figure 1 is an axonometric view of a fresh air inlet snow-melting device of a train according to an embodiment of the present application; -
Figure 2 is a top view of the fresh air inlet snow-melting device of the train according to the embodiment of the present application; and -
Figure 3 is a partially enlarged view of portion B inFigure 2 . - Technical solutions of embodiments of the present application are clearly and completely described hereinafter in conjunction with the drawings of the embodiments of the present application. It is apparent that the embodiments described in the following are only some embodiments of the present application, rather than all embodiments. Any other embodiments obtained by those skilled in the art based on the embodiments in the present application without any creative work fall in the scope of protection of the present application.
- Referring to
Figures 1 to 3 ,Figure 1 is an axonometric view of a fresh air inlet snow-melting device of a train according to an embodiment of the present application;Figure 2 is a top view of the fresh air inlet snow-melting device of the train according to the embodiment of the present application; andFigure 3 is a partially enlarged view of portion B inFigure 2 . - A fresh air inlet snow-melting device of a train is provided according to the embodiment of the present application. The fresh air inlet snow-melting device of the train includes an air inlet grating 1, a snow-
water separator 2 and a heating device. - The snow-
water separator 2 is arranged behind the air inlet grating 1 in the air inlet direction, and is configured to separate the snow-water carried in inlet air. The snow-water separator 2 has a labyrinth air inlet channel andwater dischargers 206. The labyrinth air inlet channel blocks and collides the inlet air, so that the inlet air changes a direction and a speed, so as to separate the snow-water carried in the inlet air and discharge the water from thewater dischargers 206. Thewater dischargers 206 are generally formed at the bottom of the snow-water separator 2, and the heating device is provided on a side, facing the air inlet grating 1, in the snow-water separator 2. - In summary, compared with the conventional technology, according to the fresh air inlet snow-melting device of the train provided by the embodiment of the present application, when deep snow is banked up at the air inlet of the air inlet grating 1, the heating device can be started to melt the deep snow, meanwhile, the labyrinth air inlet channel of the snow-
water separator 2 can separate water carried in inlet air from snow due to the melting snow and discharge the water from thewater dischargers 206. It can be seen that the fresh air inlet snow-melting device of the train integrates the heating device with the snow-water separator 2, which occupies a small occupation space, does not need to change the existing structure, can melt the deep snow at the air inlet of air inlet grating 1, eliminates air inlet resistance, ensures the inlet air volume of an air conditioner, also prevents snow-water from entering into an air-conditioning system, and ensures the performance of the air-conditioning system of the train under the working conditions of snowstorm weather and low temperatures. - In an embodiment, the snow-
water separator 2 includes a row ofarched baffles 201 and at least one row of U-shaped baffles which are sequentially staggered from near to far relative to the air inlet grating, and thearched baffles 201 are arched toward the air inlet grating 1, that is, an arched surface of eacharched baffle 201 affects the inlet air, shunts and guides the inlet air. The inlet air enters into the snow-water separator 2 from a gap between the twoarched baffles 201. Since an opening of each U-shaped baffle is toward the air inlet grating 1, the inlet air entering from the gap between the twoarched baffles 201 enters into the interior of the U-shaped baffle through the middle of the opening of the U-shaped baffle, the inlet air is guided by the inner wall of the U-shaped baffle to change direction inside the U-shaped baffle and flows out of an edge of the opening of the U-shaped baffle, and continues to move backward through a gap between thearched baffle 201 and the U-shaped baffle. Such snow-water separator 2 has a simple structure, and the labyrinth air inlet channel can be realized by only a few rows of baffles, which is convenient for mass production. - Furthermore, the snow-
water separator 2 further includes a housing. An opening facing the air inlet grating 1 is formed on the housing. The U-shaped baffles and thearched baffles 201 are arranged in the housing, and two ends of each U-shaped baffle and two ends of eacharched baffle 201 are respectively connected with a top plate and a bottom plate of the housing. - Certainly, the above structure is simply a preferred embodiment according to the embodiment of the present application, which is not limited in practice. Those skilled in the art can adjust the structure appropriately according to the actual needs, which is not limited herein.
- Furthermore, it can be seen from the flow process of the inlet air that the separation of the inlet air and snow-water mainly occurs in the U-shaped baffles. Therefore, for ease of discharging of the snow-water, in an embodiment of the present application, each of the
water dischargers 206 is arranged under the corresponding U-shaped baffle, that is, eachwater discharger 206 is arranged at the corresponding position on the bottom plate of the housing of the snow-water separator 2. In this way, after the inlet air collides with the inner wall of the U-shaped baffle, water droplets formed by snow-water will be formed on the inner wall of the U-shaped baffle, and the water droplets are collected downward and flow into thedischargers 206 for discharging. - In other embodiments, a catchment pan may also be provided under each of the U-shaped baffles, and the
water discharger 206 is arranged at the lowest point of the catchment pan. - In an embodiment, in the embodiment of the present application, the heating device includes an
electric heating pipe 202. Theelectric heating pipe 202 is arranged in one-to-one correspondence with a side, away from the air inlet grating 1, of thearched baffle 201. - It should be noted that the heating device may also be a heating film, a heating wire and the like, and is arranged on a surface or inside of the
arched baffle 201. Certainly, in addition to thearched baffle 201, the U-shaped baffle may also be provided with the heating device. - In order to avoid contact between the
electric heating pipe 202 and snow-water and snow-water, in the embodiment of the present application, the snow-water separator 2 further includes a V-shapedbaffle 203, an opening of the V-shapedbaffle 203 faces thearched baffle 201. The V-shapedbaffle 203 is connected with the correspondingarched baffle 201 to form a cavity for accommodating theelectric heating pipe 202, so that a closed cavity can be formed by the V-shapedbaffle 203, thearched baffle 201, the top plate and the bottom plate of the snow-water separator 2, which is isolated theelectric heating pipe 202 from the outside. - To further optimize the above technical solution, in order to improve the separation effect of the snow-
water separator 2, in the embodiment of the present application, the snow-water separator 2 includes a row of firstU-shaped baffles 205 and a row of secondU-shaped baffles 209. The inlet air can enter into an air-conditioning system only after two times of filtration of water. At the same time, the flow direction of the inlet air after passing through the U-shaped baffle changes, in order to avoid mutual interference between the inlet air flowing out of the U-shaped baffles in the same row, a firstflow guiding plate 204 extending between the two adjacent firstU-shaped baffles 205 is formed on a tip of the V-shapedbaffle 203. A secondflow guiding plate 207 extending between the two adjacent secondU-shaped baffles 209 is formed on the firstU-shaped baffle 205. So that the inlet air flows to the secondU-shaped baffle 209 under the action of the firstflow guiding plate 204 after flowing out of the firstU-shaped baffle 205, and flows into the air-conditioning system under the action of the secondflow guiding plate 207 after flowing out of the secondU-shaped baffle 209. - It is understandable that the construction of the snow-
water separator 2 is not limited to thearched baffle 201, the U-shaped baffle, the V-shapedbaffle 203 and the like, and other regular or irregular structures can be used to form a labyrinth channel. - In order to further improve the separation effect of the U-shaped baffle to snow-water, in the embodiment of the present application,
bent edges 208 extending into the U-shaped baffle are formed on two sides of the opening of the U-shaped baffle. The spacing between the twobent edges 208 gradually reduces in the extension direction. The inlet air may be forced to change direction again by using the twobent edges 208 at the opening of the U-shaped baffle when the inlet air flows out of the U-shaped baffle, so that the direction of the inlet air is changed twice in the U-shaped baffle, thereby achieving better separation effect. - In an embodiment, the fresh air inlet snow-melting device of the train further includes a temperature sensor and a controller. The temperature sensor is arranged at the air inlet of the air inlet grating 1 and is configured to measure the temperature at the air inlet of the air inlet grating 1. The temperature sensor is connected with a controller signal, and the controller is configured to control the heating device to be turned on when the temperature at the air inlet of the air inlet grating 1 is lower than a preset value, and to control the heating device to be turned off when the temperature at the air inlet of air inlet grating 1 is higher than the preset value, so as to realize the automatic control of the snow-melting device and facilitate the use.
- Furthermore, the fresh air inlet snow-melting device of the train further includes the temperature sensor connected with the controller signal. The temperature sensor is configured to monitor the temperature of the heating device. When the heating device overheats, the controller turns off the heating device to avoid failure due to overheating.
- To further optimize the above technical solution, in the embodiment of the present application, the fresh air inlet snow-melting device of the train further includes a pressure
wave valve plate 3 provided behind the snow-water separator 2 in a direction of the air inlet. - Based on the fresh air inlet snow-melting device of the train according to the above embodiments, a railway train is further provided according to the present application. The railway train includes the fresh air inlet snow-melting device of the train described in any one of the above. Since the railway train adopts the fresh air inlet snow-melting device of the train according to the above embodiments, the railway train has the same beneficial effect as the fresh air inlet snow-melting device of the train according to the above embodiments.
- The above embodiments are described in a progressive manner. Each of the embodiments is mainly focused on describing its differences from other embodiments, and references may be made among these embodiments with respect to the same or similar parts.
- The above illustration of the disclosed embodiments can enable those skilled in the art to practice or use the present application. Various modifications to the embodiments are apparent to the person skilled in the art, and the general principle herein can be implemented in other embodiments without departing from the spirit or scope of the present disclosure. Therefore, the present disclosure is not limited to the embodiments described herein, but should be in accordance with the broadest scope consistent with the principle and novel features disclosed herein.
1 air inlet grating, | 2 snow-water separator, |
201 arched baffle, | 202 electric heating pipe, |
203 V-shaped baffle, | 204 first flow guiding plate, |
205 first U-shaped baffle, | 206 water discharger, |
207 second flow guiding plate, | 208 bent edge, |
209 second U-shaped baffle, | 3 pressure wave valve plate |
Claims (10)
- A fresh air inlet snow-melting device of a train, comprising:an air inlet grating;a snow-water separator; anda heating device,wherein the snow-water separator is arranged behind the air inlet grating, and is provided with a labyrinth air inlet channel for separating snow-water from snow and water dischargers for discharging the snow-water, andwherein the heating device is provided on a side, facing the air inlet grating, in the snow-water separator.
- The fresh air inlet snow-melting device of the train according to claim 1, wherein, the snow-water separator comprises a row of arched baffles and at least one row of U-shaped baffles which are sequentially staggered from near to far relative to the air inlet grating, and the arched baffles are arched toward the air inlet grating, and an opening of each U-shaped baffle faces the air inlet grating.
- The fresh air inlet snow-melting device of the train according to claim 2, wherein each of the water dischargers is provided under the corresponding U-shaped baffle.
- The fresh air inlet snow-melting device of the train according to claim 2 or 3, wherein, the heating device comprises an electric heating pipe, and the electric heating pipe is arranged in one-to-one correspondence with a side, away from the air inlet grating, of each arched baffle.
- The fresh air inlet snow-melting device of the train according to claim 4, wherein, the snow-water separator further comprises a V-shaped baffle, and the V-shaped baffle is connected with the corresponding arched baffle to form a cavity for accommodating the electric heating pipe.
- The fresh air inlet snow-melting device of the train according to claim 5, wherein, the snow-water separator comprises a row of first U-shaped baffles and a row of second U-shaped baffles, a first flow guiding plate extending between two adjacent first U-shaped baffles is formed on a tip of the V-shaped baffle, and a second flow guiding plate extending between two adjacent second U-shaped baffles is formed on the first U-shaped baffle.
- The fresh air inlet snow-melting device of the train according to any one of claims 2, 3, 5 and 6, wherein, bent edges extending into the corresponding U-shaped baffle are formed on two sides of the opening of each U-shaped baffle, and spacing between the two bent edges gradually reduces along an extension direction.
- The fresh air inlet snow-melting device of the train according to any one of claims 1 to 3 and 5 to 6, further comprising a temperature sensor and a controller, wherein the temperature sensor is arranged at an air inlet of the air inlet grating, and the controller is configured to control the heating device to be turned on when the temperature at the air inlet of the air inlet grating is lower than a preset value, and to control the heating device to be turned off when the temperature at the air inlet of the air inlet grating is higher than the preset value.
- The fresh air inlet snow-melting device of the train according to any one of claims 1 to 3 and 5 to 6, further comprising a pressure wave valve plate provided behind the snow-water separator in a direction of the air inlet.
- A railway train, comprising the fresh air inlet snow-melting device of the train according to any one of claims 1 to 9.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811503092.XA CN109353362A (en) | 2018-12-10 | 2018-12-10 | A kind of track train and train fresh air air inlet device for melting snow |
CN201822067450.9U CN209191959U (en) | 2018-12-10 | 2018-12-10 | A kind of track train and train fresh air air inlet device for melting snow |
PCT/CN2019/120993 WO2020119451A1 (en) | 2018-12-10 | 2019-11-26 | Railway train and fresh air inlet snow-melting device of train |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3895953A1 true EP3895953A1 (en) | 2021-10-20 |
EP3895953A4 EP3895953A4 (en) | 2022-09-07 |
Family
ID=71075724
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP19895761.5A Withdrawn EP3895953A4 (en) | 2018-12-10 | 2019-11-26 | Railway train and fresh air inlet snow-melting device of train |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP3895953A4 (en) |
SG (1) | SG11202008048WA (en) |
WO (1) | WO2020119451A1 (en) |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3023236A1 (en) * | 1980-06-21 | 1982-01-14 | Daimler-Benz Ag, 7000 Stuttgart | BETWEEN THE ENGINE AND TRUNK AND THE SPLASH OF A VEHICLE LOCATED AGGREGATE ROOM |
JP4464422B2 (en) * | 2007-06-06 | 2010-05-19 | カルソニックカンセイ株式会社 | Drainage structure of vehicle air conditioner |
CN101078562A (en) * | 2007-06-29 | 2007-11-28 | 泰州泰怡热工电器有限公司 | Air preheater |
CN203126861U (en) * | 2012-11-16 | 2013-08-14 | 江苏新誉空调系统有限公司 | Rail transit air conditioning unit rainwater separating device |
CN203888576U (en) * | 2014-05-26 | 2014-10-22 | 南车青岛四方机车车辆股份有限公司 | Vehicle, air conditioner and overhead fresh air opening structure thereof |
CN204674593U (en) * | 2015-05-18 | 2015-09-30 | 江苏荣邦机械制造有限公司 | Rail vehicle air conditioner group electro heat rainwater separator |
CN205652133U (en) * | 2016-05-13 | 2016-10-19 | 上海飞特亚空气过滤有限公司 | Electrical heating snow melt rain separator |
CH713147B1 (en) * | 2016-11-18 | 2020-07-15 | Gk Gruenenfelder Ag | Vehicle body for a vehicle for the transportation of goods, with a roof structure with at least one plate and at least one electric heating device. |
JP6879781B2 (en) * | 2017-03-01 | 2021-06-02 | 株式会社ヴァレオジャパン | Vehicle air conditioner |
CN206679002U (en) * | 2017-04-13 | 2017-11-28 | 重庆公共运输职业学院 | A kind of fresh air energy saving device of the orbit passenger transport row car air-conditioner of energy-conserving and environment-protective |
DE102018000998A1 (en) * | 2018-02-07 | 2018-08-02 | Daimler Ag | On-roof heat pump for a motor vehicle, in particular for a commercial vehicle |
CN109353362A (en) * | 2018-12-10 | 2019-02-19 | 中车长春轨道客车股份有限公司 | A kind of track train and train fresh air air inlet device for melting snow |
CN209191959U (en) * | 2018-12-10 | 2019-08-02 | 中车长春轨道客车股份有限公司 | A kind of track train and train fresh air air inlet device for melting snow |
-
2019
- 2019-11-26 WO PCT/CN2019/120993 patent/WO2020119451A1/en unknown
- 2019-11-26 EP EP19895761.5A patent/EP3895953A4/en not_active Withdrawn
- 2019-11-26 SG SG11202008048WA patent/SG11202008048WA/en unknown
Also Published As
Publication number | Publication date |
---|---|
WO2020119451A1 (en) | 2020-06-18 |
SG11202008048WA (en) | 2020-09-29 |
EP3895953A4 (en) | 2022-09-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8201651B2 (en) | Automobile over-bulkhead air intake system | |
US8157040B2 (en) | Automobile over-bulkhead air intake system | |
CN104149804A (en) | Overhead air conditioning unit with sand wind preventing function and for railway vehicle | |
CN202743013U (en) | Rain hat system for vehicle | |
US3413905A (en) | Air intake | |
EP2275294B1 (en) | Drain pan | |
EP3895953A1 (en) | Railway train and fresh air inlet snow-melting device of train | |
CN104755847A (en) | Air conditioner | |
CN109353362A (en) | A kind of track train and train fresh air air inlet device for melting snow | |
CN209191959U (en) | A kind of track train and train fresh air air inlet device for melting snow | |
CN201872760U (en) | Wind and sand prevention ventilating system of motor train unit trailer air conditioner | |
JP6121200B2 (en) | Gas-liquid separation structure for vehicle air conditioning | |
JP6095777B2 (en) | Air conditioner for vehicles | |
CN109720365A (en) | The air-conditioning duct and rail vehicle of rail vehicle | |
CN108058646B (en) | Car rearview mirror | |
KR101762839B1 (en) | Structure and Apparatus for Ventilation of Vehicle with Guide Vane | |
CN206278106U (en) | The anti-winged water installations of railway vehicle air conditioner negative pressure cavity discharge outlet | |
CN105189245A (en) | Air outlet | |
DE102015007454A1 (en) | Air intake for a heating, ventilating, - or air conditioning of a motor vehicle | |
EP2168796B1 (en) | Air conditioning system for a car | |
JP2007045326A (en) | Air conditioner | |
CN112776839B (en) | Low-temperature demisting device of railway locomotive | |
CN112849082A (en) | Clearing device for automobile and automobile comprising same | |
CN105555565B (en) | Water tank for motor vehicles | |
CN216684297U (en) | Vehicle with a steering wheel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20200813 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
A4 | Supplementary search report drawn up and despatched |
Effective date: 20220808 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B61D 27/00 20060101AFI20220802BHEP |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: LI, CHANGSHENG Inventor name: ZHAO, JINLONG Inventor name: CAO, YANHUA |
|
STAA | Information on the status of an ep patent application or granted ep patent |