WO2019190078A1 - 건축물의 슬라브 시공 장치 및 방법 - Google Patents
건축물의 슬라브 시공 장치 및 방법 Download PDFInfo
- Publication number
- WO2019190078A1 WO2019190078A1 PCT/KR2019/002774 KR2019002774W WO2019190078A1 WO 2019190078 A1 WO2019190078 A1 WO 2019190078A1 KR 2019002774 W KR2019002774 W KR 2019002774W WO 2019190078 A1 WO2019190078 A1 WO 2019190078A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- slab
- supporter
- prop head
- detachable guide
- support
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/48—Supporting structures for shutterings or frames for floors or roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/48—Supporting structures for shutterings or frames for floors or roofs
- E04G11/50—Girders, beams, or the like as supporting members for forms
Definitions
- the present invention relates to the construction of concrete slabs of a building, and more particularly, the assembly and dismantling of slab panels used in the construction of slabs ranging from the slab construction through the curing process after slab concrete casting using formwork to support the weight of the concrete slabs at the upper end.
- the slab construction apparatus and method of the building to be made quickly and simply by a detent type support coupled to the prop head and the detachable guide coupled to guide the progressive lowering of the slab panel.
- the recent construction formwork is composed of a panel assembly mainly made of metal, such as iron or aluminum bar
- the wall formwork is formed in a rectangular unit with a vertical length is relatively larger than the width at intervals of the thickness of the wall to be constructed
- the slab formwork is assembled by successive joining of the wall panels to cover the area of the wall, and the slab formwork consists of a series of rectangular unit slab panels arranged in a single plane between the supporter erected vertically from the floor and the beams supported on the top of the wall formwork. By being arranged so as to constitute a support bottom surface for concrete pouring.
- the concrete is poured into the formwork, and when the curing is completed, the formwork is dismantled.
- the height (floor height) between the floor surface and the ceiling exceeds the worker's height. Therefore, in order to dismantle the slab panel, the slab panel which is separated by the operator using the ladder to separate and dismantle the panel is dropped to the floor by its own weight. As a result, the noise and dust generated during the collision with the floor have been inevitably deteriorating not only the construction site but also the surrounding environment.
- Korean Patent Registration No. 10-0484512 is to dismantle the formwork after concrete casting and curing for forming walls and slabs through formwork.
- the slab panel support beam structure is improved so that the slab panel does not fall directly from the ceiling to the floor and is supported at a height lower than the operator needs to use a ladder, thereby allowing the operator to lift the panel directly to the floor.
- the construction method of the slab construction formwork of a new method has been disclosed.
- the slab construction formwork of the above patent solves all the problems that have been pointed out in the existing formwork at once, and it is dismantled easily and quickly while minimizing damage to the panel easily and quickly without requiring special skills for installing and dismantling the formwork. Due to the advantage of being able to plan work, the related industry has been dubbed the "drop construction method", and the construction using the same as the eco-friendly form construction method for the construction of apartments and high-rise buildings has been continuously expanded.
- Patent Registration No. 10-1127008 discloses that one side is placed on the slab corner bracket on the top of the wall panel.
- a technique is disclosed in which a slab panel supporting beam that is rotatably mounted is lowered along with a tie rod, and the slab panel is also lowered.
- Patent No. 10-1491074 discloses a yoke for supporting a slab panel from a slab corner bracket. As it is removed, a method of dismantling formwork is known to move the slab panel downward along the supporter while keeping the slab panel horizontal.
- Patent registration No. 10-1514395 is to support the center portion of the beam by a bracket slidably mounted to the supporter, and the beam is configured so that both ends of the link linkage by the slab corner brackets when the slab panel is dismantled
- a technique that allows the slab beam and the slab panel supported thereon to be lowered together In the process of sliding down the bracket mounted on the outer peripheral surface of the supporter has been disclosed a technique that allows the slab beam and the slab panel supported thereon to be lowered together.
- the corner bracket which is mounted on the sofit length of the top of the wall panel and coupled with the outer end of the beam is easy from the sofit length and beam at the time of disassembly of the formwork.
- a prop head connected to the beam is formed on the upper side of the supporter, and below it, a sliding guide for guiding and supporting the beam is detachably formed, and the slab panel and the beam weight It is to provide a slab construction device of the building so that the descending by a stable through the lumber member provided in the removable sliding guide.
- Another object of the present invention is to allow the corner bracket to be coupled to the beam outer end of the top of the wall panel to be easily combined and separated from the pit and the beam, while the beam is mounted together with the fixture on the outer circumferential surface of the supporter under the prophead of the assisted supporter.
- the slab panel and the beam can be lowered by the weight of the slab slowly and stably through the stiffening member provided in the sliding guide when dismantling the formwork. It is to provide a construction method for building slabs so that installation and dismantling of the building can be done simply and quickly.
- the above and other objects of the present invention are a beam fixing bracket coupled by a hinge pin to a corner bracket slidably mounted to a pit lance at a top of a wall panel, a supporter standing vertically from the bottom, and A prop head coupled to an upper end of the supporter and having the same cross section as the beam, each outer end being fixed to the beam fixing bracket or the prop head and supported horizontally by the supporter between the opposite wall panel;
- a slab panel coupled in a lattice form in the same plane in the space partitioned by the beam length and the beam to form a slab bottom surface, and the beam and the prop head are integrally connected to support the load of the beam by the supporter.
- a beam holding member for supporting the beam together with the beam holding member and being separated from the prop head.
- a detachable guide for lowering the beam along the supporter, a stiffening member for progressively lowering the beam by friction with the outer circumferential surface of the supporter when the detachable guide descends, and fixed to a predetermined height on the supporter to fix the beam and the slab
- a construction slab construction device comprising a stopper to stop the panel from descending.
- the corner bracket has a substantially rectangular cross-sectional shape in which the lower surface of the one side is joined so that the lance is inserted so as to be slidably inserted, the lower side of the pair is formed with a pair of pin inserts, One side of the vertical outer wall to be inserted into a combination consists of a free end formed with a locking step is present between the pin insertion portion and the locking step is present as a slit.
- the beam fixing bracket includes a fastening part including a pin hole for common insertion of the pin insertion part and the hinge pin of the corner bracket and a horizontally extending one side in the fastening part, and caught by a pin fastened to the beam at an outer end thereof. It includes a body portion including a formed locking bending piece and a hook extending upward from the fastening portion opposite to the body portion and hooked to the engaging jaw of the corner bracket at its end.
- the hook In the beam fixing bracket, the hook is engaged with the locking jaw of the corner bracket by the common insertion of the hinge pin in a state in which the pin hole of the fastening part is aligned with the pin insertion part of the corner bracket, and thus the hook fixing member is fixed to the pit pit and the corner bracket.
- the prop head is fixed in the form of a support that is fitted to the upper end of the supporter, and wrapped around the support on the upper end of the support and consists of a main body of an inverted triangular shape in which both ends are inclined downward in the same cross-sectional shape as the beam.
- the beam is coupled to the prop head supported on the top of the supporter, and both ends are supported by the pit lance to support the slab panel.
- the beam has the same cross section as the prop head, and the side end coupled with the prop head is upward. It forms a slope.
- the beam is provided with a fixing piece seating portion as a recessed portion in which a seating rib for mounting the slab panel is projected along the length direction on the front and rear surfaces thereof, and downwardly bent in the width direction.
- the supporter under the prop head is formed symmetrically with each other is provided with a detachable guide is installed on the outer peripheral surface of the supporter, the detachable guide is fixed to the pin hole of the fixing piece in common to the upper end of the wing portion extending upwardly outward A pinhole is provided for inserting the pin, and the lower member seating portion is integrally formed under the wing portion.
- the stiffening member includes a friction member head which makes frictional contact with the outer circumferential surface of the supporter by the elastic force of the spring, and a fixed rod which is fixed to the stiffening member seating portion with the spring interposed therebetween.
- a stopper is formed on the outer circumferential surface of the vertical section of the supporter to stop the detachable guide descending together with the beam at the time of dismantling of the slab in the lowered state only by the predetermined section.
- the prop head and the beam are fixed by using a fixing piece and a detachable guide, and the beam fixing bracket is used to fix the end of the beam to the corner bracket so that the beam is horizontal and between the two walls.
- the detachable guy Guide the beam and slab panel to descend along the outer circumferential surface of the support under the action of frictional force by the stiffening member, descending on the supporter to separate the stopped panel and beam from the stopper and slab concrete After complete curing, the prop head is coupled with the supporter removed.
- the beam and the prop head are connected to each other, and then the beam and the prop head connected to each other are supported on the pit pit at the top of both walls, and then the top of the supporter is installed on the prop head installed from the ground. It may be combined, but the following process is the same as the previous method.
- the present invention does not need to install a separate filler support until the complete curing of the concrete after dismantling the formwork in the conventional slab construction, the support of the present invention equipped with a prop head to guide the lowering of the beam and slab panel and Together with the configuration of the zone-type support, which serves as a pillar support, there is an advantage that the formwork and the dismantling work can be made quickly and easily by simplifying the formwork component for slab construction.
- the zoned support serves to prevent sagging due to the weight of the concrete until the load and curing of the concrete are generated during the casting of the concrete for slab formation. Otherwise, no additional filler support is required.
- the coupling and separation between the prop head and the beam including the coupling and separation between the beam and the pit lance, are made in one step by the insertion and separation of the pin, the installation and dismantling work for the slab construction is highly advanced. Construction work can be performed quickly without the need for proficiency.
- the beam and the panel assembly as a heavy weight falling by the weight in the process of dismantling the form is guided to the separate guide to descend the ride on the outer circumferential surface of the supporter while maintaining the overall horizontal state by the frictional force of the stiffening member It is gradually lowered in the course of the control, and thus the risk of panel damage and safety accidents in the process of disassembly of the form is eliminated, while the source of noise or dust is also blocked.
- FIG. 1 is an exploded perspective view of an embodiment of the present invention
- Figure 2 is a perspective view of the device of Figure 1 coupled
- Figure 3 is an exploded perspective view of the pit pit and beam coupling unit according to an embodiment of the present invention.
- Figure 4 is a cross-sectional view of the coupling state and the beam sopit according to an embodiment of the present invention.
- Figure 5 is an exploded perspective view of the beam and the supporter coupling portion according to an embodiment of the present invention.
- Figure 6 is a cross-sectional view of the combined state of FIG.
- FIG. 7 is a cross-sectional view of the prop head and the beam separated from the apparatus of FIG. 5;
- FIG. 8 is an exploded perspective view of another embodiment of the detachable guide of the present invention.
- FIG. 9 is a cross sectional view of the prop head and beam engagement of the apparatus in which the detachable guide of FIG. 8 is used; FIG.
- Figure 10 is a perspective view showing the installation state of the slab panel using the apparatus of the present invention.
- 11-15 are step-by-step cross-sectional views of a form dismantling process according to the method of the present invention.
- Figure 1 is an exploded perspective view of an embodiment of the present invention
- Figure 2 is a perspective view of the combined state of the device of Figure 1
- Figure 3 is a pit and beam coupling portion according to an embodiment of the present invention 4 is an exploded perspective view
- FIG. 4 is a cross-sectional view illustrating a coupling state between a pit pit and a beam according to an exemplary embodiment of the present invention.
- the pit pit 1000 is mounted on the upper end of the wall panel (not shown), the beam 2000 is coupled to both ends of the pit pit 1000 and supported, and the beam (
- the prop heads 3000 are coupled to each other in a straight line by connecting the 2000 and the prop heads 3000 and the beam heads 2000 are more securely connected to the prop heads 3000.
- the detachable guide 4000 guides the beam and the slab panel to descend along the supporter by its own weight, and is installed on the main body of the detachable guide 4000, and the beam and the slab panel descend along the supporter along with the detachable guide.
- the stiffening member 5000 for lowering and vertically erected from the bottom, the upper end is coupled to the prop head 3000 to support the prop head, while mounting of the detachable guide 4000 is achieved.
- the pit pit 1000 is a substantially hollow rectangular cross-sectional shape of one side lower portion of the beam 2000 coupling portion, which is fixed to the top of the wall panel in a horizontal direction, and has a corner bracket 1300 having approximately the same circumferential cross-sectional shape therein. ) Is inserted sliding.
- the corner bracket 1300 has a pair of pin insertion portions 1310 formed at one side lower portion thereof, and one side vertical outer wall portion which is inserted in combination with the small pipe length comprises a free end portion having a locking step 1320 formed therein. An open space is formed between the insertion part 1310 and the locking step 1320.
- the engaging jaw 1320 of the corner bracket 1300 in the state coupled to the pit pit 1000 is supported in contact with the step 1150 protruding inward on the free end of the outer vertical wall of the pit pit. do.
- a beam fixing bracket 1500 for coupling the two members through the corner bracket 1300 is coupled to the corner bracket 1300.
- the beam fixing bracket 1500 includes a fastening part 1510 having a pinhole 1511 formed therein, and a hooking bending piece formed to be caught by a pin P2 extending to the outer side in the horizontal direction of the fastening part and fastened to a beam at an outer end thereof.
- the beam fixing bracket 1500 has a hinge pin P1 in a state in which the pinhole 1511 of the fastening portion 1510 is aligned with the pin insertion portion 1310 of the corner bracket 1300. ), The hook 1512 is engaged with the latching jaw 1320 of the corner bracket 1500 to be fixed to the pit length 1000 and the corner bracket 1300.
- Reference numeral F is a stop piece for preventing the separation of the hinge pin (P1).
- Figure 5 is an exploded perspective view of the beam and the supporter coupling portion according to an embodiment of the present invention
- Figure 6 is a cross-sectional view of the coupling state of Figure 5, as shown therein
- the prop head 3000 is the supporter 6000
- the main body of the inverted triangular hollow cross-section is fixed to the upper end of the support (3200) and the upper end of the support (3200) is fixed in the form surrounding the support and the same cross-sectional shape as the beam 2000, both ends are inclined downward 3100.
- the main body 3100 of the prop head 3000 is vertically bent from the upper and lower ends of the planar upper surface 3110 and the upper surface of which the anchor 3111 is formed to be fixed to the bottom surface of the slab to be constructed, the slab panel is coupled Being provided on both sides (3120) and the fixing piece fastening surface (3140) vertically extending down the stepped portion 3130 inwardly bent from the lower end of both sides, the fixing piece fastening surface (3140) for fixing the fixing piece
- the pin insertion hole 3141 is formed.
- the beam 2000 is coupled to the prop head 3000 supported on the top of the supporter 6000, and both ends thereof are supported by the pit pit 1000 to support the slab panel SP. It has the same cross section as 3000, and the side end portion coupled with the prop head 3000 forms an upward inclined surface to form a straight line without a gap when the prop head and the beam are connected.
- the beam 2000 has a fixing piece 2200 as a concave indentation in which a seating rib 2100 for seating the slab panel is protruded along the length direction on the front and rear surfaces thereof, and is bent backward in the width direction below the beam 2000. ) Is provided.
- the beam 2000 and the prop head 3000 are connected and fixed by a pair of fixing pieces 2300 which are commonly fastened to the prop head 3000, the beam 2000, and the detachable guide 4000.
- the detachable guide 4000 is installed symmetrically on the supporter 6000 below the prop head 3000, and the detachable guide 4000 is fixed to the upper end of the wing portion 4100 extending upwardly outward.
- a pinhole 4110 is provided for insertion of the fixing pin P3 which is commonly inserted into the pin hole 2310, and the lower member seating portion 4200 is integrally formed under the wing portion 4100.
- the stiffening member 5000 extends from the friction head 5110 and the friction head making frictional contact with the outer circumferential surface of the supporter 6000 by the elastic force of the spring 5200, and seats the stiffening member with the spring 5200 interposed therebetween.
- the fixed rod 5120 is fixed to the portion 4200.
- a lower portion of the detachable guide 4000 that is, the fastening member 4300 for mounting to the supporter 6000 may be extended to the inner side of the loose member seating portion 4200, respectively, and the fastening portion may be coupled on the free end of the fastening portion.
- Fasteners for fasteners are formed, the fasteners may be made of a hook or a separate fastening piece.
- Figure 5 shows a fastening part fixture consisting of the engaging portion 4310 on both sides.
- FIG. 8 shows another embodiment of the detachable guide 4000, wherein one of the fasteners is one of the fastening portions 4310, and the other is the fastening piece 4320, and above the wing portion 4100. It has the same structure as the detachable guide of Figure 5 except that the support bracket 4400 of the "b" shape cross section is added.
- the support bracket 4400 in the state in which the pin P3 is inserted through the pinhole 4110 or the pin P3 is inserted into the fixing piece 2300 and the pinhole of the beam as shown in FIG. 9. ) May take the form of contact supporting the bottom of the pin P3.
- the fixing piece 2300 is positioned on the fixing piece fastening surface 3140 of the prop head 3000 and the fixing piece seating part 2200 surface of the beam 2000, and the detachable guide 4000. Inserting the center pin (P3) across the fixing piece 2300 and the prop head (3000) in a state that the pin hole (4110) formed in both wing portions (4100) of the corresponding to the pin hole 2310 of the corresponding fixing piece Meanwhile, by inserting both pins P3 penetrating the fixing piece 2300 and the pin 2000 and the pinhole 4110 of the detachable guide 4000, the beam is coupled to the prop head and the beam, and thus coupled The assembly is supported by the supporter 6000.
- the prop head 3000 and the beam 2000 and the detachable guide 4000 using the fixing piece 2300 and the pin (P3) as described above the fixed fixing state between these members is maintained and the supporter
- the prop as shown in Figures 5 and 6 in preparation for the risk that the slab panel assembly including the beam falls by the load applied from the weight of the concrete and the beam cast to form the slab
- the locking jaw 3210 is formed on the outer circumferential surface of the support 3200 of the head 3000, and thus the small-diameter portion 8200 of the stop key 8000 having the large-diameter portion 8100 and the small-diameter portion 8200 is attached to the locking jaw 3210. ) To support the more secure slab panel assembly through the stop key 8000.
- the beam 2000, the prop head 3000, and the detachable guide 4000 are integrally coupled to each other, and the friction of the stiffening member 5000 is completed when the slab panel (not shown) is assembled between the beams.
- the head 5110 is in a state of making elastic contact with the outer circumferential surface of the supporter 6000 by the elastic force of the spring 5200, wherein the friction head 5110 gives a frictional force in relation to the supporter 6000 made of a metal material
- a suitable material may be made of rubber or synthetic resin and the like, and the spring may adjust the friction force applied to the supporter by adjusting the elastic force.
- the detachable guide 4000 descending together with the beam when dismantling the slab panel has a predetermined section, that is, the worker does not use a separate ladder.
- a stopper 7000 is formed to stop in the lowered state at a height sufficient to pull down the back, and the stopper is formed from the entire outer circumferential surface of the supporter so that the stopper can reliably support the heavy material including the detachable guide in contact therewith. It is preferable to form it with the support surface extended outward.
- reference numeral P4 denotes a pin for fixing the stopper on the supporter 6000.
- the slab construction method using the slab factory of the present invention having the above structure is as follows.
- the pit pit 1000 is installed at an upper end of a wall panel installed in advance, and a plurality of corner brackets 1300 are slidably inserted into the beam coupling part.
- the prop head and the beam 2000 are fixed to the top of the supporter 6000 and the prop head and the beam 2000 are vertically erected from the bottom of a position in line with the corner brackets of the side walls.
- the beam fixing bracket 1500 allows the end of the beam to be fixed to the corner bracket 1300 so that the beam 2000 is horizontal and supported between both walls. do.
- the coupling between the prop head 3000 and the beam 2000 allows the prop head 3000 and the beam 2000 to be in a straight line, as well as the pinholes 4110 provided at both wing portions 4100 of the detachable guide 4000. This is achieved by abutting the pinning piece 2300 and penetrating the pin P3 through the three pinholes 2310 in a state in which the pinhole of the corresponding fixing piece 2300 and the pinhole of the beam are matched.
- the coupling between the corner bracket 1300 and the beam 2000 is a pin hole 1511 formed in the fastening portion 1510 of the beam fixing bracket 1500 and the pin insertion portion of the corner bracket 1300 as shown in FIG. 4.
- the pin 13 is commonly inserted in the state in which the 1310 is aligned, and the end of the beam 200 is mounted on and supported on the beam fixing bracket 1500 fixed to the sofit length 1000.
- the slab panel is seated in the space between the beams that span the top of both walls and is supported by the supporter, so that the surface of the beam and the slab panel and the pit length are free of voids or gaps. Formation of the formwork is completed by forming a surface.
- the beam 2000 and the pit lance 1000 are separated by removing the pin P1 coupling the corner bracket 1300 and the beam fixing bracket 1500 to remove the beam fixing bracket 1500. To lose.
- one end portion of the dismantling tool T having an open end in contact with the step 3130 of the prop head 3000 is inserted into the hole formed at the side of the slab panel SL. Hold the handle in one state and rotate it to separate the contact surface of the slab panel with concrete.
- the beam 2000 is separated from the prop head 3000.
- the separation between the two members is achieved by removing the pin P3 inserted into the central pinhole 2300 of the fixing piece 2300.
- the slab panel assembly begins to descend the supporter by its own weight. If the stop key 8000 is mounted, the slab panel is moved by striking the stop key so that the prop 3200 of the prop head 3000 moves from the small diameter portion 3100 of the stop key to the large diameter portion 8200. Lowering of the assembly is initiated.
- the lowering of the slab panel assembly is elastic on the outer circumferential surface of the supporter 6000 in a state where the beam 200 is firmly supported by the fixing piece 2300 and the detachable guide 4000 as shown in FIGS. 7 and 12.
- the lowering force is gradually lowered by the frictional force applied from the stiffening member 5000, which is in contact with the lowering member 5000, and the lowering is performed in a horizontal state in which a wide flat slab panel assembly is inclined to either side or the assembly state is not disturbed. It is stable.
- the lowering of the slab panel assembly is stopped as the bottom surface of the detachable guide 4000 contacts the stopper 7000 on the supporter 6000. At this time, the operator removes the coupling pins between the slab panels (SP) without using a separate ladder to separate the slab panel and put it down to the floor (Fig. 13).
- Both of the detachable guides 4000 are pushed up or pushed down relatively in the case of both of the fastening portion fasteners of the engaging portion 4310, and in the case of one of the fastening portion fasteners of the fastening piece 4320. After removing the piece for the removal is easily made from the supporter 6000 through a simple operation of applying a relative vertical position change.
- the support including the prop head remains as a zoned support that supports the load until the slab concrete is fully cured, as shown in FIG. After curing, dissolution takes place.
- the beam 2000 and the prop head 3000 are first connected to each other using the fixing piece 2300 to form a beam and a prop head assembly having a length matching the length between both side walls. And assembling the corner bracket 1300 and the beam support bracket 1500 to the pit lance 1000 at the top of the wall, and allowing both ends of the beam and prop head assembly to be supported by the beam support bracket.
- the slab construction formwork comprising the step of engaging the upper end of the supporter coupled to the detachable guide 4000 on the outer circumferential surface with the prop head support of the beam and prop head assembly, and the support of the beam by the wing of the detachable guide It consists of an installation step, and the form dismantling step following the concrete pouring is performed in the same process as the previous method.
- a detachable guide 4000 provided with the support bracket 4400 of FIG. 8.
- the support bracket 4400 of the detachable guide 4000 coupled to the beam and prop head assembly together with the supporter 6000 is pins P3 pre-inserted on both outer sides of the fixing piece 2300 as shown in FIG. 9. Support the bottom of the).
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
Claims (14)
- 벽 패널의 상단에 장착되어 코너 브라켓(1300)이 결합되는 소피트 랭스(1000)와,상기 코너 브라켓(1300)에 결합되는 빔 고정용 브라켓(1500)에 양측 단부가 지지되는 빔(2000)과,상기 빔(2000)과 동일한 상면을 유지하며 직선상으로 연결되는 프롭 헤드(3000)와,서포터의 외주면에 결합되어 상기 프롭 헤드(3000)와 빔(2000)의 연결이 이루어지도록 하는 한편 거푸집의 해체시에 프롭 헤드(3000)를 제외한 빔(2000)과 슬라브 패널이 자중에 의해 서포터를 따라 하강하도록 유도하는 분리형 가이드(4000)와,상기 분리형 가이드(4000)에 구비되어 분리형 가이드와 함께 서포터를 따라 하강하는 빔과 슬라브 패널의 완만한 하강이 이루어지도록 하는 완강부재(5000)와,상단부가 상기 프롭 헤드(3000)와 결합되어 프롭 헤드를 지지하는 한편 상기 분리형 가이드(4000)의 장착이 이루어지는 서포터(6000), 및상기 서포트(6000)의 외주면에 돌출되게 형성되어 분리형 가이드(4000)의 하강을 정지시키는 스토퍼(7000)를 포함하여 구성됨을 특징으로 하는 건축물의 슬라브 시공 장치.
- 제1항에 있어서, 상기 코너 브라켓(1300)은 한 쌍의 핀 삽입부(1310)가 구비되고 일측 수직외벽의 자유단부에는 걸림턱(1320)이 형성되며,상기 빔 고정용 브라켓(1500)은 상기 코너 브라켓(1300)의 핀 삽입부(1310)와 핀(P1)이 공통삽입되는 핀홀(1511)이 구비된 체결부(1510)와 상기 체결부로부터 연장되고 외측 단부에 빔(2000)에 체결되는 핀(P2)에 걸리도록 형성된 걸림절곡편(1521)을 포함하는 몸체부(1520) 및 상기 몸체부(1520)와 상기 체결부(1510)로부터 상향으로 연장되고 그 단부에 상기 코너 브라켓(1300)의 걸림턱(1320)에 걸어물리도록 형성된 후크(1512)를 포함하여 이루어진 것을 특징으로 하는 건축물의 슬라브 시공 장치.
- 제1항에 있어서, 상기 프롭 헤드(3000)는 상기 서포터(6000)의 상단에 끼움 결합되는 지주(3200)와, 상기 지주(3200)의 상단에 지주를 감싸는 형태로 고정되며 빔(2000)과 동일한 단면 형태로서 양측 단부가 하향 경사진 전체적으로 역삼각형 중공 단면 형태의 본체(3100)로 이루어짐을 특징으로 하는 건축물의 슬라브 시공 장치.
- 제3항에 있어서, 상기 프롭 헤드(3000)의 본체(3100)는 앵커(3111)가 돌출형성된 평면상의 상면(3110)과 상면의 상하 단부로부터 수직으로 절곡되어 슬라브 패널이 결합되는 양 측면(3120) 및 양측면의 하단부로부터 내향 절곡된 단턱부(3130)의 아래로 수직 연장된 고정편 체결면(3140)이 구비되고, 상기 고정편 체결면 (3140)에는 핀삽입공(3141)이 형성됨을 특징으로 하는 건축물의 슬라브 시공 장치.
- 제1항에 있어서,상기 빔(2000)은 전,후면상에 슬라브 패널의 안착을 위한 안착 리브(2100)가 길이방향을 따라 돌출형성되고, 그 아래쪽으로는 폭방향으로 후퇴절곡된 고정편 안착부(2200)가 구비된 것을 특징으로 하는 건축물의 슬라브 시공 장치.
- 제5항에 있어서, 상기 빔(2000)과 프롭 헤드(3000)의 연결은 프롭 헤드(3000)와 빔(2000) 및 분리형 가이드(4000)에 공통 체결되는 한 쌍의 고정편(2300)과 고정편(2300) 사이를 관통하여 삽입되는 핀(P3)에 의해 이루어짐을 특징으로 하는 건축물의 슬라브 시공 장치.
- 제1항에 있어서, 상기 분리형 가이드(4000)는 분리 결합이 가능한 한 쌍의 대칭 구조로서, 외측으로 상향 연장된 각 윙부(4100)의 상단에 핀홀(4110)이 구비되고, 윙부(4100) 아래쪽으로는 완강부재 안착부(4200)가 일체로 형성됨을 특징으로 하는 건축물의 슬라브 시공 장치.
- 제7항에 있어서, 상기 분리형 가이드(4000)의 완강부재 안착부(4200) 내측으로는 상기 서포터(6000)에의 장착을 위한 체결부(4300)가 각각 연장 형성되고, 체결부(4300)의 자유단부에는 체결부 고정구로서 걸어물림부(4310)나 체결용 피스(4320)가 구비됨을 특징으로 하는 건축물의 슬라브 시공 장치.
- 제8항에 있어서, 상기 분리형 가이드(4000)의 체결부 고정구 중 한 쪽은 걸어물림부(4310)로, 다른 쪽은 체결용 피스(4320)으로 이루어지며, 윙부(4100)의 위쪽으로 "ㄴ"자 단면의 지지브라켓(4400)이 연장 형성된 것을 특징으로 하는 건축물의 슬라브 시공 장치.
- 제1항에 있어서, 상기 완강부재(5000)는 스프링(5200)의 탄성력에 의해 서포터(6000)의 외주면과 마찰접촉을 이루는 마찰헤드(5110)와 마찰헤드로부터 연장되어 스프링(5200)이 개재된 상태로 분리형 가이드(4000)의 완강부재 안착부(4200)에 고정되는 고정로드(5120)를 포함하여 구성됨을 특징으로 하는 건축물의 슬라브 시공 장치.
- 제1항에 있어서, 상기 프롭 헤드(3000)의 지주(3200) 외주면에 걸림턱(3210)을 형성되고, 대경부(8100)와 소경부(8200)를 갖는 멈춤키(8000)의 소경부(8200)가 상기 걸림턱(3210)에 괘지되도록 하여 멈춤키(8000)를 더 포함하는 것을 특징으로 하는 건축물의 슬라브 시공 장치.
- 제1항에 있어서, 상기 서포터(6000)는 슬라브 판넬의 해체 후 슬라브 콘크리트의 양생이 완료되기까지 슬라브 저면과 바닥면 사이의 하중을 지지하는 존치형 서포트인 것을 특징으로 하는 건축물의 슬라브 시공 장치.
- 벽체 패널의 상단에 소피트 랭스를 설치하고 이에 코너 브래킷과 빔 고정용 브라켓을 장착하는 단계,서포터의 상단에 프롭 헤드를 결합하여 바닥으로부터 수직으로 세우는 단계, 상기 프롭 헤드와 빔을 고정편과 분리형 가이드를 이용해서 고정시키는 한편 빔 고정용 브라켓을 이용하여 빔의 단부가 코너 브라켓에 고정되도록 하여 빔이 수평 상태를 유지하며 양 벽체 사이에 지지되도록 하는 단계;빔 사이의 공간에 슬라브 패널을 격자상으로 안착시키는 단계;상기 빔과 슬라브 패널로 이루어진 거푸집에 콘크리트를 타설하는 단계;콘트리트가 어느 정도 양생이 이루어진 때에 소피트 랭스와 빔 사이의 결합 및 프롭 헤드와 빔 사이의 결합을 분리시키는 단계;상기 분리형 가이드에 의해 가이드되고 분리형 가이드에 장착된 완강 부재에 의한 서포터 외주면과의 마찰력으로 빔과 슬라브 패널이 서포트의 외주면을 따라 서서히 하강하도록 하는 단계;상기 서포터를 타고 하강하여 스토퍼 상에 멈춘 슬라브 패널과 빔 및 분리형 가이드를 차례로 분리해 내는 단계; 및슬라브 콘트리트가 완전히 양생된 후에 프롭 헤드가 결합된 존치형 서포터를 제거해 내는 단계,로 이루어짐을 특징으로 하는 건축물의 슬라브 시공 방법.
- 고정편을 이용하여 빔과 프롭 헤드를 서로 연결시켜 양 측벽 사이의 길이와 일치하는 길이의 빔과 프롭 헤드 조립체를 형성하는 단계;벽체 상단의 소피트 랭스에 코너 브라켓과 빔 지지용 브라켓을 조립하는 단계;상기 빔과 프롭 헤드 조립체의 양 단부가 빔 지지용 브라켓에 지지되도록 하는 단계;외주면에 분리형 가이드가 결합된 서포터의 상단을 빔과 프롭 헤드 조립체의 프롭 헤드 지주와 결합시킴과 아울러 분리형 가이드의 윙부에 의해 빔의 지지가 이루어지도록 하는 단계;빔 사이의 공간에 슬라브 패널을 격자상으로 안착시키는 단계;상기 빔과 슬라브 패널로 이루어진 거푸집에 콘크리트를 타설하는 단계;콘트리트가 어느 정도 양생이 이루어진 때에 소피트 랭스와 빔 사이의 결합 및 프롭 헤드와 빔 사이의 결합을 분리시키는 단계;상기 분리형 가이드에 의해 가이드되고 분리형 가이드에 장착된 완강 부재에 의한 서포터 외주면과의 마찰력으로 빔과 슬라브 패널이 서포트의 외주면을 따라 서서히 하강하도록 하는 단계;상기 서포터를 타고 하강하여 스토퍼 상에 멈춘 슬라브 패널과 빔 및 분리형 가이드를 차례로 분리해 내는 단계; 및슬라브 콘트리트가 완전히 양생된 후에 프롭 헤드가 결합된 존치형 서포터를 제거해 내는 단계,로 이루어짐을 특징으로 하는 건축물의 슬라브 시공 방법.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201980022769.4A CN112041519B (zh) | 2018-03-28 | 2019-03-11 | 建造建筑的楼板的设备和方法 |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20180035745 | 2018-03-28 | ||
KR10-2018-0035745 | 2018-03-28 | ||
KR1020190001501A KR102150274B1 (ko) | 2018-03-28 | 2019-01-07 | 건축물의 슬라브 시공 장치 및 방법 |
KR10-2019-0001501 | 2019-01-07 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2019190078A1 true WO2019190078A1 (ko) | 2019-10-03 |
Family
ID=68059333
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/KR2019/002774 WO2019190078A1 (ko) | 2018-03-28 | 2019-03-11 | 건축물의 슬라브 시공 장치 및 방법 |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2019190078A1 (ko) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20190277044A1 (en) * | 2018-03-12 | 2019-09-12 | Faresin Formwork S.p.A. | Support device, of the drop head type, for supporting beams of formworks for floor slabs, apparatus comprising such device and supporting beam to be associated with the device |
CN115126224A (zh) * | 2022-06-15 | 2022-09-30 | 晟通科技集团有限公司 | 模板及模板结构 |
US11585103B2 (en) * | 2018-07-27 | 2023-02-21 | Peri Se | Mounting head with anchoring cross-member and ceiling formwork system connected thereto |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20090095736A (ko) * | 2008-03-06 | 2009-09-10 | 윤병주 | 거푸집 결합 및 해체장치 |
KR101007538B1 (ko) * | 2008-04-07 | 2011-01-14 | 삼목정공주식회사 | 슬래브 벽폼 체결장치 |
KR20120037696A (ko) * | 2010-10-12 | 2012-04-20 | 삼목정공주식회사 | 헤드 분리형 드롭헤드를 이용한 슬래브 폼 장치 및 이의 사용방법 |
KR101514395B1 (ko) * | 2013-12-30 | 2015-04-23 | 주식회사 주신산업개발 | 슬래브거푸집의 지지장치 |
KR20180029144A (ko) * | 2016-09-09 | 2018-03-20 | 백희정 | 존치형 서포트를 활용한 슬래브 알루미늄판넬 드롭시공방법 및 드롭장치 |
-
2019
- 2019-03-11 WO PCT/KR2019/002774 patent/WO2019190078A1/ko active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20090095736A (ko) * | 2008-03-06 | 2009-09-10 | 윤병주 | 거푸집 결합 및 해체장치 |
KR101007538B1 (ko) * | 2008-04-07 | 2011-01-14 | 삼목정공주식회사 | 슬래브 벽폼 체결장치 |
KR20120037696A (ko) * | 2010-10-12 | 2012-04-20 | 삼목정공주식회사 | 헤드 분리형 드롭헤드를 이용한 슬래브 폼 장치 및 이의 사용방법 |
KR101514395B1 (ko) * | 2013-12-30 | 2015-04-23 | 주식회사 주신산업개발 | 슬래브거푸집의 지지장치 |
KR20180029144A (ko) * | 2016-09-09 | 2018-03-20 | 백희정 | 존치형 서포트를 활용한 슬래브 알루미늄판넬 드롭시공방법 및 드롭장치 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20190277044A1 (en) * | 2018-03-12 | 2019-09-12 | Faresin Formwork S.p.A. | Support device, of the drop head type, for supporting beams of formworks for floor slabs, apparatus comprising such device and supporting beam to be associated with the device |
US10883283B2 (en) * | 2018-03-12 | 2021-01-05 | Faresin Formwork S.p.A. | Support device, of the drop head type, for supporting beams of formworks for floor slabs, apparatus comprising such device and supporting beam to be associated with the device |
US11585103B2 (en) * | 2018-07-27 | 2023-02-21 | Peri Se | Mounting head with anchoring cross-member and ceiling formwork system connected thereto |
CN115126224A (zh) * | 2022-06-15 | 2022-09-30 | 晟通科技集团有限公司 | 模板及模板结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20190114731A (ko) | 건축물의 슬라브 시공 장치 및 방법 | |
WO2018190584A1 (ko) | 구조적 안정성이 향상된 건축용 클라이밍 시스템 | |
WO2019190078A1 (ko) | 건축물의 슬라브 시공 장치 및 방법 | |
WO2017086704A1 (ko) | 안전발판을 포함한 건축용 비계장치 | |
WO2020101235A1 (ko) | 슬라이드식 슬라브 판넬 지지장치 | |
WO2015178584A1 (ko) | 철근망의 선조립 공법 | |
KR200425807Y1 (ko) | 인양형 갱폼 | |
KR101616302B1 (ko) | 승강기 통로용 작업발판 고정대 | |
KR101559988B1 (ko) | 조기 탈형이 가능한 슬래브 거푸집 시스템 및 이를 이용한 슬래브 시공 방법 | |
KR20090003854U (ko) | 천장 구조 | |
KR200391342Y1 (ko) | 건축용 갱폼의 가이드레일 고정장치 | |
WO2017003004A1 (ko) | 건축물 지붕시공방법 및 그에 사용되는 건축자재 | |
JP2007138416A (ja) | 外部養生ユニットのクライミング工法 | |
US20070096006A1 (en) | Overhead beam assembly | |
KR102344853B1 (ko) | 건축용 슬라브 패널 빔 지지가이드 | |
KR101592817B1 (ko) | 슬래브 거푸집 구조 | |
JPH0220354Y2 (ko) | ||
JPH05178561A (ja) | エレベータのガイドレール付設方法 | |
WO2011052854A1 (ko) | 가설대 조임 장치 및 방법 | |
KR102226433B1 (ko) | 슬라브형틀용 안전클립 및 슬라브형틀 분리방법 | |
WO2016108474A1 (ko) | 신축이 가능한 슬라이딩 발판 | |
WO2017003003A1 (ko) | 건축물 지붕시공방법 및 그에 사용되는 건축자재 | |
KR102311766B1 (ko) | 슬라브패널 지지용 빔 조립체를 이용한 슬라브패널 설치구조 및 이의 드롭시공방법 | |
WO2016108475A1 (ko) | 패널을 이용한 발판 | |
KR100901016B1 (ko) | 건축물의 외벽 비계 안전 브라켓 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 19778213 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 19778213 Country of ref document: EP Kind code of ref document: A1 |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 19778213 Country of ref document: EP Kind code of ref document: A1 |
|
32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205 DATED 19.04.2021) |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 19778213 Country of ref document: EP Kind code of ref document: A1 |