WO2011052854A1 - 가설대 조임 장치 및 방법 - Google Patents

가설대 조임 장치 및 방법 Download PDF

Info

Publication number
WO2011052854A1
WO2011052854A1 PCT/KR2010/000963 KR2010000963W WO2011052854A1 WO 2011052854 A1 WO2011052854 A1 WO 2011052854A1 KR 2010000963 W KR2010000963 W KR 2010000963W WO 2011052854 A1 WO2011052854 A1 WO 2011052854A1
Authority
WO
WIPO (PCT)
Prior art keywords
profile
locking member
operation means
guide
tightening
Prior art date
Application number
PCT/KR2010/000963
Other languages
English (en)
French (fr)
Inventor
홍영근
Original Assignee
금강공업(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 금강공업(주) filed Critical 금강공업(주)
Publication of WO2011052854A1 publication Critical patent/WO2011052854A1/ko

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/22Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/22Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor
    • E04G11/24Construction of lifting jacks or climbing rods for sliding forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B1/00Devices for securing together, or preventing relative movement between, constructional elements or machine parts
    • F16B1/02Means for securing elements of mechanisms after operation

Definitions

  • the present invention relates to an apparatus and a method for tightening a temporary stand, and more particularly, a temporary stand for tightening a gap between a temporary stand and a structure when lifting or lowering various temporary stands or working scaffolds at a desired height at a construction site or a loading dock.
  • a tightening device and method A tightening device and method.
  • An elevating device is indispensably used to elevate a large load of temporary construction materials or construction materials to a desired height at a construction site, or to transport a heavy load temporary construction table to a predetermined height at a loading dock.
  • formwork is installed on the outer wall of the structure at the time of construction of the building structure, in which case a temporary acting as a kind of scaffold for the work is installed on the outer wall of the structure in order to perform smooth work on the outer wall of the structure.
  • a temporary acting as a kind of scaffold for the work is installed on the outer wall of the structure in order to perform smooth work on the outer wall of the structure.
  • These constructions continue to be further installed as the number of floors of the structure increases.
  • ascending constructions were lifted up entirely by cranes when constructing high-rise building structures.
  • the applicant of the present invention performs the lifting step of the temporary lifting rod without using a crane by the lifting base material stepped up and down the profile in the Republic of Korea Patent No. 0743520 (name: temporary lifting device and temporary lifting method using the same). I've presented a technique to make it possible.
  • the registered patent has a main point of elevating the profile step by step while the lifting base is engaged to the engaging projection formed at a predetermined interval along the vertical direction to the profile of the temporary table.
  • the lifting material is selectively engaged with any one of the protruding projections while moving forward or backward along the lifting direction through the configuration of the hydraulic cylinder and the hook. Therefore, it is possible to raise and lower the temporary stage step by step safely and easily.
  • the technical problem to be achieved by the present invention is to tighten the temporary construction in the place to handle the construction site, loading and unloading construction site, so as to safely and easily lift, the work can be worked when the gap between the construction site and the structure is opened.
  • the present invention provides a device and method for tightening a hypothesis.
  • the present invention for achieving the above object, in the tightening device for tightening the interval between the lifting operation means installed on the outer wall of the structure and the profile provided on the side facing the outer wall of the structure and provided with a plurality of engaging portions at regular intervals.
  • the first locking member provided in the shape of a hook
  • the second locking member provided in the shape of a hook in the opposite direction corresponding to the first locking member
  • the first locking member and the second locking member are spaced apart from each other.
  • a temporary clamping device including a shaft member in which the bolt member and the nut member for adjusting the spacing is axially connected.
  • the present invention in the tightening device for tightening the interval between the lifting operation means provided on the outer wall of the structure, and the profile provided on the side facing the outer wall of the structure, the profile having a plurality of engaging portions along the longitudinal direction, and It includes a latch that can be engaged with the engaging portion is supported by the lifting operation means for elevating the profile while supporting the lower portion and the lifting operation means coupled to the lifting operation means for providing a lift driving force, the lifting
  • the actuating means includes a pair of left and right guide frames provided with a guide groove in a vertical direction with respect to the lifting direction of the profile, a support frame provided to face each other while supporting the guide frame, and an oblique line to the support frame.
  • the guide channel is provided between the support frame and the guide channel providing a path through which the latch is pushed upward along the oblique path and after the latch passes, the latch is lowered by load.
  • a pair of left and right guide arms which are slid along the guide grooves provided in the guide grooves, and the tightening device includes a first catching member provided in a hook shape and a first catching member corresponding to the first catching member.
  • the second locking member provided in the shape of a hook and the first locking member and the second locking member It provides a temporary clamping device including a shaft member is connected to the shaft and the bolt member and the nut member for adjusting the spaced apart from each other.
  • the first catching member includes a pair of first catching plates having one end formed in a hook shape and spaced apart from each other, and a pair of first connecting plates having a through hole formed therein while connecting the catching plates with each other.
  • the second catching member includes a pair of second catching plates having one end formed in a hook shape and spaced apart from each other, and a second connecting member having a through hole formed therein while connecting the catching plates with each other.
  • the shaft member may include a bolt member penetrating through a through hole between a first connecting plate of the first locking member and a second connecting member of the second locking member, and installed at one end of the bolt member to rotate the first locking member. It includes a nut member for adjusting the spaced apart between the member and the second locking member.
  • the present invention in the tightening method for tightening the interval between the lifting operation means installed on the outer wall of the structure and the profile provided on the side facing the outer wall of the structure and provided with a plurality of engaging portions at regular intervals, Installing a hook-type first locking member provided in the tightening device to the coupling pin, Installing a hook-type second locking member provided in the tightening device on the fastening pin of the profile, and the nut of the tightening device Rotating the member to move the second locking member along the bolt member connecting the first locking member and the second locking member to narrow the spaced distance between the first locking member and the second locking member; and A pair of left and right guide arms, which are opened or closed by sliding along a guide groove provided in the guide frame of the lifting operation means, It provides a hypothesis tightening method comprising the step of wrapping the flange of the profile by sliding in a vertical direction with respect to the lifting direction.
  • FIG. 1 is a perspective view illustrating a state in which a bolt member and a nut member are axially connected to connect a first catching member and a second catching member and to adjust a spaced distance as a temporary clamping device according to a preferred embodiment of the present invention.
  • Figure 2 is a bottom perspective view showing a tightening device according to a preferred embodiment of the present invention.
  • FIG 3 is a top perspective view showing a tightening device according to a preferred embodiment of the present invention.
  • Figure 4 is a cross-sectional side view of the tightening device according to a preferred embodiment of the present invention.
  • FIG. 5 is a side cross-sectional view of a tightening device according to a preferred embodiment of the present invention.
  • FIG. 6 is a front cross-sectional view of a tightening device according to a preferred embodiment of the present invention.
  • FIG 7 and 8 are sectional views showing an embodiment in which the lifting operation means is mounted on the structure.
  • FIGS. 9 and 10 are views showing an embodiment in which the temporary actuation tightening device is mounted to the lifting operation means and the profile to narrow the gap by rotating the nut member.
  • 11 and 12 are views showing an embodiment in which the interval between the lifting operation means and the profile is narrowed so that the guide arm can be attached to the profile by rotating the nut member with the temporary actuation device mounted on the lifting operation means and the profile.
  • 13 and 14 show an embodiment in which the gap between the lifting operation means and the profile is narrowed, and then the guide arm is bound to surround the flange of the profile.
  • 15 is a perspective view showing the lifting operation means bound to the profile.
  • 16 is a perspective view showing an open state of the guide arm of the lifting operation means.
  • 17 is an exploded perspective view of the guide arm of the lifting operation means.
  • structure 10 first locking member
  • second guide groove 240 support frame
  • first guide pin 246 second guide pin
  • bracket 400 lift driving means
  • FIG. 1 is a perspective view illustrating a state in which a bolt member and a nut member are axially connected to connect a first locking member and a second locking member and to control a spaced distance as a temporary clamping device according to a preferred embodiment of the present invention.
  • 2 is a bottom perspective view showing a tightening device according to a preferred embodiment of the present invention
  • Figure 3 is a top perspective view showing a tightening device according to a preferred embodiment of the present invention
  • Figure 4 is a preferred embodiment of the present invention 5 is a cross-sectional side view of the tightening device according to the preferred embodiment of the present invention
  • FIG. 6 is a front cross-sectional view of the tightening device according to the preferred embodiment of the present invention.
  • Figure 15 is a perspective view showing the lifting operation means is attached to the profile
  • Figure 16 is a perspective view showing an open state of the guide arm of the lifting operation means
  • Figure 17 is an exploded perspective view of the lifting operation means.
  • the present invention is installed on the side facing the outer wall of the structure (1) is provided with a profile (100) having a plurality of engaging portions 130 at regular intervals, and installed on the outer wall of the structure (1)
  • a tightening device for tightening the interval between the lifting operation means 200 to be in detail, the first catching member 10 provided in the shape of a hook and the hook in the opposite direction corresponding to the first catching member 10.
  • the shaft includes a shaft member 30 is connected.
  • the temporary lifting device is installed on the side facing the outer wall of the structure and is provided with a plurality of locking parts 140 at regular intervals, and for lifting up the temporary mounting table.
  • Hatch including a lifting operation means (200, 300), and also coupled to the lifting operation means (200, 300) up and down to drive the construction table in the upward direction to provide the lifting driving force to the lifting operation means (200,300)
  • the moving means 400 The moving means 400.
  • Eletation is used to include ascent and descent.
  • the lifting operation means (200,300) is made of a pair of crisp and clear relative to the lifting drive means (400).
  • Lift operation means 200 is installed on the outer wall of the structure (1) is fixed.
  • the lifting operation means 200 is fixed to the outer wall of the structure 10 such as concrete will be described as an example.
  • a through hole 270 into which the coupling pin 242 is inserted is formed to fix the lower end of the elevating driving means 400 inserted between the pair of fixing frames 241 with the coupling pin 242.
  • the fixed frame 241 may be provided integrally with the support frame 240 as the support frame 240 protrudes in the rear direction (the direction opposite to the direction in which the profile is bound) and extends. Accordingly, the lifting operation means 200 is coupled to the through-hole 270 above the support frame 241 in a state in which the lower end of the lifting driving means 400 is inserted between the pair of support frames 241. By being inserted is coupled to the lifting drive means (400).
  • the lifting operation means 200 is formed with guide arms 222 and 232 that are closed or open to partially surround the profile 100. As shown in FIG. 15, the guide arms 222 and 232 partially wrap the flange 120 of the profile 100, thereby allowing the profile 100 to be smoothly lifted and lowered.
  • the guide arms 222 and 232 have an upper guide arm 222 and a lower guide arm 232 and a supporting member 234 connecting them, the upper guide arm 222 and the lower guide arm 232 and Support member 234 is provided in a pair of left and right relative to the latch (210).
  • the guide arms 222 and 232 may further include guide channels 236 for guiding the web 110 of the profile 100.
  • the guide channel 236 serves to guide the web 110 of the profile when the profile 100 moves up and down to suppress movement from side to side, and preferably has a flat plate shape smaller than the width of the web 110 of the profile. .
  • one end of the guide arms 222 and 232 is partially overlapped with the upper guide frame 220 and the lower guide frame 230 so as to be engaged with each other.
  • One end of the upper guide arm 222 is installed to be positioned below the upper guide frame 220, and one end of the lower guide arm 232 is installed to be positioned above the lower guide frame 230.
  • the upper guide frame 220 and the lower guide frame 230 are provided with guide grooves 238 and 239 which are movement paths of the guide arms 222 and 232.
  • the guide arms 222 and 232 are opened or closed by sliding vertically with respect to the lifting direction of the profile 100 along the guide grooves 238 and 239 having a predetermined length consisting of the through grooves.
  • the guide grooves 238 and 239 have a structure in which the guide arms 222 and 232 are horizontally moved horizontally and then rotated in a diagonal path (circular arc) with respect to the linearly moved path, and the upper guide frame 220. And a groove is formed in the lower guide frame 230.
  • the upper guide arm 222 and the lower guide arm 232 are connected through the first guide pin 244 and the second guide pin 246 passing through the guide grooves 238 and 239.
  • the first guide pin 244 only moves horizontally linearly
  • the second guide pin 246 moves linearly horizontally. 1
  • the guide pin 244 is rotated along an oblique path (circular arc) with respect to the linearly moved path using the rotational axis.
  • the guide arms 222 and 232 are closed, the guide arms 222 and 232 are fixed by the first guide pin 244 and the second guide pin 246, thereby preventing them from moving.
  • the second elevating operation means 300 is configured similarly to the elevating operation means 200, and is coupled to the upper end of the elevating driving means 400 and serves to elevate the profile 100.
  • the temporary lifting device may further include a bracket 252 for fixing the lifting operation means 200 to the outer wall of the structure 1.
  • the bracket 252 is installed to partially overlap the side of the fixed frame 241 or the support frame 240, and is provided with a pair of panel frames 254b and the panel frames 254b which are provided to face each other and face each other. It includes a connecting frame 254a for connecting, and the support frame 240 and the panel frame 254b may be bonded to each other through the coupling fixing pin 258.
  • the through-hole 264 for penetrating the fixing frame 241 or the support frame 240 and the panel frame 254b through the coupling fixing pin 258 is provided, the coupling fixing pin 258 is a longitudinal rod in the longitudinal direction Has a structure in which the protrusions 259 are partially formed, and the through hole 264 has a complex of an insertion groove 264 " and a circular 264 'into which the protrusions 259 are inserted corresponding to the structure of the coupling fixing pin 258.
  • the coupling fixing pin 258 is formed by the protrusion 259 formed in the round bar. 264.
  • a through hole 266 for fixing the lifting operation means 200 to the structure 1 is formed in the connecting frame 254a, and a bolt is inserted and lifted through the through hole 266.
  • the actuating means 200 is fixed to the structure 1.
  • the first catching member 10 has a pair of hooks having one end formed to be hooked to the coupling pin 242 of the lifting operation unit 200 and spaced apart from each other. It consists of a first locking plate 11, the first locking plates 11 are cast so as to be connected through a pair of first connecting plate 12 having a through hole formed therein to be connected to each other.
  • the second catching member 20 for catching the fastening pin 101 of the profile 100 also has a pair of second catching plates 21 and the catching plate which are formed in a hook shape and are spaced apart from each other. It includes a second connecting member 22 having a through hole therein while connecting to each other.
  • the shaft member 30 is divided into a bolt member 31 and a nut member 35, wherein the bolt member 31 is formed of the first connecting plate 12 of the first locking member 10 and the first member. 2 penetrates the through-hole of the second connecting member 22 of the locking member 20, and the nut member 35 is installed at one end of the bolt member 31 to rotate the first locking member 10. Adjust the spaced apart from each other and the second locking member 20.
  • FIG 7 and 8 are views showing an embodiment in which the lifting operation means 200 is mounted on the structure (1)
  • Figures 9 and 10 shows the lifting device 200 and the temporary mounting device on the profile (100)
  • Figure 11 is a view showing an embodiment of narrowing the gap by rotating the nut member 35
  • Figure 11 and Figure 12 is mounted on the elevating operation means 200 and the profile 100
  • the tightening device is mounted on the nut member 35
  • Figure 13 is a view showing an embodiment in which the distance between the lifting and lowering operation means 200 and the profile 100 is narrowed so that the guide arms (222, 232) to the profile 100 by rotating the After narrowing the gap between the 200 and the profile 100, the guide arms 222 and 232 are attached to surround the flange 120 of the profile 100.
  • Temporary clamping method according to the present invention is installed on the side facing the outer wall of the structure (1) spaced apart between the profile 100 and a lifting operation means installed on the outer wall of the structure (1) having a plurality of engaging portions at regular intervals
  • a tightening method for tightening first install the first locking member 10 according to the present invention on the coupling pin 242 of the temporary lifting device 200, and the fastening pin 101 of the profile 100 Install the second locking member 20 of the tightening device.
  • the nut member 35 of the tightening device is rotated to narrow the spaced distance between the first locking member 10 and the second locking member 20.
  • the rotation of the nut member 35 works by using a special rotating equipment (for example, a spanner), along the bolt member 31 installed over the first locking member 10 and the second locking member 20.
  • the second locking member 20 is moved to narrow the spaced distance between the first locking member 10 and the second locking member 20.
  • a pair of left and right guide arms 222 and 232 which are opened or closed by sliding along guide grooves 238 and 239 provided in the guide frames 220 and 230 of the lifting operation means 200 are perpendicular to the lifting direction of the profile 100. It slides and closes to surround the flange 120 of the profile 100. That is, the pair of left and right guide arms 222 and 232 moving along the guide grooves 238 and 239 provided in the pair of left and right guide frames 220 and 230 are closed.
  • the guide channel 236 of the lifting operation means 200 is connected to the web 110 of the profile when the profile 100 is lifted. It acts as a guide and can suppress movement from side to side.
  • the gap between the lifting operation means 200 and the profile 100 (the distance between the structure and the temporary placing table) is narrowed so that the guide arms 222 and 232 of the lifting operation means 200 surround the flange 120 of the profile 100.
  • the second locking member 20 is rotated. Is moved along the bolt member 31 to widen the distance between the first locking member 10 and the second locking member 20, and then the first locking member 10 is coupled to the lifting operation means 200 by a coupling pin. Detachable at 242 and detaching the second locking member 20 from the fastening pin 101 of the profile 100.

Abstract

본 발명은, 구조물의 외벽에 설치되는 승강작동수단과, 구조물 외벽과 마주보는 측에 설치되고 일정 간격으로 복수 개의 걸림부가 구비된 프로파일 사이의 간격을 조이는 조임장치에 있어서, 갈고리 모양으로 구비된 제1 걸림부재와, 상기 제1 걸림부재에 대응하여 반대방향으로 갈고리 모양으로 구비된 제2 걸림부재 및 상기 제1 걸림부재와 제2 걸림부재를 연결하고 상호 이격된 간격을 조절하기 위한 볼트부재와 너트부재가 축연결된 축부재를 포함하는 가설대 조임장치 및 이를 이용한 가설대 조임방법에 관한 것이다. 본 발명에 의하면, 가설대와 구조물 사이의 간격을 가설대 조임장치를 이용하여 간단하게 조여줄 수 있므로 가설대 승강작업에 소요되는 시간 및 경비를 절감하여 전체 공사진행에 소요되는 공기 및 경비를 대폭 절감할 수 있다.

Description

가설대 조임 장치 및 방법
본 발명은 가설대 조임 장치 및 방법에 관한 것으로, 더욱 상세하게는 건설현장이나 하역장 등에서 각종 가설대 또는 작업발판을 원하는 높이의 위치로 승강시킬 경우 가설대와 구조물 사이에 벌어진 간격을 조여주는 가설대 조임 장치 및 방법에 관한 것이다.
건설현장에서 하중이 큰 가설물 또는 건설자재를 원하는 높이의 위치로 승강시키거나, 하역장에서 고하중의 가설대를 소정 높이의 위치로 운송하는 데에 있어서, 승강장치가 필수적으로 이용되고 있다.
예를 들어, 건축 구조물의 시공시 구조물의 외벽에 거푸집을 설치하는데, 이때 구조물 외벽에 대한 원활한 작업 수행을 위하여 구조물 외벽에 일종의 작업용 발판의 역할을 하는 가설대가 설치된다. 이러한 가설대는 구조물의 층수 증가에 따라 계속해서 위로 추가 설치되는데, 종래에는 고층의 건축 구조물을 시공할 때 크레인에 의해 전체적으로 상향 인양되는 상승식 가설대가 사용되었다. 그러나, 크레인의 이용은 작업에 소요되는 시간과 경비를 증가시킴으로 인해 공사진행에 지장을 초래하는 문제가 있다. 이에, 본 발명의 출원인은 대한민국 등록특허 제0704720호(명칭: 가설대 승강장치 및 이를 이용한 가설대 승강방법)에서 프로파일을 단계적으로 승강시키는 승강기재에 의해 크레인을 사용하지 않고도 가설대 승강작업을 수행할 수 있도록 하는 기술을 제시한 바 있다.
상기 등록특허는 가설대의 프로파일에 수직방향을 따라 일정간격으로 형성된 걸림돌기에 승강기재가 걸림결합하면서 단계적으로 프로파일을 승강시키는 것을 요지로 하고 있다. 특히 승강기재는 유압실린더와 후크의 구성을 통해 승강방향을 따라 전진 또는 후퇴하면서 프로파일의 걸림돌기들 중 어느 하나와 선택적으로 걸림결합이 된다. 따라서, 가설대를 목표 높이까지 단계적으로 안전하고 용이하게 승강시킬 수가 있다.
그러나 각종 가설대 또는 작업발판을 원하는 높이의 위치로 승강시킬 경우 가설대와 구조물 사이의 간격은 필연적으로 벌어질 수밖에 없고 이에 따른 대책으로 가설대의 분절을 통한 방법이 있으나, 이는 많은 경험과 비용이 드는 방법으로서 간단하면서도 편리한 새로운 방법이 절실히 필요하게 되었다.
본 발명이 이루고자 하는 기술적 과제는 건설현장이나 하역장을 비롯하여 각종 가설대를 다루는 곳에서 가설대를 안전하고 용이하게 승강할 수 있도록, 가설대와 구조물 사이의 간격이 벌어진 경우 작업할 수 있는 상태로 조여주는 가설대 조임 장치 및 방법을 제공함에 있다.
상기와 같은 목적을 달성하기 위한 본 발명은, 구조물의 외벽에 설치되는 승강작동수단과, 구조물 외벽과 마주보는 측에 설치되고 일정 간격으로 복수 개의 걸림부가 구비된 프로파일 사이의 간격을 조이는 조임장치에 있어서, 갈고리 모양으로 구비된 제1 걸림부재와, 상기 제1 걸림부재에 대응하여 반대방향으로 갈고리 모양으로 구비된 제2 걸림부재 및 상기 제1 걸림부재와 제2 걸림부재를 연결하고 상호 이격된 간격을 조절하기 위한 볼트부재와 너트부재가 축연결된 축부재를 포함하는 가설대 조임장치를 제공한다.
또한, 본 발명은, 구조물 외벽에 설치되는 승강작동수단과, 구조물 외벽과 마주보는 측에 설치되는 프로파일 사이의 간격을 조이는 조임장치에 있어서, 길이 방향을 따라 복수 개의 걸림부를 구비한 프로파일과, 상기 걸림부에 걸림작용될 수 있는 걸림쇠가 구비되어 상기 걸림부의 아래를 지지하면서 상기 프로파일을 승강시키기 위한 승강작동수단 및 상기 승강작동수단에 결합되어 승강 구동력을 제공하는 승강구동수단을 포함하며, 상기 승강작동수단은, 상기 프로파일의 승강방향에 대하여 수직방향으로 가이드홈이 구비된 좌우 한 쌍의 가이드프레임과, 상기 가이드프레임을 지지하면서 서로 이격되어 마주보게 구비된 지지프레임과, 상기 지지프레임에 사선형으로 구비되고 걸림쇠의 이동 경로를 제공하며 상기 프로파일이 상승하는 경우에는 걸림부에 의해 걸림쇠가 사선형의 경로를 따라 상부로 밀어 올려지고 걸림부가 통과한 후에는 하중에 의해 걸림쇠가 아래로 내려오게 되는 경로를 제공하는 가이드채널과, 상기 지지프레임 사이에 설치되고 상기 프로파일이 상향진입시 상기 걸림부에 접촉되어 상기 가이드채널을 따라 상향으로 직선 이동되고 상기 프로파일이 하향진입시 상기 걸림부와 상호 걸림결합되며 상기 걸림부의 아래를 지지하면서 상기 프로파일을 승강시키기 위한 걸림쇠와, 상기 가이드프레임에 구비된 가이드홈을 따라 슬라이딩되어 개방되거나 닫혀지는 좌우 한 쌍의 가이드암을 포함하며, 상기 조임장치는, 갈고리 모양으로 구비된 제1 걸림부재와, 상기 제1 걸림부재에 대응하여 반대방향으로 갈고리 모양으로 구비된 제2 걸림부재 및 상기 제1 걸림부재와 제2 걸림부재를 연결하고 상호 이격된 간격을 조절하기 위한 볼트부재와 너트부재가 축연결된 축부재를 포함하는 가설대 조임장치를 제공한다.
상기 제1 걸림부재는, 일단이 갈고리 모양으로 형성되고 서로 이격되어 마주보게 구비된 한쌍의 제1 걸림판 및 상기 걸림판을 서로 연결하면서 내부에 관통공이 형성된 한쌍의 제1 연결판을 포함하며, 상기 제2 걸림부재는, 일단이 갈고리 모양으로 형성되고 서로 이격되어 마주보게 구비된 한쌍의 제2 걸림판 및 상기 걸림판을 서로 연결하면서 내부에 관통공이 형성된 제2 연결부재를 포함한다.
상기 축부재는, 상기 제1 걸림부재의 제1 연결판과 상기 제2 걸림부재의 제2 연결부재의 관통공을 관통하는 볼트부재과, 상기 볼트부재의 일단에 설치되어 회전에 의해 상기 제1 걸림부재와 상기 제2 걸림부재의 상호 이격된 간격을 조절하는 너트부재를 포함한다.
또한, 본 발명은, 구조물 외벽에 설치되는 승강작동수단과, 구조물 외벽과 마주보는 측에 설치되고 일정 간격으로 복수 개의 걸림부가 구비된 프로파일 사이의 간격을 조이는 조임방법에 있어서, 상기 승강작동수단의 결합핀에 상기 조임장치에 구비된 갈고리 모양의 제1 걸림부재를 설치하고, 상기 프로파일의 체결핀에 상기 조임장치에 구비된 갈고리 모양의 제2 걸림부재를 설치하는 단계와, 상기 조임장치의 너트부재를 회전시켜 상기 제1 걸림부재와 상기 제2 걸림부재를 연결하는 볼트부재를 따라 상기 제2 걸림부재가 이동되게 하여 상기 제1 걸림부재와 상기 제2 걸림부재의 이격된 간격을 좁히는 단계 및 상기 승강작동수단의 가이드프레임에 구비된 가이드홈을 따라 슬라이딩되어 개방되거나 닫혀지는 좌우 한 쌍의 가이드암이 상기 프로파일의 승강방향에 대하여 수직방향으로 슬라이딩되게 하여 상기 프로파일의 플랜지를 감싸게 하는 단계를 포함하는 가설대 조임방법을 제공한다.
본 발명에 의하면, 단순하면서도 내구성이 있는 가설대 조임장치를 사용함으로서, 가설대와 구조물 사이의 간격을 안전하고 용이하게 좁힐 수 있다.
또한, 본 발명에 의하면, 종래와 같이 가설대를 분절할 필요없이 가설대와 구조물 사이의 간격을 가설대 조임장치를 이용하여 간단하게 조여주면 되므로 가설대 승강작업에 소요되는 시간 및 경비를 절감하여 전체 공사진행에 소요되는 공기 및 경비를 대폭 절감할 수 있다는 효과가 있다.
도 1은 본 발명의 바람직한 실시예에 따른 가설대 조임장치로서 제1 걸림부재와 제2 걸림부재를 연결하고 상호 이격된 간격을 조절하기 위한 볼트부재와 너트부재가 축연결된 상태를 도시한 사시도이다.
도 2는 본 발명의 바람직한 실시예에 따른 조임장치를 도시한 저면 사시도이다.
도 3은 본 발명의 바람직한 실시예에 따른 조임장치를 도시한 상측면 사시도이다.
도 4는 본 발명의 바람직한 실시예에 따른 조임장치의 상측면 절단면도이다.
도 5는 본 발명의 바람직한 실시예에 따른 조임장치의 측면 절단면도이다.
도 6은 본 발명의 바람직한 실시예에 따른 조임장치의 정면 절단면도이다.
도 7 및 도 8은 구조물에 승강작동수단이 장착된 실시예를 보여주는 단면도이다.
도 9 및 도 10은 승강작동수단과 프로파일에 가설대 조임장치가 장착되어 너트부재를 회전시켜 간격을 좁히는 실시예를 보여주는 도면이다.
도 11 및 도 12는 승강작동수단과 프로파일에 가설대 조임장치가 장착되어 너트부재를 회전시킴으로써 가이드암을 프로파일에 결착시킬 수 있게 승강작동수단과 프로파일 사이의 간격이 좁혀진 실시예를 보여주는 도면이다.
도 13 및 도 14는 승강작동수단과 프로파일 사이의 간격을 좁힌 다음, 가이드암을 프로파일의 플랜지를 감싸도록 결착시킨 실시예를 보여주는 도면이다.
도 15는 승강작동수단이 프로파일에 결착된 모습을 보여주는 사시도이다.
도 16은 승강작동수단의 가이드암이 개방된 상태를 도시한 사시도이다.
도 17은 승강작동수단의 가이드암의 분해사시도이다.
<도면의 주요 부분에 대한 부호의 설명>
1: 구조물 10 : 제1 걸림부재
11 : 제1 걸림판 12 : 제1 연결판
20 : 제2 걸림부재 21 : 제2 걸림판
22 : 제2 연결부재 30 : 축부재
31 : 볼트부재 35 : 너트부재
100: 프로파일 200,300: 승강작동수단
210,310: 걸림쇠 220,230: 가이드프레임
222,232: 가이드암 238: 제1 가이드홈
239: 제2 가이드홈 240: 지지프레임
244: 제1 가이드핀 246: 제2 가이드핀
252: 브라켓 400: 승강구동수단
이하, 첨부된 도면을 참조하여 본 발명에 따른 바람직한 실시예를 상세하게 설명하기로 한다. 그러나, 이하의 실시예는 이 기술분야에서 통상적인 지식을 가진 자에게 본 발명이 충분히 이해되도록 제공되는 것으로서 여러 가지 다른 형태로 변형될 수 있으며, 본 발명의 범위가 다음에 기술되는 실시예에 한정되는 것은 아니다. 도면상에서 동일 부호는 동일한 요소를 지칭한다.
도 1은 본 발명의 바람직한 실시예에 따른 가설대 조임장치로서 제1 걸림부재와 제2 걸림부재를 연결하고 상호 이격된 간격을 조절하기 위한 볼트부재와 너트부재가 축연결된 상태를 도시한 사시도이고, 도 2는 본 발명의 바람직한 실시예에 따른 조임장치를 도시한 저면 사시도이며, 도 3은 본 발명의 바람직한 실시예에 따른 조임장치를 도시한 상측면 사시도이고, 도 4는 본 발명의 바람직한 실시예에 따른 조임장치의 상측면 절단면도이며, 도 5는 본 발명의 바람직한 실시예에 따른 조임장치의 측면 절단면도이고, 도 6은 본 발명의 바람직한 실시예에 따른 조임장치의 정면 절단면도이다.
또한 도 15는 승강작동수단이 프로파일에 결착된 모습을 보여주는 사시도이고, 도 16은 승강작동수단의 가이드암이 개방된 상태를 도시한 사시도이며, 도 17은 승강작동수단의 분해사시도이다.
도 1 내지 도 6에서 보는 바와 같이 본 발명은 구조물(1) 외벽과 마주보는 측에 설치되고 일정 간격으로 복수 개의 걸림부(130)가 구비된 프로파일(100)과, 구조물(1) 외벽에 설치되는 승강작동수단(200) 사이의 간격을 조이는 조임장치에 대한 것으로서, 구체적으로 살펴보면 갈고리 모양으로 구비된 제1 걸림부재(10)와, 상기 제1 걸림부재(10)에 대응하여 반대방향으로 갈고리 모양으로 구비된 제2 걸림부재(20)와 상기 제1 걸림부재(10)와 제2 걸림부재(20)를 연결하고 상호 이격된 간격을 조절하기 위한 볼트부재(31)와 너트부재(35)가 축연결된 축부재(30)를 포함한다.
여기에서 도 7 내지 도 17에서 보는 바와 같이 가설대 승강장치는, 구조물 외벽에 마주보는 측에 설치되고 일정 간격으로 복수 개의 걸림부(140)가 구비된 프로파일(100)과, 가설대를 승강시키기 위한 승강작동수단(200, 300)을 포함하며, 또한 가설대를 상방향으로 구동시키기 위하여 상하의 승강작동수단(200, 300) 사이에 결합되어 승강작동수단(200, 300)에 승강 구동력을 제공하는 승강구동수단(400)을 포함한다. 이하에서 '승강'이라 함은 상승과 하강을 포함하는 의미로 사용한다.
상기 승강작동수단(200,300)은 승강구동수단(400)을 기준으로 상렷衢坪 한 쌍으로 이루어져 있다. 승강작동수단(200)은 구조물(1)의 외벽에 설치되어 고정이 된다. 이하에서는 승강작동수단(200)이 콘크리트와 같은 구조물(10)의 외벽에 고정된 경우를 예로 들어 설명한다.
한 쌍의 고정프레임(241) 사이로 삽입된 승강구동수단(400)의 하단부를 결합핀(242)으로 고정할 수 있도록 결합핀(242)이 삽입되는 관통공(270)이 형성되어 있다. 고정프레임(241)은 지지프레임(240)이 후방향(프로파일이 결착되는 방향과 반대 방향)으로 돌출되어 연장된 것으로서 지지프레임(240)과 일체형으로 구비된 것일 수 있다. 이에 따라, 승강작동수단(200)은 한쌍의 지지프레임(241) 사이로 승강구동수단(400)의 하단부가 삽입된 상태에서 지지프레임(241) 상측의 관통공(270)으로 결합핀(242)이 삽입됨으로써 승강구동수단(400)과 결합이 된다.
그리고 승강작동수단(200)에는 프로파일(100)을 부분적으로 감싸도록 닫혀지거나 개방되는 가이드암(222,232)이 형성되어 있다. 도 15에 도시된 바와 같이 가이드암(222,232)은 프로파일(100)의 플랜지(120)를 부분적으로 감싸게 됨으로써, 프로파일(100)이 원활하게 승강할 수 있게 한다. 가이드암(222, 232)은 상부 가이드암(222)과 하부 가이드암(232) 및 이들 사이를 연결하는 지지부재(234)를 구비하며, 상부 가이드암(222), 하부 가이드암(232) 및 지지부재(234)는 걸림쇠(210)를 기준으로 좌우 한 쌍으로 구비되어 있다. 가이드암(222, 232)은 프로파일(100)의 웹(110)을 가이드하는 가이드채널(236)을 더 구비할 수도 있다. 가이드채널(236)은 프로파일(100)이 승강시 프로파일의 웹(110)을 가이드하는 역할을 하여 좌우로 움직이는 것을 억제하며, 프로파일의 웹(110)의 폭보다 작은 평판형으로 구비되는 것이 바람직하다.
도 16에서 보는 바와 같이 가이드암(222,232)의 일단부는 상부 가이드프레임(220)과 하부 가이드프레임(230)과 일부 중첩되어 맞물리게 설치된다. 상부 가이드암(222)의 일단부는 상부 가이드프레임(220) 하부에 위치되게 설치되고, 하부 가이드암(232)의 일단부는 하부 가이드프레임(230) 상부에 위치되게 설치된다.
상부 가이드프레임(220) 및 하부 가이드프레임(230)에는 가이드암(222,232)의 이동 경로인 가이드홈(238, 239)이 구비되어 있다. 가이드암(222,232)은 관통홈으로 이루어진 일정 길이의 가이드홈(238, 239)을 따라 프로파일(100)의 승강방향에 대하여 수직으로 슬라이딩됨으로서 개방되거나 닫혀진다. 가이드홈(238, 239)은 가이드암(222,232)이 수평으로 직선 이동된 후, 직선 이동된 경로에 대하여 사선 방향의 경로(원호)로 회전이동될 수 있는 구조를 갖고, 상부 가이드프레임(220) 및 하부 가이드프레임(230)에 홈이 형성된 것이다. 상부 가이드암(222)과 하부 가이드암(232)은 가이드홈(238, 239)을 관통하는 제1 가이드핀(244)과 제2 가이드핀(246)을 통해 연결되어 있다. 가이드암(222,232)이 가이드홈(238, 239)을 따라 이동시, 제1 가이드핀(244)은 수평으로 직선 이동만을 하게 되고, 제2 가이드핀(246)은 수평으로 직선 이동을 한 후, 제1 가이드핀(244)을 회전중심축으로 하여 직선 이동된 경로에 대하여 사선 방향의 경로(원호)를 따라 회전 이동되게 된다. 가이드암(222,232)이 닫혀져 있는 경우, 가이드암(222, 232)은 제1 가이드핀(244) 및 제2 가이드핀(246)에 의해 고정되어 움직이지 못하게 된다.
제2 승강작동수단(300)은 승강작동수단(200)과 유사하게 구성되며, 승강구동수단(400)의 상단부에 결합되어 프로파일(100)을 승강시키는 역할을 한다.
또한, 도 17에서 보는 바와 같이 가설대 승강장치는, 승강작동수단(200)을 구조물(1)의 외벽에 고정하기 위한 브라켓(252)을 더 포함할 수 있다. 브라켓(252)은, 고정프레임(241) 또는 지지프레임(240)의 측면에 일부 중첩되게 설치되고, 서로 이격되어 마주보게 구비된 한 쌍의 패널프레임(254b)과, 패널프레임(254b)을 서로 연결하는 연결프레임(254a)을 포함하고, 지지프레임(240)과 패널프레임(254b)은 결합고정핀(258)을 통해 서로 결착될 수 있다. 고정프레임(241) 또는 지지프레임(240)과 패널프레임(254b)에 결합고정핀(258)으로 관통하기 위한 관통공(264)이 구비되어 있고, 결합고정핀(258)은 둥근 막대에 길이 방향으로 돌기부(259)가 일부 형성된 구조를 갖고, 관통공(264)은 결합고정핀(258)의 구조에 대응하여 돌기부(259)가 삽입되는 삽입홈(264")과 원형(264')의 복합 구조로 이루어지며, 결합고정핀(258)이 관통공(264)에 삽입되어 결합고정핀(258)이 회전되게 되면 결합고정핀(258)은 둥근 막대에 형성된 돌출부(259)에 의해 관통공(264)으로부터 빠지지 않게 된다. 구조물(1)에 승강작동수단(200)을 고정하기 위한 관통공(266)이 연결프레임(254a)에 형성되어 있고, 관통공(266)을 통해 볼트가 삽입되어 승강작동수단(200)이 구조물(1)에 고정되게 된다.
한편 도 2 내지 도 6에서 보는 바와 같이 상기 제1 걸림부재(10)는 일단이 승강작동수단(200)의 결합핀(242)에 걸리기 위해 갈고리 모양으로 형성되고 서로 이격되어 마주보게 구비된 한쌍의 제1 걸림판(11)으로 이루어지는 데, 상기 제1 걸림판들(11)은 서로 연결되기 위해 내부에 관통공이 형성된 한쌍의 제1 연결판(12)을 통해 연결되도록 주조된다.
프로파일(100)의 체결핀(101)에 걸리기 위한 상기 제2 걸림부재(20)도 일단이 갈고리 모양으로 형성되고 서로 이격되어 마주보게 구비된 한쌍의 제2 걸림판(21)과 상기 걸림판을 서로 연결하면서 내부에 관통공이 형성된 제2 연결부재(22)를 포함한다.
여기에서 상기 축부재(30)는 볼트부재(31)와 너트부재(35)로 나뉘는 데, 상기 볼트부재(31)는 상기 제1 걸림부재(10)의 제1 연결판(12)과 상기 제2 걸림부재(20)의 제2 연결부재(22)의 관통공을 관통하고, 상기 너트부재(35)는 상기 볼트부재(31)의 일단에 설치되어 회전에 의해 상기 제1 걸림부재(10)와 상기 제2 걸림부재(20)의 상호 이격된 간격을 조절한다.
이하 도면을 참조하여 본 발명에 따른 가설대 조임방법에 대하여 자세히 설명한다.
도 7 및 도 8은 구조물(1)에 승강작동수단(200)이 장착된 실시예를 보여주는 도면이고, 도 9 및 도 10은 승강작동수단(200)과 프로파일(100)에 가설대 조임장치가 장착되어 너트부재(35)를 회전시켜 간격을 좁히는 실시예를 보여주는 도면이며, 도 11 및 도 12는 승강작동수단(200)과 프로파일(100)에 가설대 조임장치가 장착되어 너트부재(35)를 회전시킴으로써 가이드암(222,232)을 프로파일(100)에 결착시킬 수 있게 승강작동수단(200)과 프로파일(100) 사이의 간격이 좁혀진 실시예를 보여주는 도면이고, 도 13 및 도 14는 승강작동수단(200)과 프로파일(100) 사이의 간격을 좁힌 다음, 가이드암(222,232)을 프로파일(100)의 플랜지(120)를 감싸도록 결착시킨 실시예를 보여주는 도면이다.
본 발명에 따른 가설대 조임방법은 구조물(1) 외벽과 마주보는 측에 설치되고 일정 간격으로 복수 개의 걸림부가 구비된 프로파일(100)과, 구조물(1) 외벽에 설치된 승강작동수단 사이에 벌어진 간격을 조이는 조임방법에 대한 것으로서, 먼저 가설대 승강장치(200)의 결합핀(242)에 본 발명에 따른 제1 걸림부재(10)를 설치하고, 프로파일(100)의 체결핀(101)에 상기 조임장치의 제2 걸림부재(20)를 설치한다.
그리고 상기 조임장치의 너트부재(35)를 회전시켜 상기 제1 걸림부재(10)와 제2 걸림부재(20)의 이격된 간격을 좁힌다.
이 때 상기 너트부재(35)의 회전은 특수한 회전장비(예컨대, 스패너)를 이용하여 작업하여, 제1 걸림부재(10)와 제2 걸림부재(20)에 걸쳐 설치된 볼트부재(31)를 따라 제2 걸림부재(20)가 이동되게 하여 제1 걸림부재(10)와 제2 걸림부재(20) 사이의 이격된 간격을 좁힐 수 있도록 한다.
승강작동수단(200)의 가이드프레임(220,230)에 구비된 가이드홈(238,239)을 따라 슬라이딩되어 개방되거나 닫혀지는 좌우 한 쌍의 가이드암(222,232)이 프로파일(100)의 승강방향에 대하여 수직방향으로 슬라이딩되게 하여 프로파일(100)의 플랜지(120)을 감싸도록 닫는다. 즉, 좌우 한 쌍의 가이드프레임(220, 230)에 구비된 가이드홈(238, 239)을 따라 이동하는 좌우 한 쌍의 가이드암(222, 232)을 닫는다.
가이드암(222, 232)이 프로파일(100)의 플랜지(120)를 감싸도록 닫혀지면, 승강작동수단(200)의 가이드채널(236)은 프로파일(100)이 승강시 프로파일의 웹(110)을 가이드하는 역할을 하여 좌우로 움직이는 것을 억제시킬 수 있다.
승강작동수단(200)과 프로파일(100) 사이의 간격(구조물과 가설대 사이의 간격)이 좁혀져서 승강작동수단(200)의 가이드암(222,232)이 프로파일(100)의 플랜지(120)를 감싸게 되면, 가설대 조임장치의 너트부재(35)를 제1 걸림부재(10)와 제2 걸림부재(20) 사이의 간격을 좁힐 때의 회전 방향과 반대 방향으로 회전시켜 제2 걸림부재(20)가 볼트부재(31)를 따라 이동되게 하여 제1 걸림부재(10)와 제2 걸림부재(20) 사이의 간격을 넓힌 다음, 제1 걸림부재(10)를 승강작동수단(200)의 결합핀(242)에서 착탈하고 제2 걸림부재(20)를 프로파일(100)의 체결핀(101)에서 착탈한다.
이상, 본 발명의 바람직한 실시예를 들어 상세하게 설명하였으나, 본 발명은 상기 실시예에 한정되는 것은 아니며, 본 발명의 기술적 사상의 범위내에서 당 분야에서 통상의 지식을 가진 자에 의하여 여러 가지 변형이 가능하다.

Claims (5)

  1. 구조물의 외벽에 설치되는 승강작동수단과, 구조물 외벽과 마주보는 측에 설치되고 일정 간격으로 복수 개의 걸림부가 구비된 프로파일 사이의 간격을 조이는 조임장치에 있어서,
    갈고리 모양으로 구비된 제1 걸림부재;
    상기 제1 걸림부재에 대응하여 반대방향으로 갈고리 모양으로 구비된 제2 걸림부재; 및
    상기 제1 걸림부재와 제2 걸림부재를 연결하고 상호 이격된 간격을 조절하기 위한 볼트부재와 너트부재가 축연결된 축부재를 포함하는 가설대 조임장치.
  2. 구조물 외벽에 설치되는 승강작동수단과, 구조물 외벽과 마주보는 측에 설치되는 프로파일 사이의 간격을 조이는 조임장치에 있어서,
    길이 방향을 따라 복수 개의 걸림부를 구비한 프로파일;
    상기 걸림부에 걸림작용될 수 있는 걸림쇠가 구비되어 상기 걸림부의 아래를 지지하면서 상기 프로파일을 승강시키기 위한 승강작동수단; 및
    상기 승강작동수단에 결합되어 승강 구동력을 제공하는 승강구동수단을 포함하며,
    상기 승강작동수단은,
    상기 프로파일의 승강방향에 대하여 수직방향으로 가이드홈이 구비된 좌우 한 쌍의 가이드프레임;
    상기 가이드프레임을 지지하면서 서로 이격되어 마주보게 구비된 지지프레임;
    상기 지지프레임에 사선형으로 구비되고 걸림쇠의 이동 경로를 제공하며, 상기 프로파일이 상승하는 경우에는 걸림부에 의해 걸림쇠가 사선형의 경로를 따라 상부로 밀어 올려지고 걸림부가 통과한 후에는 하중에 의해 걸림쇠가 아래로 내려오게 되는 경로를 제공하는 가이드채널;
    상기 지지프레임 사이에 설치되고, 상기 프로파일이 상향진입시 상기 걸림부에 접촉되어 상기 가이드채널을 따라 상향으로 직선 이동되고, 상기 프로파일이 하향진입시 상기 걸림부와 상호 걸림결합되며, 상기 걸림부의 아래를 지지하면서 상기 프로파일을 승강시키기 위한 걸림쇠; 및
    상기 가이드프레임에 구비된 가이드홈을 따라 슬라이딩되어 개방되거나 닫혀지는 좌우 한 쌍의 가이드암을 포함하며,
    상기 조임장치는,
    갈고리 모양으로 구비된 제1 걸림부재;
    상기 제1 걸림부재에 대응하여 반대방향으로 갈고리 모양으로 구비된 제2 걸림부재; 및
    상기 제1 걸림부재와 제2 걸림부재를 연결하고 상호 이격된 간격을 조절하기 위한 볼트부재와 너트부재가 축연결된 축부재를 포함하는 가설대 조임장치.
  3. 제1항 또는 제2항에 있어서,
    상기 제1 걸림부재는,
    일단이 갈고리 모양으로 형성되고 서로 이격되어 마주보게 구비된 한쌍의 제1 걸림판; 및
    상기 걸림판을 서로 연결하면서 내부에 관통공이 형성된 한쌍의 제1 연결판을 포함하며,
    상기 제2 걸림부재는,
    일단이 갈고리 모양으로 형성되고 서로 이격되어 마주보게 구비된 한쌍의 제2 걸림판; 및
    상기 걸림판을 서로 연결하면서 내부에 관통공이 형성된 제2 연결부재를 포함하는 가설대 조임장치.
  4. 제3항에 있어서,
    상기 축부재는,
    상기 제1 걸림부재의 제1 연결판과 상기 제2 걸림부재의 제2 연결부재의 관통공을 관통하는 볼트부재; 및
    상기 볼트부재의 일단에 설치되어 회전에 의해 상기 제1 걸림부재와 상기 제2 걸림부재의 상호 이격된 간격을 조절하는 너트부재를 포함하는 가설대 조임장치.
  5. 구조물 외벽에 설치되는 승강작동수단과, 구조물 외벽과 마주보는 측에 설치되고 일정 간격으로 복수 개의 걸림부가 구비된 프로파일 사이의 간격을 조이는 조임방법에 있어서,
    상기 승강작동수단의 결합핀에 상기 조임장치에 구비된 갈고리 모양의 제1 걸림부재를 설치하고, 상기 프로파일의 체결핀에 상기 조임장치에 구비된 갈고리 모양의 제2 걸림부재를 설치하는 단계;
    상기 조임장치의 너트부재를 회전시켜 상기 제1 걸림부재와 상기 제2 걸림부재를 연결하는 볼트부재를 따라 상기 제2 걸림부재가 이동되게 하여 상기 제1 걸림부재와 상기 제2 걸림부재의 이격된 간격을 좁히는 단계; 및
    상기 승강작동수단의 가이드프레임에 구비된 가이드홈을 따라 슬라이딩되어 개방되거나 닫혀지는 좌우 한 쌍의 가이드암이 상기 프로파일의 승강방향에 대하여 수직방향으로 슬라이딩되게 하여 상기 프로파일의 플랜지를 감싸게 하는 단계를 포함하는 가설대 조임방법.
PCT/KR2010/000963 2009-10-29 2010-02-17 가설대 조임 장치 및 방법 WO2011052854A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2009-0103143 2009-10-29
KR1020090103143A KR101062138B1 (ko) 2009-10-29 2009-10-29 가설대 조임 장치 및 방법

Publications (1)

Publication Number Publication Date
WO2011052854A1 true WO2011052854A1 (ko) 2011-05-05

Family

ID=43922271

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2010/000963 WO2011052854A1 (ko) 2009-10-29 2010-02-17 가설대 조임 장치 및 방법

Country Status (3)

Country Link
KR (1) KR101062138B1 (ko)
MY (1) MY165244A (ko)
WO (1) WO2011052854A1 (ko)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060312A (zh) * 2017-04-28 2017-08-18 天长市华利机械实业有限公司 一种用于脚手架整体固定装置
WO2018221933A1 (ko) * 2017-05-31 2018-12-06 강한주 지반 굴착기용 케이싱 가이드 장치 및 이를 이용한 굴착방법

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101613425B1 (ko) 2014-09-22 2016-04-19 금강공업 주식회사 프로파일 걸림 장치
WO2018221927A1 (ko) * 2017-05-30 2018-12-06 유니월드오토테크주식회사 의료용 전기톱

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200198526Y1 (ko) * 2000-04-11 2000-10-02 주식회사신영 건축 공사에 있어서 방진프레임 현수장치
KR20020062259A (ko) * 2002-05-06 2002-07-25 웨이 펀 츄 레일 브래킷 조립체 및 이를 이용한 수직 이동형 비계
US20030052249A1 (en) * 2000-01-18 2003-03-20 Thomas Waldschmitt Wall climbing form hoist
KR200369775Y1 (ko) * 2004-07-29 2004-12-14 남영주 레일과 레일브래킷 조립체 및 이를 포함하는 수직이동형비계
KR100927258B1 (ko) * 2007-11-07 2009-11-16 금강공업 주식회사 가설대 승강장치

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100840847B1 (ko) 2007-05-31 2008-06-23 삼목정공주식회사 갱폼과 레일의 연결구조
KR100874865B1 (ko) 2008-06-16 2008-12-19 이송복 건축용 갱폼 인양장치

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030052249A1 (en) * 2000-01-18 2003-03-20 Thomas Waldschmitt Wall climbing form hoist
KR200198526Y1 (ko) * 2000-04-11 2000-10-02 주식회사신영 건축 공사에 있어서 방진프레임 현수장치
KR20020062259A (ko) * 2002-05-06 2002-07-25 웨이 펀 츄 레일 브래킷 조립체 및 이를 이용한 수직 이동형 비계
KR200369775Y1 (ko) * 2004-07-29 2004-12-14 남영주 레일과 레일브래킷 조립체 및 이를 포함하는 수직이동형비계
KR100927258B1 (ko) * 2007-11-07 2009-11-16 금강공업 주식회사 가설대 승강장치

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060312A (zh) * 2017-04-28 2017-08-18 天长市华利机械实业有限公司 一种用于脚手架整体固定装置
WO2018221933A1 (ko) * 2017-05-31 2018-12-06 강한주 지반 굴착기용 케이싱 가이드 장치 및 이를 이용한 굴착방법

Also Published As

Publication number Publication date
KR101062138B1 (ko) 2011-09-05
KR20110046622A (ko) 2011-05-06
MY165244A (en) 2018-03-14

Similar Documents

Publication Publication Date Title
WO2011087234A2 (ko) 거푸집 작업발판의 인양방법
US9133632B2 (en) Platform support device for lifting loads or persons the height of a structure
WO2011007949A1 (ko) 가설대 승강장치
WO2011052854A1 (ko) 가설대 조임 장치 및 방법
US11780706B2 (en) Modular elevator assembly and rail
WO2019190078A1 (ko) 건축물의 슬라브 시공 장치 및 방법
RU2736256C2 (ru) Сборный защитный экран для ограждения по периметру
AU2012255623B2 (en) A lifting apparatus for a safety screen
CN110219451B (zh) 主体施工及装修同步作业用升降防护平台及作业方法
CN114945531A (zh) 用于将装配框架引入竖井中的移动式传送设备及方法
WO2023184882A1 (zh) 物料提升装置
US4022330A (en) Apparatus for mounting building panels
CN211169743U (zh) 建筑外墙防护脚手架升降机
WO2020096160A1 (ko) 엘리베이터 가이드 레일 리프팅 지그
JPH09151053A (ja) エレベータの乗かごの固定装置
JP2002129747A (ja) リフトアップ工法およびリフトアップシステム
WO2005007551A1 (ja) エレベータの作業足場装置
CN108792906B (zh) 电梯对重框的加强件安装辅助装置和加强件安装方法
JP2001073551A (ja) スライド式足場設備およびスライド式足場設備の組立方法
KR101306590B1 (ko) 프로파일 안내 걸림 장치
CN217000787U (zh) 一种电梯井免拆卸式提升平台装置
JP4784167B2 (ja) エレベータの据付作業用足場装置
JPH09202563A (ja) エレベータの据付方法
JP3630596B2 (ja) エレベータのロープ掛け方法
JP2526955Y2 (ja) 門形運搬据付装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10826939

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 883/MUMNP/2012

Country of ref document: IN

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 10826939

Country of ref document: EP

Kind code of ref document: A1