WO2019181993A1 - 水処理設備のメンテナンス支援装置 - Google Patents

水処理設備のメンテナンス支援装置 Download PDF

Info

Publication number
WO2019181993A1
WO2019181993A1 PCT/JP2019/011632 JP2019011632W WO2019181993A1 WO 2019181993 A1 WO2019181993 A1 WO 2019181993A1 JP 2019011632 W JP2019011632 W JP 2019011632W WO 2019181993 A1 WO2019181993 A1 WO 2019181993A1
Authority
WO
WIPO (PCT)
Prior art keywords
water treatment
work
treatment facility
unit
maintenance
Prior art date
Application number
PCT/JP2019/011632
Other languages
English (en)
French (fr)
Inventor
徹 坂倉
Original Assignee
栗田工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 栗田工業株式会社 filed Critical 栗田工業株式会社
Publication of WO2019181993A1 publication Critical patent/WO2019181993A1/ja

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Definitions

  • the present invention relates to a maintenance support device for water treatment facilities.
  • the water treatment equipment installed in the customer's factory, etc. is planned in advance for the maintenance period for one year, and at the scheduled time, replacement of consumable parts and aging equipment, chemical replenishment, etc. are performed as regular maintenance. It was.
  • maintenance may be performed in response to an operation signal or alarm signal from a sensor attached to the water treatment facility or from a customer.
  • the present invention has an object to provide a maintenance support device for a water treatment facility that arranges workers and articles necessary for maintenance and supports the maintenance work.
  • a maintenance support device for water treatment facilities includes a contract information storage unit that stores contract information with customers who have installed water treatment facilities, including inspection frequency and inspection contents; For each of a plurality of types of work on the water treatment facility, a work content storage unit that stores information on articles to be used, and work to determine work to be performed on the customer's water treatment facility based on the contract information And an article arrangement unit that identifies an article to be used for the work decided by the work decision unit based on information in the work content storage unit and arranges transportation of the article.
  • the work determination unit determines a work to be performed on the water treatment facility based on the content of an alarm from the water treatment facility.
  • the apparatus further includes a maintenance prediction unit that predicts work required for the water treatment facility based on operation data from the water treatment facility.
  • an operator skill storage unit that stores information on skills held
  • a person-in-charge selection unit that selects a person in charge of work on the water treatment facility of the customer
  • the work content storage unit stores skills necessary for each of a plurality of types of work
  • the person-in-charge selection unit includes skills required for work performed on the water treatment facility of the customer. Is selected as the person in charge.
  • FIG. 1 is a schematic diagram of a maintenance support system according to an embodiment of the present invention. It is a block block diagram of the maintenance assistance apparatus which concerns on the same embodiment. It is a figure which shows the example of the data structure of driving condition DB. It is a figure which shows the example of the data structure of contract information DB. It is a figure which shows the example of the data structure of work content DB. It is a figure which shows the example of the data structure of alarm DB. It is a figure which shows the example of the data structure of worker skill DB. It is a figure which shows the example of the data structure of article inventory DB. It is a figure which shows the example of the data structure of worker schedule DB. It is a figure which shows the example of the data structure of location information DB. It is a functional block diagram of the maintenance support device concerning the embodiment. It is a flowchart explaining the maintenance assistance method which concerns on the same embodiment.
  • the maintenance support device 1 in the monitoring center collects the operation data from the water treatment facility installed in the customer factory F in real time or periodically.
  • the maintenance support device 1 receives an alarm signal when any abnormality or the like occurs in the water treatment facility.
  • the maintenance support device 1 identifies the maintenance work necessary for the water treatment facility based on the operation data, the alarm signal and the content thereof, the contract content with the customer, and the like.
  • the maintenance support device 1 selects a worker who has the skills necessary to perform the specified maintenance work and can be dispatched to the factory F.
  • the maintenance support device 1 creates a patrol route for visiting the factories F in consideration of the expected work time in each factory F, the location of each factory F, and the like. .
  • the maintenance support device 1 notifies the terminal T (smart phone, tablet terminal, PC, etc.) owned by the operator of the created tour route and the work content in each factory F.
  • the maintenance support device 1 checks the inventory status of the articles necessary for the identified maintenance work, arranges workers according to the date of the maintenance work, and if necessary, supplies goods from the inventory center S to the customer. Arrange for transportation.
  • the water treatment facility 2 installed in a customer factory F or the like includes a control unit 20, a monitoring unit 21, a communication unit 22, and a plurality of water treatment units 23.
  • the water treatment unit 23 is a device used for water treatment facilities, such as an activated carbon filter, a reverse osmosis membrane module, an electric deionization device, a non-regenerative ion exchanger, a membrane filter, a degassing membrane, a pump, a valve, and the like. It is.
  • Each water treatment unit 23 is assigned a unique ID (identification information).
  • the monitoring unit 21 uses various sensors (not shown) provided in the water treatment facility 2 to detect the amount of treated water, the quality of the treated water, the level of the chemical tank, and the like, and the operation status of each water treatment unit 23 is detected. Monitor.
  • the control unit 20 associates the operation data of each water treatment unit 23 with the identification information, and notifies the maintenance support apparatus 1 via the network such as the Internet in real time or periodically by the communication unit 22.
  • the maintenance support device 1 has a CPU (Central Processing Unit) 10 as a control unit that comprehensively controls the operation of the maintenance support device 1.
  • the CPU 10 is based on an OS (Operating System) program and executes middleware, application programs, and the like.
  • a storage unit 11, a communication unit 12, a display unit 13, an input unit 14, and the like are connected to the CPU 10 via a bus.
  • the storage unit 11 includes a ROM (Read Only Memory), a RAM (Random Access Memory), a hard disk device, and the like.
  • ROM Read Only Memory
  • RAM Random Access Memory
  • Various programs are stored in the ROM, and each function of the maintenance support device 1 is realized by the CPU 10 executing various processes according to these programs.
  • the RAM is used as a work memory for temporarily storing data when the CPU 10 executes processing based on a program.
  • the hard disk device has an operation status DB (database), contract information DB, work content DB, alarm DB, worker skill DB, article inventory DB, worker schedule DB, location information DB, and the like.
  • the operation data of each water treatment unit 23 is stored in the operation status DB.
  • the contract information DB stores a regular maintenance plan and contract conditions (inspection frequency, inspection contents, etc.) for periodic inspection.
  • the alarm DB stores the alarm content and time notified from the water treatment facility 2.
  • the alarm DB also records the cause of the alarm occurrence found by the work.
  • the name of the worker who performs the maintenance work, the area in charge, the skills possessed, etc. are registered in the worker skill DB.
  • the inventory status of each article is registered in the article inventory DB.
  • a schedule for each worker who performs maintenance work is registered in the worker schedule DB.
  • the location (address) of the customer's factory is registered in the location information DB.
  • the communication unit 12 of the maintenance support device 1 communicates with the communication unit 22 of the water treatment facility 2 and the operator's terminal T via the Internet or the like.
  • the display unit 13 is a liquid crystal display, for example, and displays various screens.
  • the input unit 14 receives various operations from the administrator, and is a keyboard, a mouse, or the like.
  • the inspection contract extraction unit 102, the maintenance prediction unit 104, the alarm content extraction unit 106, the priority determination unit 108, the work A determination unit 110, an article arrangement unit 112, a person-in-charge selection unit 114, a tour route creation unit 116, a notification unit 118, an update unit 120, and the like are realized.
  • the processing of each unit will be described with reference to the flowchart shown in FIG.
  • the flowchart shown in FIG. 12 explains the maintenance support method according to the present embodiment.
  • the inspection contract extraction unit 102 confirms the contract contents in the contract information DB, and extracts the maintenance work to be performed in the near future and the factory where the work is performed, which is determined in advance by the contract (step S1).
  • the maintenance prediction unit 104 predicts maintenance work that will be required in the near future based on the operation data in the operation status DB (step S2). For example, it is predicted that membrane cleaning / membrane exchange will be required based on the quality of the treated water. Alternatively, it is predicted that chemical replenishment will be required based on fluctuations in the liquid level in the chemical tank.
  • the alarm content extraction unit 106 extracts the content of an unsupported alarm from the alarm DB (step S3).
  • the priority determination part 108 determines the priority of the factory to circulate based on the content of the alarm (step S4). For example, the priority of a factory that notifies a serious alarm such as water treatment being stopped is set high. It is also possible to set a higher priority for a factory that has issued an alarm with a higher degree of urgency or importance than a factory that performs regular maintenance by contract. (In this case, the urgency and importance are set in advance in association with the alarm code.)
  • the work determination unit 110 determines the maintenance work to be performed for each factory where workers are dispatched (step S5). For example, the maintenance work to be performed is determined by a contract. Further, the factor of the alarm to be dealt with this time is estimated from the past alarm contents registered in the alarm DB and the factor thereof, and the work to be performed is determined.
  • the article arrangement unit 112 refers to the work content DB and extracts and specifies the articles necessary for the work determined in step S5 (step S6).
  • the article arrangement unit 112 refers to the article inventory DB, confirms the inventory of articles necessary for the work, and arranges transportation (step S7).
  • the person-in-charge selection unit 114 refers to the work content DB and extracts skills necessary for the work determined in step S5.
  • the person-in-charge selecting unit 114 refers to the worker skill DB and the worker schedule DB, and is responsible for dispatching workers who have the extracted skills, the factory where the work is performed is in the area in charge, and the schedule is vacant. (Step S8). When there are a plurality of workers that can be dispatched, an operator with less possession skills may be selected, or an operator who has been to the same factory in the past may be selected.
  • the traveling route creation unit 116 refers to the work content DB, and calculates the work required time in each factory from the standard work time of work performed in each factory (step S9).
  • the traveling route creation unit 116 refers to the location information DB and creates a traveling route having the shortest travel distance (travel time) from the location of each factory (step S10).
  • the traveling route creation unit 116 creates the traveling route so that the factory with high priority determined in step S4 comes before the factory with low priority.
  • the traveling route creation unit 116 may obtain traffic information such as road congestion information and railway operation information from the web and the like, and may create a traveling route in consideration of the traffic information.
  • the notification unit 118 notifies the operator's terminal T of the patrol route, the visit date and time of each factory, the work contents at each factory, and the like (step S11).
  • the work result is registered (step S12).
  • the cause of the alarm is registered in the alarm DB.
  • the update unit 120 updates the possession skill of the worker skill DB. For example, it is determined that a new skill has been acquired when a predetermined training is taken or a predetermined work is performed a predetermined number of times.
  • the registration of the work result may be performed by the worker using the terminal T, or may be input from the input unit 14 based on the report submitted by the worker.
  • an operator registers using the terminal T, only the cause of the alarm that he / she can handle can be registered. In addition, the possession skill cannot be updated from the terminal T.
  • the maintenance support device 1 According to the maintenance support device 1 according to the present embodiment, it is possible to identify the work to be performed in each factory, and to check and arrange necessary items. For this reason, it is possible to prevent the occurrence of a situation where there is a shortage of articles at the visited factory, and to perform maintenance efficiently.
  • the present invention is not limited to the above-described embodiment as it is, and can be embodied by modifying constituent elements without departing from the scope of the invention in the implementation stage.
  • various inventions can be formed by appropriately combining a plurality of components disclosed in the embodiment. For example, some components may be deleted from all the components shown in the embodiment.
  • constituent elements over different embodiments may be appropriately combined.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • General Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Manufacturing & Machinery (AREA)
  • Automation & Control Theory (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

水処理設備のメンテナンス支援装置は、点検頻度及び点検内容を含む、水処理設備を設置している顧客との契約情報を記憶する契約情報記憶部と、前記水処理設備に対する複数種類の作業の各々について、使用する物品の情報を記憶する作業内容記憶部と、前記契約情報に基づいて、前記顧客の水処理設備に対して実施する作業を決定する作業決定部と、前記作業内容記憶部の情報に基づいて、前記作業決定部が決定した作業に使用する物品を特定し、該物品の搬送手配を行う物品手配部と、を備える。

Description

水処理設備のメンテナンス支援装置
 本発明は、水処理設備のメンテナンス支援装置に関する。
 半導体等の製造工場においては、製品の洗浄に、塩分等の不純物を除去した処理水(純水)が大量に使用される。一時的な製品生産規模の拡大に伴い、より大量の処理水が必要とされることがある。この課題を経済的に解決すべく、一時的に水処理設備を貸し出し、かつ水処理設備を構成する複数種のユニットの在庫を管理することで、同時に数多くの工場に効率良く水処理設備と水処理設備を構成する複数種のユニットの交換品とを提供する水処理設備提供システムが提案されている(例えば特許文献1参照)。
 顧客の工場等に設置した水処理設備は、1年間のメンテナンス時期を事前に計画しておき、計画した時期になると定期メンテナンスとして、消耗品部材や老朽化した機器の交換、薬品補充等を行っていた。また、水処理設備に取り付けられたセンサからの運転信号やアラーム信号、顧客からの連絡を受けて、メンテナンスを行うこともあった。
 従来、メンテナンスの作業担当者が自ら、担当エリア内の工場に設置された水処理設備に対するメンテナンス作業の計画を立て、必要な物品(交換部材や補充薬品)の手配を行っていた。複数の工場を効率良く巡回し、メンテナンス作業を行うためには、各工場で実施する作業内容を把握し、物品の手配期間等を考慮して計画を立てる必要がある。作業担当者の能力によっては、メンテナンスを効率良く行えないことがあった。
特許第5035493号公報
 本発明は、メンテナンスに必要な作業者や物品の手配を行い、メンテナンス作業を支援する水処理設備のメンテナンス支援装置を提供することを目的とする。
 本発明による水処理設備のメンテナンス支援装置は、点検頻度及び点検内容を含む、水処理設備を設置している顧客との契約情報を記憶する契約情報記憶部と、
 前記水処理設備に対する複数種類の作業の各々について、使用する物品の情報を記憶する作業内容記憶部と、前記契約情報に基づいて、前記顧客の水処理設備に対して実施する作業を決定する作業決定部と、前記作業内容記憶部の情報に基づいて、前記作業決定部が決定した作業に使用する物品を特定し、該物品の搬送手配を行う物品手配部と、を備える。
 本発明の一態様では、前記作業決定部は、前記水処理設備からのアラームの内容に基づいて、該水処理設備に対して実施する作業を決定する。
 本発明の一態様では、前記水処理設備からの運転データに基づいて、該水処理設備に必要となる作業を予測するメンテナンス予測部をさらに備える。
 本発明の一態様では、複数の作業者の各々について、保有するスキルの情報を記憶する作業者スキル記憶部と、前記顧客の水処理設備に対する作業の担当者を選定する担当者選定部と、をさらに備え、前記作業内容記憶部は、複数種類の作業の各々について必要なスキルを記憶しており、前記担当者選定部は、前記顧客の水処理設備に対して実施する作業に必要なスキルを保有する作業者を前記担当者として選定する。
 本発明によれば、メンテナンスに必要な作業者や物品の手配を行い、メンテナンス作業を支援できる。
本発明の実施形態に係るメンテナンス支援システムの概略図である。 同実施形態に係るメンテナンス支援装置のブロック構成図である。 運転状況DBのデータ構造の例を示す図である。 契約情報DBのデータ構造の例を示す図である。 作業内容DBのデータ構造の例を示す図である。 アラームDBのデータ構造の例を示す図である。 作業者スキルDBのデータ構造の例を示す図である。 物品在庫DBのデータ構造の例を示す図である。 作業者スケジュールDBのデータ構造の例を示す図である。 所在地情報DBのデータ構造の例を示す図である。 同実施形態に係るメンテナンス支援装置の機能ブロック図である。 同実施形態に係るメンテナンス支援方法を説明するフローチャートである。
 以下、図面を参照して実施の形態について説明する。
 図1に示すように、監視センタ内のメンテナンス支援装置1が、顧客の工場Fに設置された水処理設備から運転データをリアルタイム又は定期的に収集する。また、メンテナンス支援装置1は、水処理設備で何らかの異常等が発生した際に、アラーム信号を受信する。メンテナンス支援装置1は、運転データ、アラーム信号とその内容、顧客との契約内容等に基づいて、水処理設備に必要なメンテナンス作業を特定する。
 メンテナンス支援装置1は、特定したメンテナンス作業を実施するために必要なスキルを有し、工場Fへ派遣可能な作業者を選定する。メンテナンス支援装置1は、作業者を複数の工場Fへ派遣する場合、各工場Fでの予想作業時間、各工場Fの場所等を考慮して、複数の工場Fを巡回する巡回ルートを作成する。メンテナンス支援装置1は、作成した巡回ルート、各工場Fでの作業内容を、作業者が所有する端末T(スマートフォン、タブレット端末、PC等)に通知する。
 メンテナンス支援装置1は、特定したメンテナンス作業に必要な物品の在庫状況を確認し、メンテナンス作業の実施日に合わせて、作業者の手配を行うとともに、必要に応じて在庫センタSから顧客への物品の搬送を手配する。
 図2に示すように、顧客の工場F等に設置される水処理設備2は、制御部20、監視部21、通信部22、及び複数の水処理ユニット23を有する。水処理ユニット23は、水処理設備に用いられる機器であり、活性炭フィルタ、逆浸透膜モジュール、電気式脱イオン装置、非再生型イオン交換器、膜式濾過器、脱気膜、ポンプ、バルブ等である。各水処理ユニット23には固有のID(識別情報)が割り当てられている。
 監視部21は、水処理設備2に設けられた各種センサ(図示略)を用いて、処理水量や処理水の水質、薬品タンクの液位等を検出し、各水処理ユニット23の運転状況を監視する。制御部20は、各水処理ユニット23の運転データをその識別情報と対応付け、通信部22により、インターネット等のネットワークを介してメンテナンス支援装置1にリアルタイムに、又は定期的に通知する。
 メンテナンス支援装置1は、メンテナンス支援装置1の動作を統括的に制御する制御部としてのCPU(Central Processing Unit)10を有している。CPU10は、OS(Operating System)プログラムをベースとし、その上で、ミドルウェアやアプリケーションプログラムなどを実行する。CPU10には、バスを介して、記憶部11、通信部12、表示部13、入力部14等が接続されている。
 記憶部11は、ROM(Read Only Memory)、RAM(Random Access Memory)、ハードディスク装置等を含む。ROMには、各種のプログラムが格納されており、これらのプログラムに従ってCPU10が各種処理を実行することでメンテナンス支援装置1の各機能が実現される。RAMは、CPU10がプログラムに基づいて処理を実行する際にデータを一時的に格納するワークメモリとして使用される。
 ハードディスク装置は、運転状況DB(データベース)、契約情報DB、作業内容DB、アラームDB、作業者スキルDB、物品在庫DB、作業者スケジュールDB、所在地情報DB等を有する。
 図3に示すように、運転状況DBには、各水処理ユニット23の運転データが格納されている。
 図4に示すように、契約情報DBには、定期メンテナンス計画や、定期点検の契約条件(点検頻度、点検内容等)が格納されている。
 図5に示すように、作業内容DBには、標準作業時間、使用する物品(交換する機器、補充する薬品等)、必要なスキル等が作業毎に登録されている。
 図6に示すように、アラームDBには、水処理設備2から通知されたアラームの内容や時刻等が記録されている。また、アラームDBには、作業によって判明したアラーム発生の原因も記録されている。
 図7に示すように、作業者スキルDBには、メンテナンス作業を行う作業者の氏名、担当エリア、所有するスキル等が登録されている。
 図8に示すように、物品在庫DBには、各物品の在庫状況が登録されている。
 図9に示すように、作業者スケジュールDBには、メンテナンス作業を行う作業者毎のスケジュールが登録されている。
 図10に示すように、所在地情報DBには、顧客の工場の所在地(住所)が登録されている。
 メンテナンス支援装置1の通信部12は、インターネット等を介して、水処理設備2の通信部22や作業者の端末Tと通信を行う。
 表示部13は、例えば液晶ディスプレイであり、各種画面を表示する。入力部14は、管理者から各種の操作を受け付けるものであり、キーボードやマウス等である。
 CPU10が記憶部11に格納されているメンテナンス支援プログラムを実行することで、図11に示すように、点検契約抽出部102、メンテナンス予測部104、アラーム内容抽出部106、優先度判定部108、作業決定部110、物品手配部112、担当者選定部114、巡回ルート作成部116、通知部118、更新部120等が実現される。各部の処理を図12に示すフローチャートに沿って説明する。図12に示すフローチャートは、本実施形態に係るメンテナンス支援方法を説明するものである。
 点検契約抽出部102が、契約情報DB内の契約内容を確認し、契約により予め決められている、近日中に実施すべきメンテナンス作業、及び作業を行う工場を抽出する(ステップS1)。
 メンテナンス予測部104が、運転状況DB内の運転データに基づいて、近日中に必要となるメンテナンス作業を予測する(ステップS2)。例えば、処理水質の変動に基づいて膜洗浄/膜交換が必要になると予測する。あるいはまた、薬品タンク内の液位の変動に基づいて、薬品補充が必要になると予測する。
 アラーム内容抽出部106が、アラームDBから、未対応のアラームの内容を抽出する(ステップS3)。
 優先度判定部108が、アラームの内容に基づいて、巡回する工場の優先度を判定する(ステップS4)。例えば、水処理が停止した等の重大なアラームを通知している工場の優先度が高く設定される。また、契約による定期メンテナンスを行う工場よりも緊急度や重要度の高いアラームを発している工場の優先度が高く設定されるようにすることも可能である。(この場合、警報コードに関連付けて予め緊急度や重要度を設定しておく。)
 作業決定部110が、作業員を派遣する工場毎に、実施するメンテナンス作業を決定する(ステップS5)。例えば、実施するメンテナンス作業は、契約により決められているものである。また、アラームDBに登録されている過去のアラーム内容及びその要因から、今回対処するアラームの要因を推定し、実施する作業を決定する。
 物品手配部112が、作業内容DBを参照し、ステップS5で決定した作業に必要な物品を抽出、特定する(ステップS6)。物品手配部112は、物品在庫DBを参照し、作業に必要な物品の在庫を確認し、搬送の手配を行う(ステップS7)。
 担当者選定部114が、作業内容DBを参照し、ステップS5で決定した作業に必要なスキルを抽出する。担当者選定部114は、作業者スキルDB及び作業者スケジュールDBを参照し、抽出したスキルを持ち、作業を行う工場が担当エリア内であり、かつスケジュールが空いている作業者を、派遣する担当者として選定する(ステップS8)。派遣可能な作業者が複数いる場合は、所有スキルが少ない作業者を選定してもよいし、同じ工場へ過去に行ったことがある作業者を選定してもよい。
 所有スキルが少ない作業者を選定することで、経験を積ませることができる。また、所有スキルの多い作業者を残しておくことで、その後に緊急度の高いアラームが発生した場合に、当該担当者を迅速に派遣し、対応することが可能となる。
 巡回ルート作成部116が、作業内容DBを参照し、各工場で実施する作業の標準作業時間から、各工場での作業所要時間を算出する(ステップS9)。
 巡回ルート作成部116が、所在地情報DBを参照し、各工場の所在地から、移動距離(移動時間)が最短となる巡回ルートを作成する(ステップS10)。巡回ルート作成部116は、ステップS4で判定した優先度の高い工場が優先度の低い工場よりも先になるように巡回ルートを作成する。巡回ルート作成部116は、道路の渋滞情報や鉄道運行情報などの交通情報をウェブ等から入手し、交通情報を考慮して巡回ルートを作成してもよい。
 通知部118が、巡回ルート、各工場の訪問日時、各工場での作業内容等を、作業者の端末Tに通知する(ステップS11)。
 作業完了後、作業結果が登録される(ステップS12)。例えば、アラームの原因がアラームDBに登録される。また、作業者が新たなスキルを習得した場合、更新部120が作業者スキルDBの所有スキルを更新する。例えば、所定の研修を受講した場合や、所定の作業を所定回数実施した場合などに、新たなスキルを習得したと判定される。
 作業結果の登録は、作業者が端末Tを用いて行ってもよいし、作業者が提出した報告書に基づいて、入力部14から入力してもよい。作業者が端末Tを用いて登録する場合、自身が対応したアラームの原因のみ登録できる。また、所有スキルの更新は、端末Tからは行えないようにしてある。
 このように、本実施形態に係るメンテナンス支援装置1によれば、各工場で実施する作業を特定し、必要な物品の在庫確認・手配を行うことができる。そのため、訪問先の工場で物品が足りなくなるという状況の発生を防止し、メンテナンスを効率良く行うことができる。
 なお、本発明は上記実施形態そのままに限定されるものではなく、実施段階ではその要旨を逸脱しない範囲で構成要素を変形して具体化できる。また、上記実施形態に開示されている複数の構成要素の適宜な組み合わせにより、種々の発明を形成できる。例えば、実施形態に示される全構成要素から幾つかの構成要素を削除してもよい。さらに、異なる実施形態にわたる構成要素を適宜組み合わせてもよい。
 本発明を特定の態様を用いて詳細に説明したが、本発明の意図と範囲を離れることなく様々な変更が可能であることは当業者に明らかである。
 本出願は、2018年3月23日付で出願された日本特許出願2018-056457に基づいており、その全体が引用により援用される。
 1 メンテナンス支援装置
 2 水処理設備

Claims (4)

  1.  点検頻度及び点検内容を含む、水処理設備を設置している顧客との契約情報を記憶する契約情報記憶部と、
     前記水処理設備に対する複数種類の作業の各々について、使用する物品の情報を記憶する作業内容記憶部と、
     前記契約情報に基づいて、前記顧客の水処理設備に対して実施する作業を決定する作業決定部と、
     前記作業内容記憶部の情報に基づいて、前記作業決定部が決定した作業に使用する物品を特定し、該物品の搬送手配を行う物品手配部と、
     を備える水処理設備のメンテナンス支援装置。
  2.  前記作業決定部は、前記水処理設備からのアラームの内容に基づいて、該水処理設備に対して実施する作業を決定することを特徴とする請求項1に記載の水処理設備のメンテナンス支援装置。
  3.  前記水処理設備からの運転データに基づいて、該水処理設備に必要となる作業を予測するメンテナンス予測部をさらに備えることを特徴とする請求項1又は2に記載の水処理設備のメンテナンス支援装置。
  4.  複数の作業者の各々について、保有するスキルの情報を記憶する作業者スキル記憶部と、
     前記顧客の水処理設備に対する作業の担当者を選定する担当者選定部と、
     をさらに備え、
     前記作業内容記憶部は、複数種類の作業の各々について必要なスキルを記憶しており、
     前記担当者選定部は、前記顧客の水処理設備に対して実施する作業に必要なスキルを保有する作業者を前記担当者として選定することを特徴とする請求項1乃至3のいずれか1項に記載のメンテナンス支援装置。
PCT/JP2019/011632 2018-03-23 2019-03-20 水処理設備のメンテナンス支援装置 WO2019181993A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018056457A JP6806110B2 (ja) 2018-03-23 2018-03-23 水処理設備のメンテナンス支援装置
JP2018-056457 2018-03-23

Publications (1)

Publication Number Publication Date
WO2019181993A1 true WO2019181993A1 (ja) 2019-09-26

Family

ID=67986232

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/011632 WO2019181993A1 (ja) 2018-03-23 2019-03-20 水処理設備のメンテナンス支援装置

Country Status (3)

Country Link
JP (1) JP6806110B2 (ja)
TW (1) TW201945292A (ja)
WO (1) WO2019181993A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7325630B2 (ja) * 2020-06-05 2023-08-14 三菱電機株式会社 空気調和機の診断システムおよび学習装置

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002334189A (ja) * 2001-05-10 2002-11-22 Ebara Engineering Service Co Ltd 排出物処理施設及び水処理施設への作業員派遣を管理する管理センタ
JP2002352024A (ja) * 2001-05-29 2002-12-06 Mitsubishi Electric Corp 駆動装置の保守管理システム
JP2003256730A (ja) * 2002-03-05 2003-09-12 Ricoh Co Ltd 顧客支援システム、プログラムおよび記録媒体
JP2004287688A (ja) * 2003-03-20 2004-10-14 Mitsubishi Electric Building Techno Service Co Ltd 保守作業日程作成システム
JP2005122541A (ja) * 2003-10-17 2005-05-12 Kurita Water Ind Ltd 設備管理システム
JP2009075884A (ja) * 2007-09-20 2009-04-09 Hitachi Information Systems Ltd 機器故障修理受付システム及び機器故障修理受付方法
JP5035493B2 (ja) * 2001-03-28 2012-09-26 栗田工業株式会社 水処理設備提供システム
JP2013242774A (ja) * 2012-05-22 2013-12-05 Mitsubishi Electric Building Techno Service Co Ltd 保守作業スケジュール作成装置及びプログラム
JP2017016239A (ja) * 2015-06-29 2017-01-19 株式会社リコー 情報処理システム及びプログラム

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008310633A (ja) * 2007-06-15 2008-12-25 Hitachi Ltd 機器保守方法および機器保守システム

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5035493B2 (ja) * 2001-03-28 2012-09-26 栗田工業株式会社 水処理設備提供システム
JP2002334189A (ja) * 2001-05-10 2002-11-22 Ebara Engineering Service Co Ltd 排出物処理施設及び水処理施設への作業員派遣を管理する管理センタ
JP2002352024A (ja) * 2001-05-29 2002-12-06 Mitsubishi Electric Corp 駆動装置の保守管理システム
JP2003256730A (ja) * 2002-03-05 2003-09-12 Ricoh Co Ltd 顧客支援システム、プログラムおよび記録媒体
JP2004287688A (ja) * 2003-03-20 2004-10-14 Mitsubishi Electric Building Techno Service Co Ltd 保守作業日程作成システム
JP2005122541A (ja) * 2003-10-17 2005-05-12 Kurita Water Ind Ltd 設備管理システム
JP2009075884A (ja) * 2007-09-20 2009-04-09 Hitachi Information Systems Ltd 機器故障修理受付システム及び機器故障修理受付方法
JP2013242774A (ja) * 2012-05-22 2013-12-05 Mitsubishi Electric Building Techno Service Co Ltd 保守作業スケジュール作成装置及びプログラム
JP2017016239A (ja) * 2015-06-29 2017-01-19 株式会社リコー 情報処理システム及びプログラム

Also Published As

Publication number Publication date
JP2019168941A (ja) 2019-10-03
JP6806110B2 (ja) 2021-01-06
TW201945292A (zh) 2019-12-01

Similar Documents

Publication Publication Date Title
CN104142664B (zh) 使用大数据的工业产品的预测维护
CN104142660B (zh) 用于工业自动化的经由云平台的远程协助
WO2019181994A1 (ja) 水処理設備のメンテナンス支援装置
CN107431716A (zh) 用于生成合并的、经过滤的和基于相关安全风险的通知的通知子系统
KR102447337B1 (ko) 자동화된 배달원 스케줄링을 위한 시스템 및 방법
Rafiei et al. Novel bi-level hierarchical production planning in hybrid MTS/MTO production contexts
Buchanan et al. Failure, uncertainty and control: the role of operators in a computer integrated production system
WO2019181993A1 (ja) 水処理設備のメンテナンス支援装置
Nedeliaková et al. New trends in process-oriented quality management
JP2019185395A (ja) 水処理設備の管理装置
CN107431715A (zh) 用于使用基础设施监视软件来收集网络安全风险数据的技术
JP4932681B2 (ja) トレーサビリティシステム
JP2020168626A (ja) 水処理設備のメンテナンス支援装置
CN116227872A (zh) 一种基于项目设备实际使用分析的企业设备管理方法及系统
JP2019185397A (ja) 水処理設備の管理装置
KR20180036090A (ko) 물류 자동화 장비 유지보수 데이터베이스 구축 시스템 및 방법
WO2019176707A1 (ja) 水処理設備の管理装置
CN104137127A (zh) 用于自动创建当前个人工作清单的灌装设备及计算机实现方法
JP6558458B1 (ja) 水処理設備の管理装置
JP2019185396A (ja) 水処理設備の管理装置
CN113448693A (zh) 一种数字化工厂saas云平台
JP2005196484A (ja) 生産管理システム
JP6558460B1 (ja) 水処理設備の管理装置
Pane et al. Implementation Concept of Industry 4.0 to Manufacturing Industry in Indonesia in Order to Optimize Supply Chain Management
Quintana et al. Increasing the effectiveness and cost‐efficiency of corrective maintenance using relay‐type assignment

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19772377

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19772377

Country of ref document: EP

Kind code of ref document: A1