WO2018233432A1 - 一种管道结构及其单层或双层真空管道的快速铺设方法 - Google Patents

一种管道结构及其单层或双层真空管道的快速铺设方法 Download PDF

Info

Publication number
WO2018233432A1
WO2018233432A1 PCT/CN2018/087724 CN2018087724W WO2018233432A1 WO 2018233432 A1 WO2018233432 A1 WO 2018233432A1 CN 2018087724 W CN2018087724 W CN 2018087724W WO 2018233432 A1 WO2018233432 A1 WO 2018233432A1
Authority
WO
WIPO (PCT)
Prior art keywords
pipe
layer
track
vacuum pipe
double
Prior art date
Application number
PCT/CN2018/087724
Other languages
English (en)
French (fr)
Inventor
苏彬诚
Original Assignee
苏彬诚
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 苏彬诚 filed Critical 苏彬诚
Publication of WO2018233432A1 publication Critical patent/WO2018233432A1/zh

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B13/00Other railway systems
    • B61B13/08Sliding or levitation systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B13/00Other railway systems
    • B61B13/10Tunnel systems

Definitions

  • the invention relates to the technical field of high-speed trains, in particular to a pipeline structure and a quick laying method of the single-layer or double-layer vacuum pipeline.
  • the high-speed train is a kind of modern high-tech rail transit development direction. After the high-speed rail of the wheel-rail technology achieves a speed of 400KM/h, there is no higher development space due to the friction between the wheel and rail.
  • the way to achieve higher speed train speed can also adopt the magnetic levitation system, which realizes the contactless suspension and guidance between the train and the track through electromagnetic force, and then uses the electromagnetic force generated by the linear motor to pull the train.
  • the maglev train system can be divided into two directions, namely the constant-conducting magnetic (EMS) used in Germany and the superconducting magnetic repulsion (EDS) train used in Japan.
  • the current highest speed is the Japanese Superconducting Magnetic Rejection (EDS) train, which has reached 600KM/h, and this speed has not yet been truly commercialized.
  • the object of the present invention is to provide a pipe structure having high strength, low cost, convenient processing and laying, and a quick laying method of the double-layer vacuum pipe.
  • a pipe structure comprising an inner spiral pipe, an outer spiral pipe, a high-strength hard filler filled between the inner spiral pipe and the outer spiral pipe, and a spiral pipe for the inner layer and a tensioning member integrally combined with the hard filler and the hard filler, the tensioning member being respectively fastened to the inner spiral tube and/or the outer spiral tube, and the inner diameter of the inner spiral tube It is 3m or more and 15m or less.
  • the inner spiral tube and the outer spiral tube rotate in opposite directions.
  • the inner spiral tube and the outer spiral tube are integrally wound with a steel plate.
  • the outer surface of the pipe is provided with a boss for the pipe installation along the length direction.
  • the cross section of the boss is arranged in an isosceles trapezoidal shape.
  • a rapid laying method for a single-layer or double-layer vacuum pipe comprising the pipe structure described above, specifically comprising the following steps:
  • the pipe unit sequentially conveyed through the temporary conveying rail is lifted by a bridge machine disposed above the vacuum pipe bracket, and the bottom surface of the boss of the pipe unit is turned over by the turning device provided at the top of the bridge machine to The bottom surface is arranged upwards, and then cooperates with the corresponding vacuum pipe bracket, and then the unloaded transport vehicle is converted into a permanent transport track by the bridge machine, so that the transport vehicle returns along the permanent transport track, and finally the external lifting device will
  • the conveyor is again changed to the starting point of the temporary conveying track.
  • the pipe unit is reloaded, the vehicle continues to travel forward, and the cycle is repeated to complete the laying of the single-layer vacuum pipe;
  • a temporary conveying rail located at the tail of the single-layer vacuum pipe may be first removed, and then the lower bottom surface of the pipe unit conveyed through the above steps may be conveyed. After the track is removed, the plane of the boss is closely matched, and the cycle of the double-layer vacuum pipe is completed.
  • the top of the vacuum pipe bracket is provided with a positioning groove, and the positioning groove cooperates with the outer peripheral surfaces of both ends of the pipe unit.
  • the permanent conveying track comprises a rail bearing surface extending horizontally outwardly from the outer side wall of the lower vacuum pipe of the double-layer vacuum pipe, a track laid along the track bearing surface, and a slope disposed at the bottom of the track bearing surface
  • the support rods, the same ends of the adjacent support rods are respectively fastened with the lock columns embedded in the side walls of the lower vacuum pipes of the double-layer vacuum pipes.
  • the present invention provides a pipe structure and a rapid laying method thereof for a single-layer or double-layer vacuum pipe, the pipe structure comprising an inner spiral pipe, an outer spiral pipe, and a filling spiral disposed on the inner spiral pipe a high-strength hard filler between the outer spiral tube and a tensioning member for integrating the inner spiral tube and the outer spiral tube with the hard filler, the tensioning member respectively
  • the inner spiral tube and/or the outer spiral tube are fastened, and the inner spiral tube has an inner diameter of 3 m or more and 15 m or less.
  • the pipeline structure designed by the structure has large pipe diameter, high pipeline strength, low cost and convenient processing; the two pipes in the above structure are superimposed one on top of the other, and the single layer can be conveniently realized through the temporary conveying track and the permanent conveying track setting. Or the double-layer vacuum pipe is quickly erected and the structure is stable and reliable.
  • Figure 1 is a cross-sectional view showing a vacuum piping of the present invention.
  • Figure 2 is a perspective view of Figure 1.
  • Fig. 3 is a structural schematic view showing the laying of the lower vacuum pipe of the double-layer vacuum pipe of the present invention.
  • Fig. 4 is a structural schematic view showing the direction of the bottom surface of the boss of the vacuum pipe in Fig. 3;
  • Fig. 5 is a schematic view showing the structure of the upper vacuum pipe of the double-layer vacuum pipe of the present invention when it is combined with the lower vacuum pipe.
  • Figure 6 is a schematic view showing the structure of the double-layer vacuum pipe of the present invention after being laid.
  • the present embodiment provides a pipe structure including an inner spiral pipe 101 , an outer spiral pipe 102 , and a filling between the inner spiral pipe 101 and the outer spiral pipe 102 .
  • the inner layer spiral tube 101 and the outer layer spiral tube 102 are fastened, and the inner layer spiral tube 101 has an inner diameter of 3 m or more and 15 m or less. In the present embodiment, it is preferable that the inner layer spiral tube 101 has an inner diameter of 6 m.
  • the inner layer spiral tube 101 and the outer layer spiral tube 102 are integrally wound with a steel plate, and the inner layer spiral tube 101 and the outer layer spiral tube 102 rotate in opposite directions, thereby making the inner A relatively closed cavity is formed between the layer spiral tube 101 and the outer layer spiral tube, thereby facilitating the filling of the hard filler 103.
  • the hard filler can be set as a concrete filler, and the filling can be increased by filling when filling.
  • the clamping member is used to improve the integrity of the inner spiral tube 101 and the outer spiral tube 102.
  • the tensioning member can be preferentially welded or riveted to the gap between the inner spiral tube 101 and the outer spiral tube 102. The filling of the hard filler 103 is performed thereafter.
  • the outer surface of the vacuum duct 100 is provided with a boss 105 for mounting the vacuum duct 100 in the longitudinal direction, and the cross section of the boss 105 is disposed in an isosceles trapezoidal shape.
  • the boss 105 is arranged to facilitate the transportation of the vacuum pipe and the laying of the single or double layer vacuum pipe.
  • a method for laying a double-layer vacuum pipe includes the pipe structure described above, and includes the following steps:
  • a plurality of pipe units 107 are laid on the top of the spaced-apart vacuum pipe bracket 200, and the bottom surface of the bosses of the plurality of pipe units 107 are horizontally arranged upwards, thereby forming a boss plane 108;
  • the pipe unit 107 sequentially conveyed through the temporary conveyance rails 1081 is lifted by the bridge machine 300 disposed above the vacuum pipe bracket 200, and the pipe unit is passed through the turning device 301 provided at the top of the bridge machine 300.
  • the bottom surface of the boss of the 107 is turned upside down, and then the corresponding vacuum pipe bracket 200 is engaged, and then the unloaded transport vehicle 1082 is converted to the permanent transport track 109 by the bridge machine 300, thereby making the transport vehicle 1082 Returning along the permanent conveying rail 109, finally transferring the conveying vehicle 1082 to the starting point of the temporary conveying rail 1081 again by the external lifting device, and continuing to drive forward after re-loading the pipeline unit 107, and sequentially circulating to complete the laying of the single-layer vacuum pipeline;
  • the pipe unit 107 can be hoisted on the transport vehicle 1082 whose boss is placed downward on the temporary transport rail, and the pipeline unit 107 can be continuously transported to both ends of the erected vacuum pipe and erected and installed. .
  • the temporary conveying rail 1081 located at the tail of the single-layer vacuum pipe may be first removed, and then the lower bottom surface of the pipe unit 107 to be conveyed through the above steps.
  • a section of the boss plane 108 after the removal of the conveyor track is closely integrated to form an upper and lower high-strength carrier body, thereby circulating and completing the laying of the double-layer vacuum pipe.
  • the top of the vacuum pipe bracket 200 is provided with a positioning groove 201, and the positioning groove cooperates with the outer peripheral surfaces of both ends of the pipe unit 107.
  • the permanent transport track 109 includes a track bearing surface 401 extending horizontally outwardly from the outer side wall of the lower vacuum pipe of the double-layer vacuum pipe, a track 402 laid along the track bearing surface 401, and an inclined arrangement on the track
  • the support rod 403 at the bottom of the track bearing surface 401 and the same end of the adjacent support rod 403 are respectively fastened with the lock column 106 embedded in the side wall of the lower vacuum tube of the double-layer vacuum pipe.
  • the permanent conveying track formed in this way not only facilitates the return of the conveyor when the double-layer vacuum pipe is laid, but also provides favorable safety for the maintenance of the later double-layer vacuum pipe and the evacuation of personnel in the event of an emergency safety accident in operation. Guarantee.
  • the detached temporary conveying rail 1081 is fastened to the inner wall of the double-layer vacuum pipe after laying, and is used as a high-speed train track in the vacuum pipe, thereby setting up, greatly improving the vacuum pipe.
  • the laying method of the double-layer vacuum pipe designed by the above method can directly build the manufacturing unit of the pipe unit to one end or the middle position of the double-layer vacuum pipe line, and then pass the produced pipe unit to the bridge machine.
  • the large lifting equipment is lifted to the transport vehicle, so that the transport vehicle continuously carries on the pipeline unit with the progress of the pipeline unit in front, and then the pipeline unit is recycled by passing the transport vehicle through the permanent transport rail. In this way, the transportation is greatly solved due to the large volume of the pipeline unit and the heavy transportation efficiency, thereby greatly improving the laying efficiency of the double-layer vacuum pipeline.

Landscapes

  • Engineering & Computer Science (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Lining Or Joining Of Plastics Or The Like (AREA)
  • Road Paving Structures (AREA)
  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

一种管道结构及其单层或双层真空管道的快速铺设方法,管道结构包括内层螺旋管(101)、外层螺旋管(102)、填充设置于内层螺旋管(101)和外层螺旋管(102)之间的高强度的硬性填充物(103)、以及用于所述内层螺旋管(101)和外层螺旋管(102)与所述硬性填充物(103)结合为一体的拉紧件(104),所述拉紧件(104)分别与所述内层螺旋管(101)和/或外层螺旋管(102)紧固,且所述内层螺旋管(101)的内径大于等于3m,且小于等于15m。以此结构设计的管道结构,管径大,管道强度高,成本低且加工方便;将上述结构中的两管道上下叠加,并通过临时输送轨道及永久输送轨道的设置,能够方便的实现单层或双层真空管道的快速架设,且结构稳定可靠。

Description

一种管道结构及其单层或双层真空管道的快速铺设方法 技术领域
本发明涉及高速列车技术领域,尤其涉及一种管道结构及其单层或双层真空管道的快速铺设方法。
背景技术
高速列车是一种现代高科技轨道交通发展的方向,轮轨技术的高铁做到时速400KM/h以后,由于轮轨之间的摩擦力减小就已经没有更高的发展空间了。实现更高速列车运行速度的方式还能采用磁悬浮系统,它是通过电磁力实现列车与轨道之间的无接触的悬浮和导向,再利用直线电机产生的电磁力牵引列车运行。目前磁悬浮列车系统,可以分为两个方向,分别是德国所采用的常导磁吸式(EMS)和日本所采用的超导磁斥式(EDS)列车。目前最高的车速是日本超导磁斥式(EDS)列车,达到了600KM/h,而且这一速度还没有真正的商业化运营。
速度作为人类一直追求的目标,从来只有更高,没有最高。研发新型的更为先进的交通运输工具,要想速度再有新的提升,在空气中采用以上两种磁悬浮技术已不能满足要求了。由于基于在大气当中开发的磁悬浮系统在高速状态下空气阻力所消耗的能源所占的比重越来越高,开发在真空管道中运行的磁悬浮列车系统就成为了热门学科。
现有技术下用于大型建筑的管道结构,大多采用金属板材一体焊接成型,因此存在结构弹性模量较高、易腐蚀,生产成本高等诸多问题。
此外,现有技术下针对高速列车设计的真空管道,大多也是采用金属管材设置,因此同样也会存在上述缺陷,且同时存在架设后密封性差,架设效率低等一系列问题。
发明内容
本发明的目的在于提供一种强度高,成本低,方便加工和铺设的管道结构及其双层真空管道的快速铺设方法。
为达此目的,本发明采用以下技术方案:
一种管道结构,包括内层螺旋管、外层螺旋管、填充设置于所述内层螺旋管和外层螺旋管之间的高强度的硬性填充物、以及用于所述内层螺旋管和外层螺旋管与所述硬性填充物结合为一体的拉紧件,所述拉紧件分别与所述内层螺旋管和/或外层螺旋管紧固,且所述内层螺旋管的内径大于等于3m,且小于等于15m。
其中,所述内层螺旋管和外层螺旋管的旋转方向相反。
其中,所述内层螺旋管和外层螺旋管均采用钢板一体卷设而成。
其中,该管道的外表面沿长度方向设置有用于所述管道安装的凸台。
其中,所述凸台的横截面呈等腰梯形状设置。
一种单层或双层真空管道的快速铺设方法,包括上述所述的管道结构,具体包括以下步骤:
1).将多根管道单元铺设于间隔设置的真空管道支架的顶部,并使得多根管道单元的凸台底面水平朝上设置,以此形成一个凸台平面;
2).之后在所述凸台平面的顶部铺设临时输送轨道,并在所述临时输送轨道外侧的多根管道单元所形成的的真空管道体外侧壁架设永久输送轨道,以使得沿临时输送轨道向前输送管道单元的输送车能够沿所述永久输送轨道返回;所述临时输送轨道和永久输送轨道均随着前方管道单元的架设而同步向前铺设;
3).将通过临时输送轨道依次输送来的管道单元,通过间隔设置于真空管 道支架上方的架桥机吊起,并通过设置在架桥机顶部的翻转装置将管道单元的凸台底面翻转至底面朝上设置,之后与对应的真空管道支架相配合,然后再将卸载后的输送车通过架桥机变换至永久输送轨道,以此使得输送车沿永久输送轨道返回,最后通过外部吊装设备将输送车再次变换至临时输送轨道的起点,待重新装载管道单元后继续向前行驶,依次循环,完成单层真空管道的铺设;
4).若需要进行双层真空管道的铺设时,可首先将位于上述所述单层真空管道尾部的一段临时输送轨道拆除,之后,再将通过上述步骤输送来的管道单元的下底面与输送轨道拆除后的一段凸台平面紧密配合,以此循环,完成双层真空管道的铺设。
其中,所述真空管道支架的顶部设置有定位凹槽,所述定位凹槽与管道单元两端的外周面相配合。
其中,所述永久输送轨道包括水平向外延伸架设于双层真空管道的下层真空管道外侧壁的轨道承载面、沿所述轨道承载面铺设的轨道、以及倾斜设置于所述轨道承载面底部的支撑杆,相邻支撑杆的同一端分别与埋设于双层真空管道的下层真空管道侧壁的锁柱紧固。
本发明的有益效果:本发明提供了一种管道结构及其单层或双层真空管道的快速铺设方法,管道结构包括内层螺旋管、外层螺旋管、填充设置于所述内层螺旋管和外层螺旋管之间的高强度的硬性填充物、以及用于所述内层螺旋管和外层螺旋管与所述硬性填充物结合为一体的拉紧件,所述拉紧件分别与所述内层螺旋管和/或外层螺旋管紧固,且所述内层螺旋管的内径大于等于3m,且小于等于15m。以此结构设计的管道结构,管径大,管道强度高,成本低且加工方便;将上述结构中的两管道上下叠加,并通过临时输送轨道及永久输送轨道的设置,能够方便的实现单层或双层真空管道的快速架设,且结构稳定可靠。
附图说明
图1是本发明一种真空管道的截面图。
图2是图1的轴测图。
图3是本发明双层真空管道的下层真空管道铺设时的结构示意图。
图4是图3中对真空管道的凸台底面调整方向时的结构示意图。
图5是本发明双层真空管道的上层真空管道与下层真空管道配合时的结构示意图。
图6是本发明双层真空管道铺设后的结构示意图。
具体实施方式
下面结合附图并通过具体实施方式来进一步说明本发明的技术方案。
结合图1至图2所示,本实施例提供了一种管道结构,包括内层螺旋管101、外层螺旋管102、填充设置于所述内层螺旋管101和外层螺旋管102之间的高强度的硬性填充物103、以及用于所述内层螺旋管101和外层螺旋管102与所述硬性填充物103结合为一体的拉紧件104,所述拉紧件104分别与所述内层螺旋管101和外层螺旋管102紧固,且所述内层螺旋管101的内径大于等于3m,且小于等于15m。本实施例中优选内层螺旋管101的内径为6m。
本实施例中,所述内层螺旋管101和外层螺旋管102均采用钢板一体卷设而成,且所述内层螺旋管101和外层螺旋管102的旋转方向相反,以此使得内层螺旋管101和外层螺旋管之间形成较为封闭的腔体,以此便于硬性填充物103的填充,本实施例中,硬性填充物可设置为混凝土填充物,在填充时可通过增加拉紧件,以此提升内层螺旋管101和外层螺旋管102的一体性,本实施例中,拉紧件可优先焊接或铆接于内层螺旋管101和外层螺旋管102之间的间隙内,之后在进行硬性填充物103的填充。
该真空管道100的外表面沿长度方向设置有用于所述真空管道100安装的凸台105,所述凸台105的横截面呈等腰梯形状设置。凸台105的设置,便于真空管道的运输以及单层或双层真空管道的铺设。
一种双层真空管道的铺设方法,结合图3至图6所示,包括上述所述的管道结构,且包括以下步骤:
1).将多根管道单元107铺设于间隔设置的真空管道支架200的顶部,并使得多根管道单元107的凸台底面水平朝上设置,以此形成一个凸台平面108;
2).之后在所述凸台平面108的顶部铺设临时输送轨道1081,并在所述临时输送轨道1081外侧的多根管道单元107所形成的的真空管道体外侧壁架设永久输送轨道109,以使得沿临时输送轨道1081向前输送管道单元107的输送车1082能够沿所述永久输送轨道109返回;所述临时输送轨道1081和永久输送轨道109均随着前方管道单元107的架设而同步向前铺设;
3).将通过临时输送轨道1081依次输送来的管道单元107,通过间隔设置于真空管道支架200上方的架桥机300吊起,并通过设置在架桥机300顶部的翻转装置301将管道单元107的凸台底面翻转至底面朝上设置,之后与对应的真空管道支架200相配合,然后再将卸载后的输送车1082通过架桥机300变换至永久输送轨道109,以此使得输送车1082沿永久输送轨道109返回,最后通过外部吊装设备将输送车1082再次变换至临时输送轨道1081的起点,待重新装载管道单元107后继续向前行驶,依次循环,完成单层真空管道的铺设;.本实施例中可将管道单元107吊起凸台朝下放置在临时输送轨道上的输送车1082上,可源源不断的向已架设好的真空管道的两头方向输送管道单元107并进行架设和安装。以此方式架设,可将生产管道单元的工厂设置到待铺设的真空管道线路的中部,之后采用上述方式向两头同步施工,以此有效提升管道单元的 架设速度。
4).若需要进行双层真空管道的铺设时,可首先将位于上述所述单层真空管道尾部的一段临时输送轨道1081拆除,之后,在将通过上述步骤输送来的管道单元107的下底面与输送轨道拆除后的一段凸台平面108紧密配合成一体,形成上下高强度的承载体,以此循环,完成双层真空管道的铺设。
具体的,为了便于下层管道单元的定位,所述真空管道支架200的顶部设置有定位凹槽201,所述定位凹槽与管道单元107两端的外周面相配合。
本实施例中,所述永久输送轨道109包括水平向外延伸架设于双层真空管道的下层真空管道外侧壁的轨道承载面401、沿所述轨道承载面401铺设的轨道402、以及倾斜设置于所述轨道承载面401底部的支撑杆403,相邻支撑杆403的同一端分别与埋设于双层真空管道的下层真空管道侧壁的锁柱106紧固。以此方式形成的永久输送轨道,不仅能够方便双层真空管道铺设时输送车的返回,同时,还为后期双层真空管道的维护,以及运营中出现紧急安全事故时的人员疏散提供有利的安全保障。
本实施例中,拆卸的所述临时输送轨道1081与铺设后的双层真空管道的管体内壁紧固,以此作为真空管道内的高速列车轨道去使用,以此设置,极大的提升了真空管道内轨道铺设的便利性。
采用上述方式设计的双层真空管道的铺设方法,在铺设时,可将管道单元的制造厂直接建到双层真空管道线路的一端或中间位置,之后将生产好的管道单元通往架桥机等大型起重设备提升至输送车,以此使得输送车随着前方管道单元的铺设进度持续不断的进行管道单元的输送,之后在使得输送车通过永久输送轨道返回,以此循环的进行管道单元的输送,以此方式,极大的解决了因管道单元体积大,重量重所带来的运输效率低的问题,进而极大的提升了双层 真空管道的铺设效率。
以上结合具体实施例描述了本发明的技术原理。这些描述只是为了解释本发明的原理,而不能以任何方式解释为对本发明保护范围的限制。基于此处的解释,本领域的技术人员不需要付出创造性的劳动即可联想到本发明的其它具体实施方式,这些方式都将落入本发明的保护范围之内。

Claims (8)

  1. 一种管道结构,其特征在于:包括内层螺旋管、外层螺旋管、填充设置于所述内层螺旋管和外层螺旋管之间的高强度的硬性填充物、以及用于所述内层螺旋管和外层螺旋管与所述硬性填充物结合为一体的拉紧件,所述拉紧件分别与所述内层螺旋管和/或外层螺旋管紧固,且所述内层螺旋管的内径大于等于3m,且小于等于15m。
  2. 根据权利要求1所述的一种管道结构,其特征在于:所述内层螺旋管和外层螺旋管的旋转方向相反。
  3. 根据权利要求1所述的一种管道结构,其特征在于:所述内层螺旋管和外层螺旋管均采用钢板一体卷设而成。
  4. 根据权利要求1所述的一种管道结构,其特征在于:该管道的外表面沿长度方向设置有用于所述管道安装的凸台。
  5. 根据权利要求4所述的一种管道结构,其特征在于:所述凸台的横截面呈等腰梯形状设置。
  6. 一种单层或双层真空管道的快速铺设方法,包括如上述权利要求1至5任意一项所述的管道结构,其特征在于,包括以下步骤:
    1).将多根管道单元铺设于间隔设置的真空管道支架的顶部,并使得多根管道单元的凸台底面水平朝上设置,以此形成一个凸台平面;
    2).之后在所述凸台平面的顶部铺设临时输送轨道,并在所述临时输送轨道外侧的多根管道单元所形成的的真空管道体外侧壁架设永久输送轨道,以使得沿临时输送轨道向前输送管道单元的输送车能够沿所述永久输送轨道返回;所述临时输送轨道和永久输送轨道均随着前方管道单元的架设而同步向前铺设;
    3).将通过临时输送轨道依次输送来的管道单元,通过间隔设置于真空管 道支架上方的架桥机吊起,并通过设置在架桥机顶部的翻转装置将管道单元的凸台底面翻转至底面朝上设置,之后与对应的真空管道支架相配合,然后再将卸载后的输送车通过架桥机变换至永久输送轨道,以此使得输送车沿永久输送轨道返回,最后通过外部吊装设备将输送车再次变换至临时输送轨道的起点,待重新装载管道单元后继续向前行驶,依次循环,完成单层真空管道的铺设;
    4).若需要进行双层真空管道的铺设时,可首先将位于上述所述单层真空管道尾部的一段临时输送轨道拆除,之后,在将通过上述步骤输送来的管道单元的下底面与输送轨道拆除后的一段凸台平面紧密配合,以此循环,完成双层真空管道的铺设。
  7. 根据权利要求6所述的一种单层或双层真空管道的快速铺设方法,其特征在于:所述真空管道支架的顶部设置有定位凹槽,所述定位凹槽与管道单元两端的外周面相配合。
  8. 根据权利要求6所述的一种单层或双层真空管道的快速铺设方法,其特征在于:所述永久输送轨道包括水平向外延伸架设于双层真空管道的下层真空管道外侧壁的轨道承载面、沿所述轨道承载面铺设的轨道、以及倾斜设置于所述轨道承载面底部的支撑杆,相邻支撑杆的同一端分别与埋设于双层真空管道的下层真空管道侧壁的锁柱紧固。
PCT/CN2018/087724 2017-06-23 2018-05-21 一种管道结构及其单层或双层真空管道的快速铺设方法 WO2018233432A1 (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201710484309.6 2017-06-23
CN201710484309.6A CN107264541B (zh) 2017-06-23 2017-06-23 一种管道结构及其单层或双层真空管道的快速铺设方法

Publications (1)

Publication Number Publication Date
WO2018233432A1 true WO2018233432A1 (zh) 2018-12-27

Family

ID=60068742

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2018/087724 WO2018233432A1 (zh) 2017-06-23 2018-05-21 一种管道结构及其单层或双层真空管道的快速铺设方法

Country Status (2)

Country Link
CN (1) CN107264541B (zh)
WO (1) WO2018233432A1 (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107264541B (zh) * 2017-06-23 2019-05-07 苏彬诚 一种管道结构及其单层或双层真空管道的快速铺设方法
CN107907281B (zh) * 2018-01-11 2020-05-26 张跃 一种真空管道的泄漏判断方法
CN108561626B (zh) * 2018-05-24 2023-11-28 张跃 一种管道安装装置及方法
CN109334682A (zh) * 2018-10-24 2019-02-15 中铁磁浮交通投资建设有限公司 一种轻质真空管道交通系统及其施工方法
CN111452807A (zh) * 2020-04-10 2020-07-28 张立发 一种管道物流运输系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002129502A (ja) * 2000-10-23 2002-05-09 Pfleiderer Infrastrukturtechnik Gmbh & Co Kg トランスラピッドの走路
CN1775603A (zh) * 2004-11-15 2006-05-24 李岭群 管道真空吊轨永磁吸引悬浮与导向路-车系统
CN101748664A (zh) * 2008-12-16 2010-06-23 彭智祥 一种复合钢管结构及用途
CN103569138A (zh) * 2013-09-26 2014-02-12 杜慧峰 一种立体高速管道运输系统
US20150360580A1 (en) * 2013-03-14 2015-12-17 Daryl Oster Evacuated tube and capsule having interchange capability
CN107264541A (zh) * 2017-06-23 2017-10-20 苏彬诚 一种管道结构及其单层或双层真空管道的快速铺设方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6554199B1 (en) * 2000-10-06 2003-04-29 Pfleiderer Infrastrukturtechnick Gmbh & Co., Kg Trackway for transrapid
CN1198016C (zh) * 2000-10-26 2005-04-20 普夫莱德雷尔基础结构技术两合公司 用于快速运输的行车路面
DE20207670U1 (de) * 2002-05-15 2003-09-25 Wilcken Alexander Von Fahrweg für eine Magnetschwebebahn
DE10237176B4 (de) * 2002-08-14 2006-06-08 Pfleiderer Infrastrukturtechnik Gmbh & Co. Kg Fahrbahn für Magnetbahnzüge
CN202017830U (zh) * 2010-09-26 2011-10-26 西京学院 适用于真空管道交通的钢混凝土复合结构管道

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002129502A (ja) * 2000-10-23 2002-05-09 Pfleiderer Infrastrukturtechnik Gmbh & Co Kg トランスラピッドの走路
CN1775603A (zh) * 2004-11-15 2006-05-24 李岭群 管道真空吊轨永磁吸引悬浮与导向路-车系统
CN101748664A (zh) * 2008-12-16 2010-06-23 彭智祥 一种复合钢管结构及用途
US20150360580A1 (en) * 2013-03-14 2015-12-17 Daryl Oster Evacuated tube and capsule having interchange capability
CN103569138A (zh) * 2013-09-26 2014-02-12 杜慧峰 一种立体高速管道运输系统
CN107264541A (zh) * 2017-06-23 2017-10-20 苏彬诚 一种管道结构及其单层或双层真空管道的快速铺设方法

Also Published As

Publication number Publication date
CN107264541B (zh) 2019-05-07
CN107264541A (zh) 2017-10-20

Similar Documents

Publication Publication Date Title
WO2018233432A1 (zh) 一种管道结构及其单层或双层真空管道的快速铺设方法
KR102397877B1 (ko) 수송 시스템
CN105523049B (zh) 一种真空管道运输车站系统
CN1111123C (zh) 管道真空永磁补偿式悬浮列车-高架路-站系统
CN108482183A (zh) 一种磁悬浮管道运输系统
CN105179807A (zh) 用于大型钢管穿越路基套管的移动装置
WO2018233429A1 (zh) 一种真空高速列车的轨道系统
CN107558314A (zh) 利用轨道夹持器转运轨道的方法
CN110422051B (zh) 一种永磁磁悬浮管轨运输系统
WO2018233428A1 (zh) 一种高速列车运行系统及其运行方法
CN105196889A (zh) 一种用于直线电机轨道的爆炸复合感应板装置
CN205101674U (zh) 用于大型钢管穿越路基套管的移动装置
CN101327798B (zh) 真空管道用于长途客运的方法
CN204927982U (zh) 一种轨道式电缆敷设装置
CN108639070A (zh) 悬浮与驱动系统外置光滑内壁高温超导真空管道交通系统
CN205855380U (zh) 一种货运磁悬浮真空管道传输系统
CN205523759U (zh) 一种基于滑台的中低速磁浮车辆走行装置
CN208411428U (zh) 一种磁悬浮管道运输系统
CN108639071A (zh) 长距离大直径密封管道系统
CN107757633A (zh) 一种物流运输车系统
CN105599775B (zh) 一种真空管道运输高速车辆站台摆渡装置
CN207278271U (zh) 一种用于真空管道运输系统的双层双向多通道隧道结构
CN210912405U (zh) 一种用于真空管道运输的管道装置
Fang et al. A novel magpipe pipeline transportation system using linear motor drives
WO2022134450A1 (zh) 一种空中电磁飞车

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18821104

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18821104

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 18821104

Country of ref document: EP

Kind code of ref document: A1