ワーク搬送システム及び工作機械システム Download PDFInfo
- Publication number
- WO2018190052A1 WO2018190052A1 PCT/JP2018/009445 JP2018009445W WO2018190052A1 WO 2018190052 A1 WO2018190052 A1 WO 2018190052A1 JP 2018009445 W JP2018009445 W JP 2018009445W WO 2018190052 A1 WO2018190052 A1 WO 2018190052A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- workpiece
- loader
- main
- chuck
- relay
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23Q—DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
- B23Q7/00—Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting
- B23Q7/04—Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting by means of grippers
- B23Q7/048—Multiple gripper units
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23Q—DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
- B23Q7/00—Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting
- B23Q7/04—Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting by means of grippers
- B23Q7/046—Handling workpieces or tools
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23B—TURNING; BORING
- B23B3/00—General-purpose turning-machines or devices, e.g. centre lathes with feed rod and lead screw; Sets of turning-machines
- B23B3/08—Turning-machines characterised by the use of faceplates
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23B—TURNING; BORING
- B23B3/00—General-purpose turning-machines or devices, e.g. centre lathes with feed rod and lead screw; Sets of turning-machines
- B23B3/30—Turning-machines with two or more working-spindles, e.g. in fixed arrangement
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23Q—DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
- B23Q41/00—Combinations or associations of metal-working machines not directed to a particular result according to classes B21, B23, or B24
- B23Q41/02—Features relating to transfer of work between machines
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23Q—DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
- B23Q7/00—Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting
- B23Q7/14—Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting co-ordinated in production lines
Definitions
- the present invention relates to a workpiece transfer system and a machine tool system.
- a machine tool such as a lathe includes a workpiece transfer device that delivers workpieces to a plurality of spindles (work holding units) that hold and rotate a workpiece to be processed.
- the main loader moves along the rails arranged on the machine tool body and delivers the workpiece to the main spindle of the machine tool body, and the workpiece is transferred between the main loader.
- work discharge stand is known (for example, refer patent document 1).
- An object of the present invention is to provide a workpiece transfer system and a machine tool system that can improve the machining efficiency.
- n + m an integer of m ⁇ 1
- main loaders that are arranged corresponding to each of the n workpiece holding units and deliver workpieces to the n relay loaders that deliver workpieces to the workpiece holding units.
- a workpiece transfer system having a main loader with a chuck is provided.
- the n main loader chucks hold an unprocessed workpiece
- the m main loader chucks are empty, and the empty main loader chuck is used.
- the relay loader also includes a relay loader chuck that delivers the workpiece to the workpiece holding unit.
- the main loader moves the main loader chuck to a position corresponding to the relay loader chuck and delivers the workpiece to the relay loader chuck. May be.
- a plurality of relay loader chucks may be arranged in one relay loader.
- the n + m main loader chucks are arranged in one direction and arranged at a constant interval, and the plurality of relay loader chucks are arranged at the same interval as the interval of the main loader chuck.
- the relay loader chuck may be arranged in a state of being arranged in parallel with one direction. Moreover, you may provide the control part which performs the operation
- the main loader can move in a horizontal direction and a direction orthogonal to the direction of the rotation axis of the work holding unit, and the relay loader can turn in a direction around an axis parallel to the rotation axis of the work holding unit
- the relay loader chuck may be configured to pivot between a first position where one of the relay loader chucks faces the work holding portion and a second position where the relay loader chuck can face the n + m main loader chucks.
- the relay loader chuck and the main loader chuck may be configured to hold the workpiece in a direction parallel to the rotation axis of the workpiece holding portion.
- the main loader chuck may be switchable between a state in which the workpiece is held in a direction parallel to the rotation axis of the workpiece holding unit and a state in which the workpiece is held downward.
- the present invention also includes a machine tool main body having a plurality of workpiece holding portions that rotate while holding a workpiece to be processed, a loading portion that holds an unprocessed workpiece, an unloading portion that holds a processed workpiece,
- a machine tool system including the workpiece transfer system that transfers a workpiece between one or both of a workpiece holding unit and a carry-in unit and between the workpiece holding unit and a carry-out unit.
- the main loader chuck is provided with n + m pieces of n pieces of workpiece holding units
- the main loader is provided between the workpiece holding unit and the loading unit and between the workpiece holding unit and Since it is not necessary to repeat the movement to and from the unloading part for each work holding part, and the work can be transferred by the main loader to n work holding parts in a short time, the work transfer efficiency is improved.
- the machining efficiency of the workpiece can be improved.
- the control unit can efficiently receive a processed workpiece and supply an unprocessed workpiece with respect to one of the workpiece holding units.
- the loader has a relay loader that is arranged corresponding to each of the n workpiece holding units and has a relay loader chuck that delivers the workpiece to the workpiece holding unit.
- the main loader When moving to the corresponding position and delivering the workpiece to the relay loader chuck, the main loader must move toward the other workpiece holder while the relay loader delivers the workpiece to and from the workpiece holder. Since the time during which the main loader is stopped can be shortened, the work transfer efficiency can be improved.
- a plurality of workpieces can be simultaneously transferred between the plurality of relay loader chucks of the relay loader and the n + m main loader chucks of the main loader. For example, an unprocessed workpiece held by the other one of the main loader chucks while passing the processed workpiece held by one of the relay loader chucks and one of the main loader chucks. It can be received by another one of the relay loader chucks. As described above, since a plurality of workpieces can be transferred at the same time, the time required to transfer the workpieces can be shortened, and the conveyance efficiency of the workpieces can be improved.
- n + m main loader chucks are arranged in one direction and arranged at a constant interval, and a plurality of relay loader chucks are arranged at the same interval as the interval of the main loader chuck.
- the relay loader chucks can be arranged in parallel with one direction, the plurality of relay loader chucks and the n + m main loader chucks can be easily opposed to each other and easily receive a plurality of workpieces simultaneously. Can pass.
- the controller loads the relay loader and the main loader with each other. It can be operated easily.
- the main loader is movable in the horizontal direction and in a direction perpendicular to the direction of the rotation axis of the work holding unit, and the relay loader is capable of turning around an axis parallel to the rotation axis of the work holding unit,
- the relay loader can move efficiently with respect to the work holding portion, and the relay loader easily turns the relay loader chuck to the work holding portion or the main loader chuck by turning between the first position and the second position. be able to.
- the relay loader chuck and the main loader chuck hold the workpiece in a direction parallel to the rotation axis of the workpiece holding unit
- the relay loader chuck delivers the workpiece to the workpiece holding unit or the main loader chuck, etc. Therefore, it is not necessary to change the orientation of the relay loader chuck or the main loader chuck, and the time required for transferring the workpiece can be shortened.
- the main loader chuck can be switched between a state in which the main loader chuck holds the work in a direction parallel to the rotation axis of the work holding unit and a state in which the work is held downward, the work is directed upward. Even when it is placed, this work can be held by switching the direction of the main loader chuck, and versatility can be ensured for the direction in which the work is placed.
- FIG. 7 is a diagram illustrating an example of the operation of the workpiece transfer system following FIG. 6.
- FIG. 8 is a diagram illustrating an example of the operation of the workpiece transfer system following FIG. 7.
- FIG. 9 is a diagram illustrating an example of the operation of the workpiece transfer system following FIG. 8.
- FIG. 10 is a diagram illustrating an example of the operation of the workpiece transfer system following FIG. 9. It is a figure which shows an example of the workpiece conveyance system and machine tool system which concern on 2nd Embodiment.
- FIG. 12 is a diagram illustrating an example of the operation of the workpiece transfer system following FIG. 11.
- FIG. 13 is a diagram illustrating an example of the operation of the work transfer system following FIG. 12.
- FIG. 14 is a diagram illustrating an example of the operation of the work transfer system following FIG. 13.
- FIG. 15 is a diagram illustrating an example of the operation of the workpiece transfer system following FIG. 14.
- FIG. 16 is a diagram illustrating an example of the operation of the work transfer system following FIG. 15.
- FIG. 17 is a diagram illustrating an example of the operation of the workpiece transfer system following FIG. 16. It is a figure which shows an example of the workpiece conveyance system and machine tool system which concern on 3rd Embodiment.
- FIG. 19 is a diagram illustrating an example of the operation of the work transfer system following FIG. 18.
- FIG. 20 is a diagram illustrating an example of the operation of the work transfer system following FIG. 19.
- FIG. 21 is a diagram illustrating an example of the operation of the workpiece transfer system following FIG. 20.
- FIG. 22 is a diagram illustrating an example of the operation of the workpiece transfer system following FIG. 21.
- FIG. 21 is a diagram illustrating an example of the operation of the workpiece transfer system following FIG. 21.
- FIG. 23 is a diagram illustrating an example of the operation of the work transfer system following FIG. 22.
- FIG. 24 is a diagram illustrating an example of the operation of the work transfer system following FIG. 23. It is a figure which shows an example of the workpiece conveyance system and machine tool system which concern on 4th Embodiment.
- FIG. 26 is a diagram illustrating an example of the operation of the work transfer system following FIG. 25.
- FIG. 27 is a diagram illustrating an example of the operation of the work transfer system following FIG. 26.
- FIG. 28 is a diagram illustrating an example of the operation of the work transfer system following FIG. 27.
- FIG. 29 is a diagram illustrating an example of the operation of the workpiece transfer system following FIG. 28.
- FIG. 30 is a diagram illustrating an example of operation of the workpiece transfer system, following FIG. 29.
- FIG. 31 is a diagram illustrating an example of operation of the workpiece transfer system, following FIG. 30.
- FIG. 1 is a diagram illustrating an example of a workpiece transfer system 50 and a machine tool system 100 according to the first embodiment.
- a machine tool system 100 includes a first main body (machine tool main body) 10, a second main body (machine tool main body) 20, a carry-in portion 30, a carry-out portion 40, and a workpiece transfer system. 50 and a control unit 60.
- the control unit 60 is a control unit of the machine tool system 100 and a control unit of the workpiece transfer system 50.
- the control unit is not limited to one control unit 60, and the control unit of the machine tool system 100 and the control unit of the workpiece transfer system 50 may be separately installed.
- the first main body 10 and the second main body 20 are, for example, parallel twin-axis lathes, and are arranged with the + Z direction facing the front side.
- the 1st main-body part 10 has the spindles (work holding
- a plurality of cutting tools for cutting the workpiece W are held on a tool post such as a turret, and any one of the cutting tools is selected and used.
- Two main shafts 11 and 12 are arranged side by side in the X direction.
- the main shafts 11 and 12 are supported by a bearing or the like (not shown) so as to be rotatable around the axis of the rotation axis AX1 parallel to the Z direction.
- Spindle chucks 13 and 14 are disposed at the + Z side ends of the spindles 11 and 12.
- the spindle chucks 13 and 14 include a plurality of gripping claws 13A and 14A (see FIG. 5), and can hold the workpiece W in the + Z direction by closing the gripping claws 13A and 14A, respectively.
- the 2nd main-body part 20 has the spindles (work holding
- a plurality of cutting tools for cutting the workpiece W are held on a tool post such as a turret, and any one of the cutting tools is selected and used.
- Two main shafts 21 and 22 are arranged side by side in the X direction.
- the main shafts 21 and 22 are supported by a bearing (not shown) or the like so as to be rotatable around the axis of the rotation axis AX1 parallel to the Z direction.
- main shaft chucks 23 and 24 are arranged at the + Z side ends of the main shafts 21 and 22, respectively.
- the spindle chucks 23 and 24 include a plurality of gripping claws 23A and 24A (see FIG. 5), and can hold the workpiece W in the + Z direction by closing the gripping claws 23A and 24A.
- the main shafts 11 and 12 and the main shafts 21 and 22 are parallel to each other, and the ends on the + Z side of the main shafts 11, 12, 21, and 22 are aligned in the X direction (the main shaft chucks 13, 14, 23, and 24 are (Aligned in the X direction).
- the number of the main shafts of the first main body 10 and the second main body 20 is two, but the number of main shafts is not limited to this, and n (n ⁇ 2) main shafts. May be arranged, and three or more main shafts may be arranged.
- the carry-in unit 30 an unprocessed workpiece W to be processed is placed on the machine tool system 100.
- the carry-in unit 30 includes a holding table 31 that holds the workpiece W.
- the holding table 31 holds two or more unprocessed workpieces W (two in this embodiment).
- the plurality of workpieces W are arranged side by side at intervals d described later.
- the carry-in unit 30 is configured so that an unprocessed workpiece W can be delivered to a main loader 52 described later. Details of the carry-in unit 30 will be described later.
- the unloading unit 40 holds the processed workpiece W after being processed by the first main body 10 or the second main body 20 in the machine tool system 100.
- the carry-out unit 40 has a plurality of (two in this embodiment) carry-out chucks 41 that can hold the processed workpiece W.
- the plurality of unloading chucks 41 are arranged side by side at intervals d described later.
- Each of the unloading chucks 41 can hold the workpiece W in the ⁇ Z direction.
- the work transfer system 50 includes a relay loader 51 (relay loader) and a main loader 52 (main loader).
- the relay loader 51 is arranged at two locations on the first main body portion 10, the ⁇ X side of the main shaft 11 and the + X side of the main shaft 12, and in the second main body portion 20, Are arranged at two locations on the side and the + X side of the main shaft 22.
- the relay loaders 51 on the ⁇ X side that is, corresponding to the main shafts 11 and 21 are arranged.
- the relay loader 51 is referred to as a relay loader 51a.
- the relay loader 51 on the + X side that is, the relay loader 51 arranged corresponding to the main shafts 12 and 22 is referred to as a relay loader 51b.
- the relay loader 51 has a plurality of relay loader chucks 53 (two in this embodiment).
- the relay loader chuck 53 on the ⁇ X side is referred to as a relay loader chuck 53a
- the relay loader chuck 53 on the + X side is referred to as a relay loader chuck 53a.
- the relay loader chuck 53 is arranged at the same interval d as the interval between the plurality of main loader chucks 56 arranged in the main loader 52 described later.
- two relay loader chucks 53 are not limited to two provided in one relay loader 51, and three or more relay loader chucks 53 may be provided.
- the relay loader chucks 53 are arranged in one direction and at a constant interval d.
- Each of the relay loader chucks 53 includes a gripping claw or a suction portion (not shown) for holding the workpiece W, and the workpiece W is parallel to the ⁇ Z direction, that is, the rotation axis AX1 of the spindles 11, 12, 21, and 22. It can be held in the direction.
- the relay loader chuck 53 delivers the workpiece W to each of the spindles 11, 12, 21, and 22.
- Each of the relay loader chucks 53 can advance and retract in the ⁇ Z direction, and when the workpiece W is delivered to the spindle 11 or the like, the relay loader chuck 53 moves in the ⁇ Z direction to deliver the workpiece W.
- the relay loader chuck 53 is not limited to be able to advance and retract in the ⁇ Z direction, and the spindle 11 and the like may be able to advance and retract in the + Z direction when the workpiece W is transferred.
- the relay loader chuck 53 advances in the ⁇ Z direction, the unprocessed workpiece W is transferred from the relay loader chuck 53 to the spindle 11 or the like, or the processed workpiece W is received from the spindle 11 or the like to the relay loader chuck 53. Details of the relay loader 51 will be described later with reference to another drawing.
- the main loader 52 conveys the workpiece W between the carry-in unit 30 and the relay loader 51 and between the relay loader 51 and the carry-out unit 40.
- the main loader 52 includes a loader head (see, for example, the loader head 52B in FIG. 3), and the loader head has n + m (m ⁇ 1) integer main loader chucks 56.
- main loader chuck 56a the most -X side main loader chuck 56 is represented as a main loader chuck 56a
- main loader chuck 56b the central main loader chuck 56 in the X direction
- main loader chuck 56c The main loader chuck 56 on the + X side is referred to as a main loader chuck 56c.
- Each of the main loader chucks 56 includes a plurality of gripping claws 57 (see FIG. 2) for gripping the workpiece W, and by closing the gripping claws 57, the workpiece W is moved in the + Z direction, that is, the spindles 11, 12, 21, It can be held in a direction parallel to the 22 rotation axis AX1.
- the main loader chuck 56 receives the workpiece W from the carry-in unit 30 or transfers the workpiece W to the carry-out unit 40.
- the main loader chuck 56 can advance and retreat in the + Z direction.
- the main loader chuck 56 advances in the + Z direction with respect to the loading unit 30 or the unloading unit 40 when receiving the workpiece W from the loading unit 30 or when transferring the workpiece W to the unloading unit 40.
- the main loader chuck 56 delivers the workpiece W to the relay loader chuck 53.
- the main loader chuck 56 moves in the + Z direction toward the relay loader chuck 53.
- the present invention is not limited to this configuration, and the relay loader chuck 53 advances in the ⁇ Z direction toward the main loader chuck 56. You may let them.
- the plurality of main loader chucks 56 may be configured to advance and retract individually in the + Z direction, or may be configured to advance and retract in the + Z direction as a whole (for example, together with the loader head).
- the drive system in the main loader chuck 56 can be simplified in the Z direction.
- the plurality of main loader chucks 56 are, for example, arranged in the X direction and arranged at a constant interval d. Therefore, when the relay loader 51 and the main loader 52 are opposed to each other in the Z direction, the two relay loader chucks 53 and the two main loader chucks 56 of the three are in a state of facing each other on a one-to-one basis.
- the main loader 52 has a guide 50G.
- the guide 50 ⁇ / b> G is disposed along the carry-in unit 30, the first main body unit 10, the second main body unit 20, and the carry-out unit 40.
- the main loader chuck 56 drives a driving device (not shown) to move along the guide 50G together with the loader head (not shown) in the X direction (the horizontal direction and the direction orthogonal to the direction of the rotation axis AX1 such as the main shaft 11). It is movable. By moving the main loader chuck 56 in the X direction, it is possible to dispose the main loader chuck 56 in each of the carry-in part 30, the first main body part 10, the second main body part 20, and the carry-out part 40.
- the height of the guide 50G is set so that when the main loader chuck 56 is used as the carry-in portion 30 or the like, the main loader chuck 56 can deliver the workpiece W at that height.
- the main loader chuck 56 (or loader head (not shown)) may be moved up and down, and in this case, the height of the guide 50G can be arbitrarily set.
- the control unit 60 comprehensively controls operations of the first main body unit 10, the second main body unit 20, the carry-in unit 30, the carry-out unit 40, and the workpiece transfer system 50 based on a predetermined machining program.
- the control unit 60 includes a communication unit (not shown), and instructs the operation of the first main body unit 10, the second main body unit 20, the carry-in unit 30, the carry-out unit 40, and the workpiece transfer system 50 through the communication unit, It also receives various information such as the operating status of each unit. Note that communication between the control unit 60 and each unit may be either wired or wireless.
- FIG. 2 is a diagram illustrating an example of the carry-in unit 30.
- the carry-in unit 30 includes a holding base 31 ⁇ / b> A and a conveyor belt 32.
- the conveyor belt 32 can transfer the workpiece W by placing the workpiece W on the upper surface.
- the conveyor belt 32 circulates in the X direction or the Z direction by a drive unit (not shown) with the workpiece W placed thereon.
- the workpiece W is placed on the conveyor belt 32 at a place different from the carry-in unit 30 and is arranged in the carry-in unit 30 as the conveyor belt 32 circulates.
- the carrying-in part 30 is not limited to providing the conveyor belt 32, The structure which simply mounts the workpiece
- the conveyor belt 32 places the workpiece W sideways, that is, with the central axis of the workpiece W along the Z direction.
- a positioning protrusion may be provided on the conveyor belt 32 so that the workpiece W does not roll on the conveyor belt 32 when the workpiece W is placed sideways.
- the main loader chuck 56 of the main loader 52 moves sideways from the ⁇ Z side of the workpiece W, and receives the workpiece W by gripping the workpiece W. Further, when the main loader chuck 56 receives the workpiece W, it is placed on the conveyor belt 32 with the ⁇ Z side of the workpiece W protruding so as not to interfere with the conveyor belt 32 or the holding base 31A.
- FIG. 3 is a diagram showing another example of the main loader.
- the conveyor belt 32 can also place the workpiece W in the vertical direction, that is, with the central axis of the workpiece W along the Y direction.
- the end surface of the workpiece W is a flat surface
- the workpiece W can be placed on the conveyor belt 32 in the vertical direction.
- the main loader chuck 56 of the main loader 52A needs to be advanced in the + Y direction (that is, vertically) and from the upper side to the lower side of the workpiece W.
- the main loader chuck 56 needs to direct the workpiece W in the + Z direction (that is, in the horizontal direction) when delivering the workpiece W other than the carry-in unit 30, the main loader chuck 56 is oriented to the main loader 52A. A mechanism to change is needed.
- the main loader 52 ⁇ / b> A includes a switching mechanism 58 that switches the direction of the main loader chuck 56.
- the switching mechanism 58 includes a drive unit (not shown), and is provided between the loader head 52B and the main loader chuck 56 by this drive unit, and the main loader chuck 56 is oriented in the + Z direction (lateral direction) and the ⁇ Y direction (vertical direction). Direction).
- the switching mechanism 58 includes a drive unit (not shown), and the direction of the main loader chuck 56 is switched by this drive unit.
- the main loader 52A includes a lifting device (not shown) that lifts and lowers the loader head 52B, and lifts the main loader chuck 56 together with the loader head 52B.
- the main loader 52 ⁇ / b> A configured as described above sets the main loader chuck 56 downward by the switching mechanism 58 above the workpiece W placed on the carry-in unit 30, and then the main loader chuck is lifted by a lifting device (not shown).
- the workpiece W is held by closing the gripping claws 57 when the gripping claws 57 are positioned outside the upper portion of the workpiece W.
- the main loader chuck 56 sideways by the switching mechanism 58, the workpiece W is held in the + Z direction.
- the workpiece W can be delivered to the relay loader chuck 53 of the relay loader 51.
- FIG. 4 is a diagram illustrating another example of the carry-in unit 30.
- the main loader chuck 56 can receive the workpiece W from the carry-in unit 30.
- the carrying-in part 30 shown in FIG. 4 can switch the workpiece
- the carry-in unit 30 includes a holding base 31 ⁇ / b> C and a holding mechanism 33 that holds the workpiece W.
- the holding mechanism 33 includes a base portion 33a, a shaft portion 33b, and a holding portion 33c.
- the base 33a is attached to the holding table 31C, but instead of this form, it may be attached to a conveyor or a rotary table, for example, and movable.
- the shaft portion 33b is disposed in parallel with the X direction at the upper portion of the base portion 33a.
- the holding portion 33c is rotatable with respect to the base portion 33a in the X direction around the shaft portion 33b, and is rotated by a driving unit (not shown).
- the holding portion 33c includes a gripping claw or a suction portion and holds the end portion of the workpiece W.
- the direction of the workpiece W can be switched between the horizontal direction (Z direction) and the vertical direction (Y direction). Therefore, for example, even when the workpiece W is in the vertical orientation in the state where it is transferred to the carry-in portion 30, when the workpiece W is transferred to the main loader 52, the holding portion 33c is rotated to move the workpiece W from the vertical orientation to the horizontal orientation. Can be arranged.
- the main loader chuck 56 of the main loader 52 can receive the workpiece W laterally from the + Y side.
- FIG. 5A and 5B are diagrams showing an example of the relay loader 51, where FIG. 5A shows the case viewed from the + Z direction (front side), and FIG. 5B shows the case viewed from the + Y direction (above).
- the relay loader 51 includes a relay loader chuck 53, a shaft portion 54, and a turning plate 55.
- the relay loader chuck 53 is fixed to the turning plate 55.
- the shaft portion 54 is arranged such that the central axis AX2 is parallel to the Z direction.
- the swivel plate 55 can be swung in the direction around the shaft 54 by a drive unit (not shown).
- FIG. 5 illustrates the relay loader 51 corresponding to the main shafts 11 and 21 as an example, but the relay loader 51 corresponding to the main shafts 12 and 22 is configured symmetrically with the configuration illustrated in FIG. The other is the same except that the turning direction of the turning plate 55 is reversed.
- the relay loader 51 can move the relay loader chuck 53 between the first position P1 and the second position P2 by turning the turning plate 55 in the direction around the axis of the shaft portion 54.
- the relay loader chuck 53 faces the spindle chucks 13 and 23 of the spindles 11 and 21.
- the turning plate 55 is in the second position P ⁇ b> 2
- the relay loader chuck 53 faces the main loader chuck 56 of the main loader 52.
- the relay loader 51 can be opposed to the two relay loader chucks 53a and 53b and the main shafts 11 and 21, respectively, at the first position P1 by adjusting the turning position of the turning plate 55.
- FIG. 5A shows a state in which the swivel plate 55 indicated by the alternate long and short dash line opposes the relay loader chuck 53a to the main shafts 11 and 21 at the first position P1.
- the relay loader 51 is provided so as to be able to advance and retract in the ⁇ Z direction by a drive unit (not shown).
- the relay loader chuck 53 can deliver the workpiece W between the main shafts 11 and 21 and the retreat position P1a retracted in the + Z direction so that the work W does not interfere with the main shafts 11 and 21 when the revolving plate 55 is swung. In addition, it can move between the traveling position P1b that has advanced in the ⁇ Z direction.
- a configuration in which the main spindle chucks 13 and 23 can advance and retract in the + Z direction may be applied.
- FIG. 6 to 10 are diagrams illustrating an example of the operation of the machine tool system 100 including the workpiece transfer system 50.
- the workpiece W is processed by the cutting tool T (see FIG. 5A) between the main shafts 11 and 12 of the first main body 10 and the main shafts 21 and 22 of the second main body 20.
- the operation from the state in which the processed workpiece W is held on the relay loader chuck 53b in the relay loader 51 corresponding to each of the spindles 11, 12, 21, and 22 will be described.
- the processed workpiece W is indicated with a plurality of points to be distinguished from the unprocessed workpiece W.
- the control unit 60 instructs the main loader 52 to receive two workpieces W placed in advance in the carry-in unit 30.
- Two workpieces W are preliminarily arranged in the loading portion 30 in a lateral direction, and the two workpieces W are spaced in the same manner as the intervals of the three main loader chucks 56 or the two relay loader chucks 53. d is set.
- the control unit 60 advances the three main loader chucks 56 of the main loader 52 in the + Z direction, and two of the three main loader chucks 56 receive two unprocessed workpieces W simultaneously by the two main loader chucks 56a and 56b. Make it.
- the main loader chuck 56c moves in the + Z direction together with the other main loader chucks 56a and 56b, but does not hold the workpiece W (a state where the workpiece W is not held, the same applies hereinafter). It is.
- the control unit 60 retracts the main loader chuck 56 in the ⁇ Z direction, and then moves the main loader chuck 56 in the + X direction along the guide 50G to relay the main loader chuck 56 corresponding to the main shaft 11 of the first main body unit 10. It arrange
- the controller 60 holds the processed workpiece W received from the spindle 11 by the relay loader chuck 53b of the relay loader 51a after or before the arrival of the main loader chuck 56, and the relay loader chuck 53a is empty. Then, the relay loader chuck 53 is arranged at the second position P2.
- the controller 60 makes the relay loader chuck 53a empty in the relay loader 51a and the main loader chuck 56b holding the unprocessed workpiece W in the main loader 52 face each other. In this state, the relay loader chuck 53b holding the processed workpiece W in the relay loader 51a and the empty main loader chuck 56c in the main loader 52 face each other at the same time.
- the control unit 60 advances the three main loader chucks 56 in the + Z direction and moves them to a position where the workpiece W can be transferred to and from the relay loader chuck 53. Subsequently, the control unit 60 closes the main loader chuck 56c and holds the processed workpiece W, and then releases the relay loader chuck 53b. As a result, the processed workpiece W is transferred from the relay loader chuck 53b to the main loader chuck 56c. At the same time or almost simultaneously, the control unit 60 closes the relay loader chuck 53a and holds the unprocessed workpiece W, and then releases the main loader chuck 56b.
- the unprocessed workpiece W is transferred from the main loader chuck 56b to the relay loader chuck 53a.
- the unprocessed workpiece W and the processed workpiece W can be simultaneously transferred in one operation between the relay loader 51a and the main loader 52.
- the relay loader 51a causes the relay loader chuck 53a to hold the unprocessed workpiece W, and the relay loader chuck 53b becomes empty.
- the main loader chuck 56c holds the processed workpiece W, and the central main loader chuck 56b becomes empty.
- the main loader chuck 56a maintains a state where the unprocessed workpiece W is held.
- the relay loader chuck 53 or the main loader chuck 56 does not need to change the direction for transferring the workpiece W, and transfers the workpiece W in one operation. The time required can be shortened.
- the main loader chuck 56 advances in the + Z direction.
- the relay loader chuck 53 may advance in the ⁇ Z direction.
- the control unit 60 turns the turning plate 55 of the relay loader 51a that has received the unprocessed workpiece W (see FIG. 5).
- the control unit 60 turns the turning plate 55 of the relay loader 51a that has received the unprocessed workpiece W (see FIG. 5).
- the swivel plate 55 is moved to the second position P2 while the relay loader chuck 53b holds the processed workpiece W. (See the description of FIG. 10 described later), and a series of controls are performed so that the relay loader 51a is brought into the state shown in FIG.
- the delivery of the workpiece W between the relay loader chuck 53 and the spindle chuck 13 is the same in the delivery of the workpiece W between the other relay loader chuck 53 and the other spindle chuck 14 or the like.
- the control unit 60 retracts the main loader chuck 56 in the ⁇ Z direction and then moves the main loader chuck 56 in the + X direction along the guide 50G.
- the relay loader 51 b of the relay loader 51 b corresponding to the main shaft 12 is disposed at a position that can face the relay loader chuck 53.
- the controller 60 holds the processed workpiece W received from the spindle 12 by the relay loader chuck 53b of the relay loader 51b after or before the arrival of the main loader chuck 56, and the relay loader chuck 53a is empty. Then, the relay loader chuck 53 is arranged at the second position P2.
- the control unit 60 makes the relay loader chuck 53a empty in the relay loader 51b and the main loader chuck 56a holding the unprocessed workpiece W in the main loader 52 face each other. In this state, the relay loader chuck 53b that holds the processed workpiece W in the relay loader 51a and the main loader chuck 56b that is empty in the main loader 52 face each other at the same time.
- the control unit 60 advances the three main loader chucks 56 in the + Z direction and moves them to a position where the workpiece W can be delivered to and from the relay loader 51b. Subsequently, the control unit 60 closes the main loader chuck 56b and holds the processed workpiece W, and then releases the relay loader chuck 53b. As a result, the processed workpiece W is transferred from the relay loader chuck 53b to the main loader chuck 56b. At the same time or almost the same time, the controller 60 closes the relay loader chuck 53a and holds the unprocessed workpiece W, and then releases the main loader chuck 56a.
- the unprocessed workpiece W is transferred from the main loader chuck 56a to the relay loader chuck 53a.
- the unprocessed workpiece W and the processed workpiece W can be simultaneously transferred in one operation between the relay loader 51b and the main loader 52.
- the relay loader 51b causes the relay loader chuck 53a to hold the unprocessed workpiece W, and the relay loader chuck 53b becomes empty.
- the main loader chuck 56b holds the processed workpiece W, and the main loader chuck 56a becomes empty.
- the main loader chuck 56c maintains a state where the processed workpiece W is held. In this workpiece W delivery operation, the time required for workpiece W delivery can be shortened, as described above.
- the control unit 60 moves the main loader 52 in the + X direction along the guide 50G, and moves the main loader chuck 56 to the unloading chuck 41 of the unloading unit 40. Opposite to. At this time, the control unit 60 makes the two main loader chucks 56b and 56c holding the processed workpiece W and the two unloading chucks 41 face each other. The distance between the two unloading chucks 41 is set to the distance d, similar to the distance between the main loader chucks 56. Subsequently, as shown in FIG. 10, the control unit 60 advances the main loader chuck 56 in the + Z direction and moves it to a position where the workpiece W can be delivered to and from the unloading chuck 41.
- the control unit 60 releases the main loader chucks 56b and 56c after holding the processed workpiece W by the unloading chucks 41.
- the two processed workpieces W are transferred from the main loader chucks 56b and 56c to the unloading chucks 41 at the same time or almost simultaneously.
- a plurality of (two) workpieces W can be delivered simultaneously in one operation between the main loader 52 and the unloading unit 40.
- the main loader 52 becomes empty in the three main loader chucks 56, moves in the ⁇ X direction along the guide 50G, and returns to the carry-in unit 30, as shown in FIG. Two unprocessed workpieces W can be held by the main loader chuck 56.
- the main loader 52 delivers the workpiece W to the two relay loaders 51a and 51b arranged in the first main body 10 while moving once in the + X direction from the carry-in unit 30 to the carry-out unit 40. Is performed continuously. That is, the main loader 52 transports the two unprocessed workpieces W of the carry-in unit 30 to the relay loaders 51a and 51b, and processes them from the relay loaders 51a and 51b by one movement in the + X direction. The finished work W is received and conveyed to the carry-out unit 40.
- the main loader chuck 56 holds two unprocessed workpieces W in the carry-in portion 30, and then moves in the + X direction along the guide 50 ⁇ / b> G, and the main shaft 21 of the second main body portion 20.
- the unprocessed workpiece W is transferred to and received from the relay loader chuck 53 of the relay loader 51a corresponding to.
- the operation for transferring the workpiece W is the same as in FIG.
- the main loader chuck 56 moves in the + X direction along the guide 50G and is not connected to the relay loader chuck 53 of the relay loader 51b corresponding to the main shaft 22 of the second main body portion 20.
- the processed workpiece W is handed over and the processed workpiece W is received.
- the operation for transferring the workpiece W is the same as in FIG. Next, the main loader chuck 56 moves in the + X direction along the guide 50G, and passes the processed workpiece W to the unloading chuck 41 of the unloading unit 40.
- the main loader 52 can hold two unprocessed workpieces W by the main loader chuck 56 as shown in FIG. 6 when the main loader chuck 56 becomes empty and returns to the loading unit 30.
- the unprocessed workpiece W is continuously supplied to the main shafts 11 and 12 of the first main body 10 and the main shafts 21 and 22 of the second main body 20, and The processed workpiece W is continuously collected.
- the processed workpiece W held by the unloading chuck 41 of the unloading unit 40 is transferred from the unloading unit 40 to another place by, for example, a conveyor device.
- a plurality of workpieces W can be delivered at the same time, and the main loader 52 does not frequently reciprocate between the carry-in unit 30 or the carry-out unit 40.
- the required time is shortened, the conveyance efficiency of the workpiece W is improved, and the machining efficiency of the workpiece W can be further improved.
- an example corresponding to the first main body portion 10 and the second main body portion 20 having two main shafts is shown. However, even if the main body portion has three or more main shafts (the number of main shafts). By arranging + m) main loader chucks 56, it is possible to cope with the same as described above.
- main loader chucks 56 is three in total, which is +1 for two main shafts.
- the number of main loader chucks 56 is not limited to this configuration. Four or more main loader chucks 56 may be provided for one main shaft.
- FIG. 11 is a diagram illustrating an example of the workpiece transfer system 250 and the machine tool system 200 according to the second embodiment.
- the machine tool system 200 includes a first main body (machine tool main body) 10, a second main body (machine tool main body) 20, a carry-in part 30, a carry-out part 40, and a workpiece transfer system. 250 and a control unit 60.
- the structure of the workpiece conveyance system 250 differs from 1st Embodiment, and it is the same as that of 1st Embodiment about another structure.
- the same or equivalent components as those in the first embodiment described above are denoted by the same reference numerals, and description thereof is omitted or simplified.
- the work transfer system 250 includes a relay loader 51 and a main loader 252.
- the relay loader 51 has the same configuration as that of the first embodiment described above.
- the number of the main shafts 11 and 12 of the first main body portion 10 is described as n (n ⁇ 2), but in the second embodiment, the main shaft 11 of the first main body portion 10 is described.
- 12 and the number of the main shafts 21 and 22 of the second main body portion 20 are n (n is an integer of 2). Therefore, in the present embodiment, the four relay loaders 51 arranged in the first main body 10 and the second main body 20 are distinguished, and the relay loader 51a is arranged corresponding to the main shaft 11 of the first main body 10.
- the relay loader 51b is arranged corresponding to the main shaft 12 of the first main body section 10
- the relay loader 51c is arranged corresponding to the main shaft 21 of the second main body section 20
- the relay loader 51d is arranged as the second main body section. It is arranged corresponding to 20 main shafts 22.
- the five main loader chucks 56 are arranged in the X direction at intervals d.
- the configuration of each main loader chuck 56 is the same as that of the first embodiment described above.
- the main loader chucks 56a, 56b, 56c, 56d, and 56e are sequentially described from the ⁇ X side to the + X side.
- the unloading section 30 is loaded with four unprocessed workpieces W so as to correspond to the main loader chucks 56a to 56e.
- the point that the four workpieces W are arranged at the interval d is the same as in the first embodiment.
- the unloading section 40 has four unloading chucks 41 so as to correspond to the main loader chucks 56a to 56e.
- the point that the unloading chucks 41 are arranged at intervals d is the same as in the first embodiment.
- 12 to 14 are diagrams illustrating an example of the operation of the machine tool system 200 including the workpiece transfer system 250.
- the main shafts 11 and 12 of the first main body portion 10 and the main shafts 21 and 22 of the second main body portion 20 are cut by the cutting tool T (see FIG. 5A).
- the operation from the state in which the processed workpiece W is held on the relay loader chuck 53b among the relay loaders 51a to 51d corresponding to the spindles 11, 12, 21, and 22 is performed. Will be explained.
- the control unit 60 causes the main loader chuck 56 of the main loader 252 to receive the four unprocessed workpieces W placed on the carry-in unit 30.
- the procedure for receiving the workpiece W by each main loader chuck 56 is the same as in the first embodiment.
- the control unit 60 causes the unprocessed workpiece W to be simultaneously received by four main loader chucks 56a, 56b, 56c, and 56d among the five main loader chucks 56 of the main loader 52. Therefore, the main loader chuck 56e is in an empty state.
- the control unit 60 retracts the main loader chuck 56 in the ⁇ Z direction, and then moves the main loader chuck 56 in the + X direction along the guide 50G to relay the main loader chuck 56 corresponding to the main shaft 11 of the first main body unit 10. It arrange
- the controller 60 holds the processed workpiece W received from the spindle 11 by the relay loader chuck 53b of the relay loader 51a after the arrival of the main loader chuck 56 or before arrival, and The relay loader chuck 53 is disposed at the second position P2 with the relay loader chuck 53a being empty.
- the controller 60 makes the relay loader chuck 53a empty in the relay loader 51a and the main loader chuck 56d holding the unprocessed workpiece W in the main loader 52 face each other. In this state, the relay loader chuck 53 b that holds the processed workpiece W in the relay loader 51 a and the main loader chuck 56 e that is empty in the main loader 52 face each other at the same time.
- the control unit 60 advances the five main loader chucks 56 in the + Z direction and moves them to a position where the workpiece W can be transferred to and from the relay loader chuck 53. Subsequently, the control unit 60 closes the main loader chuck 56e and holds the processed workpiece W, and then releases the relay loader chuck 53b. As a result, the processed workpiece W is transferred from the relay loader chuck 53b to the main loader chuck 56e. At the same time or almost the same time, the control unit 60 closes the relay loader chuck 53a and holds the unprocessed workpiece W, and then releases the main loader chuck 56d. As a result, the unprocessed workpiece W is transferred from the main loader chuck 56d to the relay loader chuck 53a.
- the relay loader 51a causes the relay loader chuck 53a to hold the unprocessed workpiece W, and the relay loader chuck 53b becomes empty.
- the main loader chuck 56e holds the processed workpiece W
- the main loader chuck 56d becomes empty
- the main loader chucks 56a to 56c hold the unprocessed workpiece W. Is maintained.
- the control unit 60 retracts the main loader chuck 56 in the ⁇ Z direction and then moves the main loader chuck 56 in the + X direction along the guide 50G to relay the main loader chuck 56 corresponding to the main shaft 12 of the first main body unit 10. It arrange
- the controller 60 holds the processed workpiece W received from the spindle 12 by the relay loader chuck 53b of the relay loader 51b after or before the arrival of the main loader chuck 56, and The relay loader chuck 53 is disposed at the second position P2 with the relay loader chuck 53a being empty.
- the controller 60 makes the relay loader chuck 53a empty in the relay loader 51a and the main loader chuck 56c holding the unprocessed workpiece W in the main loader 52 face each other. In this state, the relay loader chuck 53b that holds the processed workpiece W in the relay loader 51b and the main loader chuck 56d that is empty in the main loader 52 face each other at the same time.
- the control unit 60 advances the five main loader chucks 56 in the + Z direction and moves them to a position where the workpiece W can be transferred to and from the relay loader chuck 53. Subsequently, the control unit 60 closes the main loader chuck 56d and holds the processed workpiece W, and then releases the relay loader chuck 53b. As a result, the processed workpiece W is transferred from the relay loader chuck 53b to the main loader chuck 56d. At the same time or almost the same time, the controller 60 closes the relay loader chuck 53a and holds the unprocessed workpiece W, and then releases the main loader chuck 56c. As a result, the unprocessed workpiece W is transferred from the main loader chuck 56c to the relay loader chuck 53a.
- the relay loader 51b causes the relay loader chuck 53a to hold the unprocessed workpiece W, and the relay loader chuck 53b becomes empty.
- the main loader 52 the main loader chucks 56d and 56e hold the processed workpiece W
- the main loader chuck 56c becomes empty
- the main loader chucks 56a and 56b keep the unprocessed workpiece W. The state is maintained.
- zipper 13 is the same as that of the operation
- the control unit 60 retracts the main loader chuck 56 in the ⁇ Z direction, and then moves the main loader chuck 56 in the + X direction along the guide 50G to relay the main loader chuck 56 corresponding to the main shaft 21 of the second main body unit 20. It arrange
- the controller 60 holds the processed workpiece W received from the spindle 12 by the relay loader chuck 53b of the relay loader 51c after the arrival of the main loader chuck 56 or before arrival of the main loader chuck 56, as in the first embodiment, and
- the relay loader chuck 53 is disposed at the second position P2 with the relay loader chuck 53a being empty.
- the controller 60 makes the relay loader chuck 53a empty in the relay loader 51c and the main loader chuck 56b holding the unprocessed workpiece W in the main loader 52 face each other. In this state, the relay loader chuck 53b that holds the processed workpiece W in the relay loader 51c and the main loader chuck 56c that is empty in the main loader 52 face each other simultaneously.
- the control unit 60 advances the five main loader chucks 56 in the + Z direction and moves them to a position where the workpiece W can be delivered to and from the relay loader chuck 53. Subsequently, the control unit 60 closes the main loader chuck 56c and holds the processed workpiece W, and then releases the relay loader chuck 53b. As a result, the processed workpiece W is transferred from the relay loader chuck 53b to the main loader chuck 56c. At the same time or almost simultaneously, the control unit 60 closes the relay loader chuck 53a and holds the unprocessed workpiece W, and then releases the main loader chuck 56b. As a result, the unprocessed workpiece W is transferred from the main loader chuck 56b to the relay loader chuck 53a.
- the relay loader chuck 51c holds the unprocessed workpiece W and the relay loader chuck 53b becomes empty.
- the main loader 52 holds the processed workpiece W with the main loader chucks 56c to 56e, the main loader chuck 56b becomes empty, and the main loader chuck 56a holds the unprocessed workpiece W. Is maintained.
- the control unit 60 retracts the main loader chuck 56 in the ⁇ Z direction and then moves the main loader chuck 56 in the + X direction along the guide 50G to relay the main loader chuck 56 corresponding to the main shaft 22 of the second main body unit 20. It arrange
- the control unit 60 holds the processed workpiece W received from the spindle 12 by the relay loader chuck 53b of the relay loader 51d after or before the arrival of the main loader chuck 56, and The relay loader chuck 53 is disposed at the second position P2 with the relay loader chuck 53a being empty.
- the controller 60 causes the relay loader chuck 53a that is empty in the relay loader 51d and the main loader chuck 56a that holds the unprocessed workpiece W in the main loader 52 to face each other.
- the relay loader chuck 53b that holds the processed workpiece W in the relay loader 51d and the main loader chuck 56b that is empty in the main loader 52 simultaneously face each other.
- the control unit 60 advances the five main loader chucks 56 in the + Z direction and moves them to a position where the workpiece W can be transferred to and from the relay loader chuck 53. Subsequently, the control unit 60 closes the main loader chuck 56c and holds the processed workpiece W, and then releases the relay loader chuck 53b. As a result, the processed workpiece W is transferred from the relay loader chuck 53b to the main loader chuck 56b. At the same time or almost the same time, the controller 60 closes the relay loader chuck 53a and holds the unprocessed workpiece W, and then releases the main loader chuck 56a. As a result, the unprocessed workpiece W is transferred from the main loader chuck 56a to the relay loader chuck 53a.
- the relay loader 51d causes the relay loader chuck 53a to hold the unprocessed workpiece W, and the relay loader chuck 53b becomes empty.
- the main loader chucks 56b to 56e hold the processed workpiece W, and the main loader chuck 56a becomes empty.
- the control unit 60 moves the main loader chuck 56 in the + X direction along the guide 50G so that the main loader chuck 56 can face the unloading chuck 41 of the unloading unit 40. Place in position.
- the control unit 60 advances the five main loader chucks 56 in the + Z direction and moves them to a position where the workpiece W can be delivered to and from the unloading chuck 41.
- the control unit 60 releases the main loader chucks 56b to 56e after holding the processed workpiece W by each unloading chuck 41.
- the four processed workpieces W are delivered from the main loader chucks 56b to 56e to the unloading chucks 41 simultaneously or almost simultaneously.
- the main loader 52 becomes empty in the five main loader chucks 56, moves in the ⁇ X direction along the guide 50G, and returns to the carry-in section 30, as shown in FIG.
- the four load workpieces W can be held by the main loader chuck 56.
- the main loader 52 moves to the four relay loaders 51a to 51d arranged in the first main body unit 10 and the second main body unit 20 while moving once in the + X direction from the carry-in unit 30 to the carry-out unit 40.
- the workpiece W is continuously transferred. That is, the main loader 52 transports the four unprocessed workpieces W in the carry-in unit 30 to each of the relay loaders 51a to 51d by one movement in the + X direction, and processes from the relay loaders 51a to 51d.
- the finished work W is received and conveyed to the carry-out unit 40.
- the unprocessed workpiece W is supplied to the plurality of spindles 11, 12, 21, 22.
- the time required for delivery of the workpiece W can be shortened and the conveyance efficiency of the workpiece W can be improved.
- the total number of the four spindles 11, 12, 21, and 22 is +1.
- the number of spindles is not limited to this, and the number is + m with respect to the number of spindles. Therefore, for example, six or more main loader chucks 56 may be provided for the four main shafts.
- FIG. 18 is a diagram illustrating an example of the workpiece transfer system 350 and the machine tool system 300 according to the third embodiment.
- a machine tool system 300 includes a first main body (machine tool main body) 10, a second main body (machine tool main body) 20, a carry-in portion 30, a carry-out portion 40, and a workpiece transfer system. 350 and the control part 60 are provided.
- the structure of the workpiece conveyance system 350 differs from 1st Embodiment, and it is the same as that of 1st Embodiment about another structure.
- the same or equivalent components as those in the first embodiment described above are denoted by the same reference numerals, and description thereof is omitted or simplified.
- the work transfer system 350 has a main loader 352 and does not have a relay loader.
- n which is the number of main shafts 11 and 12 of the first main body portion 10, is described as 2.
- the main loader 352 is movable in the X direction along the guide 350G.
- the guide 350G is arranged along the X direction on the + Z side of the first main body 10 and the second main body 20.
- the main loader chuck 56 is the same as the configuration shown in the first embodiment except that the main loader chuck 56 is disposed so as to face the spindle chuck 13 and the like.
- the guide 350G may be disposed on the ⁇ Z side of the first main body 10 and the second main body 20 in the same manner as the guide 50G of the first embodiment.
- the main loader 352 is provided with a mechanism for causing the main loader chuck 56 to face the spindle chuck 13 and the like.
- the carrying-in part 30 is the same as that of 1st Embodiment except the point which hold
- FIGS. 19 to 24 are diagrams illustrating an example of the operation of the machine tool system 300 including the workpiece transfer system 350.
- FIG. similarly to the first embodiment, the main shafts 11 and 12 of the first main body portion 10 and the main shafts 21 and 22 of the second main body portion 20 are cut by the cutting tool T (see FIG. 5A). The operation from the state in which the processing of W is performed and the processed workpiece W is held on each of the spindles 11, 12, 21, and 22 will be described.
- the control unit 60 advances the main loader chuck 56 in the ⁇ Z direction, and two unprocessed workpieces W placed on the loading unit 30 are transferred to the main loader chuck 56 of the main loader 352. Let me receive it.
- the procedure for receiving the workpiece W by each main loader chuck 56 is the same as in the first embodiment.
- the control unit 60 causes the unprocessed workpiece W to be received simultaneously by two of the three main loader chucks 56a and 56b among the three main loader chucks 56 of the main loader 352. Therefore, the main loader chuck 56c is in an empty state.
- the controller 60 retracts the main loader chuck 56 in the + Z direction and then moves the main loader chuck 56c in the + X direction along the guide 350G. It arrange
- the control unit 60 advances the three main loader chucks 56 in the ⁇ Z direction and moves them to a position where the workpiece W can be delivered to and from the spindle chuck 13.
- the control unit 60 closes the main loader chuck 56c and holds the processed workpiece W, and then releases the spindle chuck 13. As a result, the processed workpiece W is transferred from the spindle chuck 13 to the main loader chuck 56c.
- the controller 60 retracts the main loader chuck 56 in the + Z direction, and then moves the main loader chuck 56 in the + X direction along the guide 350G to hold the unprocessed workpiece W in the main loader chuck 56.
- the chuck 56b is disposed at a position where the main shaft 11 can face the main shaft chuck 13.
- the controller 60 advances the three main loader chucks 56 in the ⁇ Z direction and moves them to a position where the workpiece W can be delivered to and from the spindle chuck 13.
- the control unit 60 closes the spindle chuck 13 and holds the unprocessed workpiece W, and then releases the main loader chuck 56b. As a result, the unprocessed workpiece W is transferred from the main loader chuck 56b to the spindle chuck 13.
- the main loader 352 is in a state where the main loader chuck 56c holds the processed workpiece W, the main loader chuck 56b becomes empty, and the main loader chuck 56a holds the unprocessed workpiece W. Is maintained.
- the controller 60 retracts the main loader chuck 56 in the + Z direction and then moves the main loader chuck 56b in the + X direction along the guide 350G. It arrange
- the control unit 60 advances the three main loader chucks 56 in the ⁇ Z direction and moves them to a position where the workpiece W can be delivered to and from the spindle chuck 14.
- the control unit 60 closes the main loader chuck 56b and holds the processed workpiece W, and then releases the main spindle chuck 14. As a result, the processed workpiece W is transferred from the spindle chuck 14 to the main loader chuck 56b.
- the controller 60 retracts the main loader chuck 56 in the + Z direction, and then moves the main loader chuck 56 in the + X direction along the guide 350G to hold the unprocessed workpiece W in the main loader chuck 56.
- the chuck 56 a is disposed at a position where the main shaft 11 can face the main shaft chuck 14.
- the control unit 60 advances the three main loader chucks 56 in the ⁇ Z direction and moves them to a position where the workpiece W can be delivered to and from the spindle chuck 14.
- the control unit 60 closes the spindle chuck 14 and holds the unprocessed workpiece W, and then releases the main loader chuck 56a. As a result, the unprocessed workpiece W is transferred from the main loader chuck 56a to the spindle chuck 14.
- the main loader 352 holds the processed workpiece W in the main loader chucks 56b and 56c, and the main loader chuck 56a becomes empty.
- the control unit 60 retracts the main loader chuck 56 in the + Z direction and then moves the main loader chuck 56 in the + X direction along the guide 350G so that the main loader chuck 56 can face the unloading chuck 41 of the unloading unit 40. To place.
- the control unit 60 advances the three main loader chucks 56 in the ⁇ Z direction and moves them to a position where the workpiece W can be delivered to and from the unloading chuck 41. Subsequently, the control unit 60 releases the main loader chucks 56b and 56c after holding the processed workpiece W by each unloading chuck 41. As a result, the two processed workpieces W are transferred from the main loader chucks 56b and 56c to the unloading chucks 41 at the same time or almost simultaneously.
- the main loader 352 causes the three main loader chucks 56 to be in an empty state, moves in the ⁇ X direction along the guide 350G, and returns to the carry-in unit 30, as shown in FIG. Two unprocessed workpieces W can be held by the main loader chuck 56.
- the main loader 352 delivers the workpiece W to the two main spindle chucks 13 and 14 disposed in the first main body 10 while moving once in the + X direction from the carry-in section 30 to the carry-out section 40. Is performed continuously. That is, the main loader 352 transports the two unprocessed workpieces W in the carry-in portion 30 to the spindle chucks 13 and 14 and moves from the spindle chucks 13 and 14 by one movement in the + X direction. The finished work W is received and conveyed to the carry-out unit 40.
- the main loader chuck 356 holds two unprocessed workpieces W in the carry-in portion 30, and then moves in the + X direction along the guide 350G.
- the machined workpiece W is received with the spindle chuck 23 and the unmachined workpiece W is delivered.
- the operation of transferring the workpiece W is the same as that shown in FIGS.
- the main loader chuck 56 moves in the + X direction along the guide 350G, receives the processed workpiece W with respect to the main shaft chuck 24 of the main shaft 22 of the second main body portion 20, and receives an unprocessed workpiece. Pass W.
- the operation for transferring the workpiece W is the same as that shown in FIGS.
- the main loader chuck 56 moves in the + X direction along the guide 350 ⁇ / b> G, and passes the processed workpiece W to the unloading chuck 41 of the unloading unit 40.
- the unprocessed workpiece W is supplied to the plurality of spindles 11 and 12 or the spindles 21 and 22 while the main loader 352 reaches the carry-out unit 40 from the carry-in unit 30. And since the processed workpiece
- work W can be improved. Moreover, according to this embodiment, since a relay loader is not used, equipment cost can be reduced. In the above-described embodiment, a total of three main loader chucks 56 is used for the number of main shafts 11 and 12 (n 2), but four or more main loader chucks 56 may be used.
- a total of five main loader chucks 56 may be used for the four main shafts 11, 12, 21, 22.
- FIG. 25 is a diagram illustrating an example of the workpiece transfer system 450 and the machine tool system 400 according to the fourth embodiment.
- the machine tool system 400 includes a first main body (machine tool main body) 10, a second main body (machine tool main body) 20, a carry-in portion 30, a carry-out portion 40, and a workpiece transfer system. 450 and a control unit 60.
- the structure of the workpiece conveyance system 450 differs from 1st Embodiment, and it is the same as that of 1st Embodiment about another structure.
- the same or equivalent components as those in the first embodiment described above are denoted by the same reference numerals, and description thereof is omitted or simplified.
- the work transfer system 450 includes a relay loader 451 and a main loader 52.
- the relay loader 451 includes one relay loader chuck 53 on the turning plate 55 (see FIG. 5). That is, there is a one-to-one relationship between the spindle chuck 13 and the like of each spindle 11 and the relay loader chuck 53 of each relay loader 51.
- the relay loader 451 turns the turning plate 55 to turn the relay loader chuck 53 so as to face the spindle chuck 13 and the like, and the main loader 52. It can be moved to the second position P2 facing the chuck 56.
- the main loader 52 has the same configuration as that of the first embodiment described above.
- 26 to 31 are diagrams showing an example of the operation of the machine tool system 400 including the workpiece transfer system 450.
- the main shafts 11 and 12 of the first main body portion 10 and the main shafts 21 and 22 of the second main body portion 20 are cut by the cutting tool T (see FIG. 5A). The operation from the state in which the processing of W is performed and the processed workpiece W is held on each of the spindles 11, 12, 21, and 22 will be described.
- the control unit 60 causes the main loader chuck 56 of the main loader 52 to receive the two unprocessed workpieces W placed on the carry-in unit 30.
- the procedure for receiving the workpiece W by each main loader chuck 56 is the same as in the first embodiment.
- the control unit 60 causes the unprocessed workpiece W to be received simultaneously by two of the three main loader chucks 56 of the main loader 52, the main loader chucks 56a and 56b. Therefore, the main loader chuck 56c is in an empty state.
- the control unit 60 retracts the main loader chuck 56 in the ⁇ Z direction, and then moves the main loader chuck 56 in the + X direction along the guide 50G to relay the main loader chuck 56 corresponding to the main shaft 11 of the first main body unit 10. It arrange
- the controller 60 holds the processed workpiece W received from the spindle 11 by the relay loader chuck 53 of the relay loader 451a before or after the arrival of the main loader chuck 56.
- the relay loader chuck 53 is disposed at the second position P2.
- the controller 60 causes the relay loader chuck 53 of the relay loader 451a and the main loader chuck 56c that is empty in the main loader 52 to face each other.
- the control unit 60 advances the three main loader chucks 56 in the + Z direction and moves them to a position where the workpiece W can be transferred to and from the relay loader chuck 53. Subsequently, the control unit 60 closes the main loader chuck 56c and holds the processed workpiece W, and then releases the relay loader chuck 53. As a result, the processed workpiece W is transferred from the relay loader chuck 53 to the main loader chuck 56c.
- control unit 60 retracts the main loader chuck 56 in the ⁇ Z direction, and then moves it in the + X direction along the guide 50G, so that the unprocessed portion of the relay loader chuck 53 of the relay loader 451a and the main loader 52 are not processed.
- the main loader chuck 56b holding the workpiece W is opposed to the main loader chuck 56b.
- the control unit 60 advances the three main loader chucks 56 in the + Z direction and moves them to a position where the workpiece W can be transferred to and from the relay loader chuck 53. Subsequently, the control unit 60 closes the relay loader chuck 53 and holds the unprocessed workpiece W, and then releases the main loader chuck 56b. As a result, the unprocessed workpiece W is transferred from the main loader chuck 56 b to the relay loader chuck 53.
- the main loader 52 is in a state where the main loader chuck 56c holds the processed workpiece W, the main loader chuck 56b becomes empty, and the main loader chuck 56a holds the unprocessed workpiece W. Is maintained.
- the control unit 60 turns the turning plate 55 of the relay loader 451a that has received the unprocessed workpiece W (see FIG. 5). ) Is swung to the first position P1, and the unprocessed workpiece W held by the relay loader chuck 53 is received by the main spindle chuck 13 (see the description of FIG. 29 described later), and then the swiveling plate 55 is moved to the second position P2. A series of controls are performed to make a turn. The delivery of the workpiece W between the relay loader chuck 53 and the spindle chuck 13 is the same in the delivery of the workpiece W between the other relay loader chuck 53 and the other spindle chuck 14 or the like.
- the control unit 60 retracts the main loader chuck 56 in the ⁇ Z direction and then moves the main loader chuck 56 in the + X direction along the guide 50G to relay the main loader chuck 56 corresponding to the main shaft 12 of the first main body unit 10. It arrange
- the controller 60 holds the processed workpiece W received from the spindle 12 by the relay loader chuck 53 of the relay loader 51b after or before the arrival of the main loader chuck 56.
- the relay loader chuck 53 is disposed at the second position P2.
- the control unit 60 makes the relay loader chuck 53 holding the processed workpiece W in the relay loader 51b and the main loader chuck 56b empty in the main loader 52 face each other.
- the control unit 60 advances the three main loader chucks 56 in the + Z direction and moves them to a position where the workpiece W can be delivered to and from the relay loader chuck 53. Subsequently, the control unit 60 closes the main loader chuck 56b and holds the processed workpiece W, and then releases the relay loader chuck 53. As a result, the processed workpiece W is transferred from the relay loader chuck 53 to the main loader chuck 56b. Next, the controller 60 retracts the main loader chuck 56 in the ⁇ Z direction, and then moves it in the + X direction along the guide 50G. The main loader chuck 56a holding the workpiece W is opposed to the main loader chuck 56a.
- the control unit 60 advances the three main loader chucks 56 in the + Z direction and moves them to a position where the workpiece W can be delivered to and from the relay loader chuck 53. Subsequently, the control unit 60 closes the relay loader chuck 53 and holds the unprocessed workpiece W, and then releases the main loader chuck 56a. As a result, the unprocessed workpiece W is transferred from the main loader chuck 56 a to the relay loader chuck 53. With the above-described operation, the main loader 52 holds the processed workpiece W with the main loader chucks 56b and 56c, and the main loader chuck 56a becomes empty.
- control unit 60 moves the main loader chuck 56 in the + X direction along the guide 50G so that the main loader chuck 56 can face the unloading chuck 41 of the unloading unit 40. Place in position.
- the controller 60 advances the three main loader chucks 56 in the + Z direction and moves them to a position where the workpiece W can be delivered to and from the unloading chuck 41. Subsequently, the control unit 60 releases the main loader chucks 56b and 56c after holding the processed workpiece W by each unloading chuck 41. As a result, the two processed workpieces W are transferred from the main loader chucks 56b and 56c to the unloading chucks 41 at the same time or almost simultaneously.
- the main loader 352 has three main loader chucks 56 in an empty state, moves in the ⁇ X direction along the guide 50G, and returns to the carry-in unit 30, as shown in FIG. Two unprocessed workpieces W can be held by the main loader chuck 56.
- the main loader 52 is moved from the carry-in unit 30 to the carry-out unit 40 once in the + X direction.
- the workpiece W is continuously transferred to the two main spindle chucks 13 and 14 arranged at 10.
- the main loader chuck 56 holds two unprocessed workpieces W in the carry-in unit 30, and then moves in the + X direction along the guide 50G.
- the processed workpiece W is received with the relay loader chuck 53 of 451a, and the unprocessed workpiece W is transferred.
- the operation for transferring the workpiece W is the same as that shown in FIGS.
- the main loader chuck 56 moves in the + X direction along the guide 50G, receives the processed workpiece W with respect to the relay loader chuck 53 of the relay loader 451b of the second main body portion 20, and is unprocessed. Pass the work W.
- the operation for transferring the workpiece W is the same as that shown in FIGS.
- the main loader chuck 56 moves in the + X direction along the guide 50G, and passes the processed workpiece W to the unloading chuck 41 of the unloading unit 40.
- the unprocessed workpiece W is supplied to the plurality of spindles 11 and 12 or the spindles 21 and 22 while the main loader 52 reaches the carry-out unit 40 from the carry-in unit 30. And since the processed workpiece
- the turning plate 55 turns as the relay loaders 51 and 451 to switch between the first position P1 and the second position P2. It is not limited to.
- the relay loaders 51 and 451 may be configured such that the relay loader chuck 53 is slidable in the vertical direction (Y direction) or the like.
- lathes are described as examples of the first main body 10 and the second main body 20 that are machine tool bodies, but the machine tool body is not limited to a lathe.
- the machine tool main body may be a machining center or the like.
- the contents of Japanese Patent Application No. 2017-078246, which is a Japanese patent application, and all the references cited in this specification are incorporated as part of the description of this text.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Turning (AREA)
- Feeding Of Workpieces (AREA)
- Multi-Process Working Machines And Systems (AREA)
Abstract
【課題】ワーク保持部が複数ある場合においても各ワーク保持部に対してワークの受け渡しを効率よく行い、ワークの搬送に要する時間を短縮してワークの加工効率を向上させる。 【解決手段】ワーク搬送システム50は、加工対象のワークWを保持して回転する主軸(ワーク保持部)11、12、21、22に対してワークWを受け渡しするワーク搬送システムであって、n(n≧2の整数)個の主軸11、12、21、22のそれぞれに対して、又はn個の主軸11、12、21、22のそれぞれに対応して配置され、主軸11、12、21、22に対してワークWを受け渡しするn個の中継ローダ51に対してワークを受け渡すn+m(m≧1の整数)個の主ローダチャック56を備える主ローダ52と、を有する。
Description
本発明は、ワーク搬送システム及び工作機械システムに関する。
旋盤などの工作機械は、加工対象のワークを保持して回転する複数の主軸(ワーク保持部)に対してワークを受け渡すワーク搬送装置を備えている。ワーク搬送装置の一例として、工作機械本体に配置されたレールに沿って移動し、工作機械本体の主軸に対してワークの受け渡しを行う主ローダと、この主ローダとの間でワークの受け渡しを行い、かつワーク供給台あるいはワーク排出台との間でワークの受け渡しを行う中継ローダとを有する構成が知られている(例えば、特許文献1参照)。
上記したワーク搬送装置では、主ローダと中継ローダとのワークの受け渡しにおいて、ワークを受け渡すチャックを切り換えて行っているため、チャックの切り替えに時間がかかり、ワークの搬送に要する時間が長くなるといった問題がある。また、例えば、平行2軸旋盤などのように主軸が複数ある場合、1台の主ローダで各主軸に対してワークの受け渡しを行うと、さらにワークの搬送に要する時間が長くなり、ワークの加工効率を低下させる要因となるので、主軸が複数ある場合においてワークを効率よく搬送することが望まれている。
以上のような事情に鑑み、本発明は、主軸等のワーク保持部が複数ある場合においても各ワーク保持部に対してワークの受け渡しを効率よく行い、ワークの搬送に要する時間を短縮してワークの加工効率を向上させることが可能なワーク搬送システム及び工作機械システムを提供することを目的とする。
本発明では、加工対象のワークを保持して回転するワーク保持部に対してワークを受け渡しするワーク搬送システムであって、n(n≧2の整数)個のワーク保持部のそれぞれに対して又はn個のワーク保持部のそれぞれに対応して配置されてワーク保持部に対して、ワークを受け渡しするn個の中継ローダに対してワークを受け渡すn+m(m≧1の整数)個の主ローダチャックを備える主ローダを有するワーク搬送システムが提供される。
また、n個のワーク保持部の1つに関して、n個の主ローダチャックが未加工のワークを保持し、かつ、m個の主ローダチャックが空の状態で、空の状態の主ローダチャックでワーク保持部の1つから加工済みのワークを受け取り、未加工のワークを保持する主ローダチャックから未加工のワークをワーク保持部の1つに供給し、次のワーク保持部の1つに関して、先に空となった主ローダチャックで次のワーク保持部の1つから加工済みのワークを受け取り、未加工のワークを保持する主ローダチャックから未加工のワークを次のワーク保持部の1つに供給し、ワーク保持部の1つに関する加工済みのワークの受け取り及び未加工のワークの供給をn回繰り返して実行させる制御部を備えてもよい。また、中継ローダは、ワーク保持部に対してワークを受け渡しする中継ローダチャックを備え、主ローダは、主ローダチャックが中継ローダチャックに対応する位置に移動して中継ローダチャックに対してワークを受け渡してしてもよい。また、中継ローダチャックは、1つの中継ローダにおいて複数配置されてもよい。また、n+m個の主ローダチャックは、一方向に並びかつ一定の間隔で配置され、複数の中継ローダチャックは、主ローダチャックの間隔と同一の間隔に配置され、中継ローダの移動により、複数の中継ローダチャックを一方向と平行に並んだ状態で配置可能であってもよい。また、中継ローダチャックから主ローダチャックへワークを渡す動作と、主ローダチャックから中継ローダチャックへワークを渡す動作とを一動作で行わせる制御部を備えてもよい。
また、主ローダは、水平方向でかつワーク保持部の回転軸の方向と直交する方向に移動可能であり、中継ローダは、ワーク保持部の回転軸に平行な軸周り方向に旋回可能であり、中継ローダチャックのいずれかをワーク保持部に対向する第1位置と、中継ローダチャックをn+m個の主ローダチャックに対向可能な第2位置との間を旋回する構成でもよい。また、中継ローダチャック及び主ローダチャックは、ワーク保持部の回転軸に対して平行な方向に向けてワークを保持する構成でもよい。また、主ローダチャックは、ワーク保持部の回転軸に対して平行な方向に向けてワークを保持する状態と、下方に向けてワークを保持する状態とに切り替え可能であってもよい。
また、本発明は、加工対象のワークを保持して回転する複数のワーク保持部を有する工作機械本体と、未加工のワークを保持する搬入部と、加工済みのワークを保持する搬出部と、ワーク保持部と搬入部との間、及びワーク保持部と搬出部との間の一方又は双方でワークを搬送する上記ワーク搬送システムと、を備える、工作機械システムが提供される。
本発明のワーク搬送システム及び工作機械システムによれば、主ローダチャックをn個のワーク保持部に対してn+m個備えるので、主ローダが、ワーク保持部と搬入部との間及びワーク保持部と搬出部との間の移動をワーク保持部ごとに繰り返す必要がなく、n個のワーク保持部に対して主ローダによるワークの受け渡しを短時間で行えるので、ワークの搬送効率が向上し、さらに、ワークの加工効率を向上させることができる。また、上記した制御部を備える場合、制御部によってワーク保持部の1つに関する加工済みのワークの受け取り及び未加工のワークの供給を効率よく行うことができる。また、n個のワーク保持部のそれぞれに対応して配置され、ワーク保持部に対してワークを受け渡しする中継ローダチャックを備える中継ローダを有し、主ローダは、主ローダチャックが中継ローダチャックに対応する位置に移動して中継ローダチャックに対してワークを受け渡す場合、主ローダは、中継ローダがワーク保持部との間でワークを受け渡す間に他のワーク保持部に向けて移動することができ、主ローダが停止している時間を短縮するのでワークの搬送効率を向上させることができる。また、中継ローダチャックが、1つの中継ローダにおいて複数配置される場合、中継ローダの複数の中継ローダチャックと、主ローダのn+m個の主ローダチャックとの間で複数のワークを同時に受け渡すことが可能であり、例えば、中継ローダチャックの1つで保持している加工済みのワークと主ローダチャックの1つに渡しつつ、主ローダチャックの他の1つで保持している未加工のワークを中継ローダチャックの他の一つで受け取ることが可能となる。このように、複数のワークを同時に受け渡すことができるので、ワークの受け渡しに要する時間が短縮されてワークの搬送効率を向上させることができる。
また、n+m個の主ローダチャックが、一方向に並びかつ一定の間隔で配置され、複数の中継ローダチャックが、主ローダチャックの間隔と同一の間隔に配置され、中継ローダの移動により、複数の中継ローダチャックを一方向と平行に並んだ状態で配置可能である場合、複数の中継ローダチャックと、n+m個の主ローダチャックとを容易に対向させることができ、容易に複数のワークを同時に受け渡すことができる。また、中継ローダチャックから主ローダチャックへワークを渡す動作と、主ローダチャックから中継ローダチャックへワークを渡す動作とを一動作で行わせる制御部を備える場合、制御部によって中継ローダ及び主ローダを容易に動作させることができる。また、主ローダが、水平方向でかつワーク保持部の回転軸の方向と直交する方向に移動可能であり、中継ローダが、ワーク保持部の回転軸に平行な軸周り方向に旋回可能であり、中継ローダチャックのいずれかをワーク保持部に対向する第1位置と、複数の中継ローダチャックをn+m個の主ローダチャックに対向可能な第2位置との間を旋回する場合、主ローダが複数のワーク保持部に対して効率よく移動することができ、中継ローダが、第1位置と第2位置との間を旋回することにより、容易にワーク保持部または主ローダチャックに中継ローダチャックを対向させることができる。
また、中継ローダチャック及び主ローダチャックが、ワーク保持部の回転軸に対して平行な方向に向けてワークを保持する場合、中継ローダチャックがワーク保持部又は主ローダチャックにワークを受け渡す際などにおいて、中継ローダチャック又は主ローダチャックの向きを変える必要がなく、ワークの受け渡しに要する時間を短縮できる。また、主ローダチャックが、ワーク保持部の回転軸に対して平行な方向に向けてワークを保持する状態と、下方に向けてワークを保持する状態とに切り替え可能である場合、ワークが上向きに置かれている場合でも主ローダチャックの向きを切り替えることによりこのワークを保持することができ、ワークが置かれる向きについて汎用性を確保できる。
以下、本発明の実施形態について図面を参照しながら説明する。ただし、本発明は図面に記載された形態に限定されない。また、図面においては内容を説明するため、一部分を大きくまたは強調して記載するなど適宜縮尺を変更して表現している。以下の各図において、XYZ座標系を用いて図中の方向を説明する。このXYZ座標系においては、水平面に平行な平面をXZ平面とする。このXZ平面において主軸11等の方向をZ方向と表記し、Z方向に直交する方向をX方向と表記する。また、XZ平面に垂直な方向はY方向と表記する。X方向、Y方向及びZ方向のそれぞれは、図中の矢印の方向が+方向であり、矢印の方向とは反対の方向が-方向であるとして説明する。
<第1実施形態>
第1実施形態について図面を参酌して説明する。図1は、第1実施形態に係るワーク搬送システム50及び工作機械システム100の一例を示す図である。図1に示すように、工作機械システム100は、第1本体部(工作機械本体)10と、第2本体部(工作機械本体)20と、搬入部30と、搬出部40と、ワーク搬送システム50と、制御部60とを備える。なお、制御部60は、工作機械システム100の制御部であり、かつ、ワーク搬送システム50の制御部である。ただし、1つの制御部60であることに限定されず、工作機械システム100の制御部とワーク搬送システム50の制御部とが別に設置されてもよい。
第1実施形態について図面を参酌して説明する。図1は、第1実施形態に係るワーク搬送システム50及び工作機械システム100の一例を示す図である。図1に示すように、工作機械システム100は、第1本体部(工作機械本体)10と、第2本体部(工作機械本体)20と、搬入部30と、搬出部40と、ワーク搬送システム50と、制御部60とを備える。なお、制御部60は、工作機械システム100の制御部であり、かつ、ワーク搬送システム50の制御部である。ただし、1つの制御部60であることに限定されず、工作機械システム100の制御部とワーク搬送システム50の制御部とが別に設置されてもよい。
第1本体部10及び第2本体部20は、例えば平行2軸旋盤であり、+Z方向を正面側に向けて配置される。第1本体部10は、主軸(ワーク保持部)11、12と、切削工具を保持する不図示のタレット等の刃物台とを有する。タレット等の刃物台には、ワークWを切削するための複数の切削工具が保持されており、いずれかの切削工具が選択されて用いられる。主軸11、12は、X方向に2個並んで配置される。主軸11、12は、それぞれ不図示の軸受け等によって、Z方向に平行な回転軸AX1の軸線周りに回転可能に支持される。主軸11、12の+Z側の端部には、主軸チャック13、14が配置される。主軸チャック13、14は、複数の把持爪13A、14A(図5参照)を備え、把持爪13A、14Aを閉じることにより、それぞれワークWを+Z方向に向けて保持可能である。
第2本体部20は、第1本体部10と同様に、主軸(ワーク保持部)21、22と、切削工具を保持する不図示のタレット等の刃物台とを有する。タレット等の刃物台には、ワークWを切削するための複数の切削工具が保持されており、いずれかの切削工具が選択されて用いられる。主軸21、22は、X方向に2個並んで配置される。主軸21、22は、それぞれ不図示の軸受け等によって、Z方向に平行な回転軸AX1の軸線周りに回転可能に支持される。主軸21、22の+Z側の端部には、主軸11、12と同様に、主軸チャック23、24が配置される。主軸チャック23、24は、複数の把持爪23A、24A(図5参照)を備え、把持爪23A、24Aを閉じることにより、それぞれワークWを+Z方向に向けて保持可能である。
主軸11、12と主軸21、22とは互いに平行しており、これら主軸11、12、21、22の+Z側の端部がX方向に並ぶように(主軸チャック13、14、23、24がX方向に並ぶように)配置されている。なお、本実施形態において、第1本体部10及び第2本体部20の主軸の数は、それぞれ2個ずつであるが、この形態に限定されず、n(n≧2の整数)個の主軸が配置されればよく、3個以上の主軸が配置されてもよい。
搬入部30は、工作機械システム100において、加工対象である未加工のワークWが載置される。搬入部30は、ワークWを保持する保持台31を有する。保持台31には、未加工の2個以上の(本実施形態では2個の)ワークWが保持される。複数のワークWは、後述する間隔dで並んで配置される。搬入部30は、後述する主ローダ52に対して未加工のワークWを渡すことができるように構成されている。搬入部30の詳細については後述する。
搬出部40は、工作機械システム100において、第1本体部10あるいは第2本体部20により加工された後の加工済みのワークWを保持する。搬出部40は、加工済みのワークWを保持可能な複数の(本実施形態では2つの)搬出用チャック41を有する。複数の搬出用チャック41は、後述する間隔dで並んで配置される。搬出用チャック41のそれぞれは、ワークWを-Z方向に向けて保持可能である。ただし、搬出部40が搬出用チャック41を備えることに限定されず、例えば、単に加工済みのワークWを載置する載置台を備えてもよい。
ワーク搬送システム50は、中継ローダ51(中継ローダ)と、主ローダ52(主ローダ)とを有する。中継ローダ51は、第1本体部10において、n(n≧2の整数であり、本実施形態においてはn=2)個の主軸11、12のそれぞれに対応して配置され、第2本体部20において、n(n≧2の整数であり、本実施形態においてはn=2)個の主軸21、22のそれぞれに対応して配置される。本実施形態において、中継ローダ51は、第1本体部10において、主軸11の-X側と、主軸12の+X側との2個所に配置され、第2本体部20において、主軸21の-X側と、主軸22の+X側との2個所に配置される。以下、第1本体部10及び第2本体部20のそれぞれに配置される2つの中継ローダ51を区別する場合、-X側の中継ローダ51、つまり、主軸11、21に対応して配置される中継ローダ51を中継ローダ51aと表記する。また、+X側の中継ローダ51、つまり主軸12、22に対応して配置される中継ローダ51を中継ローダ51bと表記する。
中継ローダ51は、中継ローダチャック53を複数(本実施形態では2つ)有する。以下、2つの中継ローダチャック53を区別する場合、-X側の中継ローダチャック53を中継ローダチャック53aと表記し、+X側の中継ローダチャック53を中継ローダチャック53aと表記する。中継ローダチャック53は、後述の主ローダ52に配置される複数の主ローダチャック56の間隔と同一の間隔dに配置される。
なお、中継ローダチャック53は、1つの中継ローダ51において2つ設けられることに限定されず3つ以上設けられてもよい。中継ローダチャック53が3つ以上配置される場合、それぞれの中継ローダチャック53は、一方向に並びかつ一定の間隔dとなるように配置される。中継ローダチャック53のそれぞれは、ワークWを保持するための不図示の把持爪又は吸着部等を備え、ワークWを-Z方向、つまり主軸11、12、21、22の回転軸AX1に平行な方向に向けて保持可能である。中継ローダチャック53は、主軸11、12、21、22のそれぞれに対してワークWの受け渡しを行う。
中継ローダチャック53のそれぞれは、-Z方向に進退可能であり、主軸11等に対してワークWを受け渡す際に-Z方向に進行してワークWの受け渡しを行う。ただし、中継ローダチャック53が-Z方向に進退可能であることに限定されず、ワークWの受け渡しに際して主軸11等が+Z方向に進退可能であってもよい。中継ローダチャック53が-Z方向に進行することにより、中継ローダチャック53から主軸11等に未加工のワークWを渡し、あるいは、主軸11等から中継ローダチャック53に加工済みのワークWを受け取る。なお、中継ローダ51の詳細については別図を用いて後述する。
主ローダ52は、搬入部30と中継ローダ51との間、及び、中継ローダ51と搬出部40との間で、ワークWを搬送する。主ローダ52は、ローダヘッド(例えば図3のローダヘッド52B参照)を備えており、このローダヘッドにn+m(m≧1の整数)個の主ローダチャック56を有している。本実施形態では、主ローダチャック56は3つ、つまりn=2かつm=1の場合について説明する。以下、3つの主ローダチャック56を区別する場合、最も-X側の主ローダチャック56を主ローダチャック56aと表記し、X方向の中央の主ローダチャック56を主ローダチャック56bと表記し、最も+X側の主ローダチャック56を主ローダチャック56cと表記する。
主ローダチャック56のそれぞれは、ワークWを把持するための複数の把持爪57(図2参照)を備え、把持爪57を閉じることにより、ワークWを+Z方向、つまり主軸11、12、21、22の回転軸AX1に平行な方向に向けて保持可能である。主ローダチャック56は、搬入部30からワークWを受け取り、又は搬出部40にワークWを渡す。主ローダチャック56は、+Z方向に進退可能である。主ローダチャック56は、搬入部30からワークWを受け取る場合、又は搬出部40にワークWを渡す場合に搬入部30又は搬出部40に対して+Z方向に進行する。
また、主ローダチャック56は、中継ローダチャック53に対してワークWの受け渡しを行う。ワークWの受け渡しの際、主ローダチャック56が中継ローダチャック53に向けて+Z方向に移動するが、この形態に限定されず、中継ローダチャック53を主ローダチャック56に向けて-Z方向に進行させてもよい。なお、複数の主ローダチャック56は、個別に+Z方向に進退する構成であってもよいし、全体として(例えば、ローダヘッドとともに)+Z方向に進退する構成であってもよい。主ローダチャック56が全体として+Z方向に進退する場合、主ローダチャック56におけるZ方向に駆動系を簡略化することができる。
複数の主ローダチャック56は、例えばX方向に並び、かつ一定の間隔dに配置される。したがって、中継ローダ51と主ローダ52とをZ方向に対向させる場合、2つの中継ローダチャック53と、3つのうちの2つの主ローダチャック56とが、それぞれ1対1で対向した状態となる。
主ローダ52は、ガイド50Gを有する。ガイド50Gは、搬入部30、第1本体部10、第2本体部20、及び搬出部40に沿って配置されている。主ローダチャック56は、不図示の駆動装置を駆動することにより、不図示のローダヘッドとともにガイド50Gに沿ってX方向(水平方向でかつ主軸11等の回転軸AX1の方向と直交する方向)に移動可能である。主ローダチャック56がX方向に移動することにより、搬入部30、第1本体部10、第2本体部20、及び搬出部40のそれぞれに主ローダチャック56を配置させることが可能である。また、主ローダチャック56を搬入部30等にした際、主ローダチャック56がその高さでワークWの受け渡しが可能となるように、ガイド50Gの高さが設定されている。ただし、主ローダチャック56(あるいは不図示のローダヘッド)を昇降可能としてもよく、この場合、ガイド50Gの高さを任意に設定可能である。
制御部60は、所定の加工プログラムに基づいて第1本体部10、第2本体部20、搬入部30、搬出部40及びワーク搬送システム50の動作を統括的に制御する。制御部60には、不図示の通信部を備えており、この通信部によって第1本体部10、第2本体部20、搬入部30、搬出部40及びワーク搬送システム50の動作を指示し、また、各部の動作状況などの各種情報を受信する。なお、制御部60と各部との通信は、有線又は無線のいずれであってもよい。
図2は、搬入部30の一例を示す図である。図2に示すように、搬入部30は、保持台31Aとコンベアベルト32とを備える。コンベアベルト32は、上面にワークWを載置してワークWを移送可能である。コンベアベルト32は、ワークWを載置した状態で不図示の駆動部によりX方向又はZ方向に周回する。ワークWは、例えば、搬入部30と異なる場所でコンベアベルト32上に載置され、コンベアベルト32が周回することにより搬入部30に配置される。このように、ワークWがコンベアベルト32に載置されることにより、複数のワークWを連続して搬入部30に配置することができ、さらに、搬入部30におけるワークWの配置位置を調整することができる。なお、搬入部30は、コンベアベルト32を備えることに限定されず、単にワークWを保持台31Aに載置する構成であってもよい。
図2に示すように、コンベアベルト32は、ワークWを横向きで、つまりワークWの中心軸がZ方向に沿った状態で載置する。なお、ワークWを横向きに載置する際、ワークWがコンベアベルト32上で転がらないように、例えばコンベアベルト32に位置決め用の突起等が設けられてもよい。ワークWが横向きに載置される場合、主ローダ52の主ローダチャック56は、ワークWの-Z側から横向きに移動し、ワークWを把持することによりワークWを受け取る。また、主ローダチャック56がワークWを受け取る際にコンベアベルト32又は保持台31Aと干渉しないように、ワークWの-Z側を突出させた状態でコンベアベルト32に載置されている。このように、搬入部30においてワークWを横向きに載置することにより、主ローダ52の主ローダチャック56を横向き(+Z方向に向けて)にしたままワークWを受け取ることができ、主ローダチャック56の向きを変更するための機構を設ける必要がない。
図3は、主ローダの他の例を示す図である。図3に示すように、コンベアベルト32は、ワークWを縦向きで、つまりワークWの中心軸がY方向に沿った状態で載置することも可能である。ワークWの端面が平面である場合、ワークWを縦向きでコンベアベルト32に載置できる。ワークWが縦向きに載置される場合、主ローダ52Aの主ローダチャック56を+Y方向に(すなわち縦向きに)向け、ワークWの上方から下方に向けて進行させる必要がある。ただし、主ローダチャック56は、搬入部30以外でワークWを受け渡す場合にワークWを+Z方向に(すなわち横向きに)向ける必要があるので、主ローダ52Aには、主ローダチャック56の向きを変える機構が必要となる。
図3に示すように、主ローダ52Aは、主ローダチャック56の向きを切り替える切替機構58を備えている。切替機構58は、不図示の駆動部を備え、この駆動部によりローダヘッド52Bと主ローダチャック56との間に設けられ、主ローダチャック56の向きを+Z方向(横向き)と-Y方向(縦向き)との間で切り替える。切替機構58は、不図示の駆動部を備え、この駆動部により主ローダチャック56の向きを切り替える。また、主ローダ52Aは、ローダヘッド52Bを昇降させる不図示の昇降装置を備えており、ローダヘッド52Bとともに主ローダチャック56を昇降させる。
このように構成された主ローダ52Aは、搬入部30に載置されたワークWの上方において、切替機構58により主ローダチャック56を下向きに設定し、次いで、不図示の昇降装置により主ローダチャック56を下降させ、把持爪57がワークWの上部の外側に位置した段階で把持爪57を閉じることによりワークWを保持する。その後、切替機構58により主ローダチャック56を横向きに切り替えることにより、ワークWを+Z方向に向けて保持した状態となる。その結果、中継ローダ51の中継ローダチャック53に対してワークWの受け渡しを行うことが可能となる。
図4は、搬入部30の他の例を示す図である。図3に示す主ローダ52Aのように切替機構58を備えていない場合、ワークWを横向きで受け取る必要があるため、搬入部30に縦向きで載置されるワークWを横向きに変えることで、主ローダチャック56により搬入部30からワークWを受け取ることが可能となる。図4に示す搬入部30は、ワークWを縦向きから横向きに切り替えることができる。図4に示すように、搬入部30は、保持台31Cと、ワークWを保持する保持機構33とを有する。保持機構33は、基部33aと、軸部33bと、保持部33cとを有する。基部33aは、保持台31Cに取り付けられるが、この形態に代えて、例えば、コンベア又はロータリーテーブルなどに取り付けられて移動可能であってもよい。軸部33bは、基部33aの上部においてX方向に平行に配置されている。
保持部33cは、基部33aに対して軸部33bを中心とするX方向の軸周り方向に回動可能であり、不図示の駆動部により回動する。保持部33cは、把持爪又は吸着部等を備え、ワークWの端部を保持する。保持部33cが軸部33bの軸周り方向に移動することにより、ワークWの向きを横向き(Z方向)と縦向き(Y方向)に切り替えることが可能である。したがって、例えば、搬入部30に移送された状態ではワークWが縦向きであっても、ワークWを主ローダ52に渡す場合には、保持部33cを回動させてワークWを縦向きから横向きに配置させることができる。その結果、主ローダ52の主ローダチャック56は、+Y側から横向きにワークWを受け取ることができる。
図5は、中継ローダ51の一例を示す図であり、(A)は+Z方向(正面側)から見た場合を示し、(B)は+Y方向(上方)から見た場合を示す。図5に示すように、中継ローダ51は、中継ローダチャック53と、軸部54と、旋回板55とを有する。中継ローダチャック53は、旋回板55に固定される。軸部54は、中心軸AX2がZ方向に平行に配置される。旋回板55は、不図示の駆動部により、軸部54の軸周り方向に旋回可能である。図5は、主軸11、21に対応する中継ローダ51を例に挙げて説明しているが、主軸12、22に対応する中継ローダ51は、図5に示す構成と対称に構成されており、旋回板55が旋回する向きが反対となるだけで、他は同様である。
中継ローダ51は、旋回板55が軸部54の軸周り方向に旋回することにより、中継ローダチャック53を第1位置P1と第2位置P2との間で移動可能である。旋回板55が第1位置P1にある場合には、中継ローダチャック53が主軸11、21の主軸チャック13、23に対向する。また、旋回板55が第2位置P2にある場合には、中継ローダチャック53が主ローダ52の主ローダチャック56に対向する。
中継ローダ51は、旋回板55の旋回位置を調整することにより、第1位置P1において、2つの中継ローダチャック53a、53bとそれぞれ主軸11、21に対して対向させることが可能である。図5(A)では、一転鎖線で示す旋回板55が、第1位置P1において中継ローダチャック53aを主軸11、21に対して対向させた状態を示している。また、中継ローダ51は、図5(B)に示すように、不図示の駆動部により-Z方向に進退可能に設けられる。中継ローダチャック53は、旋回板55の旋回時にワークWが主軸11、21に干渉しないように+Z方向に退避した退避位置P1aと、主軸11、21との間でワークWの受け渡しが可能なように-Z方向に進行した進行位置P1bとの間で移動可能である。ただし、上記したように、中継ローダチャック53が-Z方向に進退可能とする構成に代えて、主軸チャック13、23が+Z方向に進退可能とする構成が適用されてもよい。
続いて、上記のように構成されたワーク搬送システム50及び工作機械システム100の動作について説明する。図6から図10は、ワーク搬送システム50を含めた工作機械システム100の動作の一例を示す図である。以下の例では、第1本体部10の主軸11、12と、第2本体部20の主軸21、22とで切削工具T(図5(A)参照)によりワークWの加工が行われており、各主軸11、12、21、22に対応する中継ローダ51のうち中継ローダチャック53bに加工済みのワークWが保持された状態からの動作を説明する。なお、図面において、加工済みのワークWには、未加工のワークWと区別するために複数の点を表記している。
図6に示すように、制御部60は、搬入部30に予め載置された2つのワークWを、主ローダ52によって受け取るよう指示する。搬入部30には、予め2つのワークWが横向きの状態で配置されており、この2つのワークWは、3つの主ローダチャック56の間隔又は2つの中継ローダチャック53の間隔と同様に、間隔dに設定されている。制御部60は、主ローダ52の3つの主ローダチャック56を+Z方向に進行させ、3つの主ローダチャック56のうち、2つの主ローダチャック56a、56bにより2つの未加工のワークWを同時に受け取らせる。このとき、主ローダチャック56cは、他の主ローダチャック56a、56bとともに+Z方向に移動するがワークWを保持していない空の状態(ワークWを保持していない状態、以下同様である。)である。
次に、制御部60は、主ローダチャック56を-Z方向に退避させた後、ガイド50Gに沿って+X方向に移動させ、主ローダチャック56を第1本体部10の主軸11に対応する中継ローダ51aの中継ローダチャック53と対向可能な位置に配置させる。制御部60は、主ローダチャック56の到着後又は到着前に、中継ローダ51aの中継ローダチャック53bが主軸11から受け取った加工済みのワークWを保持し、かつ、中継ローダチャック53aが空の状態で、中継ローダチャック53を第2位置P2に配置させる。制御部60は、中継ローダ51aにおいて空の状態の中継ローダチャック53aと、主ローダ52において未加工のワークWを保持している主ローダチャック56bとを対向させる。この状態では、中継ローダ51aにおいて加工済みワークWを保持している中継ローダチャック53bと、主ローダ52において空の状態の主ローダチャック56cとが同時に対向した状態となる。
次に、図7に示すように、制御部60は、3つの主ローダチャック56を+Z方向に進行させ、中継ローダチャック53との間でワークWの受け渡しが可能な位置に移動させる。続いて、制御部60は、主ローダチャック56cを閉じて加工済みのワークWを保持した後、中継ローダチャック53bを解放させる。その結果、加工済みのワークWが中継ローダチャック53bから主ローダチャック56cに渡される。同時又はほぼ同時に、制御部60は、中継ローダチャック53aを閉じて未加工のワークWを保持した後、主ローダチャック56bを解放させる。その結果、未加工のワークWが主ローダチャック56bから中継ローダチャック53aに渡される。このように、中継ローダ51aと主ローダ52との間において、未加工のワークW及び加工済みのワークWの受け渡しを一動作で同時に行わせることができる。
上記した動作により、中継ローダ51aは、中継ローダチャック53aが未加工のワークWを保持し、中継ローダチャック53bが空の状態となる。また、主ローダ52は、主ローダチャック56cが加工済みのワークWを保持し、中央の主ローダチャック56bが空の状態となる。なお、主ローダチャック56aは、未加工のワークWを保持したままの状態を維持している。このワークWの受け渡し動作において、中継ローダチャック53又は主ローダチャック56は、ワークWの受け渡しのために向きを変える必要がなく、一動作でワークWの受け渡しを行うので、ワークのWの受け渡しに要する時間を短縮できる。なお、上記では主ローダチャック56が+Z方向に進行しているが、この構成に代えて、中継ローダチャック53を-Z方向に進行させてもよい。
なお、主ローダ52によるワークWの搬送中及び次の中継ローダ51bとのワークWの受け渡し中において、制御部60は、未加工のワークWを受け取った中継ローダ51aの旋回板55(図5参照)を第1位置P1まで旋回させ、中継ローダチャック53bで加工済みのワークWを主軸チャック13から受け取らせた後(後述する図8の記載参照)、旋回板55を所定量旋回させ、中継ローダチャック53aで保持した未加工のワークWを主軸チャック13に受け取らせ(後述する図9の記載参照)、中継ローダチャック53bが加工済みのワークWを保持した状態で旋回板55を第2位置P2まで旋回させ(後述する図10の記載参照)、中継ローダ51aを図6に示す状態とするような一連の制御を行っている。このような、中継ローダチャック53と主軸チャック13とのワークWの受け渡しは、他の中継ローダチャック53と他の主軸チャック14等とのワークWの受け渡しにおいても同様である。
次に、図8に示すように、制御部60は、主ローダチャック56を-Z方向に退避させた後、ガイド50Gに沿って+X方向に移動させ、主ローダチャック56を第1本体部10の主軸12に対応する中継ローダ51bの中継ローダチャック53と対向可能な位置に配置させる。制御部60は、主ローダチャック56の到着後又は到着前に、中継ローダ51bの中継ローダチャック53bが主軸12から受け取った加工済みのワークWを保持し、かつ、中継ローダチャック53aが空の状態で、中継ローダチャック53を第2位置P2に配置させる。制御部60は、中継ローダ51bにおいて空の状態の中継ローダチャック53aと、主ローダ52において未加工のワークWを保持している主ローダチャック56aとを対向させる。この状態では、中継ローダ51aにおいて加工済みワークWを保持している中継ローダチャック53bと、主ローダ52において空の状態の主ローダチャック56bとが同時に対向した状態となる。
次に、図9に示すように、制御部60は、3つの主ローダチャック56を+Z方向に進行させ、中継ローダ51bとの間でワークWの受け渡しが可能な位置に移動させる。続いて、制御部60は、主ローダチャック56bを閉じて加工済みのワークWを保持した後、中継ローダチャック53bを解放させる。その結果、加工済みのワークWが中継ローダチャック53bから主ローダチャック56bに渡される。同時又はほぼ同時に、制御部60は、中継ローダチャック53aを閉じて未加工のワークWを保持した後、主ローダチャック56aを解放させる。その結果、未加工のワークWが主ローダチャック56aから中継ローダチャック53aに渡される。このように、中継ローダ51bと主ローダ52との間において、未加工のワークW及び加工済みのワークWの受け渡しを一動作で同時に行わせることができる。
上記した動作により、中継ローダ51bは、中継ローダチャック53aが未加工のワークWを保持し、中継ローダチャック53bが空の状態となる。また、主ローダ52は、主ローダチャック56bが加工済みのワークWを保持し、主ローダチャック56aが空の状態となる。なお、主ローダチャック56cは、加工済みのワークWを保持したままの状態を維持している。このワークWの受け渡し動作では、上記と同様に、ワークのWの受け渡しに要する時間を短縮できる。
次に、制御部60は、主ローダチャック56を-Z方向に退避させた後、主ローダ52をガイド50Gに沿って+X方向に移動させ、主ローダチャック56を搬出部40の搬出用チャック41に対向させる。このとき、制御部60は、加工済みのワークWを保持する2つの主ローダチャック56b、56cと、2つの搬出用チャック41と、を対向させる。2つの搬出用チャック41の間隔は、主ローダチャック56の間隔と同様に、間隔dに設定されている。続いて、図10に示すように、制御部60は、主ローダチャック56を+Z方向に進行させ、搬出用チャック41との間でワークWの受け渡しが可能な位置に移動させる。
続いて、制御部60は、各搬出用チャック41により加工済みのワークWを保持した後、主ローダチャック56b、56cを解放させる。その結果、2つの加工済みのワークWが主ローダチャック56b、56cから各搬出用チャック41に同時又はほぼ同時に渡される。このように、主ローダ52と搬出部40との間において、複数の(2つの)ワークWの受け渡しを一動作で同時に行わせることができる。このような動作により、主ローダ52は、3つの主ローダチャック56が空の状態となり、ガイド50Gに沿って-X方向に移動して搬入部30に戻ることにより、図6に示すように、主ローダチャック56で2つの未加工のワークWを保持可能となる。
このように、主ローダ52は、搬入部30から搬出部40まで+X方向に1回移動する間において、第1本体部10に配置される2つの中継ローダ51a、51bに対してワークWの受け渡しを連続して行う。つまり、主ローダ52は、1回の+X方向への移動により、搬入部30の2つの未加工のワークWを、中継ローダ51a、51bのそれぞれに搬送し、かつ、中継ローダ51a、51bから加工済みのワークWを受け取って搬出部40に搬送する。
次に、主ローダチャック56は、図6と同様に、搬入部30で2つの未加工のワークWを保持した後、ガイド50Gに沿って+X方向に移動し、第2本体部20の主軸21に対応する中継ローダ51aの中継ローダチャック53との間で未加工のワークWを渡し、かつ、加工済みのワークWを受け取る。なお、ワークWの受け渡しの動作については図7と同様である。次に、主ローダチャック56は、図8と同様に、ガイド50Gに沿って+X方向に移動し、第2本体部20の主軸22に対応する中継ローダ51bの中継ローダチャック53との間で未加工のワークWを渡し、かつ、加工済みのワークWを受け取る。なお、ワークWの受け渡しの動作については図9と同様である。次に、主ローダチャック56は、ガイド50Gに沿って+X方向に移動し、搬出部40の搬出用チャック41に加工済みのワークWを渡す。
主ローダ52は、主ローダチャック56が空の状態となり、搬入部30に戻ることにより、図6に示すように、主ローダチャック56で2つの未加工のワークWを保持可能となる。このような動作が繰り返して行われることにより、第1本体部10の主軸11、12、及び第2本体部20の主軸21、22に対して未加工のワークWを連続して供給し、かつ、加工済みのワークWを連続して回収している。なお、搬出部40の搬出用チャック41に保持された加工済みのワークWは、例えば、コンベア装置等により搬出部40から他の場所に移送される。なお、本実施形態では、主軸11、12又は主軸21、22に関して、主ローダチャック56によるワークWの受け渡し動作がそれぞれ2回(n=2)繰り返して行われている。
以上のように、本実施形態によれば、複数のワークWを同時に受け渡すことができ、主ローダ52を搬入部30又は搬出部40との間で頻繁に往復しないので、ワークWの受け渡しに要する時間が短縮されてワークWの搬送効率が向上し、さらに、ワークWの加工効率を向上させることができる。なお、上記した実施形態では、2つの主軸を持つ第1本体部10及び第2本体部20に対応する例を示しているが、本体部に主軸が3つ以上であっても(主軸の数+m)個の主ローダチャック56を配置することで上記と同様に対応可能である。また、2つの主軸を持つ本体部が1つ又は3つ以上であっても上記と同様である。また、主ローダチャック56の数は、2つの主軸に対して+1個の計3個としているが、この構成に限定されず、主軸に対して+m個の数であればよいので、例えば、2つの主軸に対して4個以上の主ローダチャック56が設けられてもよい。
<第2実施形態>
第2実施形態について図面を参酌して説明する。図11は、第2実施形態に係るワーク搬送システム250及び工作機械システム200の一例を示す図である。図11に示すように、工作機械システム200は、第1本体部(工作機械本体)10と、第2本体部(工作機械本体)20と、搬入部30と、搬出部40と、ワーク搬送システム250と、制御部60とを備える。第2実施形態では、ワーク搬送システム250の構成が第1実施形態とは異なり、他の構成については第1実施形態と同様である。以下の説明において、上記した第1実施形態と同一または同等の構成部分については同一符号を付けて説明を省略または簡略化する。
第2実施形態について図面を参酌して説明する。図11は、第2実施形態に係るワーク搬送システム250及び工作機械システム200の一例を示す図である。図11に示すように、工作機械システム200は、第1本体部(工作機械本体)10と、第2本体部(工作機械本体)20と、搬入部30と、搬出部40と、ワーク搬送システム250と、制御部60とを備える。第2実施形態では、ワーク搬送システム250の構成が第1実施形態とは異なり、他の構成については第1実施形態と同様である。以下の説明において、上記した第1実施形態と同一または同等の構成部分については同一符号を付けて説明を省略または簡略化する。
ワーク搬送システム250は、中継ローダ51と、主ローダ252とを有する。中継ローダ51は、上記した第1実施形態と同様の構成である。なお、上記した第1実施形態では、第1本体部10の主軸11、12の数をn(n≧2の整数)として説明したが、第2実施形態では、第1本体部10の主軸11、12の数と、第2本体部20の主軸21、22の数との合計をn(n≧2の整数)としている。したがって、本実施形態において、第1本体部10及び第2本体部20に配置される4つの中継ローダ51を区別し、中継ローダ51aは、第1本体部10の主軸11に対応して配置され、中継ローダ51bは、第1本体部10の主軸12に対応して配置され、中継ローダ51cは、第2本体部20の主軸21に対応して配置され、中継ローダ51dは、第2本体部20の主軸22に対応して配置される。
また、本実施形態において、主ローダ252は、n+1(m=1とする)の5つの主ローダチャック56を有する。5つの主ローダチャック56は、間隔dでX方向に並んだ状態で配置される。なお、それぞれの主ローダチャック56の構成については、上記した第1実施形態と同様である。以下、5つの主ローダチャック56を区別する場合、-X側から+X側にかけて、順に主ローダチャック56a、56b、56c、56d、56eと表記する。
搬入部30は、主ローダチャック56a~56eに対応するように、未加工のワークWが4個並んで載置される。4つのワークWが間隔dで配置される点は、第1実施形態と同様である。また、搬出部40は、主ローダチャック56a~56eに対応するように、4つの搬出用チャック41を有する。搬出用チャック41が間隔dで並んで配置される点は、第1実施形態と同様である。
続いて、上記のように構成されたワーク搬送システム250及び工作機械システム200の動作について説明する。図12から図14は、ワーク搬送システム250を含めた工作機械システム200の動作の一例を示す図である。以下の例では、第1実施形態と同様に、第1本体部10の主軸11、12と、第2本体部20の主軸21、22とで切削工具T(図5(A)参照)によりワークWの加工が行われており、各主軸11、12、21、22に対応する中継ローダ51a~51dのうちそれぞれののうち中継ローダチャック53bに加工済みのワークWが保持された状態からの動作を説明する。
図12に示すように、制御部60は、搬入部30に載置された4つの未加工のワークWを、主ローダ252の主ローダチャック56に受け取らせる。各主ローダチャック56によるワークWの受け取り手順は、第1実施形態と同様である。なお、制御部60は、主ローダ52の5つの主ローダチャック56のうち、主ローダチャック56a、56b、56c、56dの4つにより未加工のワークWを同時に受け取らせる。したがって、主ローダチャック56eは、空の状態となる。
次に、制御部60は、主ローダチャック56を-Z方向に退避させた後、ガイド50Gに沿って+X方向に移動させ、主ローダチャック56を第1本体部10の主軸11に対応する中継ローダ51aの中継ローダチャック53と対向可能な位置に配置させる。制御部60は、第1実施形態と同様に、主ローダチャック56の到着後又は到着前に、中継ローダ51aの中継ローダチャック53bが主軸11から受け取った加工済みのワークWを保持し、かつ、中継ローダチャック53aが空の状態で、中継ローダチャック53を第2位置P2に配置させる。制御部60は、中継ローダ51aにおいて空の状態の中継ローダチャック53aと、主ローダ52において未加工のワークWを保持している主ローダチャック56dとを対向させる。この状態では、中継ローダ51aにおいて加工済みワークWを保持している中継ローダチャック53bと、主ローダ52において空の状態の主ローダチャック56eとが同時に対向した状態となる。
次に、図13に示すように、制御部60は、5つの主ローダチャック56を+Z方向に進行させ、中継ローダチャック53との間でワークWの受け渡しが可能な位置に移動させる。続いて、制御部60は、主ローダチャック56eを閉じて加工済みのワークWを保持した後、中継ローダチャック53bを解放させる。その結果、加工済みのワークWが中継ローダチャック53bから主ローダチャック56eに渡される。同時又はほぼ同時に、制御部60は、中継ローダチャック53aを閉じて未加工のワークWを保持した後、主ローダチャック56dを解放させる。その結果、未加工のワークWが主ローダチャック56dから中継ローダチャック53aに渡される。
上記した動作により、中継ローダ51aは、中継ローダチャック53aが未加工のワークWを保持し、中継ローダチャック53bが空の状態となる。また、主ローダ52は、主ローダチャック56eが加工済みのワークWを保持し、主ローダチャック56dが空の状態となり、主ローダチャック56a~56cが未加工のワークWを保持したままの状態を維持している。
次に、制御部60は、主ローダチャック56を-Z方向に退避させた後、ガイド50Gに沿って+X方向に移動させ、主ローダチャック56を第1本体部10の主軸12に対応する中継ローダ51bの中継ローダチャック53と対向可能な位置に配置させる。制御部60は、第1実施形態と同様に、主ローダチャック56の到着後又は到着前に、中継ローダ51bの中継ローダチャック53bが主軸12から受け取った加工済みのワークWを保持し、かつ、中継ローダチャック53aが空の状態で、中継ローダチャック53を第2位置P2に配置させる。制御部60は、中継ローダ51aにおいて空の状態の中継ローダチャック53aと、主ローダ52において未加工のワークWを保持している主ローダチャック56cとを対向させる。この状態では、中継ローダ51bにおいて加工済みワークWを保持している中継ローダチャック53bと、主ローダ52において空の状態の主ローダチャック56dとが同時に対向した状態となる。
次に、図14に示すように、制御部60は、5つの主ローダチャック56を+Z方向に進行させ、中継ローダチャック53との間でワークWの受け渡しが可能な位置に移動させる。続いて、制御部60は、主ローダチャック56dを閉じて加工済みのワークWを保持した後、中継ローダチャック53bを解放させる。その結果、加工済みのワークWが中継ローダチャック53bから主ローダチャック56dに渡される。同時又はほぼ同時に、制御部60は、中継ローダチャック53aを閉じて未加工のワークWを保持した後、主ローダチャック56cを解放させる。その結果、未加工のワークWが主ローダチャック56cから中継ローダチャック53aに渡される。
上記した動作により、中継ローダ51bは、中継ローダチャック53aが未加工のワークWを保持し、中継ローダチャック53bが空の状態となる。また、主ローダ52は、主ローダチャック56d、56eが加工済みのワークWを保持し、主ローダチャック56cが空の状態となり、主ローダチャック56a、56bが未加工のワークWを保持したままの状態を維持している。なお、第2実施形態において図示は省略しているが、中継ローダチャック53と主軸チャック13とのワークWの受け渡しは、上記した図8から図9に示す中継ローダ51aの動作と同様である。
次に、制御部60は、主ローダチャック56を-Z方向に退避させた後、ガイド50Gに沿って+X方向に移動させ、主ローダチャック56を第2本体部20の主軸21に対応する中継ローダ51cの中継ローダチャック53と対向可能な位置に配置させる。制御部60は、第1実施形態と同様に、主ローダチャック56の到着後又は到着前に、中継ローダ51cの中継ローダチャック53bが主軸12から受け取った加工済みのワークWを保持し、かつ、中継ローダチャック53aが空の状態で、中継ローダチャック53を第2位置P2に配置させる。制御部60は、中継ローダ51cにおいて空の状態の中継ローダチャック53aと、主ローダ52において未加工のワークWを保持している主ローダチャック56bとを対向させる。この状態では、中継ローダ51cにおいて加工済みワークWを保持している中継ローダチャック53bと、主ローダ52において空の状態の主ローダチャック56cとが同時に対向した状態となる。
次に、図15に示すように、制御部60は、5つの主ローダチャック56を+Z方向に進行させ、中継ローダチャック53との間でワークWの受け渡しが可能な位置に移動させる。続いて、制御部60は、主ローダチャック56cを閉じて加工済みのワークWを保持した後、中継ローダチャック53bを解放させる。その結果、加工済みのワークWが中継ローダチャック53bから主ローダチャック56cに渡される。同時又はほぼ同時に、制御部60は、中継ローダチャック53aを閉じて未加工のワークWを保持した後、主ローダチャック56bを解放させる。その結果、未加工のワークWが主ローダチャック56bから中継ローダチャック53aに渡される。
上記した動作により、中継ローダ51cは、中継ローダチャック53aが未加工のワークWを保持し、中継ローダチャック53bが空の状態となる。また、主ローダ52は、主ローダチャック56c~56eが加工済みのワークWを保持し、主ローダチャック56bが空の状態となり、主ローダチャック56aが未加工のワークWを保持したままの状態を維持している。
次に、制御部60は、主ローダチャック56を-Z方向に退避させた後、ガイド50Gに沿って+X方向に移動させ、主ローダチャック56を第2本体部20の主軸22に対応する中継ローダ51dの中継ローダチャック53と対向可能な位置に配置させる。制御部60は、第1実施形態と同様に、主ローダチャック56の到着後又は到着前に、中継ローダ51dの中継ローダチャック53bが主軸12から受け取った加工済みのワークWを保持し、かつ、中継ローダチャック53aが空の状態で、中継ローダチャック53を第2位置P2に配置させる。制御部60は、中継ローダ51dにおいて空の状態の中継ローダチャック53aと、主ローダ52において未加工のワークWを保持している主ローダチャック56aとを対向させる。この状態では、中継ローダ51dにおいて加工済みワークWを保持している中継ローダチャック53bと、主ローダ52において空の状態の主ローダチャック56bとが同時に対向した状態となる。
次に、図16に示すように、制御部60は、5つの主ローダチャック56を+Z方向に進行させ、中継ローダチャック53との間でワークWの受け渡しが可能な位置に移動させる。続いて、制御部60は、主ローダチャック56cを閉じて加工済みのワークWを保持した後、中継ローダチャック53bを解放させる。その結果、加工済みのワークWが中継ローダチャック53bから主ローダチャック56bに渡される。同時又はほぼ同時に、制御部60は、中継ローダチャック53aを閉じて未加工のワークWを保持した後、主ローダチャック56aを解放させる。その結果、未加工のワークWが主ローダチャック56aから中継ローダチャック53aに渡される。
上記した動作により、中継ローダ51dは、中継ローダチャック53aが未加工のワークWを保持し、中継ローダチャック53bが空の状態となる。また、主ローダ52は、主ローダチャック56b~56eが加工済みのワークWを保持し、主ローダチャック56aが空の状態となる。
次に、制御部60は、主ローダチャック56を-Z方向に退避させた後、ガイド50Gに沿って+X方向に移動させ、主ローダチャック56を搬出部40の搬出用チャック41と対向可能な位置に配置させる。次に、図17に示すように、制御部60は、5つの主ローダチャック56を+Z方向に進行させ、搬出用チャック41との間でワークWの受け渡しが可能な位置に移動させる。続いて、制御部60は、各搬出用チャック41により加工済みのワークWを保持した後、主ローダチャック56b~56eを解放させる。その結果、4つの加工済みのワークWが主ローダチャック56b~56eから各搬出用チャック41に同時又はほぼ同時に渡される。このような動作により、主ローダ52は、5つの主ローダチャック56が空の状態となり、ガイド50Gに沿って-X方向に移動して搬入部30に戻ることにより、図12に示すように、主ローダチャック56で4つの未加工のワークWを保持可能となる。
このように、主ローダ52は、搬入部30から搬出部40まで+X方向に1回移動する間において、第1本体部10及び第2本体部20に配置される4つの中継ローダ51a~51dに対してワークWの受け渡しを連続して行う。つまり、主ローダ52は、1回の+X方向への移動により、搬入部30の4つの未加工のワークWを、中継ローダ51a~51dのそれぞれに搬送し、かつ、中継ローダ51a~51dから加工済みのワークWを受け取って搬出部40に搬送する。なお、本実施形態では、主軸11、12、21、22に関して、主ローダチャック56によるワークWの受け渡し動作が4回(n=4)繰り返して行われている。
以上のように、本実施形態によれば、主ローダ52が搬入部30から搬出部40に到達する間に、複数の主軸11、12、21、22に対して未加工のワークWを供給し、かつ、加工済みのワークWを回収するので、ワークWの受け渡しに要する時間が短縮されてワークWの搬送効率が向上させることができる。なお、上記した実施形態では、4つの主軸11、12、21、22に対して+1個の計5個としているが、この構成に限定されず主軸の数に対して+m個の数であればよいので、例えば、4つの主軸に対して6個以上の主ローダチャック56が設けられてもよい。
<第3実施形態>
第3実施形態について図面を参酌して説明する。図18は、第3実施形態に係るワーク搬送システム350及び工作機械システム300の一例を示す図である。図18に示すように、工作機械システム300は、第1本体部(工作機械本体)10と、第2本体部(工作機械本体)20と、搬入部30と、搬出部40と、ワーク搬送システム350と、制御部60とを備える。第3実施形態では、ワーク搬送システム350の構成が第1実施形態とは異なり、他の構成については第1実施形態と同様である。以下の説明において、上記した第1実施形態と同一または同等の構成部分については同一符号を付けて説明を省略または簡略化する。
第3実施形態について図面を参酌して説明する。図18は、第3実施形態に係るワーク搬送システム350及び工作機械システム300の一例を示す図である。図18に示すように、工作機械システム300は、第1本体部(工作機械本体)10と、第2本体部(工作機械本体)20と、搬入部30と、搬出部40と、ワーク搬送システム350と、制御部60とを備える。第3実施形態では、ワーク搬送システム350の構成が第1実施形態とは異なり、他の構成については第1実施形態と同様である。以下の説明において、上記した第1実施形態と同一または同等の構成部分については同一符号を付けて説明を省略または簡略化する。
ワーク搬送システム350は、主ローダ352を有し、中継ローダを有していない。なお、第3実施形態において、上記した第1実施形態と同様に、第1本体部10の主軸11、12の数であるnを2として説明する。主ローダ352は、ガイド350Gに沿ってX方向に移動可能である。ガイド350Gは、第1実施形態のガイド50Gと異なり、第1本体部10及び第2本体部20の+Z側においてX方向に沿って配置されている。
主ローダチャック56は、主軸チャック13等に対向するように配置される点を除いて、第1実施形態で示す構成と同様である。なお、ガイド350Gは、第1実施形態のガイド50Gと同様に、第1本体部10及び第2本体部20の-Z側に配置されてもよい。この場合、主ローダ352は、主ローダチャック56を主軸チャック13等に対向させる機構が設けられる。また、搬入部30は、未加工のワークWを+Z方向に向けた状態で保持する点を除いて、第1実施形態と同様である。
続いて、上記のように構成されたワーク搬送システム350及び工作機械システム300の動作について説明する。図19から図24は、ワーク搬送システム350を含めた工作機械システム300の動作の一例を示す図である。以下の例では、第1実施形態と同様に、第1本体部10の主軸11、12と、第2本体部20の主軸21、22とで切削工具T(図5(A)参照)によりワークWの加工が行われており、各主軸11、12、21、22に加工済みのワークWが保持された状態からの動作を説明する。
図19に示すように、制御部60は、主ローダチャック56を-Z方向に進行させ、搬入部30に載置された2つの未加工のワークWを、主ローダ352の主ローダチャック56に受け取らせる。各主ローダチャック56によるワークWの受け取り手順は、第1実施形態と同様である。なお、制御部60は、主ローダ352の3つの主ローダチャック56のうち、主ローダチャック56a、56bの2つにより未加工のワークWを同時に受け取らせる。したがって、主ローダチャック56cは、空の状態となる。
次に、制御部60は、主ローダチャック56を+Z方向に退避させた後、ガイド350Gに沿って+X方向に移動させ、主ローダチャック56のうち主ローダチャック56cを主軸11の主軸チャック13と対向可能な位置に配置させる。次に、図20に示すように、制御部60は、3つの主ローダチャック56を-Z方向に進行させ、主軸チャック13との間でワークWの受け渡しが可能な位置に移動させる。続いて、制御部60は、主ローダチャック56cを閉じて加工済みのワークWを保持した後、主軸チャック13を解放させる。その結果、加工済みのワークWが主軸チャック13から主ローダチャック56cに渡される。
次に、制御部60は、主ローダチャック56を+Z方向に退避させた後、ガイド350Gに沿って+X方向に移動させ、主ローダチャック56のうち未加工のワークWを保持している主ローダチャック56bを主軸11の主軸チャック13と対向可能な位置に配置させる。次に、図21に示すように、制御部60は、3つの主ローダチャック56を-Z方向に進行させ、主軸チャック13との間でワークWの受け渡しが可能な位置に移動させる。続いて、制御部60は、主軸チャック13を閉じて未加工のワークWを保持した後、主ローダチャック56bを解放させる。その結果、未加工のワークWが主ローダチャック56bから主軸チャック13に渡される。
上記した動作により、主ローダ352は、主ローダチャック56cが加工済みのワークWを保持し、主ローダチャック56bが空の状態となり、主ローダチャック56aが未加工のワークWを保持したままの状態を維持している。
次に、制御部60は、主ローダチャック56を+Z方向に退避させた後、ガイド350Gに沿って+X方向に移動させ、主ローダチャック56のうち主ローダチャック56bを主軸12の主軸チャック14と対向可能な位置に配置させる。次に、図22に示すように、制御部60は、3つの主ローダチャック56を-Z方向に進行させ、主軸チャック14との間でワークWの受け渡しが可能な位置に移動させる。続いて、制御部60は、主ローダチャック56bを閉じて加工済みのワークWを保持した後、主軸チャック14を解放させる。その結果、加工済みのワークWが主軸チャック14から主ローダチャック56bに渡される。
次に、制御部60は、主ローダチャック56を+Z方向に退避させた後、ガイド350Gに沿って+X方向に移動させ、主ローダチャック56のうち未加工のワークWを保持している主ローダチャック56aを主軸11の主軸チャック14と対向可能な位置に配置させる。次に、図23に示すように、制御部60は、3つの主ローダチャック56を-Z方向に進行させ、主軸チャック14との間でワークWの受け渡しが可能な位置に移動させる。続いて、制御部60は、主軸チャック14を閉じて未加工のワークWを保持した後、主ローダチャック56aを解放させる。その結果、未加工のワークWが主ローダチャック56aから主軸チャック14に渡される。
上記した動作により、主ローダ352は、主ローダチャック56b、56cが加工済みのワークWを保持し、主ローダチャック56aが空の状態となる。次に、制御部60は、主ローダチャック56を+Z方向に退避させた後、ガイド350Gに沿って+X方向に移動させ、主ローダチャック56を搬出部40の搬出用チャック41と対向可能な位置に配置させる。
次に、図24に示すように、制御部60は、3つの主ローダチャック56を-Z方向に進行させ、搬出用チャック41との間でワークWの受け渡しが可能な位置に移動させる。続いて、制御部60は、各搬出用チャック41により加工済みのワークWを保持した後、主ローダチャック56b、56cを解放させる。その結果、2つの加工済みのワークWが主ローダチャック56b、56cから各搬出用チャック41に同時又はほぼ同時に渡される。このような動作により、主ローダ352は、3つの主ローダチャック56が空の状態となり、ガイド350Gに沿って-X方向に移動して搬入部30に戻ることにより、図19に示すように、主ローダチャック56で2つの未加工のワークWを保持可能となる。
このように、主ローダ352は、搬入部30から搬出部40まで+X方向に1回移動する間において、第1本体部10に配置される2つの主軸チャック13、14に対してワークWの受け渡しを連続して行う。つまり、主ローダ352は、1回の+X方向への移動により、搬入部30の2つの未加工のワークWを、主軸チャック13、14のそれぞれに搬送し、かつ、主軸チャック13、14から加工済みのワークWを受け取って搬出部40に搬送する。
次に、主ローダチャック356は、図19と同様に、搬入部30で2つの未加工のワークWを保持した後、ガイド350Gに沿って+X方向に移動し、第2本体部20の主軸21の主軸チャック23との間で加工済みのワークWを受け取り、かつ、未加工のワークWを渡す。なお、ワークWの受け渡しの動作については図20及び図21と同様である。次に、主ローダチャック56は、ガイド350Gに沿って+X方向に移動し、第2本体部20の主軸22の主軸チャック24との間で加工済みのワークWを受け取り、かつ、未加工のワークWを渡す。なお、ワークWの受け渡しの動作については図22及び図23と同様である。次に、主ローダチャック56は、ガイド350Gに沿って+X方向に移動し、搬出部40の搬出用チャック41に加工済みのワークWを渡す。
主ローダ352は、主ローダチャック56が空の状態となり、搬入部30に戻ることにより、図19に示すように、主ローダチャック56で2つの未加工のワークWを保持可能となる。このような動作が繰り返して行われることにより、第1本体部10の主軸11、12、及び第2本体部20の主軸21、22に対して未加工のワークWを連続して供給し、かつ、加工済みのワークWを連続して回収している。なお、本実施形態では、主軸11、12又は主軸21、22に関して、主ローダチャック56によるワークWの受け渡し動作がそれぞれ2回(n=2)繰り返して行われている。
以上のように、本実施形態によれば、主ローダ352が搬入部30から搬出部40に到達する間に、複数の主軸11、12又は主軸21、22に対して未加工のワークWを供給し、かつ、加工済みのワークWを回収するので、ワークWの受け渡しに要する時間が短縮されてワークWの搬送効率が向上させることができる。また、本実施形態によれば中継ローダを用いないので設備コストを低減できる。なお、上記した実施形態では、主軸11、12の数(n=2)に+1個の計3個の主ローダチャック56を用いるが、4個以上の主ローダチャック56を用いてもよい。また、上記した第2実施形態のように、4つの主軸11、12、21、22に対して+1個の計5個の主ローダチャック56を用いてもよい。この場合、主ローダチャック56による各主軸11等に関するワークWの受け渡しの動作は、4回(n=4)繰り返して行われる。
<第4実施形態>
第4実施形態について図面を参酌して説明する。図25は、第4実施形態に係るワーク搬送システム450及び工作機械システム400の一例を示す図である。図25に示すように、工作機械システム400は、第1本体部(工作機械本体)10と、第2本体部(工作機械本体)20と、搬入部30と、搬出部40と、ワーク搬送システム450と、制御部60とを備える。第4実施形態では、ワーク搬送システム450の構成が第1実施形態とは異なり、他の構成については第1実施形態と同様である。以下の説明において、上記した第1実施形態と同一または同等の構成部分については同一符号を付けて説明を省略または簡略化する。
第4実施形態について図面を参酌して説明する。図25は、第4実施形態に係るワーク搬送システム450及び工作機械システム400の一例を示す図である。図25に示すように、工作機械システム400は、第1本体部(工作機械本体)10と、第2本体部(工作機械本体)20と、搬入部30と、搬出部40と、ワーク搬送システム450と、制御部60とを備える。第4実施形態では、ワーク搬送システム450の構成が第1実施形態とは異なり、他の構成については第1実施形態と同様である。以下の説明において、上記した第1実施形態と同一または同等の構成部分については同一符号を付けて説明を省略または簡略化する。
ワーク搬送システム450は、中継ローダ451と、主ローダ52とを有する。中継ローダ451は、1つの中継ローダチャック53を旋回板55(図5参照)に備えている。すなわち、各主軸11等の主軸チャック13等と各中継ローダ51の中継ローダチャック53とは1対1の関係となっている。中継ローダ451は、第1実施形態の中継ローダ51と同様に、旋回板55を旋回させることにより、中継ローダチャック53を主軸チャック13等に対向させる第1位置P1と、主ローダ52の主ローダチャック56に対向させる第2位置P2とに移動させることができる。なお、主ローダ52は、上記した第1実施形態と同様の構成である。
続いて、上記のように構成されたワーク搬送システム450及び工作機械システム400の動作について説明する。図26から図31は、ワーク搬送システム450を含めた工作機械システム400の動作の一例を示す図である。以下の例では、第1実施形態と同様に、第1本体部10の主軸11、12と、第2本体部20の主軸21、22とで切削工具T(図5(A)参照)によりワークWの加工が行われており、各主軸11、12、21、22に加工済みのワークWが保持された状態からの動作を説明する。
図26に示すように、制御部60は、搬入部30に載置された2つの未加工のワークWを、主ローダ52の主ローダチャック56に受け取らせる。各主ローダチャック56によるワークWの受け取り手順は、第1実施形態と同様である。なお、制御部60は、主ローダ52の3つの主ローダチャック56のうち、主ローダチャック56a、56bの2つにより未加工のワークWを同時に受け取らせる。したがって、主ローダチャック56cは、空の状態となる。
次に、制御部60は、主ローダチャック56を-Z方向に退避させた後、ガイド50Gに沿って+X方向に移動させ、主ローダチャック56を第1本体部10の主軸11に対応する中継ローダ451aの中継ローダチャック53と対向可能な位置に配置させる。制御部60は、第1実施形態と同様に、主ローダチャック56の到着後又は到着前に、中継ローダ451aの中継ローダチャック53が主軸11から受け取った加工済みのワークWを保持した状態で、中継ローダチャック53を第2位置P2に配置させる。制御部60は、中継ローダ451aの中継ローダチャック53と、主ローダ52において空の状態の主ローダチャック56cとを対向させる。
次に、図27に示すように、制御部60は、3つの主ローダチャック56を+Z方向に進行させ、中継ローダチャック53との間でワークWの受け渡しが可能な位置に移動させる。続いて、制御部60は、主ローダチャック56cを閉じて加工済みのワークWを保持した後、中継ローダチャック53を解放させる。その結果、加工済みのワークWが中継ローダチャック53から主ローダチャック56cに渡される。次に、制御部60は、主ローダチャック56を-Z方向に退避させた後、ガイド50Gに沿って+X方向に移動させ、中継ローダ451aの中継ローダチャック53と、主ローダ52において未加工のワークWを保持した主ローダチャック56bとを対向させる。
次に、図28に示すように、制御部60は、3つの主ローダチャック56を+Z方向に進行させ、中継ローダチャック53との間でワークWの受け渡しが可能な位置に移動させる。続いて、制御部60は、中継ローダチャック53を閉じて未加工のワークWを保持した後、主ローダチャック56bを解放させる。その結果、未加工のワークWが主ローダチャック56bから中継ローダチャック53に渡される。上記した動作により、主ローダ52は、主ローダチャック56cが加工済みのワークWを保持し、主ローダチャック56bが空の状態となり、主ローダチャック56aが未加工のワークWを保持したままの状態を維持している。
なお、主ローダ52によるワークWの搬送中及び次の中継ローダ451bとのワークWの受け渡し中において、制御部60は、未加工のワークWを受け取った中継ローダ451aの旋回板55(図5参照)を第1位置P1まで旋回させ、中継ローダチャック53で保持した未加工のワークWを主軸チャック13に受け取らせた後(後述する図29の記載参照)、旋回板55を第2位置P2まで旋回させるような一連の制御を行っている。このような、中継ローダチャック53と主軸チャック13とのワークWの受け渡しは、他の中継ローダチャック53と他の主軸チャック14等とのワークWの受け渡しにおいても同様である。
次に、制御部60は、主ローダチャック56を-Z方向に退避させた後、ガイド50Gに沿って+X方向に移動させ、主ローダチャック56を第1本体部10の主軸12に対応する中継ローダ451bの中継ローダチャック53と対向可能な位置に配置させる。制御部60は、第1実施形態と同様に、主ローダチャック56の到着後又は到着前に、中継ローダ51bの中継ローダチャック53が主軸12から受け取った加工済みのワークWを保持した状態で、中継ローダチャック53を第2位置P2に配置させる。制御部60は、中継ローダ51bにおいて加工済みワークWを保持している中継ローダチャック53と、主ローダ52において空の状態の主ローダチャック56bとを対向させる。
次に、図29に示すように、制御部60は、3つの主ローダチャック56を+Z方向に進行させ、中継ローダチャック53との間でワークWの受け渡しが可能な位置に移動させる。続いて、制御部60は、主ローダチャック56bを閉じて加工済みのワークWを保持した後、中継ローダチャック53を解放させる。その結果、加工済みのワークWが中継ローダチャック53から主ローダチャック56bに渡される。次に、制御部60は、主ローダチャック56を-Z方向に退避させた後、ガイド50Gに沿って+X方向に移動させ、中継ローダ451bの中継ローダチャック53と、主ローダ52において未加工のワークWを保持した主ローダチャック56aとを対向させる。
次に、図30に示すように、制御部60は、3つの主ローダチャック56を+Z方向に進行させ、中継ローダチャック53との間でワークWの受け渡しが可能な位置に移動させる。続いて、制御部60は、中継ローダチャック53を閉じて未加工のワークWを保持した後、主ローダチャック56aを解放させる。その結果、未加工のワークWが主ローダチャック56aから中継ローダチャック53に渡される。上記した動作により、主ローダ52は、主ローダチャック56b、56cが加工済みのワークWを保持し、主ローダチャック56aが空の状態となる。
次に、制御部60は、主ローダチャック56を-Z方向に退避させた後、ガイド50Gに沿って+X方向に移動させ、主ローダチャック56を搬出部40の搬出用チャック41と対向可能な位置に配置させる。
次に、図31に示すように、制御部60は、3つの主ローダチャック56を+Z方向に進行させ、搬出用チャック41との間でワークWの受け渡しが可能な位置に移動させる。続いて、制御部60は、各搬出用チャック41により加工済みのワークWを保持した後、主ローダチャック56b、56cを解放させる。その結果、2つの加工済みのワークWが主ローダチャック56b、56cから各搬出用チャック41に同時又はほぼ同時に渡される。このような動作により、主ローダ352は、3つの主ローダチャック56が空の状態となり、ガイド50Gに沿って-X方向に移動して搬入部30に戻ることにより、図26に示すように、主ローダチャック56で2つの未加工のワークWを保持可能となる。
このように、主ローダ52は、各中継ローダ451a等において中継ローダチャック53が1つの場合であっても、搬入部30から搬出部40まで+X方向に1回移動する間において、第1本体部10に配置される2つの主軸チャック13、14に対してワークWの受け渡しを連続して行う。
次に、主ローダチャック56は、図26と同様に、搬入部30で2つの未加工のワークWを保持した後、ガイド50Gに沿って+X方向に移動し、第2本体部20の中継ローダ451aの中継ローダチャック53との間で加工済みのワークWを受け取り、かつ、未加工のワークWを渡す。なお、ワークWの受け渡しの動作については図27及び図28と同様である。次に、主ローダチャック56は、ガイド50Gに沿って+X方向に移動し、第2本体部20の中継ローダ451bの中継ローダチャック53との間で加工済みのワークWを受け取り、かつ、未加工のワークWを渡す。なお、ワークWの受け渡しの動作については図29及び図30と同様である。次に、主ローダチャック56は、ガイド50Gに沿って+X方向に移動し、搬出部40の搬出用チャック41に加工済みのワークWを渡す。
主ローダ52は、主ローダチャック56が空の状態となり、搬入部30に戻ることにより、図26に示すように、主ローダチャック56で2つの未加工のワークWを保持可能となる。このような動作が繰り返して行われることにより、第1本体部10の主軸11、12、及び第2本体部20の主軸21、22に対して未加工のワークWを連続して供給し、かつ、加工済みのワークWを連続して回収している。なお、本実施形態では、主軸11、12又は主軸21、22に関して、主ローダチャック56によるワークWの受け渡し動作がそれぞれ2回(n=2)繰り返して行われている。
以上のように、本実施形態によれば、主ローダ52が搬入部30から搬出部40に到達する間に、複数の主軸11、12又は主軸21、22に対して未加工のワークWを供給し、かつ、加工済みのワークWを回収するので、ワークWの受け渡しに要する時間が短縮されてワークWの搬送効率が向上させることができる。また、本実施形態によれば、各中継ローダ451a等に1つの中継ローダチャック53でよいので、中継ローダ451a等の構成を簡略化して設備コストを低減できる。なお、上記した実施形態では、主軸11、12の数(n=2)に+1個の計3個の主ローダチャック56を用いるが、4個以上の主ローダチャック56を用いてもよい。また、上記した第2実施形態のように、4つの主軸11、12、21、22に対して+1個の計5個の主ローダチャック56を用いてもよい。この場合、主ローダチャック56による各主軸11等に関するワークWの受け渡しの動作は、4回(n=4)繰り返して行われる。
以上、実施形態について説明したが、本発明は、上述した説明に限定されず、本発明の要旨を逸脱しない範囲において種々の変更が可能である。例えば、上記した各実施形態の構成要素を適宜組み合わせてもよい。例えば、第1実施形態の中継ローダ51の一部を第4実施形態の中継ローダ451に代えてワーク搬送システムを構成してもよい。また、上記した第1及び第2実施形態では、複数の中継ローダチャック53と複数の主ローダチャック56とが同一の間隔dで配置された構成を例に挙げて説明したが、この構成に限定されず、複数の中継ローダチャック53の間隔と、複数の主ローダチャック56の間隔とが異なってもよい。
また、上記した第1、第2及び第4実施形態では、中継ローダ51、451として旋回板55が旋回することにより第1位置P1と第2位置P2との間を切り替えているが、この構成に限定されない。例えば、中継ローダ51、451として、中継ローダチャック53を上下方向(Y方向)等にスライド可能にした構成であってもよい。
また、上記した実施形態では、工作機械本体である第1本体部10及び第2本体部20として旋盤を例に挙げて説明しているが、工作機械本体として旋盤に限定されない。例えば、工作機械本体として、マシニングセンタ等であってもよい。また、法令で許容される限りにおいて、日本特許出願である特願2017-078246、及び本明細書において引用した全ての文献、の内容を援用して本文の記載の一部とする。
AX1・・・回転軸
d・・・間隔
P1・・・第1位置
P2・・・第2位置
W・・・ワーク
10・・・第1本体部(工作機械本体)
11、12、21、22・・・主軸(ワーク保持部)
13、14、23、24・・・主軸チャック
20・・・第2本体部(工作機械本体)
30・・・搬入部
40・・・搬出部
41・・・搬出用チャック
50、250、350、450・・・ワーク搬送システム
50G、350G・・・ガイド
51、51a~51d、451・・・中継ローダ
52、252、352・・・主ローダ
53、53a、53b・・・中継ローダチャック
56、56a~56e・・・主ローダチャック
58・・・切替機構
60・・・制御部
100、200・・・工作機械システム
d・・・間隔
P1・・・第1位置
P2・・・第2位置
W・・・ワーク
10・・・第1本体部(工作機械本体)
11、12、21、22・・・主軸(ワーク保持部)
13、14、23、24・・・主軸チャック
20・・・第2本体部(工作機械本体)
30・・・搬入部
40・・・搬出部
41・・・搬出用チャック
50、250、350、450・・・ワーク搬送システム
50G、350G・・・ガイド
51、51a~51d、451・・・中継ローダ
52、252、352・・・主ローダ
53、53a、53b・・・中継ローダチャック
56、56a~56e・・・主ローダチャック
58・・・切替機構
60・・・制御部
100、200・・・工作機械システム
Claims (10)
- 加工対象のワークを保持するワーク保持部に対してワークを受け渡しするワーク搬送システムであって、
n(n≧2の整数)個の前記ワーク保持部のそれぞれに対して又はn個の前記ワーク保持部のそれぞれに対応して配置されて前記ワーク保持部に対して前記ワークを受け渡しするn個の中継ローダに対して、ワークを受け渡すn+m(m≧1の整数)個の主ローダチャックを備える主ローダを有する、ワーク搬送システム。 - n個の前記ワーク保持部の1つに関して、
n個の前記主ローダチャックが未加工の前記ワークを保持し、かつ、m個の前記主ローダチャックが空の状態で、空の状態の前記主ローダチャックで前記ワーク保持部の1つから加工済みの前記ワークを受け取り、未加工の前記ワークを保持する前記主ローダチャックから未加工の前記ワークを前記ワーク保持部の1つに供給し、
次の前記ワーク保持部の1つに関して、
先に空となった前記主ローダチャックで次の前記ワーク保持部の1つから加工済みの前記ワークを受け取り、未加工の前記ワークを保持する前記主ローダチャックから未加工の前記ワークを次の前記ワーク保持部の1つに供給し、
前記ワーク保持部の1つに関する加工済みの前記ワークの受け取り及び未加工の前記ワークの供給をn回繰り返して実行させる制御部を備える、請求項1に記載のワーク搬送システム。 - 前記中継ローダは、前記ワーク保持部に対して前記ワークを受け渡しする中継ローダチャックを備え、
前記主ローダは、前記主ローダチャックが前記中継ローダチャックに対応する位置に移動して前記中継ローダチャックに対してワークを受け渡す、請求項1又は請求項2に記載のワーク搬送システム。 - 前記中継ローダチャックは、1つの前記中継ローダにおいて複数配置される、請求項3に記載のワーク搬送システム。
- n+m個の前記主ローダチャックは、一方向に並びかつ一定の間隔で配置され、
複数の前記中継ローダチャックは、前記主ローダチャックの間隔と同一の間隔に配置され、
前記中継ローダの移動により、複数の前記中継ローダチャックを前記一方向と平行に並んだ状態で配置可能である、請求項4に記載のワーク搬送システム。 - 前記中継ローダチャックから前記主ローダチャックへ前記ワークを渡す動作と、前記主ローダチャックから前記中継ローダチャックへ前記ワークを渡す動作とを一動作で行わせる制御部を備える、請求項5に記載のワーク搬送システム。
- 前記主ローダは、水平方向でかつ前記ワーク保持部の回転軸の方向と直交する方向に移動可能であり、
前記中継ローダは、前記ワーク保持部の回転軸に平行な軸周り方向に旋回可能であり、前記中継ローダチャックを前記ワーク保持部に対向する第1位置と、前記中継ローダチャックをn+m個の前記主ローダチャックに対向可能な第2位置との間を旋回する、請求項3から請求項6のいずれか一項に記載のワーク搬送システム。 - 前記中継ローダチャック及び前記主ローダチャックは、前記ワーク保持部の回転軸に対して平行な方向に向けてワークを保持する、請求項3から請求項7のいずれか一項に記載のワーク搬送システム。
- 前記主ローダチャックは、前記ワーク保持部の回転軸に対して平行な方向に向けてワークを保持する状態と、下方に向けてワークを保持する状態とに切り替え可能である、請求項1から請求項8のいずれか一項に記載のワーク搬送システム。
- 加工対象のワークを保持して回転する複数のワーク保持部を有する工作機械本体と、
未加工のワークを保持する搬入部と、
加工済みのワークを保持する搬出部と、
前記ワーク保持部と前記搬入部との間、及び前記ワーク保持部と前記搬出部との間の一方又は双方でワークを搬送する請求項1から請求項9のいずれか一項に記載のワーク搬送システムと、を備える、工作機械システム。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US16/603,321 US11766755B2 (en) | 2017-04-11 | 2018-03-12 | Workpiece conveyance system and machine tool system |
JP2019512389A JP6760492B2 (ja) | 2017-04-11 | 2018-03-12 | ワーク搬送システム及び工作機械システム |
EP18785227.2A EP3610984A4 (en) | 2017-04-11 | 2018-03-12 | WORKPIECE TRANSPORT AND MACHINE TOOL SYSTEM |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017078246 | 2017-04-11 | ||
JP2017-078246 | 2017-04-11 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2018190052A1 true WO2018190052A1 (ja) | 2018-10-18 |
Family
ID=63793301
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2018/009445 WO2018190052A1 (ja) | 2017-04-11 | 2018-03-12 | ワーク搬送システム及び工作機械システム |
Country Status (4)
Country | Link |
---|---|
US (1) | US11766755B2 (ja) |
EP (1) | EP3610984A4 (ja) |
JP (1) | JP6760492B2 (ja) |
WO (1) | WO2018190052A1 (ja) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019217578A (ja) * | 2018-06-18 | 2019-12-26 | 高松機械工業株式会社 | 加工システム |
WO2021070460A1 (ja) * | 2019-10-07 | 2021-04-15 | 村田機械株式会社 | ワーク搬送システム、工作機械システム、及びワーク搬送方法 |
CN113020635A (zh) * | 2021-03-26 | 2021-06-25 | 河北德耐驰精密模具制造有限公司 | 一种零件加工用的数控车床 |
DE102021133317A1 (de) | 2021-12-15 | 2023-06-15 | Deckel Maho Pfronten Gmbh | Transport- und Bearbeitungssystem für Werkstücke an Großmaschinen |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63237834A (ja) * | 1987-03-24 | 1988-10-04 | Honda Motor Co Ltd | ワ−ク移送装置 |
JPH01113269A (ja) * | 1987-10-27 | 1989-05-01 | Nec Corp | 印字装置 |
JPH01234134A (ja) * | 1988-03-11 | 1989-09-19 | Hitachi Seiko Ltd | 超精密正面旋盤 |
JPH0584635A (ja) * | 1991-05-21 | 1993-04-06 | Ooga:Kk | ワーク受渡装置 |
JPH1015770A (ja) * | 1996-07-07 | 1998-01-20 | Murata Mach Ltd | ワーク搬入搬出装置 |
WO2017010729A1 (ko) * | 2015-07-15 | 2017-01-19 | 두산공작기계 주식회사 | 터닝 센터의 소재 교환 장치 |
JP2017078246A (ja) | 2015-10-20 | 2017-04-27 | 株式会社エルウェイズ | アンゴラ混成生地 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58206303A (ja) * | 1982-05-24 | 1983-12-01 | Murata Warner Suueeg Kk | 旋盤および旋盤におけるワークの受取り受渡し方法 |
JPH0352046U (ja) * | 1989-09-26 | 1991-05-21 | ||
JP3689999B2 (ja) * | 1996-09-05 | 2005-08-31 | 村田機械株式会社 | ワーク搬入・搬出装置 |
JP2009012154A (ja) * | 2007-07-09 | 2009-01-22 | Citizen Machinery Co Ltd | 工作機械 |
US10343247B2 (en) | 2014-09-24 | 2019-07-09 | Murata Machinery, Ltd. | Machine tool system and workpiece transport method |
JP7185201B2 (ja) * | 2018-11-14 | 2022-12-07 | 中村留精密工業株式会社 | ローディング装置及びそれを機内に備えた工作機械 |
-
2018
- 2018-03-12 JP JP2019512389A patent/JP6760492B2/ja active Active
- 2018-03-12 US US16/603,321 patent/US11766755B2/en active Active
- 2018-03-12 EP EP18785227.2A patent/EP3610984A4/en active Pending
- 2018-03-12 WO PCT/JP2018/009445 patent/WO2018190052A1/ja unknown
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63237834A (ja) * | 1987-03-24 | 1988-10-04 | Honda Motor Co Ltd | ワ−ク移送装置 |
JPH01113269A (ja) * | 1987-10-27 | 1989-05-01 | Nec Corp | 印字装置 |
JPH01234134A (ja) * | 1988-03-11 | 1989-09-19 | Hitachi Seiko Ltd | 超精密正面旋盤 |
JPH0584635A (ja) * | 1991-05-21 | 1993-04-06 | Ooga:Kk | ワーク受渡装置 |
JPH1015770A (ja) * | 1996-07-07 | 1998-01-20 | Murata Mach Ltd | ワーク搬入搬出装置 |
JP3474060B2 (ja) | 1996-07-07 | 2003-12-08 | 村田機械株式会社 | ワーク搬入搬出装置 |
WO2017010729A1 (ko) * | 2015-07-15 | 2017-01-19 | 두산공작기계 주식회사 | 터닝 센터의 소재 교환 장치 |
JP2017078246A (ja) | 2015-10-20 | 2017-04-27 | 株式会社エルウェイズ | アンゴラ混成生地 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019217578A (ja) * | 2018-06-18 | 2019-12-26 | 高松機械工業株式会社 | 加工システム |
JP7072450B2 (ja) | 2018-06-18 | 2022-05-20 | 高松機械工業株式会社 | 加工システム |
WO2021070460A1 (ja) * | 2019-10-07 | 2021-04-15 | 村田機械株式会社 | ワーク搬送システム、工作機械システム、及びワーク搬送方法 |
JPWO2021070460A1 (ja) * | 2019-10-07 | 2021-04-15 | ||
CN113020635A (zh) * | 2021-03-26 | 2021-06-25 | 河北德耐驰精密模具制造有限公司 | 一种零件加工用的数控车床 |
CN113020635B (zh) * | 2021-03-26 | 2022-07-01 | 河北德耐驰精密模具制造有限公司 | 一种零件加工用的数控车床 |
DE102021133317A1 (de) | 2021-12-15 | 2023-06-15 | Deckel Maho Pfronten Gmbh | Transport- und Bearbeitungssystem für Werkstücke an Großmaschinen |
WO2023110723A1 (de) | 2021-12-15 | 2023-06-22 | Deckel Maho Pfronten Gmbh | Transport- und bearbeitungssystem für werkstücke |
Also Published As
Publication number | Publication date |
---|---|
EP3610984A1 (en) | 2020-02-19 |
JP6760492B2 (ja) | 2020-09-23 |
US20200055153A1 (en) | 2020-02-20 |
US11766755B2 (en) | 2023-09-26 |
JPWO2018190052A1 (ja) | 2020-05-14 |
EP3610984A4 (en) | 2020-12-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2018190052A1 (ja) | ワーク搬送システム及び工作機械システム | |
CN109843503B (zh) | 输送设备及其控制装置和材料加工单元的装载和卸载方法 | |
US20080015097A1 (en) | Assembly Cell For Assembling Modules From Work Pieces On Pallets, As Well As Method For Its Operation | |
US11331736B2 (en) | Moving system and gear-cutting machine | |
US10518437B2 (en) | Wood door slab processing system, and related methods | |
US20030145449A1 (en) | Processing arrangement | |
JP2008183705A (ja) | ワークピース処理装置 | |
US20060075625A1 (en) | Multiple side processing machine and positioning device for a workpiece | |
CN111558843A (zh) | 机床的自动托盘交换装置 | |
JPH071204A (ja) | 立旋盤 | |
JP3808603B2 (ja) | ビードフィラー付きビードの自動供給装置 | |
JP2013059827A (ja) | 工作機械及びワークのロードアンロード方法 | |
JP4674497B2 (ja) | 加工ラインシステム | |
CN106392190B (zh) | 用于加工工件,特别是锯片的设备 | |
JP2017047507A (ja) | 工作機械の搬送装置 | |
JP6469540B2 (ja) | マシニングセンタ | |
CN113148655A (zh) | 玻璃加工生产线及其上料装置 | |
US20100089208A1 (en) | Manipulating device for lathes, in particular for vertical turret lathes, and a lathe including said device | |
JPH0717447U (ja) | ガントリローダ | |
EP2117768B1 (en) | Manipulating device for lathes, in particular for vertical turret lathes, and a lathe including said device | |
JP2993383B2 (ja) | 多軸旋盤システムのワーク搬送方法 | |
JP3023438B2 (ja) | トランスファー加工装置 | |
WO2021070460A1 (ja) | ワーク搬送システム、工作機械システム、及びワーク搬送方法 | |
JP4750316B2 (ja) | ワーク供給装置 | |
CN211218699U (zh) | 一种轮毂类设备加工生产系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 18785227 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2019512389 Country of ref document: JP Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
ENP | Entry into the national phase |