WO2018166134A1 - 物料搬送方法及系统 - Google Patents

物料搬送方法及系统 Download PDF

Info

Publication number
WO2018166134A1
WO2018166134A1 PCT/CN2017/094561 CN2017094561W WO2018166134A1 WO 2018166134 A1 WO2018166134 A1 WO 2018166134A1 CN 2017094561 W CN2017094561 W CN 2017094561W WO 2018166134 A1 WO2018166134 A1 WO 2018166134A1
Authority
WO
WIPO (PCT)
Prior art keywords
transport
area
sub
load amount
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/CN2017/094561
Other languages
English (en)
French (fr)
Inventor
姚家鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HKC Co Ltd
Chongqing HKC Optoelectronics Technology Co Ltd
Original Assignee
HKC Co Ltd
Chongqing HKC Optoelectronics Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HKC Co Ltd, Chongqing HKC Optoelectronics Technology Co Ltd filed Critical HKC Co Ltd
Priority to US16/087,813 priority Critical patent/US10934100B2/en
Publication of WO2018166134A1 publication Critical patent/WO2018166134A1/zh
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G43/00Control devices, e.g. for safety, warning or fault-correcting
    • B65G43/08Control devices operated by article or material being fed, conveyed or discharged
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G43/00Control devices, e.g. for safety, warning or fault-correcting
    • GPHYSICS
    • G02OPTICS
    • G02FOPTICAL DEVICES OR ARRANGEMENTS FOR THE CONTROL OF LIGHT BY MODIFICATION OF THE OPTICAL PROPERTIES OF THE MEDIA OF THE ELEMENTS INVOLVED THEREIN; NON-LINEAR OPTICS; FREQUENCY-CHANGING OF LIGHT; OPTICAL LOGIC ELEMENTS; OPTICAL ANALOGUE/DIGITAL CONVERTERS
    • G02F1/00Devices or arrangements for the control of the intensity, colour, phase, polarisation or direction of light arriving from an independent light source, e.g. switching, gating or modulating; Non-linear optics
    • G02F1/01Devices or arrangements for the control of the intensity, colour, phase, polarisation or direction of light arriving from an independent light source, e.g. switching, gating or modulating; Non-linear optics for the control of the intensity, phase, polarisation or colour 
    • G02F1/13Devices or arrangements for the control of the intensity, colour, phase, polarisation or direction of light arriving from an independent light source, e.g. switching, gating or modulating; Non-linear optics for the control of the intensity, phase, polarisation or colour  based on liquid crystals, e.g. single liquid crystal display cells
    • G02F1/1303Apparatus specially adapted to the manufacture of LCDs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2203/00Indexing code relating to control or detection of the articles or the load carriers during conveying
    • B65G2203/02Control or detection
    • B65G2203/0208Control or detection relating to the transported articles
    • B65G2203/0258Weight of the article
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2203/00Indexing code relating to control or detection of the articles or the load carriers during conveying
    • B65G2203/02Control or detection
    • B65G2203/0266Control or detection relating to the load carrier(s)
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2811/00Indexing codes relating to common features for more than one conveyor kind or type
    • B65G2811/06Devices controlling the relative position of articles
    • B65G2811/0673Control of conveying operations

Definitions

  • the present disclosure relates to a material transfer method and system.
  • display products such as liquid crystal display products have been more and more widely used.
  • the Stocker Schedule System is one of the important working systems in the production of liquid crystal display products. Its main role is to assist the automation department in the transfer and storage of materials required for production. However, during the material transfer process, there is usually a phenomenon in which the transfer load of the plurality of transport equipments is unbalanced, causing the transport equipment to be idle or too busy, which affects the production efficiency.
  • the present disclosure provides a material conveying method and system to balance the carrying load of each conveying device.
  • an embodiment of the present disclosure provides a material transfer method, the method comprising:
  • the conveyance area of the at least two conveyance apparatuses is adjusted according to the conveyance load amount.
  • an embodiment of the present disclosure further provides a material handling system, the system comprising:
  • At least two transporting devices and a transport control device includes a transport load acquisition module and a transport adjustment module;
  • the transport load acquisition module is configured to acquire a transport load amount of a current working period of at least two transport devices on a current production line;
  • the transport adjustment module is configured to adjust the at least two transport devices according to the transport load amount The size of the shipping area.
  • an embodiment of the present disclosure further provides a material handling system, including:
  • the production line includes a first transport sub-area, a second run sub-area, and a common transport area;
  • a first conveying device configured to carry materials in the first transport sub-area and the common transport area
  • a second conveying device configured to carry material in the second shipping sub-area and the common shipping area
  • the adjusting device is configured to adjust the first transport sub-region, the second transport sub-region, and the common transport region according to the load amount of the first transport device and the load amount of the second transport device.
  • the material transfer method and system of the present disclosure achieves balancing the transfer load of each transport device.
  • FIG. 1 is a flow chart of a material conveying method in an embodiment of the present disclosure
  • FIG. 2a is a schematic view of a transport area before adjustment of a transport device in an embodiment of the present disclosure
  • 2b is a schematic diagram of a transport area after adjustment of the transport device in an embodiment of the present disclosure
  • FIG. 3 is a schematic structural view of a material conveying system in an embodiment of the present disclosure.
  • FIG. 1 is a flow chart of a material conveying method according to an embodiment of the present disclosure.
  • the present embodiment can be appropriately configured to adjust the carrying capacity of the conveying device.
  • the method can be performed by the material conveying system, and specifically includes the following steps. :
  • Step 110 Obtain a transfer load amount of a current working period of at least two transport devices on the current production line.
  • the conveying device is mainly responsible for the transportation of materials required in the production and manufacturing process, and the conveying load amount is the amount of material required to be conveyed by the conveying device.
  • Step 120 Adjust a size of a transport area of the at least two transport apparatuses according to the transport load amount; and/or adjust a transport priority of each transport sub-area of the at least two transport apparatuses.
  • the transport area of each of the transporting devices includes a shared transport sub-area and an independent transport sub-area.
  • the independent transport sub-area of each of the transporting devices is an area in which the transporting device is independently responsible for material transport
  • the shared transport sub-area is an area in which the transporting equipment and other transporting equipments are jointly responsible for material transport.
  • the transport load amount of each transport device can be compared with the preset transport load amount, and if the difference between the transport load amount of the transport device and the preset transport load amount is greater than a first preset threshold, or the load load amount and the pre-load If the difference between the transport load amounts is less than the second predetermined threshold, the transport load of the transport device is larger or smaller, the transport area of the transport equipment can be adjusted, and/or the transport sub-areas can be adjusted.
  • the priority is transported to adjust the amount of transport load and balance the workload of each transport equipment. Further, it is also possible to calculate the difference between the transport load amounts of the transport apparatuses having the common transport sub-areas, and adjust the transport area size of each transport apparatus and/or the transport priority of each transport sub-area based on the difference.
  • the size of the transportation area of the at least two conveying devices is adjusted according to the conveying load amount; and/or each of the at least two conveying devices is adjusted.
  • Shipping priority for shipping sub-areas including:
  • the load difference is greater than or equal to the first load threshold, adjusting a size of the transport area of the two transport devices according to the load difference; and/or adjusting each transport sub-area of the two transport devices Shipping priority.
  • the first load threshold may be set as needed, and is not specifically limited. By calculating the difference between the two transporting devices, it can be determined whether the transport load of the two transporting devices is balanced. When the load difference is greater than or equal to the first load threshold, it indicates that the transport loads of the two transporting devices are different. Larger, that is, there is a phenomenon that one transporting device is relatively busy, and the other transporting device is relatively idle. At this time, the transporting area or shipping priority of the two transporting devices can be adjusted according to the load difference. The production efficiency is improved by balancing the transfer load of the two transfer equipments and increasing the transfer efficiency.
  • the size of the transport area of the at least two transport apparatuses is adjusted according to the transport load amount, and the transport area of the transport equipment having a small transport load amount is increased, and the transport load amount is reduced.
  • the transport area of the transport equipment is adjusted according to the transport load amount, and the transport area of the transport equipment having a small transport load amount is increased, and the transport load amount is reduced.
  • the portion where the transport area of the transport apparatus having a large load amount is reduced can be used as a portion where the transport area of the transport apparatus having a small load amount is increased.
  • adjusting the size of the transport area of the at least two transport apparatuses according to the transport load amount includes: increasing a shared transport sub-area of the transport equipment with a small transport load amount, and reducing a transport load amount. Large independent transport sub-area of the transport equipment.
  • FIG. 2a is a schematic diagram of a transport area before adjustment of a transport device according to an embodiment of the present disclosure.
  • 2b is a schematic view of a transport area after adjustment of the transport apparatus in an embodiment of the present disclosure.
  • the conveying area of the first conveying apparatus includes an independent conveying sub-area A and a shared conveying sub-area C
  • the conveying area of the second conveying apparatus includes an independent conveying sub-area B and a shared conveying sub-area. C, wherein the shared transport sub-area C is commonly transported by the first transport device and the second transport device.
  • the shared transporter can be increased.
  • the independent transport sub-area A of the first transport equipment is reduced, so that the second transport apparatus can share part of the transport tasks belonging to the first transport equipment, thereby balancing and reducing the transport load of the two transport equipments.
  • adjusting the shipping priority of each transport sub-area of the at least two transporting devices includes:
  • the transport equipment having a large transport load amount is adjusted such that the transport priority of the independent transport sub-region is greater than the transport priority of the shared transport sub-region; and the transport transport sub-region is adjusted for the transport equipment having a small transport load amount
  • the shipping priority is greater than the shipping priority of the individual shipping sub-areas.
  • the transport priority of the independent transport sub-area A is greater than the shared transport sub-area C, and the transport load amount is more
  • the transport priority of the shared transport sub-area C is larger than the independent transport sub-area B, and the transport apparatus having a small transport load amount can share the workload of the transport equipment having a large transport load amount.
  • the starting position (material storage position) of the material transfer is in the same transport sub-area or not in the same transport sub-area as the target position, and the following can be divided into the following cases:
  • the first type the starting position is in the independent transport sub-area, and the target position is in the independent transport sub-area;
  • the second type the starting position is in the independent transport sub-area, and the target position is in the shared transport sub-area;
  • the third type the starting position is in the shared shipping sub-area, and the target position is in the shared shipping sub-area.
  • the first case For transport equipment with a large load capacity, the first case should be transported first, followed by the second case, and finally the third case.
  • the second case For transport equipment with a small load capacity, the second case should be transported first, followed by the third and finally the first. In this way, it is ensured that the transport equipment having a large load is preferentially transported to the independent transport sub-area, and the transport equipment having a small load is preferentially transported to the shared transport sub-area, thereby balancing the workload of both, thereby improving work efficiency and productivity. .
  • the transport load amount of the current working period of at least two transport equipments on the current production line is obtained, and the size of the transport area of the at least two transport equipments is adjusted according to the transport load amount; and/or the The transport priority of each transport sub-area of at least two transport equipments is balanced, thereby achieving a balance of the transport load of each transport equipment.
  • the system includes: at least two conveying devices 210 and a conveying control device 220; and the conveying control device 220 includes a conveying load acquiring module 221 And a transfer adjustment module 222; wherein
  • the transport load acquisition module 221 is configured to acquire a transport load amount of a current working period of at least two transport devices on the current production line;
  • the transport adjustment module 222 is configured to adjust the size of the transport area of the at least two transport apparatuses according to the transport load amount; and/or to adjust the transport priority of each transport sub-area of the at least two transport apparatuses;
  • the transport area of each of the transporting devices includes a shared transport sub-area and an independent transport sub-area.
  • the transport adjustment module 222 includes:
  • a load difference calculation unit configured to calculate a load difference between the transfer loads of the two transfer devices
  • a transport adjustment unit configured to: if the load difference is greater than or equal to the first load threshold, The load difference adjusts a size of a transport area of the two transport apparatuses; and/or adjusts a transport priority of each transport sub-area of the two transport apparatuses.
  • the transport adjustment module 222 is specifically configured to:
  • the transport area of the transport apparatus having a small transport load amount is increased, and the transport area of the transport apparatus having a large transport load amount is reduced.
  • the transport adjustment module 222 is specifically configured to:
  • the shared transport sub-area of the transport equipment having a small transport load amount is increased, and the independent transport sub-area of the transport equipment having a large transport load amount is reduced.
  • the transport adjustment module 222 specifically includes:
  • the first preference level adjusting unit is configured to adjust the transport priority of the independent transport sub-region to be greater than the transport priority of the shared transport sub-region for the transport device having a large transport load amount;
  • the second priority adjustment unit is configured to adjust the transport priority of the shared transport sub-region to be larger than the transport priority of the independent transport sub-region for the transport device having a small transport load amount.
  • the present disclosure also provides a material conveying system, comprising: a production line, a first conveying device, a second conveying device, and an adjusting device.
  • the production line includes a first transport sub-area, a second transport sub-area, and a common transport area.
  • the first transfer device is configured to carry the material in the first transport sub-area and the common transport area.
  • the second transfer device is configured to carry the material in the second transport sub-area and the common transport area.
  • the adjusting device is configured to adjust the first transport sub-region, the second transport sub-region, and the common transport region according to the load amount of the first transport device and the load amount of the second transport device.
  • the adjusting device when the load amount of the first transport device is greater than the load amount of the second transport device, the adjusting device is configured to: calculate a difference between a load amount of the first transport device and a load amount of the second transport device If the difference is greater than or equal to the first threshold, reducing the first transport subregion and increasing the second transport sub region. For example, a portion of the first transport sub-area may be assigned to the second transport sub-area.
  • the adjusting device when the load amount of the first transport device is greater than the load amount of the second transport device, the adjusting device is configured to: calculate a difference between a load amount of the first transport device and a load amount of the second transport device And if the difference is greater than or equal to the first threshold, reducing the first transport sub-area and increasing the common transport area.
  • the adjusting device when the load amount of the first transport device is greater than the load amount of the second transport device, the adjusting device is configured to: calculate a difference between a load amount of the first transport device and a load amount of the second transport device If the difference is greater than or equal to the first threshold, the priority of the first transport device operating in the common transport region is increased, and the priority of the first transport device operating in the first transport region is reduced. For example, after adjustment, the priority of the first transporting device operating in the common transporting area is higher than the priority of the first transporting apparatus operating in the first transporting area, that is, the first transporting apparatus preferentially transports the material in the common transporting area.
  • the adjusting device when the load amount of the first transport device is greater than a second threshold, is configured to: reduce the first transport sub-region and increase the common transport region.
  • the adjusting device when the load amount of the first conveying device is greater than a second threshold, is configured to: reduce the first transport sub-region and increase the second transport region.
  • the adjusting device is configured to: reduce the first conveying sub-region and the second conveying sub-region and increase Public shipping area.
  • the adjustment device includes a processor and a memory.
  • the adjustment device may further include an input device and an output device.
  • the input device knows the load amount of the first transport device and the load amount of the second transport device.
  • the processor calculates the size or priority of the adjusted first transport sub-region, the second transport sub-region and the common transport region according to the load amount of the first transport device and the load amount of the second transport device.
  • the output device adjusts the first transport sub-area, the second transport sub-area, and the common transport area
  • the size or priority is sent to the first transport device and the second transport device.
  • the first conveying device and the second conveying device convey the material according to the adjusted first conveying sub-area, the second conveying sub-area, and the common conveying area.
  • the material conveying system provided in this embodiment is the same as the material conveying method provided in any embodiment of the present disclosure.
  • the material conveying method provided by any embodiment of the present disclosure may be provided, and the corresponding functional module for performing the material conveying method and Beneficial effect.
  • the material transfer method provided by any of the embodiments of the present disclosure.

Landscapes

  • Physics & Mathematics (AREA)
  • Nonlinear Science (AREA)
  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • General Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • General Factory Administration (AREA)
  • Warehouses Or Storage Devices (AREA)
  • Control Of Conveyors (AREA)

Abstract

一种物料搬送方法及系统。所述方法包括:获取当前生产线上至少两台搬送设备的当前工作时段的搬送负载量;根据所述搬送负载量调整所述至少两台搬送设备的运送区域的大小;和/或,调整所述至少两台搬送设备的各运送子区域的运送优先级;其中,每一所述搬送设备的所述运送区域包括共享运送子区域(C)和独立运送子区域(A)。

Description

物料搬送方法及系统 技术领域
本公开涉及一种物料搬送方法及系统。
背景技术
随着显示技术的发展,液晶显示产品等显示产品的得到了越来越广泛应用。
仓库调度系统(Stocker Schedule system,SSS)是液晶显示产品的生产中重要的工作系统之一。其主要作用是辅助自动化部门完成对生产所需物料的搬送和存储。然而,在物料的搬送过程中,通常会出现多个搬送设备的搬送负载量不平衡的现象,造成搬送设备的过闲或过忙,影响生产效率。
发明内容
本公开提供一种物料搬送方法及系统,以平衡各搬送设备的搬送负载量。
第一方面,本公开实施例提供了一种物料搬送方法,所述方法包括:
获取当前生产线上至少两台搬送设备的当前工作时段的搬送负载量;
根据所述搬送负载量调整所述至少两台搬送设备的运送区域。
第二方面,本公开实施例还提供了一种物料搬送系统,所述系统包括:
至少两台搬送设备和搬送控制装置;所述搬送控制装置包括搬送负载获取模块和搬送调整模块;其中,
所述搬送负载获取模块设置为获取当前生产线上至少两台搬送设备的当前工作时段的搬送负载量;
所述搬送调整模块设置为根据所述搬送负载量调整所述至少两台搬送设备 的运送区域的大小。
第三方面,本公开实施例还提供了一种物料搬送系统,包括:
生产线,其中,所述生产线包括第一运送子区域,第二运行子区域和公共运送区域;
第一搬送设备,设置为在第一运送子区域和公共运送区域搬运物料;
第二搬送设备,设置为在第二运送子区域和公共运送区域搬运物料;以及
调整装置,设置为根据所述第一搬送设备的负载量和第二搬运设备的负载量调整所述第一运送子区域,第二运送子区域和公共运送区域。
本公开的物料搬送方法及系统实现了平衡各搬送设备的搬送负载量。
附图说明
下面将通过参照附图详细描述本公开的示例性实施例,使本领域的普通技术人员更清楚本公开的上述及其他特征。
图1是本公开一实施例中的一种物料搬送方法的流程图;
图2a是本公开一实施例中的搬送设备调整前的运送区域示意图;
图2b是本公开一实施例中的搬送设备调整后的运送区域示意图;
图3是本公开一实施例中的一种物料搬送系统的结构示意图。
具体实施方式
下面结合附图和实施例对本公开作进一步的详细说明。可以理解的是,此处所描述的具体实施例仅仅设置为解释本公开,而非对本公开的限定。另外还需要说明的是,为了便于描述,附图中仅示出了与本公开相关的部分而非全部结构。在不冲突的情况下,以下实施例以及实施例中的特征可以任意相互组合。
图1是本公开一实施例中的一种物料搬送方法的流程图,本实施例可适设置为需要调整搬送设备搬送负载量的情况,该方法可以由物料搬送系统来执行,具体包括如下步骤:
步骤110、获取当前生产线上至少两台搬送设备的当前工作时段的搬送负载量。
其中,所述搬送设备主要负责生产制造过程中所需物料的搬送,所述搬送负载量即需要所述搬送设备搬送的物料量。
步骤120、根据所述搬送负载量调整所述至少两台搬送设备的运送区域的大小;和/或,调整所述至少两台搬送设备的各运送子区域的运送优先级。
其中,每一所述搬送设备的所述运送区域包括共享运送子区域和独立运送子区域。
其中,每一所述搬送设备的所述独立运送子区域为所述搬送设备独立负责物料搬送的区域,共享运送子区域为所述搬送设备与其他搬送设备共同负责物料搬送的区域。
具体的,可以将各搬送设备的搬送负载量与预设搬送负载量进行比较,若搬送设备的搬送负载量与预设搬送负载量的差值大于第一预设阈值,或搬送负载量与预设搬送负载量的差值小于第二预设阈值,则所述搬送设备的搬送负载量较大或较小,可以调整所述搬送设备的运送区域大小,和/或,调整各运送子区域的运送优先级,以调整其搬送负载量,平衡各搬送设备的工作量。另外,还可以计算具有共同运送子区域的搬送设备的搬送负载量之间的差值,根据所述差值调整各搬送设备的运送区域大小,和/或各运送子区域的运送优先级。
可选的,当前生产线上搬送设备为两台,则根据所述搬送负载量调整所述至少两台搬送设备的运送区域的大小;和/或,调整所述至少两台搬送设备的各 运送子区域的运送优先级,包括:
计算两台所述搬送设备的所述搬送负载量之间的负载差值;
若所述负载差值大于或等于第一负载阈值,则根据所述负载差值调整所述两台搬送设备的运送区域的大小;和/或,调整所述两台搬送设备的各运送子区域的运送优先级。
其中,所述第一负载阈值可以根据需要进行设定,并不做具体限定。通过计算两台搬送设备的搬送差值可以判断两台搬送设备的搬送负载量是否平衡,当所述负载差值大于或等于所述第一负载阈值时,说明两台搬送设备的搬送负载量相差较大,即存在一台搬送设备相对较忙,而另一台搬送设备相对较闲的现象,此时可以根据所述负载差值调整所述两台搬送设备的运送区域或运送优先级等,以平衡两台搬送设备的搬送负载量,提高搬送效率,从而提供生产效率。
可选的,根据所述搬送负载量调整所述至少两条搬送设备的运送区域的大小,包括:增大搬送负载量较小的所述搬送设备的运送区域,缩小搬送负载量较大的所述搬送设备的运送区域。
这样设置,可以减少搬送负载量较大的搬送设备的负载量,而增大搬送负载量较小的搬送设备的搬送负载量,从而平衡各搬送设备的搬送负载。具体的,负载量较大的搬送设备的运送区域减小的部分可以作为负载量较小的搬送设备的运送区域增大的部分。
可选的,根据所述搬送负载量调整所述至少两台搬送设备的运送区域的大小,包括:增大搬送负载量较小的所述搬送设备的共享运送子区域,并缩小搬送负载量较大的所述搬送设备的独立运送子区域。
具体的,图2a是本公开一实施例中的搬送设备调整前的运送区域示意图, 图2b是本公开一实施例中的搬送设备调整后的运送区域示意图。参考图2a,以两台搬送设备为例,第一搬送设备的运送区域包括独立运送子区域A和共享运送子区域C,第二搬送设备的运送区域包括独立运送子区域B和共享运送子区域C,其中,共享运送子区域C由第一搬送设备和第二搬送设备共同运送物料。当第一搬送设备的搬送负载量较大,第二搬送设备的搬送负载量较小,造成第一搬送设备较忙,而第二搬送设备较闲时,参考图2b,可以增大共享运送子区域C,并缩小第一搬送设备的独立运送子区域A,这样第二搬送设备可以分担部分属于第一搬送设备的搬送任务,从而平衡降低两台搬送设备的搬送负载量。
可选的,调整所述至少两台搬送设备的各运送子区域的运送优先级,包括:
对搬送负载量较大的所述搬送设备,调整其独立运送子区域的运送优先级大于共享运送子区域的运送优先级;对搬送负载量较小的所述搬送设备,调整其共享运送子区域的运送优先级大于独立运送子区域的运送优先级。
具体的,仍以两台搬送设备为例,参考图2b,对于搬送负载量较大的第一搬送设备,其独立运送子区域A的运送优先级大于共享运送子区域C,对于搬送负载量较小的第二搬送设备,其共享运送子区域C的运送优先级大于独立运送子区域B,这样设置,搬送负载量较小的搬送设备可以分担一部分搬送负载量较大的搬送设备的工作量,从而提高工作效率,提高生产率。
另外,在实际生产线中会存在物料搬送的起始位置(物料存放位置)与目标位置在同一运送子区域或不在同一运送子区域的情况,具体可分为以下几种情况:
第一种:起始位置在独立运送子区域,目标位置在独立运送子区域;
第二种:起始位置在独立运送子区域,目标位置在共享运送子区域;
第三种;起始位置在共享运送子区域,目标位置在共享运送子区域。
对于搬送负载量较大的运送设备,应优先对第一种情况进行运送,其次为第二种情况,最后为第三种情况。对于搬送负载量较小的运送设备,应优先对第二种情况进行运送,其次为第三种,最后为第一种。这样保证了,搬送负载量较大的搬送设备优先运送独立运送子区域,搬送负载量较小的搬送设备优先运送共享运送子区域,平衡了两者的工作量,从而提高工作效率,提高了生产率。
本实施例通过获取当前生产线上至少两台搬送设备的当前工作时段的搬送负载量,并根据所述搬送负载量调整所述至少两台搬送设备的运送区域的大小;和/或,调整所述至少两台搬送设备的各运送子区域的运送优先级,从而实现了平衡各搬送设备的搬送负载量。
图3是本公开一实施例中的一种物料搬送系统的结构示意图,参考图3,所述系统包括:至少两台搬送设备210和搬送控制装置220;搬送控制装置220包括搬送负载获取模块221和搬送调整模块222;其中,
搬送负载获取模块221设置为获取当前生产线上至少两台搬送设备的当前工作时段的搬送负载量;
搬送调整模块222设置为根据所述搬送负载量调整所述至少两台搬送设备的运送区域的大小;和/或,调整所述至少两台搬送设备的各运送子区域的运送优先级;其中,每一所述搬送设备的所述运送区域包括共享运送子区域和独立运送子区域。
可选的,当前生产线上搬送设备为两台,搬送调整模块222包括:
负载差值计算单元,设置为计算两台所述搬送设备的所述搬送负载量之间的负载差值;
搬送调整单元,设置为若所述负载差值大于或等于第一负载阈值,则根据 所述负载差值调整所述两台搬送设备的运送区域的大小;和/或,调整所述两台搬送设备的各运送子区域的运送优先级。
可选的,搬送调整模块222具体设置为:
增大搬送负载量较小的所述搬送设备的运送区域,缩小搬送负载量较大的所述搬送设备的运送区域。
可选的,搬送调整模块222具体设置为:
增大搬送负载量较小的所述搬送设备的共享运送子区域,并缩小搬送负载量较大的所述搬送设备的独立运送子区域。
可选的,搬送调整模块222具体包括:
第一优选级调整单元,设置为对搬送负载量较大的所述搬送设备,调整其独立运送子区域的运送优先级大于共享运送子区域的运送优先级;
第二优先级调整单元,设置为对搬送负载量较小的所述搬送设备,调整其共享运送子区域的运送优先级大于独立运送子区域的运送优先级。
本公开还提供一种物料搬送系统,包括:生产线、第一搬送设备、第二搬送设备和调整装置。
所述生产线包括第一运送子区域,第二运送子区域和公共运送区域。
第一搬送设备设置为在第一运送子区域和公共运送区域搬运物料。
第二搬送设备设置为在第二运送子区域和公共运送区域搬运物料。
调整装置设置为根据所述第一搬送设备的负载量和第二搬运设备的负载量调整所述第一运送子区域,第二运送子区域和公共运送区域。
可选地,在所述第一搬送设备的负载量大于第二搬运设备的负载量时,所述调整装置设置为:计算第一搬送设备的负载量和第二搬送设备的负载量的差值,若所述差值大于或等于第一阈值,减小第一运送子区域并增大第二运送子 区域。例如,可以将第一运送子区域的一部分划归到第二运送子区域。
可选地,在所述第一搬送设备的负载量大于第二搬运设备的负载量时,所述调整装置设置为:计算第一搬送设备的负载量和第二搬送设备的负载量的差值,若所述差值大于或等于第一阈值,减小第一运送子区域并增大公共运送区域。
可选地,在所述第一搬送设备的负载量大于第二搬运设备的负载量时,所述调整装置设置为:计算第一搬送设备的负载量和第二搬送设备的负载量的差值,若所述差值大于或等于第一阈值,提高所述第一搬送设备在公共运送区域运行的优先级,降低第一搬送设备在第一运送区域运行的优先级。例如,经过调整,第一搬送设备在公共运送区域运行的优先级高于第一搬送设备在第一运送区域运行的优先级,即第一搬送设备优先在公共运送区域搬运物料。
可选地,在第一搬送设备的负载量大于第二阈值时,所述调整装置设置为:减小第一运送子区域并增大公共运送区域。
可选地,在第一搬送设备的负载量大于第二阈值时,所述调整装置设置为:减小第一运送子区域并增大第二运送区域。
可选地,在第一搬送设备的负载量和第二搬送设备的负载量都大于第二阈值时,所述调整装置设置为:减小第一运送子区域和第二运送子区域并增大公共运送区域。
例如,调整装置包括处理器和存储器。可选地,调整装置还可以包括输入装置和输出装置。输入装置获知第一搬送设备的负载量和第二搬送设备的负载量。处理器根据所述第一搬送设备的负载量和第二搬运设备的负载量计算调整后的所述第一运送子区域,第二运送子区域和公共运送区域的大小或优先级。输出装置将调整后的所述第一运送子区域,第二运送子区域和公共运送区域的 大小或优先级发送给第一搬送设备和第二搬送设备。第一搬送设备和第二搬送设备根据调整后的第一运送子区域,第二运送子区域和公共运送区域搬送物料。
本实施例提供的物料搬送系统,与本公开任意实施例所提供的物料搬送方法属于同一公开构思,可执行本公开任意实施例所提供的物料搬送方法,具备执行物料搬送方法相应的功能模块和有益效果。未在本实施例中详尽描述的技术细节,可参见本公开任意实施例提供的物料搬送方法。
注意,上述仅为本公开的较佳实施例及所运用技术原理。本领域技术人员会理解,本公开不限于这里所述的特定实施例,对本领域技术人员来说能够进行各种明显的变化、重新调整和替代而不会脱离本公开的保护范围。因此,虽然通过以上实施例对本公开进行了较为详细的说明,但是本公开不仅仅限于以上实施例,在不脱离本公开构思的情况下,还可以包括更多其他等效实施例,而本公开的范围由所附的权利要求范围决定。

Claims (20)

  1. 一种物料搬送方法,包括:
    获取当前生产线上至少两台搬送设备的当前工作时段的搬送负载量;
    根据所述搬送负载量调整所述至少两台搬送设备的运送区域。
  2. 根据权利要求1所述的方法,其中,每个搬送设备的运送区域包括共享运送子区域和独立运送子区域,所述物料搬送方法还包括:
    根据所述搬送负载量调整所述至少两台搬送设备的共享运送子区域和独立运送子区域的运送优先级。
  3. 根据权利要求1所述的方法,其中,当前生产线上的搬送设备为两台,则根据所述搬送负载量调整所述至少两台搬送设备的运送区域包括:
    计算两台所述搬送设备的所述搬送负载量之间的差值;
    若所述差值大于或等于第一阈值,则根据所述差值调整所述两台搬送设备的运送区域的大小。
  4. 根据权利要求1所述的方法,其中,当前生产线上的搬送设备为两台,根据所述搬送负载量调整所述至少两台搬送设备的共享运送子区域和独立运送子区域的运送优先级包括:
    计算两台所述搬送设备的所述搬送负载量之间的差值;
    若所述差值大于或等于第一阈值,则根据所述搬送负载量调整所述至少两台搬送设备的共享运送子区域和独立运送子区域的运送优先级。
  5. 根据权利要求1所述的方法,其中,根据所述搬送负载量调整所述至少两台搬送设备的运送区域,包括:
    增大搬送负载量较小的所述搬送设备的运送区域,缩小搬送负载量较大的所述搬送设备的运送区域。
  6. 根据权利要求1所述的方法,其中,每个搬送设备的运送区域包括共享 运送子区域和独立运送子区域,所述根据所述搬送负载量调整所述至少两台搬送设备的运送区域的大小包括:
    增大搬送负载量较小的所述搬送设备的共享运送子区域,并缩小搬送负载量较大的所述搬送设备的独立运送子区域。
  7. 根据权利要求2所述的方法,其中,调整所述至少两台搬送设备的各运送子区域的运送优先级,包括:
    对搬送负载量较大的所述搬送设备,调整其独立运送子区域的运送优先级大于共享运送子区域的运送优先级;
    对搬送负载量较小的所述搬送设备,调整其共享运送子区域的运送优先级大于独立运送子区域的运送优先级。
  8. 一种物料搬送系统,其中,包括:
    至少两台搬送设备和搬送控制装置;所述搬送控制装置包括搬送负载获取模块和搬送调整模块;其中,
    所述搬送负载获取模块设置为获取当前生产线上至少两台搬送设备的当前工作时段的搬送负载量;
    所述搬送调整模块设置为根据所述搬送负载量调整所述至少两台搬送设备的运送区域。
  9. 根据权利要求8所述的系统,其中,当前生产线上搬送设备为两台,所述搬送调整模块包括:
    负载差值计算单元,设置为计算两台所述搬送设备的所述搬送负载量之间的负载差值;
    搬送调整单元,设置为若所述负载差值大于或等于第一负载阈值,则根据所述负载差值调整所述两台搬送设备的运送区域的大小。
  10. 根据权利要求8所述的系统,其中,每个搬送设备的运送区域包括共享运送子区域和独立运送子区域,所述搬送调整模块还设置为根据所述搬送负载量调整所述两台搬送设备的各运送子区域的运送优先级。
  11. 根据权利要求8所述的系统,其中,所述搬送调整模块具体设置为:
    增大搬送负载量较小的所述搬送设备的运送区域,缩小搬送负载量较大的所述搬送设备的运送区域。
  12. 根据权利要求9所述的系统,其中,所述搬送调整模块具体设置为:
    增大搬送负载量较小的所述搬送设备的运送区域,缩小搬送负载量较大的所述搬送设备的运送区域。
  13. 根据权利要求10所述的系统,其中,所述搬送调整模块具体包括:
    第一优选级调整单元,设置为对搬送负载量较大的所述搬送设备,调整其独立运送子区域的运送优先级大于共享运送子区域的运送优先级;
    第二优先级调整单元,设置为对搬送负载量较小的所述搬送设备,调整其共享运送子区域的运送优先级大于独立运送子区域的运送优先级。
  14. 一种物料搬送系统,包括:
    生产线,其中,所述生产线包括第一运送子区域,第二运行子区域和公共运送区域;
    第一搬送设备,设置为在第一运送子区域和公共运送区域搬运物料;
    第二搬送设备,设置为在第二运送子区域和公共运送区域搬运物料;以及
    调整装置,设置为根据所述第一搬送设备的负载量和第二搬运设备的负载量调整所述第一运送子区域,第二运送子区域和公共运送区域。
  15. 根据权利要求14所述的系统,其中,在所述第一搬送设备的负载量大于第二搬运设备的负载量时,所述调整装置设置为:计算第一搬送设备的负载 量和第二搬送设备的负载量的差值,若所述差值大于或等于第一阈值,减小第一运送子区域并增大第二运送子区域。
  16. 根据权利要求14所述的系统,其中,在所述第一搬送设备的负载量大于第二搬运设备的负载量时,所述调整装置设置为:计算第一搬送设备的负载量和第二搬送设备的负载量的差值,若所述差值大于或等于第一阈值,减小第一运送子区域并增大公共运送区域。
  17. 根据权利要求14所述的系统,其中,在所述第一搬送设备的负载量大于第二搬运设备的负载量时,所述调整装置设置为:计算第一搬送设备的负载量和第二搬送设备的负载量的差值,若所述差值大于或等于第一阈值,提高所述第一搬送设备在公共运送区域运行的优先级,降低第一搬送设备在第一运送区域运行的优先级。
  18. 根据权利要求14所述的系统,其中,在第一搬送设备的负载量大于第二阈值时,所述调整装置设置为:减小第一运送子区域并增大公共运送区域。
  19. 根据权利要求14所述的系统,其中,在第一搬送设备的负载量大于第二阈值时,所述调整装置设置为:减小第一运送子区域并增大第二运送区域。
  20. 根据权利要求14所述的系统,其中,在第一搬送设备的负载量和第二搬送设备的负载量都大于第二阈值时,所述调整装置设置为:减小第一运送子区域和第二运送子区域并增大公共运送区域。
PCT/CN2017/094561 2017-03-17 2017-07-26 物料搬送方法及系统 Ceased WO2018166134A1 (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US16/087,813 US10934100B2 (en) 2017-03-17 2017-07-26 Material handling method and system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201710160239.9 2017-03-17
CN201710160239.9A CN106743326B (zh) 2017-03-17 2017-03-17 一种物料搬送方法及系统

Publications (1)

Publication Number Publication Date
WO2018166134A1 true WO2018166134A1 (zh) 2018-09-20

Family

ID=58966177

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2017/094561 Ceased WO2018166134A1 (zh) 2017-03-17 2017-07-26 物料搬送方法及系统

Country Status (3)

Country Link
US (1) US10934100B2 (zh)
CN (1) CN106743326B (zh)
WO (1) WO2018166134A1 (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106743326B (zh) * 2017-03-17 2020-09-11 惠科股份有限公司 一种物料搬送方法及系统
CN107748545A (zh) * 2017-09-26 2018-03-02 武汉华星光电技术有限公司 一种搬送指令优先级控制的方法及系统
CN117787581A (zh) * 2022-12-30 2024-03-29 周慧琴 一种生产加工过程中的物料供需平衡管理方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010028090A (ja) * 2008-06-20 2010-02-04 Ihi Corp 処理設備、搬送制御装置及び搬送制御方法
CN103708210A (zh) * 2013-12-13 2014-04-09 上海邮政科学研究院 一种交叉带分拣设备上包台的控制方法
CN105446281A (zh) * 2014-09-01 2016-03-30 中芯国际集成电路制造(上海)有限公司 工艺腔室的派货方法和系统
CN106743326A (zh) * 2017-03-17 2017-05-31 惠科股份有限公司 一种物料搬送方法及系统

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4648056A (en) * 1984-07-05 1987-03-03 Hall Systems, Inc. Floating tare adjustment for continuous conveyor weighing systems
US20040176874A1 (en) * 1994-09-15 2004-09-09 Scanvaegt A/S Method and apparatus for weight controlled portioning of articles having non-uniform weight
US5933354A (en) * 1995-10-13 1999-08-03 Matsushita Electric Industrial Co., Ltd. System for controlling physical distribution pallets
ES2333697T3 (es) * 2001-04-05 2010-02-26 Inpeco Ip Ltd. Metodo para la gestion de sistemas de celula de trabajo basado en un sistema de gestion de la automatizacion.
JP2003197711A (ja) * 2001-12-27 2003-07-11 Tokyo Electron Ltd 被処理体の搬送システム及び被処理体の搬送方法
US8145350B2 (en) * 2002-11-01 2012-03-27 Lantech.Com, Llc Method and system for building a load
AT500946A1 (de) * 2004-10-22 2006-05-15 Tgw Transportgeraete Gmbh Warenumschlaglager und verfahren zu dessen betrieb
CA2844967C (en) * 2007-09-07 2016-02-02 Dematic Corp. Conveyor systems
US8306836B2 (en) * 2008-12-01 2012-11-06 Trimble Navigation Limited Management of materials on a construction site
JP5454554B2 (ja) * 2011-11-11 2014-03-26 株式会社デンソー 搬送システムおよびその制御方法
CN104182279A (zh) * 2014-02-26 2014-12-03 无锡天脉聚源传媒科技有限公司 一种任务调度方法、装置及系统
CN104977903B (zh) * 2014-04-03 2018-09-07 中芯国际集成电路制造(上海)有限公司 基于实时派工系统的机台组下的晶圆批次派工方法和系统
US9475639B2 (en) * 2014-11-24 2016-10-25 Amazon Technologies, Inc. Inventory system with efficient operator handling of inventory items
CN107531427B (zh) * 2014-12-31 2020-09-04 费孚内部物流公司 基于视觉的输送机包装件管理系统
CN104951888A (zh) * 2015-06-24 2015-09-30 北京京东尚科信息技术有限公司 处理拣货信息的方法和系统
CN105279630B (zh) * 2015-09-30 2018-11-20 湖北龙源电力科技有限公司 立体仓库多任务优化调度控制方法
US10427884B2 (en) * 2015-12-31 2019-10-01 Fives Intralogistics Corp. Vision based conveyor package density management system
CN106040597A (zh) * 2016-05-31 2016-10-26 乐视控股(北京)有限公司 一种物流商品分拣方法及其系统
US9745137B1 (en) * 2016-06-03 2017-08-29 Zme, Llc Apparatus, system and method for material handling and/or processing

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010028090A (ja) * 2008-06-20 2010-02-04 Ihi Corp 処理設備、搬送制御装置及び搬送制御方法
CN103708210A (zh) * 2013-12-13 2014-04-09 上海邮政科学研究院 一种交叉带分拣设备上包台的控制方法
CN105446281A (zh) * 2014-09-01 2016-03-30 中芯国际集成电路制造(上海)有限公司 工艺腔室的派货方法和系统
CN106743326A (zh) * 2017-03-17 2017-05-31 惠科股份有限公司 一种物料搬送方法及系统

Also Published As

Publication number Publication date
CN106743326A (zh) 2017-05-31
US20190106282A1 (en) 2019-04-11
CN106743326B (zh) 2020-09-11
US10934100B2 (en) 2021-03-02

Similar Documents

Publication Publication Date Title
KR101930981B1 (ko) 처리 장치군 컨트롤러, 생산 처리 시스템, 처리 장치군 제어 방법, 생산 효율화 시스템, 생산 효율화 장치 및 생산 효율화 방법
US20180358252A1 (en) Conveyance system and conveyance method
WO2018166134A1 (zh) 物料搬送方法及系统
KR102242431B1 (ko) 기판 처리 시스템, 기판 반송 방법, 및 제어 프로그램
JP2011253897A (ja) 基板処理システム及び基板処理方法
TW202240490A (zh) 任務分配方法、裝置、控制終端和倉儲系統
WO2023125220A1 (zh) 一种半导体工艺设备的调度控制方法和半导体工艺设备
WO2023142653A1 (zh) 分区管理方法、装置、计算机设备和存储介质
JP5303222B2 (ja) 搬送制御装置及び搬送制御方法
JP2011091334A (ja) 基板処理装置
CN116620808A (zh) 物料传输方法、控制装置及物料传输设备
CN109081069A (zh) 一种运料方法
JP2012216852A5 (ja) 基板処理装置および基板処理装置の制御方法
JP2015111729A5 (zh)
CN112950060A (zh) 一种环形rgv的调度方法、装置、电子设备及存储介质
CN113658890A (zh) 提高半导体设备产能的方法和系统
JP2015211216A (ja) 基板処理装置
CN104238468B (zh) 自动导向搬运系统、控制方法与其自动导向搬运装置
JP4429980B2 (ja) 自動搬送システム
TWI552937B (zh) 自動導向搬運系統、控制方法與其自動導向搬運裝置
JP6402595B2 (ja) 搬送システム
CN106776077A (zh) 消息处理方法、装置、控制器及系统
JP2024070159A (ja) インラインシステム
CN121442979A (zh) 机台控制方法、机台控制装置和机台
JP2004306174A (ja) 生産ラインの搬送システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17900998

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205N DATED 31/10/2019)

122 Ep: pct application non-entry in european phase

Ref document number: 17900998

Country of ref document: EP

Kind code of ref document: A1