WO2018061087A1 - 鋼材部品の製造方法 - Google Patents

鋼材部品の製造方法 Download PDF

Info

Publication number
WO2018061087A1
WO2018061087A1 PCT/JP2016/078457 JP2016078457W WO2018061087A1 WO 2018061087 A1 WO2018061087 A1 WO 2018061087A1 JP 2016078457 W JP2016078457 W JP 2016078457W WO 2018061087 A1 WO2018061087 A1 WO 2018061087A1
Authority
WO
WIPO (PCT)
Prior art keywords
tempering
steel
steel material
screw
manufacturing
Prior art date
Application number
PCT/JP2016/078457
Other languages
English (en)
French (fr)
Inventor
剛 杉本
諭吉 岡山
武志 押尾
田中 圭
亮介 平石
健二 安井
Original Assignee
日産自動車株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日産自動車株式会社 filed Critical 日産自動車株式会社
Priority to PCT/JP2016/078457 priority Critical patent/WO2018061087A1/ja
Publication of WO2018061087A1 publication Critical patent/WO2018061087A1/ja

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/06Surface hardening
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/18Hardening; Quenching with or without subsequent tempering
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/34Methods of heating
    • C21D1/42Induction heating
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/28Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for plain shafts
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/25Process efficiency

Definitions

  • the present invention relates to a method for manufacturing a steel material part.
  • the outer surface of the first intermediate body that has undergone the chamfering process is heat-treated to form a second intermediate body, and the portion corresponding to the heat treatment layer of the portion to be screwed of the second intermediate body is removed.
  • a method of forming a screw portion in a portion to be screwed is known (for example, see Patent Document 1).
  • the portion to be screwed after removing the machining allowance is higher in hardness than before performing the surface hardening treatment such as carburizing and quenching after the chamfering process, and the thread portion grinding process is performed. There is also a problem that the hardness is not suitable for implementation.
  • the problem to be solved by the present invention is to compare a predetermined part of a steel material part subjected to surface hardening treatment including quenching without increasing man-hours or reducing material yield, with other parts, It is providing the manufacturing method of the steel-material components which can reduce surface hardness.
  • the present invention temperes a predetermined part of a steel part subjected to a surface hardening process including a quenching process by locally heating and gradually cooling, and another part of the steel part from the predetermined part.
  • the above-mentioned problem is solved by tempering by heat transfer.
  • the present invention it is possible to increase the tempering amount of the predetermined part of the steel material part subjected to the surface hardening treatment including the quenching process as compared with the tempering amount of the other part, thereby increasing the man-hours and reducing the material yield. Therefore, the surface hardness of the predetermined part of the steel part subjected to the surface hardening treatment including the quenching treatment can be reduced compared with other parts, and the impact strength can be increased.
  • FIG. 1 is a perspective view showing a link-shaped steel part 1 manufactured using the method for manufacturing a steel part according to this embodiment.
  • a link-shaped steel material part 1 shown in this figure is a part constituting a multi-link of a variable compression ratio engine.
  • This multi-link is a configuration in which a pair of steel parts 1 are combined symmetrically and coupled with screws, and rotates by an amount corresponding to a change in compression ratio with a crankshaft as a rotation axis.
  • the steel material part 1 includes a semicircular bearing portion 11, a pair of pin press-fit portions 12, and a screw portion 13.
  • a bearing portion 11 is provided between the pair of pin press-fit portions 12 and the screw portion 13.
  • the bearing 11 constitutes a crankshaft bearing.
  • the pair of pin press-fitting portions 12 have holes for press-fitting pins for connecting the upper link or the control link.
  • the screw portion 13 has a screw hole 13A for screwing the screw. Although illustration is omitted, a screw hole through which a screw is inserted is formed between the pair of pin press-fit portions 12, and the screw inserted into the screw hole is screwed into the screw hole 13 ⁇ / b> A of the other steel material part 1. Match.
  • FIG. 2 is a process diagram of the method for manufacturing the steel part 1 of the present embodiment.
  • a forging process is performed to form the steel part 1 having a link-shaped outer shape.
  • a hole 13B (see FIG. 4 and FIG. 5) without a thread groove is formed in the threaded portion 13 of the steel part 1.
  • a chamfering process is performed, and the black skin on the surface of the steel material part 1 is removed.
  • step S3 a surface hardening process is performed, and the surface of the steel material part 1 is hardened by heat treatment.
  • heat treatment such as carburizing quenching, nitriding quenching, and carbonitriding quenching is performed on the entire surface of the steel part 1.
  • FIG. 3A is a diagram showing the relationship between the treatment time and temperature of each step after the surface hardening treatment step in the method for producing the steel component 1 of the present embodiment
  • FIG. 3B is in the method for producing the steel component of the comparative example. It is a figure which shows the relationship between the processing time and temperature of each process after a surface hardening process. A comparative example will be described later.
  • carburizing and quenching is performed in the surface hardening process.
  • the steel material part 1 is heated to 1050 ° C. in a carburizing gas atmosphere and kept at 1050 ° C. for a predetermined time, and then slowly cooled.
  • the quenching process after the carburizing process the steel material part 1 is heated to 900 ° C. and held for a certain time, and then rapidly cooled in a gas atmosphere.
  • the heating temperature, the carburizing method, and the rapid cooling method are only examples, and are not limited.
  • the steel material when the steel material is hardened, the steel material is distorted. Therefore, a portion requiring a high-precision finished shape such as a screw part or a gear needs to be formed by grinding after hardening.
  • the martensitic structure formed on the surface of the steel part 1 after carburizing and quenching has a high hardness such as 60 HRC. Therefore, when the screw hole 13A of the screw portion 13 is formed by grinding after the carburizing and quenching in the surface hardening process in step S3, grinding is performed on the martensite structure having high hardness.
  • the martensite structure formed on the surface of the steel material after quenching has relatively low toughness and does not have the impact strength required for the threaded portion, gears, sliding surface, and the like. Further, in the present embodiment, high toughness and low surface hardness are required for the threaded portion 13 of the steel material part 1, whereas the portion other than the threaded portion 13 of the steel material part 1 is as high as the threaded portion 13. Toughness and low surface hardness are not required. Therefore, in this embodiment, a tempering process described below is performed in step S4.
  • FIG. 4 is a schematic diagram for explaining the tempering process of the present embodiment
  • FIG. 5 is a perspective view showing a state in which the tempering process of the present embodiment is being performed.
  • the high frequency coil 21 for the inner surface of the high frequency induction heating device 20 is inserted into the hole 13B, and the inner peripheral surface of the hole 13B is induction heated.
  • the high-frequency induction heating apparatus 20 having a power output of 10 kW and an induction current frequency of 10 kHz is used, and the heating time is set to 2 seconds.
  • the inner peripheral surface of the hole 13B is induction-heated for 2 seconds, and then the heated portion is allowed to cool as shown in FIG. 3A.
  • the steel material part 1 is left in the atmosphere for 10 minutes. At this time, the portions other than the screw portion 13 are heated by heat transfer from the heating portion.
  • FIG. 6 is a graph showing a temperature history of the screw portion 13 and the pin press-fit portion 12 in the tempering process of the present embodiment. As shown in this graph, the threaded portion 13 of the steel part 1 is rapidly heated and then gradually cooled, whereas the pin press-fit portion 12 away from the threaded portion 13 is separated from the threaded portion 13. It is gradually heated by heat transfer and then gradually cooled.
  • the tempering parameter P as an index representing the degree of progress of tempering is expressed by the following equation (1).
  • T is a tempering temperature
  • t is a tempering time
  • C is a material constant.
  • the tempering parameter P increases as the temperature T increases.
  • the periphery of the screw portion 13 and the pin Since the temperature difference with the part away from the screw part 13 such as the press-fitting part 12 becomes large, the difference in the degree of tempering progress between the periphery of the screw part 13 immediately after the start of tempering and the part away from the screw part 13 becomes large. Thereafter, since the temperature difference between the periphery of the screw portion 13 and the portion away from the screw portion 13 decreases, the tempering at the periphery of the screw portion 13 and the portion away from the screw portion 13 has a large difference in progress. Proceed with it.
  • the inner peripheral surface of the hole 13B is intensively heated for a short time, and the portions other than the screw portion 13 are heated by heat transfer from the screw portion 13, thereby shortening the length.
  • time in this embodiment, 10 minutes and 2 seconds
  • the tempering amount of the screw portion 13 can be particularly increased as compared with the tempering amount of other portions.
  • Fig. 7 is a graph showing an example of the relationship between the tempering temperature of steel and the change in mechanical properties of steel (Source: NACHI-BUSINESS Materials news Vol.5 D1 November / 2004 (Technical Information Magazine of Fujikoshi Co., Ltd.) )).
  • This graph shows the change in mechanical properties due to tempering of chromium molybdenum steel (SCM435).
  • the impact strength (Charpy impact value) is set by setting the tempering temperature to about 200 ° C., as compared with the case of setting the tempering temperature to 100 ° C. or 300 ° C. It turns out that becomes high.
  • tempering temperature 200 degreeC or more compared with the case where tempering temperature is made less than 200 degreeC.
  • tempering temperature is made less than 200 degreeC.
  • the said steel material and the steel material of the steel material component 1 of this embodiment differ in a component, the tendency of the change of a mechanical physical property is common, but the relationship between tempering temperature and a mechanical physical property value does not correspond. Absent.
  • the tempering process of this embodiment as shown in the graph of FIG. 6, when the tempering temperature of the screw portion 13 immediately after the start of tempering was 400 ° C. and the tempering time was 10 minutes, The surface hardness of the portion 13 was 18 HRC, the impact strength of the screw portion 13 was 120 J / cm 2 , and the surface hardness of the pin press-fit portion 12 was 62 HRC. From this result, it can be seen that according to the tempering process of the present embodiment, the hardness of the surface of the hole 13B of the screw portion 13 can be set to a hardness suitable for screw grinding. Moreover, according to the tempering process of this embodiment, it turns out that the impact strength requested
  • FIG. 8 is a schematic diagram for explaining the screw grinding process of the present embodiment.
  • the screw grinding process of step S5 is performed after the tempering process of step S4.
  • the screw hole 13A is formed in the screw portion 13 by screw grinding the hole 13B of the tempered screw portion 13.
  • the hardness of the surface of the hole 13B is 18HRC and suitable for screw grinding by the above-described tempering process, screw grinding can be performed without any trouble.
  • the carburizing process is performed.
  • the steel material part 1 is heated to 1050 ° C. in a carburizing gas atmosphere and held at 1050 ° C. for a certain period of time, and then gradually cooled and then rapidly cooled in a gas atmosphere.
  • the screw grinding process is performed outside the furnace.
  • the hardness of the surface of the screw portion 13 after the carburizing process is 62 HRC as shown in Table 1 above, which is higher than that of the present embodiment. Therefore, this comparative example is inferior to the present embodiment in terms of the load on the grinding tool and the grinding accuracy. However, in this comparative example, the hardness of the surface of the screw portion 13 at the time of screw grinding is lower than that in the case where screw grinding is performed after quenching.
  • a quenching process is performed.
  • the steel material part 1 is heated to 900 ° C. and held for a certain time, and then rapidly cooled in a gas atmosphere.
  • a tempering step is performed. In this tempering step, the steel part 1 is heated to 170 ° C. and held for 70 minutes, and then allowed to cool in the atmosphere.
  • the hardness of the surface of the screw portion 13 was 62 HRC
  • the impact strength of the screw portion 13 was 50 J / cm 2
  • the hardness of the surface of the pin press-fit portion 12 was 61 HRC
  • the hardness of the surface of the screw portion 13 is 18 HRC
  • the impact strength of the screw portion 13 is 120 J / cm 2 . Therefore, according to the present embodiment, it can be seen that the hardness of the surface of the screw portion 13 is reduced by 70% and the impact strength of the screw portion 13 is increased by 140% compared to the comparative example.
  • the tempering time is 70 minutes
  • the tempering time is 10 minutes and 2 seconds.
  • the tempering time can be reduced by 86% compared to the comparative example.
  • the tempering time can be greatly shortened compared to the comparative example, thereby carburizing and quenching.
  • the total time for tempering can be greatly reduced.
  • the steel part 1 is subjected to the surface hardening process including the quenching process (the carburizing and quenching process in the present embodiment), and the steel part 1 is predetermined.
  • the part screw part 13 in the present embodiment
  • the part is tempered by locally heating and gradually cooling, and the other part of the steel material part 1 is tempered by heat transfer from the predetermined part.
  • part of the steel material component 1 which performed the surface hardening process including the quenching process can be made to increase more than the tempering amount of another site
  • the steel material part 1 subjected to the surface hardening treatment without increasing man-hours or lowering the material yield as in the case of removing the cut after the surface hardening treatment by providing a margin for the predetermined portion.
  • the above-mentioned predetermined portion can be made to have a high impact strength and a low surface hardness as compared with other portions.
  • induction tempering is performed in which the predetermined portion of the steel material component 1 is tempered by induction heating.
  • the said predetermined part can be heated intensively in a short time, and another part can be heated by the heat transfer from the said predetermined part.
  • the steel material component 1 is subjected to a surface hardening process including a quenching process (in this embodiment, a carburizing and quenching process), and the steel material part 1 is machined by a predetermined portion.
  • a quenching process in this embodiment, a carburizing and quenching process
  • the screw part 13 is tempered by locally heating and gradually cooling, and the other part of the steel material part 1 is tempered by heat transfer from the predetermined part.
  • part to machine in the steel material component 1 which carried out the surface hardening process can be made to increase rather than the amount of tempering of another site
  • the fall of hardness more than necessary can be prevented.
  • the surface hardening process (carburization hardening process in this embodiment) including a hardening process is implemented with respect to the steel material part 1, and the thread part 13 of the steel material part 1 is carried out. While tempering by locally heating and gradually cooling, the other part of the steel material part 1 is tempered by heat transfer from the screw portion 13. Thereby, the amount of tempering of the screw part 13 of the steel material part 1 which carried out the surface hardening process can be made to increase rather than the amount of tempering of another site
  • the predetermined part of the steel material part 1 (screw part 13 in this embodiment) is tempered by locally heating and gradually cooling, and other parts of the steel material part 1 are also tempered. And tempering by heat transfer from the predetermined portion. Thereby, the hardness of the surface of the predetermined part of the carburized and hardened steel part 1 can be reduced, and the toughness of the predetermined part of the steel part can be improved.
  • the steel member 1 in the shape of a link that forms a multi-link as a steel member has been taken as an example.
  • the required degree of impact strength of a screw portion, a gear, a sliding surface, etc. is high, while the hardness is high.
  • the present invention can also be applied to steel parts of other shapes having a predetermined part that needs to be reduced.
  • induction tempering has been described as an example of tempering treatment, other tempering methods such as laser tempering can be adopted as long as a predetermined part can be locally heated in a short time.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

鋼材部品(1)に対して焼入れ処理を含む表面硬化処理を実施する表面硬化工程と、鋼材部品1のネジ部(13)等の所定部位を、局所的に加熱して徐冷することで焼戻しすると共に、鋼材部品1の他の部位を、所定部位からの伝熱により焼戻しする焼戻し工程とを備える。

Description

鋼材部品の製造方法
 本発明は、鋼材部品の製造方法に関するものである。
 プーリーシャフトのネジ部の形成方法として、面削工程を経た第一中間体の外面を熱処理して第二中間体を形成し、この第二中間体のネジ化予定部の熱処理層相当分を除去した後にネジ化予定部にネジ部を形成する方法が知られている(例えば、特許文献1参照)。
特開2015-72039号公報
 上記の方法では、ネジ部研削加工の前に熱処理相当分を除去する切削加工を実施することで二度の加工が必要となり加工コストが上昇したり、ネジ化予定部に取り代を設けることで材料歩留りが低下したりするという問題がある。さらに、上記の方法では、取り代を除去した後のネジ化予定部は、面削工程後の浸炭焼き入れ等の表面硬化処理を実施する前と比較すると高硬度であり、ネジ部研削加工を実施するのには好適な硬度ではないという問題もある。
 本発明が解決しようとする課題は、工数を増加させたり材料歩留りを低下させたりすることなく、焼入れ処理を含む表面硬化処理を施した鋼材部品の所定部位を、その他の部位と比較して、表面硬度を低下させることができる鋼材部品の製造方法を提供することである。
 本発明は、焼入れ処理を含む表面硬化処理を施した鋼材部品の所定部位を、局所的に加熱して徐冷することで焼戻しすると共に、上記鋼材部品の他の部位を、上記所定部位からの伝熱により焼戻しすることによって上記課題を解決する。
 本発明によれば、焼入れ処理を含む表面硬化処理を施した鋼材部品の所定部位の焼戻し量をその他の部位の焼戻し量よりも増加させることができるので、工数を増加させたり材料歩留りを低下させたりすることなく、焼入れ処理を含む表面硬化処理を施した鋼材部品の所定部位を、その他の部位と比較して、表面硬度を低下させ、あわせて、衝撃強度を高くすることもできる。
本発明の一実施形態の鋼材部品の製造方法を用いて製造するリンク形状の鋼材部品を示す斜視図である。 本発明の一実施形態の鋼材部品の製造方法の工程図である。 本発明の一実施形態の鋼材部品の製造方法における表面硬化処理工程以降の各工程の処理時間と温度との関係を示す図である。 比較例の鋼材部品の製造方法における表面硬化処理工程以降の各工程の処理時間と温度との関係を示す図である。 本発明の一実施形態の焼戻し工程を説明するための概略図である。 本発明の一実施形態の焼戻し工程を実施している状態を示す斜視図である。 本発明の一実施形態の焼戻し工程におけるネジ部とピン圧入部との温度履歴を示すグラフである。 鋼材の焼戻し温度と、鋼材の機械的物性の変化との関係の一例を示すグラフである。 本発明の一実施形態のネジ研削工程を説明するための概略図である。
 以下、本発明の一実施形態を図面に基づいて説明する。図1は、本実施形態の鋼材部品の製造方法を用いて製造するリンク形状の鋼材部品1を示す斜視図である。この図に示すリンク形状の鋼材部品1は、可変圧縮比エンジンのマルチリンクを構成する部品である。このマルチリンクは、一対の鋼材部品1が相互に対称に組み合わされてネジで結合された構成であり、クランクシャフトを回転軸として圧縮比を変更する分だけ回転する。
 鋼材部品1は、半円形状の軸受部11と、一対のピン圧入部12と、ネジ部13とを備える。一対のピン圧入部12とネジ部13との間に軸受部11が設けられている。軸受部11は、クランクシャフトの軸受を構成する。一対のピン圧入部12は、アッパーリンク又はコントロールリンクを連結するためのピンを圧入する孔を有する。ネジ部13は、ネジを螺合させるネジ孔13Aを有する。図示は省略するが、一対のピン圧入部12の間にはネジが挿通されるネジ孔が形成されており、このネジ孔に挿通されたネジが、他方の鋼材部品1のネジ孔13Aに螺合する。
 図2は、本実施形態の鋼材部品1の製造方法の工程図である。この図に示すように、本実施形態の鋼材部品1の製造方法では、まず、ステップS1において、鍛造工程を実施し、リンク形状の外形を有する鋼材部品1を形成する。この鍛造工程では、鋼材部品1のネジ部13に、ネジ溝の無い孔13B(図4及び図5参照)を形成する。次に、ステップS2において、面削工程を実施し、鋼材部品1の表面の黒皮を除去する。
 次に、ステップS3において、表面硬化処理工程を実施し、鋼材部品1の表面を熱処理により硬化させる。本工程では、浸炭焼入れ、窒化焼入れ、浸炭窒化焼入れ等の熱処理を、鋼材部品1の表面全体に対して行う。
 図3Aは、本実施形態の鋼材部品1の製造方法における表面硬化処理工程以降の各工程の処理時間と温度との関係を示す図であり、図3Bは、比較例の鋼材部品の製造方法における表面硬化処理工程以降の各工程の処理時間と温度との関係を示す図である。比較例については後述する。
 図3Aに示すように、本実施形態では、表面硬化処理工程において、浸炭焼入れを実施する。浸炭処理では、浸炭ガスの雰囲気において鋼材部品1を1050℃まで加熱して一定時間1050℃に保持した後に徐冷する。浸炭処理後の焼入れ処理では、鋼材部品1を900℃まで加熱して一定時間保持し、その後、ガス雰囲気中で急冷する。なお、加熱温度、浸炭方法、及び急冷方法は一実施例であり、限定されるものではない。
 ここで、鋼材に焼入れを実施すると鋼材に歪みが生じるので、ネジ部や歯車等の高精度な仕上がり形状が要求される部分は、焼入れを実施した後に研削加工により成型する必要がある。それに対して、浸炭焼入れを実施した後の鋼材部品1の表面に形成されるマルテンサイト組織は、60HRC等の高硬度である。そのため、ステップS3の表面硬化処理工程における浸炭焼入れに次いで、ネジ部13のネジ孔13Aを研削加工により形成する場合には、高硬度のマルテンサイト組織に対して研削加工を行うことになる。一方において、焼入れ後の鋼材の表面に形成されるマルテンサイト組織は、比較的靱性が低く、ネジ部や歯車や摺動面等に要求される衝撃強度は備えない。さらに、本実施形態では、鋼材部品1のネジ部13については高い靱性と低い表面硬度とが要求されるのに対して、鋼材部品1のネジ部13以外の部分についてはネジ部13程の高い靱性や低い表面硬度は要求されない。そこで、本実施形態では、ステップS4において、以下に説明する焼戻し工程を実施する。
 図4は、本実施形態の焼戻し工程を説明するための概略図であり、図5は、本実施形態の焼戻し工程を実施している状態を示す斜視図である。これらの図に示すように、本実施形態の焼戻し工程では、高周波誘導加熱装置20の内面用の高周波コイル21を、孔13Bに挿入し、孔13Bの内周面を誘導加熱する。本実施形態では、電源出力が10kW、誘導電流の周波数が10kHzの高周波誘導加熱装置20を使用し、加熱時間を2秒とした。
 本実施形態の焼戻し工程では、孔13Bの内周面を2秒間、誘導加熱した後、図3Aに示すように、加熱部位を放冷する。本実施形態では、鋼材部品1を10分間、大気中に放置する。この際、ネジ部13以外の部分は、加熱部位からの伝熱により加熱される。
 図6は、本実施形態の焼戻し工程におけるネジ部13とピン圧入部12との温度履歴を示すグラフである。このグラフに示すように、鋼材部品1のネジ部13は、急速に加熱され、その後、徐々に冷却されるのに対して、ネジ部13から離れたピン圧入部12では、ネジ部13からの伝熱により徐々に加熱され、その後、徐々に冷却される。
 ここで、焼戻しの進行度を表す指標としての焼戻しパラメータPは、下記(1)式で表される。
Figure JPOXMLDOC01-appb-M000001
但し、Tは焼戻し温度、tは焼戻し時間、Cは材料定数である。
 上記(1)式によれば、焼戻しパラメータPは、温度Tが高くなるほど高くなるところ、本実施形態では、焼戻し開始直後(本実施形態では開始から2分程度)にネジ部13の周辺とピン圧入部12等のネジ部13から離れた部位との温度差が大きくなるので、焼戻し開始直後におけるネジ部13の周辺とネジ部13から離れた部位とでの焼戻し進行度の差が大きくなる。その後、ネジ部13の周辺とネジ部13から離れた部位とでの温度差が減少するので、ネジ部13の周辺とネジ部13から離れた部位とでの焼戻しは、進行度に大きな差をもったまま進行する。
 即ち、本実施形態の焼戻し工程では、孔13Bの内周面を集中的に短時間加熱し、ネジ部13以外の部位はネジ部13からの伝熱で加熱されるようにすることにより、短時間(本実施形態は10分2秒)で、ネジ部13の焼戻し量をその他の部位の焼戻し量と比較して特に増加させることができる。
 図7は、鋼材の焼戻し温度と、鋼材の機械的物性の変化との関係の一例を示すグラフである(出典:NACHI-BUSINESS Materials news Vol.5 D1 November/2004(株式会社不二越の技術情報誌))。このグラフには、クロムモリブデン鋼(SCM435)の焼戻しによる機械的性質の変化が示されている。このグラフに示すように、当該鋼材を焼戻しする場合には、焼戻し温度を200℃程度にすることで、焼戻し温度を100℃や300℃にする場合と比較して、衝撃強度(シャルピー衝撃値)が高くなることがわかる。また、焼戻し温度を200℃以上にすることで、焼戻し温度を200℃未満にする場合と比較して硬度(ブリネル硬さ)が低下することがわかる。なお、当該鋼材と本実施形態の鋼材部品1の鋼材とでは、成分が異なることから、機械的物性の変化の傾向は共通するが、焼戻し温度と機械的物性値との関係が一致するわけではない。
 本実施形態の焼戻し工程では、図6のグラフに示すように、焼戻し開始直後のネジ部13の焼戻し温度を400℃とし、焼戻し時間を10分間としたところ、下記表1に示すように、ネジ部13の表面の硬度は18HRC、ネジ部13の衝撃強度は120J/cm、ピン圧入部12の表面の硬度は62HRCとなった。この結果から、本実施形態の焼戻し工程によれば、ネジ部13の孔13Bの表面の硬度を、ネジ研削を実施するのに好適な硬度にすることができることがわかる。また、本実施形態の焼戻し工程によれば、ネジ部13に要求される衝撃強度を確保できることがわかる。なお、表1に示す比較例の工法、及びその結果については後述する。
Figure JPOXMLDOC01-appb-T000002
 図8は、本実施形態のネジ研削工程を説明するための概略図である。この図及び図2に示すように、ステップS4の焼戻し工程に次いで、ステップS5のネジ研削工程を実施する。本工程では、焼戻ししたネジ部13の孔13Bをネジ研削することにより、ネジ部13にネジ孔13Aを形成する。ここで、本実施形態では、上述の焼戻し工程により孔13Bの表面の硬度が18HRCとネジ研削するのに好適な硬度になっているので、支障無くネジ研削を実施できる。
 以下、本実施形態の鋼材部品1の製造方法の効果を説明するための比較例について説明する。図3Bに示すように、本比較例では、本実施形態と同様の方法で得られた鍛造品に対して熱処理及びネジ研削を行う。
 本比較例では、まず、浸炭工程を実施する。この浸炭工程では、浸炭ガスの雰囲気において鋼材部品1を1050℃まで加熱して一定時間1050℃に保持した後に、まず、徐冷し、その後、ガス雰囲気中で急冷する。
 次に、炉外でネジ研削工程を実施する。ここで、浸炭処理後のネジ部13の表面の硬度は上記表1に示すように62HRCと、本実施形態と比較して高硬度である。そのため、本比較例は、研削工具の負荷や研削の精度等の点で本実施形態に劣ることになる。ただし、本比較例では、焼入れ後にネジ研削を実施する場合と比較すると、ネジ研削時のネジ部13の表面の硬度は低くなる。
 次に、焼入れ工程を実施する。この焼入れ工程では、鋼材部品1を900℃まで加熱して一定時間保持し、その後、ガス雰囲気中で急冷する。次に、焼戻し工程を実施する。この焼戻し工程では、鋼材部品1を170℃まで加熱して70分間保持し、その後、大気中で放冷する。
 上記表1に示すように、本比較例では、ネジ部13の表面の硬度は62HRC、ネジ部13の衝撃強度は50J/cm、ピン圧入部12の表面の硬度は61HRCとなった。それに対して、本実施形態では、ネジ部13の表面の硬度は18HRC、ネジ部13の衝撃強度は120J/cmとなった。従って、本実施形態によれば、比較例に対して、ネジ部13の表面の硬度は70%減少し、ネジ部13の衝撃強度は140%増加することがわかる。また、本比較例では、焼戻し時間が70分であるのに対して、本実施形態では、焼戻し時間が10分2秒である。従って、本実施形態によれば、比較例に対して、焼戻し時間を86%減少させることができる。ここで、本実施形態と比較例とで、浸炭処理及び焼入れ処理の時間は同等であるため、本実施形態によれば、比較例に対して、焼戻し時間を大幅に短縮できることにより、浸炭、焼入れ、焼戻しの合計時間を大幅に短縮できる。
 以上説明したように、本実施形態に係る鋼材部品1の製造方法では、鋼材部品1に対して焼入れ処理を含む表面硬化処理(本実施形態では浸炭焼入れ処理)を実施し、鋼材部品1の所定部位(本実施形態ではネジ部13)を、局所的に加熱して徐冷することで焼戻しすると共に、鋼材部品1の他の部位を、上記所定部位からの伝熱により焼戻しする。これにより、焼入れ処理を含む表面硬化処理を施した鋼材部品1の上記所定部位の焼戻し量をその他の部位の焼戻し量よりも増加させることができる。従って、上記所定部位に取り代を設けて表面硬化処理の後に切削して除去する場合のように工数を増加させたり材料歩留りを低下させたりすることなく、上記表面硬化処理を施した鋼材部品1の上記所定部位を、その他の部位と比較して、高い衝撃強度、及び低い表面硬度を有するものにすることができる。
 また、本実施形態に係る鋼材部品1の製造方法では、鋼材部品1の上記所定部位を誘導加熱により焼戻す高周波焼戻しを実施する。これにより、上記所定部位を短時間で集中的に加熱し、その他の部位を上記所定部位からの伝熱で加熱することができる。
 また、本実施形態に係る鋼材部品1の製造方法では、鋼材部品1に対して焼入れ処理を含む表面硬化処理(本実施形態では浸炭焼入れ処理)を実施し、鋼材部品1の機械加工する所定部位(本実施形態ではネジ部13)を、局所的に加熱して徐冷することで焼戻しすると共に、鋼材部品1の他の部位を、上記所定部位からの伝熱により焼戻しする。これにより、表面硬化処理をした鋼材部品1における機械加工する所定部位の焼戻し量を、その他の部位の焼戻し量よりも増加させることができる。従って、機械加工する上記所定部位の表面の硬度を、機械加工するのに好適な硬度に低下させることができる。一方、所定部位以外の部位については、必要以上の硬度の低下を防止することができる。
 また、本実施形態に係る鋼材部品1の製造方法では、鋼材部品1に対して焼入れ処理を含む表面硬化処理(本実施形態では浸炭焼入れ処理)を実施し、鋼材部品1のネジ部13を、局所的に加熱して徐冷することで焼戻しすると共に、鋼材部品1の他の部位を、ネジ部13からの伝熱により焼戻しする。これにより、表面硬化処理をした鋼材部品1のネジ部13の焼戻し量を、その他の部位の焼戻し量よりも増加させることができる。従って、ネジ研削する孔13Bの表面の硬度を、ネジ研削するのに好適な硬度に低下させることができると共に、ネジ部13の表面の衝撃強度を向上させることができる。
 さらに、本実施形態に係る鋼材部品1の製造方法では、鋼材部品1に対して浸炭焼入れ処理を実施するので、鋼材部品1の表面には高硬度ではあるものの低靱性のマルテンサイト組織が形成される。それに対して、浸炭焼入れ処理の後に、鋼材部品1の所定部位(本実施形態ではネジ部13)を、局所的に加熱して徐冷することで焼戻しすると共に、鋼材部品1の他の部位を、上記所定部位からの伝熱により焼戻しする。これにより、浸炭焼入れした鋼材部品1の所定部位の表面の硬度を低下させると共に、当該鋼材部品の所定部位の靱性を向上させることができる。
 なお、以上に説明した実施形態は、本発明の理解を容易にするために記載されたものであって、本発明を限定するために記載されたものではない。従って、上述の実施形態に開示された各要素は、本発明の技術的範囲に属する全ての設計変更や均等物をも含む趣旨である。
 例えば、上述の実施形態では、鋼材部品としてマルチリンクを構成するリンク形状の鋼材部品1を例に挙げたが、ネジ部や歯車や摺動面等の衝撃強度の要求度が高く、一方で硬度を低下させる必要がある所定部位を備える他の形状の鋼材部品にも本発明を適用できる。また、焼戻し処理として高周波焼戻しを例に挙げたが、所定部位を短時間で局所的に加熱できる方法であれば、レーザ焼戻し等の他の焼戻し方法も採用できる。
1…鋼材部品
 11…軸受部
 12…ピン圧入部
 13…ネジ部

Claims (5)

  1.  鋼材部品に対して焼入れ処理を含む表面硬化処理を実施する表面硬化処理工程と、
     前記表面硬化処理工程を経た前記鋼材部品の所定部位を、局所的に加熱して徐冷することで焼戻しすると共に、前記鋼材部品の他の部位を、前記所定部位からの伝熱により焼戻しする焼戻し工程と
    を備える鋼材部品の製造方法。
  2.  前記焼戻し工程において、前記所定部位を誘導加熱により焼戻す高周波焼戻しを実施する請求項1に記載の鋼材部品の製造方法。
  3.  前記焼戻し工程において焼戻しされた前記所定部位を、機械加工する機械加工工程を備える請求項1又は2に記載の鋼材部品の製造方法。
  4.  前記機械加工工程は、ネジ研削工程を含む請求項3に記載の鋼材部品の製造方法。
  5.  前記表面硬化処理は、浸炭処理を含む請求項1~4の何れか1項に記載の鋼材部品の製造方法。
PCT/JP2016/078457 2016-09-27 2016-09-27 鋼材部品の製造方法 WO2018061087A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/JP2016/078457 WO2018061087A1 (ja) 2016-09-27 2016-09-27 鋼材部品の製造方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2016/078457 WO2018061087A1 (ja) 2016-09-27 2016-09-27 鋼材部品の製造方法

Publications (1)

Publication Number Publication Date
WO2018061087A1 true WO2018061087A1 (ja) 2018-04-05

Family

ID=61760211

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/078457 WO2018061087A1 (ja) 2016-09-27 2016-09-27 鋼材部品の製造方法

Country Status (1)

Country Link
WO (1) WO2018061087A1 (ja)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59114359A (ja) * 1982-12-17 1984-07-02 高周波熱錬株式会社 変形能のすぐれたプレストレストコンクリ−ト用鋼棒およびその製造方法
JPS6330344U (ja) * 1986-08-11 1988-02-27
JP2006144928A (ja) * 2004-11-19 2006-06-08 Yamaha Motor Co Ltd コンロッド、エンジン、自動車両およびコンロッドの製造方法
WO2009123227A1 (ja) * 2008-03-31 2009-10-08 高周波熱錬株式会社 鋼材、鋼材の製造方法及び鋼材の製造装置
JP2013130272A (ja) * 2011-12-22 2013-07-04 Daihatsu Motor Co Ltd ベルト式無段変速機のプーリ及びその加工方法
US20150091225A1 (en) * 2013-10-01 2015-04-02 Hendrickson Usa, Llc Leaf spring and method of manufacture thereof having sections with different levels of through hardness

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59114359A (ja) * 1982-12-17 1984-07-02 高周波熱錬株式会社 変形能のすぐれたプレストレストコンクリ−ト用鋼棒およびその製造方法
JPS6330344U (ja) * 1986-08-11 1988-02-27
JP2006144928A (ja) * 2004-11-19 2006-06-08 Yamaha Motor Co Ltd コンロッド、エンジン、自動車両およびコンロッドの製造方法
WO2009123227A1 (ja) * 2008-03-31 2009-10-08 高周波熱錬株式会社 鋼材、鋼材の製造方法及び鋼材の製造装置
JP2013130272A (ja) * 2011-12-22 2013-07-04 Daihatsu Motor Co Ltd ベルト式無段変速機のプーリ及びその加工方法
US20150091225A1 (en) * 2013-10-01 2015-04-02 Hendrickson Usa, Llc Leaf spring and method of manufacture thereof having sections with different levels of through hardness

Similar Documents

Publication Publication Date Title
CN105593539B (zh) 空心驱动轴及用于制造空心驱动轴的方法
KR102344891B1 (ko) 스플라인 허브 제조방법
WO2018061087A1 (ja) 鋼材部品の製造方法
JP2008208940A (ja) 等速自在継手用部品及びその製造方法
JP5371084B2 (ja) 円柱状部品の熱処理方法
JP6113141B2 (ja) 歯車などの構成部品を処理する方法
KR100871949B1 (ko) 바리에이터용 디스크 및 그 제조방법
JP4026472B2 (ja) 軸受部品の製造方法
JP5424298B2 (ja) 円柱状部品の熱処理方法
JP6615954B2 (ja) 外歯歯車の製造方法
JP6977339B2 (ja) 鋼材部品の熱処理方法
JP6429853B2 (ja) 偏心揺動型減速装置のクランク軸の製造方法
KR102521913B1 (ko) 파동 기어 장치 제조 방법
JP2017020555A (ja) 歯車を製造する方法
JP2008069422A (ja) 鍛造部品の製造方法
WO2023139936A1 (ja) クランクシャフト及びその製造方法
JP5754608B2 (ja) 機械加工部品の製造方法および機械加工部品
JPH0873929A (ja) 機械要素部品及びその製造方法
CN106636570A (zh) 一种渗碳销套返修的热处理方法
JP2023079577A (ja) 歯車の製造方法及び歯車
JP2007246975A (ja) 鉄鋼製の軸の製造方法
JP2003071632A (ja) 歯車の製造方法
CN117773511A (zh) 曲轴制造方法及曲轴
JP2005264262A (ja) 環状歯車の熱処理方法及び環状歯車
JP4683221B2 (ja) リングギヤ及びリングギヤの製造方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16917640

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16917640

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: JP