WO2018047490A1 - 検査システムの調整方法およびそれに用いる補助エレメント - Google Patents
検査システムの調整方法およびそれに用いる補助エレメント Download PDFInfo
- Publication number
- WO2018047490A1 WO2018047490A1 PCT/JP2017/026834 JP2017026834W WO2018047490A1 WO 2018047490 A1 WO2018047490 A1 WO 2018047490A1 JP 2017026834 W JP2017026834 W JP 2017026834W WO 2018047490 A1 WO2018047490 A1 WO 2018047490A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- inspection
- module
- transport
- modules
- auxiliary element
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/28—Testing of electronic circuits, e.g. by signal tracer
- G01R31/2851—Testing of integrated circuits [IC]
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01L—SEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
- H01L21/00—Processes or apparatus adapted for the manufacture or treatment of semiconductor or solid state devices or of parts thereof
- H01L21/67—Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere
- H01L21/67005—Apparatus not specifically provided for elsewhere
- H01L21/67011—Apparatus for manufacture or treatment
- H01L21/67155—Apparatus for manufacturing or treating in a plurality of work-stations
- H01L21/6719—Apparatus for manufacturing or treating in a plurality of work-stations characterized by the construction of the processing chambers, e.g. modular processing chambers
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R1/00—Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
- G01R1/02—General constructional details
- G01R1/04—Housings; Supporting members; Arrangements of terminals
- G01R1/0408—Test fixtures or contact fields; Connectors or connecting adaptors; Test clips; Test sockets
- G01R1/0491—Test fixtures or contact fields; Connectors or connecting adaptors; Test clips; Test sockets for testing integrated circuits on wafers, e.g. wafer-level test cartridge
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/26—Testing of individual semiconductor devices
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/28—Testing of electronic circuits, e.g. by signal tracer
- G01R31/2851—Testing of integrated circuits [IC]
- G01R31/2855—Environmental, reliability or burn-in testing
- G01R31/286—External aspects, e.g. related to chambers, contacting devices or handlers
- G01R31/2862—Chambers or ovens; Tanks
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/28—Testing of electronic circuits, e.g. by signal tracer
- G01R31/2851—Testing of integrated circuits [IC]
- G01R31/2855—Environmental, reliability or burn-in testing
- G01R31/286—External aspects, e.g. related to chambers, contacting devices or handlers
- G01R31/2868—Complete testing stations; systems; procedures; software aspects
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01L—SEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
- H01L21/00—Processes or apparatus adapted for the manufacture or treatment of semiconductor or solid state devices or of parts thereof
- H01L21/67—Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere
- H01L21/67005—Apparatus not specifically provided for elsewhere
- H01L21/67011—Apparatus for manufacture or treatment
- H01L21/67155—Apparatus for manufacturing or treating in a plurality of work-stations
- H01L21/67207—Apparatus for manufacturing or treating in a plurality of work-stations comprising a chamber adapted to a particular process
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01L—SEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
- H01L21/00—Processes or apparatus adapted for the manufacture or treatment of semiconductor or solid state devices or of parts thereof
- H01L21/67—Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere
- H01L21/67005—Apparatus not specifically provided for elsewhere
- H01L21/67242—Apparatus for monitoring, sorting or marking
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01L—SEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
- H01L21/00—Processes or apparatus adapted for the manufacture or treatment of semiconductor or solid state devices or of parts thereof
- H01L21/67—Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere
- H01L21/67005—Apparatus not specifically provided for elsewhere
- H01L21/67242—Apparatus for monitoring, sorting or marking
- H01L21/67253—Process monitoring, e.g. flow or thickness monitoring
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01L—SEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
- H01L21/00—Processes or apparatus adapted for the manufacture or treatment of semiconductor or solid state devices or of parts thereof
- H01L21/67—Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere
- H01L21/677—Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations
- H01L21/67763—Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components ; Apparatus not specifically provided for elsewhere for conveying, e.g. between different workstations the wafers being stored in a carrier, involving loading and unloading
- H01L21/67775—Docking arrangements
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01L—SEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
- H01L22/00—Testing or measuring during manufacture or treatment; Reliability measurements, i.e. testing of parts without further processing to modify the parts as such; Structural arrangements therefor
- H01L22/10—Measuring as part of the manufacturing process
- H01L22/14—Measuring as part of the manufacturing process for electrical parameters, e.g. resistance, deep-levels, CV, diffusions by electrical means
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01L—SEMICONDUCTOR DEVICES NOT COVERED BY CLASS H10
- H01L22/00—Testing or measuring during manufacture or treatment; Reliability measurements, i.e. testing of parts without further processing to modify the parts as such; Structural arrangements therefor
- H01L22/20—Sequence of activities consisting of a plurality of measurements, corrections, marking or sorting steps
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/28—Testing of electronic circuits, e.g. by signal tracer
- G01R31/2851—Testing of integrated circuits [IC]
- G01R31/2893—Handling, conveying or loading, e.g. belts, boats, vacuum fingers
Definitions
- the present invention relates to a method for adjusting an inspection system and an auxiliary element used therefor.
- an electrical inspection of an IC chip formed on a semiconductor wafer is performed.
- an inspection apparatus that performs such electrical inspection, a probe apparatus that performs electrical inspection by bringing a probe into contact with an electrode of a semiconductor element formed on a semiconductor wafer is generally used.
- Patent Document 1 In order to efficiently perform such electrical inspection on a large number of semiconductor wafers, an inspection system in which a plurality of probe devices (inspection devices) are connected to a transfer unit (loader) has been proposed (for example, Patent Document 1).
- Such an inspection system is normally assembled and adjusted for each probe device (inspection device) and transport unit (loader) module, then docked, and various adjustments required after the system is assembled. Then, the inspection is performed, and then the modules are separated and shipped again.
- a plurality of probe devices as a module and a transport device are once docked before the shipment to configure an inspection system, and then separated and shipped again for each module. It will be long.
- an object of the present invention is to provide a technique capable of reducing the lead time before shipment of the inspection system.
- a plurality of inspection modules for inspecting an object to be inspected and a transport module for transporting the object to be inspected to the plurality of inspection modules are assembled, and the object to be inspected is transported.
- an inspection system adjustment method for performing a predetermined adjustment before shipping the inspection system It is necessary to perform adjustment after preparing an auxiliary element having a predetermined function of the inspection module or a predetermined function of the transfer module, and assembling the inspection module and the transfer module to configure the inspection system.
- the auxiliary element is connected to the transport module or the inspection module, so that the transport module is a single unit, or the plurality of inspection modules are single units, or the plurality of inspection modules are used as one system.
- a method for adjusting an inspection system is provided.
- the auxiliary element has a transport module simulator which is a virtual transport module on software, which is connected to the inspection module and can send and receive control signals similar to those of the transport module to the inspection module. Can be.
- the auxiliary element has an inspection module simulator which is a virtual inspection module on software, which is connected to the transfer module and can send and receive control signals similar to those of the inspection module to the transfer module. Can be.
- the transport module is adjusted by the inspection module simulator, the transport module is transported and the transport module is adjusted based on a control signal from the test module simulator. At this time, it is possible to use a temporary placement jig for an inspection object that simulates the stage of the inspection object of the inspection module.
- the auxiliary element may include a virtual transfer module jig that is connected to the inspection module and can send an electric signal similar to the electric signal sent from the transfer module to the inspection module.
- the auxiliary element may include a virtual inspection module jig that is connected to the transport module and can transmit an electrical signal similar to the electrical signal transmitted from the inspection module to the transport module.
- It may further include adjusting the predetermined operation using inspection module adjustment self-diagnosis software that virtually performs a predetermined operation by the inspection module alone.
- It may further include attaching a positioning jig in which the positioning blocks of the inspection module are aligned at a predetermined interval to the frame of the inspection system.
- a plurality of inspection modules for inspecting an object to be inspected and a conveyance module for conveying the object to be inspected to the plurality of inspection modules are assembled, and the object to be inspected is conveyed.
- the auxiliary element is used when making a predetermined adjustment before shipping the inspection system.
- Has a predetermined function of the inspection module or a predetermined function of the transfer module is connected to the transfer module or the inspection module, and assembles the inspection module and the transfer module to constitute the inspection system.
- the auxiliary element is provided for adjustment items that need to be adjusted from Each single multiple inspection module, or to allow adjusting the plurality of test modules as a system.
- the auxiliary element having the predetermined function of the inspection module or the predetermined function of the transfer module are connected to the transport module or the inspection module, so that the transport module is adjusted as a single unit, or a plurality of inspection modules are adjusted as a single unit, or a plurality of inspection modules are adjusted as one system. For this reason, it is not necessary to assemble the inspection system before shipment, and the lead time before shipment of the inspection system can be shortened.
- FIG. 1 is a plan view showing a schematic configuration of an example of an inspection system to which the adjustment method of the present invention is applied
- FIG. 2 is a side view thereof.
- the inspection system 100 performs an electrical inspection of a semiconductor wafer (hereinafter simply referred to as a wafer) W that is an object to be inspected, and includes a plurality of (in this example, five) probe devices (inspection modules) 10 and a carrier. Unit (conveying module) 20.
- the inspection system 100 is configured by assembling a probe device 10 and a transport unit 20 in a frame, and a plurality of probe devices are arranged in the longitudinal direction of the transport unit 20 (X direction in the figure).
- the transfer unit 20 is provided with a loading / unloading stage unit 21 having a plurality of loading / unloading stages for loading / unloading a wafer W, a probe card and the like, and a pre-alignment unit 22 for pre-alignment of the wafer W.
- a FOUP F which is a wafer storage container, is placed on the carry-in / out stage.
- the probe device 10 corresponds to a housing 11, a head plate 12 that forms a top surface of the housing 11, and a circular hole 12 a is formed in the center, and a hole 12 a of the head plate 12.
- a probe card 13 having a probe needle (contactor) 13 a and a stage 14 on which the wafer W is placed at a position below the probe card 13.
- the stage 14 can be moved in the X, Y, Z, and ⁇ directions by an XY table mechanism, a Z direction moving mechanism, and a ⁇ direction moving mechanism (all not shown).
- the wafer W delivered from is positioned at a predetermined inspection position.
- the probe needle (contact) 13a of the probe card 13 is connected to the IC chip terminal of the wafer W.
- a test head 16 that electrically relays between the probe card 13 and the tester is pivotably provided above the probe device 10, and the test head 16 is positioned at an inspection position directly above the probe device 10.
- a connection terminal (not shown) on the upper surface of the probe card 13 is connected to the test head 16 via the connection ring 15.
- the transfer unit 20 includes a delivery unit 31 that delivers the wafer W to the plurality of probe devices 10, the carry-in / out stage unit 21, and the pre-alignment unit 22, and the delivery unit 31 in the arrangement direction (X direction) of the plurality of probe devices 10. ) And a LM guide 33 that guides the transfer section 31 in the X direction, and further includes a housing 37 that accommodates them (see FIG. 2).
- the transfer unit 31 supports the transfer base 34 that can move in the X direction on the LM guide 33 and the wafer W, and moves in the Y direction, the Z direction (vertical direction), and the ⁇ direction (rotation direction) with respect to the transfer base 34.
- the transfer arm 35 includes an arm drive mechanism (not shown) that drives the transfer arm 35, and a cover member 36 that covers the wafer W on the transfer arm 35 when the transfer arm 35 is retracted.
- the cover member 36 rotates in the ⁇ direction together with the transport arm 35.
- each probe device 10 has a built-in control unit 40, and the transport unit 20 has a built-in control unit 50.
- the control unit 40 of the probe apparatus 10 includes a probe apparatus PC (process computer) 41 and a probe apparatus controller 42.
- the probe device PC41 performs high-order control, and the probe device controller 42 performs low-order control such as drive system control.
- the control unit 50 of the transport unit 20 includes a loader PC 51 and a loader controller 52.
- the loader PC 51 performs upper control, and the loader controller 52 performs lower control such as control of the drive system.
- the probe device PC 41, the probe device controller 42, the loader PC 51, and the loader controller 52 are connected by a LAN via a hub (HUB) 55 and can communicate with each other.
- UOB hub
- the control unit 40 and the control unit 50 control each component of the probe device 10 and the transport unit 20 by a predetermined control program (software), respectively.
- the probe device PC41 and the loader PC51 are connected to and controlled by a computer that manages the entire manufacturing process in the factory where the inspection system 100 is installed.
- the inspection system 100 has an on / off switch (not shown), and when the switch is turned on or off, the electrical signal is sent to the plurality of probe devices 10 and the transport unit 20. Further, the EMO (emergency stop) signal of the transport unit, the EMO signal of the tester, the interlock signal, and the DOCK / UNDOCK signal are sent from the transport unit 20 to each probe device 10. Further, the EMO signal, the interlock signal, and the AIR ON signal of the probe device 10 are sent from each probe device 10 to the transport unit 20.
- the pre-alignment is performed by taking out the wafer W before inspection from the FOUP F on the loading / unloading stage by the transfer unit 31 of the transfer unit 20 based on a predetermined control program.
- the wafer W is delivered to the unit 22 and the pre-aligned wafer W is transferred to a predetermined stage of the probe apparatus 10.
- a predetermined electrical inspection is performed on the wafer W by the probe device 10.
- the transfer unit 31 of the transfer unit 20 receives the inspected wafer W and stores it in the FOUP F.
- Such an inspection operation of the wafer W is continuously performed in parallel with respect to the plurality of probe apparatuses 10, and the inspection of the plurality of wafers W is efficiently performed.
- each probe device 10 and the transport unit 20 it is necessary to assemble each probe device 10 and the transport unit 20 for each module at an assembly stage before shipment, and then perform various adjustments before shipment.
- Some adjustment items can be performed by a single module, but there are also items that need to be performed after the probe system 10 and the transport unit 20 are assembled in a frame and the inspection system 100 is configured.
- the inspection system 100 since it is necessary to separate each module before shipping, after assembly and various adjustments are performed for each probe device 10 and each unit of the transport unit 20, these are docked to assemble an inspection system. It is necessary to perform various adjustments and inspections necessary later, and then separate each module again.
- a predetermined auxiliary element is connected to the probe device 10 or the transport unit for adjustment items that need to be adjusted after the probe device 10 and the transport unit 20 are assembled and the inspection system 100 is configured.
- the transport unit 20 can be adjusted as a single unit, or the plurality of probe devices 10 can be adjusted for each unit, or the plurality of probe devices 10 can be adjusted as a system. This eliminates the need to assemble the inspection system 100 before shipping, and can shorten the lead time before shipping compared to the prior art.
- a probe device simulator that is a virtual probe device on a soft wafer that is connected to the transfer unit 20 and can send and receive control signals on the same software as the probe device 10 to the transfer unit 20
- a transport unit simulator that is a virtual transport unit on software that is connected to the probe device 10 and can send and receive control signals on software similar to the transport unit 20 to the probe device 10
- a virtual transport unit jig connected to the probe device 10 and capable of giving the probe device 10 an electrical signal similar to the electrical signal sent from the transport unit 20 to the probe device 10
- a virtual probe device jig that is connected to the transport unit 20 and can give the transport unit 20 an electrical signal similar to the electrical signal sent from the probe device 10 to the transport unit 20; Is used.
- FIG. 4 is a conceptual diagram showing the probe device simulator (1).
- the probe device simulator 60 is connected to the actual machine of the transport unit 20 and includes a personal computer 61 and a controller 62 that can perform the same control as the control system of the probe device 10.
- the personal computer 61 has the same function as the probe apparatus PC 41 of the probe apparatus 10, and the controller 62 has the same function as the probe apparatus controller 42.
- the probe device simulator 60 has self-diagnosis software (program) for performing self-diagnosis by communicating the same signal as that of the probe device 10 with the transport unit 20, and predetermined confirmation and adjustment of the transport unit 20 ( Send and receive signals necessary for aging.
- the probe device simulator 60 is connected by the number of probe devices 10 to be connected to the transport unit 20 (five in this example).
- the probe device simulator 60 gives a signal given from the probe device 10 to the transport unit 20 to the transport unit 20 and confirms whether the transport unit 20 can perform predetermined communication with the probe device 10. And make adjustments if necessary.
- the probe device simulator 60 also adjusts (aging) the wafer transfer of the transfer unit 20. That is, the probe device simulator 60 gives a transfer signal to the transfer unit 20 to execute transfer of the wafer W by the transfer unit 20 and adjusts the transfer operation. At this time, since the transfer unit 20 actually transfers the wafer by a signal from the probe apparatus simulator 60, the transfer arm 35 of the transfer unit 20 as shown in FIG. A temporary wafer placement jig 65 that is assumed to deliver the wafer to the wafer is used.
- the wafer temporary placement jig 65 includes a temporary placement stage 66 set at the same height as the stage 14 of the actual probe apparatus 10, a support member 67 that supports the temporary placement stage 66, and a base member 68.
- the software of the probe device simulator 60 changes the details of opening / closing the shutter and updating the presence / absence of the wafer.
- FIG. 6 is a conceptual diagram showing the transport unit simulator (2).
- the transport unit simulator 70 is connected to the actual machine of the probe device 10 and includes a personal computer 71 and a controller 72 that can perform the same control as the control system of the transport unit 20.
- the personal computer 71 has the same function as the transport unit PC 51 of the transport unit 20, and the controller 72 has the same function as the transport unit controller 52.
- the transport unit simulator 70 has software for communicating the same signals as those of the transport unit 20 with the probe device 10 and exchanging signals necessary for predetermined confirmation and adjustment (aging) of the probe device 10. is doing.
- the transport unit simulator 70 needs to provide a signal given from the transport unit 20 to the probe device 10 to the probe device 10 and check whether the probe device 10 can perform predetermined communication with the transport unit 20. Make adjustments.
- the transport unit simulator 70 gives a system activation signal from the controller 72 to the transport unit 20, confirms whether or not the inspection system 100 is activated, and makes a predetermined adjustment as necessary.
- the transport unit simulator 70 gives a trigger signal of system initial (initialization) from the personal computer 71 to the probe device 10 to cause the probe device 10 to perform the operation of searching for the origin.
- a trigger signal of system initial (initialization) from the personal computer 71 to the probe device 10 to cause the probe device 10 to perform the operation of searching for the origin.
- an OK signal is output, and adjustment is performed if necessary.
- the transport unit simulator 70 confirms the display on the display 17 of the probe device 10 by the personal computer 71 and adjusts if necessary.
- FIG. 7 is a block diagram showing the virtual transport unit jig (3) above.
- the virtual transport unit jig 80 is configured by a controller.
- the virtual transport unit jig 80 includes an on switch 81 and an off switch 82 of the transport unit (loader) 20, a cover sensor switch (loader cover sensor) 83 of the transport unit 20, an EMO switch (loader EMO) 84 of the transport unit 20, A tester EMO switch (tester EMO) 85, a dock (DOCK) sensor switch (DOCK sensor) 86, and an undock sensor switch (UNDOCK sensor) 87 are connected.
- tester EMO tester EMO
- DOCK sensor dock
- UNDOCK sensor undock sensor switch
- the virtual transport unit jig 80 outputs a power ON / OFF signal, a loader EMO signal, an interlock signal, a tester EMO signal, and a DOCK / UNDOCK signal to the probe device 10 by turning on these switches. , Power ON / OFF, transport unit 20 interlock, transport unit 20 and tester EMO, and IO check operation check. Power ON / OFF, transport unit 20 interlock, transport unit 20 and tester EMO operation check is performed by the LED 88 provided on the virtual transport unit jig 80, and IO check operation check is performed on the IO read / write screen. . If the operation is not confirmed, a predetermined adjustment is performed.
- FIG. 8 is a configuration diagram showing the virtual probe device jig of (4) above.
- the virtual probe device jig 90 is configured by a controller.
- the virtual probe device jig 90 is connected to a cover sensor switch (probe device cover sensor) 91 of the probe device 10, an EMO switch (probe device EMO) 92 of the probe device 10, and an AIR ON switch 93.
- the virtual probe device jig 90 is connected to wirings of a plurality of probe device 10 connection portions of the transport unit 20 (No. 1 to 5 in this example).
- the virtual probe device jig 90 outputs a probe device EMO signal, an interlock signal, and an AIR operation signal to the transport unit 20 by turning on these switches. By this signal, the EMO of the probe device 10 and the probe device are output. Check the operation of 10 interlocks and AIR ON. These operation checks are performed by the LED 94 provided on the virtual probe device jig 90. Confirmation of operation is probe device no. 1 to 5 are automatically performed. In the case of NG, an error is displayed on the display screen 95. If an error message appears, make a predetermined adjustment.
- the operation check of the transport unit 20 by the power ON / OFF signal can be performed by connecting a personal computer or the like separately.
- the probe device adjustment self-diagnosis can be used to virtually perform predetermined operations by the probe device 10 alone and to check and adjust these operations. It is also effective to use software.
- Such probe device adjustment self-diagnosis software is built in the control unit 40 of the probe device 10.
- the stage 14 and the shutter of the probe device 10 are operated in a predetermined manner so that wiring in the probe device 10 and Make sure that the piping is not stressed during driving, and adjust if stress is applied.
- the following a) to d) are repeated by the probe device adjustment self-diagnosis software.
- Stage initial operation b) Opening / closing operation of shutter
- the present invention is not limited to the above-described embodiment, and various modifications can be made within the scope of the idea of the present invention.
- a probe apparatus having a specific structure as an inspection module and a transport system having a specific structure as a transport module have been described as an example.
- the structure of the module is not limited to that of the above embodiment, and another inspection module may be used instead of the probe device.
- (1) to (4) are shown as auxiliary elements.
- an inspection system is constructed by assembling an inspection module such as a probe device and a conveyance module such as a conveyance unit.
- the adjustments that need to be made after configuration are not limited to those of the above-described embodiment as long as they can be performed by the modules of the inspection module and the transfer module.
- an inspection system for inspecting a semiconductor wafer has been shown.
- an inspection system for inspecting an object to be inspected other than a semiconductor wafer may be used.
Landscapes
- Engineering & Computer Science (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Computer Hardware Design (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Manufacturing & Machinery (AREA)
- Power Engineering (AREA)
- Condensed Matter Physics & Semiconductors (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Testing Of Individual Semiconductor Devices (AREA)
- Testing Or Measuring Of Semiconductors Or The Like (AREA)
- Tests Of Electronic Circuits (AREA)
- Container, Conveyance, Adherence, Positioning, Of Wafer (AREA)
Abstract
被検査体を検査する複数の検査モジュール(10)と、複数の検査モジュールに被検査体を搬送する搬送モジュール(20)とを組み立てて構成され、被検査体を前記搬送モジュールにより前記各検査モジュールに搬送して複数の被検査体について順次検査を行う検査システム(100)において、出荷前に所定の調整を行う検査システムの調整方法は、検査モジュール(10)の所定の機能、または搬送モジュール(20)の所定の機能を有する補助エレメントを準備することと、検査モジュール(10)と搬送モジュール(20)を組み立てて検査システムを構成してから調整を行う必要がある調整項目について、前記補助エレメント(60,70,80,90)を、搬送モジュール(20)または検査モジュール(10)に接続することにより、搬送モジュール(20)を単体で、または複数の検査モジュール(10)を単体ごと、もしくは複数の検査モジュール(10)を一つのシステムとして調整することとを有する。
Description
本発明は、検査システムの調整方法およびそれに用いる補助エレメントに関する。
半導体デバイスの製造プロセスでは、半導体ウエハに形成されたICチップの電気的検査が行われる。このような電気的検査を行う検査装置として、一般的に、半導体ウエハに形成された半導体素子の電極にプローブを接触させて電気的検査を行うプローブ装置が用いられる。
このような電気的検査を多数の半導体ウエハに対して効率的に行うため、複数台のプローブ装置(検査装置)を搬送ユニット(ローダー)に連結してなる検査システムが提案されている(例えば、特許文献1)。
このような検査システムは、通常、各プローブ装置(検査装置)および搬送ユニット(ローダー)のモジュール単体ごとに組立および各種調整を行った後、これらをドッキングし、システムを組み上げた後に必要な各種調整および検査を行い、その後、再びモジュール毎に分離して出荷する。
従来の調整方法は、出荷前に、モジュールとしての複数のプローブ装置および搬送装置を一旦ドッキングして検査システムを構成した後、再びモジュール毎に分離して出荷するため、製品出荷までのリードタイムが長くなってしまう。
したがって、本発明の目的は、検査システムの出荷前のリードタイムを短縮することができる技術を提供することにある。
本発明の第1の観点によれば、被検査体を検査する複数の検査モジュールと、前記複数の検査モジュールに被検査体を搬送する搬送モジュールとを組み立てて構成され、被検査体を前記搬送モジュールにより前記各検査モジュールに搬送して複数の被検査体について順次検査を行う検査システムにおいて、前記検査システムを出荷する前に所定の調整を行う検査システムの調整方法であって、
前記検査モジュールの所定の機能、または前記搬送モジュールの所定の機能を有する補助エレメントを準備することと、前記検査モジュールと前記搬送モジュールを組み立てて前記検査システムを構成してから調整を行う必要がある調整項目について、前記補助エレメントを、前記搬送モジュールまたは前記検査モジュールに接続することにより、前記搬送モジュールを単体で、または前記複数の検査モジュールを単体ごと、もしくは前記複数の検査モジュールを一つのシステムとして調整することとを有する、検査システムの調整方法が提供される。
前記検査モジュールの所定の機能、または前記搬送モジュールの所定の機能を有する補助エレメントを準備することと、前記検査モジュールと前記搬送モジュールを組み立てて前記検査システムを構成してから調整を行う必要がある調整項目について、前記補助エレメントを、前記搬送モジュールまたは前記検査モジュールに接続することにより、前記搬送モジュールを単体で、または前記複数の検査モジュールを単体ごと、もしくは前記複数の検査モジュールを一つのシステムとして調整することとを有する、検査システムの調整方法が提供される。
前記補助エレメントは、前記検査モジュールに接続され、前記検査モジュールに対して前記搬送モジュールと同様の制御信号の授受を行うことができる、ソフトウエア上の仮想的な搬送モジュールである搬送モジュールシミュレータを有するものとすることができる。
前記補助エレメントは、前記搬送モジュールに接続され、前記搬送モジュールに対して前記検査モジュールと同様の制御信号の授受を行うことができる、ソフトウエア上の仮想的な検査モジュールである検査モジュールシミュレータを有するものとすることができる。この場合に、前記検査モジュールシミュレータにより、前記搬送モジュールの調整を行う際に、前記検査モジュールシミュレータからの制御信号に基づいて前記搬送モジュールにより被検査体の搬送を行って前記搬送モジュールの調整を行う際に、前記検査モジュールの被検査体のステージを模擬した被検査体の仮置き治具を用いるようにすることができる。
前記補助エレメントは、前記検査モジュールに接続され、前記検査モジュールに対して前記搬送モジュールから送られる電気信号と同様の電気信号を送ることができる仮想搬送モジュール治具を有するものとすることができる。
前記補助エレメントは、前記搬送モジュールに接続され、前記搬送モジュールに対して前記検査モジュールから送られる電気信号と同様の電気信号を送ることができる仮想検査モジュール治具を有するものとすることができる。
前記検査モジュール単体で所定の動作を仮想的に行わせる検査モジュール調整自己診断ソフトウエアを用い、前記所定の動作の調整を行うことをさらに有してもよい。
前記検査モジュールの位置決めブロックを所定間隔に合わせた位置出し治具を前記検査システムのフレームに取り付けることをさらに有してもよい。
本発明の第2の観点によれば、被検査体を検査する複数の検査モジュールと、前記複数の検査モジュールに被検査体を搬送する搬送モジュールとを組み立てて構成され、被検査体を前記搬送モジュールにより前記各検査モジュールに搬送して複数の被検査体について順次検査を行う検査システムにおいて、前記検査システムを出荷する前に所定の調整を行う際に用いられる補助エレメントであって、前記補助エレメントは、前記検査モジュールの所定の機能、または前記搬送モジュールの所定の機能を有し、前記搬送モジュールまたは前記検査モジュールに接続され、前記検査モジュールと前記搬送モジュールを組み立てて前記検査システムを構成してから調整を行う必要がある調整項目について、前記搬送モジュールを単体で、または前記複数の検査モジュールを単体ごと、もしくは前記複数の検査モジュールを一つのシステムとして調整可能とする、補助エレメントが提供される。
本発明によれば、検査モジュールと搬送モジュールを組み立てて前記検査システムを構成してから調整を行う必要がある調整項目について、検査モジュールの所定の機能、または搬送モジュールの所定の機能を有する補助エレメントを、搬送モジュールまたは前記検査モジュールに接続することにより、搬送モジュールを単体で、または複数の検査モジュールを単体ごと、もしくは複数の検査モジュールを一つのシステムとして調整するようにした。このため、出荷前に検査システムを組み立てる必要がなく、検査システムの出荷前のリードタイムを短縮することができる。
以下、添付図面を参照して本発明の実施の形態について詳細に説明する。
<検査システムの構成>
図1は本発明の調整方法が適用される検査システムの一例の概略構成を示す平面図、図2はその側面図である。検査システム100は、被検査体である半導体ウエハ(以下、単にウエハと記す)Wの電気的検査を行うものであり、複数(本例では5台)のプローブ装置(検査モジュール)10と、搬送ユニット(搬送モジュール)20とを有している。
<検査システムの構成>
図1は本発明の調整方法が適用される検査システムの一例の概略構成を示す平面図、図2はその側面図である。検査システム100は、被検査体である半導体ウエハ(以下、単にウエハと記す)Wの電気的検査を行うものであり、複数(本例では5台)のプローブ装置(検査モジュール)10と、搬送ユニット(搬送モジュール)20とを有している。
検査システム100は、フレーム内にプローブ装置10と搬送ユニット20が組み立てられて構成され、複数のプローブ装置は、搬送ユニット20の長手方向(図中X方向)に配列されている。
搬送ユニット20には、ウエハWやプローブカード等の搬入出を行う複数の搬入出ステージを有する搬入出ステージ部21と、ウエハWのプリアライメントを行うプリアライメント部22とが取り付けられている。搬入出ステージには、例えばウエハ収納容器であるフープ(FOUP)Fが載置されるようになっている。
プローブ装置10は、図2に示すように、筐体11と、筐体11の天面を構成し、中央に円形の孔12aが形成されたヘッドプレート12と、ヘッドプレート12の孔12aに対応する位置に取り付けられ、プローブ針(接触子)13aを有するプローブカード13と、プローブカード13の下方位置でウエハWを載置するステージ14とを有する。
ステージ14は、X-Yテーブル機構、Z方向移動機構およびθ方向移動機構(いずれも図示せず)によりX、Y、Z、θ方向に移動可能となっており、搬送ユニット20の受け渡し部31から受け渡されたウエハWを所定の検査位置へ位置決めするようになっている。
また、プローブカード13のプローブ針(接触子)13aは、ウエハWのICチップの端子に接続するようになっている。
プローブ装置10の上方には、プローブカード13とテスターとの間を電気的に中継するテストヘッド16が旋回可能に設けられており、テストヘッド16がプローブ装置10の直上の検査位置に位置された時に、プローブカード13上面の接続端子(図示せず)が接続リング15を介してテストヘッド16に接続されるようになっている。
搬送ユニット20は、複数のプローブ装置10、搬入出ステージ部21およびプリアライメント部22に対してウエハWの受け渡しを行う受け渡し部31と、受け渡し部31を複数のプローブ装置10の配列方向(X方向)に沿って移動させる駆動機構32と、受け渡し部31をX方向にガイドするLMガイド33とを有し、さらにこれらを収容する筐体37を有している(図2参照)。
受け渡し部31は、LMガイド33上をX方向に移動可能な搬送ベース34と、ウエハWを支持し、搬送ベース34に対しY方向、Z方向(上下方向)、θ方向(回転方向)に移動可能な搬送アーム35と、搬送アーム35を駆動するアーム駆動機構(図示せず)と、搬送アーム35が退避状態で搬送アーム35上のウエハWをカバーするカバー部材36とを有している。カバー部材36は、搬送アーム35とともにθ方向に回転するようになっている。搬送アーム35は一つであっても、2つ以上であってもよい。
図3に示すように、各プローブ装置10には制御部40が内蔵されており、搬送ユニット20には、制御部50が内蔵されている。プローブ装置10の制御部40は、プローブ装置PC(プロセスコンピュータ)41と、プローブ装置コントローラ42を有している。プローブ装置PC41は上位の制御を行い、プローブ装置コントローラ42は駆動系の制御等の下位の制御を行う。また、搬送ユニット20の制御部50は、ローダーPC51と、ローダーコントローラ52を有している。ローダーPC51は上位の制御を行い、ローダーコントローラ52は駆動系等の制御等の下位の制御を行う。プローブ装置PC41、プローブ装置コントローラ42、ローダーPC51、およびローダーコントローラ52はハブ(HUB)55を介してLANにより接続されており、通信可能となっている。制御部40および制御部50は、それぞれ所定の制御プログラム(ソフトウエア)によって、プローブ装置10および搬送ユニット20の各構成部を制御する。プローブ装置PC41およびローダーPC51は、検査システム100が設置されている工場における全体の製造工程を管理するコンピュータに接続され、制御される。
また、検査システム100は、オン・オフスイッチ(図示せず)を有しており、そのスイッチがオンまたはオフされた場合に、その電気信号が複数のプローブ装置10および搬送ユニット20に送られる。また、搬送ユニット20から各プローブ装置10には、搬送ユニットのEMO(緊急停止)信号やテスターのEMO信号、インターロック信号、およびDOCK/UNDOCK信号が送られる。さらに、各プローブ装置10から搬送ユニット20には、プローブ装置10のEMO信号、インターロック信号、AIR ON信号が送られる。
以上のような検査システム100においては、装置を起動した後、所定の制御プログラムに基づいて、搬送ユニット20の受け渡し部31により検査前のウエハWを搬入出ステージ上のフープFから取り出してプリアライメント部22に受け渡し、プリアライメント後のウエハWを所定のプローブ装置10のステージに搬送する。そして、そのウエハWに対してプローブ装置10にて所定の電気的検査を実施する。その後、搬送ユニット20の受け渡し部31が検査後のウエハWを受け取り、フープF内に収納する。このようなウエハWの検査動作を複数のプローブ装置10に対して並列的に連続して行い、複数のウエハWの検査を効率的に行う。
ところで、このような検査装置においては、出荷前の組み立て段階で、各プローブ装置10および搬送ユニット20のモジュール単体ごとに組立を行い、その後、出荷前に各種調整を行う必要がある。調整項目の中にはモジュール単体で行えるものもあるが、複数のプローブ装置10と搬送ユニット20をフレーム内に組み立て、検査システム100を構成してから行う必要がある項目も存在する。一方、出荷する前にはモジュール毎に分離する必要があるため、各プローブ装置10および搬送ユニット20のモジュール単体ごとに組立および各種調整を行った後、これらをドッキングして、検査システムを組み上げた後に必要な各種調整および検査を行い、その後、再びモジュール毎に分離する必要がある。
しかし、このように、モジュールとしての複数のプローブ装置10および搬送ユニット20を一旦ドッキングして検査システム100を組み立てた後、再びモジュール毎に分離するという作業は、煩雑であり、リードタイムが長くなってしまう。
そこで、本実施形態では、プローブ装置10および搬送ユニット20を組み立てて、検査システム100を構成した後に調整を行う必要がある調整項目について、プローブ装置10または搬送ユニットに所定の補助エレメントを接続することにより、搬送ユニット20を単体で、または複数のプローブ装置10を単体ごとに、もしくは複数のプローブ装置10をシステムとして調整できるようにした。これにより、出荷前に検査システム100を組み立てる必要がなくなり、出荷前のリードタイムを従来よりも短縮することができる。
補助エレメントとしては、
(1)搬送ユニット20に接続され、搬送ユニット20に対してプローブ装置10と同様のソフトウエア上の制御信号の授受を行うことができる、ソフトウエハ上の仮想的なプローブ装置であるプローブ装置シミュレータ、
(2)プローブ装置10に接続され、プローブ装置10に対して搬送ユニット20と同様のソフトウエア上の制御信号の授受を行うことができる、ソフトウエア上の仮想的な搬送ユニットである搬送ユニットシミュレータ、
(3)プローブ装置10に接続され、搬送ユニット20からプローブ装置10に送られる電気信号と同様の電気信号をプローブ装置10に与えることができる仮想搬送ユニット治具、
(4)搬送ユニット20に接続され、プローブ装置10から搬送ユニット20に送られる電気信号と同様の電気信号を搬送ユニット20に与えることができる仮想プローブ装置治具、
が用いられる。
(1)搬送ユニット20に接続され、搬送ユニット20に対してプローブ装置10と同様のソフトウエア上の制御信号の授受を行うことができる、ソフトウエハ上の仮想的なプローブ装置であるプローブ装置シミュレータ、
(2)プローブ装置10に接続され、プローブ装置10に対して搬送ユニット20と同様のソフトウエア上の制御信号の授受を行うことができる、ソフトウエア上の仮想的な搬送ユニットである搬送ユニットシミュレータ、
(3)プローブ装置10に接続され、搬送ユニット20からプローブ装置10に送られる電気信号と同様の電気信号をプローブ装置10に与えることができる仮想搬送ユニット治具、
(4)搬送ユニット20に接続され、プローブ装置10から搬送ユニット20に送られる電気信号と同様の電気信号を搬送ユニット20に与えることができる仮想プローブ装置治具、
が用いられる。
図4は、上記(1)のプローブ装置シミュレータを示す概念図である。図4に示すように、プローブ装置シミュレータ60は、搬送ユニット20の実機に対して接続されるものであり、プローブ装置10の制御系と同様の制御が可能なパーソナルコンピュータ61とコントローラ62を有する。パーソナルコンピュータ61は、プローブ装置10のプローブ装置PC41と同様の機能を有し、コントローラ62はプローブ装置コントローラ42と同様の機能を有する。プローブ装置シミュレータ60は、プローブ装置10と同様の信号を搬送ユニット20との間で通信して自己診断する自己診断ソフトウエア(プログラム)を有しており、搬送ユニット20の所定の確認や調整(エージング)に必要な信号の授受を行う。プローブ装置シミュレータ60は、搬送ユニット20に接続すべきプローブ装置10の数(本例では5つ)だけ接続される。
具体的には、プローブ装置シミュレータ60は、プローブ装置10から搬送ユニット20に与えられる信号を搬送ユニット20に与え、搬送ユニット20がプローブ装置10との間で所定の通信が可能か否かを確認し、必要があれば調整を行う。
また、プローブ装置シミュレータ60は、搬送ユニット20のウエハ搬送の調整(エージング)も行う。すなわち、プローブ装置シミュレータ60が、搬送信号を搬送ユニット20に与えて搬送ユニット20によるウエハWの搬送を実行させ、搬送動作の調整を行う。この際には、プローブ装置シミュレータ60からの信号により、搬送ユニット20が実際にウエハの搬送を行うため、図5に示すような、搬送ユニット20の搬送アーム35により、ウエハWをプローブ装置のステージへウエハを受け渡すことを想定したウエハ仮置き治具65を用いる。ウエハ仮置き治具65は、実際のプローブ装置10のステージ14と同じ高さに設定された仮置きステージ66と、仮置きステージ66を支持する支持部材67と、ベース部材68とを有する。
なお、プローブ装置シミュレータ60のソフトウエアは、シャッターの開け閉め、およびウエハ有無更新の内容を変更する。
図6は、上記(2)の搬送ユニットシミュレータを示す概念図である。図6に示すように、搬送ユニットシミュレータ70は、プローブ装置10の実機に対して接続されるものであり、搬送ユニット20の制御系と同様の制御が可能なパーソナルコンピュータ71とコントローラ72を有する。パーソナルコンピュータ71は、搬送ユニット20の搬送ユニットPC51と同様の機能を有し、コントローラ72は搬送ユニットコントローラ52と同様の機能を有する。また、搬送ユニットシミュレータ70は、搬送ユニット20と同様の信号をプローブ装置10との間で通信し、プローブ装置10の所定の確認や調整(エージング)に必要な信号の授受を行うソフトウエアを有している。
搬送ユニットシミュレータ70は、搬送ユニット20からプローブ装置10に与えられる信号をプローブ装置10に与え、プローブ装置10が搬送ユニット20との間で所定の通信が可能か否かを確認し、必要があれば調整を行う。
また、搬送ユニットシミュレータ70は、コントローラ72から搬送ユニット20にシステム起動の信号を与え、検査システム100が起動するか否かを確認し、必要に応じて所定の調整を行う。
さらに、搬送ユニットシミュレータ70は、パーソナルコンピュータ71からプローブ装置10にシステムイニシャル(初期化)のトリガー信号を与え、プローブ装置10に原点さがしの動作をさせる。所定のイニシャル動作がされた場合はOKの信号が出され、必要があれば調整を行う。さらにまた、搬送ユニットシミュレータ70は、パーソナルコンピュータ71によりプローブ装置10のディスプレイ17の表示を確認し、必要があれば調整を行う。
図7は、上記(3)の仮想搬送ユニット治具を示す構成図である。図7に示すように、仮想搬送ユニット治具80はコントローラで構成されている。仮想搬送ユニット治具80には、搬送ユニット(ローダー)20のオンスイッチ81、オフスイッチ82、搬送ユニット20のカバーセンサースイッチ(ローダーカバーセンサ)83、搬送ユニット20のEMOスイッチ(ローダーEMO)84、テスターのEMOスイッチ(テスターEMO)85、ドック(DOCK)センサスイッチ(DOCKセンサ)86、アンドック(UNDOCK)センサスイッチ(UNDOCKセンサ)87が接続されている。
仮想搬送ユニット治具80は、これらのスイッチをONすることにより、パワーON/OFF信号、ローダーEMO信号、インターロック信号、テスターEMO信号、DOCK/UNDOCK信号をプローブ装置10に出力し、この信号により、パワーON/OFF、搬送ユニット20のインターロック、搬送ユニット20およびテスターのEMO、およびIOチェックの動作確認を行う。パワーON/OFF、搬送ユニット20のインターロック、搬送ユニット20およびテスターのEMOの動作確認は、仮想搬送ユニット治具80に設けられたLED88により行い、IOチェックの動作確認はIOリードライト画面で行う。動作確認されない場合は、所定の調整を行う。
図8は、上記(4)の仮想プローブ装置治具を示す構成図である。図8に示すように、仮想プローブ装置治具90はコントローラで構成されている。仮想プローブ装置治具90には、プローブ装置10のカバーセンサースイッチ(プローブ装置カバーセンサ)91、プローブ装置10のEMOスイッチ(プローブ装置EMO)92、AIR ON スイッチ93が接続されている。また、仮想プローブ装置治具90は、搬送ユニット20の複数(本例ではNo.1~5の5つ)のプローブ装置10接続部の配線に接続されている。
仮想プローブ装置治具90は、これらのスイッチをONにすることにより、プローブ装置EMO信号、インターロック信号、AIR動作信号を搬送ユニット20に出力し、この信号により、プローブ装置10のEMO、プローブ装置10のインターロック、およびAIR ONの動作確認を行う。これらの動作確認は仮想プローブ装置治具90に設けられたLED94により行う。動作確認はプローブ装置No.1~5まで自動的に行い、NGの場合は表示画面95にエラー表示する。エラー表示が出た場合は、所定の調整を行う。
なお、パワーON/OFF信号による搬送ユニット20の動作確認は、パーソナルコンピュータ等を別途接続して行うことができる。
上記(1)~(4)に示すような補助エレメントの他に、プローブ装置10単体で所定の動作を仮想的に行わせて、これら動作の確認・調整を行うことができるプローブ装置調整自己診断ソフトウエアを用いることも有効である。
このようなプローブ装置調整自己診断ソフトウエアは、プローブ装置10の制御部40に内蔵されており、例えば、プローブ装置10のステージ14およびシャッターに所定の動作をさせて、プローブ装置10内の配線および配管に駆動時のストレスがかからないことを確認し、ストレスがかかった場合は調整を行う。具体的には、プローブ装置調整自己診断ソフトウエアにより、以下のa)~d)を繰り返す。
a)ステージイニシャル動作
b)シャッターの開・閉動作
c)ステージ上のウエハのアライメント動作
d)ステージのX,Y,Z,θフルストローク駆動
a)ステージイニシャル動作
b)シャッターの開・閉動作
c)ステージ上のウエハのアライメント動作
d)ステージのX,Y,Z,θフルストローク駆動
従来は、これらの動作は検査システムを構成してから行っていたが、このようなプローブ装置調整自己診断ソフトウエアをプローブ装置10の制御部40に内蔵させることにより、プローブ装置10単体での調整が可能となる。
その他、プローブ装置10の位置決めブロックの取り付けミスによるプローブ装置10の位置ずれをなくすための位置出し治具を用いることも有効である。すなわち、図9に示すような、各プローブ装置10の位置決めブロック111の間隔を所定間隔に合わせた位置出し治具110をフレームに取り付ける。これにより出荷する際に検査システムを組み立てないことによるプローブ装置10の位置ずれが生じる不都合を解消することができる。
<他の適用>
なお、本発明は上記実施形態に限定されることなく、本発明の思想の範囲内において種々変形可能である。例えば、上記実施形態では、検査モジュールとしての特定の構造のプローブ装置と、搬送モジュールとしての特定の構造の搬送ユニットを組み立てて構成する検査システムを例にとって説明したが、プローブ装置と搬送システム(搬送モジュール)の構造は上記実施形態のものに限らず、また、プローブ装置の代わりに他の検査モジュールを用いてもよい。
なお、本発明は上記実施形態に限定されることなく、本発明の思想の範囲内において種々変形可能である。例えば、上記実施形態では、検査モジュールとしての特定の構造のプローブ装置と、搬送モジュールとしての特定の構造の搬送ユニットを組み立てて構成する検査システムを例にとって説明したが、プローブ装置と搬送システム(搬送モジュール)の構造は上記実施形態のものに限らず、また、プローブ装置の代わりに他の検査モジュールを用いてもよい。
また、上記実施形態では、補助エレメントとして(1)~(4)を示したが、これらも例示に過ぎず、プローブ装置のような検査モジュールと搬送ユニットのような搬送モジュールを組み立てて検査システムを構成してから行う必要がある調整を、検査モジュール、搬送モジュールのモジュール単体で行えるようにするものであれば上記実施形態のものに限らない。
さらに、上記実施形態では、半導体ウエハを検査する検査システムを示したが、半導体ウエハ以外の被検査体を検査する検査システムであってもよい。
10;プローブ装置(検査モジュール)、11;筐体、12;ヘッドプレート、14;ステージ、20;搬送ユニット(搬送モジュール)、21;搬入出ステージ、22;プリアライメント部、31;受け渡し部、32;駆動機構、40,50;制御部、41;プローブ装置PC、42;プローブ装置コントローラ、51;ローダーPC、52;ローダーコントローラ、55;ハブ(HUB)、60;プローブ装置シミュレータ(補助エレメント)、70;搬送ユニットシミュレータ(補助エレメント)、80;仮想搬送ユニット治具(補助エレメント)、90;仮想プローブ装置治具(補助エレメント)、100;検査システム、W;半導体ウエハ(被搬送体)
Claims (13)
- 被検査体を検査する複数の検査モジュールと、前記複数の検査モジュールに被検査体を搬送する搬送モジュールとを組み立てて構成され、被検査体を前記搬送モジュールにより前記各検査モジュールに搬送して複数の被検査体について順次検査を行う検査システムにおいて、前記検査システムを出荷する前に所定の調整を行う検査システムの調整方法であって、
前記検査モジュールの所定の機能、または前記搬送モジュールの所定の機能を有する補助エレメントを準備することと、
前記検査モジュールと前記搬送モジュールを組み立てて前記検査システムを構成してから調整を行う必要がある調整項目について、前記補助エレメントを、前記搬送モジュールまたは前記検査モジュールに接続することにより、前記搬送モジュールを単体で、または前記複数の検査モジュールを単体ごと、もしくは前記複数の検査モジュールを一つのシステムとして調整することと
を有する、検査システムの調整方法。 - 前記補助エレメントは、前記検査モジュールに接続され、前記検査モジュールに対して前記搬送モジュールと同様の制御信号の授受を行うことができる、ソフトウエア上の仮想的な搬送モジュールである搬送モジュールシミュレータを有する、請求項1に記載の検査システムの調整方法。
- 前記補助エレメントは、前記搬送モジュールに接続され、前記搬送モジュールに対して前記検査モジュールと同様の制御信号の授受を行うことができる、ソフトウエア上の仮想的な検査モジュールである検査モジュールシミュレータを有する、請求項1または請求項2に記載の検査システムの調整方法。
- 前記検査モジュールシミュレータにより、前記搬送モジュールの調整を行う際に、前記検査モジュールシミュレータからの制御信号に基づいて前記搬送モジュールにより被検査体の搬送を行って前記搬送モジュールの調整を行う際に、前記検査モジュールの被検査体のステージを模擬した被検査体の仮置き治具を用いる、請求項3に記載の検査システムの調整方法。
- 前記補助エレメントは、前記検査モジュールに接続され、前記検査モジュールに対して前記搬送モジュールから送られる電気信号と同様の電気信号を送ることができる仮想搬送モジュール治具を有する、請求項1から請求項4のいずれか1項に記載の検査システムの調整方法。
- 前記補助エレメントは、前記搬送モジュールに接続され、前記搬送モジュールに対して前記検査モジュールから送られる電気信号と同様の電気信号を送ることができる仮想検査モジュール治具を有する、請求項1から請求項5のいずれか1項に記載の検査システムの調整方法。
- 前記検査モジュール単体で所定の動作を仮想的に行わせる検査モジュール調整自己診断ソフトウエアを用い、前記所定の動作の調整を行うことをさらに有する、請求項1から請求項6のいずれか1項に記載の検査システムの調整方法。
- 前記検査モジュールの位置決めブロックを所定間隔に合わせた位置出し治具を前記検査システムのフレームに取り付けることをさらに有する、請求項1から請求項7のいずれか1項に記載の検査システムの調整方法。
- 被検査体を検査する複数の検査モジュールと、前記複数の検査モジュールに被検査体を搬送する搬送モジュールとを組み立てて構成され、被検査体を前記搬送モジュールにより前記各検査モジュールに搬送して複数の被検査体について順次検査を行う検査システムにおいて、前記検査システムを出荷する前に所定の調整を行う際に用いられる補助エレメントであって、
前記補助エレメントは、前記検査モジュールの所定の機能、または前記搬送モジュールの所定の機能を有し、前記搬送モジュールまたは前記検査モジュールに接続され、
前記検査モジュールと前記搬送モジュールを組み立てて前記検査システムを構成してから調整を行う必要がある調整項目について、前記搬送モジュールを単体で、または前記複数の検査モジュールを単体ごと、もしくは前記複数の検査モジュールを一つのシステムとして調整可能とする、補助エレメント。 - 前記検査モジュールに接続され、前記検査モジュールに対して前記搬送モジュールと同様の制御信号の授受を行うことができる、ソフトウエア上の仮想的な搬送モジュールである搬送モジュールシミュレータを有する、請求項9に記載の補助エレメント。
- 前記搬送モジュールに接続され、前記搬送モジュールに対して前記検査モジュールと同様の制御信号の授受を行うことができる、ソフトウエア上の仮想的な検査モジュールである検査モジュールシミュレータを有する、請求項9または請求項10に記載の補助エレメント。
- 前記検査モジュールに接続され、前記検査モジュールに対して前記搬送モジュールから送られる電気信号と同様の電気信号を送ることができる仮想搬送モジュール治具を有する、請求項9から請求項11のいずれか1項に記載の補助エレメント。
- 前記搬送モジュールに接続され、前記搬送モジュールに対して前記検査モジュールから送られる電気信号と同様の電気信号を送ることができる仮想検査モジュール治具を有する、請求項9から請求項12のいずれか1項に記載の補助エレメント。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201780054613.5A CN109729737B (zh) | 2016-09-09 | 2017-07-25 | 检查系统的调节方法及其使用的辅助器件 |
KR1020197006677A KR102220915B1 (ko) | 2016-09-09 | 2017-07-25 | 검사 시스템의 조정 방법 및 그에 이용하는 보조 엘리먼트 |
US16/331,584 US11016142B2 (en) | 2016-09-09 | 2017-07-25 | Adjustment method of inspection system and auxiliary element therefor |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016-176149 | 2016-09-09 | ||
JP2016176149A JP6832654B2 (ja) | 2016-09-09 | 2016-09-09 | 検査システムの調整方法およびそれに用いる補助エレメント |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2018047490A1 true WO2018047490A1 (ja) | 2018-03-15 |
Family
ID=61561907
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2017/026834 WO2018047490A1 (ja) | 2016-09-09 | 2017-07-25 | 検査システムの調整方法およびそれに用いる補助エレメント |
Country Status (6)
Country | Link |
---|---|
US (1) | US11016142B2 (ja) |
JP (1) | JP6832654B2 (ja) |
KR (1) | KR102220915B1 (ja) |
CN (1) | CN109729737B (ja) |
TW (1) | TWI733889B (ja) |
WO (1) | WO2018047490A1 (ja) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007235031A (ja) * | 2006-03-03 | 2007-09-13 | Advantest Corp | 半導体試験装置 |
JP2008004940A (ja) * | 2006-06-20 | 2008-01-10 | Samsung Electronics Co Ltd | 仮想テストが可能な半導体テストシステム及びその半導体テスト方法 |
WO2011016096A1 (ja) * | 2009-08-07 | 2011-02-10 | 株式会社アドバンテスト | 試験装置および試験方法 |
Family Cites Families (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5262716A (en) * | 1992-04-21 | 1993-11-16 | Hewlett-Packard Company | Tester calibration procedure which includes fixturing |
US6327556B1 (en) * | 1998-02-21 | 2001-12-04 | Adaptec, Inc. | AT-speed computer model testing methods |
WO2001001245A1 (en) * | 1999-06-26 | 2001-01-04 | Yang Sei Yang | Input/output probing apparatus and input/output probing method using the same, and mixed emulation/simulation method based on it |
US6541993B2 (en) * | 2000-12-26 | 2003-04-01 | Ericsson, Inc. | Transistor device testing employing virtual device fixturing |
US6934670B2 (en) * | 2001-03-30 | 2005-08-23 | Intel Corporation | Virtual test environment |
US6794889B2 (en) * | 2002-04-26 | 2004-09-21 | Agilent Technologies, Inc. | Unified apparatus and method to assure probe card-to-wafer parallelism in semiconductor automatic wafer test, probe card measurement systems, and probe card manufacturing |
US8466703B2 (en) * | 2003-03-14 | 2013-06-18 | Rudolph Technologies, Inc. | Probe card analysis system and method |
CN100541717C (zh) * | 2003-05-28 | 2009-09-16 | 株式会社尼康 | 曝光方法、曝光装置以及器件制造方法 |
JP4820560B2 (ja) * | 2005-03-07 | 2011-11-24 | 株式会社アドバンテスト | 試験装置、試験方法、電子デバイスの生産方法、試験シミュレータ、及び試験シミュレーション方法 |
CN100511629C (zh) * | 2005-10-06 | 2009-07-08 | 东京毅力科创株式会社 | 处理系统及其运作方法 |
US20070294580A1 (en) * | 2006-05-31 | 2007-12-20 | Ziyang Lu | Virtual tester architecture |
WO2009050768A1 (ja) * | 2007-10-15 | 2009-04-23 | Fujitsu Limited | シミュレート方法、電子装置の設計方法、シミュレートプログラムおよびシミュレーション装置 |
JP4886800B2 (ja) * | 2009-02-26 | 2012-02-29 | インターナショナル・ビジネス・マシーンズ・コーポレーション | プローブカード、プローブカードの製造方法、プローバ装置 |
MY181423A (en) * | 2011-03-01 | 2020-12-21 | Celerint Llc | Method and system for utilizing stand-alone controller in multiplexed handler test cell for indexless tandem semiconductor test |
CN102313850B (zh) * | 2011-06-24 | 2014-07-23 | 中国电力科学研究院 | 一种柔性直流输电系统的物理实时动态模拟装置 |
TWI524456B (zh) * | 2011-11-04 | 2016-03-01 | 東京威力科創股份有限公司 | 基板處理系統、基板運送方法、程式及電腦記憶媒體 |
JP2013191737A (ja) * | 2012-03-14 | 2013-09-26 | Tokyo Electron Ltd | ウエハ検査装置 |
JP5952645B2 (ja) | 2012-06-06 | 2016-07-13 | 東京エレクトロン株式会社 | ウエハ検査用インターフェース及びウエハ検査装置 |
US9222895B2 (en) * | 2013-02-25 | 2015-12-29 | Kla-Tencor Corp. | Generalized virtual inspector |
US10156611B2 (en) * | 2013-09-12 | 2018-12-18 | Teradyne, Inc. | Executing code on a test instrument in response to an event |
US9437453B2 (en) * | 2014-03-31 | 2016-09-06 | Stmicroelectronics, Inc. | Control of wafer surface charge during CMP |
US9991412B2 (en) * | 2014-12-05 | 2018-06-05 | Solarcity Corporation | Systems for precision application of conductive adhesive paste on photovoltaic structures |
CN105242134B (zh) * | 2015-09-22 | 2018-06-19 | 许继集团有限公司 | 一种适用于智能高压设备系统级测试的分布式测试方法 |
-
2016
- 2016-09-09 JP JP2016176149A patent/JP6832654B2/ja active Active
-
2017
- 2017-07-25 KR KR1020197006677A patent/KR102220915B1/ko active IP Right Grant
- 2017-07-25 US US16/331,584 patent/US11016142B2/en active Active
- 2017-07-25 CN CN201780054613.5A patent/CN109729737B/zh active Active
- 2017-07-25 WO PCT/JP2017/026834 patent/WO2018047490A1/ja active Application Filing
- 2017-08-25 TW TW106128893A patent/TWI733889B/zh active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007235031A (ja) * | 2006-03-03 | 2007-09-13 | Advantest Corp | 半導体試験装置 |
JP2008004940A (ja) * | 2006-06-20 | 2008-01-10 | Samsung Electronics Co Ltd | 仮想テストが可能な半導体テストシステム及びその半導体テスト方法 |
WO2011016096A1 (ja) * | 2009-08-07 | 2011-02-10 | 株式会社アドバンテスト | 試験装置および試験方法 |
Also Published As
Publication number | Publication date |
---|---|
KR102220915B1 (ko) | 2021-02-26 |
CN109729737A (zh) | 2019-05-07 |
JP2018041884A (ja) | 2018-03-15 |
CN109729737B (zh) | 2023-08-25 |
TW201824416A (zh) | 2018-07-01 |
TWI733889B (zh) | 2021-07-21 |
KR20190035872A (ko) | 2019-04-03 |
US20190219632A1 (en) | 2019-07-18 |
JP6832654B2 (ja) | 2021-02-24 |
US11016142B2 (en) | 2021-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9581641B2 (en) | Wafer inspection apparatus | |
US8207744B2 (en) | Testing apparatus | |
JP6895772B2 (ja) | 検査装置およびコンタクト方法 | |
JP5690321B2 (ja) | プローブ装置および試験装置 | |
US7245142B2 (en) | Liquid crystal substrate inspection apparatus | |
WO2019163275A1 (ja) | コンタクト精度保証方法、コンタクト精度保証機構、および検査装置 | |
CN110211889B (zh) | 检查系统 | |
TW201621499A (zh) | 自動機系統,用於自動機系統之自動機教導方法及自動機教導裝置 | |
JP2006245508A (ja) | 基板移載装置の組立て方法および基板移載装置の搬送系ユニット | |
KR102355572B1 (ko) | 검사 장치, 검사 시스템, 및 위치 맞춤 방법 | |
JP2021141143A (ja) | 検査装置 | |
JP2006190816A (ja) | 検査装置および検査方法 | |
WO2018047490A1 (ja) | 検査システムの調整方法およびそれに用いる補助エレメント | |
TWI755458B (zh) | 搬運系統 | |
KR20180031483A (ko) | 디스플레이 패널 테스트용 컨택터 시스템 | |
US8294481B2 (en) | Handler | |
KR102319587B1 (ko) | 검사 시스템 | |
JP2016192484A (ja) | プローバ | |
KR20140086558A (ko) | 검사 장치 | |
CN117352423A (zh) | 包括非接触通信装置的半导体制造设备 | |
JP2008147202A (ja) | 半導体検査装置およびこれを用いた半導体検査システム | |
JP2006017526A (ja) | 半導体デバイスの自動試験装置、及び自動試験装置用プログラム | |
TW201541100A (zh) | 檢查裝置 | |
KR20160141015A (ko) | 연성 인쇄회로기판 접합방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 17848435 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 20197006677 Country of ref document: KR Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 17848435 Country of ref document: EP Kind code of ref document: A1 |