WO2018025365A1 - 無線列車制御システム及び無線列車制御方法 - Google Patents

無線列車制御システム及び無線列車制御方法 Download PDF

Info

Publication number
WO2018025365A1
WO2018025365A1 PCT/JP2016/072908 JP2016072908W WO2018025365A1 WO 2018025365 A1 WO2018025365 A1 WO 2018025365A1 JP 2016072908 W JP2016072908 W JP 2016072908W WO 2018025365 A1 WO2018025365 A1 WO 2018025365A1
Authority
WO
WIPO (PCT)
Prior art keywords
train
ground base
track
management device
information
Prior art date
Application number
PCT/JP2016/072908
Other languages
English (en)
French (fr)
Inventor
勝紀 土田
敦 高見
智宏 大西
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to PCT/JP2016/072908 priority Critical patent/WO2018025365A1/ja
Priority to US16/318,438 priority patent/US11117601B2/en
Priority to JP2018531046A priority patent/JP6532609B2/ja
Priority to EP16911624.1A priority patent/EP3495233B1/en
Publication of WO2018025365A1 publication Critical patent/WO2018025365A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/20Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning, or like safety means along the route or between vehicles or vehicle trains
    • B61L23/08Control, warning, or like safety means along the route or between vehicles or vehicle trains for controlling traffic in one direction only
    • B61L23/14Control, warning, or like safety means along the route or between vehicles or vehicle trains for controlling traffic in one direction only automatically operated
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L15/00Methods, circuits, or devices for controlling the traction-motor speed of electrically-propelled vehicles
    • B60L15/40Adaptation of control equipment on vehicle for remote actuation from a stationary place
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L1/00Devices along the route controlled by interaction with the vehicle or vehicle train, e.g. pedals
    • B61L1/18Railway track circuits
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/10Operations, e.g. scheduling or time tables
    • B61L27/16Trackside optimisation of vehicle or vehicle train operation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/30Trackside multiple control systems, e.g. switch-over between different systems
    • B61L27/33Backup systems, e.g. switching when failures occur
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/40Handling position reports or trackside vehicle data
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/70Details of trackside communication
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2200/00Type of vehicles
    • B60L2200/26Rail vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/20Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation
    • B61L2027/204Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation using Communication-based Train Control [CBTC]

Definitions

  • the present invention relates to a radio train control system and a radio train control method.
  • CBTC Common Control Based Train Control
  • the train operation is controlled by communication between a radio control compatible train and a ground base device which is a ground control device.
  • a ground base device fails, the position of the train in the area under the jurisdiction of the ground base device cannot be grasped.
  • Patent Document 1 which is a conventional technology, aims to “obtain a train management system that can reliably perform on-line management of trains in an area even when a base device that manages a train goes down”. There is disclosed a technique that enables the on-line management of a train by separately providing an ID detection device connected to the on-line management device without going through the device.
  • the present invention has been made in view of the above, and an object of the present invention is to provide a radio train control system capable of suppressing the increase in equipment cost and reliably performing on-line management of a train even when a ground base device fails.
  • the present invention is a wireless train control system that controls a train on a track on which a track circuit is laid, and performs wireless communication with the train,
  • a terrestrial radio device for acquiring position information;
  • a field device for acquiring track circuit state information indicating whether the track circuit is on a shore or falling; and receiving the position information and the track circuit state information;
  • a ground base device that transmits control information to a train; and
  • a track management device that receives the position information and the track circuit state information and manages track information, the ground radio device, the field device, and the track management device Has a transmission path connected without going through the ground base device, and the station management device can transmit control information to the train via the transmission path when the ground base device fails It is characterized in.
  • FIG. 5 is a diagram for describing a position and route expression method according to Embodiment 1;
  • storage part The figure which shows an example of a track presence information, track circuit state information, and a switch state information Flow chart showing an example of operation of a standing line management device at the time of failure of the ground base device Flow chart showing details of subroutine processing of S12
  • the flowchart which shows the detail of the subroutine processing of S14 The figure which shows one general structural example of the hardware which implement
  • FIG. 1 is a diagram illustrating a configuration example of a radio train control system 8 according to Embodiment 1 of the present invention.
  • the wireless train control system 8 shown in FIG. 1 includes a line management device 1 including a track database storage unit 2, ground base devices 3A and 3B, ground wireless devices 4A and 4B, field devices 5A and 5B, a train 6A, 6B and relays 7A, 7B, 7C, 7D, 7E, 7F, 7G.
  • the trains 6A and 6B travel on the track on which the track circuit is laid.
  • the time when communication with the ground base device 3A is interrupted is the time when the ground base device 3A fails
  • the time when communication with the ground base device 3B is failed is when the ground base device 3B is faulty. That is, the ground base devices 3A and 3B transmit the train track information in the jurisdiction area to the track management device 1 as an example, but when the track information is interrupted, the track management device 1 It is recognized that the devices 3A and 3B have failed.
  • the standing line information includes at least one of train position information and track circuit state information, which will be described later.
  • the track circuit state information is information indicating whether the track circuit is on the heel or is dropped.
  • the standing line management device 1 manages the standing line information acquired from the ground base devices 3A and 3B, and train control information for the trains 6A and 6B instead of the ground base devices 3A and 3B when the ground base devices 3A and 3B fail. Can be sent.
  • the track database storage unit 2 stores a track database of an area managed by the track management device 1.
  • the track database will be described later.
  • the ground base devices 3A and 3B communicate with the trains 6A and 6B via the ground radio devices 4A and 4B, receive train information including the position information of the trains 6A and 6B, and receive the train information from the field devices 5A and 5B.
  • the track circuit state information is received and train control information is transmitted to the trains 6A and 6B.
  • the ground radio devices 4A and 4B wirelessly communicate with the trains 6A and 6B, wirelessly transmit the train control information transmitted from the ground base devices 3A and 3B to the trains 6A and 6B, and are received from the trains 6A and 6B. Train information including train position information is acquired and transmitted to the ground base devices 3A and 3B. When the ground base devices 3A and 3B are out of order, the ground radio devices 4A and 4B wirelessly transmit the train control information transmitted from the on-line management device 1 to the trains 6A and 6B and receive the train control information from the trains 6A and 6B. Train information including train position information is transmitted to the on-line management device 1.
  • the field devices 5A, 5B acquire the track circuit state information and the switch state information output from the relays 7A, 7B, 7C, 7D, 7E, 7F, 7G, and transmit them to the ground base devices 3A, 3B.
  • the field devices 5A and 5B send the track circuit state information and the switch state information from the transmission path connected without the ground base devices 3A and 3B. Send to.
  • the track circuit state information indicates a drop
  • the switch state information is information indicating the direction and the lock state of the switch.
  • Each of the trains 6A and 6B controlled by the radio train control system 8 includes an on-board control device (not shown) and an on-board radio device (not shown).
  • the on-board radio device (not shown) is wireless with the ground radio devices 4A and 4B.
  • the information obtained by the on-board wireless device (not shown) through wireless communication is acquired by the on-board control device (not shown).
  • An on-board control device (not shown) controls the trains 6A and 6B.
  • Each of the relays 7A, 7B, 7C, 7D, 7E, 7F, and 7G displays track circuit state information indicating whether or not a train is present on each track circuit indicated by A to G in FIG. Output to.
  • the radio train control system 8 shown in FIG. 1 has a transmission path in which the line management device 1 is connected to the ground radio devices 4A and 4B and the field devices 5A and 5B without the ground base devices 3A and 3B.
  • the standing line management device 1 can operate as a ground base device instead of the ground base devices 3A and 3B. Therefore, even when the ground base devices 3A and 3B are out of order, the on-line management device 1, the ground wireless devices 4A and 4B, and the field devices 5A and 5B are connected without passing through the ground base devices 3A and 3B.
  • the on-line management device 1 connected by a road realizes the operation as a ground base device instead of the ground base devices 3A and 3B, thereby operating the radio train control system 8 even when the ground base devices 3A and 3B fail. It is possible.
  • the transmission of information from the ground wireless devices 4A and 4B and the field devices 5A and 5B to the on-line management device 1 may be performed during normal operation of the ground base devices 3A and 3B, or a failure of the ground base devices 3A and 3B. It may be done only occasionally.
  • the on-line management device 1 does not go through the ground base device 3A.
  • the on-line information of the train in the jurisdiction area can be acquired by the track circuit state information acquired from the field device 5A via the connected transmission path.
  • the radio train control system 8 allows the ground management device 1 to operate as the ground base device when the ground base device 3A, 3B fails, so that the ground base device 3A, The operation can be continued even when 3B fails. Next, the operation at the time of failure of the ground base devices 3A and 3B will be described.
  • FIG. 2 is a diagram showing a jurisdiction area of a failed ground base device and a train presence state in the area.
  • the ground base device adjacent to both sides of the jurisdiction area of the failed ground base device is operating normally without failure.
  • the on-line management device 1 can acquire the on-line information of the train from the ground radio device and the on-site device even in an area where the ground base device has failed by the transmission path connected without going through the ground base devices 3A and 3B. It is.
  • the station management device 1 acquires the train track information, the track circuit status information, and the switch status information in the area where the ground base device has failed, and evacuates all trains in the area to the adjacent area. .
  • the train 1 and the train 3 can be saved because there are no other trains between the adjacent ground base device jurisdiction areas.
  • the save operation cannot be performed until the save operation of the train 1 is completed.
  • the train 2 starts the save operation after the save operation of the train 1 is completed.
  • FIG. 3 is a diagram for explaining a position and route expression method in the first embodiment.
  • FIG. 3 shows blocks [B1001], [B1002], [B1003], [B1004], and [B1005].
  • the block [B1001] is connected to the block [B1002]
  • the block [B1002] is connected to the blocks [B1003] and [B1005]
  • the block [B1003] is connected to the block [B1004].
  • a route R1001 is a route from the block [B1001] to the block [B1002]
  • a route R1002 is a route from the block [B1002] to the block [B1005]
  • a route R1003 is the block [B1002] to the block [B1004].
  • the track circuit T1 is a track circuit of the block [B1001]
  • the track circuit T2 is a track circuit of the blocks [B1002], [B1003], [B1004],
  • the block has a start end and an end, and the position in the block is indicated by a distance from the start end or the end.
  • FIG. 4 is a diagram illustrating an example of a track database stored in the track database storage unit 2.
  • a connection block on which the train can travel is defined.
  • block [B1001] the block connected to the upstream side by the three-point leader is not shown, and the switch is not connected. Therefore, for the block [B1001], there is no data in the uplink connection block and the switch condition, and [B1002] is shown in the downlink connection block.
  • Block [B1002] has block [B1001] connected on the upstream side, blocks [B1003] and [B1005] connected on the downstream side, and the switch 10 connected.
  • N indicating Normal
  • R indicating Reverse
  • the direction of the block [B1005] illustrated in FIG. 4 is the localization
  • the direction of the block [B1003] is the inversion.
  • [B1001] is indicated in the uplink connection block
  • [B1003] and [B1005] are indicated in the downlink connection block
  • the switch in [B1003] of the downlink connection block is indicated.
  • the condition is indicated as “10: R”
  • the switch condition in [B1005] of the downstream connection block is indicated as “10: N”.
  • the block [B1003] is connected to the block [B1002] on the upstream side, connected to the block [B1004] on the downstream side, and connected to the switch 10 in the inverted direction. Therefore, for block [B1003], [B1002] is indicated in the uplink connection block, [B1004] is indicated in the downlink connection block, and the switch condition in [B1004] of the downlink connection block is “ 10: R ".
  • block [B1004] the block connected to the down side by the three-point leader is not shown, and the switch is not connected. Therefore, for the block [B1004], there is no data in the downlink connection block and the switch condition, and [B1003] is shown in the uplink connection block.
  • the block [B1005] is connected to the block [B1002] on the upstream side, the block connected to the downstream side by the three-point reader is omitted, and the switch 10 in the localization direction is connected. Therefore, for block [B1005], there is no data in the downlink connection block, [B1002] is shown in the uplink connection block, and the switch condition in [B1002] of the uplink connection block is “ 10: N ".
  • FIG. 5 is a diagram showing an example of train track information, track circuit state information, and switch state information.
  • the on-line information of the train shown in FIG. 5 indicates the front position and the rear position of the train.
  • the front position of the train exists at a position 100 m from the beginning of the block [B1001] It is shown that the rear position exists at a position 40 m from the start of the block [B1001].
  • the track circuit state information of the train shown in FIG. 5 indicates whether the track circuits T1, T2, and T3 are in the fall state or the saddle state.
  • the track circuit T1 is in the drop state. Yes, the states of the track circuits T2 and T3 are on the top.
  • FIG. 6 is a flowchart showing an example of the operation of the standing line management apparatus 1 when the ground base apparatus 4A fails.
  • the train 6A is selected and the process is started, and the standing line management apparatus 1 selects the standing block of the traveling direction of the train 6A and the front position of the train 6A from the track database stored in the track database storage unit 2 ( S11)
  • Subroutine processing for obtaining a connection block of the currently selected block is performed (S12).
  • the currently selected block is a standing block at the front position of the train 6A.
  • a subroutine for obtaining this connection block will be described later with reference to FIG.
  • the standing line management apparatus 1 determines whether there is an acquired connection block as a result of the subroutine of S12 (S13).
  • connection management device 1 determines that it cannot be saved (S18), and ends the process.
  • connection management device 1 performs a subroutine process for determining the presence or absence of a line train (S14).
  • the line management apparatus 1 determines whether there is a line of another train from the result of S14 (S15).
  • the subroutine of S14 which determines the presence or absence of an on-line train is later mentioned with reference to FIG.
  • the line management device 1 determines that it cannot be saved (S18), and ends the process. If there is no other train line from the result of S14 (S15: No), the track management apparatus 1 determines whether the currently selected block has reached an area where the ground base apparatus is operating normally. Determine (S16).
  • the on-line management apparatus 1 determines that it can be saved (S17) and ends the process. . If the selected block has not reached the area where the ground base unit is operating normally (S16: No), the line management device 1 advances the selected block in the traveling direction (S19). ) Return to S12. If it is determined that the vehicle can be saved, the train 6A is saved to an area where the ground base device is operating normally. The saving operation may be performed automatically, or the determination result may be displayed on the cab and the driver may perform the saving operation.
  • FIG. 7 is a flowchart showing details of the subroutine processing in S12.
  • the standing line management apparatus 1 determines whether there is a switch condition in the connection information of the selected block (S21). When there is no switch condition in the connection information of the selected block (S21: No), since there is only one block that can be selected, the standing line management apparatus 1 selects a connection block in the traveling direction (S26). ), The subroutine processing is ended. If the connection information of the selected block has a switch condition (S21: Yes), the on-line management device 1 acquires the switch information (S22), and the direction of the switch It is determined whether or not there is connection information that matches (S23).
  • the information on the switch is the direction and the locked state of the switch acquired from the field device. If there is no connection information that matches the direction of the switch (S23: No), the direction of the switch is unknown, and the line management device 1 determines that there is no connection block (S25). ), The subroutine processing is ended.
  • the standing line management apparatus 1 determines whether or not the switch is locked (S24). When the switch is not locked (S24: No), the line management device 1 determines that there is no connection block (S25), and ends the subroutine processing.
  • the switch is locked (S24: Yes)
  • the standing line management apparatus 1 selects a connection block in the traveling direction (S26), and ends the subroutine processing.
  • FIG. 8 is a flowchart showing details of the subroutine processing in S14.
  • the line management device 1 determines whether there is line information of another train that is a block selected by the front position or the rear position (S31). When there is on-line information of another train that is a block selected by the front position or the rear position (S31: Yes), the on-line management device 1 determines that there is another line on the other train (S37), and performs subroutine processing. End. If there is no track information of another train that is the block selected by the front position or the rear position (S31: No), the track management apparatus 1 has a track circuit corresponding to the selected block. Is determined (S32).
  • the track management device 1 determines that there is no track on another train (S36), and ends the subroutine processing. If there is a track circuit corresponding to the selected block (S32: Yes), the track management device 1 determines whether this track circuit is the same as the track circuit corresponding to the front position block of the own train. Is determined (S33). When it is the same as the track circuit corresponding to the front position block of the own train (S33: Yes), the station management device 1 determines that there is no other train (S36) and ends the process.
  • the track management device 1 acquires track circuit state information of the selected block (S34), and this track circuit It is determined whether or not is a cocoon (S35). If the track circuit is not on the coast (S35: No), the station management device 1 determines that there is another train (S37) and ends the subroutine processing. When the track circuit is on the coast (S35: Yes), the track management device 1 determines that there is no track on another train (S36), and ends the subroutine processing.
  • the standing line management apparatus 1 includes a processor, a storage circuit, a receiver, and a transmitter, and each operation can be realized by software.
  • FIG. 9 is a diagram illustrating a general configuration example of hardware for realizing the standing line management apparatus 1 according to the first embodiment.
  • the apparatus shown in FIG. 9 includes a processor 101, a storage circuit 102, a receiver 103, and a transmitter 104.
  • the processor 101 performs calculation and control by software using the received data, and the memory 102 receives the received data or processor. 101 stores data and software necessary for calculation and control.
  • the receiver 103 is an interface that receives information from the outside.
  • the transmitter 104 is an interface that transmits information to the outside. Note that a plurality of processors 101, storage circuits 102, receivers 103, and transmitters 104 may be provided.
  • the train detection device connected to the track management device is unnecessary, and the train track management can be reliably performed even when the ground base device is out of order while suppressing an increase in equipment cost.
  • a possible wireless train control system can be obtained.
  • the first embodiment it is possible to perform on-line management according to the track circuit state when the control device mounted on the upper side of the vehicle fails.
  • the radio train control system can be restarted early without waiting for the ground base device to recover.
  • Embodiment 2 FIG. In the first embodiment described above, the direction of the switch cannot be changed, and depending on the direction of the switch when the ground base device is out of order, the retracting operation of the existing train can be efficiently performed. The case where it is difficult to perform is assumed. Therefore, in the second embodiment, a radio train control system that can control the direction of the switch even when a failure occurs will be described.
  • FIG. 10 is a diagram showing a configuration example of the radio train control system 8a according to the second embodiment of the present invention.
  • the radio train control system 8a shown in FIG. 10 is different from the radio train control system 8 shown in FIG. 1 in that an interlocking device 9 and a switch 10 are added, and the other configurations are the same.
  • the switch 10 is provided in a track circuit indicated by C.
  • the interlocking device 9 is a device that is arranged between the on-line management device 1 and the terrestrial radio devices 4A and 4B and can control the direction of the switch 10 on the track.
  • the interlocking device 9 controls the direction of the switch device 10 according to the instruction of the track management device 1 so that the train on the track can be saved. Can do.
  • the interlocking device 9 switches according to the instruction of the station management device 1 so that the direction of the switch 10 can be saved.
  • the direction of the lever 10 can be controlled.
  • the second embodiment it is possible to enable the evacuation operation of the train that is on the line, regardless of the direction of the switch when the ground base device is out of order.
  • the configuration described in the above embodiment shows an example of the contents of the present invention, and can be combined with another known technique, and can be combined with other configurations without departing from the gist of the present invention. It is also possible to omit or change the part.
  • 1 Line management device 2 track database storage unit, 3A, 3B ground base device, 4A, 4B ground radio device, 5A, 5B field device, 6A, 6B train, 7A, 7B, 7C, 7D, 7E, 7F, 7G relay 8, 8a Radio train control system, 9 interlocking device, 10 switch, 101 processor, 102 storage circuit, 103 receiver, 104 transmitter.

Abstract

設備コストの増加を抑えて地上拠点装置3A,3Bの故障時にも列車6A,6Bの在線管理を確実に行うことを目的とし、軌道回路が敷設された線路上の列車6A,6Bを制御する無線列車制御システム8であって、列車6A,6Bと無線通信を行い、列車6A,6Bの位置情報を取得する地上無線装置4A,4Bと、軌道回路が扛上であるか落下であるかを示す軌道回路状態情報を取得する現場装置5A,5Bと、位置情報及び軌道回路状態情報を受信して列車6A,6Bに制御情報を送信する地上拠点装置3A,3Bと、位置情報及び軌道回路状態情報を受信して在線情報を管理する在線管理装置1とを備え、地上無線装置4A,4B及び現場装置5A,5Bと在線管理装置1とは、地上拠点装置3A,3Bを介することなく接続された伝送路を有し、在線管理装置1は、地上拠点装置3A,3Bの故障時には伝送路を介して列車6A,6Bに制御情報を送信可能である。

Description

無線列車制御システム及び無線列車制御方法
 本発明は、無線列車制御システム及び無線列車制御方法に関するものである。
 CBTC(Communication Based Train Control)と呼ばれる無線列車制御システムでは、無線制御対応列車と地上の制御装置である地上拠点装置とが通信することで、列車の運行を制御する。このような無線列車制御システムでは、地上拠点装置が故障すると、当該地上拠点装置が管轄するエリアの列車の位置が把握できない。
 従来技術である特許文献1には、「列車を管理する拠点装置がダウンした場合にもそのエリア内の列車の在線管理を確実に行うことのできる列車管理システムを得る」ことを目的とし、拠点装置を介することなく在線管理装置に接続されたID検知装置を別途設けることで、列車の在線管理を可能とする技術が開示されている。
特開2007-15517号公報
 しかしながら、上記の従来技術によれば、在線管理装置に接続された列車検知用の装置が必須である。そのため、設備コストが増大する、という問題があった。
 本発明は、上記に鑑みてなされたものであって、設備コストの増加を抑えて地上拠点装置の故障時にも列車の在線管理を確実に行うことが可能な無線列車制御システムを得ることを目的とする。
 上述した課題を解決し、目的を達成するために、本発明は、軌道回路が敷設された線路上の列車を制御する無線列車制御システムであって、前記列車と無線通信を行い、前記列車の位置情報を取得する地上無線装置と、前記軌道回路が扛上であるか落下であるかを示す軌道回路状態情報を取得する現場装置と、前記位置情報及び前記軌道回路状態情報を受信して前記列車に制御情報を送信する地上拠点装置と、前記位置情報及び前記軌道回路状態情報を受信して在線情報を管理する在線管理装置とを備え、前記地上無線装置及び前記現場装置と前記在線管理装置とは、前記地上拠点装置を介することなく接続された伝送路を有し、前記在線管理装置は、前記地上拠点装置の故障時には前記伝送路を介して前記列車に制御情報を送信可能であることを特徴とする。
 本発明によれば、設備コストの増加を抑えて地上拠点装置の故障時にも列車の在線管理を確実に行うことが可能な無線列車制御システムを得ることができる、という効果を奏する。
本発明の実施の形態1に係る無線列車制御システムの一構成例を示す図 故障した地上拠点装置の管轄エリアと当該エリアにおける列車の在線状態を示す図 実施の形態1における位置及び経路の表現方法を説明する図 線路データベース記憶部に記憶されている線路データベースの一例を示す図 列車の在線情報、軌道回路状態情報及び転てつ器状態情報の一例を示す図 地上拠点装置の故障時における在線管理装置の一動作例を示すフローチャート S12のサブルーチン処理の詳細を示すフローチャート S14のサブルーチン処理の詳細を示すフローチャート 実施の形態1における在線管理装置を実現するハードウエアの一般的な一構成例を示す図 実施の形態2に係る無線列車制御システムの一構成例を示す図
 以下に、本発明の実施の形態に係る無線列車制御システム及び無線列車制御方法を図面に基づいて詳細に説明する。なお、この実施の形態によりこの発明が限定されるものではない。
実施の形態1.
 図1は、本発明の実施の形態1に係る無線列車制御システム8の一構成例を示す図である。図1に示す無線列車制御システム8は、線路データベース記憶部2を含む在線管理装置1と、地上拠点装置3A,3Bと、地上無線装置4A,4Bと、現場装置5A,5Bと、列車6A,6Bと、リレー7A,7B,7C,7D,7E,7F,7Gとを備える。列車6A,6Bは軌道回路が敷設された線路上を走行する。
 なお、以下の説明において、故障であるか否かは通信の可否によって判定する。すなわち、地上拠点装置3Aとの通信の途絶時を地上拠点装置3Aの故障時とし、地上拠点装置3Bとの通信の途絶時を地上拠点装置3Bの故障時とする。すなわち、地上拠点装置3A,3Bは、管轄エリアにおける列車の在線情報を在線管理装置1に、一例として一定周期で送信しているが、この在線情報が途絶えると、在線管理装置1は、地上拠点装置3A,3Bが故障したと認識する。なお、在線情報には、後述する列車の位置情報及び軌道回路状態情報の少なくともいずれかが含まれる。なお、軌道回路状態情報は、軌道回路が扛上であるか落下であるかを示す情報である。
 在線管理装置1は、地上拠点装置3A,3Bから取得した在線情報を管理し、地上拠点装置3A,3Bの故障時には地上拠点装置3A,3Bの代わりに列車6A,6Bに対して列車の制御情報を送信することが可能である。
 線路データベース記憶部2は、在線管理装置1が管轄するエリアの線路データベースを記憶している。線路データベースについては後述する。
 地上拠点装置3A,3Bは、地上無線装置4A,4Bを介して列車6A,6Bと通信を行い、列車6A,6Bの位置情報をはじめとする列車情報を受信し、現場装置5A,5Bからの軌道回路状態情報を受信し、列車6A,6Bに列車の制御情報を送信する。
 地上無線装置4A,4Bは、列車6A,6Bと無線通信を行い、地上拠点装置3A,3Bから送信される列車の制御情報を列車6A,6Bに無線で送信し、列車6A,6Bから受信した列車の位置情報をはじめとする列車情報を取得して地上拠点装置3A,3Bに送信する。また、地上拠点装置3A,3Bの故障時には、地上無線装置4A,4Bは、在線管理装置1から送信される列車の制御情報を列車6A,6Bに無線で送信し、列車6A,6Bから受信した列車の位置情報をはじめとする列車情報を在線管理装置1に送信する。
 現場装置5A,5Bは、リレー7A,7B,7C,7D,7E,7F,7Gから出力された軌道回路状態情報及び転てつ器状態情報を取得し、地上拠点装置3A,3Bに送信する。また、地上拠点装置3A,3Bの故障時には、現場装置5A,5Bは、地上拠点装置3A,3Bを介さずに接続する伝送路から軌道回路状態情報及び転てつ器状態情報を在線管理装置1に送信する。ここで、軌道回路上に列車が在線している場合には、軌道回路状態情報は落下を示し、軌道回路上に列車が在線していない場合には、軌道回路状態情報は扛上を示す。また、転てつ器状態情報は、転てつ器の方向及び鎖錠状態を示す情報である。
 無線列車制御システム8によって制御される列車6A,6Bの各々は、図示しない車上制御装置と、図示しない車上無線装置とを備え、図示しない車上無線装置は地上無線装置4A,4Bと無線通信を行い、図示しない車上無線装置が無線通信により取得した情報は、図示しない車上制御装置に取得される。図示しない車上制御装置が列車6A,6Bを制御する。
 リレー7A,7B,7C,7D,7E,7F,7Gの各々は、図1にAからGで示す各軌道回路に列車が在線しているか否かを示す軌道回路状態情報を現場装置5A,5Bに出力する。
 図1に示す無線列車制御システム8は、在線管理装置1と、地上無線装置4A,4B及び現場装置5A,5Bとが地上拠点装置3A,3Bを介さずに接続される伝送路を有し、在線管理装置1は、地上拠点装置3A,3Bの代わりに地上拠点装置としての動作が可能である。そのため、地上拠点装置3A,3Bの故障している時でも、在線管理装置1と、地上無線装置4A,4B及び現場装置5A,5Bとは、地上拠点装置3A,3Bを介さずに接続する伝送路により接続され、在線管理装置1は、地上拠点装置3A,3Bの代わりに地上拠点装置としての動作を実現することで、地上拠点装置3A,3Bの故障時にも無線列車制御システム8を動作させることが可能である。
 地上無線装置4A,4B及び現場装置5A,5Bから在線管理装置1への情報の送信は、地上拠点装置3A,3Bの正常稼働時にも行われてもよいし、地上拠点装置3A,3Bの故障時にのみ行われてもよい。
 また、地上拠点装置及び地上無線装置の双方が故障した場合、一例として地上拠点装置3A及び地上無線装置4Aの双方が故障した場合には、在線管理装置1は、地上拠点装置3Aを介さずに接続される伝送路を介して現場装置5Aから取得した軌道回路状態情報によって管轄エリアの列車の在線情報を取得可能である。
 上記説明したように、本実施の形態1に係る無線列車制御システム8は、地上拠点装置3A,3Bの故障時には在線管理装置1が地上拠点装置としての動作を行うことで、地上拠点装置3A,3Bの故障時にも動作を継続することができる。次に、地上拠点装置3A,3Bの故障時の動作について説明する。
 図2は、故障した地上拠点装置の管轄エリアと当該エリアにおける列車の在線状態を示す図である。図2では、故障した地上拠点装置の管轄エリアの両隣に隣接する地上拠点装置は、故障しておらず正常に動作している。在線管理装置1は、地上拠点装置3A,3Bを介さずに接続される伝送路によって、地上拠点装置が故障したエリアについても、列車の在線情報を地上無線装置及び現場装置から取得することが可能である。在線管理装置1は、地上拠点装置が故障したエリアにおける列車の在線情報、軌道回路状態情報及び転てつ器状態情報を取得して、当該エリア内に在線する列車を全て隣接するエリアに待避させる。
 図2においては、列車1及び列車3については、隣接する地上拠点装置管轄エリアまでの間に他の列車が在線していないため待避動作が可能である。しかしながら、列車2については、隣接するエリアまでの間に列車1が在線しているので、列車1の待避動作が完了するまでは待避動作を行うことができない。列車2は、列車1の待避動作完了後に待避動作を開始する。
 図3は、本実施の形態1における位置及び経路の表現方法を説明する図である。図3には、ブロック[B1001],[B1002],[B1003],[B1004],[B1005]が示されている。ブロック[B1001]はブロック[B1002]に接続され、ブロック[B1002]はブロック[B1003]及びブロック[B1005]に接続され、ブロック[B1003]はブロック[B1004]に接続されている。経路R1001は、ブロック[B1001]からブロック[B1002]への経路であり、経路R1002は、ブロック[B1002]からブロック[B1005]への経路であり、経路R1003は、ブロック[B1002]からブロック[B1004]への経路である。軌道回路T1は、ブロック[B1001]の軌道回路であり、軌道回路T2は、ブロック[B1002],[B1003],[B1004],[B1005]の軌道回路である。
 また、ブロック[B1001]に示すように、ブロックには始端及び終端が存在し、ブロック内位置は始端又は終端からの距離によって示される。
 図4は、線路データベース記憶部2に記憶されている線路データベースの一例を示す図である。図4には、列車が走行可能な接続ブロックが定義されている。
 ブロック[B1001]は、3点リーダーにより上り側に接続されたブロックの図示が省略され、転てつ器は接続されていない。そのため、ブロック[B1001]については、上り側接続ブロック及び転てつ器条件にデータが存在せず、下り側接続ブロックに[B1002]が示されている。
 ブロック[B1002]は、上り側にブロック[B1001]が接続され、下り側にブロック[B1003],[B1005]が接続され、転てつ器10が接続されている。ここで、転てつ器10の方向が定位であればデータベースにはNormalを示すNが記載され、転てつ器10の方向が反位であればデータベースにはReverseを示すRが記載される。ここでは、図4に示すブロック[B1005]の方向が定位であり、ブロック[B1003]の方向が反位である。そのため、ブロック[B1002]については、上り側接続ブロックに[B1001]が示され、下り側接続ブロックに[B1003]及び[B1005]が示され、下り側接続ブロックの[B1003]における転てつ器条件には「10:R」と示され、下り側接続ブロックの[B1005]における転てつ器条件には「10:N」と示されている。
 ブロック[B1003]は、上り側にブロック[B1002]が接続され、下り側にブロック[B1004]が接続され、反位方向の転てつ器10が接続されている。そのため、ブロック[B1003]については、上り側接続ブロックに[B1002]が示され、下り側接続ブロックに[B1004]が示され、下り側接続ブロックの[B1004]における転てつ器条件には「10:R」と示されている。
 ブロック[B1004]は、3点リーダーにより下り側に接続されたブロックの図示が省略され、転てつ器は接続されていない。そのため、ブロック[B1004]については、下り側接続ブロック及び転てつ器条件にデータが存在せず、上り側接続ブロックに[B1003]が示されている。
 ブロック[B1005]は、上り側にブロック[B1002]が接続され、3点リーダーにより下り側に接続されたブロックの図示が省略され、定位方向の転てつ器10が接続されている。そのため、ブロック[B1005]については、下り側接続ブロックにはデータが存在せず、上り側接続ブロックに[B1002]が示され、上り側接続ブロックの[B1002]における転てつ器条件には「10:N」と示されている。
 図5は、列車の在線情報、軌道回路状態情報及び転てつ器状態情報の一例を示す図である。図5に示す列車の在線情報には、列車の前部位置及び後部位置が示されており、ここでは、列車の前部位置はブロック[B1001]の始端から100mの位置に存在し、列車の後部位置はブロック[B1001]の始端から40mの位置に存在することが示されている。
 図5に示す列車の軌道回路状態情報には、軌道回路T1,T2,T3の状態が落下であるか、扛上であるかが示されており、ここでは、軌道回路T1の状態は落下であり、軌道回路T2,T3の状態は扛上である。
 図5に示す転てつ器状態情報には、転てつ器の方向及び鎖錠状態が示されており、ここでは、転てつ器10の方向が定位であり、鎖錠状態が鎖錠であることが示されている。
 図6は、地上拠点装置4Aの故障時における在線管理装置1の一動作例を示すフローチャートである。まず、列車6Aを選択して処理をスタートし、在線管理装置1は、線路データベース記憶部2に記憶された線路データベースから列車6Aの進行方向及び列車6Aの前部位置の在線ブロックを選択し(S11)、現在選択しているブロックの接続ブロックを取得するサブルーチン処理を行う(S12)。ここでは、現在選択しているブロックは列車6Aの前部位置の在線ブロックである。この接続ブロックを取得するサブルーチンについては、図7を参照して後述する。在線管理装置1は、S12のサブルーチンの結果、取得した接続ブロックがあるか否かを判定する(S13)。
 S12で取得した接続ブロックがない場合(S13:No)には、在線管理装置1は、待避不可と判定し(S18)、処理をエンドする。S12で取得した接続ブロックがある場合(S13:Yes)には、在線管理装置1は、在線列車の有無を判定するサブルーチン処理を行う(S14)。そして、在線管理装置1は、S14の結果から他列車の在線があるか否かを判定する(S15)。なお、在線列車の有無を判定するS14のサブルーチンについては、図8を参照して後述する。
 S14の結果から他列車の在線がある場合(S15:Yes)には、在線管理装置1は、待避不可と判定し(S18)、処理をエンドする。S14の結果から他列車の在線がない場合(S15:No)には、在線管理装置1は、現在選択しているブロックが、地上拠点装置が正常稼働中であるエリアに到達したか否かを判定する(S16)。
 選択しているブロックが、地上拠点装置が正常稼働中であるエリアに到達している場合(S16:Yes)には、在線管理装置1は、待避可能と判定し(S17)、処理をエンドする。選択しているブロックが、地上拠点装置が正常稼働中であるエリアに到達していない場合(S16:No)には、在線管理装置1は、進行方向に選択しているブロックを進めて(S19)S12に戻る。なお、待避可能と判定した場合には、列車6Aを地上拠点装置が正常稼働中であるエリアまで待避動作させる。また、待避動作は自動で行ってもよいし、運転台に判定結果が表示されて運転手が待避動作を行ってもよい。
 図7は、S12のサブルーチン処理の詳細を示すフローチャートである。まず、S12の処理をスタートすると、在線管理装置1は、選択したブロックの接続情報に転てつ器条件があるか否かを判定する(S21)。選択したブロックの接続情報に転てつ器条件がない場合(S21:No)には、選択可能なブロックは1つであるため、在線管理装置1は、進行方向の接続ブロックを選択し(S26)、サブルーチン処理をエンドする。選択したブロックの接続情報に転てつ器条件がある場合(S21:Yes)には、在線管理装置1は、当該転てつ器の情報を取得し(S22)、当該転てつ器の方向に合致する接続情報があるか否かを判定する(S23)。なお、ここで、当該転てつ器の情報は、現場装置から取得する、当該転てつ器の方向及び鎖錠状態である。当該転てつ器の方向に合致する接続情報がない場合(S23:No)には、当該転てつ器の方向が不明であるとし、在線管理装置1は、接続ブロックなしと判定し(S25)、サブルーチン処理をエンドする。当該転てつ器の方向に合致する接続情報がある場合(S23:Yes)には、在線管理装置1は、当該転てつ器が鎖錠されているか否かを判定する(S24)。当該転てつ器が鎖錠されていない場合(S24:No)には、在線管理装置1は、接続ブロックなしと判定し(S25)、サブルーチン処理をエンドする。当該転てつ器が鎖錠されている場合(S24:Yes)には、在線管理装置1は、進行方向の接続ブロックを選択し(S26)、サブルーチン処理をエンドする。
 図8は、S14のサブルーチン処理の詳細を示すフローチャートである。まず、S14の処理をスタートすると、在線管理装置1は、前部位置又は後部位置が選択しているブロックである他列車の在線情報があるか否かを判定する(S31)。前部位置又は後部位置が選択しているブロックである他列車の在線情報がある場合(S31:Yes)には、在線管理装置1は、他列車の在線ありと判定し(S37)、サブルーチン処理をエンドする。前部位置又は後部位置が選択しているブロックである他列車の在線情報がない場合(S31:No)には、在線管理装置1は、選択しているブロックに対応する軌道回路があるか否かを判定する(S32)。選択しているブロックに対応する軌道回路がない場合(S32:No)には、在線管理装置1は、他列車の在線なしと判定し(S36)、サブルーチン処理をエンドする。選択しているブロックに対応する軌道回路がある場合(S32:Yes)には、在線管理装置1は、この軌道回路が自列車の前部位置ブロックに対応する軌道回路と同じであるか否かを判定する(S33)。自列車の前部位置ブロックに対応する軌道回路と同じである場合(S33:Yes)には、在線管理装置1は、他列車の在線なしと判定し(S36)、処理をエンドする。自列車の前部位置ブロックに対応する軌道回路と同じでない場合(S33:No)には、在線管理装置1は、選択しているブロックの軌道回路状態情報を取得し(S34)、この軌道回路が扛上であるか否かを判定する(S35)。当該軌道回路が扛上でない場合(S35:No)には、在線管理装置1は、他列車の在線ありと判定し(S37)、サブルーチン処理をエンドする。当該軌道回路が扛上である場合(S35:Yes)には、在線管理装置1は、他列車の在線なしと判定し(S36)、サブルーチン処理をエンドする。
 なお、上記説明した本実施の形態1において、在線管理装置1は、プロセッサと、記憶回路と、受信器と、送信器とを備え、各動作はソフトウエアにより実現することができる。図9は、本実施の形態1における在線管理装置1を実現するハードウエアの一般的な一構成例を示す図である。図9に示す装置は、プロセッサ101、記憶回路102、受信器103及び送信器104を備え、プロセッサ101は受信したデータを用いてソフトウエアによる演算及び制御を行い、メモリ102は受信したデータ又はプロセッサ101が演算及び制御を行うに際して必要なデータ及びソフトウエアの記憶を行う。受信器103は、外部から情報を受信するインターフェースである。送信器104は、外部に情報を送信するインターフェースである。なお、プロセッサ101、記憶回路102、受信器103及び送信器104は、各々複数設けられていてもよい。
 本実施の形態1によれば、在線管理装置に接続された列車検知用の装置が不要であり、設備コストの増加を抑えて地上拠点装置の故障時にも列車の在線管理を確実に行うことが可能な無線列車制御システムを得ることができる。
 また、本実施の形態1によれば、車上側に搭載された制御装置の故障時には軌道回路状態によって在線管理を行うことが可能である。
 また、本実施の形態1によれば、地上拠点装置が故障したエリアから地上拠点装置が故障した状態で列車を待避動作させることが可能である。そのため、地上拠点装置が故障したエリアの前後で折り返し運転をさせることで、地上拠点装置の復旧を待たずに早期に無線列車制御システムを再開させることができる。
実施の形態2.
 上記説明した実施の形態1においては、転てつ器の方向を変えることができず、地上拠点装置の故障時の転てつ器の方向によっては在線している列車の待避動作を効率的に行うことが困難な場合が想定される。そこで、本実施の形態2においては、故障時にも転てつ器の方向を制御可能な無線列車制御システムについて説明する。
 図10は、本発明の実施の形態2に係る無線列車制御システム8aの一構成例を示す図である。図10に示す無線列車制御システム8aは、図1に示す無線列車制御システム8に対して連動装置9及び転てつ器10が追加された点が異なり、その他の構成は同じである。
 転てつ器10は、Cで示す軌道回路に設けられている。連動装置9は、在線管理装置1と地上無線装置4A,4Bとの間に配され、線路上の転てつ器10の方向を制御可能な装置である。連動装置9は、転てつ器10の方向が不明である場合には、在線している列車が待避動作可能なように在線管理装置1の指示に従って転てつ器10の方向を制御することができる。又は、転てつ器10の方向によって待避させることができない列車が存在する場合には、連動装置9は、転てつ器10の方向を待避動作可能なように在線管理装置1の指示に従って転てつ器10の方向を制御することができる。
 本実施の形態2によれば、地上拠点装置の故障時の転てつ器の方向によらず、在線している列車の待避動作を可能とすることができる。
 以上の実施の形態に示した構成は、本発明の内容の一例を示すものであり、別の公知の技術と組み合わせることも可能であるし、本発明の要旨を逸脱しない範囲で、構成の一部を省略、変更することも可能である。
 1 在線管理装置、2 線路データベース記憶部、3A,3B 地上拠点装置、4A,4B 地上無線装置、5A,5B 現場装置、6A,6B 列車、7A,7B,7C,7D,7E,7F,7G リレー、8,8a 無線列車制御システム、9 連動装置、10 転てつ器、101 プロセッサ、102 記憶回路、103 受信器、104 送信器。

Claims (5)

  1.  軌道回路が敷設された線路上の列車を制御する無線列車制御システムであって、
     前記列車と無線通信を行い、前記列車の位置情報を取得する地上無線装置と、
     前記軌道回路が扛上であるか落下であるかを示す軌道回路状態情報を取得する現場装置と、
     前記位置情報及び前記軌道回路状態情報を受信して前記列車に制御情報を送信する地上拠点装置と、
     前記位置情報及び前記軌道回路状態情報の少なくともいずれかを含む在線情報を管理する在線管理装置とを備え、
     前記地上無線装置及び前記現場装置と前記在線管理装置とは、前記地上拠点装置を介することなく接続された伝送路を有し、
     前記在線管理装置は、前記地上拠点装置の故障時には前記伝送路を介して前記列車に制御情報を送信可能であることを特徴とする無線列車制御システム。
  2.  前記在線管理装置は、前記地上無線装置の故障時には前記伝送路を介して前記軌道回路状態情報を受信することを特徴とする請求項1に記載の無線列車制御システム。
  3.  前記在線管理装置は、前記地上拠点装置の故障時には前記在線情報を参照して前記列車を正常稼働中の他の地上拠点装置の管轄エリアまで待避させることを特徴とする請求項1に記載の無線列車制御システム。
  4.  前記在線管理装置と前記地上無線装置との間に配され、前記線路上の転てつ器を制御可能な連動装置を備えることを特徴とする請求項1に記載の無線列車制御システム。
  5.  地上拠点装置の故障時に、この地上拠点装置が管轄するエリアから列車を待避させる待避動作を行う在線管理装置の無線列車制御方法であって、
     前記在線管理装置が前記列車の前部位置の在線ブロックを選択するステップと、
     前記在線管理装置が前記列車の進行方向に存在する、前記在線ブロックに接続された接続ブロックを取得するステップと、
     前記在線ブロックに接続された接続ブロックが存在せず前記接続ブロックを取得できなかった場合には、前記在線管理装置が前記列車の待避動作が不可であると判定するステップと、
     前記在線管理装置が前記地上拠点装置の管轄エリア内に他の列車が在線しているか否かを判定するステップと、
     前記管轄エリア内に他の列車が存在する場合には、前記在線管理装置が前記列車の待避動作が不可であると判定するステップと、
     前記列車が正常稼働中の地上拠点装置の管轄エリアに存在する場合には待避可能と判定するステップと、
     前記列車が正常稼働中の地上拠点装置の管轄エリアに存在しない場合には在線ブロックの選択を進行方向に1つ進めるステップとを含むことを特徴とする無線列車制御方法。
PCT/JP2016/072908 2016-08-04 2016-08-04 無線列車制御システム及び無線列車制御方法 WO2018025365A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
PCT/JP2016/072908 WO2018025365A1 (ja) 2016-08-04 2016-08-04 無線列車制御システム及び無線列車制御方法
US16/318,438 US11117601B2 (en) 2016-08-04 2016-08-04 Radio train control system and radio train control method
JP2018531046A JP6532609B2 (ja) 2016-08-04 2016-08-04 無線列車制御システム及び無線列車制御方法
EP16911624.1A EP3495233B1 (en) 2016-08-04 2016-08-04 Wireless train control system and wireless train control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2016/072908 WO2018025365A1 (ja) 2016-08-04 2016-08-04 無線列車制御システム及び無線列車制御方法

Publications (1)

Publication Number Publication Date
WO2018025365A1 true WO2018025365A1 (ja) 2018-02-08

Family

ID=61073000

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/072908 WO2018025365A1 (ja) 2016-08-04 2016-08-04 無線列車制御システム及び無線列車制御方法

Country Status (4)

Country Link
US (1) US11117601B2 (ja)
EP (1) EP3495233B1 (ja)
JP (1) JP6532609B2 (ja)
WO (1) WO2018025365A1 (ja)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3842318A1 (de) * 2019-12-23 2021-06-30 Thales Management & Services Deutschland GmbH Verfahren zur datenübertragung innerhalb eines schienengebundenen verkehrssystems, datenübertragungssystem, schienengebundenes verkehrssystem mit einem datenübertragungssystem und verwendung von kommunikationseinheiten an feldelementen
CN112706805B (zh) * 2021-03-26 2021-09-10 交控科技股份有限公司 轨旁设备、轨道星链系统及列车运行控制系统
ES2959096A1 (es) * 2022-07-22 2024-02-20 Redislogar S A Estructura de gabinete para puestos fijos en un sistema transmisor de comunicación tren-tierra con sistema de gestión para monitorizar y operar remotamente

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005067258A (ja) * 2003-08-27 2005-03-17 Nippon Signal Co Ltd:The 列車制御装置
JP2007015517A (ja) * 2005-07-06 2007-01-25 East Japan Railway Co 列車管理システム
JP2009241661A (ja) * 2008-03-28 2009-10-22 Railway Technical Res Inst 無線基地局停止時における列車間隔制御
JP2014129029A (ja) * 2012-12-28 2014-07-10 Toshiba Corp 列車制御システム

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5420883A (en) * 1993-05-17 1995-05-30 Hughes Aircraft Company Train location and control using spread spectrum radio communications
JP4454303B2 (ja) * 2003-12-22 2010-04-21 株式会社日立製作所 信号保安システム
GB2430528A (en) * 2005-09-22 2007-03-28 Westinghouse Brake & Signal Transmitting movement authorities to trains independently of the interlocking controlling lineside signals.
JP4471996B2 (ja) 2007-09-18 2010-06-02 株式会社日立製作所 列車制御システム
US8989926B2 (en) * 2009-11-18 2015-03-24 Convergent Communications, Inc. Railroad signaling and communication system using a fail-safe voltage sensor to verify trackside conditions in safety-critical railroad applications
JP5415391B2 (ja) 2010-11-04 2014-02-12 公益財団法人鉄道総合技術研究所 無線列車制御システム及び無線列車制御方法
CN102233887A (zh) 2011-05-16 2011-11-09 铁道部运输局 Ctcs-3级列车运行控制系统
CN102238231B (zh) * 2011-05-16 2013-12-18 铁道部运输局 Ctcs-3级无线闭塞中心设备及系统
JP5877538B2 (ja) * 2011-09-30 2016-03-08 日本信号株式会社 列車制御システム
JP5922902B2 (ja) * 2011-09-30 2016-05-24 日本信号株式会社 無線通信ネットワークシステムの同期方法
KR101318850B1 (ko) 2012-01-04 2013-10-17 현대로템 주식회사 무선통신시스템과 폴백시스템을 이용한 열차제어시스템 및 방법
JP5680762B2 (ja) * 2012-10-26 2015-03-04 株式会社京三製作所 在線検知装置及び在線検知方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005067258A (ja) * 2003-08-27 2005-03-17 Nippon Signal Co Ltd:The 列車制御装置
JP2007015517A (ja) * 2005-07-06 2007-01-25 East Japan Railway Co 列車管理システム
JP2009241661A (ja) * 2008-03-28 2009-10-22 Railway Technical Res Inst 無線基地局停止時における列車間隔制御
JP2014129029A (ja) * 2012-12-28 2014-07-10 Toshiba Corp 列車制御システム

Also Published As

Publication number Publication date
US20190291758A1 (en) 2019-09-26
JP6532609B2 (ja) 2019-06-19
EP3495233A1 (en) 2019-06-12
EP3495233A4 (en) 2019-11-06
JPWO2018025365A1 (ja) 2018-11-15
US11117601B2 (en) 2021-09-14
EP3495233B1 (en) 2021-11-03

Similar Documents

Publication Publication Date Title
WO2018025365A1 (ja) 無線列車制御システム及び無線列車制御方法
AU2007254679A1 (en) Signalling system
JP2014207792A (ja) 列車制御システム
US11040732B2 (en) Wireless train control system, ground control device, and wireless train control method
JP6072075B2 (ja) 列車制御装置および列車制御方法
JP6091385B2 (ja) 列車無線システム
US20110097077A1 (en) Optical transmission system
JP5826543B2 (ja) 列車制御装置
JP2006137337A (ja) 列車制御システム、及び列車制御方法
JP5467749B2 (ja) 移動閉塞方式atc論理装置を用いた常用系信号とバックアップ系信号を有するバックアップ機能を備えた信号システム
KR102287253B1 (ko) 인접 열차 간 직접 통신의 오류 발생 시 통신 절체 기술
KR101289725B1 (ko) 모노레일에서의 무선 송수신 시스템 및 그 제어 방법, 그리고 모노레일에서의 무선 송수신 시스템 데이터 처리 방법
JP6270504B2 (ja) 列車無線システム
CN114670904B (zh) 列车通信系统、方法、电子设备和存储介质
JP6608337B2 (ja) 無線通信システム
KR100965555B1 (ko) Trs를 이용한 실시간 열차 고장 정보의 이중화 전송시스템 및 방법
US11433933B2 (en) Ground base device, unmanned operation system, operation system, and unmanned operation method
JP6081017B2 (ja) 列車情報管理装置
CN115092219B (zh) NiTC列控系统与CBTC列控系统的制式切换方法
JP4003704B2 (ja) 二重化伝送路切替装置及び方法
CN115230782B (zh) 列车故障阶段进路切换系统及方法
JP2003308594A (ja) 車両の走行制御方法および走行制御システム
JP4181720B2 (ja) Atc信号を利用した列車用誤出発防止装置
JP6041771B2 (ja) 列車無線システム
JP2002019611A (ja) 列車運行管理システムおよび連動装置

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 2018531046

Country of ref document: JP

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16911624

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2016911624

Country of ref document: EP

Effective date: 20190304