WO2018011909A1 - 空気調和機 - Google Patents

空気調和機 Download PDF

Info

Publication number
WO2018011909A1
WO2018011909A1 PCT/JP2016/070692 JP2016070692W WO2018011909A1 WO 2018011909 A1 WO2018011909 A1 WO 2018011909A1 JP 2016070692 W JP2016070692 W JP 2016070692W WO 2018011909 A1 WO2018011909 A1 WO 2018011909A1
Authority
WO
WIPO (PCT)
Prior art keywords
unit
outdoor
indoor
terminal
relay
Prior art date
Application number
PCT/JP2016/070692
Other languages
English (en)
French (fr)
Inventor
和重 澤田
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to JP2018527306A priority Critical patent/JP6831379B2/ja
Priority to PCT/JP2016/070692 priority patent/WO2018011909A1/ja
Publication of WO2018011909A1 publication Critical patent/WO2018011909A1/ja

Links

Images

Definitions

  • the present invention relates to an air conditioner that can reduce the power consumption of an outdoor unit during operation standby and can prevent a refrigerant from sleeping in a compressor.
  • Refrigerant stagnation refers to a phenomenon in which refrigerant accumulates inside the compressor. Refrigerant accumulation generally tends to occur when the outside air temperature rises. Hereinafter, the phenomenon that the refrigerant accumulates in the compressor is referred to as “refrigerant stagnation”.
  • the starting load increases when starting the stopped compressor, the compressor may be damaged, or a large starting current may flow to cause a system abnormality.
  • the liquid refrigerant accumulated in the compressor is discharged from the compressor by heating the compressor for a certain period of time after the outdoor unit is turned on or stopped. ing.
  • the following patent document 1 is an example of an air conditioner that can prevent the stagnation of refrigerant.
  • a high-frequency alternating current voltage that does not drive the compressor is applied to the motor winding of the compressor by the switching element in the inverter circuit unit to heat the motor winding, and is generated from the motor winding.
  • the liquid refrigerant that has accumulated in the compressor due to the heat generated is discharged from the compressor.
  • applying a high-frequency AC voltage that does not drive the compressor to the motor winding to cause a current to flow through the motor winding is referred to as “restraint energization”.
  • Patent Document 1 shows an example in which the restraint energization for 30 minutes and the energization stop for 30 minutes are repeated until the operation of the compressor is resumed.
  • Patent Document 2 discloses an air conditioner that reduces the power consumption of the outdoor unit.
  • the air conditioner of Patent Document 2 when an operation standby signal is received from the remote controller during operation standby, the operation standby signal is transmitted to the outdoor unit.
  • the outdoor control unit of the outdoor unit opens a power supply relay provided between the commercial power supply and the outdoor rectifier circuit. As a result, the power supply from the commercial power supply is cut off, and the power consumed by the outdoor unit during standby, that is, standby power is reduced.
  • a conventional air conditioner that reduces power consumption during operation standby is configured as described above. For this reason, if the power of the outdoor unit is interrupted, the CPU for controlling the outdoor unit is also stopped. If the outdoor unit control CPU stops, execution of restraint energization is impossible. That is, the conventional air conditioner that reduces power consumption during operation standby has a problem that it cannot perform energization during operation standby.
  • the present invention has been made in view of the above, and an object of the present invention is to obtain an air conditioner capable of shutting off the power of the outdoor unit while energizing the outdoor unit while waiting for operation.
  • an air conditioner includes an outdoor unit and an indoor unit, the outdoor unit includes an outdoor control unit, and the indoor unit includes an indoor control unit.
  • the outdoor control unit determines that the standby power can be reduced
  • the outdoor control unit reduces the standby power after notifying the indoor unit to reduce the standby power.
  • the indoor control unit counts the timer after receiving the notification from the outdoor control unit, and activates the outdoor unit after the first period has elapsed.
  • FIG. 3 is a block diagram illustrating an example of a hardware configuration in the indoor control unit according to the first embodiment.
  • FIG. 1 is a block diagram showing an electrical system of an air conditioner according to Embodiment 1.
  • the air conditioner in Embodiment 1 includes an outdoor unit 1 and an indoor unit 2.
  • the connection state before starting the outdoor unit 1 is shown.
  • “physical connection” and “electrical connection” are simply referred to as “connection” without being distinguished.
  • the outdoor unit 1 includes an outdoor rectifying unit 9, a first inrush current preventing relay 10, an inrush current preventing resistor 11, a power supply relay 12, a second inrush current preventing relay 13, a smoothing capacitor 14, an inverter circuit unit 15, An outdoor control unit 16, an outdoor operation switching unit 17, and a compressor 39 are provided.
  • the compressor 39 is driven by the inverter circuit unit 15.
  • the indoor unit 2 operates the outdoor start relay 8 that opens and closes the connection between the power line 24 and the power signal common line 25, and the outdoor start relay 8, and single-phase alternating current is connected between the signal line 26 and the power signal common line 25.
  • the outdoor unit 1 includes a power supply relay 12 that opens and closes a connection with the outdoor unit 1 connected to the three-phase AC power source 3, an outdoor rectification unit 9 connected to the power supply relay 12, and an output of the outdoor rectification unit 9.
  • Smoothing capacitor 14 for smoothing outdoor communication circuit unit 19 communicating with indoor unit 2 via power signal common line 25 and signal line 26, power supply switching relay 20 to which signal line 26 is connected, and outdoor activation relay 8 Through an inrush current prevention relay drive unit 21 that operates when single-phase AC power is supplied between the signal line 26 and the power signal common line 25, the outdoor activation relay 8, and the power supply switching relay 20.
  • 21 Ri comprises a first inrush current preventing relay 10 controlled, is connected in parallel with the first inrush current preventing relay 10, a second inrush current preventing relay 13 controlled by the outdoor control unit 16, a.
  • the outdoor unit 1 includes an outdoor terminal block 23.
  • the outdoor terminal block 23 has an R terminal 27, an S terminal 28, a T terminal 29, an outdoor S1 terminal 30, an outdoor S2 terminal 31, and an outdoor S3 terminal 32.
  • the R terminal 27, the S terminal 28, and the T terminal 29 are connected to the three-phase AC power source 3, and power from the three-phase AC power source 3 is supplied to the outdoor unit 1.
  • the outdoor S1 terminal 30 and the R terminal 27 are connected, and the outdoor S2 terminal 31 and the S terminal 28 are connected, and electric power is supplied by single-phase alternating current.
  • the power supplied to the outdoor S1 terminal 30 and the outdoor S2 terminal 31 is not limited to the single-phase power between the R terminal 27 and the S terminal 28, but the single-phase power between any two phases in the three-phase AC power supply 3. Can be used.
  • the indoor unit 2 includes an indoor terminal block 22.
  • the indoor terminal block 22 has an indoor S1 terminal 33, an indoor S2 terminal 34, and an indoor S3 terminal 35.
  • the indoor S1 terminal 33 is connected to the outdoor S1 terminal 30 via the power line 24
  • the indoor S2 terminal 34 is connected to the outdoor S2 terminal 31 via the power signal common line 25
  • the indoor S3 terminal 35 is connected to the outdoor S3 terminal 32 via the signal line 26. Connected with.
  • the indoor unit 2 includes an indoor control unit 4, an indoor rectification unit 5, an indoor communication circuit unit 6, an indoor operation switching unit 7, an outdoor activation relay 8, and a reception unit 36.
  • the outdoor activation relay 8 has an a terminal, a b terminal, and a c terminal.
  • the a terminal is connected to the indoor S1 terminal 33
  • the b terminal is connected to the indoor communication circuit section 6, and the c terminal is connected to the indoor S3 terminal 35.
  • the c terminal which is one contact of the outdoor activation relay 8, is always connected to the indoor S3 terminal 35, and the other contact is connected to either the a terminal or the b terminal.
  • the outdoor activation relay 8 can switch between connecting the indoor S3 terminal 35 to the indoor S1 terminal 33 or connecting the indoor S3 terminal 35 to the indoor communication circuit unit 6.
  • the indoor control unit 4 operates the outdoor activation relay 8.
  • the outdoor activation relay 8 when the outdoor activation relay 8 is not operated, that is, when the outdoor unit 1 is not energized, the indoor S3 terminal 35 and the indoor communication circuit unit 6 are connected via the outdoor activation relay 8, and the power signal common line 25 and the signal are connected.
  • the line 26 is connected to the outdoor unit 1, a communication line is established between the outdoor unit 1 and the indoor unit 2, and various operation signals are transmitted and received.
  • the outdoor activation relay 8 when the outdoor activation relay 8 is operated, that is, when the outdoor unit 1 is energized, the indoor S3 terminal 35 and the indoor S1 terminal 33 are connected, and a single phase is connected between the power signal common line 25 and the signal line 26. AC power is supplied.
  • the indoor S1 terminal 33 is connected to the indoor rectification unit 5, and the indoor S2 terminal 34 is connected to the indoor rectification unit 5 and the indoor communication circuit unit 6.
  • the single-phase AC voltage applied between the power supply line 24 and the power supply signal common line 25 is converted into a DC voltage by the indoor rectification unit 5, and power is supplied to the indoor control unit 4.
  • the indoor operation switching unit 7 connected to the indoor control unit 4 determines whether or not standby power that is the power consumed by the outdoor unit 1 during operation standby is reduced.
  • the illustrated example is an example in which whether or not to reduce standby power is set with a jumper line.
  • standby power is reduced if a jumper wire is connected between the c1 terminal and the c2 terminal, and standby power is reduced if a jumper wire is connected between the c2 terminal and the c3 terminal. Does not reduce.
  • the method of switching whether or not to reduce standby power is not limited to jumper wires, and switching using a switch may be used.
  • the receiving unit 36 is connected to the remote controller 37 and the indoor control unit 4.
  • the receiving unit 36 receives an operation command from the remote controller 37 and transmits the received command to the indoor control unit 4.
  • the R terminal 27 of the outdoor unit 1 is connected to one end of the first inrush current prevention relay 10 and the second inrush current prevention relay 13 and one end side terminal (a terminal) of the power supply relay 12.
  • the other ends of the first inrush current prevention relay 10 and the second inrush current prevention relay 13 are connected to one end of the inrush current prevention resistor 11.
  • the other end of the inrush current preventing resistor 11 is connected to the terminal (b terminal) on the other end side of the power supply relay 12 and the outdoor rectification unit 9. Furthermore, both ends of the first inrush current prevention relay 10 and the second inrush current prevention relay 13 are connected to the outdoor operation switching unit 17.
  • a terminal (c terminal) on one end side of the power supply relay 12 is connected to the S terminal 28, and a terminal (d terminal) on the other end side of the power supply relay 12 is connected to the outdoor rectification unit 9.
  • the T terminal 29 is connected to the outdoor rectification unit 9.
  • terminals (a terminal and c terminal) on one end side of the power supply relay 12 are connected to the R terminal 27 and the S terminal 28, respectively, but the R terminal 27, the S terminal 28, and the T terminal are connected. 29 only needs to be connected to any two terminals.
  • one end and the other end of the circuit portion in which the inrush current prevention resistor 11 is connected in series to the parallel circuit of the first inrush current prevention relay 10 and the second inrush current prevention relay 13 are shown in FIG. Although connected to b terminal, each may be connected to c terminal and d terminal. In other words, one end and the other end of the circuit unit need only be connected to the input / output of any one contact in the power supply relay 12.
  • the power supply relay 12 is a two-contact relay, but may have two one-contact relays.
  • the outdoor rectification unit 9 rectifies the AC voltage of the three-phase AC power source 3 and converts it to an arbitrary DC voltage.
  • the power supply relay 12 and the second inrush current prevention relay 13 operate under the control of the outdoor control unit 16, and when they do not operate, the contacts are opened as shown in FIG.
  • the outdoor operation switching unit 17 is connected to both ends of the first inrush current prevention relay 10 and is also connected to the outdoor control unit 16.
  • the outdoor operation switching unit 17 determines whether or not to reduce standby power during operation standby.
  • the illustrated example is an example in which whether or not to reduce standby power is set with a jumper line.
  • a jumper wire is connected between the a1 terminal and the a2 terminal, standby power during operation standby is reduced.
  • a jumper wire is connected between the b1 terminal and the b2 terminal, a current path that bypasses the first inrush current prevention relay 10 is formed by the b1 terminal and the b2 terminal. Does not reduce standby power.
  • Information about whether to reduce standby power during operation standby is transmitted from the outdoor operation switching unit 17 to the outdoor control unit 16.
  • Both ends of the smoothing capacitor 14 are connected to the outdoor rectification unit 9.
  • the smoothing capacitor 14 smoothes the output from the outdoor rectification unit 9 and applies a DC voltage to the connected inverter circuit unit 15 and outdoor control unit 16.
  • the outdoor unit 1 further includes a power supply switching relay 20, a communication circuit power supply unit 18, an inrush current prevention relay driving unit 21, and an outdoor communication circuit unit 19.
  • the power supply switching relay 20 has an a terminal, a b terminal, and a c terminal.
  • the a terminal is connected to the communication circuit power supply unit 18, the b terminal is connected to the inrush current prevention relay driving unit 21, and the c terminal is connected to the outdoor S2 terminal 31.
  • the c terminal which is one contact of the power supply switching relay 20 is always connected to the outdoor S2 terminal 31 and the other contact is connected to either the a terminal or the b terminal.
  • the power supply switching relay 20 can switch between connecting the outdoor S2 terminal 31 to the inrush current prevention relay driving unit 21 or connecting the outdoor S2 terminal 31 to the communication circuit power supply unit 18.
  • the power supply switching relay 20 operates under the control of the outdoor control unit 16.
  • the contact is connected between the b terminal and the c terminal, and the outdoor S2 terminal 31 is connected to the inrush current prevention relay driving unit 21 via the power supply switching relay 20.
  • the inrush current prevention relay drive unit 21 is energized, and the first inrush current prevention relay 10 is Close the contact.
  • the communication circuit power supply unit 18 applies a single-phase AC voltage between the power supply line 24 and the power supply signal common line 25 to generate a DC voltage, and supplies power to the outdoor communication circuit unit 19.
  • the generation of the DC voltage can be realized by a half-wave rectifier circuit, but is not limited thereto.
  • the inverter circuit unit 15 is controlled by the outdoor control unit 16 and converts the applied DC voltage into an AC voltage having an arbitrary frequency and an arbitrary voltage.
  • the inverter circuit unit 15 applies the converted AC voltage to the compressor 39 and drives the compressor 39.
  • the operation of the air conditioner during operation standby will be described with reference to FIG. First, the power of the three-phase AC power supply 3 is input to the outdoor unit 1 through the R terminal 27, the S terminal 28, and the T terminal 29.
  • the contacts of the first inrush current prevention relay 10, the second inrush current prevention relay 13, and the power supply relay 12 are open during standby, the inverter circuit unit 15 that is an outdoor unit load, the outdoor Electric power is not supplied to the operation switching unit 17 and the outdoor control unit 16.
  • One end of the communication circuit power supply unit 18 is connected to the power supply line 24 via the outdoor S1 terminal 30, but the other end is disconnected from the outdoor S2 terminal 31 by the power supply switching relay 20, and power is supplied. Not. Therefore, power is not supplied to the outdoor communication circuit unit 19 as well.
  • One end of the inrush current prevention relay drive unit 21 is connected to the power signal common line 25 via the outdoor S2 terminal 31, but the other end is connected to the signal line 26 via the outdoor S3 terminal 32. Power is not supplied.
  • the standby power in the outdoor unit 1 is reduced during standby.
  • the indoor control unit 4 When the indoor control unit 4 receives the operation command signal from the remote controller 37, the indoor control unit 4 turns on the outdoor activation relay 8, disconnects the connection between the indoor S3 terminal 35 and the indoor communication circuit unit 6, and connects the indoor S3 terminal. The connection is switched between 35 and the indoor S1 terminal 33. By this control, a single-phase AC voltage is applied between the outdoor S2 terminal 31 and the outdoor S3 terminal 32.
  • the inrush current prevention relay drive unit 21 When electric power is supplied between the outdoor S2 terminal 31 and the outdoor S3 terminal 32, the inrush current prevention relay drive unit 21 is energized via the power supply switching relay 20, and the first inrush current prevention relay 10 is turned on. And close the contact.
  • the first inrush current prevention relay 10 When the first inrush current prevention relay 10 is closed, the AC voltage from the three-phase AC power supply 3 is converted into a DC voltage by the outdoor rectification unit 9, and the converted DC voltage is applied to the smoothing capacitor 14 and the inverter circuit unit 15. Is done.
  • the outdoor control unit 16 is activated by the application of the DC voltage.
  • the outdoor control unit 16 turns on the second inrush current prevention relay 13 after activation and closes the contact.
  • the outdoor control unit 16 monitors the voltage charged in the smoothing capacitor 14 and confirms that the voltage is stable at the set voltage. Then, the outdoor control unit 16 turns on the power supply relay 12 to close the contact of the power supply relay 12.
  • the second inrush current prevention relay 13 is turned off, and the contact of the second inrush current prevention relay 13 is opened.
  • the indoor control unit 4 turns off the outdoor activation relay 8 after an arbitrary set time has elapsed since the outdoor activation relay 8 is turned on, disconnects the connection between the indoor S3 terminal 35 and the indoor S1 terminal 33, The connection is switched between the S3 terminal 35 and the indoor communication circuit unit 6.
  • the single-phase AC voltage applied between the outdoor S2 terminal 31 and the outdoor S3 terminal 32 is cut off, and the inrush current prevention relay drive unit 21 is de-energized. Therefore, the first inrush current prevention relay 10 is turned off to open the contact. This operation can prevent a short circuit in the outdoor unit starting operation.
  • the outdoor control unit 16 turns on the power supply switching relay 20 to open the connection between the outdoor S2 terminal 31 and the inrush current prevention relay drive unit 21, and the outdoor The connection is switched to the connection between the S2 terminal 31 and the communication circuit power supply unit 18.
  • a single-phase AC voltage applied between the outdoor S1 terminal 30 and the outdoor S2 terminal 31 is applied to the communication circuit power supply unit 18.
  • the communication circuit power supply unit 18 converts the single-phase AC voltage into an arbitrary DC voltage and applies it to the outdoor communication circuit unit 19.
  • the procedure is such that the first inrush current prevention relay 10 is turned off after the outdoor activation relay 8 is turned off by the indoor control unit 4.
  • the supply switching relay 20 may be turned on.
  • the power supply switching relay 20 is turned on, the inrush current prevention relay drive unit 21 is de-energized and the first inrush current prevention relay 10 is turned off, so that the outdoor unit 1 is started even if the order is changed. Is possible.
  • the outdoor control unit 16 starts the communication with the indoor unit 2 by operating the outdoor communication circuit unit 19.
  • the outdoor communication circuit unit 19 starts communication with the indoor communication circuit unit 6 via the power signal common line 25 and the signal line 26.
  • the outdoor control unit 16 determines whether communication between the outdoor communication circuit unit 19 and the indoor communication circuit unit 6 has been established. When communication is established, steady communication between the indoor unit 2 and the outdoor unit 1 is performed.
  • the outdoor control unit 16 receives an operation command from the indoor unit 2 and enters a heating operation or a cooling operation. If communication cannot be established, communication is started again and communication establishment is attempted. Repeat the establishment of communication until the specified number of times or within the specified time. If communication cannot be established, a communication abnormality is determined. If communication can be established, the routine proceeds to steady communication between the indoor unit 2 and the outdoor unit 1.
  • the second inrush current prevention relay 13 is a relay for increasing the possibility of self-recovery from an instantaneous power failure and improving the convenience of the user.
  • Instantaneous power failure is a phenomenon in which external power supply is temporarily interrupted.
  • FIG. 2 is an explanatory diagram for explaining an operation during an instantaneous power failure.
  • the sequence operation of the power supply relay 12 is shown on the left side
  • the sequence operation of the second inrush current prevention relay 13 is shown on the right side in relation to the bus voltage.
  • the “bus voltage” here is a voltage of a DC bus connecting the outdoor rectification unit 9 and the inverter circuit unit 15, and corresponds to the voltage of the smoothing capacitor 14 in the example of FIG. 1.
  • “the voltage of the smoothing capacitor 14” will be referred to as “bus voltage”.
  • the bus voltage is monitored by the outdoor control unit 16 as described above.
  • the bus voltage is monitored by the outdoor control unit 16 as described above.
  • the power supply is interrupted, some load is connected to the circuit, so that the bus voltage decreases.
  • the higher the load the faster the bus voltage drop rate. Since the contact of the power supply relay 12 is closed while the outdoor unit is energized, if the power supply is immediately restored, the bus voltage is instantaneously increased to a voltage obtained by smoothing the power supply voltage. On the other hand, when the power supply does not return, the bus voltage continues to decrease.
  • the power supply relay 12 is turned off, the contact of the power supply relay 12 is opened, and then the second inrush current prevention relay 13 is turned on.
  • the contact of the second inrush current prevention relay 13 is closed. Since the operation is a sequence operation, the bus voltage when the contact of the second inrush current prevention relay 13 is closed becomes a voltage Vth1 ′ (Vth1 ′ ⁇ Vth1) that is further lower than the first voltage threshold Vth1. There is also.
  • the outdoor control unit 16 continues to turn on the second inrush current prevention relay 13 as long as the outdoor control unit 16 can operate.
  • the voltage of the smoothing capacitor 14 can be recovered through a path that passes through the second inrush current prevention relay 13 and the inrush current prevention resistor 11.
  • the inrush current prevention resistor 11 since the inrush current prevention resistor 11 is used, the inrush current value can be limited, and a failure of a subsequent circuit, for example, the outdoor rectification unit 9 due to an excessive inrush current can be prevented.
  • the outdoor control unit 16 confirms that the stable voltage V DD has stabilized, and then turns on the power supply relay 12 to turn on the power supply relay 12. And then the second inrush current prevention relay 13 is turned off to open the contact of the second inrush current prevention relay 13. As long as the power supply from the three-phase AC power supply 3 continues, the charging current to the smoothing capacitor 14 is supplied to the smoothing capacitor 14 via the power supply relay 12 and does not go through the second inrush current prevention relay 13. . With the above control operation, unnecessary power in the air conditioner can be reduced.
  • operation state when collectively referred to as “operation state”
  • standby state to reduce standby power
  • an operation stop command is instructed from the remote control 37 in the operation state (step S101).
  • the operation stop command is transmitted to the indoor control unit 4 via the receiving unit 36.
  • the indoor control unit 4 that has received the operation stop command transmits the operation stop command to the outdoor control unit 16 via the indoor communication circuit unit 6 and the outdoor communication circuit unit 19.
  • Receiving the operation stop command the outdoor control unit 16 stops the operation of the air conditioner (step S102).
  • the outdoor control unit 16 predicts whether restraint energization is necessary or not.
  • the compressor 39 is provided with a plurality of temperature sensors, temperature difference information between the temperature sensors, or difference information between the initial temperature and the current temperature in each temperature sensor, and the outside air temperature. Based on the temperature information from the sensor, the refrigerant state or the refrigerant amount can be predicted. If it is determined that the refrigerant is in the stagnation state, restraint energization is performed.
  • the outdoor communication circuit unit 19 of the outdoor unit 1 reduces the standby power of the outdoor unit 1 to the indoor communication of the indoor unit 2.
  • the circuit unit 6 is notified (step S104).
  • the notification is transmitted to the indoor control unit 4 via the indoor communication circuit unit 6, and the indoor control unit 4 recognizes that the outdoor unit 1 enters the standby power reduction operation and starts timer counting (step S105). .
  • the indoor control unit 4 notifies the outdoor unit 1 that the indoor unit 2 has started the timer count via the indoor communication circuit unit 6 and the outdoor communication circuit unit 19 (step S106).
  • the outdoor control unit 16 turns off the power supply relay 12 (step S107).
  • the power supply from the three-phase AC power supply 3 decreases, the DC voltage after rectification in the outdoor unit 1, that is, the voltage of the smoothing capacitor 14 decreases (step S108), and the outdoor control unit 16 turns OFF (step S109). Since the outdoor control unit 16 is de-energized, the power supply switching relay 20 is turned off (step S110).
  • step S111 the inverter circuit unit 15, the outdoor control unit 16, and the communication circuit power supply unit 18, which are main loads in the outdoor unit 1, are de-energized, and power consumption in these units is cut.
  • the operation proceeds to a standby power reduction operation (step S111).
  • the indoor control unit 4 of the indoor unit 2 counts the duration of the standby power reduction operation of the outdoor unit 1 by a timer.
  • the timer count by the indoor control unit 4 is performed until the predicted time when the outdoor unit 1 determines that the restriction energization is unnecessary is elapsed.
  • the indoor control unit 4 activates the outdoor unit 1.
  • the start-up procedure is as already described above.
  • the outdoor start relay 8 can be turned ON to supply power to the outdoor unit 1, and the smoothing capacitor 14 can be charged to start the outdoor unit 1. it can.
  • the compressor is turned off at time t1.
  • the power supply of the outdoor unit 1 does not turn off immediately, but turns off at time t2 after the time T1 has elapsed.
  • the standby power reduction operation described above is performed.
  • the first period from time t2 to time t3 is a period corresponding to the above-described prediction time or a period set based on the prediction time.
  • the outdoor unit 1 is activated, and it is determined whether restraint energization is necessary during the time T2 from the time t3 to the time t4.
  • the standby power reduction operation is performed until the time t5 when the predicted time has elapsed, and the necessity of the restraint energization is determined again at the time t5. Thereafter, these operations are repeated unless an operation command is input.
  • the necessity period of restraint energization is determined and the prediction period in which the restraint energization is unnecessary is set as the first period.
  • the present invention is not limited to this.
  • a period set in advance for each model may be set as the first period.
  • the set first period may be changed.
  • the outdoor unit 1 can be activated even if the timer count in the indoor control unit 4 has not passed the predicted time. After the transition and the outdoor unit 1 is started, the operation shifts to a heating or cooling operation.
  • the outdoor unit 1 since the outdoor unit 1 is not energized when the outdoor unit 1 is in the standby power reduction operation, the communication signal from the outdoor communication circuit unit 19 of the outdoor unit 1 is sent to the indoor communication circuit unit 6 of the indoor unit 2. Not sent. Normally, when the signal from the outdoor communication circuit unit 19 of the outdoor unit 1 is interrupted, the indoor control unit 4 recognizes that a communication abnormality has occurred and notifies the remote controller 37 of it.
  • the outdoor unit 1 when the timer count in the indoor control unit 4 is continued, the outdoor unit 1 is operating to reduce standby power, and the outdoor unit 1 and the indoor unit 2 Recognizes that “normal” communication is not possible. That is, when the timer count in the indoor control unit 4 is continued, it is possible to prevent erroneous determination as a communication abnormality.
  • the outdoor unit 1 when the outdoor unit 1 determines that the restraint energization is not necessary, the outdoor unit 1 shifts to the non-energized state by the standby power reduction operation.
  • a function of counting the timer in the indoor unit 2 during a predicted time period in which energization is unnecessary is provided. And when the timer count in the indoor unit 2 continues, a function that does not determine that the communication is abnormal is provided.
  • This mechanism makes it possible to achieve both a function for preventing erroneous determination of communication abnormality and a function for reducing standby power in the outdoor unit 1.
  • the indoor control unit 4 may be configured to include a calculation unit 40 and a timer 42 as shown in FIG.
  • the timer 42 performs the above-described timer count. Information on the timer count is transmitted to the calculation unit 40.
  • the arithmetic unit 40 performs various arithmetic processes and takes charge of the various controls described above.
  • a CPU Central Processing Unit
  • a memory 202 that stores a program read by the CPU 200
  • the interface 204 that performs input / output of The CPU 200 may be an arithmetic device, a microprocessor, a microcomputer, a processor, or a DSP (Digital Signal Processor).
  • the memory 202 is, for example, a nonvolatile or volatile semiconductor memory such as a RAM (Random Access Memory), a ROM (Read Only Memory), a flash memory, an EPROM (Erasable Programmable ROM), an EEPROM (Electrically Programmable EPROM), or the like. Is applicable.
  • the memory 202 stores a program for executing the function of the calculation unit 40.
  • the CPU 200 executes various control processes and arithmetic processes described in the present embodiment by exchanging necessary information through the interface 204.
  • the CPU 200 and the memory 202 shown in FIG. 6 may be replaced with a processing circuit 203 as shown in FIG.
  • the processing circuit 203 is, for example, a single circuit, a composite circuit, a programmed processor, a parallel programmed processor, an ASIC (Application Specific Integrated Circuit), an FPGA (Field-Programmable Gate Array), or a combination of these. Applicable.
  • FIG. 8 is a block diagram illustrating a connection configuration example of the air conditioner according to the second embodiment.
  • FIG. 8 shows a configuration in which two indoor units are connected to one outdoor unit, but three or more indoor units may be connected.
  • a second indoor unit 38 is connected to the outdoor unit 1.
  • the indoor S1 terminal 33 of the indoor unit 38 is connected to the outdoor S1 terminal 30 of the outdoor unit 1 by the power line 24, and the indoor S2 terminal 34 of the indoor unit 38 is connected to the outdoor S2 terminal 31 of the outdoor unit 1 by the power signal common line 25.
  • the indoor S3 terminal 35 of the indoor unit 38 is connected to the outdoor S3 terminal 32 of the outdoor unit 1 through the signal line 26.
  • the procedure until the air conditioner is activated is the same as the procedure of the first embodiment.
  • the outdoor activation relay 8 is turned on from the indoor control unit 4 of the indoor unit 2 to charge the smoothing capacitor 14 and the outdoor unit. 1 is activated. After the outdoor unit 1 is started up, communication is performed between the outdoor unit 1 and the indoor unit 2 and between the outdoor unit 1 and the indoor unit 38 via the power signal common line 25 and the signal line 26.
  • identification numbers are set for the indoor unit 2 and the indoor unit 38.
  • unit setting it is assumed that the indoor unit 2 is set to No. 1 and the indoor unit 38 is set to No. 2 by this unit setting.
  • the indoor unit 2 performs a timer count during standby power reduction during which the outdoor unit 1 is de-energized, and manages the restart time of the next outdoor unit 1. That is, of the plurality of indoor units, the indoor unit 2 set as the first unit is caused to perform time management for restarting the outdoor unit 1.
  • the indoor unit 2 set as the first unit has been described as performing the time management for restarting the outdoor unit 1.
  • the indoor unit 38 set as the second unit is restarted. You may make it perform time management of.
  • Embodiment 3 In the air conditioner according to the second embodiment, for a plurality of indoor units, the time management for restarting the outdoor unit whose standby power is being reduced is performed by one indoor unit set as a unit. Regardless of the setting, the outdoor unit 1 may be activated by performing time management on any of the connected indoor units. Even with this setting, the same effect as in the first and second embodiments can be obtained.

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

空気調和機は、室外機及び室内機を備え、室外機は室外制御部を備え、室内機は室内制御部を備える。室外制御部は、待機電力を低減できると判断したときに、室内機に待機電力を低減することを通知した後に待機電力を低減する。室内制御部は、室外制御部からの通知を受けてからタイマカウントを行い、拘束通電を不要と判断した予測時間の経過後に室外機を起動させる。

Description

空気調和機
 本発明は、運転待機時に室外機の消費電力を低減することができ、また、圧縮機に冷媒が寝込むのを防止することができる空気調和機に関する。
 「冷媒が寝込む」とは、圧縮機の内部に冷媒が溜まり込む現象を言う。冷媒の溜まり込みは、一般的に外気温度が上昇すると発生し易くなる。以下、圧縮機内に冷媒が溜まり込む現象を「冷媒の寝込み」と称する。
 冷媒の寝込みが発生すると、停止中の圧縮機を起動させるときに起動負荷が大きくなり、圧縮機が破損したり、大きな起動電流が流れてシステム異常が発生したりすることがあった。これを防ぐため、従来の空気調和機では、室外機に電源を投入した後、又は運転停止後に、一定時間圧縮機を加熱することで、圧縮機内部に溜まった液冷媒を圧縮機から排出している。
 冷媒の寝込みを防止できる空気調和機の例に、下記特許文献1がある。特許文献1の空気調和機では、インバータ回路部にあるスイッチング素子により圧縮機のモータ巻線に対し、圧縮機が駆動されない高周波交流電圧を印加してモータ巻線を加熱し、モータ巻線から発生する熱により圧縮機内に溜まり込んだ液冷媒を圧縮機から排出している。このように、圧縮機が駆動されない高周波交流電圧をモータ巻線に印加してモータ巻線に電流を流すことを「拘束通電」と称している。
 なお、拘束通電は常に行われているわけではなく、設定された時間間隔で通電と停止とが繰り返されるものである。特許文献1には、圧縮機の運転を再開するまでの間、30分間の拘束通電と30分間の通電停止とを繰り返す例が示されている。
 また、下記特許文献2には、室外機の消費電力を低減する空気調和機が開示されている。特許文献2の空気調和機では、運転待機時において、リモコンからの運転待機信号を受信すると、当該運転待機信号が室外機へ送信される。室外機の室外制御部は、運転待機信号を受信すると、商用電源と室外整流回路との間に設けられた電源供給リレーを開放する。これより商用電源からの電力供給は遮断され、運転待機時に室外機が消費する電力すなわち待機電力を低減している。
特開2013-113476号公報 特開2010-243051号公報
 運転待機時に消費電力を低減する従来の空気調和機は、上記のように構成されている。このため、室外機の電力が遮断されていれば、室外機制御用のCPUも停止する。室外機制御用のCPUが停止すれば、拘束通電の実行は不可能である。すなわち、運転待機時に消費電力を低減する従来の空気調和機では、運転待機時に拘束通電ができないという課題があった。
 逆に、拘束通電を行う従来の空気調和機では、運転待機時に拘束通電を可能とするため、運転待機時に室外機の電源を遮断することができないという課題があった。
 本発明は、上記に鑑みてなされたものであって、運転待機時において、室外機の拘束通電を行いつつ、室外機の電源遮断を行うことができる空気調和機を得ることを目的とする。
 上述した課題を解決し、目的を達成するため、本発明に係る空気調和機は、室外機及び室内機を備え、室外機は室外制御部を備え、室内機は室内制御部を備える。室外制御部は、待機電力を低減できると判断したときに、室内機に待機電力を低減することを通知した後に待機電力を低減する。室内制御部は、室外制御部からの通知を受けてからタイマカウントを行い、第1の期間の経過後に室外機を起動させる。
 本発明によれば、運転待機時に拘束通電を行う空気調和機であっても、運転待機時に室外機の電源を遮断することができる、という効果を奏する。
実施の形態1における空気調和機の電装系統を示すブロック図 実施の形態1の空気調和機における瞬時停電時の動作を説明するための説明図 実施の形態1の要部動作を示すフローチャート 実施の形態1の要部動作を示すタイミングチャート 実施の形態1の室内制御部における機能構成を示すブロック図 実施の形態1の室内制御部におけるハードウェア構成の一例を示すブロック図 実施の形態1の室内制御部におけるハードウェア構成の他の例を示すブロック図 実施の形態2における空気調和機の接続構成例を示すブロック図
 以下に、本発明の実施の形態に係る空気調和機を図面に基づいて詳細に説明する。なお、以下の実施の形態により、本発明が限定されるものではない。
実施の形態1.
 図1は、実施の形態1における空気調和機の電装系統を示すブロック図である。図1に示すように、実施の形態1における空気調和機は、室外機1及び室内機2を備える。なお、図1では、特に、室外機1を起動する前の接続状態を示している。なお、以下の説明では、「物理的な接続」と「電気的な接続」とを区別することなく、単に「接続」と称して説明する。
<空気調和機の概括的な構成>
 まず、空気調和機の概括的な構成を図1を参照して説明する。室外機1及び室内機2は、電源線24、電源信号共通線25及び信号線26の3芯により接続され、室外機1には3相交流電源3が接続され、その内の2線から電源線24及び電源信号共通線25を介して室内機2に単相交流電源を給電する構成である。
 また、室外機1は、室外整流部9、第1の突入電流防止リレー10、突入電流防止抵抗11、電源供給リレー12、第2の突入電流防止リレー13、平滑コンデンサ14、インバータ回路部15、室外制御部16、室外動作切替部17及び圧縮機39を備えている。圧縮機39は、インバータ回路部15によって駆動される。
 室内機2は、電源線24と電源信号共通線25との接続を開閉する室外起動リレー8と、室外起動リレー8を動作させ、信号線26と電源信号共通線25との間に単相交流電源を供給させる室内制御部4と、を備える。室外機1は、3相交流電源3に接続された室外機1との接続を開閉する電源供給リレー12と、電源供給リレー12に接続された室外整流部9と、室外整流部9の出力を平滑する平滑コンデンサ14と、電源信号共通線25及び信号線26を介して室内機2と通信する室外通信回路部19と、信号線26が接続される電源供給切替リレー20と、室外起動リレー8を介して信号線26と電源信号共通線25との間に単相交流電源が供給されたときに動作する突入電流防止リレー駆動部21と、室外起動リレー8及び電源供給切替リレー20を介して電源信号共通線25と信号線26との間に単相交流電源が供給されたときに動作する突入電流防止リレー駆動部21と、電源供給リレー12と並列に接続され、突入電流防止リレー駆動部21により制御される第1の突入電流防止リレー10と、第1の突入電流防止リレー10と並列に接続され、室外制御部16により制御される第2の突入電流防止リレー13と、を備える。
<空気調和機の詳細構成>
 次に、空気調和機の更に詳細な構成について説明する。室外機1は、室外端子台23を備えている。室外端子台23は、R端子27、S端子28、T端子29、室外S1端子30、室外S2端子31及び室外S3端子32を有している。R端子27、S端子28、T端子29は、3相交流電源3に接続されており、3相交流電源3からの電力が室外機1に供給されている。室外機1の内部では、室外S1端子30とR端子27とが接続されると共に、室外S2端子31とS端子28とが接続され、単相交流による電力が供給されている。なお、室外S1端子30及び室外S2端子31に供給される電力は、R端子27及びS端子28間の単相電力には限られず、3相交流電源3における何れか2相間の単相電力を使用することができる。
 室内機2は、室内端子台22を備えている。室内端子台22は、室内S1端子33、室内S2端子34及び室内S3端子35を有している。室内S1端子33は、電源線24で室外S1端子30と接続され、室内S2端子34は電源信号共通線25で室外S2端子31と接続され、室内S3端子35は信号線26で室外S3端子32と接続されている。
 室内機2は、室内制御部4、室内整流部5、室内通信回路部6、室内動作切替部7、室外起動リレー8及び受信部36を備えている。室外起動リレー8は、a端子、b端子及びc端子を有している。a端子は室内S1端子33に接続され、b端子は室内通信回路部6に接続され、c端子は室内S3端子35に接続されている。室外起動リレー8の一方の接点であるc端子は常に室内S3端子35に接続され、他方の接点はa端子及びb端子のうちの何れかに接続される。室外起動リレー8により、室内S3端子35を室内S1端子33に接続するか、室内S3端子35を室内通信回路部6に接続するかを切り替えることができる。
 室内制御部4は、室外起動リレー8を動作させる。ここで、室外起動リレー8を動作させないとき、即ち室外機1に通電しないときには、室外起動リレー8を介して室内S3端子35と室内通信回路部6とが接続され、電源信号共通線25と信号線26とが室外機1に接続され、室外機1と室内機2との間の通信ラインが確立され、各種運転信号が送受信される。
 一方、室外起動リレー8を動作させたとき、即ち室外機1に通電するときには、室内S3端子35と室内S1端子33とが接続され、電源信号共通線25と信号線26との間に単相交流による電力が供給される。
 室内S1端子33は室内整流部5に接続され、室内S2端子34は室内整流部5と室内通信回路部6に接続される。電源線24と電源信号共通線25との間に印加された単相交流電圧は、室内整流部5で直流電圧に変換され、室内制御部4に電力が供給される。
 室内制御部4と接続された室内動作切替部7は、運転待機時に室外機1が消費する電力である待機電力を低減するか否かを判断する。図示の例は、待機電力を低減するか否かをジャンパー線で設定する例である。室内動作切替部7において、c1端子とc2端子との間にジャンパー線が接続されていれば待機電力を低減し、c2端子とc3端子との間にジャンパー線が接続されていれば、待機電力を低減しない。なお、待機電力を低減するか否かの切替方法は、ジャンパー線に限るものでなく、スイッチによる切替でもよい。
 受信部36は、リモコン37と室内制御部4に接続される。受信部36は、リモコン37からの運転指令を受信し、受信した指令を室内制御部4に伝達する。
 室外機1のR端子27には、第1の突入電流防止リレー10及び第2の突入電流防止リレー13の各一端ならびに電源供給リレー12における一端側の端子(a端子)が接続される。第1の突入電流防止リレー10及び第2の突入電流防止リレー13の各他端は突入電流防止抵抗11の一端に接続される。突入電流防止抵抗11の他端は、電源供給リレー12の他端側の端子(b端子)及び室外整流部9に接続される。さらに、第1の突入電流防止リレー10及び第2の突入電流防止リレー13の両端は、室外動作切替部17に接続される。
 S端子28には、電源供給リレー12における一端側の端子(c端子)が接続され、電源供給リレー12における他端側の端子(d端子)は、室外整流部9に接続される。T端子29は、室外整流部9に接続される。
 なお、図1では、電源供給リレー12の一端側の端子(a端子及びc端子)は、R端子27とS端子28とにそれぞれ接続されているが、R端子27、S端子28及びT端子29のうちの何れかの2端子と接続されていればよい。また、第1の突入電流防止リレー10と第2の突入電流防止リレー13との並列回路に突入電流防止抵抗11を直列に接続した回路部における一端及び他端は、図1ではそれぞれa端子及びb端子に接続されているが、それぞれがc端子及びd端子に接続されていてもよい。すなわち、当該回路部における一端及び他端が、電源供給リレー12における何れか1接点の入出力と接続されていればよい。
 また、図1において、電源供給リレー12は、2接点のリレーを示しているが、1接点のリレーが2つある構成でもよい。
 室外整流部9は、3相交流電源3の交流電圧を整流し、任意の直流電圧に変換する。電源供給リレー12及び第2の突入電流防止リレー13は、室外制御部16の制御によって動作し、動作しないときは、図1に示すように接点を開放している。
 室外動作切替部17は、第1の突入電流防止リレー10の両端に接続されると共に、室外制御部16にも接続されている。室外動作切替部17は、運転待機時の待機電力を低減するか否かを判断する。図示の例は、待機電力を低減するか否かをジャンパー線で設定する例である。室外動作切替部17において、a1端子とa2端子との間にジャンパー線が接続されていれば、運転待機時の待機電力を低減する。一方、b1端子とb2端子との間にジャンパー線が接続されていれば、これらb1端子,b2端子によって、第1の突入電流防止リレー10をバイパスする電流経路が形成されるので、運転待機時の待機電力を低減しない。運転待機時の待機電力を低減するか否かの情報は、室外動作切替部17から室外制御部16に伝達される。
 平滑コンデンサ14の両端は、室外整流部9に接続されている。平滑コンデンサ14は、室外整流部9からの出力を平滑化し、接続されているインバータ回路部15及び室外制御部16に直流電圧を印加する。
 室外機1は、さらに電源供給切替リレー20、通信回路電源部18、突入電流防止リレー駆動部21及び室外通信回路部19を備えている。電源供給切替リレー20は、a端子、b端子及びc端子を有している。a端子は通信回路電源部18に接続され、b端子は突入電流防止リレー駆動部21に接続され、c端子は室外S2端子31に接続されている。電源供給切替リレー20の一方の接点であるc端子は常に室外S2端子31に接続され、他方の接点はa端子及びb端子のうちの何れかに接続される。電源供給切替リレー20により、室外S2端子31を突入電流防止リレー駆動部21に接続するか、室外S2端子31を通信回路電源部18に接続するかを切り替えることができる。
 電源供給切替リレー20は、室外制御部16の制御によって動作する。電源供給切替リレー20が動作しないとき、接点はb端子とc端子とが接続され、電源供給切替リレー20を介して、室外S2端子31が突入電流防止リレー駆動部21と接続される。この接続により、室内機2によって電源信号共通線25と信号線26との間に単相交流が通電されたとき、突入電流防止リレー駆動部21が通電され、第1の突入電流防止リレー10が接点を閉じる。
 電源供給切替リレー20が動作するとき、接点はa端子とc端子とが接続され、電源供給切替リレー20を介して、室外S2端子31が通信回路電源部18と接続される。通信回路電源部18は、電源線24と電源信号共通線25との間の単相交流電圧が印加されて直流電圧を生成し、室外通信回路部19に電源を供給する。直流電圧の生成は、半波整流回路により実現できるが、これに限るものではない。
 インバータ回路部15は、室外制御部16によって制御され、印加された直流電圧を任意周波数及び任意電圧の交流電圧に変換する。インバータ回路部15は、変換した交流電圧を圧縮機39に印加し、圧縮機39を駆動する。
<運転待機時の動作>
 次に、空気調和機の運転待機時の動作について図1を参照して説明する。まず、R端子27、S端子28及びT端子29を介して、室外機1に3相交流電源3の電力が投入される。ここで、運転待機時においては、第1の突入電流防止リレー10、第2の突入電流防止リレー13及び電源供給リレー12の接点が開いているため、室外機負荷であるインバータ回路部15、室外動作切替部17及び室外制御部16へは、電力は供給されない。
 通信回路電源部18は、一端が室外S1端子30を介して電源線24に接続されているが、もう一端が電源供給切替リレー20により室外S2端子31との接続が切れており、電力が供給されない。そのため、室外通信回路部19へも同様に電力が供給されない。突入電流防止リレー駆動部21は、一端が室外S2端子31を介して電源信号共通線25に接続されているが、もう一端は室外S3端子32を介して信号線26に接続されているので、電力が供給されない。
 以上の動作態様により、運転待機時においては、室外機1での運転待機電力は低減されている。
<運転動作に入るまでの動作>
 次に、空気調和機が運転動作に入るまでの動作を説明する。室内機2において、電源線24と電源信号共通線25を介して、3相交流電源3からの電力が投入されると、室内制御部4に電源が供給され、室内機2は起動する。起動後、室内動作切替部7の設定が確認される。図示の例では、c1端子とc2端子にジャンパー線が接続されているので、運転待機時の待機電力を低減する空気調和機と認識される。室内制御部4は、受信部36を介してリモコン37からの運転指令を待ち受ける状態に移行する。
 室内制御部4がリモコン37からの運転指令信号を受けると、室内制御部4は、室外起動リレー8をON動作させ、室内S3端子35と室内通信回路部6との接続を切り離し、室内S3端子35と室内S1端子33との接続に切り替える。この制御によって、室外S2端子31と室外S3端子32との間に単相交流電圧が印加される。
 室外S2端子31と室外S3端子32との間に電力が供給されると、電源供給切替リレー20を介して突入電流防止リレー駆動部21が通電され、第1の突入電流防止リレー10がON動作し、接点を閉じる。第1の突入電流防止リレー10が閉じることで、3相交流電源3からの交流電圧が室外整流部9で直流電圧に変換され、変換された直流電圧が平滑コンデンサ14とインバータ回路部15に印加される。
 ここで、第1の突入電流防止リレー10を通る電源供給経路では、突入電流防止抵抗11が入っているので、短絡を防ぐことができる。直流電圧の印加によって、室外制御部16が起動する。室外制御部16は、起動後に第2の突入電流防止リレー13をON動作し、接点を閉じる。室外制御部16は、平滑コンデンサ14に充電された電圧を監視し、設定電圧で安定したことを確認した後、電源供給リレー12をON動作させて、電源供給リレー12の接点を閉じ、その後、第2の突入電流防止リレー13をOFF動作させ、第2の突入電流防止リレー13の接点を開放する。
 室内制御部4は、室外起動リレー8をON動作させてから任意の設定時間を経過した後に、室外起動リレー8をOFF動作させ、室内S3端子35と室内S1端子33との接続を切り離し、室内S3端子35と室内通信回路部6との接続に切り替える。この制御によって、室外S2端子31と室外S3端子32との間に印加されていた単相交流電圧は遮断され、突入電流防止リレー駆動部21は非通電となるため、第1の突入電流防止リレー10はOFF動作し、接点を開放する。この動作によって、室外機起動動作における短絡を防ぐことができる。
 突入電流防止リレー駆動部21が非通電になると、室外制御部16は、電源供給切替リレー20をON動作させて、室外S2端子31と突入電流防止リレー駆動部21との接続を開放し、室外S2端子31と通信回路電源部18との接続に繋ぎかえる。この制御により、室外S1端子30と室外S2端子31との間に印加された単相交流電圧が通信回路電源部18に印加される。通信回路電源部18は、単相交流電圧を任意の直流電圧に変換して室外通信回路部19に印加する。
 なお、上記の説明では、室内制御部4による室外起動リレー8のOFF動作の後に、第1の突入電流防止リレー10がOFF動作する手順であったが、この順番を逆に入れ替え、先に電源供給切替リレー20をON動作させてもよい。電源供給切替リレー20をON動作させた場合、突入電流防止リレー駆動部21が非通電になり、第1の突入電流防止リレー10がOFF動作となるので、順番を入れ替えても室外機1の起動は可能となる。
 室外制御部16は、室外通信回路部19を動作させて室内機2との通信を開始する。室外通信回路部19は、電源信号共通線25と信号線26を介して、室内通信回路部6との通信を開始する。室外制御部16は、室外通信回路部19と室内通信回路部6との通信が確立できたか否かを判定する。通信が確立できたときには、室内機2と室外機1の定常通信を行う。室外制御部16は、室内機2からの運転指令を受けて、暖房運転又は冷房運転の動作に入る。通信が確立できなかったときには、再度通信を開始し、通信の確立を試みる。通信の確立の判定を規定回数もしくは規定時間内まで繰り返す。通信が確立できない場合は、通信異常を判断し、通信が確立できれば、室内機2と室外機1との定常通信に移行する。
<瞬時停電時の動作>
 第2の突入電流防止リレー13は、瞬時停電時からの自己復帰の可能性を高め、利用者の利便性の向上を図るためのリレーである。瞬時停電とは、外部からの電源供給が一時的に途絶える現象である。図2は、瞬時停電時の動作を説明するための説明図である。図2において、左側には電源供給リレー12のシーケンス動作を、右側には第2の突入電流防止リレー13のシーケンス動作を、母線電圧との関係で示している。なお、ここでいう「母線電圧」とは、室外整流部9とインバータ回路部15とを繋ぐ直流母線の電圧であり、図1の例では平滑コンデンサ14の電圧に一致する。以下の説明では、「平滑コンデンサ14の電圧」を「母線電圧」と称して説明する。
 母線電圧は、前述の通り、室外制御部16で監視されている。電源供給が途絶えると、回路には何らかの負荷が接続されているため、母線電圧が低下する。負荷が大きいほど母線電圧の低下速度は速い。室外機の通電中には、電源供給リレー12の接点が閉じているので、電源供給が直ちに復帰すれば、母線電圧は、瞬時に電源電圧を平滑した電圧まで上昇して復帰する。一方、電源供給が復帰しないときは、母線電圧は低下を続ける。
 そこで、母線電圧が第1の電圧閾値Vth1よりも低下したとき、電源供給リレー12をOFF動作させ、電源供給リレー12の接点を開放し、続いて第2の突入電流防止リレー13をON動作させ、第2の突入電流防止リレー13の接点を閉じる。なお、シーケンス動作であるため、第2の突入電流防止リレー13の接点が閉じられるときの母線電圧は、第1の電圧閾値Vth1よりもさらに低下した電圧Vth1’(Vth1’<Vth1)となることもある。
 母線電圧が第1の電圧閾値Vth1を下回り、さらに低下し続けても、室外制御部16が動作できる電圧である限り、室外制御部16は、第2の突入電流防止リレー13をON動作し続ける。室外制御部16が動作可能な電圧で電源が復帰すると、第2の突入電流防止リレー13及び突入電流防止抵抗11を通る経路で平滑コンデンサ14の電圧が回復できる。また、突入電流防止抵抗11を介するため、突入電流値を制限でき、過大な突入電流による、後段の回路、例えば室外整流部9の故障を防ぐことができる。
 母線電圧が回復して電源電圧が安定電圧VDDに復帰すると、室外制御部16は、安定電圧VDDで安定したことを確認した後、電源供給リレー12をON動作させて、電源供給リレー12の接点を閉じ、続いて第2の突入電流防止リレー13をOFF動作させて、第2の突入電流防止リレー13の接点を開放する。3相交流電源3からの電源供給が続いている限り、平滑コンデンサ14への充電電流は電源供給リレー12経由で平滑コンデンサ14に供給され、第2の突入電流防止リレー13を経由することはない。以上の制御動作により、空気調和機における不要電力の低減が可能となる。
 次に、室外機1が冷房運転の状態又は暖房運転の状態(以下、両者を総称する場合「運転状態」と称する)から待機状態に移行して待機電力を低減するまでの動作の流れを図3のフローチャートを用いて説明する。
 まず、運転状態のときに、リモコン37から運転停止指令が指示される(ステップS101)。運転停止指令は、受信部36を介して室内制御部4に伝達される。運転停止指令を受けた室内制御部4は、室内通信回路部6及び室外通信回路部19を介して室外制御部16に運転停止指令を伝達する。運転停止指令を受領した室外制御部16は、空気調和機の運転を停止する(ステップS102)。
 運転停止から一定時間経過した後、室外制御部16は、拘束通電が必要か不要かを予測判断する。判断の仕方としては図示していないが、圧縮機39に複数の温度センサを備え、各温度センサ間の温度差分情報、又は、各温度センサにおける初期温度と現在の温度との差分情報及び外気温度センサからの温度情報を元に、冷媒状態又は冷媒量を予測することができる。冷媒が寝込み状態にあると判断されれば、拘束通電が実施される。
 拘束通電の要否の予測判断によって拘束通電が不要と判断すると(ステップS103)、室外機1の室外通信回路部19は、室外機1の待機電力を低減することを、室内機2の室内通信回路部6に通知する(ステップS104)。当該通知は室内通信回路部6を介して室内制御部4に伝達され、室内制御部4は、室外機1が待機電力の低減動作に入ることを認識し、タイマカウントを開始する(ステップS105)。
 次に、室内制御部4は、室内機2がタイマカウントを開始したことを室内通信回路部6及び室外通信回路部19を介して室外機1へ通知する(ステップS106)。室外制御部16は、電源供給リレー12をOFFする(ステップS107)。これにより、3相交流電源3からの電源が低下し、室外機1における整流後の直流電圧すなわち平滑コンデンサ14の電圧が低下し(ステップS108)、室外制御部16はOFFする(ステップS109)。室外制御部16が非通電となるため、電源供給切替リレー20がOFF動作となる(ステップS110)。
 このとき、室外機1での主な負荷となるインバータ回路部15、室外制御部16及び通信回路電源部18は非通電となり、これら各部での電力消費がカットされるので、室外機1は、待機電力低減動作に移行する(ステップS111)。これにより、運転待機中における室外機1の電力を低減することができるので、省電力化の効果が得られる。
 上記のフローチャートの動作について補足する。室内機2の室内制御部4では、室外機1の待機電力低減動作の継続時間をタイマカウントしている。室内制御部4によるタイマカウントは、室外機1が拘束通電を不要と判断した予測時間が経過するまで行われる。予測時間が経過すると、室内制御部4は、室外機1を起動させる。起動の手順は、上記で既に説明した通りであり、室外起動リレー8がON動作して室外機1に電源が供給され、平滑コンデンサ14が充電されることで、室外機1を起動することができる。そして、室外機1の起動後の運転待機中のときに拘束通電の要否を判定し、拘束通電が不要と判断された場合には、同じ手順で室外機1を待機電力低減動作に移行させる。このときの室外機1における圧縮機動作と電源状態のON又はOFFについて、図4のタイミングチャートを用いて説明する。
 まず、時刻t1で圧縮機の動作をOFFにする。上述の通り、室外機1の電源はすぐにはOFFにならず、T1時間経過後の時刻t2でOFFになる。時刻t2から時刻t3までの第1の期間では、上述した待機電力低減動作となる。時刻t2から時刻t3までの第1の期間は、上述した予測時間に相当する期間、もしくは当該予測時間に基づいて設定された期間である。予測時間が経過した時刻t3では、室外機1が起動され、時刻t3から時刻t4までのT2時間の間で、拘束通電の要否が判定される。拘束通電が不要と判断された場合には、予測時間が経過した時刻t5まで待機電力低減動作となり、時刻t5で再度、拘束通電の要否が判定される。これ以後、運転指令が入力されない限り、これらの動作が繰り返される。
 なお、上記では、拘束通電の要否を判定し、拘束通電が不要とされる予測期間を第1の期間としているが、これに限定されない。空気調和機の場合、機種によって圧縮機の容量が決まるため、予め機種毎に設定した期間を第1の期間としてもよい。また、第1の期間を設定する場合、複数の温度センサ間の温度差分情報、複数の温度センサのそれぞれにおける初期温度と現在の温度との差分情報、又は、外気温度センサからの温度情報を元に、設定した第1の期間を変更してもよい。
 また、待機電力低減動作中のとき、リモコン37からの運転指令が入力された場合には、室内制御部4でのタイマカウントが予測時間を経過していなくても、室外機1の起動動作に移行し、室外機1が起動された後は、暖房又は冷房の運転動作に移行する。
 また、室外機1が待機電力低減動作中のとき、室外機1は非通電であるため、室外機1の室外通信回路部19からの通信信号は、室内機2の室内通信回路部6には送信されない。通常、室外機1の室外通信回路部19からの信号が途絶えたとき、室内制御部4は、通信異常が発生したと認識し、リモコン37に通知する。
 これに対し、実施の形態1の空気調和機では、室内制御部4でのタイマカウントが継続されているときは、室外機1が待機電力の低減動作中であり、室外機1と室内機2とが“正常”に通信できないことは認識できている。すなわち室内制御部4でのタイマカウントが継続されているときは、通信異常と誤判定しないようにすることができる。
 以上のように、実施の形態1における空気調和機においては、室外機1が拘束通電不要と判断した場合、室外機1は、待機電力低減動作で非通電状態に移行するが、その際、拘束通電が不要となる予測時間の期間において、室内機2でタイマカウントする機能を設けた。そして、室内機2でのタイマカウントが継続しているときには、通信異常とは判定しない機能を設けた。この仕組みにより、通信異常の誤判定を防止する機能と、室外機1における待機電力の低減機能との両立が可能となる。これにより、待機電力低減の機能を持つ空気調和機においても拘束通電が行えるため、起動負荷の増大に起因する圧縮機の破損、及び、大きな起動電流に起因するシステム異常の発生を抑止できるという効果が得られる。
 最後に、実施の形態1の室内制御部4におけるハードウェア構成について、図5から図7の図面を参照して説明する。
 室内制御部4は、図5に示すように、演算部40及びタイマ42を備える構成とすることができる。タイマ42は、上述したタイマカウントを行う。タイマカウントの情報は、演算部40に伝達される。演算部40は、各種の演算処理を行うと共に、上述した各種の制御を担任する。
 また、演算部40の機能を実現する場合には、図6に示すように、演算を行うCPU(Central Processing Unit:中央処理装置)200、CPU200によって読みとられるプログラムが保存されるメモリ202及び信号の入出力を行うインタフェース204を含む構成とすることができる。なお、CPU200は、演算装置、マイクロプロセッサ、マイクロコンピュータ、プロセッサ、又はDSP(Digital Signal Processor)などと称されるものであってもよい。また、メモリ202とは、例えば、RAM(Random Access Memory)、ROM(Read Only Memory)、フラッシュメモリ、EPROM(Erasable Programmable ROM)、EEPROM(Electrically EPROM)などの、不揮発性又は揮発性の半導体メモリなどが該当する。
 具体的に、メモリ202には、演算部40の機能を実行するプログラムが格納されている。CPU200は、インタフェース204を介して、必要な情報の授受を行うことにより、本実施の形態で説明された各種の制御処理及び演算処理を実行する。
 なお、図6に示すCPU200及びメモリ202は、図7のように処理回路203に置き換えてもよい。処理回路203は、例えば、単一回路、複合回路、プログラム化したプロセッサ、並列プログラム化したプロセッサ、ASIC(Application Specific Integrated Circuit)、FPGA(Field-Programmable Gate Array)、又は、これらを組み合わせたものが該当する。
実施の形態2.
 実施の形態1における空気調和機は室外機の1台に対し接続される室内機が1台である1対1の構成であるが、接続される室内機が複数台の場合について図8を参照して説明する。図8は、実施の形態2における空気調和機の接続構成例を示すブロック図である。図8において、図1に示す実施の形態1と同一又は同等の部分には、同一符号を付して重複する説明は省略する。なお、図8は、1つの室外機に2台の室内機が接続される構成を示すものであるが、3台以上の室内機が接続される場合であってもよい。
 図8において、室外機1には1台目の室内機2に加え2台目の室内機38が接続されている。室内機38の室内S1端子33は、電源線24により室外機1の室外S1端子30に接続され、室内機38の室内S2端子34は、電源信号共通線25により室外機1の室外S2端子31に接続され、室内機38の室内S3端子35は、信号線26により室外機1の室外S3端子32に接続されている。
 空気調和機を起動するまでの手順は、実施の形態1の手順と同じであり、室内機2の室内制御部4から室外起動リレー8をON動作させて、平滑コンデンサ14を充電して室外機1を起動させる。室外機1が立ち上がった後は、電源信号共通線25及び信号線26を介して室外機1と室内機2及び室外機1と室内機38との間で通信が行われる。
 最初の通信において、室内機2及び室内機38に対して識別用の番号が設定される。これは、号機設定と呼ばれる。ここでは、この号機設定により、室内機2が1号機に設定され、室内機38が2号機に設定されたとする。室内機2は、室外機1が非通電となる待機電力低減中にタイマカウントを行い、次の室外機1の再起動の時間を管理する。すなわち、複数台の室内機のうち、1号機に設定された室内機2に室外機1の再起動の時間管理を行わせる。これにより、室内機が複数台接続された空気調和機においても、待機電力低減の機能と、拘束通電の機能とを具備させることができ、起動負荷の増大に起因する圧縮機の破損、及び、大きな起動電流に起因するシステム異常の発生を抑止できるという効果が得られる。
 なお、上記の説明では、1号機に設定された室内機2に室外機1の再起動の時間管理を行わせると説明したが、2号機に設定された室内機38に室外機1の再起動の時間管理を行わせるようにしてもよい。
実施の形態3.
 実施の形態2における空気調和機では、複数台の室内機に対して、待機電力低減中の室外機の再起動の時間管理を、号機設定された1つの室内機に行わせていたが、号機設定に関係なく、接続される室内機の何れにも、時間管理を行わせて室外機1を起動させてもよい。このような設定でも、実施の形態1,2と同様の効果が得られる。
 なお、以上の実施の形態に示した構成は、本発明の内容の一例を示すものであり、別の公知の技術と組み合わせることも可能であるし、本発明の要旨を逸脱しない範囲で、構成の一部を省略、変更することも可能である。
 1 室外機、2,38 室内機、3 3相交流電源、4 室内制御部、5 室内整流部、6 室内通信回路部、7 室内動作切替部、8 室外起動リレー、9 室外整流部、10 第1の突入電流防止リレー、11 突入電流防止抵抗、12 電源供給リレー、13 第2の突入電流防止リレー、14 平滑コンデンサ、15 インバータ回路部、16 室外制御部、17 室外動作切替部、18 通信回路電源部、19 室外通信回路部、20 電源供給切替リレー、21 突入電流防止リレー駆動部、22 室内端子台、23 室外端子台、24 電源線、25 電源信号共通線、26 信号線、27 R端子、28 S端子、29 T端子、30 室外S1端子、31 室外S2端子、32 室外S3端子、33 室内S1端子、34 室内S2端子、35 室内S3端子、36 受信部、37 リモコン、39 圧縮機、40 演算部、42 タイマ、200 CPU、202 メモリ、203 処理回路、204 インタフェース。

Claims (4)

  1.  室内機と室外機を備えた空気調和機であって、
     前記室外機は室外制御部を備え、前記室外制御部は、待機電力を低減できると判断したときに、前記室内機に待機電力を低減することを通知した後に前記待機電力を低減し、
     前記室内機は室内制御部を備え、前記通知を受けてから前記室内制御部にてタイマカウントを行い、第1の期間の経過後に前記室外機を起動させることを特徴とする空気調和機。
  2.  前記第1の期間は、拘束通電を不要と判断した予測期間に設定されていることを特徴とする請求項1に記載の空気調和機。
  3.  前記室外機に前記室内機が複数台接続されたときに、1台の前記室内機のみが、前記タイマカウントを行うことを特徴とする請求項1又は2に記載の空気調和機。
  4.  前記室外機に前記室内機が複数台接続されたとき、前記室内制御部でのタイマカウントは複数台の前記室内機のそれぞれが行うことを特徴とする請求項1又は2に記載の空気調和機。
PCT/JP2016/070692 2016-07-13 2016-07-13 空気調和機 WO2018011909A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2018527306A JP6831379B2 (ja) 2016-07-13 2016-07-13 空気調和機
PCT/JP2016/070692 WO2018011909A1 (ja) 2016-07-13 2016-07-13 空気調和機

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2016/070692 WO2018011909A1 (ja) 2016-07-13 2016-07-13 空気調和機

Publications (1)

Publication Number Publication Date
WO2018011909A1 true WO2018011909A1 (ja) 2018-01-18

Family

ID=60951675

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/070692 WO2018011909A1 (ja) 2016-07-13 2016-07-13 空気調和機

Country Status (2)

Country Link
JP (1) JP6831379B2 (ja)
WO (1) WO2018011909A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2019202734A1 (ja) * 2018-04-20 2021-04-01 三菱電機株式会社 空気調和機
DE112021006997T5 (de) 2021-02-03 2023-11-30 Mitsubishi Electric Corporation Klimaanlage

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000193325A (ja) * 1998-12-25 2000-07-14 Matsushita Electric Ind Co Ltd 空気調和機
JP2008286419A (ja) * 2007-05-15 2008-11-27 Panasonic Corp 空気調和装置
JP2010065958A (ja) * 2008-09-12 2010-03-25 Hitachi Appliances Inc 空気調和装置
JP2013108672A (ja) * 2011-11-21 2013-06-06 Mitsubishi Heavy Ind Ltd クランクケースヒータを備えた空気調和機
JP2013113476A (ja) * 2011-11-28 2013-06-10 Mitsubishi Electric Corp 空気調和装置
JP2013204979A (ja) * 2012-03-29 2013-10-07 Fujitsu General Ltd 空気調和機

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000193325A (ja) * 1998-12-25 2000-07-14 Matsushita Electric Ind Co Ltd 空気調和機
JP2008286419A (ja) * 2007-05-15 2008-11-27 Panasonic Corp 空気調和装置
JP2010065958A (ja) * 2008-09-12 2010-03-25 Hitachi Appliances Inc 空気調和装置
JP2013108672A (ja) * 2011-11-21 2013-06-06 Mitsubishi Heavy Ind Ltd クランクケースヒータを備えた空気調和機
JP2013113476A (ja) * 2011-11-28 2013-06-10 Mitsubishi Electric Corp 空気調和装置
JP2013204979A (ja) * 2012-03-29 2013-10-07 Fujitsu General Ltd 空気調和機

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2019202734A1 (ja) * 2018-04-20 2021-04-01 三菱電機株式会社 空気調和機
DE112021006997T5 (de) 2021-02-03 2023-11-30 Mitsubishi Electric Corporation Klimaanlage

Also Published As

Publication number Publication date
JPWO2018011909A1 (ja) 2018-11-01
JP6831379B2 (ja) 2021-02-17

Similar Documents

Publication Publication Date Title
JP6184391B2 (ja) 空気調和機
EP3680566B1 (en) Air conditioner
JP6231749B2 (ja) 空気調和機
WO2018011909A1 (ja) 空気調和機
EP2001096B1 (en) Controller
JP5804009B2 (ja) 空気調和装置
US10944350B2 (en) Motor drive device
JP2014103828A (ja) 電気給湯機の制御装置
JP6336209B2 (ja) 空気調和装置
JP4762993B2 (ja) 空気調和機の制御装置
JP2013137115A (ja) 空気調和装置
JP2015055450A (ja) 空気調和装置
JP6925448B2 (ja) 空気調和機
CN108027159B (zh) 空气调节机以及空气调节机的控制方法
JP5841880B2 (ja) 蓄電装置
JP7168854B2 (ja) 空気調和機及び予熱運転方法
JP5928423B2 (ja) 空気調和装置
JP7422930B2 (ja) 空気調和装置
JP5772579B2 (ja) 空気調和装置
JP2009207330A (ja) 突入電流制限回路用リレー制御装置および突入電流制限回路用リレー制御方法

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2018527306

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16908813

Country of ref document: EP

Kind code of ref document: A1