WO2017179420A1 - 煤吹装置 - Google Patents
煤吹装置 Download PDFInfo
- Publication number
- WO2017179420A1 WO2017179420A1 PCT/JP2017/012714 JP2017012714W WO2017179420A1 WO 2017179420 A1 WO2017179420 A1 WO 2017179420A1 JP 2017012714 W JP2017012714 W JP 2017012714W WO 2017179420 A1 WO2017179420 A1 WO 2017179420A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- injection pipe
- casing
- pressure vessel
- divided
- support portion
- Prior art date
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J3/00—Removing solid residues from passages or chambers beyond the fire, e.g. from flues by soot blowers
- F23J3/02—Cleaning furnace tubes; Cleaning flues or chimneys
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J3/00—Removing solid residues from passages or chambers beyond the fire, e.g. from flues by soot blowers
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J3/00—Removing solid residues from passages or chambers beyond the fire, e.g. from flues by soot blowers
- F23J3/02—Cleaning furnace tubes; Cleaning flues or chimneys
- F23J3/023—Cleaning furnace tubes; Cleaning flues or chimneys cleaning the fireside of watertubes in boilers
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F28—HEAT EXCHANGE IN GENERAL
- F28G—CLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
- F28G1/00—Non-rotary, e.g. reciprocated, appliances
- F28G1/16—Non-rotary, e.g. reciprocated, appliances using jets of fluid for removing debris
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F28—HEAT EXCHANGE IN GENERAL
- F28G—CLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
- F28G15/00—Details
- F28G15/003—Control arrangements
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F28—HEAT EXCHANGE IN GENERAL
- F28G—CLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
- F28G15/00—Details
- F28G15/02—Supports for cleaning appliances, e.g. frames
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23D—BURNERS
- F23D2900/00—Special features of, or arrangements for burners using fluid fuels or solid fuels suspended in a carrier gas
- F23D2900/21—Burners specially adapted for a particular use
- F23D2900/21007—Burners specially adapted for a particular use for producing soot, e.g. nanoparticle soot
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J2700/00—Ash removal, handling and treatment means; Ash and slag handling in pulverulent fuel furnaces; Ash removal means for incinerators
- F23J2700/001—Ash removal, handling and treatment means
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
- F23J—REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES
- F23J3/00—Removing solid residues from passages or chambers beyond the fire, e.g. from flues by soot blowers
- F23J3/06—Systems for accumulating residues from different parts of furnace plant
Definitions
- the present invention inserts an injection tube from the outside of the furnace into a heat exchanger tube of a heat exchanger in a boiler in which the pressure of the gas in the furnace is maintained at a high pressure of several MPa, such as a gasification furnace, and the like
- the present invention relates to a soot blower for cleaning a heat transfer tube by blowing a cleaning gas.
- a soot blower equipped with an injection tube that is inserted into and removed from the furnace and injects high-pressure steam or the like onto the surface of the heat transfer tube is employed.
- the pressure inside the furnace is almost equal to normal pressure.
- the furnace pressure becomes normal pressure or higher, especially in high-pressure furnaces where the furnace pressure is several MPa like a gasification furnace,
- various sealing materials such as a gland packing are disposed in the passage of the injection tube to keep the inside of the furnace airtight.
- the soot blower described in Patent Document 1 is intended to prevent the char from leaking out of the furnace and to prevent the char injection tube from being deposited on the insertion / removal path in the furnace.
- This soot blowing device is provided with a connecting pipe that communicates with the inside of the furnace at the insertion position of the injection pipe in the furnace, and a seal box is connected to the connecting pipe via an insertion shutoff valve, and the seal box, the insertion shutoff valve, and the connecting pipe are connected.
- the injection tube is detachably disposed in the furnace, and the deposit removing gas can be supplied to the connecting tube.
- the soot blower supplies a seal gas to the seal box.
- the soot blower device described in Patent Document 2 is intended to reliably prevent leakage of harmful or flammable exhaust gas in a furnace or flue.
- a heat exchanger is provided in a housing to which exhaust gas is guided, and an injection tube that injects a sealing gas toward the heat exchanger through an insertion hole formed in the outer wall on the outer wall of the housing.
- a sealing material interposed between the outer peripheral surface of the injection pipe and the inner peripheral surface of the casing on the outer side of the on-off valve, and a gas supply hole for guiding a sealing gas toward the sealing material are provided.
- the deposit removing gas is supplied to a connecting pipe provided in communication with the inside of the furnace at the insertion position of the injection pipe in the furnace, as described in Patent Document 1, Since the pressure in the furnace is about 2.7 MPa with respect to the pressure inside the furnace of about 2.6 MPa, the surface of the injection pipe can be prevented even if char deposition on the pipe insertion / removal path of the injection pipe can be prevented. It does not lead to the removal of char attached to the surface. Moreover, although invention of patent document 1 supplies seal gas to a seal box, since the pressure in a furnace is about 2.7 MPa with respect to about 2.6 MPa as described in the said patent document 1, it is a seal gas. The char that adheres to the surface of the injection tube is not prevented from being taken into the sealing material.
- Patent Document 2 supplies a seal gas toward the seal material, as described in Patent Document 2, since the seal gas is 5 kg / cm 2 (about 0.5 MPa), It is not possible to prevent the char adhering to the surface of the injection tube from being taken into the sealing material.
- This invention solves the subject mentioned above, and it aims at providing the soot blowing apparatus which can prevent the situation where the char adhering to the surface of the injection tube for soot blowing is taken in into a sealing material. To do.
- Another object of the present invention is to provide a soot blowing device that can reduce axial misalignment of an injection pipe for soot blowing.
- a soot blowing device includes a heat transfer tube of a heat exchanger disposed inside a pressure vessel, and an injection tube provided movably inside and outside the pressure vessel.
- the inside is provided to extend outside the pressure vessel so as to surround the insertion hole on the pressure vessel side in which the injection pipe is inserted
- An air supply device that is arranged in the immediate vicinity of the support portion and generates a gas jet at a portion where the injection pipe protrudes on the pressure vessel side.
- the char attached to the surface of the spray tube is blown away.
- the situation where the char adhering to the surface of the injection tube for soot blowing is taken in the sealing material of a support part can be prevented.
- the soot blowing apparatus of 2nd invention is 1st invention WHEREIN:
- the said support part is a seal
- the bearing is disposed on the pressure vessel side of the seal material, and the air supply device supplies air to at least one of the pressure vessel side or the seal material side with respect to the bearing. It is characterized by doing.
- the bearing of the support part guides the movement of the injection pipe, and is less airtight than a sealing material that ensures airtightness. For this reason, the char adhering to the surface of the injection tube tends to easily pass through the bearing.
- the first air supply device supplies air to at least one of the pressure vessel side and the sealing material side with reference to the bearing. Therefore, a jet is effectively generated in the injection pipe protruding toward the pressure vessel on the tip end side of the bearing. Thereby, before passing a bearing, the char adhering to the surface of an injection pipe can be blown away.
- the soot blowing device of the third invention is characterized in that, in the first or second invention, the air supply device has an exhaust part for exhausting gas to the outside of the casing.
- a soot blowing device is the invention as set forth in any one of the first to third aspects, wherein the casing has a divided casing that is divided into a plurality of parts in the moving direction of the injection pipe, Each of the divided casings has a contact surface that is opposed to and in contact with each other in the moving direction of the injection pipe, and is formed in an annular shape in the circumferential direction at one of the opposed contact surfaces and is in contact with the other contact surface A recess for accommodating a ring is formed, the support portion is provided in the divided casing, and the nozzle of the air supply device is provided.
- the contact surfaces come into contact with each contact surface of each divided casing in a form in which the seal ring is accommodated in the recess, without being sandwiched between the contact rings.
- the axial misalignment can be reduced, and airtightness can be secured by the seal ring.
- the soot blowing device of the fifth invention is based on the second invention, wherein the casing has a divided casing that is divided into a plurality of parts in the moving direction of the injection pipe, and each of the divided casings is A contact surface is formed in contact with each other in the direction of movement of the injection tube, and a recess is formed in an annular shape in the circumferential direction on one of the opposed contact surfaces and accommodates a seal ring that contacts the other contact surface.
- Each of the divided casings is provided with the bearing of the support portion and the sealing material, and is provided with a nozzle of the air supply device.
- the contact surfaces come into contact with each contact surface of each divided casing in a form in which the seal ring is accommodated in the recess, without being sandwiched between the contact rings.
- the axial misalignment can be reduced, and airtightness can be secured by the seal ring.
- the bearing of a support part and the sealing material are each provided in the division
- At least one of the divided casings is configured as a spacer that is not provided with the support portion.
- the work space when removing the support part at the time of maintenance, the work space can be secured by removing the divided casing configured as a spacer, and the maintenance work can be easily performed.
- the soot blowing apparatus of 7th invention has the heat exchanger tube of the heat exchanger arrange
- the injection pipe is inserted into the inside of the pressure vessel so as to extend outside the pressure vessel so as to surround the insertion hole on the pressure vessel side.
- Each of the divided casings has a contact surface facing each other in the moving direction of the injection pipe, and each of the divided casings is opposed to each other in the moving direction of the injection pipe.
- Circumferential direction at the contact surface Is formed in an annular shape is formed with a recess in which the seal ring is housed to be contacted with the other contact surface, and wherein said supporting portion that is provided in the split casing.
- the contact surfaces come into contact with each contact surface of each divided casing in a form in which the seal ring is accommodated in the recess, without being sandwiched between the contact rings.
- the axial misalignment can be reduced, and airtightness can be secured by the seal ring.
- the soot blowing apparatus of 8th invention is the seal which ensures the airtightness between the said bearing and the bearing which guides the movement of the said injection pipe, and the said casing and the said injection pipe in 7th invention.
- the bearing is arranged on the pressure vessel side of the sealing material, and the bearing of the supporting portion and the sealing material are provided in each of the divided casings.
- the contact surfaces come into contact with each contact surface of each divided casing in a form in which the seal ring is accommodated in the recess, without being sandwiched between the contact rings.
- the axial misalignment can be reduced, and airtightness can be secured by the seal ring.
- the bearing of a support part and the sealing material are each provided in the division
- the soot blowing apparatus of the ninth invention is characterized in that at least one of the divided casings is configured as a spacer not provided with the support portion.
- the work space when removing the support part at the time of maintenance, the work space can be secured by removing the divided casing configured as a spacer, and the maintenance work can be easily performed.
- FIG. 1 is a schematic view of a soot blower according to an embodiment of the present invention.
- FIG. 2 is an enlarged view of a main part of the soot blower according to the embodiment of the present invention.
- FIG. 3 is an enlarged view of a main part of another example of the soot blower according to the embodiment of the present invention.
- FIG. 4 is an enlarged view of a main part of another example of the soot blower according to the embodiment of the present invention.
- FIG. 5 is a schematic diagram of an additional example of the soot blower according to the embodiment of the present invention.
- FIG. 6 is an enlarged view of a main part of another example of the soot blower according to the embodiment of the present invention.
- FIG. 7 is an enlarged view of a main part of another example of the soot blower according to the embodiment of the present invention.
- FIG. 1 is a schematic diagram of a soot blower according to the present embodiment.
- FIG. 2 is an enlarged view of a main part of the soot blower according to the present embodiment.
- the soot blower of this embodiment is provided in a pressure vessel 100 represented by a gasification furnace.
- the pressure vessel 100 includes a plurality of inner wall tubes arranged therein to define a gas passage, and the gas passage includes a group of a plurality of heat transfer tubes extending in a direction perpendicular to the gas flow ( The heat exchange part formed in the bank) is arranged.
- the soot blower is connected so that the cylindrical casing 1 surrounds the insertion hole 100 a of the pressure vessel 100 and extends outside the pressure vessel 100.
- the casing 1 has a connecting pipe 2 and a seal box 4.
- the connecting pipe 2 is provided in communication with the inside of the pressure vessel 100 from the insertion hole 100a.
- the installation position of the connecting pipe 2 corresponds to a position almost immediately below the position where the group of heat transfer tubes is installed when viewed in the horizontal direction, and when an injection pipe 5 to be described later is inserted into the pressure vessel 100, The position where you can face each other is selected.
- the upper end is pivotally supported so that the pressure vessel 100 and the connecting tube 2 are normally shielded.
- a shielding door 13 that is pushed at the tip and is opened inside the pressure vessel 100 is provided.
- a roller member is provided at a position where the tip of the injection pipe 5 abuts on the surface of the shielding door 13 facing the connecting pipe 2, and the injection pipe 5 and the shielding door 13 are shocked. It is comprised so that it may not contact
- an insertion cutoff valve 3 is provided at an outer end facing away from the pressure vessel 100.
- the insertion cutoff valve 3 is installed with one connected to the outer end of the connecting pipe 2 and the other connected to the seal box 4.
- the insertion cutoff valve 3 is operated manually or automatically to communicate or block between the connecting pipe 2 and the seal box 4.
- the seal box 4 is formed in a tubular shape so that the injection tube 5 can be inserted therethrough.
- the side of the seal box 4 connected to the insertion cutoff valve 3 is called the front end side, and the side far from the insertion cutoff valve 3 is called the rear end side.
- the injection tube 5 is formed in a cylindrical shape whose front end is closed, and has an injection hole 5a on the front end.
- the injection pipe 5 is configured such that the tip side can reciprocate over a predetermined stroke from the seal box 4 through the insertion cutoff valve 3 and the connection pipe 2 within the pressure vessel 100.
- the injection pipe 5 is provided with a wheel 9 driven by a motor 8 on the rear end side far from the pressure vessel 100, and the wheel 9 is along a guide track 10 provided parallel to the moving direction of the injection pipe 5. To move back and forth.
- the injection pipe 5 is guided to move at the rear end side and the front end side of the seal box 4 by the gland packing 6 and the support portion 7 when reciprocating, and airtightness with the seal box 4 is ensured.
- the gland packing 6 is formed in an annular shape and is disposed on the rear end side inside the seal box 4.
- the reciprocating injection pipe 5 is supported in a sealed state by the inside of the annular shape, and is connected to the inner wall of the seal box 4. It is comprised so that a space
- the support portion 7 includes a bearing 7 ⁇ / b> A that guides the movement of the injection pipe 5 on the inner side formed in an annular shape, and the seal box 4 and the injection pipe 5 between the inner side and the outer side formed in an annular shape. And an annular sealing material 7B for ensuring airtightness.
- the seal box 4 constituting the casing 1 has a divided casing 12 that is divided into a plurality (two in FIG. 2) in the moving direction of the injection pipe 5.
- Each divided casing 12 is formed with a flange 12A at a divided portion, and is connected by a bolt 12C with a seal member such as a vortex gasket 12B sandwiched between the flanges 12A facing each other.
- the bearing 7 ⁇ / b> A is provided in the divided casing 12 near the pressure vessel 100
- the sealing material 7 ⁇ / b> B is provided in the divided casing 12 far from the pressure vessel 100.
- a guide tube 11 having a fixed installation position is provided behind the injection tube 5.
- the injection pipe 5 is fitted so as to allow its own movement with respect to the guide pipe 11 in a state where the front end side of the guide pipe 11 is inserted from the rear end side and is sealed between the injection pipe 5 and the guide pipe 11. That is, the injection pipe 5 and the guide pipe 11 have a double pipe structure that expands and contracts with each other.
- the soot blower includes the steam supply device 21, the first air supply device (air supply device) 30, the second air supply device 41, and the third air supply device 51.
- a steam line 23 is connected between the rear end side of the guide pipe 11 protruding from the rear end side of the injection pipe 5 and the steam source 22.
- the steam line 23 is provided with a shutoff valve 24. Therefore, when the shutoff valve 24 is open, cleaning steam (gas) is supplied from the steam source 22 to the guide pipe 11 and the injection pipe 5 via the steam line 23.
- the check line 25 is arrange
- a plurality of microswitches are provided along the movement path of the injection tube 5, and the position of the injection tube 5 that moves to be inserted into and removed from the pressure vessel 100 is detected by the microswitch.
- an operation command for opening and closing the shutoff valve 24 for starting and stopping the injection of steam is obtained.
- a first nitrogen gas line 32 is connected between the immediate vicinity of the support portion 7 and the first nitrogen gas supply source 31 in the seal box 4 of the casing 1.
- the first nitrogen gas line 32 is provided with a shutoff valve 33.
- the first nitrogen gas line 32 is provided with an adjustment valve 35 that automatically adjusts the opening according to the detection signal of the flow meter 34, and an orifice set at a constant throttle amount downstream of the adjustment valve 35. 36 is provided. Thereby, when the shut-off valve 33 is open, nitrogen gas having a pressure higher than the gas pressure inside the pressure vessel 100 is always supplied from the first nitrogen gas supply source 31 in the immediate vicinity of the support portion 7.
- the check valve 37 is disposed at the downstream position of the regulating valve 35, so that the gas does not flow back to the first nitrogen gas supply source 31 side.
- the first nitrogen gas supply source 31 supplies nitrogen gas for removing deposits such as valves and filter chars in the gasifier, and the first air supply device 30 A gas supply source 31 is used.
- the pressure of the nitrogen gas supplied by the first air supply device 30 is such that the pressure difference with respect to the gas pressure inside the pressure vessel 100 is, for example, in the range of 0.1 MPa to 1.2 MPa, When the gas pressure inside the pressure vessel 100 is 2.7 MPa, a pressure of 2.8 MPa or more and 3.9 MPa or less is supplied.
- the 1st air supply apparatus 30 should just be provided with at least one of the adjustment valve 35 or the orifice 36 in adjusting the pressure of the nitrogen gas supplied.
- the nitrogen gas supplied in the immediate vicinity of the support portion 7 causes a jet of nitrogen gas to flow in the portion where the injection pipe 5 protrudes from the support portion 7 to the pressure vessel 100 side.
- a second nitrogen gas line 43 is connected between the seal box 4 of the casing 1 and a second nitrogen gas supply source 42 different from the first nitrogen gas supply source 31.
- the second nitrogen gas line 43 is provided with a shutoff valve 44.
- the second nitrogen gas line 43 is provided with an adjustment valve 46 that automatically adjusts the opening degree according to a detection signal of the flow meter 45 on the downstream side of the shutoff valve 44, and a downstream position of the adjustment valve 46. Is provided with an orifice 47 set to a fixed throttle amount.
- the pressure of the nitrogen gas supplied by the second air supply device 41 is 2.9 MPa, which is about 0.2 MPa higher than the gas pressure 2.7 MPa inside the pressure vessel 100, for example.
- the second air supply device 41 is provided with another second nitrogen gas line 43 ′ in which the second nitrogen gas line 43 branches off at an upstream position of the shutoff valve 44 and communicates with the steam line 23.
- the other second nitrogen gas line 43 ′ is provided with a shutoff valve 44 ′ and a check valve 48 ′ located downstream of the shutoff valve 44 ′. Therefore, when the shutoff valve 24 of the steam supply device 21 is closed and the shutoff valve 44 ′ is open, the char is removed from the second nitrogen gas supply source 42 via the other second nitrogen gas line 43 ′ and the steam line 23. Nitrogen gas is supplied to the guide tube 11 and the injection tube 5.
- a third nitrogen gas line 53 is provided between the upstream position of the shutoff valve 44 (shutoff valve 44 ′) of the second nitrogen gas line 43 and the connecting pipe 2 that is the casing 1. .
- the third nitrogen gas line 53 is provided with an adjustment valve 55 that automatically adjusts the opening according to the detection signal of the flow meter 54.
- nitrogen gas having a pressure higher than the gas pressure inside the pressure vessel 100 is constantly supplied from the second nitrogen gas supply source 42 to the inside of the connecting pipe 2.
- the check valve 56 is disposed downstream of the regulating valve 55, the gas does not flow backward to the second nitrogen gas supply source 42 side.
- the pressure of the nitrogen gas supplied by the third air supply device 51 is 2.9 MPa, which is about 0.2 MPa higher than the gas pressure 2.7 MPa inside the pressure vessel 100, for example.
- the pressure vessel 100 functions as a gasification furnace
- a high pressure gas of 2.7 MPa flows in the pressure vessel 100
- the insertion shut-off valve 3 is closed, the injection pipe 5 is in the rest position shown in FIG. 2, and the shut-off valves 24, 44 and 44 ′ are also in the closed position.
- the first nitrogen gas line 32 also has the shutoff valve 33 closed in a steady state where the pressure vessel 100 functions as a gasification furnace.
- the third nitrogen gas line 53 is not provided with a shut-off valve, and is adjusted by the regulating valve 55 to exceed the pressure of the high-pressure gas in the pressure vessel 100.
- nitrogen gas of 2.9 MPa is used in the pressure vessel 100. Always supplied during operation.
- the shut-off valve 44 is opened, and the nitrogen gas adjusted to about 2.7 MPa as the seal gas passes through the second nitrogen gas line 43. It is supplied to the seal box 4. Subsequently, the insertion shut-off valve 3 is opened, the motor 8 is started, and the injection pipe 5 is inserted into the pressure vessel 100 through the connecting pipe 2, and the shut-off valve 24 is opened at a predetermined position and the injection pipe is passed through the steam line 23. The steam is introduced into the nozzle 5 and the injection of the steam is started from the injection hole 5a. The injection of the steam is continued until the injection pipe 5 turns back at the predetermined position and returns to the injection start position. Close and stop injection.
- the injection pipe 5 pushes and opens the shielding door 13 disposed between the connection pipe 2 and the pressure vessel 100 at its tip. Advance.
- the shutoff valve 44 ′ is temporarily opened when the injection hole 5a provided at the tip of the jet pipe 5 is inserted into the connecting pipe 2. Nitrogen gas is supplied from the other second nitrogen gas line 43 ′ through the vapor line 23 into the injection pipe 5, and the air remaining in the injection pipe 5 is purged.
- the injection tube 5 continues to be extracted from the pressure vessel 100 even after the stop of the steam injection.
- the injection pipe 5 exits the connecting pipe 2 and the insertion cutoff valve 3 and returns to the rest position, but the insertion cutoff valve 3 is restored to the closed position in accordance with the retreat timing, and then the cutoff valve 44 is also closed. And it returns to the original state where nitrogen gas is supplied to the connecting pipe 2 through the third nitrogen gas line 53.
- the shutoff valve 33 of the first air supply device 30 is opened.
- the nitrogen gas of 2.8 MPa or more and 3.9 MPa or less is adjusted by the regulating valve 35 and surpasses the pressure of the high-pressure gas in the pressure vessel 100, for example, through the first nitrogen gas line 32 and in the vicinity of the support portion 7. Supplied.
- the heat transfer tube of the heat exchanger is arranged inside the pressure vessel 100, and the heat transfer tube is changed from the injection tube 5 provided so as to be movable inside and outside the pressure vessel 100.
- the injection tube 5 is provided to extend outside the pressure vessel 100 so as to surround the insertion hole 100a on the pressure vessel 100 side into which the injection tube 5 is inserted.
- gas nitrogen gas
- the first air supply device 30 causes the nitrogen gas jet to flow from the support portion 7 to the pressure vessel 100 side by generating a jet of nitrogen gas at the portion where the injection tube 5 protrudes to the pressure vessel 100 side.
- the char attached to the surface of the injection pipe 5 is blown off by the gas injected into the injection pipe 5. For this reason, the situation where the char adhering to the surface of the injection tube 5 for soot blowing is taken into the sealing material 7B of the support part 7 can be prevented. As a result, the effect of suppressing the deterioration of the sealing material 7B of the support portion 7 can be enhanced.
- the step of causing the first gas supply device 30 to generate a jet of nitrogen gas at the portion where the injection tube 5 protrudes toward the pressure vessel 100 is for the purpose of removing char attached to the surface of the injection tube 5.
- Nitrogen gas is supplied only while the injection tube 5 is moving. This is because the amount of nitrogen gas input is preferably reduced from the viewpoint of suppressing a decrease in the generated gas heating value of the gasification furnace, and it is desirable to shorten the input time.
- the front end of the 1st nitrogen gas line 32 is connected so that the 1st air supply apparatus 30 may be near the support part 7, and may supply nitrogen gas by the rear end side of the support part 7.
- FIG. The nozzle 32 a is disposed on the rear end side of the sealing material 7 ⁇ / b> B in the support portion 7.
- the nitrogen gas supplied from the nozzle 32 a passes through a minute gap between the support portion 7 and the injection pipe 5, and generates a jet in the injection pipe 5 protruding toward the pressure vessel 100.
- the nitrogen gas supplied from the nozzle 32a passes through a minute gap between the sealing material 7B on the rear end side and the injection pipe 5, and further between the bearing 7A on the front end side and the injection pipe 5.
- a jet is generated in the injection pipe 5 that passes through the minute gap and protrudes toward the pressure vessel 100 side. Thereby, the char adhering to the surface of the injection tube 5 is blown away.
- the arrangement of the nozzle 32a is not limited to the configuration described above.
- 3 and 4 are enlarged views of main parts of another example of the soot blower according to the present embodiment, and show another arrangement of the nozzles 32a.
- the nozzle 32 a is disposed in the immediate vicinity of the support portion 7 and is disposed on the tip end side of the bearing 7 ⁇ / b> A in the support portion 7.
- the nitrogen gas supplied from the nozzle 32a directly causes a jet flow in the injection pipe 5 protruding to the pressure vessel 100 side.
- the nitrogen gas supplied from the nozzle 32a causes a jet flow in the injection pipe 5 protruding toward the pressure vessel 100 on the tip side of the bearing 7A. Thereby, the char adhering to the surface of the injection tube 5 is blown away.
- the nozzle 32a is disposed in the immediate vicinity of the support portion 7 and on the rear end side and the front end side of the bearing 7A in the support portion 7.
- the nitrogen gas supplied from the nozzle 32 a passes through a minute gap between the bearing 7 ⁇ / b> A and the injection pipe 5, and generates a jet in the injection pipe 5 protruding toward the pressure vessel 100.
- the nitrogen gas supplied from the nozzle 32a generates a jet in the injection pipe 5 protruding toward the pressure vessel 100 on the tip side of the bearing 7A. Thereby, the char adhering to the surface of the injection tube 5 is blown away.
- the support portion 7 includes the bearing 7A that guides the movement of the injection pipe 5, and the sealing material 7B that ensures the airtightness between the casing 1 and the injection pipe 5.
- the bearing 7A is disposed on the pressure vessel 100 side of the sealing material 7B, and the first air supply device 30 supplies air to at least one of the pressure vessel 100 side or the sealing material 7B side with respect to the bearing 7A. .
- the bearing 7A of the support portion 7 guides the movement of the injection pipe 5, and is less airtight than the sealing material 7B that ensures airtightness. For this reason, the char adhering to the surface of the injection pipe 5 tends to easily pass through the bearing 7A.
- the first air supply device 30 supplies air to at least one of the pressure vessel 100 side and the sealing material 7B side with reference to the bearing 7A. Therefore, a jet is effectively generated in the injection pipe 5 protruding toward the pressure vessel 100 at the tip end side of the bearing 7A. Thereby, before passing the bearing 7A, the char adhering to the surface of the injection pipe 5 can be blown away.
- FIG. 5 is a schematic diagram of an additional example of the soot blower according to the present embodiment.
- the first air supply device 30 has an exhaust part that exhausts nitrogen gas to the outside of the casing 1.
- the exhaust section includes a branch line 38 that is branched downstream from the orifice 36 of the first nitrogen gas line 32 and opened to the atmosphere, and a shut-off valve 39 provided in the branch line 38. Is done.
- the exhaust part opens the shut-off valve 39 so that the nitrogen gas in the first nitrogen gas line 32 is discharged through the branch line 38.
- the opening operation of the casing 1 at the time of maintenance of the support portion 7 of the casing 1 and the like can be performed safely.
- the pressure remaining between the insertion cutoff valve 3 and the support portion 7 is reliably exhausted at the start of maintenance. Therefore, the operation of opening the casing 1 can be performed safely by exhausting the gas inside the casing 1 by the exhaust section.
- FIG. 6 and 7 are enlarged views of main parts of another example of the soot blower according to the present embodiment.
- the casing 1 has a divided casing 12 that is divided into a plurality (four in FIG. 6) in the moving direction X of the injection pipe 5.
- Each divided casing 12 is formed with contact surfaces 12D that are opposed to each other in the moving direction of the injection pipe 5, and is formed in an annular shape in the circumferential direction at one of the opposed contact surfaces 12D to accommodate the seal ring 12E. 12F is formed.
- segmentation casing 12 is fastened with the volt
- the divided casing 12 is provided with the support portion 7 and the nozzle 32a of the first air supply device 30 is provided.
- the split casing 12 is provided with the bearing 7A of the support portion 7 and the sealing material 7B, and the nozzle 32a of the first air supply device 30 is provided.
- the nozzle 32a of the first air supply device 30 is provided on the pressure vessel 100 side and the sealing material 7B side with respect to the bearing 7A, but is not limited thereto.
- the nozzle 32a may be provided on at least one of the pressure vessel 100 side or the sealing material 7B side with respect to the bearing 7A.
- the support part 7 is divided and formed in the bearing 7A and the sealing material 7B, while the support part 7 guides the movement of the injection pipe 5, the casing 1, the injection pipe 5,
- the nozzle 32a may be provided on at least one of the front end side or the rear end side of the integrally formed support portion 7.
- the seal ring 12E is accommodated in each contact surface 12D of each divided casing 12 in a form in which the seal ring 12E is accommodated in the recess 12F. Since the contact surfaces 12D are in contact with each other without being sandwiched, axial misalignment is reduced and airtightness is secured by the seal ring 12E.
- At least one of the divided casings 12 is configured as a spacer not provided with the support portion 7.
- the first air supply device 30 is not essential in order to obtain the effect of reducing the axial misalignment of the injection pipe 5 or performing maintenance work easily. Accordingly, a configuration in which the divided casing 12 having the form shown in FIG. 7 is provided and the nozzle 32a of the first air supply device 30 is not provided may be employed.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Incineration Of Waste (AREA)
Abstract
圧力容器(100)の内部に熱交換器の伝熱管が配置されており、圧力容器(100)の内外に移動可能に設けられた噴射管(5)から伝熱管に向けて清掃用の蒸気を噴射する煤吹装置において、噴射管(5)が挿入される圧力容器(100)側の挿入穴(100a)を囲んで圧力容器(100)の外側に延在して設けられて内部に噴射管(5)が挿通される筒状のケーシング(1)と、ケーシング(1)の内部に設けられて噴射管(5)の移動を案内すると共にケーシング(1)と噴射管(5)との間の気密性を確保する支持部(7)と、支持部(7)の直近に配置されて圧力容器(100)側に噴射管(5)が突出する部分にガス(窒素ガス)の噴流を生じさせる第一給気装置(30)と、を備える。これにより、煤吹するための噴射管の表面に付着したチャーがシール材に取り込まれる事態を防止する。
Description
本発明は、例えば、ガス化炉などのように炉内ガスの圧力が数MPaの高圧に維持されたボイラにおける熱交換器の伝熱管に対し、炉外から噴射管を挿入して蒸気などの清掃用の気体を吹き付けて伝熱管を清掃する煤吹装置に関する。
石炭焚きボイラで代表されるように、燃料に固形の石炭を採用するボイラでは、燃焼ガス中に混入する粒子状の未燃カーボン(チャー)が熱交換器の伝熱管に堆積すると伝熱機能を低下させる。このため、稼働中のボイラで一日数回に亘って伝熱管を清掃し、チャーの除去を行うことが必要となる。
この清掃のため、炉内に抜き挿しして伝熱管の表面に高圧蒸気などを噴射する噴射管を備えた煤吹装置が採用されている。例えば、石炭焚きボイラでは、炉内圧力が常圧にほぼ等しいため、噴射管の炉内抜き挿しに際して、炉内ガスの漏出について格別の配慮を払う必要もなく噴射管の炉内出し入れを行うことができる。しかし、燃料が石油、ガスなどを採用する油焚きボイラ、ガス焚きボイラなどでは、炉内圧力が常圧以上となり、特にガス化炉のように炉内圧力が数MPaとなる高圧のものでは、噴射管の炉内抜き挿しに際しては、噴射管の通路にグランドパッキンを始めとして種々のシール材を配置して、炉内の気密保持を行う構造が必要となる。
従来、特許文献1に記載の煤吹装置は、チャーの炉外への漏出防止と、チャーの噴射管の炉内抜き挿し経路への堆積防止を図ることを目的としている。この煤吹装置は、噴射管の炉内挿入位置に炉内と連通する連結管を設け、連結管に挿入遮断弁を介してシールボックスを接続し、シールボックス、挿入遮断弁、および連結管を介して噴射管を炉内に抜き挿し可能に配置すると共に、連結管に堆積物除去ガスを供給可能にしている。また、この煤吹装置は、シールボックスにシールガスを供給する。
また、従来、特許文献2に記載のスートブロア装置は、炉または煙道内の有害または可燃性の排ガスの漏洩を確実に防ぐことを目的としている。このスートブロア装置は、排ガスが導かれるハウジングに、熱交換器が設けられ、ハウジングの外壁には、この外壁に形成される挿入孔を挿通して熱交換器に向けてシールガスを噴射する噴射管が軸線方向に変位自在に設けられ、噴射管は、外壁に各挿入孔を外囲して固定されるケーシング内に挿通され、ケーシングには、噴射管が挿通する弁孔を有する開閉弁と、この開閉弁よりも外部側で噴射管の外周面とケーシングの内周面との間に介在されるシール材と、このシール材に向けてシールガスを導くガス供給孔とが設けられている。
ところで、噴射管は、炉内に挿入されることから、その表面にチャーが付着する。そして、噴射管が炉内から引き抜かれる際、噴射管の表面に付着したチャーがシール材に取り込まれ、シール材の耐久性を低下させるおそれがある。
上述した特許文献1の発明は、噴射管の炉内挿入位置に炉内と連通して設けられた連結管に堆積物除去ガスを供給しているが、当該特許文献1に記載のように、炉内圧力が約2.6MPaに対して約2.7MPaの堆積物除去ガスであるため、噴射管の炉内抜き挿し経路へのチャーの堆積を防止することができても、噴射管の表面に付着したチャーを除去するまでに至らない。また、特許文献1の発明は、シールボックスにシールガスを供給するが、当該特許文献1に記載のように、炉内圧力が約2.6MPaに対して約2.7MPaのシールガスであるため、噴射管の表面に付着したチャーがシール材に取り込まれることを防止するまでに至らない。
また、上述した特許文献2の発明は、シール材に向けてシールガスを供給するが、当該特許文献2に記載のように、5kg/cm2(約0.5MPa)のシールガスであるため、噴射管の表面に付着したチャーがシール材に取り込まれることを防止するまで至らない。
一方、特許文献1に記載のシールボックスおよび連結管や、特許文献2に記載のケーシングの各筒体をフランジ取り合わせとし、ボルテックスガスケットなどによるシール部材をフランジ間に配置する場合、対向するフランジの面間がガスケットの潰し代で変化するため、面間の差が噴射管の軸心ズレに繋がることになる。噴射管に軸心ズレが生じると、噴射管が伝熱管に接触するおそれがある。
本発明は、上述した課題を解決するものであり、煤吹するための噴射管の表面に付着したチャーがシール材に取り込まれる事態を防止することのできる煤吹装置を提供することを目的とする。また、本発明は、煤吹するための噴射管の軸心ズレを低減することのできる煤吹装置を提供することを目的とする。
上述の目的を達成するために、第1の発明の煤吹装置は、圧力容器の内部に熱交換器の伝熱管が配置されており、前記圧力容器の内外に移動可能に設けられた噴射管から前記伝熱管に向けて清掃用の気体を噴射する煤吹装置において、前記噴射管が挿入される前記圧力容器側の挿入穴を囲んで前記圧力容器の外側に延在して設けられて内部に前記噴射管が挿通される筒状のケーシングと、前記ケーシングの内部に設けられて前記噴射管の移動を案内すると共に前記ケーシングと前記噴射管との間の気密性を確保する支持部と、前記支持部の直近に配置されて前記圧力容器側に前記噴射管が突出する部分にガスの噴流を生じさせる給気装置と、を備えることを特徴とする。
この煤吹装置によれば、給気装置により、圧力容器側に噴射管が突出する部分に窒素ガスの噴流を生じさせることで、支持部から圧力容器側に突出する噴射管に噴射されたガスにより噴射管の表面に付着したチャーが吹き飛ばされる。このため、煤吹するための噴射管の表面に付着したチャーが支持部のシール材に取り込まれる事態を防止することができる。この結果、支持部のシール材の劣化が進行することを抑える効果を高めることができる。
また、第2の発明の煤吹装置は、第1の発明において、前記支持部は、前記噴射管の移動を案内する軸受と、前記ケーシングと前記噴射管との間の気密性を確保するシール材と、を有して前記シール材の前記圧力容器側に前記軸受が配置されており、前記給気装置は、前記軸受を基準として前記圧力容器側または前記シール材側の少なくとも一方に給気することを特徴とする。
支持部の軸受は、噴射管の移動を案内するものであり、気密性を確保するシール材と比較して気密性が低い。このため、噴射管の表面に付着したチャーは、軸受を通過しやすい傾向にある。この煤吹装置によれば、第一給気装置は、軸受を基準として圧力容器側またはシール材側の少なくとも一方に給気する。従って、軸受の先端側において、圧力容器側に突出する噴射管に効果的に噴流を生じさせる。これにより、軸受を通過する以前に、噴射管の表面に付着したチャーを吹き飛ばすことができる。
また、第3の発明の煤吹装置は、第1または第2の発明において、前記給気装置は、前記ケーシングの外部にガスを排気する排気部を有することを特徴とする。
この煤吹装置によれば、ケーシングの内部のガスが排気されるため、ケーシングの支持部などのメンテナンス時におけるケーシングの開放作業を安全に実施することができる。
また、第4の発明の煤吹装置は、第1~第3のいずれか1つの発明において、前記ケーシングは、前記噴射管の移動方向で複数に分割形成された分割ケーシングを有しており、各前記分割ケーシングは、前記噴射管の移動方向で互いに対向して接触する接触面が形成され、対向する一方の前記接触面で周方向に環状に形成されて他方の接触面に接触されるシールリングが収容される凹部が形成されており、前記分割ケーシングに前記支持部が設けられ、かつ前記給気装置のノズルが設けられることを特徴とする。
この煤吹装置によれば、噴射管の移動方向である軸方向では、シールリングが凹部に収容された形態で各分割ケーシングの各接触面でシールリングを挟み込むことなく各接触面が接触するため、軸心ズレを低減することができ、かつシールリングにより気密性を確保することができる。
また、第5の発明の煤吹装置は、第2の発明において、前記ケーシングは、前記噴射管の移動方向で複数に分割形成された分割ケーシングを有しており、各前記分割ケーシングは、前記噴射管の移動方向で互いに対向して接触する接触面が形成され、対向する一方の前記接触面で周方向に環状に形成されて他方の接触面に接触されるシールリングが収容される凹部が形成されており、各前記分割ケーシングに前記支持部の前記軸受と前記シール材とがそれぞれ設けられ、かつ前記給気装置のノズルが設けられることを特徴とする。
この煤吹装置によれば、噴射管の移動方向である軸方向では、シールリングが凹部に収容された形態で各分割ケーシングの各接触面でシールリングを挟み込むことなく各接触面が接触するため、軸心ズレを低減することができ、かつシールリングにより気密性を確保することができる。しかも、分割ケーシングに支持部の軸受とシール材とがそれぞれ設けられているため、軸受とシール材とのそれぞれのメンテナンスを容易に行うことができる。
また、第6の発明の煤吹装置は、第4または第5の発明において、前記分割ケーシングの少なくとも1つは、前記支持部を設けられていないスペーサとして構成されることを特徴とする。
この煤吹装置によれば、メンテナンス時に支持部を取り外す場合、スペーサとして構成した分割ケーシングを抜くことで、作業スペースを確保することができ、メンテナンス作業を容易に行うことができる。
また、第7の発明の煤吹装置は、圧力容器の内部に熱交換器の伝熱管が配置されており、前記圧力容器の内外に移動可能に設けられた噴射管から前記伝熱管に向けて清掃用の気体を噴射する煤吹装置において、前記噴射管が挿入される前記圧力容器側の挿入穴を囲んで前記圧力容器の外側に延在して設けられて内部に前記噴射管が挿通される筒状のケーシングと、前記ケーシングの内部に設けられて前記噴射管の移動を案内すると共に前記ケーシングと前記噴射管との間の気密性を確保する支持部と、を備え、前記ケーシングは、前記噴射管の移動方向で複数に分割形成された分割ケーシングを有しており、各前記分割ケーシングは、前記噴射管の移動方向で互いに対向して接触する接触面が形成され、対向する一方の前記接触面で周方向に環状に形成されて他方の接触面に接触されるシールリングが収容される凹部が形成されており、前記分割ケーシングに前記支持部が設けられることを特徴とする。
この煤吹装置によれば、噴射管の移動方向である軸方向では、シールリングが凹部に収容された形態で各分割ケーシングの各接触面でシールリングを挟み込むことなく各接触面が接触するため、軸心ズレを低減することができ、かつシールリングにより気密性を確保することができる。
また、第8の発明の煤吹装置は、第7の発明において、前記支持部は、前記噴射管の移動を案内する軸受と、前記ケーシングと前記噴射管との間の気密性を確保するシール材と、を有して前記シール材の前記圧力容器側に前記軸受が配置されており、各前記分割ケーシングに前記支持部の前記軸受と前記シール材とがそれぞれ設けられることを特徴とする。
この煤吹装置によれば、噴射管の移動方向である軸方向では、シールリングが凹部に収容された形態で各分割ケーシングの各接触面でシールリングを挟み込むことなく各接触面が接触するため、軸心ズレを低減することができ、かつシールリングにより気密性を確保することができる。しかも、分割ケーシングに支持部の軸受とシール材とがそれぞれ設けられているため、軸受とシール材とのそれぞれのメンテナンスを容易に行うことができる。
また、第9の発明の煤吹装置は、第7または第8の発明において、前記分割ケーシングの少なくとも1つは、前記支持部を設けられていないスペーサとして構成されることを特徴とする。
この煤吹装置によれば、メンテナンス時に支持部を取り外す場合、スペーサとして構成した分割ケーシングを抜くことで、作業スペースを確保することができ、メンテナンス作業を容易に行うことができる。
本発明によれば、煤吹するための噴射管の表面に付着したチャーがシール材に取り込まれる事態を防止することができる。
以下に、本発明に係る実施形態を図面に基づいて詳細に説明する。なお、この実施形態によりこの発明が限定されるものではない。また、下記実施形態における構成要素には、当業者が置換可能かつ容易なもの、あるいは実質的に同一のものが含まれる。
図1は、本実施形態に係る煤吹装置の概略図である。図2は、本実施形態に係る煤吹装置の要部拡大図である。
本実施形態の煤吹装置は、ガス化炉で代表される様な圧力容器100に設けられる。この圧力容器100は、図には明示しないが、内部に多数の内壁管を配置してガス通路を区画し、ガス通路には、ガスの流れに直交する方向に延びる多数の伝熱管の群(バンク)で形成した熱交換部を配置している。
煤吹装置は、筒状のケーシング1が圧力容器100の挿入穴100aを囲むように接続され、圧力容器100の外側に延在して設けられている。ケーシング1は、連結管2と、シールボックス4とを有している。
連結管2は、挿入穴100aから圧力容器100の内部に連通して設けられている。連結管2の設置位置は、水平方向で見て伝熱管の群が設置される位置のほぼ直下に相当し、後述する噴射管5が圧力容器100内に挿入されたとき、伝熱管の群に近接して対峙出来る位置を選択されている。この連結管2と圧力容器100の間であって圧力容器100の挿入穴100aの位置には、上端部を枢支されて常時は圧力容器100と連結管2とを遮蔽し、噴射管5の先端で押されて圧力容器100の内側に開かれる遮蔽扉13が設けられている。なお、遮蔽扉13の連結管2に対峙する面で、噴射管5の先端が当接する位置には、図示しないが、ころ部材が設けられており、噴射管5と遮蔽扉13は衝撃的に当接したり、摩擦接合したりすることのないように構成されている。
連結管2において、圧力容器100から離れて向く外方端に、挿入遮断弁3が設けられている。挿入遮断弁3は、一方を連結管2の外方端に、他方をシールボックス4に接続して設置されている。挿入遮断弁3は、手動または自動で操作されて、連結管2とシールボックス4の間を連通または遮断する。
シールボックス4は、噴射管5が挿通されるように管状に形成されている。シールボックス4の挿入遮断弁3に接続された側を先端側といい、挿入遮断弁3に遠い側を後端側という。
噴射管5は、先端側が閉塞された筒状に形成され、その先端側に噴射孔5aを有している。噴射管5は、先端側がシールボックス4から挿入遮断弁3、連結管2を経て圧力容器100の内部を所定のストロークに亘って往復移動が可能に構成されている。噴射管5は、圧力容器100から遠い後端側に、モータ8により駆動される車輪9が設けられ、この車輪9が噴射管5の移動方向に対して平行に設けられた案内軌道10に沿って移動することで往復移動する。
噴射管5は、シールボックス4の後端側および先端側において、グランドパッキン6および支持部7により往復移動に際して移動が案内されると共にシールボックス4との間の気密性が確保される。グランドパッキン6は、環状に形成されて、シールボックス4の内部の後端側に配置され、往復動する噴射管5を環状の内側によりシール状態で支持し、かつ、シールボックス4の内壁との間を環状の外側でシールするように構成されている。支持部7は、図2に示すように、環状に形成された内側で噴射管5の移動を案内する軸受7Aと、環状に形成された内側および外側でシールボックス4と噴射管5との間の気密性を確保する環状のシール材7Bと、を有する。
ここで、ケーシング1をなすシールボックス4は、図2に示すように、噴射管5の移動方向で複数(図2では2つ)に分割形成された分割ケーシング12を有している。各分割ケーシング12は、分割部分にフランジ12Aがそれぞれ形成され、各フランジ12Aが対向する間にボルテックスガスケット12Bなどのシール部材が挟まれた状態でボルト12Cにより連結される。支持部7は、圧力容器100寄りの分割ケーシング12に軸受7Aが設けられ、圧力容器100から遠い分割ケーシング12にシール材7Bが設けられている。
また、噴射管5の後方に、設置位置を固定されたガイド管11が設けられている。噴射管5は、後端側からガイド管11の先端側が挿通され、ガイド管11との間を密封した状態で、ガイド管11に対して自身の移動を許容するように嵌合されている。即ち、噴射管5とガイド管11は、相互に伸縮する二重パイプ構造となっている。
上記構成において、煤吹装置は、蒸気供給装置21と、第一給気装置(給気装置)30と、第二給気装置41と、第三給気装置51と、を有する。
蒸気供給装置21は、噴射管5の後端側から突出されるガイド管11の後端側と、蒸気源22との間に蒸気ライン23が接続されている。蒸気ライン23は、遮断弁24が設けられている。従って、遮断弁24が開のときには、蒸気源22から蒸気ライン23を介して清掃用の蒸気(気体)がガイド管11そして噴射管5と供給されるようになっている。なお、蒸気ライン23は、遮断弁24の下流位置に逆止弁25が配置されているので、気体が蒸気源22側に逆流することはない。
なお、図には明示しないが、噴射管5の移動経路に沿って複数のマイクロスイッチが設けられており、圧力容器100の内部に抜き挿しすべく移動する噴射管5の位置をマイクロスイッチにより検知し、噴射管5の位置に応じて蒸気の噴射開始や噴射停止を行う遮断弁24の開閉の作業指令が得られるようになっている。
第一給気装置30は、ケーシング1のシールボックス4において支持部7の直近と、第一窒素ガス供給源31との間に第一窒素ガスライン32が接続されている。第一窒素ガスライン32は、遮断弁33が設けられている。第一窒素ガスライン32は、流量計34の検知信号に応じて自動的に開度調整を行う調整弁35が設けられると共に、当該調整弁35の下流位置に一定の絞り量に設定されたオリフィス36が設けられている。これにより、遮断弁33が開のときには、支持部7の直近に第一窒素ガス供給源31から圧力容器100の内部のガス圧力より高い圧力の窒素ガスが常時供給される。なお、第一窒素ガスライン32は、調整弁35の下流位置に逆止弁37が配置されているので、気体が第一窒素ガス供給源31側に逆流することはない。また、第一窒素ガス供給源31は、ガス化炉におけるバルブやフィルタのチャーなどの堆積物を除去するための窒素ガスを供給するものであり、第一給気装置30は、この第一窒素ガス供給源31を利用している。
ここで、第一給気装置30による供給する窒素ガスの圧力は、圧力容器100の内部のガス圧力に対する圧力差が、例えば、0.1MPa以上1.2MPa以下の範囲の圧力であって、例えば、圧力容器100の内部のガス圧力が2.7MPaである場合、2.8MPa以上3.9MPa以下の圧力を供給する。なお、第一給気装置30は、供給する窒素ガスの圧力を調整するにあたり、調整弁35またはオリフィス36の少なくとも一方を備えていればよい。
この圧力の関係により、支持部7の直近に供給された窒素ガスは、支持部7より圧力容器100側に噴射管5が突出する部分に窒素ガスの噴流を生じさせる。
第二給気装置41は、ケーシング1のシールボックス4と、第一窒素ガス供給源31とは別の第二窒素ガス供給源42との間に第二窒素ガスライン43が接続されている。第二窒素ガスライン43は、遮断弁44が設けられている。また、第二窒素ガスライン43は、遮断弁44の下流側に、流量計45の検知信号に応じて自動的に開度調整を行う調整弁46が設けられると共に、当該調整弁46の下流位置に一定の絞り量に設定されたオリフィス47が設けられている。これにより、遮断弁44が開のときには、圧力容器100の内部のガス圧力より若干高い圧力の窒素ガスが常時供給される。なお、第二窒素ガスライン43は、遮断弁44の下流位置に逆止弁48が配置されているので、気体が第二窒素ガス供給源42側に逆流することはない。この第二給気装置41による供給する窒素ガスの圧力は、例えば、圧力容器100の内部のガス圧力2.7MPaに対して0.2MPa程度高い2.9MPaである。
また、第二給気装置41は、第二窒素ガスライン43が遮断弁44の上流位置で分岐して蒸気ライン23に連通する他の第二窒素ガスライン43’が設けられている。他の第二窒素ガスライン43’は、遮断弁44’および遮断弁44’の下流位置の逆止弁48’が設けられている。従って、蒸気供給装置21の遮断弁24が閉であって遮断弁44’が開のときには、第二窒素ガス供給源42から他の第二窒素ガスライン43’および蒸気ライン23を介してチャー除去用の窒素ガスがガイド管11そして噴射管5と供給されるようになっている。
第三給気装置51は、第二窒素ガスライン43の遮断弁44(遮断弁44’)の上流位置とケーシング1である連結管2との間に第三窒素ガスライン53が設けられている。第三窒素ガスライン53は、流量計54の検知信号に応じて自動的に開度調整を行う調整弁55が設けられている。これにより、連結管2の内部に第二窒素ガス供給源42から圧力容器100の内部のガス圧力より高い圧力の窒素ガスが常時供給される。なお、第三窒素ガスライン53は、調整弁55の下流位置に逆止弁56が配置されているので、気体が第二窒素ガス供給源42側に逆流することはない。この第三給気装置51による供給する窒素ガスの圧力は、例えば、圧力容器100の内部のガス圧力2.7MPaに対して0.2MPa程度高い2.9MPaである。
このように構成された本実施形態の煤吹装置は、圧力容器100がガス化炉として機能する定常状態においては、圧力容器100内には、例えば、2.7MPaの高圧ガスが流れており、この時挿入遮断弁3は閉じられ、噴射管5は、図2に示す休止位置にあり、また遮断弁24,44,44’も閉じられた位置になっている。また、第一窒素ガスライン32も、圧力容器100がガス化炉として機能する定常状態において、遮断弁33が閉じられている。一方、第三窒素ガスライン53は、遮断弁が設けられておらず、調整弁55で調整されて圧力容器100内の高圧ガスの圧力をしのぐ、例えば、2.9MPaの窒素ガスが圧力容器100の作動中常時供給される。
そして、1日に3~4回程度の頻度で行われる伝熱管の清掃時には、遮断弁44が開かれ、シールガスとして約2.7MPaに調整された窒素ガスが第二窒素ガスライン43を経てシールボックス4に供給される。続いて、挿入遮断弁3が開かれ、モータ8が始動して噴射管5は連結管2を経て圧力容器100中に挿入され、所定位置で遮断弁24を開いて蒸気ライン23を経て噴射管5に蒸気を導入し、噴射孔5aから蒸気の噴射を開始し、噴射管5が所定位置で折り返して噴射開始の位置に戻るまで蒸気の噴射は続けられ、この戻った位置で遮断弁24を閉じて噴射が停止される。ここで、噴射管5が連結管2から圧力容器100中に挿入される際には、噴射管5は連結管2と圧力容器100の間に配置された遮蔽扉13をその先端で押し開いて前進する。
なお、遮断弁24が開いて蒸気の噴射が開始される少し前には、噴射管5の先端に設けた噴射孔5aが連結管2に挿入された段階で一時的に遮断弁44’が開き、他の第二窒素ガスライン43’から蒸気ライン23を経て窒素ガスが噴射管5内に供給され、当該噴射管5内に滞留している空気などをパージする。
噴射管5による蒸気の噴射開始から停止に至る間の蒸気噴射により圧力容器100内の伝熱管の清掃作業が行われるが、この蒸気噴射の停止の後も噴射管5は引き続き圧力容器100から抜き出す移動を続ける。そして、噴射管5は、連結管2、挿入遮断弁3を出て休止位置に復位するが、この後退のタイミングに合わせて挿入遮断弁3が閉止位置に復位し、次いで遮断弁44も閉じ、かつ第三窒素ガスライン53を経て連結管2に窒素ガスが供給される元の状態に復位する。
上記第二窒素ガスライン43を介した窒素ガスの供給の間、具体的には、噴射管5が移動する間であって、噴射管5が圧力容器100中に挿入される際、または噴射管5が圧力容器100から引き出される際、あるいは両方の際に、第一給気装置30の遮断弁33が開かれる。これにより、調整弁35で調整されて圧力容器100内の高圧ガスの圧力をしのぐ、例えば、2.8MPa以上3.9MPa以下の窒素ガスが第一窒素ガスライン32を経て支持部7の直近に供給される。
このように、本実施形態の煤吹装置は、圧力容器100の内部に熱交換器の伝熱管が配置されており、圧力容器100の内外に移動可能に設けられた噴射管5から伝熱管に向けて清掃用の蒸気を噴射する煤吹装置において、噴射管5が挿入される圧力容器100側の挿入穴100aを囲んで圧力容器100の外側に延在して設けられて内部に噴射管5が挿通される筒状のケーシング1と、ケーシング1の内部に設けられて噴射管5の移動を案内すると共にケーシング1と噴射管5との間の気密性を確保する支持部7と、支持部7の直近に配置されて圧力容器100側に噴射管5が突出する部分にガス(窒素ガス)の噴流を生じさせる第一給気装置30と、を備える。
この煤吹装置によれば、第一給気装置30により、圧力容器100側に噴射管5が突出する部分に窒素ガスの噴流を生じさせることで、支持部7から圧力容器100側に突出する噴射管5に噴射されたガスにより噴射管5の表面に付着したチャーが吹き飛ばされる。このため、煤吹するための噴射管5の表面に付着したチャーが支持部7のシール材7Bに取り込まれる事態を防止することができる。この結果、支持部7のシール材7Bの劣化が進行することを抑える効果を高めることができる。
なお、第一給気装置30によって圧力容器100側に噴射管5が突出する部分に窒素ガスの噴流を生じさせる工程は、噴射管5の表面に付着したチャーを除去することが目的であり、噴射管5が移動している間のみ窒素ガスを供給する。窒素ガスの投入量は、ガス化炉の生成ガス発熱量の低下を抑える観点から少なくすることが好ましく、投入時間を短くすることが望ましいからである。
ところで、図2では、第一給気装置30は、支持部7の直近であって、支持部7の後端側で窒素ガスを供給するように、第一窒素ガスライン32の先端が接続されるノズル32aが支持部7におけるシール材7Bの後端側に配置されている。この場合、ノズル32aから供給された窒素ガスは、支持部7と噴射管5との間の微小な隙間を通り、圧力容器100側に突出する噴射管5に噴流を生じさせる。詳細には、ノズル32aから供給された窒素ガスは、後端側のシール材7Bと噴射管5との間の微小な隙間を通過し、さらに先端側の軸受7Aと噴射管5との間の微小な隙間を通過して、圧力容器100側に突出する噴射管5に噴流を生じさせる。これにより、噴射管5の表面に付着したチャーが吹き飛ばされる。
このノズル32aの配置は、上述した構成に限らない。図3および図4は、本実施形態に係る煤吹装置の他の例の要部拡大図であり、ノズル32aの別の配置を示している。
図3に示す形態では、第一給気装置30は、ノズル32aが、支持部7の直近であって、支持部7における軸受7Aの先端側に配置されている。この場合、ノズル32aから供給された窒素ガスは、圧力容器100側に突出する噴射管5に直接噴流を生じさせる。詳細には、ノズル32aから供給された窒素ガスは、軸受7Aの先端側において、圧力容器100側に突出する噴射管5に噴流を生じさせる。これにより、噴射管5の表面に付着したチャーが吹き飛ばされる。
図4に示す形態では、第一給気装置30は、ノズル32aが、支持部7の直近であって、支持部7における軸受7Aの後端側および先端側に配置されている。この場合、ノズル32aから供給された窒素ガスは、一方では、軸受7Aと噴射管5との間の微小な隙間を通過して、圧力容器100側に突出する噴射管5に噴流を生じさせる。また、ノズル32aから供給された窒素ガスは、軸受7Aの先端側において、圧力容器100側に突出する噴射管5に噴流を生じさせる。これにより、噴射管5の表面に付着したチャーが吹き飛ばされる。
このように、本実施形態の煤吹装置では、支持部7は、噴射管5の移動を案内する軸受7Aと、ケーシング1と噴射管5との間の気密性を確保するシール材7Bと、を有してシール材7Bの圧力容器100側に軸受7Aが配置されており、第一給気装置30は、軸受7Aを基準として圧力容器100側またはシール材7B側の少なくとも一方に給気する。
支持部7の軸受7Aは、噴射管5の移動を案内するものであり、気密性を確保するシール材7Bと比較して気密性が低い。このため、噴射管5の表面に付着したチャーは、軸受7Aを通過しやすい傾向にある。本実施形態の煤吹装置によれば、第一給気装置30は、軸受7Aを基準として圧力容器100側またはシール材7B側の少なくとも一方に給気する。従って、軸受7Aの先端側において、圧力容器100側に突出する噴射管5に効果的に噴流を生じさせる。これにより、軸受7Aを通過する以前に、噴射管5の表面に付着したチャーを吹き飛ばすことができる。
図5は、本実施形態に係る煤吹装置の追加例の概略図である。
本実施形態の煤吹装置では、第一給気装置30は、ケーシング1の外部に窒素ガスを排気する排気部を有する。排気部は、図5に示すように、第一窒素ガスライン32のオリフィス36より下流側で分岐して大気に開放された分岐ライン38と、分岐ライン38に設けられた遮断弁39とで構成される。
即ち、排気部は、遮断弁39を開けることで、分岐ライン38を介して第一窒素ガスライン32の窒素ガスが排出される。これにより、ケーシング1の内部のガスが排気されるため、ケーシング1の支持部7など(支持部7の軸受7Aおよびシール材7Bやグランドパッキン6)のメンテナンス時におけるケーシング1の開放作業を安全に実施することができる。具体的には、メンテナンス開始時に、挿入遮断弁3と支持部7との間に残る圧力を確実に排気する。従って、排気部によりケーシング1の内部のガスを排気することで、ケーシング1の開放作業を安全に実施することができる。
図6および図7は、本実施形態に係る煤吹装置の他の例の要部拡大図である。
図6に示すように、本実施形態の煤吹装置では、ケーシング1は、噴射管5の移動方向Xで複数(図6では4つ)に分割形成された分割ケーシング12を有している。各分割ケーシング12は、噴射管5の移動方向で互いに対向して接触する接触面12Dが形成され、対向する一方の接触面12Dで周方向に環状に形成されてシールリング12Eが収容される凹部12Fが形成されている。そして、各分割ケーシング12を噴射管5の移動方向Xでボルト12Gにて締結する。このため、対向する接触面12Dの接触が維持され、かつ凹部12Fに収容されたシールリング12Eが他方の接触面12Dに接触されて気密性が確保される。この分割ケーシング12に支持部7が設けられ、かつ、第一給気装置30のノズル32aが設けられる。
より具体的に、分割ケーシング12に支持部7の軸受7Aとシール材7Bとがそれぞれ設けられ、かつ第一給気装置30のノズル32aが設けられる。
なお、図6に示す形態では、第一給気装置30のノズル32aは、軸受7Aを基準として圧力容器100側およびシール材7B側に設けられているが、これに限定されない。ノズル32aは、軸受7Aを基準として圧力容器100側またはシール材7B側の少なくとも一方に設けられていればよい。また、図6に示す形態では、支持部7が軸受7Aとシール材7Bとに分けて形成されているが、支持部7が、噴射管5の移動を案内すると共にケーシング1と噴射管5との間の気密性を確保するように一体形成されている場合は、この一体形成の支持部7の先端側または後端側の少なくとも一方にノズル32aが設けられていればよい。
このように構成された煤吹装置に係り、例えば、上述した図2~図4に示す形態のように、ガスケット(ボルテックスガスケット)12Bをフランジ12A間に配置する場合、対向するフランジ12Aの面間がガスケット12Bの潰し代で変化するため、面間の差が噴射管5の軸心ズレに繋がることになる。噴射管5に軸心ズレが生じると、噴射管5が伝熱管に接触するおそれがある。
この問題に対し、図6に示す形態は、噴射管5の移動方向Xである軸方向では、シールリング12Eが凹部12Fに収容された形態で各分割ケーシング12の各接触面12Dでシールリング12Eを挟み込むことなく各接触面12Dが接触するため、軸心ズレが低減され、かつシールリング12Eにより気密性が確保される。
また、本実施形態の煤吹装置では、図6に示すように、分割ケーシング12の少なくとも1つは、支持部7を設けられていないスペーサとして構成されることが好ましい。
即ち、メンテナンス時に支持部7を取り外す場合、スペーサとして構成した分割ケーシング12を抜くことで、作業スペースを確保することができ、メンテナンス作業を容易に行うことができる。
なお、煤吹装置において、噴射管5の軸心ズレを低減したり、メンテナンス作業を容易に行ったりする効果を得るうえで、第一給気装置30は必須ではない。従って、図7に示す形態の分割ケーシング12を備える構成とし、第一給気装置30のノズル32aを設けない構成であってもよい。
1 ケーシング
2 連結管
3 挿入遮断弁
4 シールボックス
5 噴射管
5a 噴射孔
6 グランドパッキン
7 支持部
7A 軸受
7B シール材
12 分割ケーシング
12D 接触面
12E シールリング
12F 凹部
12G ボルト
21 蒸気供給装置
22 蒸気源
23 蒸気ライン
24 遮断弁
25 逆止弁
30 第一給気装置
31 第一窒素ガス供給源
32 第一窒素ガスライン
32a ノズル
33 遮断弁
34 流量計
35 調整弁
36 オリフィス
37 逆止弁
38 分岐ライン
39 遮断弁
100 圧力容器
2 連結管
3 挿入遮断弁
4 シールボックス
5 噴射管
5a 噴射孔
6 グランドパッキン
7 支持部
7A 軸受
7B シール材
12 分割ケーシング
12D 接触面
12E シールリング
12F 凹部
12G ボルト
21 蒸気供給装置
22 蒸気源
23 蒸気ライン
24 遮断弁
25 逆止弁
30 第一給気装置
31 第一窒素ガス供給源
32 第一窒素ガスライン
32a ノズル
33 遮断弁
34 流量計
35 調整弁
36 オリフィス
37 逆止弁
38 分岐ライン
39 遮断弁
100 圧力容器
Claims (9)
- 圧力容器の内部に熱交換器の伝熱管が配置されており、前記圧力容器の内外に移動可能に設けられた噴射管から前記伝熱管に向けて清掃用の気体を噴射する煤吹装置において、
前記噴射管が挿入される前記圧力容器側の挿入穴を囲んで前記圧力容器の外側に延在して設けられて内部に前記噴射管が挿通される筒状のケーシングと、
前記ケーシングの内部に設けられて前記噴射管の移動を案内すると共に前記ケーシングと前記噴射管との間の気密性を確保する支持部と、
前記支持部の直近に配置されて前記圧力容器側に前記噴射管が突出する部分にガスの噴流を生じさせる給気装置と、
を備えることを特徴とする煤吹装置。 - 前記支持部は、前記噴射管の移動を案内する軸受と、前記ケーシングと前記噴射管との間の気密性を確保するシール材と、を有して前記シール材の前記圧力容器側に前記軸受が配置されており、前記給気装置は、前記軸受を基準として前記圧力容器側または前記シール材側の少なくとも一方に給気することを特徴とする請求項1に記載の煤吹装置。
- 前記給気装置は、前記ケーシングの外部にガスを排気する排気部を有することを特徴とする請求項1または2に記載の煤吹装置。
- 前記ケーシングは、前記噴射管の移動方向で複数に分割形成された分割ケーシングを有しており、各前記分割ケーシングは、前記噴射管の移動方向で互いに対向して接触する接触面が形成され、対向する一方の前記接触面で周方向に環状に形成されて他方の接触面に接触されるシールリングが収容される凹部が形成されており、
前記分割ケーシングに前記支持部が設けられ、かつ前記給気装置のノズルが設けられることを特徴とする請求項1~3のいずれか1つに記載の煤吹装置。 - 前記ケーシングは、前記噴射管の移動方向で複数に分割形成された分割ケーシングを有しており、各前記分割ケーシングは、前記噴射管の移動方向で互いに対向して接触する接触面が形成され、対向する一方の前記接触面で周方向に環状に形成されて他方の接触面に接触されるシールリングが収容される凹部が形成されており、
各前記分割ケーシングに前記支持部の前記軸受と前記シール材とがそれぞれ設けられ、かつ前記給気装置のノズルが設けられることを特徴とする請求項2に記載の煤吹装置。 - 前記分割ケーシングの少なくとも1つは、前記支持部を設けられていないスペーサとして構成されることを特徴とする請求項4または5に記載の煤吹装置。
- 圧力容器の内部に熱交換器の伝熱管が配置されており、前記圧力容器の内外に移動可能に設けられた噴射管から前記伝熱管に向けて清掃用の気体を噴射する煤吹装置において、
前記噴射管が挿入される前記圧力容器側の挿入穴を囲んで前記圧力容器の外側に延在して設けられて内部に前記噴射管が挿通される筒状のケーシングと、
前記ケーシングの内部に設けられて前記噴射管の移動を案内すると共に前記ケーシングと前記噴射管との間の気密性を確保する支持部と、
を備え、
前記ケーシングは、前記噴射管の移動方向で複数に分割形成された分割ケーシングを有しており、各前記分割ケーシングは、前記噴射管の移動方向で互いに対向して接触する接触面が形成され、対向する一方の前記接触面で周方向に環状に形成されて他方の接触面に接触されるシールリングが収容される凹部が形成されており、
前記分割ケーシングに前記支持部が設けられることを特徴とする煤吹装置。 - 前記支持部は、前記噴射管の移動を案内する軸受と、前記ケーシングと前記噴射管との間の気密性を確保するシール材と、を有して前記シール材の前記圧力容器側に前記軸受が配置されており、
各前記分割ケーシングに前記支持部の前記軸受と前記シール材とがそれぞれ設けられることを特徴とする請求項7に記載の煤吹装置。 - 前記分割ケーシングの少なくとも1つは、前記支持部を設けられていないスペーサとして構成されることを特徴とする請求項7または8に記載の煤吹装置。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US16/084,355 US10962223B2 (en) | 2016-04-12 | 2017-03-28 | Soot blower |
CN201780018247.8A CN108885078B (zh) | 2016-04-12 | 2017-03-28 | 吹灰装置 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2016-079616 | 2016-04-12 | ||
JP2016079616A JP6345201B2 (ja) | 2016-04-12 | 2016-04-12 | 煤吹装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2017179420A1 true WO2017179420A1 (ja) | 2017-10-19 |
Family
ID=60041541
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2017/012714 WO2017179420A1 (ja) | 2016-04-12 | 2017-03-28 | 煤吹装置 |
Country Status (4)
Country | Link |
---|---|
US (1) | US10962223B2 (ja) |
JP (1) | JP6345201B2 (ja) |
CN (1) | CN108885078B (ja) |
WO (1) | WO2017179420A1 (ja) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6612925B2 (ja) | 2017-09-29 | 2019-11-27 | 本田技研工業株式会社 | マガジン式充電装置 |
CN110654941A (zh) * | 2019-09-30 | 2020-01-07 | 大唐郓城发电有限公司 | 一种基于火力发电厂冷却塔冷凝管用的收放装置 |
CN111811167B (zh) * | 2020-06-23 | 2021-12-10 | 山东德浩化学有限公司 | 一种工业用蒸发冷凝器 |
CN114135884B (zh) * | 2021-11-30 | 2023-08-08 | 华能秦煤瑞金发电有限责任公司 | 一种二次再热塔式炉停炉吹灰转换装置 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS62112439U (ja) * | 1986-01-08 | 1987-07-17 | ||
JPH0460279A (ja) * | 1990-06-29 | 1992-02-26 | Nippon Reinz Co Ltd | シールリングとその組み付け方法 |
JPH06159650A (ja) * | 1992-07-20 | 1994-06-07 | Babcock & Wilcox Co:The | すす吹き器の自己調整パッキン押さえ |
JPH0828853A (ja) * | 1994-07-18 | 1996-02-02 | Kawasaki Heavy Ind Ltd | スートブロア装置 |
WO2001007804A1 (en) * | 1999-07-23 | 2001-02-01 | Loy Yang Power Management Pty Ltd | Packing gland assembly for sootblowers |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1018856B (zh) * | 1988-01-12 | 1992-10-28 | 上海船用柴油机研究所 | 移动管排吹灰装置 |
JP3702237B2 (ja) * | 2002-03-18 | 2005-10-05 | 三菱重工業株式会社 | 煤吹装置 |
CN101846325B (zh) * | 2010-06-02 | 2012-08-22 | 中国石油化工集团公司 | 一种吹灰器 |
CN103148491A (zh) * | 2011-12-06 | 2013-06-12 | 中国石油化工股份有限公司 | 一种气体吹灰器 |
-
2016
- 2016-04-12 JP JP2016079616A patent/JP6345201B2/ja active Active
-
2017
- 2017-03-28 CN CN201780018247.8A patent/CN108885078B/zh active Active
- 2017-03-28 US US16/084,355 patent/US10962223B2/en active Active
- 2017-03-28 WO PCT/JP2017/012714 patent/WO2017179420A1/ja active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS62112439U (ja) * | 1986-01-08 | 1987-07-17 | ||
JPH0460279A (ja) * | 1990-06-29 | 1992-02-26 | Nippon Reinz Co Ltd | シールリングとその組み付け方法 |
JPH06159650A (ja) * | 1992-07-20 | 1994-06-07 | Babcock & Wilcox Co:The | すす吹き器の自己調整パッキン押さえ |
JPH0828853A (ja) * | 1994-07-18 | 1996-02-02 | Kawasaki Heavy Ind Ltd | スートブロア装置 |
WO2001007804A1 (en) * | 1999-07-23 | 2001-02-01 | Loy Yang Power Management Pty Ltd | Packing gland assembly for sootblowers |
Also Published As
Publication number | Publication date |
---|---|
CN108885078A (zh) | 2018-11-23 |
US20190078779A1 (en) | 2019-03-14 |
US10962223B2 (en) | 2021-03-30 |
JP6345201B2 (ja) | 2018-06-20 |
JP2017190894A (ja) | 2017-10-19 |
CN108885078B (zh) | 2020-09-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2017179420A1 (ja) | 煤吹装置 | |
US9239013B2 (en) | Combustion turbine purge system and method of assembling same | |
US8015816B2 (en) | Apparatus for discouraging fuel from entering the heat shield air cavity of a fuel injector | |
EP2574844A2 (en) | System for supplying pressured fluid to a cap assembly of a gas turbine combustor | |
JP2011522990A (ja) | ガスタービンの燃料系統を洗浄する方法とその燃料系統 | |
US9476582B2 (en) | System and method for removing slag inside a utility furnace | |
US9303870B2 (en) | System and method for injecting compound into utility furnace | |
US2545886A (en) | Openable closure for chambers under superatmospheric internal pressure and associated fluid pressure means for preventing the escape of fluids therefrom | |
JPS583166B2 (ja) | ス−トブロア構体 | |
JP6258755B2 (ja) | ガスエンジンのための燃料供給・洗浄装置 | |
KR20160092274A (ko) | 수트 블로워 | |
JP3702237B2 (ja) | 煤吹装置 | |
JP3702236B2 (ja) | 煤吹装置 | |
JP5008343B2 (ja) | 圧力検出管の清掃装置及び清掃方法 | |
CA1123688A (en) | Soot blower for pressurized furnace | |
JP4633980B2 (ja) | スラグ除去装置 | |
JP3917872B2 (ja) | 石炭ガス化炉用スートブロワ | |
JP2024078997A (ja) | バーナ及びボイラ並びにバーナガンの抜去方法 | |
KR102239239B1 (ko) | 가스 분사 장치 및 방법 | |
KR100234222B1 (ko) | 석탄 가스화 복합 발전 시스템의 건식 미분탄공급 장치 | |
JPH08312799A (ja) | 噴射媒体の供給弁 | |
JPH04290686A (ja) | 空気圧駆動調節弁の軸封部清掃方法及び軸封部清掃式空気圧駆動調節弁 | |
CN210601681U (zh) | 一种锅炉二次风管清理结构 | |
CN111623367A (zh) | 一种采用双介质清理锅炉水平烟道积灰的吹灰系统 | |
JP3649549B2 (ja) | スラグ除去装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 17782238 Country of ref document: EP Kind code of ref document: A1 |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 17782238 Country of ref document: EP Kind code of ref document: A1 |