WO2017057383A1 - エレベータの動作確認システムおよび動作確認方法 - Google Patents
エレベータの動作確認システムおよび動作確認方法 Download PDFInfo
- Publication number
- WO2017057383A1 WO2017057383A1 PCT/JP2016/078498 JP2016078498W WO2017057383A1 WO 2017057383 A1 WO2017057383 A1 WO 2017057383A1 JP 2016078498 W JP2016078498 W JP 2016078498W WO 2017057383 A1 WO2017057383 A1 WO 2017057383A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- elevator
- portable terminal
- information center
- permission
- control panel
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B5/00—Applications of checking, fault-correcting, or safety devices in elevators
- B66B5/0006—Monitoring devices or performance analysers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B5/00—Applications of checking, fault-correcting, or safety devices in elevators
- B66B5/0006—Monitoring devices or performance analysers
- B66B5/0018—Devices monitoring the operating condition of the elevator system
- B66B5/0031—Devices monitoring the operating condition of the elevator system for safety reasons
Definitions
- the present invention relates to an elevator operation confirmation system and an operation confirmation method for confirming an elevator operation using an actual machine.
- this elevator simulation device is provided in a box where an experienced person gets in, and a control operation control device that simulates the control operation of the selected elevator or a virtual failure according to the failure of the selected elevator
- a malfunction occurrence operation control device that performs the generation operation is provided, and an image corresponding to the control operation and the malfunction occurrence operation is displayed inside the box body, and the box body is vibrated according to the control operation and the malfunction occurrence operation.
- an operator such as a field engineer actually moves the seismometer installed in the elevator to It is necessary to create a state in which this occurs, and extensive preparation is required.
- the present invention has been made to solve the above-described problems, and to obtain an elevator operation confirmation system and an operation confirmation method capable of easily confirming the operation of an elevator while ensuring security. With the goal.
- An elevator operation confirmation system includes an elevator installed in a structure, a portable terminal that is carried by an operator and that transmits an operation command to an elevator control panel to drive the elevator, An information center that communicates with the terminal, and the portable terminal transmits a permission request unit that requests permission to transmit an operation command to the information center and, when transmission permission is obtained, An information transmission center that transmits an operation command, and the information center refers to the storage unit that stores the maintenance-related information of the elevator, and when the transmission permission is requested, refers to the storage unit and transmits the transmission permission. And a determination unit for determining whether or not to give.
- the elevator operation check method includes an elevator installed in a structure, a portable terminal that is carried by an operator and that drives the elevator by transmitting an operation command to the elevator control panel.
- An elevator operation confirmation method executed by an elevator operation confirmation system comprising an information center having a storage unit storing elevator maintenance-related information and communicating with a portable terminal.
- the portable terminal asks the information center for permission to transmit an operation command, and when the information center is asked for permission to transmit, Referring to the storage unit storing the maintenance related information, it is determined whether or not the transmission permission may be given, and the portable terminal transmits an operation command to the elevator control panel when the transmission permission is obtained. Then, the elevator is driven. Therefore, it is possible to easily confirm the operation of the elevator while ensuring security.
- FIG. 1 is a block diagram showing an elevator operation confirmation system according to Embodiment 1 of the present invention.
- an elevator operation confirmation system 1 has an elevator 10 installed in a structure and an operator, and drives the elevator 10 by transmitting an operation command to a control panel 15 of the elevator 10.
- a mobile terminal 20 and an information center 30 that communicates with the mobile terminal 20 are provided.
- the mobile terminal 20 and the information center 30 are connected to each other via a network.
- the elevator 10 and the mobile terminal 20 are connected to each other by wire or wireless.
- the elevator 10 and the information center 30 have not yet made a maintenance contract and are not connected to each other. Except where otherwise described, the description will be made assuming that the elevator 10 is not connected to the information center 30 before the maintenance contract.
- a hoisting machine 11 is provided in a machine room (not shown) of the elevator 10, for example.
- a main rope 12 is wound around the hoisting machine 11. Further, a car 13 is connected to one end of the main rope 12, and a counterweight 14 is connected to the other end.
- the hoisting machine 11 is connected to a control panel 15 that controls the drive of the elevator 10.
- the control panel 15 includes an earthquake control operation device 16 that performs control operation when an earthquake occurs, an automatic landing device 17 that performs automatic landing operation when a power failure occurs, and a fire control that performs control operation when a fire occurs. And a driving device 18.
- the specific operations of the earthquake control operation device 16, the automatic power landing device 17 during a power failure, and the fire control operation device 18 will be described later.
- control panel 15 includes an earthquake restoration diagnosis operation device that performs diagnosis operation for automatically restoring the elevator after an earthquake operation, a wind control operation device that performs control operation when a strong wind occurs, and a control operation when a long-period earthquake occurs.
- a long-period seismic motion control operation device or the like may be provided.
- the control panel 15 has a wireless or wired communication function (not shown) for receiving an operation command from a transmission command unit 22 of the portable terminal 20 described later.
- the portable terminal 20 includes a permission request unit 21, a command transmission unit 22, a confinement simulation unit 23, a display unit 24, a voice output unit 25, an operation unit 26, and a voice input unit 27.
- the permission request unit 21, the command transmission unit 22, and the confinement simulation unit 23 are implemented in the mobile terminal 20 as applications.
- the permission request unit 21 requests the information center 30 for permission to transmit an operation command.
- the command transmission unit 22 transmits an operation command to the control panel 15 when transmission permission is obtained.
- the confinement simulation unit 23 simulates a state where passengers are confined in the car 13. Specific operations of the permission request unit 21, the command transmission unit 22, and the confinement simulation unit 23 will be described later.
- the display unit 24 is, for example, a display
- the audio output unit 25 is, for example, a speaker
- the operation unit 26 is, for example, a hardware key or a software key composed of a touch panel
- the audio input unit 27 is, for example, It is a microphone.
- FIG. 2 is an explanatory diagram showing a screen shown on the display unit 24 shown in FIG.
- the display unit 24 displays elevator information input, earthquake control operation, automatic landing operation during power failure, fire control operation and confinement rescue operation as menus of the elevator operation confirmation system.
- Each of these menus can be selected by pressing. It should be noted that menus other than elevator information input cannot be pressed until transmission of an operation command is permitted by the information center 30.
- the information center 30 refers to the storage unit 31 that stores the maintenance-related information of the elevator 10, and when the transmission permission is requested, the information center 30 may refer to the storage unit 31 to grant the transmission permission. And a determination unit 32 for determining whether or not. A specific operation of the determination unit 32 will be described later.
- the storage unit 31 stores the structure in which the elevator 10 is installed, the unit number in the structure, and the maintenance-related information of the elevator 10 in association with each other.
- the maintenance-related information is whether or not a maintenance contract for the elevator 10 is made, and if not, if it is not made, it is a predetermined after-service period after the installation of the elevator 10 or a contract with another company. Information such as whether or not
- the storage unit 31 also stores maintenance-related information related to other elevators manufactured by the manufacturer that manufactured the elevator 10.
- the information center 30 is connected to the elevator 10 by wired communication or wireless communication via a monitoring device (not shown), and the information center 30 is connected via the monitoring device based on the maintenance contract.
- a monitoring device not shown
- the state of the elevator 10 can be remotely monitored, and remote control can be performed via a monitoring device as necessary.
- an operation command from the mobile terminal 20 can be transmitted to the control panel 15 via the information center 30. It is also possible to temporarily connect the elevator 10 to the information center 30 before making a contract.
- step S ⁇ b> 1 the permission request unit 21 first asks the information center 30 for permission to transmit an operation command.
- this process is executed when the worker inputs, for example, the structure and the number of the elevator 10 to the elevator information input shown in FIG.
- the determination unit 32 refers to the storage unit 31 and determines whether or not the elevator 10 may be driven from the mobile terminal 20 (step S2). If it is determined that it can be driven, transmission of an operation command is permitted (step S3).
- the determination unit 32 permits transmission of an operation command when a maintenance contract for the elevator 10 is not concluded and no contract is made with another company.
- the permission of the operation command is notified to the mobile terminal 20 by a one-time password generated by the determination unit 32, for example.
- the mobile terminal 20 has an authentication function for determining whether the notified one-time password is a password corresponding to a predetermined logic.
- the permission of the operation command is not limited to the one-time password, and the activation of the application itself may be used as a key.
- the determination unit 32 can permit the transmission of the operation command even when the maintenance contract for the elevator 10 is concluded. In this case, an abnormal signal issued from the elevator 10 is transmitted to the information center 30. Therefore, it is necessary to perform a process for ignoring such an abnormal signal.
- the command transmission unit 22 transmits the operation command to the control panel 15 (step S4).
- the worker continuously inputs the one-time password received from the determination unit 32 to the elevator information input shown in FIG. 2, the one-time password is authenticated. Operation, automatic landing device at power failure, and control operation at fire can be pressed, and any menu of control operation at earthquake, automatic landing device at power failure, and control operation at fire can be pressed. It is executed by selecting.
- the control panel 15 operates the earthquake control operation device 16, the automatic landing device 17 during a power failure, or the fire control operation device 18 in accordance with the operation command. Specifically, when the seismic control operation device 16 is operated, an announcement flows in the car 13, and the car 13 is moved to the nearest floor without being stopped and the door is opened.
- the car 13 when the automatic landing device 17 is operated at the time of a power failure, the car 13 temporarily stops, an announcement flows in the car 13, and the car is moved to the nearest floor by switching to the battery and the door is opened. The When the fire control operation device 18 is operated, the car 13 is moved to a predetermined evacuation floor without being stopped, and the door is opened.
- FIG. 4 first, until the portable terminal 20 is permitted to transmit an operation command, it is the same as FIG.
- the command transmission unit 22 transmits an operation command for stopping the car 13 to the control panel 15 (step S11).
- this processing is executed by the operator selecting the confinement rescue operation menu that can be pressed as shown in FIG.
- the information center 30 projects the operator of the information center 30 on the display unit 24 of the mobile terminal 20, for example, or displays the audio output unit 25 and the audio input unit 27 in the same manner as in the confinement rescue operation during normal remote monitoring.
- the portable terminal 20 creates an environment equivalent to that in the car 13 (step S13).
- the command transmission unit 22 transmits an operation command for resuming the operation of the car 13 to the control panel 15 (step S14).
- the portable terminal asks the information center for permission to transmit the operation command, and the information center sends the maintenance related information for the elevator when the permission for transmission is requested.
- the transmission permission With reference to the stored storage unit, it is determined whether or not the transmission permission may be given.
- the portable terminal transmits an operation command to the elevator control panel, and Drive. Therefore, it is possible to easily confirm the operation of the elevator while ensuring security.
Landscapes
- Maintenance And Inspection Apparatuses For Elevators (AREA)
Abstract
Description
すなわち、特許文献1のエレベータシミュレーション装置は、エレベータの実機を用いてシミュレーションを行うものではないことから、エレベータを新設またはリニューアルした場合に、その建物のオーナーや管理人(以下、「ユーザ」と称する)に対して当該エレベータの取扱説明をする際の動作確認に適用することができないという問題がある。
そのため、セキュリティを確保した上で、容易にエレベータの動作確認を行うことができる。
図1は、この発明の実施の形態1に係るエレベータの動作確認システムを示すブロック構成図である。図1において、エレベータの動作確認システム1は、構造物に設置されたエレベータ10と、作業員が所持し、エレベータ10の制御盤15に対して動作指令を送信することで、エレベータ10を駆動させる携帯端末20と、携帯端末20との間で通信を行う情報センター30とを備えている。
そのため、セキュリティを確保した上で、容易にエレベータの動作確認を行うことができる。
Claims (6)
- 構造物に設置されたエレベータと、
作業員が所持し、前記エレベータの制御盤に対して動作指令を送信することで、前記エレベータを駆動させる携帯端末と、
前記携帯端末との間で通信を行う情報センターと、を備え、
前記携帯端末は、
前記情報センターに対して、前記動作指令の送信許可を求める許可要求部と、
前記送信許可が得られた場合に、前記制御盤に対して前記動作指令を送信する指令送信部と、を有し、
前記情報センターは、
前記エレベータの保守関連情報を記憶した記憶部と、
前記送信許可を求められた場合に、前記記憶部を参照して、前記送信許可を与えてよいか否かを判定する判定部と、を有する
エレベータの動作確認システム。 - 前記動作指令は、地震発生時の管制運転、停電発生時の自動着床運転および火災発生時の管制運転の少なくとも1つである
請求項1に記載のエレベータの動作確認システム。 - 前記携帯端末は、前記制御盤に対して直接前記動作指令を送信する
請求項1または請求項2に記載のエレベータの動作確認システム。 - 前記携帯端末は、前記エレベータと前記情報センターとが互いに接続されている場合に、前記情報センターを介して、前記制御盤に対して前記動作指令を送信する
請求項1または請求項2に記載のエレベータの動作確認システム。 - 前記携帯端末は、前記エレベータのかご内に乗客が閉じ込められた状態を模擬する閉じ込め模擬部をさらに有する
請求項1から請求項4までの何れか1項に記載のエレベータの動作確認システム。 - 構造物に設置されたエレベータと、作業員が所持し、前記エレベータの制御盤に対して動作指令を送信することで、前記エレベータを駆動させる携帯端末と、前記エレベータの保守関連情報を記憶した記憶部を有し、前記携帯端末との間で通信を行う情報センターと、を備えたエレベータの動作確認システムで実行されるエレベータの動作確認方法であって、
前記携帯端末から前記情報センターに対して、前記動作指令の送信許可を求める許可要求ステップと、
前記送信許可を求められた場合に、前記記憶部を参照して、前記送信許可を与えてよいか否かを判定する判定ステップと、
前記送信許可が得られた場合に、前記制御盤に対して前記動作指令を送信する指令送信ステップと、を有する
エレベータの動作確認方法。
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017543441A JPWO2017057383A1 (ja) | 2015-09-30 | 2016-09-27 | エレベータの動作確認システムおよび動作確認方法 |
CN201680055064.9A CN108025888B (zh) | 2015-09-30 | 2016-09-27 | 电梯的动作确认系统及动作确认方法 |
KR1020187007369A KR102121133B1 (ko) | 2015-09-30 | 2016-09-27 | 엘리베이터의 동작 확인 시스템 및 동작 확인 방법 |
DE112016004475.5T DE112016004475T5 (de) | 2015-09-30 | 2016-09-27 | Aufzugsbetriebsüberprüfungssystem und aufzugbetriebsüberprüfungsverfahren |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015-193030 | 2015-09-30 | ||
JP2015193030A JP6592826B2 (ja) | 2015-09-30 | 2015-09-30 | エレベータの動作確認システムおよび動作確認方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2017057383A1 true WO2017057383A1 (ja) | 2017-04-06 |
Family
ID=58427645
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2016/078498 WO2017057383A1 (ja) | 2015-09-30 | 2016-09-27 | エレベータの動作確認システムおよび動作確認方法 |
Country Status (5)
Country | Link |
---|---|
JP (2) | JP6592826B2 (ja) |
KR (1) | KR102121133B1 (ja) |
CN (1) | CN108025888B (ja) |
DE (1) | DE112016004475T5 (ja) |
WO (1) | WO2017057383A1 (ja) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7111595B2 (ja) * | 2018-11-29 | 2022-08-02 | 株式会社日立ビルシステム | 作業管理システム |
CN114981193A (zh) * | 2020-01-31 | 2022-08-30 | 三菱电机大楼技术服务株式会社 | 实施发生灾害时的训练的电梯的灾害训练装置以及电梯系统 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002060152A (ja) * | 2000-08-11 | 2002-02-26 | Toshiba Elevator Co Ltd | エレベータの遠隔操作システム、コンテンツサーバ及びエレベータの遠隔操作方法 |
JP2005035759A (ja) * | 2003-07-17 | 2005-02-10 | Mitsubishi Electric Corp | 昇降機の保守管理システム |
JP2010280457A (ja) * | 2009-06-02 | 2010-12-16 | Toshiba Elevator Co Ltd | エレベータのコンソール追加型制御装置 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003063750A (ja) * | 2001-08-27 | 2003-03-05 | Toshiba Elevator Co Ltd | エレベーター保守ツールセキュリティシステム、保守ツール搭載用携帯端末および監視センター装置 |
CN1780779B (zh) * | 2004-04-06 | 2010-10-27 | 三菱电机株式会社 | 电梯装置 |
FI117010B (fi) * | 2004-11-01 | 2006-05-15 | Kone Corp | Hissin kauko-ohjaus |
JP2006131325A (ja) * | 2004-11-04 | 2006-05-25 | Mitsubishi Electric Corp | 既設エレベーター遠隔仕様検討システム |
CN1911771B (zh) * | 2005-08-10 | 2010-05-12 | 株式会社日立建筑系统 | 电梯保养检修系统 |
JP2008265935A (ja) | 2007-04-19 | 2008-11-06 | Toshiba Elevator Co Ltd | エレベータシミュレータ装置及びエレベータシミュレーションシステム |
-
2015
- 2015-09-30 JP JP2015193030A patent/JP6592826B2/ja active Active
-
2016
- 2016-09-27 CN CN201680055064.9A patent/CN108025888B/zh active Active
- 2016-09-27 WO PCT/JP2016/078498 patent/WO2017057383A1/ja active Application Filing
- 2016-09-27 DE DE112016004475.5T patent/DE112016004475T5/de not_active Withdrawn
- 2016-09-27 JP JP2017543441A patent/JPWO2017057383A1/ja not_active Withdrawn
- 2016-09-27 KR KR1020187007369A patent/KR102121133B1/ko active IP Right Grant
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002060152A (ja) * | 2000-08-11 | 2002-02-26 | Toshiba Elevator Co Ltd | エレベータの遠隔操作システム、コンテンツサーバ及びエレベータの遠隔操作方法 |
JP2005035759A (ja) * | 2003-07-17 | 2005-02-10 | Mitsubishi Electric Corp | 昇降機の保守管理システム |
JP2010280457A (ja) * | 2009-06-02 | 2010-12-16 | Toshiba Elevator Co Ltd | エレベータのコンソール追加型制御装置 |
Also Published As
Publication number | Publication date |
---|---|
KR20180041708A (ko) | 2018-04-24 |
JP6592826B2 (ja) | 2019-10-23 |
CN108025888A (zh) | 2018-05-11 |
JP2018095325A (ja) | 2018-06-21 |
CN108025888B (zh) | 2020-03-03 |
DE112016004475T5 (de) | 2018-06-21 |
JPWO2017057383A1 (ja) | 2018-06-28 |
KR102121133B1 (ko) | 2020-06-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2016170974A1 (ja) | エレベータ装置及びエレベータの復旧方法 | |
CN107226405B (zh) | 电梯浸水退避运行系统 | |
CN108016956A (zh) | 移动设备访问的电梯活动级别管理 | |
EP3301057B1 (en) | Elevator system having lockdown mode | |
WO2017057383A1 (ja) | エレベータの動作確認システムおよび動作確認方法 | |
CN116853917A (zh) | 与运输系统中的乘客进行通信 | |
KR102650090B1 (ko) | 서비스 툴 위치 기반 기능 가용성 | |
JP4223252B2 (ja) | エレベータの休止作業認証システム | |
JP5993723B2 (ja) | エレベータの遠隔監視装置 | |
JP2014181128A (ja) | エレベーターの遠隔監視システム | |
JP6765489B2 (ja) | エレベータの動作確認システムおよび動作確認方法 | |
JP2020011816A (ja) | エレベータのドア診断装置およびドア診断方法 | |
US20230391585A1 (en) | Remote operation of an elevator | |
JP6624518B2 (ja) | 昇降装置の遠隔監視動作確認システム | |
JP6013270B2 (ja) | エレベータ遠隔制御システム | |
JP6593706B2 (ja) | 昇降装置の遠隔監視システム | |
CN113044683A (zh) | 电梯的远程操作 | |
KR20190109928A (ko) | 엘리베이터 그룹의 원격 보수 관리 시스템 | |
JP2008120581A (ja) | エレベータの遠隔監視システム | |
JP2012030916A (ja) | エレベータの地震救出運転装置 | |
KR102469078B1 (ko) | 비상통화장치를 활용한 승객 구출 시스템 | |
JP5709330B2 (ja) | エレベータシステムおよびこれに利用するコンテンツ送信制御装置、コンテンツ送信制御方法 | |
JP2009113873A (ja) | エレベータの地震管制運転試験装置 | |
WO2021152841A1 (ja) | 災害発生時の訓練を実施するエレベーターの災害訓練装置およびエレベーターシステム | |
KR20130065973A (ko) | 이동통신 단말기를 이용한 엘리베이터 운전 제어 방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 16851554 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2017543441 Country of ref document: JP Kind code of ref document: A |
|
ENP | Entry into the national phase |
Ref document number: 20187007369 Country of ref document: KR Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 112016004475 Country of ref document: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 16851554 Country of ref document: EP Kind code of ref document: A1 |