WO2016143771A1 - 缶体の製造装置および缶体の製造方法 - Google Patents

缶体の製造装置および缶体の製造方法 Download PDF

Info

Publication number
WO2016143771A1
WO2016143771A1 PCT/JP2016/057090 JP2016057090W WO2016143771A1 WO 2016143771 A1 WO2016143771 A1 WO 2016143771A1 JP 2016057090 W JP2016057090 W JP 2016057090W WO 2016143771 A1 WO2016143771 A1 WO 2016143771A1
Authority
WO
WIPO (PCT)
Prior art keywords
jig
correction
pressurization
end plate
straightening
Prior art date
Application number
PCT/JP2016/057090
Other languages
English (en)
French (fr)
Inventor
後藤 謙治
紘平 岡
武士 物種
静幸 菱沼
茂木 弘道
豪俊 竹山
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to EP16761739.8A priority Critical patent/EP3269486B1/en
Priority to JP2017505343A priority patent/JP6274473B2/ja
Publication of WO2016143771A1 publication Critical patent/WO2016143771A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K1/00Soldering, e.g. brazing, or unsoldering
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D51/00Making hollow objects
    • B21D51/16Making hollow objects characterised by the use of the objects
    • B21D51/18Making hollow objects characterised by the use of the objects vessels, e.g. tubs, vats, tanks, sinks, or the like
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D51/00Making hollow objects
    • B21D51/16Making hollow objects characterised by the use of the objects
    • B21D51/24Making hollow objects characterised by the use of the objects high-pressure containers, e.g. boilers, bottles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K1/00Soldering, e.g. brazing, or unsoldering
    • B23K1/14Soldering, e.g. brazing, or unsoldering specially adapted for soldering seams
    • B23K1/18Soldering, e.g. brazing, or unsoldering specially adapted for soldering seams circumferential seams, e.g. of shells
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K3/00Tools, devices, or special appurtenances for soldering, e.g. brazing, or unsoldering, not specially adapted for particular methods
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K3/00Tools, devices, or special appurtenances for soldering, e.g. brazing, or unsoldering, not specially adapted for particular methods
    • B23K3/08Auxiliary devices therefor
    • B23K3/087Soldering or brazing jigs, fixtures or clamping means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/047Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work moving work to adjust its position between soldering, welding or cutting steps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/053Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work aligning cylindrical work; Clamping devices therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/16Arc welding or cutting making use of shielding gas
    • B23K9/167Arc welding or cutting making use of shielding gas and of a non-consumable electrode
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/23Arc welding or cutting taking account of the properties of the materials to be welded

Definitions

  • the present invention relates to an apparatus for manufacturing a can body such as a hot water storage tank and the like, and a method for manufacturing the can body, which are manufactured by joining a body of a thin metal member and an end plate.
  • hot water storage type water heaters that are widely used have large-capacity metal hot water storage tanks for storing the boiled hot water.
  • the structure of the can body of the hot water storage tank is generally constructed by welding bowl-shaped parts called end plates to the both ends of a cylindrical body part called a body and welding the entire circumference. ing.
  • this circumferential welding conventionally, welding methods including joints and can manufacturing apparatuses having various shapes have been studied.
  • a can manufacturing apparatus that fits and welds an end plate to the opening end of the body, and includes first and second orthodontic treatments that respectively support the end plates installed on both sides of the body.
  • the corrective ring included in each of the tools corrects the support accuracy of the end plate by abutting the rear surface of the end of the end of the end of the end of the end of the end of the end of the end of the end of the end of the corrector ring.
  • the correction unit is moved to the set position by abutting between the front face of the rising part of the body and the front face of the rising part of the opening of the end plate, and a pressure unit is generated at that position.
  • the pressure is controlled by the force to be applied, that is, by the position control of the correction jig.
  • the pressure control performed by this position control is to monitor the load factor of the motor that is the driving source of the pressure unit, for example. In general, the pressure is obtained.
  • the load at the start-up of the pressurizing unit, the frictional resistance between the correction jig and the fuselage and the end plate, and the flatness of the front side of the start-up unit and the start-up unit of the end of the end of the end plate are not secured.
  • the pressure control based on the load factor of the motor cannot always be performed with high accuracy.
  • the applied pressure may be greater than the predetermined value, and the butted portion may be deformed or crushed.
  • the present invention has been made to solve the above-described problems, and is a can body manufacturing apparatus and can body capable of reliably bringing the butted portion of the body and the end plate into close contact with each other and obtaining stable welding quality. It aims at providing the manufacturing method of.
  • the can manufacturing apparatus of the present invention comprises: A can body manufacturing apparatus for manufacturing a can body by joining a body and end plates on both sides of the body, A first correction jig and a second correction jig that respectively support the end plates disposed on both sides of the body; Correction rings having stepped portions respectively provided in the first correction jig and the second correction jig, A rotational drive unit disposed outside the first straightening jig; A pressure unit disposed outside the second straightening jig; A motor for driving the pressure unit; A controller that controls the pressure unit while monitoring the load torque of the motor, When the rear surface of the upright portion of the end plate is brought into contact with the lower surface of the stepped portion of the correction ring of the first correction jig and the second correction jig, The control unit controls the position of the second straightening jig to adjust the position movement of the second straightening jig, and a butt portion between the front of the standing part at both ends of the body and the front part of the
  • the manufacturing method of the can body of the present invention is based on the can body manufacturing apparatus shown above.
  • a part of the standing parts at both ends of the body is the step of the straightening ring before the first pressurization.
  • it stops and corrects the distortion of the body.
  • a butt portion that is reliable and stable can be obtained. Further, according to the can manufacturing method using the can manufacturing apparatus of the present invention, steps can be omitted, energy saving and cost reduction can be achieved.
  • FIG. 1 is a diagram showing a can manufacturing apparatus according to Embodiment 1.
  • FIG. FIG. 5 is a schematic diagram showing a second correction jig according to Embodiment 1. It is a figure which shows the state which attached the end plate to the 2nd correction jig by Embodiment 1.
  • FIG. It is a figure which shows the state which attached the end plate and the trunk
  • FIG. FIG. 3 is a flowchart of a method for manufacturing a can body in the can body manufacturing apparatus according to Embodiment 1;
  • FIG. 3 is a flowchart of a method for manufacturing a can body in the can body manufacturing apparatus according to Embodiment 1; FIG.
  • FIG. 3 is a flowchart of a method for manufacturing a can body in the can body manufacturing apparatus according to Embodiment 1; It is a figure which shows the butting
  • FIG. 6 is a diagram for explaining a pressurizing operation according to Embodiment 1.
  • FIG. It is a figure which shows the state which has arrange
  • FIG. 1 It is a figure which shows the state which attached the end plate to the 2nd correction jig by Embodiment 3.
  • FIG. 2 It is a figure which shows the state which attached the end plate and the trunk
  • FIG. 1 It is a figure which shows the state which attached the end plate and the trunk
  • Embodiment 1 of the present invention will be described below with reference to the drawings.
  • the can body 101 according to the first embodiment is used as a metal hot water storage tank such as a water heater.
  • the structure of the water heater will be described with reference to FIG.
  • the water heater 200 includes an electric heater 207, a can body 101 for storing hot water, and a pump 208 that constitutes a pump unit.
  • the can body 101 described in Embodiment 1 is a metal tank for storing hot water.
  • the can body 101 includes a water supply port 204 and a drainage port 205 in the lower part and a hot water supply port 206 in the upper part.
  • the can body 101 is wrapped with a heat insulating material 202 such as polystyrene foam.
  • the can body 101 and the heat insulating material 202 are stored in the housing 201.
  • An electric heater 207 as a heating element is attached to the pump unit.
  • FIG. 2 is a diagram showing a can body 101 mounted on the can manufacturing apparatus 100 according to the first embodiment.
  • the can body 101 includes a cylindrical body 1 and bowl-shaped end plates 2 on both sides of the body 1.
  • the outer diameter of the body 1 and the end plate 2 is ⁇ 300 to ⁇ 700 mm, the material used is ferritic stainless steel, and the plate thickness is 0.5 mm to 1.5 mm.
  • the total length of the can body 101 including the body 1 and the end plates 2 on both sides is about 500 mm to 2000 mm.
  • the can body manufacturing apparatus 100 will be described.
  • the can body 101 is supported via a trunk receiver 4 installed on the base 3.
  • a first correction jig 20A and a second correction jig 20B are provided outside the end plate 2 arranged on both sides of the body 1.
  • the rotational drive unit 5A is disposed on the base 3.
  • the rotary drive unit 5A is connected to the motor 8 via the shaft 6A and the gear 7 outside the first correction jig 20A.
  • the rotation drive unit 5A is rotated by the motor 8, and the can body 101 is rotated via the first correction jig 20A.
  • the rotation driven unit 5B is connected to the outside of the second correction jig 20B via the shaft 6B.
  • the rotation driven unit 5B is installed on the base 3 via the slide rail 9.
  • the rotation driven unit 5B is connected to the pressure unit 10.
  • the pressure unit 10 is installed on the base 3.
  • the pressurizing unit 10 is provided with a control unit 10A that controls the operation. When the pressurizing unit 10 is activated, the rotary driven unit 5B and the second correction jig 20B move to the left in FIG. 2 and pressurize the can body 101. This operation will be described in detail later.
  • FIG. 3 shows the second correction jig 20B.
  • the first straightening jig 20A has the same configuration except that the second straightening jig 20B has a different direction.
  • FIG. 4 is a view showing a state in which a gap S exists between the end plate 2 and the bottom plate 11 of the second correction jig 20B.
  • FIG. 4 shows a state before the can body 101 is pressed by the pressurizing unit 10 described later.
  • FIG. 5 is a diagram showing a process advanced from the state of FIG. FIG. 5 shows a state in which the end plate 2, the second correction jig 20 ⁇ / b> B, and the body 1 are combined.
  • the second correction jig 20 ⁇ / b> B is installed so as to cover the end plate 2.
  • the second correction jig 20 ⁇ / b> B includes a bottom plate 11 and a correction ring 12.
  • the bottom plate 11 receives the bottom surface 2G of the end plate 2.
  • the correction ring 12 comes into contact with the upright portion rear surface 2D of the upright portion 2C provided at the opening of the end plate 2 and the end plate side surface 2E.
  • the position of the straightening ring 12 is such that the above-mentioned gap of about 1 to 2 mm is provided between the bottom surface 2G and the bottom plate 11 of the second straightening jig 20B so that the rear surface 2D of the standing part 2D of the mirror plate 2 and the side surface 2E of the mirror plate 2 are in contact with each other.
  • the side surface 12A of the correction ring 12 is in contact with the end plate side surface 2E. Therefore, the central axis of the end plate 2 can be positioned on the central axis of the second correction jig 20B.
  • the lower surface 12B of the stepped portion 12C of the correction ring 12 and the upright portion rear surface 2D of the end plate 2 come into contact with each other. Furthermore, the side surface 12A of the correction ring 12 and the end plate side surface 2E abut. Therefore, the butt portion 16 is formed by the standing portion 1 ⁇ / b> A of the body 1 and the standing portion 2 ⁇ / b> C of the end plate 2. The butting portion 16 maintains the flatness of the joining surface, which is an important element for joining.
  • a taper 12D for guidance is formed in a stepped portion 12C provided in the horizontal direction on the inner diameter side of the correction ring 12 so that the standing portion 1A of the body 1 can be easily inserted.
  • the body 1 is positioned on the central axis of the second correction jig 20B.
  • the upright portions 1A provided at both ends of the body 1 are provided with eaves portions 1B whose upper portions are extended. Therefore, the upright portion 1A has a Z-shaped cross section. Therefore, the correction ring 12 is provided with a stepped portion 12C having an angular C-shaped cross section so that the eaves portion 1B does not hit the correction ring 12 when the end plate 2 and the body 1 are fitted together. Therefore, the rear surface 2D of the upright portion of the end plate 2 comes into contact with the lower surface 12B of the correction ring 12.
  • the second correction jig 20 ⁇ / b> B is provided with a cylinder 13 and a guide 14 that move the correction ring 12 in the horizontal direction in a direction away from the body 1 by a signal from the control unit 10 ⁇ / b> A.
  • the contact surface of the bottom plate 11 that receives the bottom surface 2 ⁇ / b> G of the end plate 2 is a portion that pressurizes the end plate 2 and the body 1 under the pressure applied by the pressurizing unit 10. Therefore, the contact surface of the bottom plate 11 has a shape that matches the curved shape of the end plate 2 and has a sufficient area.
  • the second correction jig 20B and the correction ring 12 are set at a position where the body 1 can be loaded and unloaded without any problem even when the entire length of the body 1 is the longest.
  • the position of the correction ring 12 is adjusted so as to have a gap S of about 1 mm between the bottom surface 2G of the end plate 2 and the bottom plate 11 of the second correction jig 20B. Then, the rear surface 2D of the upright portion of the end plate 2 is set so as to come into full contact with the lower surface 12B of the correction ring 12 (step ST1 in FIG. 6).
  • the pressurizing unit 10 is operated to start the first pressurization. Then, the bottom plate 11 and the bottom surface 2G of the end plate 2 are brought into contact with each other so as to eliminate the gap S shown in FIG. 4, that is, the second correction jig 20B is advanced to the temporarily determined position (step ST2 in FIG. 6). .
  • the control unit 10A determines the position of the second correction jig 20B that moves forward and the pressure applied to the butt 16 through the correction ring 12 of the second correction jig 20B. Monitor to confirm the applied pressure, and determine whether it is within a predetermined applied pressure range (step ST3 in FIG. 6).
  • the pressure correction control is performed to adjust the position of the second correction jig 20B according to an instruction from the control unit 10A (step ST4 in FIG. 6). ). That is, if it is below the set range, the second correction jig 20B is slightly advanced. Moreover, if it is more than a setting range, the 2nd correction jig
  • the pressurizing unit 10 After performing such adjustment, it is determined that the applied pressure is within a predetermined applied pressure range (YES). And 1st pressurization is completed (step ST5 of FIG. 6).
  • the pressurizing unit 10 is provided with a drive mechanism such as a servo motor (not shown). Therefore, this pressure adjustment control is performed by the controller 10A inputting the load torque information of the servomotor and the position information of the second correction jig 20B.
  • Position control of the second correction jig 20B is performed until the distance D1 from the origin D0 of the pressurizing operation start shown in FIG. 9, and in the range from the distance D1 to the distance D6, position control + pressure monitoring (load torque Monitor) control.
  • the overall length of the fuselage 1 has a variation of about 1 mm due to various manufacturing factors. For this reason, in the first pressurization, the second correction jig 20B is moved forward to the position where the preset body 1 is the longest, that is, the temporarily determined position, and then stopped. In this state, the controller 10A monitors the pressure applied by the first pressurization and confirms whether or not the pressure is within a predetermined pressure range, for example, 20 to 30 kgf.
  • the control unit 10A When outside the range, the control unit 10A outputs a slight back-and-forth movement command signal of, for example, about 0.1 mm to the pressurizing unit 10 and repeatedly adjusts the position until the predetermined pressure range is reached. The number of repetition confirmation operations is measured by the control unit 10A. Then, the control unit 10A displays a warning when the predetermined number of times is exceeded. Thus, the occurrence of abnormality in the first pressurization including that the entire length of the body 1 is abnormal is detected. Note that the amount of fine forward / backward movement can be set to an arbitrary value.
  • the control unit 10A confirming that the applied pressure is within a predetermined range outputs a signal to the second correction jig 20B, and the cylinder 13 moves the correction ring 12 from the body 1 as shown in FIG. Move away. As a result, a space 17 is formed above the butt portion 16. At this time, the body receiver 4 shown in FIG. 2 is lowered. However, the end plate 2 and the body 1 supported by the first correction jig 20A and the second correction jig 20B are in an integrated state by the first pressurizing force. Does not fall.
  • the rotary drive unit 5A operates to rotate the integrated end plate 2 and body 1. It is visually confirmed by the operator through the space 17 whether or not the butt 16 is normally formed (step ST6 in FIG. 7). Next, it is determined whether or not the butt portion is normal (step ST7 in FIG. 7). If not normal (NO), it is corrected by the operator (step ST8 in FIG. 7).
  • the first pressurization is a pressurizing force of about 20 to 30 kgf, the deformation of the standing portion 1A of the body 1 is prevented. Further, in the first pressurizing process, the upright portion 1 ⁇ / b> A moves along the guide taper 12 ⁇ / b> D of the correction ring 12. Then, the upright portion front surface 2F of the end plate 2 and the upright portion front surface 1C of the body 1 are abutted to form an abutting portion 16.
  • the butting portion 16 can be formed over the entire surface.
  • the pressurizing unit 10 is actuated by a signal from the control unit 10A, and the second pressurization is started in the range from the distance D6 to the distance D7 shown in FIG. 9 (step ST9 in FIG. 7).
  • This second pressurization is controlled by monitoring the load torque of the servo motor.
  • the second correction jig 20B is moved at a low speed. Therefore, an extra load (corresponding to noise for the position information) generated by friction accompanying position movement can be almost ignored. For this reason, the load torque of the servomotor due to the second pressurization can be grasped almost accurately.
  • the pressurizing unit 10 pressurizes the second correction jig 20B to complete the second pressurization until the distance (position) D7 at which the pressure applied by the second pressurization becomes a predetermined value, for example, 100 kgf (step in FIG. 7). ST10).
  • a predetermined value for example, 100 kgf (step in FIG. 7).
  • the horizontal axis represents the position where the position of the second correction jig 20B in the work set (step ST1) in FIG. 6 is the origin (D0). And it is a figure which shows a pressing force (load torque of a servomotor) on a vertical axis
  • FIG. 9B shows the moving distance of the second correction jig 20B.
  • FIG. 9C shows an operation timing chart of the second correction jig 20B.
  • pressurization of the can body 101 is completed by the first pressurization and the second pressurization.
  • the correction ring 12 is moved from the upper part of the butt part 16 to form a space 17 in the upper part.
  • a welding torch 18 for TIG (tungsten inert gas) welding is disposed. Welding is performed on the entire circumferential abutting portion 16 of the body 1 and the end plate 2 that are in an integrated state by pressurization (step ST11 in FIG. 7).
  • the control unit 10A monitors the load torque of the motor of the pressurizing unit 10 and controls the position of the second straightening jig 20B so that it is within a predetermined pressure range. After pressurizing the abutting portion 16 by the first pressurization, the correction ring 12 is moved to form the space 17 in the upper portion, and then the load torque of the motor is monitored and the second pressurization within a predetermined pressurizing force range is performed. Since the abutting portion 16 is pressurized, even if there is a variation in the length of the fuselage 1, the pressing force is applied to the butting portion 16 without deforming and crushing the rising portion 1A of the fuselage 1 and the rising portion 2C of the end plate 2. It can be applied, and stable welding quality can be obtained, and the manufacturing process is standardized, so that the process can be omitted, energy saving, the resulting cost reduction and easy joining work can be achieved, and the device is suitable for mass production. It has an effect.
  • the pressing force of the first pressurization is smaller than the pressing force of the second pressurization, and the formation of the abutting portion performed by the first pressurization can be performed with a small pressurizing force. It can be surely prevented.
  • FIG. The second embodiment relates to a can manufacturing method using the can manufacturing apparatus 100 of the first embodiment described above.
  • a method for manufacturing a can body will be described based on the diagram shown in the first embodiment.
  • a can body 101 is a hot water storage tank using a ferritic stainless material of a hot water storage type hot water heater.
  • the body 1, the end plate 2, the first correction jig 20 ⁇ / b> A, and the second correction jig 20 ⁇ / b> B are pressure-integrated by the can manufacturing apparatus 100 as described in the first embodiment.
  • FIG. 10 shows a state in which the welding torch 18 of the joining tool is disposed in the space 17 above the butt 16.
  • the rotation drive unit 5A is activated by the operation of the motor 8, and the pressure-integrated body 1, the end plate 2 provided at both ends of the body 1, the first correction jig 20A, and the second correction jig 20B is rotated and TIG welding is performed over the entire circumference of the butt 16.
  • the can body 101 can be manufactured by the manufacturing method of the can body of the second embodiment shown as described above, the same effect as that of the first embodiment can be obtained.
  • the body 1 integrated with pressure, the end plate 2 provided at both ends of the body 1, the first correction jig 20A and the second correction jig 20B are rotated, and the entire circumference of the butt 16 is rotated. Since welding is performed over the entire area, temporary welding of the butt portion 16 is not required, and generation of a gap in the butt portion 16 during welding can be prevented.
  • mistakes can be reduced, an extra dedicated tool is not required at the time of welding work, and an extra process is eliminated, so that stable welding with improved heat input effect can be performed.
  • the TIG welding torch can be arranged in a sufficient space 17, the can body 101 with high dimensional accuracy can be obtained. Furthermore, in a product such as a hot water storage tank in which the welded portion is formed by complete penetration and a temperature cycle is applied at a high temperature, it is possible to provide a long-life product with improved durability without crevice corrosion and stress concentration in the welded portion.
  • the case 101 is made of a ferritic stainless material.
  • the can body 101 is not limited to this, and may be an austenitic stainless steel, or a body or a copper alloy. May be.
  • brazing joining by a method of placing the butt portion 16 or by soldering may be adopted.
  • the brazing material is preferably a hard brazing material such as silver brazing, but is not limited thereto.
  • a welding method such as MIG (metal inert gas welding) welding may be employed for joining the body and the copper alloy.
  • Embodiment 3 The third embodiment relates to a can manufacturing method using the can manufacturing apparatus 100 of the first embodiment.
  • a can body manufacturing method according to the third embodiment will be described with reference to the drawings shown in the first embodiment and FIGS. 11 to 14.
  • a method for partially reducing the probability that the tip 1BB of the eaves portion 1B of the standing portion 1A of the body 1 and the standing portion 2C of the end plate 2 abut during the first pressurization will be described. .
  • the pressurizing unit 10 is advanced and the upright portion 1A of the body 1 is inserted into the correction ring 12.
  • the shape of the body 1 is bent by its own weight under the influence of gravity, and the body 1 is deformed into an ellipse. This is due to a factor that the body 1 is formed of a thin material and a factor that does not restrain the periphery of the body 1.
  • the standing portion 1 ⁇ / b> A of the body 1 is inserted into the correction ring 12 that moves forward together with the pressure unit 10.
  • FIG. 11 shows a schematic diagram of a state in which a gap G between the outer peripheral side surface 12CC of the stepped portion 12C of the correction ring 12 and the outer diameter of the eaves portion 1B of the upright portion 1A of the body 1 is greatly biased upward. .
  • the end plate 2 is set on the first correction jig 20A and the second correction jig 20B, and then the body 1 is set on the body receiver 4. Then, the rear surface 2D of the upright portion of the end plate 2 is set so as to come into full contact with the lower surface 12B of the correction ring 12 (step ST1 in FIG. 12).
  • the pressurizing unit 10 is advanced so that the standing portion 1A of the trunk 1 starts to be inserted into the stepped portion 12C of the correction ring 12, and the standing portion 1A of the trunk 1 is guided.
  • the pressure unit 10 is temporarily stopped (step ST22 in FIG. 12).
  • FIG. 13 shows the positional relationship between the correction ring 12 and the upright portion 1 ⁇ / b> A of the body 1 when the pressurizing unit 10 is temporarily stopped.
  • the straightening ring 12 is rotated in the circumferential direction as shown by the arrow in FIG. 14 in a state in which the rising portion 1A of the body 1 gets over the guide taper 12D and the pressure unit 10 is stopped.
  • the shape of the body 1 in the correction ring 12 can be adjusted to the shape of the correction ring 12 so as to be close to a perfect circle (step ST23 in FIG. 12).
  • the distortion of the body 1 is corrected.
  • the first pressurization, the second pressurization, and the welding process are performed (step ST2 of FIG. 6 to step ST11 of FIG. 7), and the can body is manufactured.
  • the shape of the body 1 in the correction ring 12 is corrected before the first pressurizing as well as the same effects as the above-described embodiments.
  • the tip 1BB of the eaves portion 1B of the standing portion 1A of the body 1 and the end plate at the time of the first pressurization The probability of occurrence of contact with the two standing portions 2C is reduced. Therefore, it is possible to perform welding with excellent accuracy.
  • Embodiment 4 FIG.
  • the present invention is not limited to this, and another method will be described. Except for the part that corrects the distortion of the body 1, the description is omitted as appropriate because it is the same as the third embodiment.
  • the predetermined point inserted into the correction ring 12 of the body 1 and the predetermined point Using two hands the body 1 is lightly tapped and bent using two hands at a point approximately 180 ° away from one point in the circumferential direction.
  • the process is repeated 2 to 3 times in increments of 60 ° to 90 °.
  • the upright portion 1 ⁇ / b> A of the body 1 is adapted to the shape of the correction ring 12. Therefore, the gap G between the correction ring 12 and the outer diameter of the eaves portion 1B of the upright portion 1A of the body 1 can be equalized to some extent in the circumferential direction.
  • the same effects as those of the above-described embodiments can be obtained, as well as the distortion of the shape of the body 1 in the correction ring 12 can be corrected, and the perfect circle Can be approached. Further, since the body 1 is struck and deflected in a state where the body plate 1 is not pressed against the end plate 2, the force of tapping is less than that in the state where the body 1 is pressed, and the working time can be shortened.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Plasma & Fusion (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)
  • Straightening Metal Sheet-Like Bodies (AREA)
  • Arc Welding In General (AREA)

Abstract

 胴体(1)の両側に設けた鏡板(2)に配置された各矯正用リングの段付き部の下面と、鏡板(2)の起立部後面を当接し、加圧ユニット(10)に設けられた制御部(10A)は、モータの負荷トルクをモニタするとともに第二矯正用治具(20B)の位置を制御を行って位置移動を自動的に微調整し、所定の加圧力とする第一加圧で突き合わせ部を加圧後、矯正用リングを移動して上部に空間を形成し、モータの負荷トルクをモニタして所定の加圧力とする第二加圧で突き合わせ部を加圧するとともに、胴体(1)、鏡板(2)、第一矯正用治具(20A)、第二矯正用治具(20B)が一体的に回転する。

Description

缶体の製造装置および缶体の製造方法
 この発明は、薄い金属部材の胴体と鏡板を接合することによって作製される貯湯タンク等の缶体の製造装置および缶体の製造方法に関するものである。
 近年普及している貯湯式給湯器においては、沸き上げた湯を貯えておくために大容量の金属製貯湯タンクを備えている。そして、その貯湯タンクの缶体の構造は、一般的には胴体と呼ばれる本体筒状の部品のその両端部分に、鏡板と呼ばれるお椀状の部品が、全周にわたり溶接されて缶体が構成されている。この周溶接については、従来より様々な形状の継手および缶体製造装置を含めての溶接方法の検討がなされている。
 缶体の長寿命化には溶接部に隙間をもたない突き合わせ継手とすることが望ましい。一般に薄板の突き合わせ溶接は、継手間の隙間および板厚方向の変位(目違い、すなわち2枚の板の厚さ方向の変位のこと)を厳密に管理する必要がある。
 このような観点から、胴体の開口端部に鏡板を嵌め合わせて溶接する缶体の製造装置であって、胴体の両側に設置された鏡板をそれぞれに支持する第1、第2の矯正用治具と、第1の矯正用治具の外側に配置された回転駆動ユニットと、第2の矯正用治具の外側に配置された加圧ユニットとを備え、第1、第2の矯正用治具のそれぞれが具備する矯正用リングによって、この矯正用リングの段付き部の底部に、鏡板開口部の立ち上げ部後面を当接して鏡板の支持精度を矯正し、加圧ユニットの加圧力により胴体の両端の立ち上げ部前面と、鏡板開口部の立ち上げ部前面とを互いに突き合わせ、矯正用治具がそれぞれに具備するガイドユニットによって矯正用リングを移動させ、段付き部の底部を鏡板開口部の立ち上げ部後面から離脱させて突き合わせ部の上部に空間を形成後、回転駆動ユニットによって、胴体、鏡板、第1、第2の矯正用治具が一体的に回転可能とする缶体の製造装置に係る技術が示されている(例えば、特許文献1参照)。
特開2012-228718号公報
 しかしながら上記特許文献1に示された技術は胴体の立ち上げ部前面と鏡板開口部の立ち上げ部前面との突き合わせを、矯正用治具を設定位置まで移動させてその位置で加圧ユニットの発生する力で加圧を行う、すなわち矯正用治具の位置制御によってなされているものであり、この位置制御でなされる加圧力制御は、加圧ユニットの駆動源である例えばモータの負荷率をモニタして加圧力を求めるのが一般的である。
 しかし、加圧ユニットの起動立ち上がり時の負荷、矯正用治具と胴体および鏡板との摩擦抵抗、さらには胴体立ち上げ部前面および鏡板開口部の立ち上げ部前面の平面度が確保されてないすなわち面ブレが大きいなどの場合においては、モータの負荷率による加圧力制御は必ずしも精度よく行えないケースが発生する。また胴体の全長および鏡板の全長が所定値より長い場合には、矯正用治具の設定位置によっては、加圧力が所定値より大きくなり、突き合わせ部を変形、潰す場合が生じるおそれがある。
 この発明は上記のような課題を解決するためになされたものであって、確実に胴体と鏡板との突き合わせ部を密着させ、安定した溶接品質を得ることのできる缶体の製造装置および缶体の製造方法を提供することを目的とする。
 この発明の缶体の製造装置は、
胴体と、前記胴体の両側に鏡板をそれぞれ接合して缶体を作製する缶体の製造装置であって、
前記胴体の両側に配置された前記鏡板をそれぞれに支持する第一矯正治具および第二矯正治具と、
前記第一矯正治具および第二矯正治具にそれぞれ具備された段付き部を有する矯正リングと、
前記第一矯正治具の外側に配置された回転駆動ユニットと、
前記第二矯正治具の外側に配置された加圧ユニットと、
前記加圧ユニットを駆動するモータと、
前記モータの負荷トルクをモニタしながら前記加圧ユニットを制御する制御部とを備え、
前記第一矯正治具および前記第二矯正治具の前記矯正リングの前記段付き部の下面に前記鏡板の起立部後面を当接すると、
前記制御部は、前記第二矯正治具の位置を制御して前記第二矯正治具の位置移動を調整して、前記胴体の両端の起立部前面と前記鏡板の起立部前面との突き合わせ部を前記モータの負荷トルクが所定の範囲内の加圧力とする第一加圧で加圧した後、
前記矯正リングを移動させて前記突き合わせ部の上部に空間を形成し、前記突き合わせ部を前記モータの負荷トルクが所定の範囲内の加圧力とする第二加圧で加圧するとともに、
前記回転駆動ユニットは、前記胴体、前記鏡板、前記第一矯正治具および前記第二矯正治具を一体的に回転可能とするものである。
 また、この発明の缶体の製造方法は、上記に示した缶体の製造装置により、
前記第二矯正治具の位置を制御して前記第二矯正治具の位置移動を調整する際、前記第一加圧前に前記胴体の両端の起立部の一部が前記矯正リングの前記段付き部に挿入されると停止し、前記胴体の歪みを修正するものである。
 この発明の缶体の製造装置によれば、
 確実にかつ安定した突き合わせ部を得ることができる。
 また、この発明の上記缶体の製造装置を用いた缶体の製造方法によれば、工程の省略化、省エネ化、低コスト化がはかれる。
実施の形態1による缶体を用いた給湯器の概略説明図である。 実施の形態1による缶体の製造装置を示す図である。 実施の形態1による第二矯正治具を示す概略図である。 実施の形態1による第二矯正治具に鏡板を取り付けた状態を示す図である。 実施の形態1による第二矯正治具に鏡板と胴体を取り付けた状態を示す図である。 実施の形態1による缶体の製造装置における缶体の製造方法のフロー図である。 実施の形態1による缶体の製造装置における缶体の製造方法のフロー図である。 実施の形態1による胴体と鏡板を突き合わせ状態を示す図である。 実施の形態1による加圧動作を説明する図である。 実施の形態2による溶接トーチを配置した状態を示す図である。 実施の形態3による缶体の製造方法における胴体の歪みの状態を説明する図である。 実施の形態3による缶体の製造装置における缶体の製造方法のフロー図である。 実施の形態3による第二矯正治具に鏡板を取り付けた状態を示す図である。 実施の形態3による第二矯正治具に鏡板と胴体を取り付けた状態を示す図である。
実施の形態1.
 以下、この発明の実施の形態1を図に基づいて説明する。尚、この実施の形態1による缶体101とは、給湯器などの金属製貯湯タンクとして使用されるものである。給湯器の構造を図1で説明する。
 給湯器200は、電気ヒータ207と、お湯を貯湯する缶体101と、ポンプユニットを構成するポンプ208とで構成される。実施の形態1で述べる缶体101とは貯湯する金属製タンクである。缶体101は、下部に給水口204および排水口205、上部に給湯口206を備えている。缶体101は、発泡スチロールなどの保温材202が巻きつけられている。缶体101および保温材202は、筐体201内に格納している。発熱体である電気ヒータ207はポンプユニットに取り付けられている。
 図2は実施の形態1による缶体の製造装置100に搭載された缶体101を示す図である。缶体101は円筒状の胴体1と、胴体1の両側にそれぞれお椀状の鏡板2を備えている。胴体1および鏡板2の外径はφ300~φ700mm、使用される材質はフェライト系ステンレス材で、板厚は0.5mm~1.5mmである。胴体1および両側の鏡板2を含む缶体101の全長は500mm~2000mm程度である。
 次に缶体の製造装置100について説明する。缶体101は図2に示すようにベース3に設置された胴体受け4を介して支持されている。胴体1の両側に配置された鏡板2の外側には、第一矯正治具20Aと第二矯正治具20Bとが設けられている。回転駆動ユニット5Aはベース3上に配置されている。回転駆動ユニット5Aは、第一矯正治具20Aの外側にシャフト6A、ギヤ7を介してモータ8に接続されている。このモータ8によって回転駆動ユニット5Aが回動し、第一矯正治具20Aを介して缶体101が回転する。
 回転従動ユニット5Bは第二矯正治具20Bの外側にシャフト6Bを介して接続されている。回転従動ユニット5Bは、スライドレール9を介してベース3に設置されている。回転従動ユニット5Bは加圧ユニット10に接続されている。加圧ユニット10はベース3上に設置されている。この加圧ユニット10には運転を制御する制御部10Aが設けられている。加圧ユニット10が作動すると、回転従動ユニット5Bおよび第二矯正治具20Bが図2の左方向に移動して、缶体101を加圧する。この動作については後に詳述する。
 回転駆動ユニット5Aにつながる第一矯正治具20Aと、加圧ユニット10につながる第二矯正治具20Bの構成、動作を図3~図5に基づいて説明する。図3は、第二矯正治具20Bを示している。尚、第一矯正治具20Aは第二矯正治具20Bと向きが異なる以外は同一の構成を有する。
 図4は鏡板2と第二矯正治具20Bの底板11とに隙間Sが存在する状態を示す図である。図4はすなわち後述する加圧ユニット10による缶体101の加圧以前の状態を示す。図5は図4の状態から進んだ工程を示す図である。図5は、鏡板2と第二矯正治具20Bおよび胴体1とが組み合わされた状態を示す。
 図4、図5に示すように、第二矯正治具20Bは鏡板2を覆うように設置される。第二矯正治具20Bは底板11と、矯正リング12とを備える。底板11は鏡板2の底面2Gを受けるものである。矯正リング12は、鏡板2の開口部に設けられた起立部2Cの起立部後面2D、および鏡板側面2Eに当接するものである。
 この矯正リング12の位置は、鏡板2の起立部後面2Dと鏡板側面2Eが確実に当接するよう、底面2Gと第二矯正治具20Bの底板11との間に1~2mm程度の前述した隙間Sを設けた位置としている。また矯正リング12の側面12Aが鏡板側面2Eに当接する構成である。よって、鏡板2の中心軸は第二矯正治具20Bの中心軸上に位置決めできる。
 図5に示すような状態では、矯正リング12の段付き部12Cの下面12Bと鏡板2の起立部後面2Dとが当接する。さらに、矯正リング12の側面12Aと鏡板側面2Eとが当接する。よって、胴体1の起立部1Aと鏡板2の起立部2Cとで突き合わせ部16を形成する。この突き合わせ部16が、接合上重要な要素である接合面の平面度を保持している。
 矯正リング12の内径側水平方向に設けられた段付き部12Cには、胴体1の起立部1Aが挿入され易いように、案内用のテーパ12Dが形成されている。このことで胴体1は第二矯正治具20Bの中心軸上に位置決めされる。また胴体1の両端に設けられた起立部1Aは上部が延伸したひさし部1Bを備えている。よって起立部1Aは断面がZ形状である。よって、鏡板2と胴体1とを嵌め合わせたときに、ひさし部1Bが矯正リング12に当たらないように、矯正リング12には角張ったC字状断面の段付き部12Cが設けられている。よって、矯正リング12の下面12Bには鏡板2の起立部後面2Dが当接する。
 尚、図3に示すように第二矯正治具20Bには、制御部10Aの信号で矯正リング12を胴体1から離れる方向で水平方向に移動させるシリンダ13およびガイド14が設けられている。
 図4に示すように、鏡板2の底面2Gを受ける底板11の接触面は、加圧ユニット10の出力する加圧力を受けて、鏡板2と胴体1を加圧する部分である。よって、底板11の接触面は、鏡板2の曲面形状に合わせた形状でかつ充分な面積を有している。
 次に、缶体の製造装置100における缶体の製造方法について、図6および図7に示すフローを参照して説明する。まず、胴体1の全長は製作上の諸要因に基づき、バラツキを有する。よって、胴体1の全長が最も長い場合でも問題なく搬入、搬出ができる位置に第二矯正治具20Bおよび矯正リング12をセットしておく。
 次に図4に示すように、鏡板2の底面2Gと第二矯正治具20Bの底板11との間に、1mm程度の隙間Sを有するように矯正リング12の位置を調整する。そして、鏡板2の起立部後面2Dが矯正リング12の下面12Bに全面接触するようセットする(図6のステップST1)。
 この全面接触により、図5に示す胴体1をセットした際の起立部1Aと鏡板2の起立部2Cとで形成される突き合わせ部16の平面度が確保される。この平面度を確保することは、後工程の例えば溶接による接合を行う場合において重要な要素である。
 次に、加圧ユニット10を作動させて第一加圧を開始する。そして、図4に示した隙間Sをなくすよう底板11と鏡板2の底面2Gとを当接させた状態、すなわち、第二矯正治具20Bを仮決め位置まで前進させる(図6のステップST2)。次に、第一加圧は前進移動する第二矯正治具20Bの位置と、第二矯正治具20Bの矯正リング12を介して前記突き合わせ部16に印加される加圧力を、制御部10Aがモニタし、加圧力を確認し、所定の加圧力範囲であるか否かを判断する(図6のステップST3)。
 そして、加圧力が所定の加圧力範囲外であれば(NO)、第二矯正治具20Bの位置を制御部10Aの指示により調整をする加圧力の調整制御によって行われる(図6のステップST4)。すなわち、設定範囲以下であれば、第二矯正治具20Bを微前進させる。また、設定範囲以上であれば、第二矯正治具20Bを微後退させる。
 このような調整を行った後、加圧力が所定の加圧力範囲内である(YES)と判断される。そして、第一加圧が完了する(図6のステップST5)。尚、加圧ユニット10には図示省略したサーボモータなどの駆動機構が設けられている。よってこの加圧力調整制御は、当該サーボモータの負荷トルク情報および第二矯正治具20Bの移動する位置情報を制御部10Aが入力することで行われる。
 前記仮決め位置に到るまでの第一加圧の動作の詳細を図9の加圧動作図を参照して説明する。
 図9に示す加圧動作開始の原点D0から距離D1に到るまでは第二矯正治具20Bの位置制御が行われ、距離D1から距離D6にわたる範囲では位置制御+加圧力モニタ(負荷トルクのモニタ)制御によって行われる。
 胴体1の全長が製造上の諸要因により1mm程度のバラツキを有する。このため、第一加圧では、予め設定された胴体1が最長の場合の位置すなわち仮決め位置まで第二矯正治具20Bを移動前進後、停止する。この状態で第一加圧による加圧力を制御部10Aがモニタし、所定の加圧力範囲、例えば20~30kgfか否かの確認を行う。
 範囲外の場合、制御部10Aは加圧ユニット10に例えば0.1mm程度の微前後移動指令信号を出力し、所定の加圧力範囲となるまで繰り返して位置調整を行う。この繰り返し確認動作回数は、制御部10Aによって計測される。そして制御部10Aは所定の回数を超えた場合に警告を表示する。このことにより、胴体1の全長が異常であることを含めた第一加圧の異常発生を検出する。尚、微前後進移動量は、任意の値に設定できるものである。
 次に、加圧力が所定の範囲内であることを確認した制御部10Aは、第二矯正治具20Bに信号出力し、シリンダ13の動作により矯正リング12を図8に示すように胴体1から離れる方向に移動する。その結果、突き合わせ部16の上部に空間17が形成される。この際、図2に示した胴体受け4が下降する。しかしながら、第一矯正治具20A、第二矯正治具20Bに支持された鏡板2、胴体1が第一加圧力によって一体化の状態であり、胴体受け4が下降しても、ベース3上に落下しない。
 この状態で、回転駆動ユニット5Aが作動し、前記一体化された鏡板2、胴体1を回転させる。空間17を介して操作員によって突き合わせ部16が正常に形成されているか目視確認する(図7のステップST6)。次に、突き合わせ部が正常であるか否かを判断する(図7のステップST7)。そして、正常でない場合(NO)には、操作員によって修正される(図7のステップST8)。
 このように第一加圧は20~30kgf程度の加圧力であるため、胴体1の起立部1Aの変形を防止している。また、この第一加圧の過程において、起立部1Aが矯正リング12の案内用のテーパ12Dに沿って移動する。そして、鏡板2の起立部前面2Fと胴体1の起立部前面1Cとが突き合わされて突き合わせ部16を形成する。この際、たとえ胴体1が傾いて段付き部12Cに挿入されたとしても、鏡板2の起立部2Cを矯正リング12で受けているため、第一加圧で胴体1の支持精度を矯正し、突き合わせ部16が全面にわたって形成されることが可能となる。
 次に、制御部10Aの信号によって加圧ユニット10が作動して、図9に示す距離D6から距離D7の範囲で第二加圧が開始される(図7のステップST9)。この第二加圧はサーボモータの負荷トルクをモニタすることによって制御される。そして第二矯正治具20Bを低速で移動させる。従って位置移動に伴う摩擦等によって発生する余分な負荷(位置情報にとってはノイズに相当する)はほとんど無視できる。このため、第二加圧によるサーボモータの負荷トルクはほぼ正確に把握可能となる。
 この第二加圧による加圧力が所定の値例えば100kgfとなる距離(位置)D7まで加圧ユニット10は第二矯正治具20Bを加圧して、第二加圧を完了する(図7のステップST10)。この第二加圧時においては、胴体1と鏡板2の突き合わせ部16の接触状態には変化を生じず、接触圧力が正常に増加する。
 以上述べた第二矯正治具20Bを介して突き合わせ部16を加圧する制御部10Aの加圧力調整制御に基づく第一加圧、第二加圧の変化維持を図9を参照して詳細に説明する。図9(A)は図6のワークセット(ステップST1)ときにおける第二矯正治具20Bの位置を原点(D0)とした位置を横軸とする。そして、加圧力(サーボモータの負荷トルク)を縦軸に示す図である。
 原点D0から距離D1までは位置制御、距離D1から距離D6は位置制御と加圧力モニタ(負荷トルクモニタ)とによる制御でこれらをもって第一加圧とする。そして、距離D6から距離D7は加圧力モニタ(負荷トルクモニタ)による制御で第二加圧としている。図9(B)は第二矯正治具20Bの移動距離を示す。図9(C)は第二矯正治具20Bの動作タイミングチャートを示す。
 以上説明したように、第一加圧と第二加圧によって缶体101の加圧が完了する。次に加圧した状態で、図10に示すように突き合わせ部16の上部から矯正リング12を移動して上部に空間17を形成する。次に、例えばTIG(tungsten inert gas)溶接用の溶接トーチ18が配置される。溶接は、加圧によって一体的な状態となっている胴体1、鏡板2における円周状の突き合わせ部16全体について行われる(図7のステップST11)。
 以上のように、この実施の形態1によれば、制御部10Aが加圧ユニット10のモータの負荷トルクをモニタするとともに第二矯正治具20Bの位置を制御し、所定の加圧力の範囲内の第一加圧によって突き合わせ部16を加圧後、矯正リング12を移動して上部に空間17を形成後、モータの負荷トルクをモニタして所定の加圧力の範囲内の第二加圧によって突き合わせ部16を加圧するので、胴体1の長さにバラツキがあったとしても、胴体1の起立部1A、鏡板2の起立部2Cを変形、潰すことなく、確実に突き合わせ部16に加圧力を印加させることができ、安定した溶接品質を得ることができるとともに製造工程が標準化されて工程の省略化、省エネ化、その結果の低コスト化かつ接合作業が容易となり、量産に適した装置となる効果を有する。
 また、第一加圧の加圧力は、第二加圧の加圧力より小さく、第一加圧で行われる突き合わせ部の形成が、小さな加圧力で行うことができるため、変形や、潰れなどを確実に防止することができる。
実施の形態2.
 この実施の形態2は、前述した実施の形態1の缶体の製造装置100を用いた缶体の製造方法に関するものである。実施の形態1で示した図に基づき缶体の製造方法を説明する。図2において、缶体101は貯湯式給湯器のフェライト系ステンレス材を用いた貯湯タンクである。胴体1、鏡板2、第一矯正治具20A、第二矯正治具20Bが実施の形態1で説明したとおり、缶体の製造装置100によって加圧一体化される。
 その後、胴体1の起立部1A、鏡板2の起立部2Cの突き合わせ部16を溶接トーチ18を用いて接合する。接合器具の溶接トーチ18を、突き合わせ部16の上部の空間17に配置した状態を図10に示している。この状態でモータ8の動作により回転駆動ユニット5Aを起動し、加圧一体化された胴体1とこの胴体1の両端に設けられた鏡板2と、第一矯正治具20A、第二矯正治具20Bとを回転させ、突き合わせ部16の全周にわたりTIG溶接を行う。
 上記のように示した実施の形態2の缶体の製造方法にて缶体101を製造することができるので、上記実施の形態1と同様の効果を奏するのはもちろんのこと、回転駆動ユニット5Aを起動し、加圧一体化された胴体1とこの胴体1の両端に設けられた鏡板2と、第一矯正治具20A、第二矯正治具20Bとを回転させ、突き合わせ部16の全周にわたり溶接を行うため、突き合わせ部16の仮止め溶接を不要とし、溶接時における突き合わせ部16の隙間の発生を防止できる。また目違いを減らすことができるので、溶接作業時に余分な専用工具を必要とせず、かつ余分な工程をなくし、入熱効果が向上した安定した溶接が行える。
 さらに、充分な空間17にTIG溶接トーチを配置できるので、寸法精度の高い缶体101が得られる。さらに、溶接部が完全溶け込みで形成され、高温で温度サイクルが印加される貯湯タンクのような製品において、溶接部の隙間腐食および応力集中のない耐久性が向上した長寿命の製品を提供できる。
 上記実施の形態2においては缶体101の材質をフェライト系ステンレス材である場合を示したが、これに限られることはなく、オーステナイト系ステンレス材であってもよく、また胴あるいは銅合金であってもよい。さらに胴あるいは銅合金の場合の接合方法として、突き合わせ部16を置きろう、あるいは差しろう方式によるろう付け接合を採用してもよい。この場合、ろう材は銀ろう等の硬ろう材が望ましいが限定されるものではない。さらに胴、銅合金の接合にはMIG(metal inert gas welding)溶接等の溶接方法を採用してもよい。
実施の形態3.
 この実施の形態3は、上記実施の形態1の缶体の製造装置100を用いた缶体の製造方法に関するものである。上記実施の形態1で示した図及び図11~図14に基づき本実施の形態3の缶体の製造方法を説明する。本実施の形態3では第一加圧時に、部分的に胴体1の起立部1Aのひさし部1Bの先端1BBと、鏡板2の起立部2Cとが当接する確率を低減させるための方法について説明する。
 第一加圧の際、加圧ユニット10を前進させて、胴体1の起立部1Aを矯正リング12に挿入する。一方、胴体1が胴体受け4へセットされたときに、胴体1の形状は、重力の影響を受けて自重でたわみ、胴体1が楕円状に変形する。これは、胴体1は板厚の薄い材料にて形成されている要因と、胴体1の周囲を拘束していない要因による。そして、胴体1が楕円状に変形した状態で、胴体1の起立部1Aは加圧ユニット10と共に前進してくる矯正リング12に挿入される。
 したがって、矯正リング12の段付き部12Cの外周側側面12CCと、胴体1の起立部1Aのひさし部1Bの外径とのギャップGは、重力に反する上方側において大きく発生する。矯正リング12の段付き部12Cの外周側側面12CCと、胴体1の起立部1Aのひさし部1Bの外径とのギャップGが上方に偏って大きく発生してる状態の模式図を図11に示す。
 矯正リング12の段付き部12Cの外周側側面12CCと、胴体1の起立部1Aのひさし部1Bの外径とのギャップGが上方に偏っている状態のままで第一加圧を行うと、部分的に胴体1の起立部1Aのひさし部1Bの先端1BBと、鏡板2の起立部2Cとが当接する場合が考えられる。
 このことを解決するための、本実施の形態3の缶体の製造方法について説明する。まず、上記各実施の形態と同様に、第一矯正治具20Aおよび第二矯正治具20Bに鏡板2をセットし、次に胴体1を胴体受け4にセットする。そして、鏡板2の起立部後面2Dが矯正リング12の下面12Bに全面接触するようセットする(図12のステップST1)。
 次に、第一加圧を行う前に、加圧ユニット10を前進させて、胴体1の起立部1Aが、矯正リング12の段付き部12Cに挿入され始め、胴体1の起立部1Aが案内用のテーパ12Dを乗り越えた時点で加圧ユニット10を一時停止する(図12のステップST22)。図13に加圧ユニット10が一時停止したときの、矯正リング12と、胴体1の起立部1Aとの位置関係を示す。
 次に、胴体1の起立部1Aが案内用のテーパ12Dを乗り越えて加圧ユニット10が停止した状態で、矯正リング12を図14の矢印に示すように周方向に回転させる。この矯正リング12の回転により、矯正リング12内での胴体1の形状を、矯正リング12の形状になじませて真円に近づけることができる(図12のステップST23)。その結果、胴体1の歪みが矯正される。以下、上記各実施の形態と同様に、第一加圧、第二加圧、および溶接の工程を行い(図6のステップST2からの図7のステップST11)、缶体を製造する。
 上記のように構成された実施の形態3によれば、上記各実施の形態と同様の効果を奏するのはもちろんのこと、第一加圧前に矯正リング12内での胴体1の形状を矯正リング12の段付き部12Cの外周側側面12CCの形状になじませて真円に近づけたことで、第一加圧時に部分的に胴体1の起立部1Aのひさし部1Bの先端1BBと、鏡板2の起立部2Cとが当接することの発生確率を低減させる。よって、精度に優れた溶接を行うことが可能となる。
実施の形態4.
 上記実施の形態3においては、矯正リング12を回転させることにより胴体1の歪みを矯正する例を示したが、これに限られることはなく、他の方法について説明する。尚、胴体1の歪みを矯正する部分以外は、上記実施の形態3と同様であるためその説明は適宜省略する。
 本実施の形態4では、胴体1の起立部1Aが案内用のテーパ12Dを乗り越え加圧ユニット10を一時停止すると、胴体1の矯正リング12に挿入されている所定の1点と、その所定の1点から周方向におおよそ180°離れた点の2点の位置を両手を用いて胴体1を軽く叩いてたわませる。その作業を60°~90°刻みで2回から3回繰り返す。このことで、胴体1の起立部1Aを矯正リング12の形状になじませる。よって、矯正リング12と胴体1の起立部1Aのひさし部1Bの外径とのギャップGをある程度周方向に均等化することができる。
 上記のように行われた実施の形態4によれば、上記各実施の形態と同様の効果を奏するのはもちろんのこと、矯正リング12内での胴体1の形状の歪みを矯正し、真円に近づかせることができる。また、胴体1が鏡板2に加圧されていない状態で胴体1を叩いてたわませるため、加圧されている状態と比較して叩く力は弱い力で済み、作業時間を短縮できる。
 尚、この発明は、その発明の範囲内において、各実施の形態を自由に組み合わせたり、各実施の形態を適宜、変形、省略することが可能である。

Claims (8)

  1. 胴体と、前記胴体の両側に鏡板をそれぞれ接合して缶体を作製する缶体の製造装置であって、
    前記胴体の両側に配置された前記鏡板をそれぞれに支持する第一矯正治具および第二矯正治具と、
    前記第一矯正治具および第二矯正治具にそれぞれ具備された段付き部を有する矯正リングと、
    前記第一矯正治具の外側に配置された回転駆動ユニットと、
    前記第二矯正治具の外側に配置された加圧ユニットと、
    前記加圧ユニットを駆動するモータと、
    前記モータの負荷トルクをモニタしながら前記加圧ユニットを制御する制御部とを備え、
    前記第一矯正治具および前記第二矯正治具の前記矯正リングの前記段付き部の下面に前記鏡板の起立部後面を当接すると、
    前記制御部は、前記第二矯正治具の位置を制御して前記第二矯正治具の位置移動を調整して、前記胴体の両端の起立部前面と前記鏡板の起立部前面との突き合わせ部を前記モータの負荷トルクが所定の範囲内の加圧力とする第一加圧で加圧した後、
    前記矯正リングを移動させて前記突き合わせ部の上部に空間を形成し、前記突き合わせ部を前記モータの負荷トルクが所定の範囲内の加圧力とする第二加圧で加圧するとともに、
    前記回転駆動ユニットは、前記胴体、前記鏡板、前記第一矯正治具および前記第二矯正治具を一体的に回転可能とする缶体の製造装置。
  2. 前記制御部は、前記第二加圧による加圧力が、前記第一加圧による加圧力より大となるように制御する請求項1に記載の缶体の製造装置。
  3. 前記制御部は、前記第一加圧による前記突き合わせ部の加圧時において、前記位置移動を調整する動作回数を計測し、所定の回数を超えると、警告表示を行う請求項1または請求項2に記載の缶体の製造装置。
  4. 前記制御部は、前記第二矯正治具の位置を制御して前記第二矯正治具の位置移動を調整する際、前記第一加圧前に前記胴体の両端の起立部の一部が前記矯正リングの前記段付き部に挿入されると一旦停止し、
    前記回転駆動ユニットは、前記矯正リングのみを回転する請求項1から請求項3のいずれか1項に記載の缶体の製造装置。
  5. 前記第二矯正治具の位置を制御して前記第二矯正治具の位置移動を調整する際、前記第一加圧前に前記胴体の両端の起立部の一部が前記矯正リングの前記段付き部に挿入されると停止し、前記矯正リングの形状に沿うように前記胴体の歪みを矯正する請求項1から請求項4のいずれか1項に記載の缶体の製造装置を用いた缶体の製造方法。
  6. 前記回転駆動ユニットによって前記胴体、前記鏡板、前記第一矯正治具および前記第二矯正治具を一体的に回転させた状態で、前記突き合わせ部を接合する請求項1から請求項4のいずれか1項に記載の缶体の製造装置を用いた缶体の製造方法。
  7. 前記胴体および前記鏡板の材質がステンレス材であり、かつ、前記接合がTIG溶接法である請求項6に記載の缶体の製造方法。
  8. 前記胴体および前記鏡板の材質が胴または銅合金であり、かつ前記接合が硬質ろう材を用いたろう付け法である請求項6に記載の缶体の製造方法。
PCT/JP2016/057090 2015-03-12 2016-03-08 缶体の製造装置および缶体の製造方法 WO2016143771A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP16761739.8A EP3269486B1 (en) 2015-03-12 2016-03-08 Can body production apparatus and can body production method
JP2017505343A JP6274473B2 (ja) 2015-03-12 2016-03-08 缶体の製造装置および缶体の製造方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015048912 2015-03-12
JP2015-048912 2015-03-12

Publications (1)

Publication Number Publication Date
WO2016143771A1 true WO2016143771A1 (ja) 2016-09-15

Family

ID=56880310

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/057090 WO2016143771A1 (ja) 2015-03-12 2016-03-08 缶体の製造装置および缶体の製造方法

Country Status (3)

Country Link
EP (1) EP3269486B1 (ja)
JP (1) JP6274473B2 (ja)
WO (1) WO2016143771A1 (ja)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108672748A (zh) * 2018-07-27 2018-10-19 陈肖兰 一种空调制冷剂存储气瓶生产用焊接台
CN108942063A (zh) * 2018-08-07 2018-12-07 淮北市向阳锅炉厂 一种油罐旋转夹具
CN109014850A (zh) * 2018-07-27 2018-12-18 上海先海电子科技有限公司 一种电池滚压装置
CN109014679A (zh) * 2018-08-31 2018-12-18 安徽金马电气科技有限公司 一种配电柜柜体焊接设备
CN109202323A (zh) * 2018-10-22 2019-01-15 来安县祥瑞机电科技有限责任公司 一种车用卧式绝热气瓶的瓶体与瓶底连接的焊接工装
CN109277767A (zh) * 2018-10-11 2019-01-29 安徽明光中兴阳光新能源科技有限公司 一种壁挂太阳能热水器集热铜管焊接设备
CN110480121A (zh) * 2019-07-31 2019-11-22 徐州德坤电气科技有限公司 一种网架连杆自动焊接生产系统的自动焊接单元
CN113927120A (zh) * 2021-09-24 2022-01-14 无锡铭辰焊接科技有限公司 一种自动钎焊设备
CN117001264A (zh) * 2023-09-25 2023-11-07 黑龙江省建筑安装集团有限公司 一种罐体预制可伸缩支撑装置

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110125588B (zh) * 2018-02-09 2021-05-18 宁波方太厨具有限公司 燃气热水器面罩挂钩点焊工装
CN108655624B (zh) * 2018-06-29 2020-08-11 青岛恒泰散热器有限公司 散热管自动焊接装置
CN108620795B (zh) * 2018-06-29 2020-10-23 青岛恒泰散热器有限公司 一种散热器焊接装置
CN108526807B (zh) * 2018-06-29 2020-05-12 青岛恒泰散热器有限公司 散热管自动焊接方法
CN110695598A (zh) * 2019-11-15 2020-01-17 苏州默声熙达设备科技有限公司 一种通风过滤器壳体焊接用组装夹持机构
CN112318053A (zh) * 2020-10-28 2021-02-05 毛晓鹏 一种用于空压机罐体焊接的拼装定位工装

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011121076A (ja) * 2009-12-09 2011-06-23 Mitsubishi Electric Corp 薄板部材の溶接方法、およびその方法を用いた缶体の製造方法
JP2012228718A (ja) * 2011-04-27 2012-11-22 Mitsubishi Electric Corp 缶体の製造装置およびその製造装置を用いた缶体の製造方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2593233B2 (ja) * 1990-04-27 1997-03-26 九州変圧器株式会社 液体用タンクの製造方法
JP2757300B2 (ja) * 1995-07-26 1998-05-25 富田工業株式会社 金属製容器
JP3193359B2 (ja) * 1999-09-06 2001-07-30 象印マホービン株式会社 金属製筒状体の接合方法および該方法で製造した金属製容器

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011121076A (ja) * 2009-12-09 2011-06-23 Mitsubishi Electric Corp 薄板部材の溶接方法、およびその方法を用いた缶体の製造方法
JP2012228718A (ja) * 2011-04-27 2012-11-22 Mitsubishi Electric Corp 缶体の製造装置およびその製造装置を用いた缶体の製造方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3269486A4 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108672748A (zh) * 2018-07-27 2018-10-19 陈肖兰 一种空调制冷剂存储气瓶生产用焊接台
CN109014850A (zh) * 2018-07-27 2018-12-18 上海先海电子科技有限公司 一种电池滚压装置
CN109014850B (zh) * 2018-07-27 2023-10-31 上海先海电子科技有限公司 一种电池滚压装置
CN108942063A (zh) * 2018-08-07 2018-12-07 淮北市向阳锅炉厂 一种油罐旋转夹具
CN109014679A (zh) * 2018-08-31 2018-12-18 安徽金马电气科技有限公司 一种配电柜柜体焊接设备
CN109277767A (zh) * 2018-10-11 2019-01-29 安徽明光中兴阳光新能源科技有限公司 一种壁挂太阳能热水器集热铜管焊接设备
CN109202323A (zh) * 2018-10-22 2019-01-15 来安县祥瑞机电科技有限责任公司 一种车用卧式绝热气瓶的瓶体与瓶底连接的焊接工装
CN110480121A (zh) * 2019-07-31 2019-11-22 徐州德坤电气科技有限公司 一种网架连杆自动焊接生产系统的自动焊接单元
CN113927120A (zh) * 2021-09-24 2022-01-14 无锡铭辰焊接科技有限公司 一种自动钎焊设备
CN117001264A (zh) * 2023-09-25 2023-11-07 黑龙江省建筑安装集团有限公司 一种罐体预制可伸缩支撑装置
CN117001264B (zh) * 2023-09-25 2024-01-30 黑龙江省建筑安装集团有限公司 一种罐体预制可伸缩支撑装置

Also Published As

Publication number Publication date
EP3269486B1 (en) 2022-04-20
JPWO2016143771A1 (ja) 2017-06-01
JP6274473B2 (ja) 2018-02-07
EP3269486A1 (en) 2018-01-17
EP3269486A4 (en) 2019-01-09

Similar Documents

Publication Publication Date Title
JP6274473B2 (ja) 缶体の製造装置および缶体の製造方法
JP5693353B2 (ja) 缶体の製造装置およびその製造装置を用いた缶体の製造方法
US8556156B1 (en) Dynamic adjustment of friction stir welding process parameters based on weld temperature
US20160184922A1 (en) Friction point joining device and friction point joining method
WO2016063538A1 (ja) 摩擦攪拌点接合装置及び摩擦攪拌点接合方法
JP4928649B1 (ja) マッシュシーム溶接方法および装置
EP2687315A1 (en) Friction stir spot welding device and friction stir spot welding method
JP5209749B2 (ja) 抵抗溶接方法、抵抗溶接部材、抵抗溶接機とその制御装置、抵抗溶接機の制御方法とその制御プログラムおよび抵抗溶接の評価方法とその評価プログラム
CN104379269A (zh) 压轧辊的制造方法和压轧辊以及压轧辊的制造装置
CN104384674B (zh) 主泵电机转子屏蔽套与转子护环的机动钨极氩弧焊接方法
CN102019501A (zh) 一种搅拌摩擦焊接圆形环缝的方法
JP2002292477A (ja) 摩擦撹拌を用いた加工制御方法、加工制御装置並びに当該方法を実行するコンピュータプログラム並びに当該コンピュータプログラムを格納した記憶媒体
US7523554B2 (en) Method of manufacturing a wheel rim
JP2006061921A (ja) 摩擦点接合方法およびその装置
JP2011156564A (ja) 溶接用電極の位置ずれ補正方法および装置
CN102019487B (zh) 一种内缩式管头自动焊机
CN112570491A (zh) 一种轻质合金中厚板焊后预应力校形及强化方法
JP3401499B2 (ja) 摩擦撹拌を用いた接合装置
JP3463671B2 (ja) 摩擦撹拌を用いた接合方法及び装置
CN113747993A (zh) 摩擦搅拌点接合装置及其运转方法
CN104227187A (zh) 大型万向轴法兰焊接方法
JP6104013B2 (ja) スポット溶接方法及びスポット溶接装置
CN110216422A (zh) 一种人孔井焊接件的制作工艺
JP2006102748A (ja) 摩擦接合装置
CN115533273A (zh) 一种智能焊接厚大工件自适应打底层坡口组对误差装置及方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16761739

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2017505343

Country of ref document: JP

Kind code of ref document: A

REEP Request for entry into the european phase

Ref document number: 2016761739

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE