WO2016137218A1 - 우수받이를 기반으로 한 개량형 도로 경계석 시공방법 - Google Patents

우수받이를 기반으로 한 개량형 도로 경계석 시공방법 Download PDF

Info

Publication number
WO2016137218A1
WO2016137218A1 PCT/KR2016/001785 KR2016001785W WO2016137218A1 WO 2016137218 A1 WO2016137218 A1 WO 2016137218A1 KR 2016001785 W KR2016001785 W KR 2016001785W WO 2016137218 A1 WO2016137218 A1 WO 2016137218A1
Authority
WO
WIPO (PCT)
Prior art keywords
boundary stone
support
installation
receiver
pedestal
Prior art date
Application number
PCT/KR2016/001785
Other languages
English (en)
French (fr)
Inventor
이덕구
Original Assignee
주식회사 디컨스이엔지
이덕구
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 디컨스이엔지, 이덕구 filed Critical 주식회사 디컨스이엔지
Publication of WO2016137218A1 publication Critical patent/WO2016137218A1/ko

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/221Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
    • E01C11/223Kerb-and-gutter structures; Kerbs with drainage openings channel or conduits, e.g. with out- or inlets, with integral gutter or with channel formed into the kerb ; Kerbs adapted to house cables or pipes, or to form conduits
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/227Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/50Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/50Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
    • E01C19/502Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes
    • E01C19/506Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes for kerbs, gutters or similar structures, e.g. raised portions, median barriers
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/10Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins

Definitions

  • the present invention is for the construction of rainwater gutters and road boundary stones installed on the side of the road, and all the members are prefabricated and modularized, and the unskilled workers at the construction site can be constructed with accurate mechanically accurate tables to improve construction and economics.
  • it relates to a method of constructing an improved road boundary stone based on the excellent receiving system by constructing an accurate curve in a curved section.
  • FIG. 1 is a cross-sectional view of the road and sidewalk showing the construction state of the conventional storm receiver and boundary stone.
  • storm receivers are facilities that collect rainwater from roads and drain them to storm pipes.
  • Human walks consist of a boundary stone and an L-shaped side opening (hereinafter referred to as 'side opening').
  • the boundary stone is a part that prevents the safety accident of the pedestrian due to the vehicle operation in advance, and the side opening supporting the boundary stone is a facility for collecting rainwater during rainy weather and draining it to the rainwater receiver.
  • the rainwater receptacle made of PC has the positional deformation due to ground disturbance and the error of linearity and height during the installation due to the heavy weight, and after the rainwater installation, the positional deformation according to the degree of compaction, Positional deformation and the like.
  • boundary stone After the boundary stone is linearly surveyed, two rebars per point are installed to determine the location, then the height of the boundary stone is measured to fix the transverse reinforcement to the height, and then fixed by the binding line.
  • the boundary line is to be aligned, and the curved section is installed more than 15 reinforcing bars (20m) per side point, which consumes a lot of manpower and materials for cutting and installing reinforcing bars, causing air extension and cost increase.
  • the conventional method is to look at the first cycle when installing the boundary stone using the rainwater receiver, the boundary stone linear survey stage 1 day after the rainwater receiver construction, the height of the auxiliary base and the compaction stage of the auxiliary base 1 day, the boundary stone linear surveying step 1 Work, reinforcing pile piling and boundary stone height measurement stage 1 day, rear formwork installation / boundary stone arrangement / side concrete concrete placement / boundary stone installation stage 1 day, front formwork installation and side concrete placing stage 1 day, completion day 1 day after dismantling formwork, etc. It takes 7 days in total, which is inefficient and causes a lot of cost and air.
  • the present invention is for the construction of rainwater gutters and road boundary stones installed on the side of the road, and all the members are prefabricated and modularized, and the unskilled workers at the construction site can be constructed with accurate mechanically accurate tables to improve construction and economics.
  • it is intended to provide an improved road boundary stone construction method based on the excellent receiving aesthetics because it is constructed with an accurate curve in the curve section.
  • the present invention is a method for installing the excellent receiving unit 80 and the boundary stone 160 on the excavation ground (G) and the auxiliary base (G1) of the roadside, respectively,
  • the boundary stone installation step of mounting a plurality of the boundary stone 160 in the upper portion of the boundary stone support 150; (6) a plurality of formwork supports 170 and a plurality of formwork supports to accommodate the sideways space 176 to form the sideways 180 to collect the rainwater as a lower part of the sidewalk that humans walk and drain to the storm receiver 80; Side-side formwork installation step of installing the formwork body 175; (7) a side concrete placing step of pouring concrete into the side space 176 and curing to form the side mouth 180; And, (8) the side support form disassembly step of dismantling the formwork support 170 and the formwork body 175; provides an improved road boundary stone construction method based on the excellent receiving.
  • the present invention is for the construction of rainwater gutters and road boundary stones installed on the side of the road, and all the members are prefabricated and modularized, and the unskilled workers at the construction site can be constructed with accurate mechanically accurate tables to improve construction and economics.
  • it is constructed with an accurate curve in a curved section, thereby providing an improved road boundary stone construction method based on the excellent receiving stand.
  • 1 is a cross-sectional view of the road and sidewalk showing the construction state of the conventional storm receiver and boundary stone.
  • Figure 2 is an exploded perspective view of the formwork for manufacturing the storm receiver used in the present invention.
  • FIG. 3 is a perspective view of the combination of FIG.
  • FIG. 4 is an exploded perspective view of a GPS receiver used in the present invention.
  • FIG. 5 is a perspective view of the combination of FIG.
  • FIG. 6 is an exploded perspective view of a prism reflector used in the present invention.
  • FIG. 7 is a perspective view of the combination of FIG.
  • FIG 8 is an exploded perspective view of the storm receiver and pedestal used in the present invention.
  • FIG. 9 is an exploded perspective view of the pedestal used in the present invention.
  • FIG. 10 is a perspective view of the combination of FIG.
  • FIG. 11 is an exploded perspective view of a supporting rod used in the present invention.
  • FIG. 12 is an exploded perspective view of another embodiment of a support rod used in the present invention.
  • Figure 13 is (1) pedestal installation and excellent receiving step in the present invention; Conceptually, the installation of the pedestal is shown.
  • FIG 14 (1) pedestal installation and excellent receiving step in the present invention; It is conceptually illustrated the installation of rainwater.
  • FIG. 15 illustrates a process of installing a prism reflector in FIG. 14.
  • Figure 16 shows the survey results table as field field used in the present invention.
  • Figure 21 shows the process of adjusting the variable leg of the lower part of the rain gutter of (1) the pedestal installation and excellent receiving step in the present invention.
  • Figure 22 shows the process of removing the pedestal of (1) pedestal installation and excellent receiving step in the present invention.
  • Figures 23 and 24 illustrate the process of installing the base concrete formwork and placing the base concrete of (1) pedestal installation and excellent receiving step in the present invention.
  • FIG. 25 conceptually illustrates (2) an auxiliary base laying step in the present invention.
  • 26 and 27 show the installation of the measurement rod of (3) the boundary stone height determination step in the present invention.
  • FIG. 29 is a perspective view of the combination of FIG.
  • FIG. 32 shows the curve section divided by the boundary stone length on the CAD drawing and tangentially indicated.
  • FIG. 33 is a conceptual diagram in which the boundary stone support and the T-plate are arranged based on FIG. 32.
  • FIG. 35 illustrates a process of adjusting the height using the support rod in FIG. 34.
  • Figure 36 shows (6) side-side mold installation step in the present invention.
  • Figure 38 in the present invention (8) side-mold die disassembly step; The final completed state is shown later.
  • the present invention is a method for installing the rainwater receiving unit 80 and the boundary stone 160 in the excavation ground (G) and the auxiliary base (G1) of the roadside, respectively,
  • the boundary stone installation step of mounting a plurality of the boundary stone 160 in the upper portion of the boundary stone support 150; (6) a plurality of formwork supports 170 and a plurality of formwork supports to accommodate the sideways space 176 to form the sideways 180 to collect the rainwater as a lower part of the sidewalk that humans walk and drain to the storm receiver 80; Side-side formwork installation step of installing the formwork body 175; (7) a side concrete placing step of pouring concrete into the side space 176 and curing to form the side mouth 180; And, (8) the side support form disassembly step of dismantling the formwork support 170 and the formwork body 175; provides an improved road boundary stone construction method based on the excellent receiving.
  • the present invention includes all four contents, including Korean Patent Application Nos. 10-2014-0068624, 10-2014-0068626, 10-2014-0068627, and 10-2014-0072946, to which the applicant of the present invention has previously applied. Clarify inclusion.
  • FIG. 1 is an exploded perspective view of the formwork for producing the storm receiver used in the present invention
  • Figure 3 is a combined perspective view of FIG.
  • the storm receiver 80 used in the present invention is prefabricated by a PC, and uses the internal formwork 30 and the external formwork 40 at the time of pre-production.
  • the internal formwork 30 is made of a combination of a plurality of formwork plates 31 are coupled to each other, the top of the formwork plate 31, the measurement sphere forming pin cradle formed with a hole into which the measurement sphere forming pin 33 is inserted ( 32) is installed.
  • the outer formwork 40 is composed of a backing plate 45 and a front plate 41, a rear plate 41 ⁇ and two side plates 41 ⁇ which are vertically coupled to the ends of the backing plate 45.
  • the side plate 41 ′′ is provided with a through hole insertion hole 43 so that the through hole 82 may be formed in the rain receiver 80, and the rain plate 80 may be disposed above the support plate 45.
  • a variable leg insertion portion forming tool 48 is installed so that a variable leg insertion portion into which the upper end of the variable leg 90 is inserted can be formed.
  • a leg 46 is formed below the support plate 45 to separate the support plate 45 from the bottom.
  • the front plate 41, the rear plate 41 ′, the side plate 41 ′′, and the support plate 45 are connected to each other by a connection part 42 or a form tie FT, and are detachably coupled to each other.
  • Figure 8 is an exploded perspective view of the storm receiver and the pedestal used in the present invention
  • Figure 9 is an exploded perspective view of the pedestal used in the present invention
  • Figure 10 is a combined perspective view of FIG.
  • the rainwater receiver 80 used in the present invention is fitted with a connecting pin 74 in the through-hole 82 to install a hanger 75 to lift the crane.
  • the upper leg 91 and the lower leg 92 and the variable leg 90 is configured to include a socket 94 is coupled to the lower portion of the upper support (91) and the lower stand 92 Leveling is possible through the rotation.
  • the pedestal 100 used in the present invention is provided with a roller 102 on the upper portion of the upper frame formed with a measuring member 103 and a hole 106 that is mounted on the roller 102 and can move back and forth, left and right
  • the plate 107 is mounted, and later the rainwater receiver 80 is temporarily placed on the upper plate 107.
  • variable leg 90 is coupled to the bottom of the pedestal 100 to allow leveling.
  • the bolt 104 is fastened to the hole 101 formed in the pedestal 100 to the hole 106 so that the upper plate 107 is not detached when the pedestal 100 is transported, and the rain catcher 80 ) Is mounted on the top plate 107, then loosen the bolt 104 and move the top plate 107 in accordance with the gauge 103.
  • Figure 13 is (1) pedestal installation and excellent receiving step in the present invention.
  • Figure 14 in the present invention (1) pedestal installation and excellent receiving step; It is conceptually illustrated the installation of rainwater.
  • the (1) pedestal installation and excellent receiving step the excavation ground (G) to form the excavation ground (G) to the level where the excellent support 80 is to be installed and the pedestal (100) on the excavation ground (G) After that, it refers to the step of mounting on the measured position on the pedestal 100 by lifting the rain receiver 80.
  • a thread is placed on the scaffold 90 to select a position, level the variable leg 90, install the pedestal 100, and use the crane as shown in FIG. 14. )
  • Figure 16 is a field test field used in the present invention shows a measurement score chart
  • Figures 17 to 20 shows a CAD drawing for obtaining FIG.
  • Figure 21 shows the process of adjusting the variable leg of the lower part of the rain gutter of (1) the pedestal installation and excellent receiving step in the present invention.
  • the rainfall receiving unit 80 is mounted on top of the pedestal 100 by lifting the rainfall receiving unit (80) 81
  • the GPS receiver 50 or the prism reflector 60 is installed to adjust the exact installation height and the installation position of the rain receiver 80, but the upper plate 107 installed on the frame 105 is the frame ( 105) It is characterized by being adjusted by sliding the roller 102 installed on the top.
  • FIG. 15 illustrates a process of installing a prism reflector in FIG. 14.
  • FIG. 4 is an exploded perspective view of a GPS receiver used in the present invention
  • FIG. 5 is a combined perspective view of FIG. 4
  • FIG. 6 is an exploded perspective view of a prism reflector used in the present invention
  • FIG. 7 is a combined perspective view of FIG. 6. .
  • the GPS receiver 50 has a support rod 52 having a tapered shape at the lower end of the receiver 51, and the support rod 52 penetrates through the support plate 57 having the slot 58 formed therein to support the support rod 52.
  • the tip is matched to the measurement port 81 of the storm receiver (80).
  • Protruding rod 53 is inserted into the slot 58 to the support rod 52 to prevent the support rod 52 from being separated from the support plate 57 and to allow vertical movement on the slot 58.
  • a leveler 54 is attached to the receiver 51 or the support plate 57, and three position adjustment holes 55 are installed on the support plate 57 to allow leveling according to the leveler 54.
  • Support plate 56 may be further configured in case the upper surface of the rain receiver 80 is irregular.
  • the prism reflector 60 is composed of almost the same function and member as the GPS receiver 50, and specifically, the level 61, the main body 62, the support rod 63, the protrusion rod 64, the support plate 66 , The slot 67 and the position adjustment port 65 and the like.
  • Figure 22 shows the process of removing the pedestal of (1) pedestal installation and excellent receiving step in the present invention
  • Figures 23 and 24 are the base concrete of (1) pedestal installation and excellent receiving step in the present invention
  • the process of installing the formwork (F) and placing the base concrete (BC) is shown.
  • FIG. 25 conceptually illustrates (2) an auxiliary base laying step in the present invention
  • FIGS. 26 and 27 illustrate a measurement rod installation of (2) the boundary stone height determining step in the present invention.
  • auxiliary base layer installation step of the present invention refers to the step of installing the auxiliary base layer (G1) to cover the lid 70 and to install a temporary lid 70 on the rainwater receiving unit 80.
  • the ribbon is bonded to the handle of the temporary lid (70) lower than the auxiliary base layer (G1) by 7cm to bend the binding line to 7cm and then fixed to the handle of all the temporary lid 70, and based on this grader base layer It is characterized in that the installation and compaction with a roller.
  • boundary stone height determining step of the present invention refers to the step of determining the height of the boundary stone 160 is installed from the top of the rainwater receiving 80 to the top.
  • the temporary lid 70 is removed and the measurement rod 130 is installed in the measurement port 81 formed on the rainwater receiving unit 80, the auxiliary base layer (G1)
  • the installation height of the boundary stone 160 is displayed on the top of the surveying rod 130 exposed to the upper portion by a ribbon or the like.
  • the temporary lid 70 is removed, and the measurement rod 130 is fixed at one place of the measurement port 81 that is aligned with the boundary stone linearly. Combine the ribbon to the height and then connect with a thread to determine the boundary stone height.
  • Figure 28 is an exploded perspective view of the T-plate and the boundary stone support used in the present invention
  • Figure 29 is a perspective view of the combination of Figure 28, Figures 30 and 31 in the present invention (4) the boundary stone support and the T-plate installation step; used The curve section calculation table is shown.
  • FIG. 32 is a diagram illustrating a curvilinear section divided into tangential lengths on a CAD drawing and marked in a tangential direction
  • FIG. 33 is a conceptual view in which a boundary seat and T-plates are arranged based on FIG. 32.
  • the other end of the T-shaped plate 140 installed on the boundary stone support 150 is spaced a predetermined distance from the tangential direction based on the curve section calculation table calculated using the CAD in advance.
  • the boundary stone support 150 is continuously installed at regular intervals by being coupled to the T-shaped plate 140, and can be easily installed by using an assistive device and a portable ruler by a curve section calculation table.
  • the T-shaped plate 140 includes a long side portion 141 and a short side portion 142 orthogonal to the other end of the long side portion 141, and one end of the long side portion 143. Both ends of the short side part 142 are provided with a protrusion insertion hole 143 into which the upper end of the support rod 120 is inserted.
  • the boundary stone support 150 includes a triangular support plate 155 and three support rods 120 coupled to end portions of the support plate 155.
  • Figure 11 is an exploded perspective view of a support rod used in the present invention
  • Figure 12 is an exploded perspective view of another embodiment of the support rod used in the present invention.
  • the support rod 120 includes an adjustment nut 121 having a protrusion pipe hole 121 ′, an adjustment rod 123 having a protrusion 123 ′, an upper spiral 125 ′, and a lower spiral. (125 ⁇ ) formed support rod body 125, screw (SB) and comedy (W), the cap nut 127, the pad 128 and the socket 129 formed with a screw coupling portion (129 ⁇ ), etc. do.
  • the adjustment rod 123 and the adjustment nut 121 can be configured to the upper control body 122 is a concept formed integrally.
  • Figure 34 shows (5) the boundary stone installation step in the present invention
  • Figure 35 shows the process of adjusting the height using the support rod in Figure 34.
  • boundary stone installation step of the present invention refers to the step of mounting a plurality of the boundary stone 160 in the upper portion of the boundary stone support 150.
  • the boundary stone support 150 is composed of a triangular support plate 120 and three support rods 120 are installed in the corner of the support plate 120, the support rod 120
  • the cap nut 127 and the socket 129 capable of adjusting the height by the rotational movement correspond to the surface of the irregular auxiliary base layer G1 by the cap nut 127 and the socket 129, but the cap nut 127 and the socket are mounted when the boundary stone 160 is mounted.
  • a frictional force is generated in the pads 128 between the 129, and there is no movement.
  • Figure 36 shows (6) side-side mold installation step in the present invention.
  • the formwork support 170 is composed of a fixing screw 171, an adjusting means 172, a support frame 173, etc., the formwork support 170 facing each other is connected to the pre-typical 190,
  • side-sphere concrete placing step refers to the step of forming the side sphere 180 by pouring concrete and curing in the side space (176).
  • Figure 38 in the present invention (8) side-mold die disassembly step; The final completed state is shown later.
  • the (8) side mold disassembling step refers to the step of dismantling the formwork support 170 and the form body 175.
  • the present invention is for the construction of rainwater gutters and road boundary stones installed on the side of the road, and all the members are prefabricated and modularized, and the unskilled workers at the construction site can be constructed with accurate mechanically accurate tables to improve construction and economics.
  • the present invention is for the construction of rainwater gutters and road boundary stones installed on the side of the road, and all the members are prefabricated and modularized, and the unskilled workers at the construction site can be constructed with accurate mechanically accurate tables to improve construction and economics.
  • it relates to a method of constructing an improved road boundary stone based on the excellent receiving system by constructing an accurate curve in a curved section.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Road Paving Structures (AREA)

Abstract

본 발명은 도로변에 설치되는 우수받이 및 도로 경계석을 시공하기 위한 것으로, 모든 부재를 사전제작하여 모듈화 시키고 시공현장에서 미숙련공도 계측된 표에 의해 기계적으로 정확한 품질로 시공할 수 있어 시공성 및 경제성이 향상되며, 특히 곡선구간에서 정확한 곡선으로 시공되어 미관이 우수한 우수받이를 기반으로 한 개량형 도로 경계석 시공방법을 제공한다.

Description

우수받이를 기반으로 한 개량형 도로 경계석 시공방법
본 발명은 도로변에 설치되는 우수받이 및 도로 경계석을 시공하기 위한 것으로, 모든 부재를 사전제작하여 모듈화 시키고 시공현장에서 미숙련공도 계측된 표에 의해 기계적으로 정확한 품질로 시공할 수 있어 시공성 및 경제성이 향상되며, 특히 곡선구간에서 정확한 곡선으로 시공되어 미관이 우수한 우수받이를 기반으로 한 개량형 도로 경계석 시공방법에 관한 것이다.
도 1은 종래의 우수받이 및 경계석의 시공상태를 도시한 도로 및 인도의 단면도이다. 일반적으로 우수받이는 도로의 우수를 집수하여 우수관으로 배수하는 시설이며, 사람이 보행하는 인도는 경계석과 L형 측구(이하, ‘측구’라 한다.)로 구성된다. 상기 경계석은 차량운행으로 인한 보행자의 안전사고를 미연에 방지하는 부분이고, 경계석을 지지하는 측구는 우천시 우수를 집수하여 우수받이로 배수하는 시설이다.
종래의 경우 우수받이는, (1) PC(precast concrete)로 제작하는 단계; (2) 경계석 선형을 측량하여 우수받이의 위치와 높이를 확정하는 단계; (3) 우수받이를 측량에 맞추어 설치하는 단계; (4) 경계석 선형 및 높이를 측량하여 보조기층을 포크레인으로 포설하여 1톤로러로 다지는 단계; (5) 경계석을 놓기 위한 경계석 선형 및 높이를 측량하는 단계; (6) 합판거푸집과 말뚝을 이용하여 경계석 후면거푸집을 설치하는 단계; (7) 포크레인을 이용하여 경계석을 배열하는 단계; (8) 1차콘크리트를 타설하는 단계; (9) 경계석을 놓기위한 콘크리트를 양생하는 단계; (10) 경계석을 설치하는 단계; (11) 합판거푸집과 포크레인을 이용하여 경계석 전면거푸집을 설치하는 단계; (12) L형측구 콘크리트를 타설하는 단계; 및, (13) 포크레인을 이용하여 거푸집을 해체하고 완성하는 단계;순으로 진행된다.
그러나 상기와 같은 종래 공법은 시공시 대체로 다음과 같은 문제점이 있다.
상기 종래 공법으로 우수받이를 정확한 위치에 설치하기 위해서는 우수받이 1개소당 2개의 점을 정확히 선형에 위치하여야 한다. 그러나 PC로 제작된 우수받이는 무거운 자중으로 인하여 설치시 지반교란과 측량시 선형 및 높이의 오차로 인한 위치변형과 우수받이 설치후 되메우고 다짐정도에 따른 위치변형 그리고 곡선구간 위치한 우수받이의 설치시 위치 변형 등이 발생한다.
상기 문제점으로 인하여 우수받이 설치후 경계석 선형 측량을 할 때 변형된 우수받이에 대하여 재시공이 불가피하여 비용 증가와 공기가 길어지며, 설계시 경계석 지반인 보조기층을 포설할 시 포장장비인 그레이더와 럴러로 포설 및 다짐을 하게 되어있으나, 보조기층 포설시 지장물인 우수받이(20m당 1개소)로 인하여 현장에서는 포크레인과 1톤 롤러 그리고 인력의 조합으로 보조기층을 포설하여 추가로 공사비용이 발생된다.
이후 경계석 선형 측량하여 1측점 당 철근 2개를 설치하여 위치를 정한 다음 경계석의 높이를 측량하여 가로철근을 높이에 맞추어 결속선으로 고정한 후 경계석 위치를 정하여 결속선으로 위치를 고정하고 이어서 실을 연결하여 경계석 선형을 맞추며, 곡선구간은 1측점 당(20m) 철근을 15개 이상 설치하여 철근절단 및 철근 설치에 많은 인력과 재료가 소모되어 공기연장 및 비용증가의 원인이 된다.
경계석 설치시 철근과 거푸집을 이용하여 후면거푸집을 설치하고 그 앞에 경계석을 배열하여 후면거푸집과 경계석 사이에 1차 콘크리트를 타설하는 데, 후면거푸집 설치와 경계석배열과 콘크리트 타설후 경계석을 설치하기 위한 양생과정(2~3시간)으로 인하여 비용 및 공기가 길어지며 이후 전면거푸집 설치 및 측구 콘크리트 타설에도 인력과 포크레인이 이용되고 거푸집 해체후 완성에도 포크레인이 필요하다.
상술한 바와 같이, 종래의 공법은 우수받이를 이용한 경계석 설치시 1싸이클을 살펴보면, 우수받이 시공후 경계석선형측량단계 1일, 보조기층 높이측량과 보조기층 포설 다짐단계 1일, 경계석 선형측량단계 1일, 철근 말뚝박기 및 경계석 높이측량단계 1일, 후면거푸집설치/경계석배열/측구콘크리트타설/경계석설치 단계 1일, 전면거푸집설치와 측구 콘크리트타설단계 1일, 익일 거푸집해체 후 완성단계 1일 등 총 7일로 소요되어 비효율적이며 이로 인한 많은 비용과 공기가 길어지는 문제점이 있다.
특히 현장에 배치되는 기능공의 숙련도에 따라 품질의 차이가 많이 발생하여 소정의 품질을 확보하기 어려운 단점이 지적되어 왔다.
본 발명은 도로변에 설치되는 우수받이 및 도로 경계석을 시공하기 위한 것으로, 모든 부재를 사전제작하여 모듈화 시키고 시공현장에서 미숙련공도 계측된 표에 의해 기계적으로 정확한 품질로 시공할 수 있어 시공성 및 경제성이 향상되며, 특히 곡선구간에서 정확한 곡선으로 시공되어 미관이 우수한 우수받이를 기반으로 한 개량형 도로 경계석 시공방법을 제공하고자 한다.
상기한 기술적 과제를 해결하기 위해 본 발명은 도로변의 굴착지반(G)과 보조기층(G1)에 각각 우수받이(80) 및 경계석(160)을 설치하기 위한 방법으로,
(1) 상기 우수받이(80)가 설치될 레벨로 지반을 굴착하여 상기 굴착지반(G)을 형성하고 상기 굴착지반(G)에 받침대(100)를 거치한 후 상기 우수받이(80)를 양중하여 상기 받침대(100) 상부에 계측된 위치에 거치하는 받침대설치및우수받이거치단계; (2) 상기 우수받이(80) 상부에 임시뚜껑(70)을 설치하고 상기 뚜껑(70)을 덮도록 보조기층(G1)을 포설하는 보조기층포설단계; (3) 상기 우수받이(80) 상단에서 상부로 상기 경계석(160)이 설치될 높이를 결정하는 경계석높이결정단계; (4) 상기 경계석(160)을 하부에서 지지할 다수개의 경계석받침대(150)와 상기 다수개의 경계석받침대(150) 상호간을 연결하는 다수개의 T형판(140)을 상기 보조기층(G1) 상부에 설치하는 경계석받침대및T형판설치단계; (5) 상기 경계석받침대(150) 상부에 상기 경계석(160)을 다수개 양중하여 거치하는 경계석설치단계; (6) 사람이 보행하는 인도의 하부로써 우수를 집수하여 상기 우수받이(80)로 배수할 측구(180)를 형성하기 위하여 측구공간(176)을 수용하도록 다수개의 거푸집지지대(170) 및 다수개의 거푸집본체(175)를 설치하는 측구거푸집설치단계; (7) 상기 측구공간(176)에 콘크리트를 타설하고 양생하여 상기 측구(180)를 형성하는 측구콘크리트타설단계; 및, (8) 상기 거푸집지지대(170) 및 상기 거푸집본체(175)를 해체하는 측구거푸집해체단계;를 포함하여 구성되는 것을 특징으로 하는 우수받이를 기반으로 한 개량형 도로 경계석 시공방법을 제공한다.
본 발명은 도로변에 설치되는 우수받이 및 도로 경계석을 시공하기 위한 것으로, 모든 부재를 사전제작하여 모듈화 시키고 시공현장에서 미숙련공도 계측된 표에 의해 기계적으로 정확한 품질로 시공할 수 있어 시공성 및 경제성이 향상되며, 특히 곡선구간에서 정확한 곡선으로 시공되어 미관이 우수한 우수받이를 기반으로 한 개량형 도로 경계석 시공방법을 제공한다.
도 1은 종래의 우수받이 및 경계석의 시공상태를 도시한 도로 및 인도의 단면도이다.
도 2는 본 발명에 사용되는 우수받이를 제작하기 위한 거푸집의 분해사시도이다.
도 3은 도 2의 결합사시도이다.
도 4는 본 발명에 사용되는 GPS수신기의 분해사시도이다.
도 5는 도 4의 결합사시도이다.
도 6은 본 발명에 사용되는 프리즘반사경의 분해사시도이다.
도 7은 도 6의 결합사시도이다.
도 8은 본 발명에 사용되는 우수받이 및 받침대의 분해사시도이다.
도 9는 본 발명에 사용되는 받침대의 분해사시도이다.
도 10은 도 9의 결합사시도이다.
도 11은 본 발명에 사용되는 지지봉의 분해사시도이다.
도 12는 본 발명에 사용되는 지지봉의 다른 실시예의 분해사시도이다.
도 13은 본 발명에서 (1) 받침대설치및우수받이거치단계; 중 받침대 설치를 개념적으로 도시한 것이다.
도 14는 본 발명에서 (1) 받침대설치및우수받이거치단계; 중 우수받이 설치를 개념적으로 도시한 것이다.
도 15는 도 14에서 프리즘반사경을 설치하는 과정을 도시한 것이다.
도 16은 본 발명에서 사용되는 현장야장으로 측량성과표를 나타낸 것이다.
도 17 내지 20은 도 16을 얻기 위한 캐드도면을 도시한 것이다.
도 21은 본 발명에서 (1) 받침대설치및우수받이거치단계;의 우수받이 하부의 가변다리를 조절하는 과정을 도시한 것이다.
도 22는 본 발명에서 (1) 받침대설치및우수받이거치단계;의 받침대를 제거하는 과정을 도시한 것이다.
도 23 및 24는 본 발명에서 (1) 받침대설치및우수받이거치단계;의 베이스콘크리트거푸집을 설치하고 베이스콘크리트를 타설하는 과정을 도시한 것이다.
도 25는 본 발명에서 (2) 보조기층포설단계;를 개념적으로 도시한 것이다.
도 26 및 27은 본 발명에서 (3) 경계석높이결정단계;의 측량봉 설치를 도시한 것이다.
도 28은 본 발명에 사용되는 T형판 및 경계석받침대의 분해사시도이다.
도 29는 도 28의 결합사시도이다.
도 30 및 31은 본 발명에서 (4) 경계석받침대및T형판설치단계;에 사용되는 곡선구간계산표를 도시한 것이다.
도 32는 캐드도면 상에서 곡선구간을 경계석 길이로 구획하고 접선방향으로 표기한 것이다.
도 33은 도 32에 의거하여 경계석받침대와 T형판을 배치한 개념도이다.
도 34는 본 발명에서 (5) 경계석설치단계;를 도시한 것이다.
도 35는 도 34에서 지지봉을 이용하여 높이를 조절하는 과정을 도시한 것이다.
도 36은 본 발명에서 (6) 측구거푸집설치단계;를 도시한 것이다.
도 37은 본 발명에서 (7) 측구콘크리트타설단계;를 도시한 것이다.
도 38은 본 발명에서 (8) 측구거푸집해체단계; 후에 최종 완성된 상태를 도시한 것이다.
본 발명은 도로변의 굴착지반(G)과 보조기층(G1)에 각각 우수받이(80) 및 경계석(160)을 설치하기 위한 방법으로,
(1) 상기 우수받이(80)가 설치될 레벨로 지반을 굴착하여 상기 굴착지반(G)을 형성하고 상기 굴착지반(G)에 받침대(100)를 거치한 후 상기 우수받이(80)를 양중하여 상기 받침대(100) 상부에 계측된 위치에 거치하는 받침대설치및우수받이거치단계; (2) 상기 우수받이(80) 상부에 임시뚜껑(70)을 설치하고 상기 뚜껑(70)을 덮도록 보조기층(G1)을 포설하는 보조기층포설단계; (3) 상기 우수받이(80) 상단에서 상부로 상기 경계석(160)이 설치될 높이를 결정하는 경계석높이결정단계; (4) 상기 경계석(160)을 하부에서 지지할 다수개의 경계석받침대(150)와 상기 다수개의 경계석받침대(150) 상호간을 연결하는 다수개의 T형판(140)을 상기 보조기층(G1) 상부에 설치하는 경계석받침대및T형판설치단계; (5) 상기 경계석받침대(150) 상부에 상기 경계석(160)을 다수개 양중하여 거치하는 경계석설치단계; (6) 사람이 보행하는 인도의 하부로써 우수를 집수하여 상기 우수받이(80)로 배수할 측구(180)를 형성하기 위하여 측구공간(176)을 수용하도록 다수개의 거푸집지지대(170) 및 다수개의 거푸집본체(175)를 설치하는 측구거푸집설치단계; (7) 상기 측구공간(176)에 콘크리트를 타설하고 양생하여 상기 측구(180)를 형성하는 측구콘크리트타설단계; 및, (8) 상기 거푸집지지대(170) 및 상기 거푸집본체(175)를 해체하는 측구거푸집해체단계;를 포함하여 구성되는 것을 특징으로 하는 우수받이를 기반으로 한 개량형 도로 경계석 시공방법을 제공한다.
이하 첨부한 도면과 함께 상기와 같은 본 발명의 개념이 바람직하게 구현된 실시예를 통하여 본 발명을 더욱 상세하게 설명한다.
그리고 설명에 앞서서 본 발명에는 본 발명의 출원인이 기존에 출원한 대한민국 특허 출원번호 10-2014-0068624, 10-2014-0068626, 10-2014-0068627, 10-2014-0072946 등 총 4건의 내용을 전부 포함함을 명확히 밝힌다.
본 발명의 우수받이를 기반으로 한 개량형 도로 경계석 시공방법은,
도로변의 굴착지반(G)과 보조기층(G1)에 각각 우수받이(80) 및 경계석(160)을 설치하기 위한 방법으로,
(1) 상기 우수받이(80)가 설치될 레벨로 지반을 굴착하여 상기 굴착지반(G)을 형성하고 상기 굴착지반(G)에 받침대(100)를 거치한 후 상기 우수받이(80)를 양중하여 상기 받침대(100) 상부에 계측된 위치에 거치하는 받침대설치및우수받이거치단계;
(2) 상기 우수받이(80) 상부에 임시뚜껑(70)을 설치하고 상기 뚜껑(70)을 덮도록 보조기층(G1)을 포설하는 보조기층포설단계;
(3) 상기 우수받이(80) 상단에서 상부로 상기 경계석(160)이 설치될 높이를 결정하는 경계석높이결정단계;
(4) 상기 경계석(160)을 하부에서 지지할 다수개의 경계석받침대(150)와 상기 다수개의 경계석받침대(150) 상호간을 연결하는 다수개의 T형판(140)을 상기 보조기층(G1) 상부에 설치하는 경계석받침대및T형판설치단계;
(5) 상기 경계석받침대(150) 상부에 상기 경계석(160)을 다수개 양중하여 거치하는 경계석설치단계;
(6) 사람이 보행하는 인도의 하부로써 우수를 집수하여 상기 우수받이(80)로 배수할 측구(180)를 형성하기 위하여 측구공간(176)을 수용하도록 다수개의 거푸집지지대(170) 및 다수개의 거푸집본체(175)를 설치하는 측구거푸집설치단계;
(7) 상기 측구공간(176)에 콘크리트를 타설하고 양생하여 상기 측구(180)를 형성하는 측구콘크리트타설단계; 및,
(8) 상기 거푸집지지대(170) 및 상기 거푸집본체(175)를 해체하는 측구거푸집해체단계;
를 포함하여 구성되는 것을 특징으로 한다.
도 2는 본 발명에 사용되는 우수받이를 제작하기 위한 거푸집의 분해사시도이고, 도 3은 도 2의 결합사시도이다.
본 발명에 사용되는 우수받이(80)는 PC로 사전 제작되는 것이 바람직하며, 사전제작시 내부거푸집(30)과 외부거푸집(40)을 이용한다.
상기 내부거푸집(30)은 다수개의 거푸집판(31)이 상호 결합된 조합으로 이루어지며, 상기 거푸집판(31) 상단에는 측량구형성핀(33)이 삽입될 구멍이 형성된 측량구형성핀거치대(32)가 설치된다.
상기 외부거푸집(40)은 받침판(45)과 상기 받침판(45)의 단부에 수직으로 결합되는 전면판(41), 후면판(41`) 그리고 2개의 측면판(41``)으로 구성된다.
상기 측면판(41``)에는 상기 우수받이(80)에 관통홀(82)이 형성될 수 있도록 관통홀삽입구(43)가 설치되며, 상기 받침판(45) 상부에는 상기 우수받이(80) 하부에 가변다리(90) 상단이 삽입되는 가변다리삽입부가 형성될 수 있도록 가변다리삽입부형성구(48)가 설치된다. 그리고 상기 받침판(45) 하부에는 상기 받침판(45)을 바닥으로부터 이격시킬 수 있는 다리부(46)가 형성된다.
그리고 상기 전면판(41), 후면판(41`), 측면판(41``) 및 받침판(45) 상호간은 연결부(42) 또는 폼타이(FT) 등으로 연결되어 분리가능하도록 체결된다.
도 8은 본 발명에 사용되는 우수받이 및 받침대의 분해사시도이고, 도 9는 본 발명에 사용되는 받침대의 분해사시도이며, 도 10은 도 9의 결합사시도이다.
본 발명에 사용되는 우수받이(80)는 관통홀(82)에 연결핀(74)을 끼워 행거(75)를 설치하여 크레인으로 양중한다. 상기 우수받이(80)의 하부에는 상부대(91)와 하부대(92) 그리고 소켓(94)을 포함하여 구성되는 가변다리(90)가 결합되어 상기 상부대(91)와 하부대(92)의 회전을 통한 레벨링이 가능하다.
본 발명에 사용되는 받침대(100)는 상부에 롤러(102)가 설치되고 계측자(103)가 표기된 프레임(105)과 상기 롤러(102) 위에 거치되어 전후좌후 이동할 수 있는 구멍(106)이 형성된 상부판(107)이 거치되며, 후에 상기 상부판(107) 상부에 상기 우수받이(80)가 임시거치되게 된다.
상기 받침대(100) 하부에는 상술한 가변다리(90)가 결합되어 레벨링이 가능하게 한다.
그리고 상기 구멍(106)에 상기 받침대(100)에 형성된 구멍(101)으로 볼트(104)가 체결되어 받침대(100)의 운반시 상기 상부판(107)이 이탈되지 않게 하며, 상기 우수받이(80)가 상기 상부판(107) 위에 거치된 후 상기 볼트(104)를 풀고 상기 계측자(103)에 맞추어 상기 상부판(107)을 이동시키면 된다.
도 13은 본 발명에서 (1) 받침대설치및우수받이거치단계; 중 받침대 설치를 개념적으로 도시한 것이며, 도 14는 본 발명에서 (1) 받침대설치및우수받이거치단계; 중 우수받이 설치를 개념적으로 도시한 것이다.
상기 (1) 받침대설치및우수받이거치단계;는 상기 우수받이(80)가 설치될 레벨로 지반을 굴착하여 상기 굴착지반(G)을 형성하고 상기 굴착지반(G)에 받침대(100)를 거치한 후 상기 우수받이(80)를 양중하여 상기 받침대(100) 상부에 계측된 위치에 거치하는 단계를 말한다.
구체적으로 도 13과 같이, 규준대(90)에 실을 띄워 위치를 선정하고 상기 가변다리(90)를 레벨링하며 상기 받침대(100)를 설치하고, 도 14와 같이 크레인을 이용하여 우수받이(80)를 양중한다.
도 16은 본 발명에서 사용되는 현장야장으로 측량성과표를 나타낸 것이고, 도 17 내지 20은 도 16을 얻기 위한 캐드도면을 도시한 것이다.
그리고 도 21은 본 발명에서 (1) 받침대설치및우수받이거치단계;의 우수받이 하부의 가변다리를 조절하는 과정을 도시한 것이다.
상기 (1) 받침대설치및우수받이거치단계;는, 사전에 캐드를 이용하여 상기 우수받이(80)의 설치높이와 설치위치가 표기된 측량성과표를 작성하여, 상기 측량성과표에 맞추어 상기 받침대(100)의 프레임(105) 하부에 설치된 가변다리(90)로 높이를 조정하고, 상기 우수받이(80)를 양중하여 상기 받침대(100) 상부에 거치한 후 상기 우수받이(80) 상단에 형성된 측량구(81)에 GPS수신기(50) 또는 프리즘반사경(60)을 설치하여 상기 우수받이(80)의 정확한 설치높이와 설치위치를 조절하되 상기 프레임(105) 상부에 설치된 상부판(107)이 상기 프레임(105) 상부에 설치된 롤러(102)를 활주하여 조절되는 것을 특징으로 한다.
도 15는 도 14에서 프리즘반사경을 설치하는 과정을 도시한 것이다.
그리고 도 4는 본 발명에 사용되는 GPS수신기의 분해사시도이고, 도 5는 도 4의 결합사시도이며, 도 6은 본 발명에 사용되는 프리즘반사경의 분해사시도이고, 도 7은 도 6의 결합사시도이다.
상기 GPS수신기(50)는 수신부(51) 하부에 선단이 테이퍼형상으로 형성된 지지봉(52)이 부착되며, 상기 지지봉(52)이 슬롯(58)이 형성된 지지판(57)을 관통하여 상기 지지봉(52) 선단을 상기 우수받이(80)의 측량구(81)에 일치시킨다. 상기 슬롯(58)에는 돌출봉(53)이 지지봉(52)으로 끼워져 상기 지지봉(52)의 상기 지지판(57)으로부터의 이탈을 방지하고 상기 슬롯(58) 상에서 상하운동이 가능하도록 한다.
상기 수신부(51) 또는 상기 지지판(57)에는 수준기(54)를 부착하며, 상기 지지판(57)에는 3개의 위치조절구(55)가 설치되어 상기 수준기(54)에 맞추어 레벨링이 가능하게 한다. 우수받이(80) 상부면이 불규칙할 경우를 대비하여 받침판(56)을 추가로 구성할 수 있다.
상기 프리즘반사경(60)은 상기 GPS수신기(50)와 거의 같은 기능과 부재로 구성되며, 구체적으로 수준기(61), 본체(62), 지지봉(63), 돌출봉(64), 지지판(66), 슬롯(67) 및 위치조절구(65) 등으로 구성된다.
도 22는 본 발명에서 (1) 받침대설치및우수받이거치단계;의 받침대를 제거하는 과정을 도시한 것이며, 도 23 및 24는 본 발명에서 (1) 받침대설치및우수받이거치단계;의 베이스콘크리트거푸집(F)을 설치하고 베이스콘크리트(BC)를 타설하는 과정을 도시한 것이다.
도 25는 본 발명에서 (2) 보조기층포설단계;를 개념적으로 도시한 것이고, 도 26 및 27은 본 발명에서 (2) 경계석높이결정단계;의 측량봉 설치를 도시한 것이다.
본 발명의 (2) 보조기층포설단계;는 상기 우수받이(80) 상부에 임시뚜껑(70)을 설치하고 상기 뚜껑(70)을 덮도록 보조기층(G1)을 포설하는 단계를 말한다. 구체적으로 상기 보조기층(G1)보다 7cm 낮은 임시뚜껑(70)의 손잡이에 리본을 결속선에 결합하여 7cm로 결속선을 구부린 후 모든 임시뚜껑(70) 손잡이에 고정시키고 이를 기준으로 보조기층면을 그레이더와 롤러로 포설 및 다짐을 하는 것을 특징으로 한다.
본 발명의 (3) 경계석높이결정단계;는 상기 우수받이(80) 상단에서 상부로 상기 경계석(160)이 설치될 높이를 결정하는 단계를 말한다.
상기 (3) 경계석높이결정단계;는, 상기 임시뚜껑(70)을 제거하고 상기 우수받이(80) 상단에 형성된 측량구(81)에 측량봉(130)을 설치하며, 상기 보조기층(G1) 상부로 노출된 상기 측량봉(130) 상단에 상기 경계석(160)의 설치높이를 리본 등으로 표시하는 것을 특징으로 한다. 구체적으로 보조기층(G1)을 완료한 후 임시뚜껑(70)을 제거하고 경계석 선형에 맞추어진 측량구(81) 1개소에 측량봉(130)을 고정하여 우수받이(80) 상면에서 일률적으로 42cm 높이에 리본을 결합한 후 실로 연결하여 경계석높이를 결정하는 것을 특징으로 한다.
도 28은 본 발명에 사용되는 T형판 및 경계석받침대의 분해사시도이고, 도 29는 도 28의 결합사시도이며, 도 30 및 31은 본 발명에서 (4) 경계석받침대및T형판설치단계;에 사용되는 곡선구간계산표를 도시한 것이다.
그리고 도 32는 캐드도면 상에서 곡선구간을 경계석 길이로 구획하고 접선방향으로 표기한 것이고, 도 33은 도 32에 의거하여 경계석받침대와 T형판을 배치한 개념도이다.
본 발명의 (4) 경계석받침대및T형판설치단계;는 상기 경계석(160)을 하부에서 지지할 다수개의 경계석받침대(150)와 상기 다수개의 경계석받침대(150) 상호간을 연결하는 다수개의 T형판(140)을 상기 보조기층(G1) 상부에 설치하는 단계를 말한다.
상기 (4) 경계석받침대및T형판설치단계;는, 사전에 캐드를 이용하여 산출된 결과를 이용하여 상기 측량봉(130)으로부터 소정거리 이격하여 상기 경계석받침대(150)와 상기 T형판(140)을 설치하되,
곡선구간의 경우, 사전에 캐드를 이용하여 산출된 곡선구간계산표에 의거하여 일단이 상기 경계석받침대(150)에 설치된 상기 T형판(140)의 타단을 접선방향에서 소정거리 이격시키는 것을 특징으로 한다. 구체적으로 경계석받침대(150)를 T형판(140)에 결합하여 일정한 간격으로 연속적으로 설치하며, 곡선구간계산표에 의하여 보조기구와 휴대용 자를 이용하여 손쉽게 설치할 수 있는 것을 특징으로 한다.
도 28 및 29에 도시된 바와 같이, 상기 T형판(140)은 장변부(141)와 상기 장변부(141) 타단에 직교하는 단변부(142)로 구성되되, 상기 장변부(143) 일단과 상기 단변부(142) 양단에는 지지봉(120)의 상단이 삽입되는 돌출부삽입구멍(143)이 형성된다.
상기 경계석받침대(150)는 삼각형의 지지판(155)과 상기 지지판(155)의 단부에 결합되는 3개의 지지봉(120)으로 구성된다.
도 11은 본 발명에 사용되는 지지봉의 분해사시도이고, 도 12는 본 발명에 사용되는 지지봉의 다른 실시예의 분해사시도이다.
도 11에 도시된 바와 같이, 상기 지지봉(120)은 돌기관통홀(121`)이 형성된 조정너트(121), 돌출부(123`)가 형성된 조정봉(123), 상부나선(125`)과 하부나선(125``)이 형성된 지지봉본체(125), 나사(SB) 및 와서(W), 캡너트(127), 패드(128) 및 나사결합부(129`)가 형성된 소켓(129) 등으로 구성된다.
또한 도 12에 도시된 바와 같이, 상기 조정봉(123)과 상기 조정너트(121)를 일체로 형성한 개념인 상부조절체(122)를 구성할 수 있다.
도 34는 본 발명에서 (5) 경계석설치단계;를 도시한 것이고, 도 35는 도 34에서 지지봉을 이용하여 높이를 조절하는 과정을 도시한 것이다.
본 발명의 (5) 경계석설치단계;는 상기 경계석받침대(150) 상부에 상기 경계석(160)을 다수개 양중하여 거치하는 단계를 말한다.
상기 (5) 경계석설치단계;에서, 상기 경계석받침대(150)는 삼각형의 지지판(120)과 상기 지지판(120)의 코너에 설치되는 3개의 지지봉(120)으로 구성되되, 상기 지지봉(120)의 회전운동으로 높이를 조절하고 구면운동이 가능한 캡너트(127)와 소켓(129)으로 불규칙한 보조기층(G1)의 표면에 대응하되 상기 경계석(160)이 거치되면 상기 캡너트(127)와 상기 소켓(129) 사이의 패드(128)에 마찰력이 발생하여 움직임이 없는 것을 특징으로 한다.
도 36은 본 발명에서 (6) 측구거푸집설치단계;를 도시한 것이다.
상기 (6) 측구거푸집설치단계;는 사람이 보행하는 인도의 하부로써 우수를 집수하여 상기 우수받이(80)로 배수할 측구(180)를 형성하기 위하여 측구공간(176)을 수용하도록 다수개의 거푸집지지대(170) 및 다수개의 거푸집본체(175)를 설치하는 단계를 말한다.
상기 거푸집지지대(170)는 고정나사(171), 조절수단(172), 지지프레임(173) 등으로 구성되고, 마주보는 거푸집지지대(170) 상호간에는 프레타이(190)로 연결되며,
구체적인 설명은 본 발명의 출원인이 대한민국에서 출원중인 출원번호 10-2014-0068626 ‘도로 경계석 시공을 위한 거푸집 기구’ 및 출원번호 10-2014-0068627 ‘도로 경계석 시공방법’으로 갈음한다.
도 37은 본 발명에서 (7) 측구콘크리트타설단계;를 도시한 것이다.
상기 (7) 측구콘크리트타설단계;는 상기 측구공간(176)에 콘크리트를 타설하고 양생하여 상기 측구(180)를 형성하는 단계를 말한다.
도 38은 본 발명에서 (8) 측구거푸집해체단계; 후에 최종 완성된 상태를 도시한 것이다.
상기 (8) 측구거푸집해체단계는 상기 거푸집지지대(170) 및 상기 거푸집본체(175)를 해체하는 단계를 말한다.
결론으로,
본 발명은 도로변에 설치되는 우수받이 및 도로 경계석을 시공하기 위한 것으로, 모든 부재를 사전제작하여 모듈화 시키고 시공현장에서 미숙련공도 계측된 표에 의해 기계적으로 정확한 품질로 시공할 수 있어 시공성 및 경제성이 향상되며, 특히 곡선구간에서 정확한 곡선으로 시공되어 미관이 우수한 우수받이를 기반으로 한 개량형 도로 경계석 시공방법을 제공하는 장점이 있다.
본 발명은 상기에서 언급한 바와 같이 바람직한 실시예와 관련하여 설명되었으나, 본 발명의 요지를 벗어남이 없는 범위 내에서 다양한 수정 및 변형이 가능하며, 다양한 분야에서 사용 가능하다. 따라서 본 발명의 청구범위는 이건 발명의 진정한 범위 내에 속하는 수정 및 변형을 포함한다.
본 발명은 도로변에 설치되는 우수받이 및 도로 경계석을 시공하기 위한 것으로, 모든 부재를 사전제작하여 모듈화 시키고 시공현장에서 미숙련공도 계측된 표에 의해 기계적으로 정확한 품질로 시공할 수 있어 시공성 및 경제성이 향상되며, 특히 곡선구간에서 정확한 곡선으로 시공되어 미관이 우수한 우수받이를 기반으로 한 개량형 도로 경계석 시공방법에 관한 것이다.

Claims (5)

  1. 도로변의 굴착지반(G)과 보조기층(G1)에 각각 우수받이(80) 및 경계석(160)을 설치하기 위한 방법으로,
    (1) 상기 우수받이(80)가 설치될 레벨로 지반을 굴착하여 상기 굴착지반(G)을 형성하고 상기 굴착지반(G)에 받침대(100)를 거치한 후 상기 우수받이(80)를 양중하여 상기 받침대(100) 상부에 계측된 위치에 거치하는 받침대설치및우수받이거치단계;
    (2) 상기 우수받이(80) 상부에 임시뚜껑(70)을 설치하고 상기 뚜껑(70)을 덮도록 보조기층(G1)을 포설하는 보조기층포설단계;
    (3) 상기 우수받이(80) 상단에서 상부로 상기 경계석(160)이 설치될 높이를 결정하는 경계석높이결정단계;
    (4) 상기 경계석(160)을 하부에서 지지할 다수개의 경계석받침대(150)와 상기 다수개의 경계석받침대(150) 상호간을 연결하는 다수개의 T형판(140)을 상기 보조기층(G1) 상부에 설치하는 경계석받침대및T형판설치단계;
    (5) 상기 경계석받침대(150) 상부에 상기 경계석(160)을 다수개 양중하여 거치하는 경계석설치단계;
    (6) 사람이 보행하는 인도의 하부로써 우수를 집수하여 상기 우수받이(80)로 배수할 측구(180)를 형성하기 위하여 측구공간(176)을 수용하도록 다수개의 거푸집지지대(170) 및 다수개의 거푸집본체(175)를 설치하는 측구거푸집설치단계;
    (7) 상기 측구공간(176)에 콘크리트를 타설하고 양생하여 상기 측구(180)를 형성하는 측구콘크리트타설단계; 및,
    (8) 상기 거푸집지지대(170) 및 상기 거푸집본체(175)를 해체하는 측구거푸집해체단계;
    를 포함하여 구성되는 것을 특징으로 하는 우수받이를 기반으로 한 개량형 도로 경계석 시공방법.
  2. 제1항에서,
    상기 (1) 받침대설치및우수받이거치단계;는,
    사전에 캐드를 이용하여 상기 우수받이(80)의 설치높이와 설치위치가 표기된 측량성과표를 작성하여,
    상기 측량성과표에 맞추어 상기 받침대(100)의 프레임(105) 하부에 설치된 가변다리(90)로 높이를 조정하고,
    상기 우수받이(80)를 양중하여 상기 받침대(100) 상부에 거치한 후 상기 우수받이(80) 상단에 형성된 측량구(81)에 GPS수신기(50) 또는 프리즘반사경(60)을 설치하여 상기 우수받이(80)의 정확한 설치높이와 설치위치를 조절하되 상기 프레임(105) 상부에 설치된 상부판(107)이 상기 프레임(105) 상부에 설치된 롤러(102)를 활주하여 조절되는 것을 특징으로 하는 우수받이를 기반으로 한 개량형 도로 경계석 시공방법.
  3. 제1항 또는 제2항에서,
    상기 (3) 경계석높이결정단계;는,
    상기 임시뚜껑(70)을 제거하고 상기 우수받이(80) 상단에 형성된 측량구(81)에 측량봉(130)을 설치하며, 상기 보조기층(G1) 상부로 노출된 상기 측량봉(130) 상단에 상기 경계석(160)의 설치높이를 표시하는 것을 특징으로 하는 우수받이를 기반으로 한 개량형 도로 경계석 시공방법.
  4. 제3항에서,
    상기 (4) 경계석받침대및T형판설치단계;는,
    사전에 캐드를 이용하여 산출된 결과를 이용하여 상기 측량봉(130)으로부터 소정거리 이격하여 상기 경계석받침대(150)와 상기 T형판(140)을 설치하되,
    곡선구간의 경우,
    사전에 캐드를 이용하여 산출된 곡선구간계산표에 의거하여 일단이 상기 경계석받침대(150)에 설치된 상기 T형판(140)의 타단을 접선방향에서 소정거리 이격시키는 것을 특징으로 하는 우수받이를 기반으로 한 개량형 도로 경계석 시공방법.
  5. 제4항에서,
    상기 (5) 경계석설치단계;에서,
    상기 경계석받침대(150)는 삼각형의 지지판(120)과 상기 지지판(120)의 코너에 설치되는 3개의 지지봉(120)으로 구성되되,
    상기 지지봉(120)의 회전운동으로 높이를 조절하고 구면운동이 가능한 캡너트(127)와 소켓(129)으로 불규칙한 보조기층(G1)의 표면에 대응하되 상기 경계석(160)이 거치되면 상기 캡너트(127)와 상기 소켓(129) 사이의 패드(128)에 마찰력이 발생하여 움직임이 없는 것을 특징으로 하는 우수받이를 기반으로 한 개량형 도로 경계석 시공방법.
PCT/KR2016/001785 2015-02-27 2016-02-24 우수받이를 기반으로 한 개량형 도로 경계석 시공방법 WO2016137218A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020150028211A KR101550398B1 (ko) 2015-02-27 2015-02-27 우수받이를 기반으로 한 개량형 도로 경계석 시공방법
KR10-2015-0028211 2015-02-27

Publications (1)

Publication Number Publication Date
WO2016137218A1 true WO2016137218A1 (ko) 2016-09-01

Family

ID=54247364

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2016/001785 WO2016137218A1 (ko) 2015-02-27 2016-02-24 우수받이를 기반으로 한 개량형 도로 경계석 시공방법

Country Status (2)

Country Link
KR (1) KR101550398B1 (ko)
WO (1) WO2016137218A1 (ko)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11536017B2 (en) 2016-10-26 2022-12-27 Envirokeeper, LLC Modular precast concrete water storage device and system

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101715093B1 (ko) * 2016-06-21 2017-03-22 주식회사 디컨스이엔지 도로의 우수받이 시공방법
KR101723132B1 (ko) * 2016-07-01 2017-04-05 주식회사 디컨스이엔지 거치용 바이스를 이용한 개량형 도로 경계석 시공방법

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005023652A (ja) * 2003-07-02 2005-01-27 Mitsubishi Plastics Ind Ltd 宅内排水枡
KR200461355Y1 (ko) * 2012-05-25 2012-07-12 최낙훈 경계석 받침대
KR200462716Y1 (ko) * 2012-07-02 2012-09-26 이학재 도로 경계석 시공장치
KR101301038B1 (ko) * 2013-03-18 2013-08-28 (주)아록이엔지 타 도로 경계석과의 결합이 용이한 배수용 도로 경계석
KR101318957B1 (ko) * 2010-08-25 2013-10-16 주식회사 정림건축종합건축사사무소 강도 보강형 집수정 및 집수정 설치 방법

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005023652A (ja) * 2003-07-02 2005-01-27 Mitsubishi Plastics Ind Ltd 宅内排水枡
KR101318957B1 (ko) * 2010-08-25 2013-10-16 주식회사 정림건축종합건축사사무소 강도 보강형 집수정 및 집수정 설치 방법
KR200461355Y1 (ko) * 2012-05-25 2012-07-12 최낙훈 경계석 받침대
KR200462716Y1 (ko) * 2012-07-02 2012-09-26 이학재 도로 경계석 시공장치
KR101301038B1 (ko) * 2013-03-18 2013-08-28 (주)아록이엔지 타 도로 경계석과의 결합이 용이한 배수용 도로 경계석

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11536017B2 (en) 2016-10-26 2022-12-27 Envirokeeper, LLC Modular precast concrete water storage device and system

Also Published As

Publication number Publication date
KR101550398B1 (ko) 2015-09-08

Similar Documents

Publication Publication Date Title
WO2016137218A1 (ko) 우수받이를 기반으로 한 개량형 도로 경계석 시공방법
CN210031842U (zh) 基于排桩、连系梁和对拉锚索的相临深基坑联合支护体系
KR100654170B1 (ko) 도로경계석 시공장치
CN113152262A (zh) 一种桥梁独柱墩加固施工方法
KR102273901B1 (ko) 철도 콘크리트 도상의 보수시공방법
JP3983415B2 (ja) 測量器械の据付架台および測量方法
EP1156160A1 (en) A canopy
JP6901654B2 (ja) 片持ちばり式擁壁の敷設方法
KR20090070852A (ko) 보차도 경계석 시공방법 및 장치
JP3178545U (ja) 敷きモルタルのレベル調整装置。
KR101591802B1 (ko) 개량형 맨홀구조를 이용한 도로의 시공방법
KR101715093B1 (ko) 도로의 우수받이 시공방법
JP2009161961A (ja) 側溝及び側溝施工方法
CN213538591U (zh) 一种混凝土假缝传力杆托架
CN212866842U (zh) 一种框构式建筑脚手架
CN209741907U (zh) 一种综合管廊集水坑钢格栅安装结构
KR101723132B1 (ko) 거치용 바이스를 이용한 개량형 도로 경계석 시공방법
KR101814755B1 (ko) 경계석용 개량형 거치바이스 및 이를 이용한 경계석 시공방법
CN114439291A (zh) 柱式检查坑现浇混凝土轨道立柱及施工方法
KR101010334B1 (ko) 조립식 삼각 측량 기준점 표시장치
CN220132673U (zh) 一种组合式仿石材路缘石
WO2018194279A1 (ko) 현장 타설 팽이말뚝 기초 및 이의 시공방법
KR20120019043A (ko) 보차도 경계석 시공용 거푸집 및 그를 이용한 보차도 경계석 시공 방법
JPH0885959A (ja) 建物基礎の施工方法
CN213952224U (zh) 超长钢护筒埋设用导向架

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16755868

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16755868

Country of ref document: EP

Kind code of ref document: A1